Integrated tower adsorption / desorption treatment system

By integrating the various functional sections of the adsorption-desorption system into the tower body through an integrated tower design, the problems of large footprint and high cost of decentralized layout are solved, achieving the effects of reduced footprint and lower cost.

CN224358210UActive Publication Date: 2026-06-16WUHAN SHITAI ENVIRONMENTAL PROTECTION TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
WUHAN SHITAI ENVIRONMENTAL PROTECTION TECH CO LTD
Filing Date
2025-07-17
Publication Date
2026-06-16

AI Technical Summary

Technical Problem

In existing technologies, decentralized adsorption-desorption systems occupy a large area, have high overall costs, and the equipment cannot be pre-assembled, requiring extensive on-site welding.

Method used

The system adopts an integrated tower design, with the adsorption section, condensation recovery section, and condensate post-treatment section stacked from top to bottom. Piping and valve groups are integrated into the tower body to form a complete unit. Each functional section is separated by partitions, and the equipment inside the tower can be prefabricated and connected in the factory.

🎯Benefits of technology

It significantly reduces the system's footprint, decreases the amount of pipes and steel used, lowers equipment manufacturing costs, and improves the ease of prefabrication and construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The utility model relates to a kind of integrated tower type adsorption desorption treatment systems, it includes: tower body, its inside is sequentially separated into first adsorption function section, condensing recovery function section and condensate post-treatment function section from top to bottom;The outside of the first adsorption function section is provided with air inlet pipeline and chimney, and first steam cloth gas device and first adsorbent are installed in its inside;Condensing coil is installed in the inside of the condensing recovery function section, and the first adsorption function section is connected to the condensing recovery function section by analysis pipeline;The inside of the condensate post-treatment function section is separated into solvent tank and layered tank, the upper end of the solvent tank and the layered tank is communicated, and the condensing recovery function section is connected to the layered tank by condensate inlet flange short pipe.It is arranged by stacking from top to bottom by adsorption function section, condensing recovery function section and condensate post-treatment function section, significantly reduce the system floor space, reduce pipeline and steel consumption, save equipment manufacturing cost.