Stone crusher for civil engineering
By introducing auxiliary crushing mechanisms and dust removal components into the stone crusher, the problems of stone stuck and dust pollution in the stone crusher are solved, and the crushing effect and the quality of the working environment are improved.
Patent Information
- Application Number
- CN202420435064.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-06
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-03-06
AI Technical Summary
The existing stone crushers have major problems such as stone jamming, crushing difficulties and dust pollution in the process of graveling, which affects work efficiency and the environment.
A stone crusher for civil engineering was designed, using auxiliary crushing mechanisms and dust removal components. The auxiliary crushing mechanism moves in the crushing chamber through the auxiliary crushing rod to adjust the position of the stone for crushing; the dust removal component passes through the dust collection plate, dust filter net and dust cleaning door, combined with the function of the fan to reduce dust.
It improves the crushing effect of the stone crusher, reduces the dust during crushing of stones, and improves the working environment and work efficiency.
Smart Images

Figure CN222490176U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of stone crushing equipment, in particular to a stone crusher for civil engineering. Background Art
[0002] Civil engineering stone crusher is a kind of mechanical equipment specially used for processing stone. It is mainly used to crush and subdivide large rocks or stones to meet the different specifications of stones required in construction, road, railway and other engineering projects.
[0003] At present, the crusher usually adopts the jaw crushing method when in use. The motor drives the belt and drives the eccentric shaft to rotate, so that the swing jaw plate in the jaw crushing chamber moves up and down, thereby completing the crushing process of the material.
[0004] In the actual stone crushing process of the above-mentioned stone crusher, there are still the following problems:
[0005] 1. When crushing stones, some larger stones will be stuck above the crushing chamber, which makes it difficult to bear the force and takes a long time to crush. Sometimes the staff also needs to adjust the force crushing position of the stone;
[0006] 2. During the stone crushing process, the stone will generate a lot of dust, which will not only affect the workers' observation of the stone crushing status, but also pollute the on-site stone crushing environment;
[0007] In summary, there is a need for a stone crusher for civil engineering with less dust and better stone crushing effect. Utility Model Content
[0008] In view of the deficiencies in the prior art, the utility model provides a stone crusher for civil engineering, which solves the problems mentioned in the background technology.
[0009] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
[0010] A stone crusher for civil engineering, comprising a stone crushing box and a stone crushing mechanism, the stone crushing box comprising a box body, a stone crushing mechanism is arranged on the top of the inner side of the box body, a crushing chamber is arranged above the stone crushing mechanism, an auxiliary crushing mechanism for assisting stone crushing is arranged on the side of the box body, a discharge hopper is arranged on the bottom of the box body, a discharge port is arranged on the side of the discharge hopper, a dust collecting component is arranged on the side of the discharge hopper away from the discharge port, and a dust removing component for removing dust is arranged above the dust collecting component;
[0011] The auxiliary crushing mechanism includes an auxiliary crushing box, an auxiliary crushing rod, a motor, a driving plate and a driving rod. The auxiliary crushing box is arranged on the side of the box body, an auxiliary crushing rod is arranged on the top of the inner side of the auxiliary crushing box, one end of the auxiliary crushing rod penetrates into the inner side of the box body, a motor is arranged below the other end of the auxiliary crushing rod, a driving rod is arranged at the output end of the motor, a driving plate is arranged on the outer side of the driving rod, the driving rod is threadedly connected to the driving plate, the top of the driving plate is fixedly connected to the outer side of the auxiliary crushing rod, and the auxiliary crushing rod is engaged and slid with the auxiliary crushing box and the box body.
[0012] Furthermore, a reinforcement rod is provided inside the auxiliary crushing box, the reinforcement rod is located below the auxiliary crushing box, and the auxiliary crushing rod is engaged and slidably engaged with the reinforcement rod.
[0013] Furthermore, the auxiliary crushing mechanism is mirror-distributed on the outside of the box body, and one end of the auxiliary crushing box located inside the box body is in an arc-shaped structure.
[0014] Furthermore, the stone crushing mechanism includes a fixed jaw, a driving device and a movable jaw. The fixed jaw and the driving device are both arranged on the top inner side of the box body, and a movable jaw is provided on the side of the driving device facing the fixed jaw.
[0015] Furthermore, the dust collecting assembly includes a dust collecting plate, a dust filter and a dust cleaning door. The dust collecting plate is arranged on the side of the discharge hopper, the dust filter is arranged on the bottom and side of the dust collecting plate, and the dust cleaning door is arranged on the front and rear sides of the dust collecting plate.
[0016] Furthermore, the dust removal assembly includes a dust removal box, a fan and a dust outlet plate. The dust removal box is arranged inside the box body, and the dust removal box is located below the stone crushing mechanism. A fan is arranged inside the dust removal box. A dust inlet is opened at one end of the dust removal box, and a dust outlet plate is arranged at the other end of the dust inlet. A dust outlet is opened inside the dust outlet plate, and the dust outlet is arranged to be downwardly inclined.
[0017] The utility model provides a stone crusher for civil engineering. Compared with the prior art, it has the following beneficial effects:
[0018] Through the auxiliary crushing mechanism arranged on the side of the crushing box, when it is difficult to crush large stones inside the crushing chamber, the auxiliary crushing rod can be controlled to move in the crushing chamber and the position of the stone can be adjusted so that the stone can be better crushed by force, thereby improving the crushing effect of the crusher. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1The utility model shows a structural schematic diagram of a stone crusher for civil engineering;
[0021] Figure 2 The internal structure schematic diagram of the box body of the utility model is shown;
[0022] Figure 3 The schematic diagram of the structure of the auxiliary crushing mechanism of the utility model is shown;
[0023] Figure 4 The structure diagram of the dust removal assembly of the utility model is shown;
[0024] As shown in the figure: 1. Crushing box; 11. Box body; 12. Crushing chamber; 13. Discharging hopper; 14. Discharging port; 2. Crushing mechanism; 21. Fixed jaw plate; 22. Driving device; 23. Movable jaw plate; 3. Auxiliary crushing mechanism; 31. Auxiliary crushing box; 32. Auxiliary crushing rod; 33. Motor; 34. Driving plate; 35. Driving rod; 36. Reinforcement rod; 4. Dust collecting assembly; 41. Dust collecting plate; 42. Dust filter; 43. Dust cleaning door; 5. Dust removal assembly; 51. Dust removal box; 52. Fan; 53. Dust discharge plate; 54. Dust outlet; 55. Dust inlet. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model is described clearly and completely. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] Embodiment 1
[0027] In order to solve the technical problems in the background technology, a stone crusher for civil engineering is provided as follows:
[0028] Combination Figure 1-Figure 4As shown, the utility model provides a stone crusher for civil engineering, including a stone crushing box 1 and a stone crushing mechanism 2. The stone crushing box 1 includes a box body 11, a stone crushing mechanism 2 is arranged on the top of the inner side of the box body 11, a crushing chamber 12 is arranged above the stone crushing mechanism 2, an auxiliary crushing mechanism 3 for auxiliary stone crushing is arranged on the side of the box body 11, a discharge hopper 13 is arranged on the bottom surface of the box body 11, a discharge port 14 is opened on the side of the discharge hopper 13, a dust collecting component 4 is arranged on the side of the discharge hopper 13 away from the discharge port 14, and a dust removal component 5 for removing dust is arranged above the dust collecting component 4; the auxiliary crushing mechanism 3 includes an auxiliary crushing box 31, an auxiliary crushing rod 32, a motor 33, a driving plate 34 and a driving rod 35, the auxiliary crushing box 31 is arranged on the side of the box body 11, and the auxiliary crushing box 3 An auxiliary crushing rod 32 is provided at the top of the inner side of the box 11, one end of the auxiliary crushing rod 32 penetrates the inner side of the box body 11, a motor 33 is provided below the other end of the auxiliary crushing rod 32, a driving rod 35 is provided at the output end of the motor 33, a driving plate 34 is provided at the outer side of the driving rod 35, the driving rod 35 is threadedly connected with the driving plate 34, the top of the driving plate 34 is fixedly connected with the outer side of the auxiliary crushing rod 32, the auxiliary crushing rod 32 is engaged and slid with the auxiliary crushing box 31 and the box body 11; the motor 33 provided inside the auxiliary crushing box 31 can drive the driving rod 35 to rotate, so that the driving plate 34 can push the auxiliary crushing rod 32; the stones inside the crushing chamber 12 can be pushed by the engagement and sliding of the auxiliary crushing rod 32 and the auxiliary crushing box 31, so as to achieve the purpose of adjusting the position of the stones;
[0029] In this embodiment, a reinforcing rod 36 is provided inside the auxiliary crushing box 31, and the reinforcing rod 36 is located below the auxiliary crushing box 31, and the auxiliary crushing rod 32 is engaged and slid with the reinforcing rod 36; the reinforcing rod 36 provided inside the auxiliary crushing box 31 can improve the stability of the auxiliary crushing rod 32 when moving;
[0030] In this embodiment, the auxiliary crushing mechanism 3 is mirror-distributed outside the box body 11, and the auxiliary crushing box 31 is located inside the box body 11 at one end and has an arc-shaped structure; through the mirror-distributed auxiliary crushing mechanism 3, it is convenient for the auxiliary crushing rod 32 to adjust the stone inside the crushing chamber 12 in two directions;
[0031] In this embodiment, the stone crushing mechanism 2 includes a fixed jaw plate 21, a driving device 22 and a movable jaw plate 23. The fixed jaw plate 21 and the driving device 22 are both arranged on the top of the inner side of the box body 11, and the movable jaw plate 23 is arranged on the side of the driving device 22 facing the fixed jaw plate 21; through the arrangement of the fixed jaw plate 21 and the movable jaw plate 23, the stone entering the crushing chamber 12 can be crushed;
[0032] When the stone crusher is used, the stone to be crushed is first put into the crushing chamber 12, and then the stone crushing mechanism 2 crushes the stone, and the crushed stone falls into the discharge hopper 13, and finally discharged from the stone crusher through the discharge port 14;
[0033] By means of the auxiliary crushing mechanism 3 arranged on the side of the crushing box 1, when it is difficult to crush larger stones inside the crushing chamber 12, the auxiliary crushing rod 32 can be controlled to move in the crushing chamber 12 to adjust the position of the stones so that the stones can be crushed better, thereby improving the crushing effect of the crusher.
[0034] Embodiment 2
[0035] like Figure 1-Figure 4 As shown, based on the above embodiment, this embodiment further provides the following contents:
[0036] In order to enable the stone crusher to achieve the function of suppressing dust, this embodiment provides the following design:
[0037] The dust collecting assembly 4 includes a dust collecting plate 41, a dust filter 42 and a dust cleaning door 43. The dust collecting plate 41 is arranged on the side of the discharge hopper 13. The dust filter 42 is arranged on the bottom and side of the dust collecting plate 41. The dust cleaning door 43 is arranged on the front and rear sides of the dust collecting plate 41. The dust filter 42 arranged inside the dust collecting plate 41 can intercept dust in the passing air. The dust cleaning door 43 is arranged to facilitate the dust removal on the dust filter 42.
[0038] In this embodiment, the dust removal assembly 5 includes a dust removal box 51, a fan 52 and a dust outlet plate 53. The dust removal box 51 is arranged on the inner side of the box body 11, and the dust removal box 51 is located below the stone crushing mechanism 2. A fan 52 is arranged inside the dust removal box 51. A dust inlet 55 is provided at one end of the dust removal box 51, and a dust outlet plate 53 is provided at the other end of the dust inlet 55. A dust outlet 54 is provided inside the dust outlet plate 53, and the dust outlet 54 is arranged downwardly inclined. The fan 52 arranged inside the dust removal box 51 can generate suction at the dust inlet 55. When the crushed stone falls, the flowing air can suck the dust into the dust removal box 51. The dust outlet 54 arranged downwardly inclined can facilitate the delivery of dust-laden air into the inner side of the dust collecting plate 41.
[0039] The working principle and use process of this utility model:
[0040] When using:
[0041] First, the stone to be crushed is put into the crushing chamber 12. At this time, the driving device 22 in the crushing mechanism 2 drives the movable jaw plate 23 to move continuously. The movable jaw plate 23 cooperates with the fixed jaw plate 21 to continuously squeeze the stone in the crushing chamber 12, so that the stone is crushed and falls;
[0042] During the crushing process:
[0043] When the stones are large, the movable jaw plate 23 and the fixed jaw plate 21 have difficulty in bearing force and the stones slip, the motor 33 in the auxiliary crushing mechanism 3 drives the driving rod 35 to rotate, and the rotating driving rod 35 drives the auxiliary crushing rod 32 to move in the box body 11 through the threaded driving plate 34, and the moving auxiliary crushing rod 32 pushes the stones in the crushing chamber 12, adjusts the position of the stones, and facilitates the crushing of the stones;
[0044] When discharging:
[0045] When the crushed stones fall into the discharge hopper 13, the fan 52 in the dust removal component 5 starts working, and the air will enter the dust removal box 51 from the discharge port 14 and the dust inlet 55. The flowing air will take away the dust in the crushed stones. The air will carry the dust through the dust filter 42 of the dust collecting component 4, so that the dust will remain on the inside of the dust filter 42. In this way, the dust flying when the stones are crushed can be reduced, which will affect the situation on site.
[0046] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0047] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A stone crusher for civil engineering, characterized in that: The invention comprises a crushing box (1) and a crushing mechanism (2), wherein the crushing box (1) comprises a box body (11), the crushing mechanism (2) is provided at the top of the inner side of the box body (11), a crushing chamber (12) is provided above the crushing mechanism (2), an auxiliary crushing mechanism (3) for assisting stone crushing is provided on the side of the box body (11), a discharge hopper (13) is provided on the bottom surface of the box body (11), a discharge port (14) is provided on the side of the discharge hopper (13), a dust collecting component (4) is provided on the side of the discharge hopper (13) away from the discharge port (14), and a dust removing component (5) for removing dust is provided above the dust collecting component (4); The auxiliary crushing mechanism (3) comprises an auxiliary crushing box (31), an auxiliary crushing rod (32), a motor (33), a driving plate (34) and a driving rod (35); the auxiliary crushing box (31) is arranged on the side of the box body (11); an auxiliary crushing rod (32) is arranged on the top of the inner side of the auxiliary crushing box (31); one end of the auxiliary crushing rod (32) penetrates the inner side of the box body (11); a motor (33) is arranged below the other end of the auxiliary crushing rod (32); a driving rod (35) is arranged at the output end of the motor (33); a driving plate (34) is arranged on the outer side of the driving rod (35); the driving rod (35) is threadedly connected to the driving plate (34); the top end of the driving plate (34) is fixedly connected to the outer side of the auxiliary crushing rod (32); the auxiliary crushing rod (32) is engaged and slidably engaged with the auxiliary crushing box (31) and the box body (11).
2. A stone crusher for civil engineering according to claim 1, characterized in that: A reinforcing rod (36) is provided inside the auxiliary crushing box (31), the reinforcing rod (36) is located below the auxiliary crushing box (31), and the auxiliary crushing rod (32) is engaged and slidably engaged with the reinforcing rod (36).
3. A stone crusher for civil engineering according to claim 1, characterized in that: The auxiliary crushing mechanism (3) is distributed in a mirror-image manner on the outside of the box body (11), and one end of the auxiliary crushing box (31) located inside the box body (11) is in an arc-shaped structure.
4. A stone crusher for civil engineering according to claim 1, characterized in that: The stone crushing mechanism (2) comprises a fixed jaw plate (21), a driving device (22) and a movable jaw plate (23); the fixed jaw plate (21) and the driving device (22) are both arranged on the top of the inner side of the box body (11); and the movable jaw plate (23) is arranged on the side of the driving device (22) facing the fixed jaw plate (21).
5. A stone crusher for civil engineering according to claim 1, characterized in that: The dust collecting assembly (4) comprises a dust collecting plate (41), a dust filter (42) and a dust cleaning door (43); the dust collecting plate (41) is arranged on the side of the discharge hopper (13); the dust filter (42) is arranged on the bottom and side of the dust collecting plate (41); and the dust cleaning door (43) is arranged on the front and rear sides of the dust collecting plate (41).
6. A stone crusher for civil engineering according to claim 1, characterized in that: The dust removal assembly (5) comprises a dust removal box (51), a fan (52) and a dust outlet plate (53); the dust removal box (51) is arranged inside the box body (11); the dust removal box (51) is located below the stone crushing mechanism (2); a fan (52) is arranged inside the dust removal box (51); a dust inlet (55) is provided at one end of the dust removal box (51); a dust outlet plate (53) is provided at the other end of the dust inlet (55); a dust outlet (54) is provided inside the dust outlet plate (53); and the dust outlet (54) is arranged to be inclined downward.
Citation Information
Cited By
Crushing-induced jaw crusher
KR103012029B1