Three-time grouting anchor cable
By introducing three grouting processes into the anchor cable structure, multiple groutings are used to enhance the friction and adhesion between the anchor cable and the solid soil, the existing problem of poor secondary grouting effect is solved, and higher land integrity and anchor cable resistance are achieved, and construction quality is improved.
Patent Information
- Application Number
- CN202421608006.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2034-07-09
AI Technical Summary
The secondary grouting of the existing anchor cable structure has limited effect on improving the integrity of the land and the pull-out resistance of the anchor cable body, and it is difficult to meet the higher requirements of the project construction.
Three grouting anchor cables are used, including the first grouting pipe, the second grouting pipe and the third grouting pipe. Through normal pressure grouting, the first high-pressure grouting and the second high-pressure grouting, the friction and adhesion between the anchor cables and the solid soil are enhanced.
Through three grouting, the integrity of the land and the resistance to pulling of the anchor cable body are significantly improved, the construction quality is improved, and the engineering construction needs can be better met with higher requirements.