Digging equipment for water and electricity installation engineering

By designing a chiseling equipment including supporting base plate, water storage tank, pump, mobile plate, mobile rack, rotary shaft and slotted disk, the problem that existing equipment cannot adjust the orientation of the slotted disk is solved, flexible adjustment and efficient chiseling of the slotted disk are achieved, and the grooved processing efficiency and cleanliness of the water and electricity installation project are improved.

CN222681338UActive Publication Date: 2025-03-28HUBEI FANGYU CONSTRUCTION ENGINEERING CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
CN202421254725.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2025-03-28
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

During the ground digging process, the existing digging equipment cannot adaptively adjust the orientation of the slotted disc, resulting in limitations in use and affecting the working treatment of the digging equipment.

Method used

A kind of drilling equipment for hydropower installation engineering is designed, including supporting base plate, water storage tank, water pump, movable plate, mobile rack, rotary shaft and slotted disc. The screw and gear system are driven by the motor to realize the rotation and movement of the slotted disc. The pump and water spray pipe are combined to realize the water spraying and cooling and dust reduction treatment of the slotted disc.

Benefits of technology

It realizes flexible adjustment and efficient drilling of grooved trays, which facilitates grooved treatment in hydropower installation projects, and improves the efficiency and cleanliness of drilling equipment through water spraying and dust reduction treatment.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The utility model relates to the field of hydroelectric installation engineering, in particular to digging equipment for hydroelectric installation engineering, which comprises a supporting bottom plate, a water storage tank mounted at the top of the supporting bottom plate, a water suction pump mounted on the supporting bottom plate and connected with the water storage tank through a water suction pipe, a connecting opening formed in the supporting bottom plate, and a connecting cover arranged at the top of the connecting opening. A first motor is mounted on the connecting side wall, a first screw is arranged on the first motor, a connecting block is connected to the first screw, a moving plate is arranged at the bottom of the connecting block, a moving frame is arranged on the moving plate, a guide rod is arranged at one end of the top of the moving plate, and a moving driving assembly is arranged at the other end of the moving plate; a connecting notch is formed in the movable frame, a fixing frame is arranged on the side wall of the connecting notch, a water spraying pipe is installed on the fixing frame, a rotating shaft is rotationally installed on the connecting notch, a slotting disc is installed on the rotating shaft, the direction of the slotting disc can be effectively, conveniently and adaptively adjusted, and therefore construction treatment of water and electricity installation engineering can be facilitated.