Vegetation type bare soil covering ecological brick
Through the composite structure of pre-embedding seed capsules in ecological bricks and adding recycled aggregates to construction waste, the problem of insufficient vegetation coverage and growth rate of existing ecological bricks is solved, and faster vegetation growth and soil and water conservation effects are achieved.
Patent Information
- Application Number
- CN202421525842.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-06-28
AI Technical Summary
The existing ecological brick structure has shortcomings in vegetation coverage and growth rate, which makes environmental recovery take a long time.
Ecological bricks are covered with vegetative bare soil, and composite structure is formed by pre-embedding seed capsules in the nutrient soil matrix and regenerated aggregate of construction waste to the vegetative permeable concrete matrix.
It effectively accelerates the growth rate of vegetation, reduces the risk of soil erosion, and helps soil and water conservation and ecological restoration.
Smart Images

Figure CN222758919U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of ecological bricks, and in particular relates to a vegetative bare soil covered ecological brick. Background Art
[0002] The statements herein merely provide background art related to the present invention and do not necessarily constitute prior art.
[0003] Soil erosion caused by exposed soil or exposed solid waste from construction is a global problem, especially in arid, semi-arid and mountainous areas. At the same time, exposed soil and construction waste are easily washed away by rainfall, leading to soil erosion. This not only weakens the fertility of the land, but may also cause geological disasters such as mudslides and landslides. It is also easy to generate dust, which seriously affects air quality. These dusts may carry harmful substances and pose a threat to human health, especially increasing the risk of respiratory diseases. Exposed land and garbage accumulation areas may destroy local biological habitats and affect ecological diversity. At the same time, these areas are usually unable to grow plants, resulting in vegetation destruction and further deterioration of soil and water conservation functions. It will reduce land productivity, reduce biodiversity, and may lead to desertification. Soil and water conservation is essential for the sustainable development of agriculture and forestry, which can not only increase crop yields and forest coverage, but also protect natural resources.
[0004] In order to achieve mine reclamation and ecological restoration, restore the damaged ecosystem, and rebuild a stable soil structure and vegetation coverage, this can be achieved by laying ecological bricks. There are many ecological brick structures in the prior art. For example, Chinese utility model patent CN205444103U discloses an ecological slope protection brick, in which a core is filled in a hexagonal frame, a through hole is set at the center of the core, and soil is filled in the through hole and seeds are buried. This ecological brick structure provides a small growth space for plants. Due to the limitation of plant volume, the vegetation coverage rate is low; at the same time, due to the limitation of the seed growth environment, the entire growth process of vegetation is relatively slow, and environmental recovery requires a long time to achieve. Utility Model Content
[0005] The purpose of the utility model is to provide a vegetation-type bare soil covering ecological brick, which adds seed capsules and a raw permeable concrete matrix on the basis of traditional ecological bricks, effectively accelerating the growth rate of vegetation. At the same time, due to its more stable structure, it reduces the risk of soil erosion and contributes to soil and water conservation and ecological restoration.
[0006] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:
[0007] In the first aspect, an embodiment of the utility model provides a vegetation-type bare soil covered ecological brick, comprising a nutrient soil matrix, a vegetation permeable concrete matrix and a seed capsule, wherein the vegetation permeable concrete matrix is located below the nutrient soil matrix, and the seed capsule is pre-buried in the nutrient soil matrix; a seed bin and a nutrient solution bin are provided in the seed capsule, and the seed bin and the nutrient solution bin are separated by a water-soluble degradable cementitious material.
[0008] As a further technical solution, the nutrient soil matrix includes natural planting soil, peat soil and NPK fertilizer.
[0009] As a further technical solution, the bioremediation concrete matrix is prepared by adding recycled aggregate from construction waste.
[0010] As a further technical solution, the diameter of the recycled aggregate from construction waste is 10mm-15mm.
[0011] As a further technical solution, the seed capsules are evenly distributed in the nutrient soil matrix, and the intervals between the seed capsules are not less than 3 cm.
[0012] As a further technical solution, the thickness of the nutrient soil matrix is 13-17 cm, and the thickness of the vegetation permeable concrete matrix is 8-12 cm.
[0013] As a further technical solution, the seeds in the seed capsule are wrapped with a heated sodium alginate solution.
[0014] As a further technical solution, the nutrient soil matrix with the seed capsules embedded in it and the vegetation permeable concrete matrix are formed at one time in a static pressure forming mold.
[0015] As a further technical solution, the pressure of the static pressure forming mold is set to 20-25Mpa.
[0016] As a further technical solution, the seeds in the seed capsule are plants that are resistant to drought and poor soil.
[0017] The beneficial effects of the above-mentioned embodiments of the utility model are as follows:
[0018] The vegetation-type bare soil-covered ecological bricks provided by the utility model are composited with a nutrient soil matrix with seed capsules and a vegetation permeable concrete matrix. The vegetation permeable concrete matrix provides a stable structure, and the seed capsules are used to effectively accelerate the growth rate of vegetation, reduce the risk of soil erosion, and contribute to soil and water conservation and ecological restoration.
[0019] The bare soil covering ecological bricks provided by the utility model for vegetation growth use seed capsules instead of direct sowing. The capsules containing nutrient solution wrapped in the outer layer protect the seeds and promote their germination under suitable conditions to form vegetation coverage, prevent soil erosion and accelerate environmental recovery.
[0020] The utility model provides a vegetated bare soil covered ecological brick, and recycled aggregates from construction waste are added to the vegetated permeable concrete matrix. The recycled aggregates from construction waste increase the overall porosity of the structure in the vegetated concrete and enhance the water permeability. At the same time, the preparation of vegetated permeable concrete with recycled aggregates from construction waste can effectively utilize waste materials, reduce resource waste, and also play an ecological function, which is conducive to soil and water conservation and ecological environment protection.
[0021] The utility model provides a vegetation-type bare soil-covered ecological brick, and permeable bricks are placed at the bottom to allow rainwater to pass through, reduce surface runoff, increase water infiltration, and replenish groundwater. The material and structural design of the ecological brick can also retain a certain amount of moisture, which is conducive to plant growth. In addition, the composite structure can withstand more pressure and weathering than a single biological brick, and further stabilize the surface.
[0022] The vegetation-type bare soil covered ecological brick provided by the utility model is a bare soil covered ecological brick prepared by compounding permeable bricks, ecological bricks and seed capsules on the basis of the original biological bricks. It not only has practical value (such as soil and water conservation, erosion prevention), but also has beautiful landscape effects, and is suitable for various scenes such as urban greening, mine restoration, river bank management, park construction, etc. In addition, the ecological brick is made of renewable and environmentally friendly materials, which further promotes the recycling of resources and reduces the negative impact on the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0024] Figure 1 It is a structural schematic diagram of the vegetation-type bare soil covered ecological brick of the utility model;
[0025] Figure 2 It is a structural schematic diagram of a seed capsule of the utility model.
[0026] The schematic diagram is for illustrative purposes only;
[0027] Among them, 1. nutrient soil matrix; 2. seed capsule; 21. nutrient solution tank; 22. seed tank; 3. vegetation permeable concrete matrix. DETAILED DESCRIPTION
[0028] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0029] Example 1
[0030] In a typical implementation of the present invention, Figure 1 and Figure 2 As shown, a vegetation-type bare soil covered ecological brick is provided, comprising a nutrient soil matrix 1, a vegetation permeable concrete matrix 3 and a seed capsule 2, wherein the vegetation permeable concrete matrix 3 is located below the nutrient soil matrix 1, and the seed capsule 2 is pre-buried in the nutrient soil matrix 1; a seed bin 22 and a nutrient solution bin 21 are arranged in the seed capsule 2, and the seed bin 22 and the nutrient solution bin 21 are separated by a water-soluble degradable cementitious material.
[0031] A nutrient soil matrix 1 with seed capsules 2 and a vegetation permeable concrete matrix 3 are composited. The vegetation permeable concrete matrix 3 provides a stable structure, and the seed capsules are used to effectively accelerate the growth rate of vegetation, reduce the risk of soil erosion, and contribute to soil and water conservation and ecological restoration.
[0032] In this embodiment, the nutrient soil matrix 1 includes natural planting soil, peat soil and NPK fertilizer.
[0033] In this embodiment, the vegetated concrete base is prepared by adding recycled aggregates from construction waste. The recycled aggregates from construction waste increase the overall porosity of the structure in the vegetated concrete and enhance the water permeability. The water permeability can reach 15 mm / min. At the same time, it is measured that the alkalinity of the vegetated permeable concrete base prepared by using the aggregates from construction waste is lower than that of the base prepared by natural aggregates. At the same time, the preparation of vegetated permeable concrete with recycled aggregates from construction waste can effectively utilize waste materials, reduce resource waste, and play an ecological role, which is conducive to soil and water conservation and ecological environment protection.
[0034] In this embodiment, the diameter of the recycled aggregate from construction waste is 10mm-15mm, and the recycled aggregate from construction waste is prepared as follows: the construction waste is preliminarily classified according to the material type to remove non-recyclable impurities such as metal, plastic, and wood; larger pieces of construction waste are preliminarily crushed using a crusher to facilitate subsequent processing; the aggregate is surface treated and immersed in cement slurry to enhance the bonding performance between the aggregate and the cement matrix; the crushed material is screened according to particle size through a vibrating screen to obtain recycled aggregate with a particle size between 10mm and 15mm; the recycled aggregate is cleaned to remove dirt, dust and other harmful substances on the surface to improve its purity and performance; the recycled aggregate is placed in a CO2 mineralization kettle for mineralization to improve its mechanical properties.
[0035] In this embodiment, the seed capsules are evenly distributed in the nutrient soil matrix, and the intervals between the seed capsules are not less than 3 cm.
[0036] In this embodiment, the thickness of the nutrient soil matrix is 13-17 cm, and the thickness of the vegetation permeable concrete matrix is 8-12 cm.
[0037] In this embodiment, the seeds in the seed capsule are wrapped with a heated sodium alginate solution.
[0038] In this embodiment, the nutrient soil matrix with the seed capsules pre-embedded therein and the vegetation permeable concrete matrix are formed at one time in a static pressure forming mold.
[0039] In this embodiment, the pressure of the static pressure forming mold is set to 20-25Mpa.
[0040] In this embodiment, the seeds in the seed capsule are plants that are resistant to drought and poor soil.
[0041] The preparation process of the vegetation-type bare soil covered ecological brick provided in this embodiment is as follows:
[0042] A. Choose plant seeds that are suitable for the environment in which they grow, such as plants that are drought-resistant and tolerant to poor soil.
[0043] B. Mix sodium alginate and water in proportion, heat until dissolved and form a jelly.
[0044] C. Use a syringe or dropper to drop the hot sodium alginate solution into the double-layer mold with seeds and stir gently to ensure that each seed is evenly coated.
[0045] D. Liquid fertilizer is injected into the outer layer (gap part) of the double-layer capsule mold.
[0046] E. Pour the capsule solution into the outer part of the mold and seal the nutrient solution compartment. Make sure the capsule solution completely covers the nutrient solution to form a complete double-layer structure.
[0047] F. Mix cement, natural planting soil, part of peat soil, and NPK fertilizer to prepare nutrient soil premix.
[0048] G. Add the prepared seed capsules to the mixture and stir gently to ensure the seeds are evenly distributed.
[0049] H. Gradually add appropriate amount of water and mix until it becomes a uniform slurry.
[0050] I. Pour the mixed nutrient soil premix into the mold, rely on gravity to achieve self-compacting, and then place it in a curing box for curing. De-mould after reaching the predetermined strength.
[0051] J. Determine the amount of bonding material and water-cement ratio based on the design strength and porosity of the permeable brick.
[0052] K. Add construction waste recycled aggregate according to the obtained formula to prepare a vegetation permeable concrete base premix.
[0053] L. Spread the vegetation permeable concrete base premix in a static pressure forming mold, place the prepared nutrient soil layer on it, and make a composite bare soil covered ecological brick under a pressure of 20-25MPa.
[0054] In the process of preparing the vegetation-type bare soil covered ecological bricks, the required materials can be put in layers to form them at one time. The preparation method is simple and there is no need to upgrade the existing equipment.
[0055] Furthermore, in steps C and D, a 0.1 g / L sodium alginate (SA) solution is placed in a mold, and seeds are implanted. After the seeds are completely wrapped, a 0.2 g / L CaCl 2 solution is added for complexation for 10 minutes to form the mold, and then a 0.1 g / L sodium alginate (SA) solution and liquid fertilizer are poured in, and then a 2% CaCl 2 solution is dripped in for complexation for 10 minutes.
[0056] Furthermore, in step G, the spacing between the seed capsules is not less than 3 cm.
[0057] Furthermore, the aggregate used in step K is recycled aggregate such as construction waste, which needs to be crushed and cleaned before use.
[0058] In this embodiment, traditional eco-bricks, permeable bricks and seed capsules are compounded to obtain bare soil covered eco-bricks of vegetation type. The composite structure of permeable bricks and eco-bricks can withstand certain pressure and weathering. The material and structural design of eco-bricks can retain a certain amount of moisture, which is conducive to the early growth of plants and further stabilizes the surface. After the plant seeds in the seed capsules germinate, the root system can fix the soil and reduce soil erosion. The combination of vegetation and eco-bricks can enhance the aesthetics of the environment and create a more natural and pleasant landscape. Insects and small animals provide habitats, promote ecological balance and accelerate environmental recovery. The composite preparation of eco-bricks not only contributes to soil and water conservation and ecological restoration, but also provides important support for environmental protection and sustainable development. At the same time, it has the characteristics of simple structure, convenience and practicality, and is easy to prepare, without the need to upgrade existing equipment.
[0059] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A plant-based bare soil covered ecological brick, characterized in that: It includes a nutrient soil matrix, a vegetation permeable concrete matrix and a seed capsule, wherein the vegetation permeable concrete matrix is located below the nutrient soil matrix, and the seed capsule is pre-buried in the nutrient soil matrix; a seed bin and a nutrient solution bin are arranged in the seed capsule, and the seed bin and the nutrient solution bin are separated by a water-soluble degradable gelling material.
2. The bare soil covered ecological brick of the vegetation type as claimed in claim 1, characterized in that: The nutrient soil matrix includes natural planting soil, peat soil and NPK fertilizer.
3. The bare soil covered ecological brick of the vegetation type as claimed in claim 1, characterized in that: The vegetation permeable concrete matrix is prepared by adding recycled aggregates from construction waste.
4. The bare soil covered ecological brick of the vegetation type as claimed in claim 3, characterized in that: The diameter of the construction waste recycled aggregate is 10mm-15mm.
5. The bare soil covered ecological brick of the vegetation type as claimed in claim 1, characterized in that: The seed capsules are evenly distributed in the nutrient soil matrix, and the intervals between the seed capsules are not less than 3 cm.
6. The vegetation-type bare soil-covered ecological brick according to claim 1, characterized in that: The thickness of the nutrient soil matrix is 13-17 cm, and the thickness of the vegetation permeable concrete matrix is 8-12 cm.
7. The bare soil covered ecological brick of the vegetation type as claimed in claim 1, characterized in that: The seeds in the seed capsule are wrapped with a heated sodium alginate solution.
8. The vegetation-type bare soil-covered ecological brick according to claim 1, characterized in that: The nutrient soil matrix with seed capsules embedded in it and the vegetation permeable concrete matrix are formed at one time in a static pressure forming mold.
9. The bare soil covered ecological brick of the vegetation type as claimed in claim 8, characterized in that: The pressure of the static pressure forming mold is set to 20-25Mpa.
10. The bare soil covered ecological brick of the vegetation type according to claim 1, characterized in that: The seeds in the seed capsule are plants that are drought-tolerant and tolerant to poor soil.
Citation Information
Patent Citations
Ecological slope protection brick
CN205444103U