Prefabricated UHPC component encircling sleeve

Through the combined structure of the clip and fixture, the problems of excessive concentrated stress and custom punching in the connection of prefabricated UHPC components are solved, and a high-strength joint and easy-to-maintenance installation method is realized. It is suitable for UHPC components with high thickness requirements.

CN222333160UInactive Publication Date: 2025-01-10SHENYANG JIANZHU UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420762152.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2025-01-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing prefabricated UHPC component connection method is difficult to control when the structural thickness is required to be thicker, the concentration stress is too high, and holes are required or customized, so the general plate cannot be used.

Method used

Using a combined structure of card parts and fixing parts, the card parts are fixed to the outer wall of the connecting part through the card slot, the anchor rod is fixed to the building wall, and the connecting block is inserted into the connecting groove of the card parts, and the concentrated stress problem is solved by fixing multiple card parts. , no additional punching or customization is required.

Benefits of technology

It realizes high-strength jointing, high degree of freedom, easy maintenance and strong tensile resistance, avoids drilling and customization, and improves installation stability and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222333160U_ABST
    Figure CN222333160U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of prefabricated components, and discloses a prefabricated UHPC component enclosure which comprises a UHPC component body, and connecting parts are integrally arranged at the upper end and the lower end of the back of the UHPC component body. The clamping piece is arranged on the outer wall of the connecting part, a clamping groove matched with the connecting part is formed in the front side of the clamping piece, and a connecting groove is formed in the rear side of the clamping piece; according to the prefabricated UHPC component encircling sleeve, the clamping piece is fixed to the outer wall of the connecting part through the clamping groove in the front side of the clamping piece, after fixing is completed, the clamping piece is fixed to the outer wall of the connecting part through the clamping groove in the front side of the clamping piece, and the fixing piece is fixed to the outer wall of the connecting part through the clamping groove in the front side of the clamping piece. The anchor rod on the front side of the fixing piece is fixed into the building wall face needing to be installed, the connecting block on the front side of the fixing piece is inserted into the connecting groove in the rear side of the clamping piece, the problem that concentrated stress is too large is solved through the fixing mode of the multiple clamping pieces, and meanwhile additional punching and customization are not needed due to the fact that the clamping pieces are matched with the connecting parts.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of prefabricated components, in particular to a prefabricated UHPC component sleeve. Background Art

[0002] Ultra-high performance concrete, referred to as UHPC (Ultra-High Performance Concrete), is the most innovative cement-based engineering material in the past thirty years, achieving a great leap in the performance of engineering materials. UHPC is the most durable engineering material. The mechanical properties of properly reinforced UHPC are close to those of steel structures. At the same time, UHPC has excellent wear resistance and explosion resistance. Therefore, UHPC is particularly suitable for large-span bridges, explosion-proof structures (military projects, bank vaults, etc.) and thin-walled structures, as well as for use in highly abrasive and highly corrosive environments.

[0003] In the prior art, back-bolt connection, slot connection, pin connection and sheet connection are generally used for prefabricated UHPC components. The back-bolt connection method has the problem that when the structure thickness is required to be thicker, the quality is difficult to control and the concentrated stress is too large. The slot connection method cannot use universal plates and needs to customize UHPC according to the size. The pin connection and sheet connection have the problem of drilling and slotting in the UHPC plate. In order to solve the above problems, a prefabricated UHPC component sleeve is proposed. Utility Model Content

[0004] The purpose of the utility model is to provide a prefabricated UHPC component sleeve in order to solve the above problems.

[0005] The technical solution adopted by the utility model is as follows: a prefabricated UHPC component sleeve, comprising:

[0006] The UHPC component body has connecting parts integrally arranged at both the upper and lower ends of the back;

[0007] A clamping member is arranged on the outer wall of the connecting portion, a clamping slot matching the connecting portion is opened on the front side of the clamping member, and a connecting slot is opened on the rear side of the clamping member;

[0008] The fixing piece is fixedly installed in the connection groove by means of bolts, a connection block is integrally arranged on the front side of the fixing piece, and an anchor rod is arranged inside the fixing piece.

[0009] Through the above technical solution, when installing the UHPC component, the clamp is first fixed to the outer wall of the connection part through the clamping groove on the front side thereof. After the fixing is completed, the anchor rod on the front side of the fixing part is fixed to the inside of the building wall to be installed. After the fixing part is installed, the connecting block on the front side of the fixing part is inserted into the connecting groove on the rear side of the clamp, so as to install the UHPC component body. The problem of excessive concentrated stress is solved by fixing with multiple clamps. At the same time, the setting of the clamp in conjunction with the connection part is adopted, and no additional drilling and customization are required.

[0010] In a preferred embodiment, locking holes are provided at both upper and lower ends of the clamping member on one side close to the connecting groove.

[0011] Through the above technical solution, when the connecting block enters the connecting groove, the bolt locks the two through the locking hole.

[0012] In a preferred embodiment, an adjustment groove is provided inside the connection block, and one side of the anchor rod is located inside the adjustment groove.

[0013] Through the above technical solution, the anchor rod can be easily adjusted through the adjustment slot.

[0014] In a preferred embodiment, the connecting portion and the slot are both dovetail structures.

[0015] Through the above technical solution, the structure has the advantages of high-strength joint, high degree of freedom, easy maintenance and strong tensile strength.

[0016] In a preferred embodiment, the clamping member and the fixing member are both made of aluminum alloy.

[0017] In a preferred embodiment, the inner wall of the slot is provided with friction patterns.

[0018] Through the above technical solution, the friction between the clamp and the connecting part is improved, preventing the component from shaking after being fixed.

[0019] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are as follows: the utility model provides a prefabricated UHPC component sleeve.

[0020] The clamp is fixed to the outer wall of the connection part through the clamping groove on the front side thereof. After the fixing is completed, the anchor rod on the front side of the fixing part is fixed to the inside of the building wall to be installed. After the fixing part is installed, the connecting block on the front side of the fixing part is inserted into the connecting groove on the rear side of the clamp, so as to install the UHPC component body. The problem of excessive concentrated stress is solved by fixing with multiple clamps. At the same time, the setting of the clamp in conjunction with the connection part is adopted, and no additional drilling and customization are required. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of the utility model;

[0022] Figure 2 It is a structural schematic diagram of the clamp in the utility model;

[0023] Figure 3 It is a structural schematic diagram of the fixing member in the utility model.

[0024] Markings in the figure: 1-UHPC component body; 11-connecting part; 2-clamp; 21-clamping slot; 22-connecting slot; 23-locking hole; 3-fixing piece; 31-connecting block; 32-adjusting slot; 33-anchor rod. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model will be clearly and completely described below in combination with the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] The following will be combined Figure 1-2 A prefabricated UHPC component sleeve according to an embodiment of the utility model is described in detail.

[0027] Example:

[0028] A prefabricated UHPC component casing, comprising:

[0029] The UHPC component body 1 has connection parts 11 integrally provided at both upper and lower ends of the back;

[0030] The clamp 2 is arranged on the outer wall of the connecting part 11. A clamping groove 21 adapted to the connecting part 11 is provided on the front side of the clamp 2. Both the connecting part 11 and the clamping groove 21 are dovetail structures, which have the advantages of high-strength connection, high degree of freedom, easy maintenance and strong tensile strength. The inner wall of the clamping groove 21 is provided with friction lines to increase the friction between the clamp 2 and the connecting part 11 and prevent the component from shaking after being fixed. When installing the UHPC component, the clamp 2 is first fixed to the outer wall of the connecting part 11 through the clamping groove 21 on the front side thereof;

[0031] A connecting groove 22 is provided at the rear side of the clamp 2, and locking holes 23 are provided at both upper and lower ends of the clamp 2 near the connecting groove 22. When the connecting block 31 enters the connecting groove 22, the bolts lock the two together through the locking holes 23.

[0032] The fixing part 3 is fixedly installed in the connecting groove 22 by bolts. The clamping part 2 and the fixing part 3 are both made of aluminum alloy. A connecting block 31 is integrally provided on the front side of the fixing part 3. An anchor rod 33 is provided inside the fixing part 3. An adjusting groove 32 is opened inside the connecting block 31. One side of the anchor rod 33 is located inside the adjusting groove 32. The adjusting groove 32 is convenient for adjusting the anchor rod 33. After the fixing is completed, the anchor rod 33 on the front side of the fixing part 3 is fixed to the inside of the building wall to be installed. After the fixing part 3 is installed, the connecting block 31 on the front side of the fixing part 3 is inserted into the connecting groove 22 on the rear side of the clamping part 2, so as to install the UHPC component body 1. The problem of excessive concentrated stress is solved by fixing with multiple clamping parts 2. At the same time, the clamping part 2 is used in conjunction with the connection part 11, and no additional drilling and customization are required.

[0033] Working principle:

[0034] First, fix the clamp 2 to the outer wall of the connecting portion 11 through the clamping groove 21 on the front side thereof. After the fixing is completed, fix the anchor rod 33 on the front side of the fixing member 3 to the inside of the building wall to be installed. After the fixing member 3 is installed, insert the connecting block 31 on the front side of the fixing member 3 into the connecting groove 22 on the rear side of the clamp 2, so as to install the UHPC component body 1. The problem of excessive concentrated stress is solved by fixing multiple clamps 2. At the same time, the clamp 2 is used in conjunction with the setting of the connecting portion 11, and no additional drilling and customization are required.

[0035] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A prefabricated UHPC component casing, characterized in that: include: A UHPC component body (1), with connecting parts (11) integrally provided at both upper and lower ends of the back; A clamping member (2) is arranged on the outer wall of the connecting portion (11), a clamping slot (21) adapted to the connecting portion (11) is provided on the front side of the clamping member (2), and a connecting slot (22) is provided on the rear side of the clamping member (2); A fixing member (3) is fixedly installed in the connection groove (22) by means of bolts, a connection block (31) is integrally provided on the front side of the fixing member (3), and an anchor rod (33) is provided inside the fixing member (3).

2. A prefabricated UHPC component jacket according to claim 1, characterized in that: The clamp (2) is provided with locking holes (23) at both upper and lower ends of a side close to the connection groove (22).

3. A prefabricated UHPC component jacket according to claim 1, characterized in that: The connection block (31) is provided with the adjustment groove (32) inside, and one side of the anchor rod (33) is located inside the adjustment groove (32).

4. A prefabricated UHPC component jacket according to claim 1, characterized in that: The connecting portion (11) and the clamping slot (21) are both dovetail structures.

5. A prefabricated UHPC component jacket according to claim 1, characterized in that: The clamping piece (2) and the fixing piece (3) are both made of aluminum alloy.

6. A prefabricated UHPC component jacket according to claim 1, characterized in that: The inner wall of the clamping slot (21) is provided with friction patterns.