Spliced airport pavement concrete plug template
The design of the spliced airport pavement concrete plug formwork solves the problem of conflict between traditional formwork and pavement tongue and groove, enabling multiple reuse of formwork and improving construction quality.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- BEIJING JINGANG ROAD ENGINEERING CONSTRUCTION CO LTD
- Filing Date
- 2025-07-09
- Publication Date
- 2026-06-19
AI Technical Summary
In traditional airport pavement construction, the end cap template conflicts with the tongue and groove joint of the already formed pavement, causing damage, affecting the flatness and structural integrity, and requiring the customization of templates of various lengths, which increases the complexity and cost of construction.
Design a splicing airport pavement concrete plug formwork, which adopts a main formwork, extension formwork, side formwork and ear plate structure, and is fixed by bolt connection and dowel bars. It can adapt to different widths, reduce damage to the pavement, and use tongue and groove side formwork to fit the tongue and groove of the formed pavement.
This allows for multiple reuses of the template, adapting to different pavement widths, reducing pavement damage, and improving construction quality and the overall structural flatness.
Smart Images

Figure CN224378654U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of airport runway construction technology, and in particular to a spliced airport runway concrete plug template. Background Technology
[0002] In airport concrete pavement construction, the skip-section method is widely used. The pavement section widths are mainly set at 5m, 4.5m, and 4m, and the common construction lengths for a single section are 100m, 120m, and 150m. When a single section reaches its end, a capping formwork is installed and dowel bars are embedded to effectively transfer the load, ensure uniform stress on the pavement panel, and improve the overall structural performance.
[0003] In traditional construction techniques, end cap formwork primarily utilizes wooden or steel formwork support systems. However, given the large scale and complex segmentation of airport pavement projects, custom-made end cap formwork of various lengths is necessary to meet construction requirements based on different pavement widths. Furthermore, airport pavements typically feature longitudinal tongue-and-groove joints; the formwork used during pavement opening is designed with a recessed tongue-and-groove shape, resulting in a protruding tongue-and-groove structure after completion. During the filling phase, the existing pavement sections on both sides directly serve as formwork, requiring no additional support. However, when setting up end cap formwork at the end of a single pavement section, the protruding tongue-and-groove joints on both sides can create spatial conflicts with the end cap formwork, easily leading to tongue-and-groove damage. This, in turn, affects pavement smoothness and structural integrity, reducing the overall quality of pavement construction. Summary of the Invention
[0004] In view of the above situation and to overcome the defects of the prior art, this utility model provides a spliced airport pavement concrete plug template to solve the problems involved in the background art.
[0005] To achieve the above objectives, this utility model provides the following technical solution: a splicing airport pavement concrete plug template, including a main template, extension templates on both sides of the main template, and side templates on both sides of the extension templates;
[0006] The main template has first ear plates on both sides, the extension template has second ear plates and third ear plates on both sides respectively, and the side template has a fourth ear plate on one side. The first ear plate, second ear plate, third ear plate and fourth ear plate are all provided with bolt holes.
[0007] The main template and the extension template are connected by a first ear plate and a second ear plate, and the extension template and the side template are connected by a third ear plate and a fourth ear plate.
[0008] Furthermore, the edge template includes a female tongue and groove edge template and a straight edge template, wherein the female tongue and groove edge template is provided with a female tongue and groove.
[0009] Furthermore, the main template and the extension template are provided with force transmission rod holes for fixing the force transmission rod.
[0010] Furthermore, the main template is provided with vertical stiffening plates.
[0011] Furthermore, the vertical stiffening plate is a right-angle plate, with one right-angle side fixed to the main template and the other right-angle side in contact with the ground;
[0012] The vertical stiffening plate is fixed vertically to the main template.
[0013] Furthermore, the vertical stiffening plate is provided with a sleeve, and a positioning pin is inserted into the sleeve and fixed to the ground.
[0014] Compared with the prior art, the beneficial effects of this utility model are:
[0015] This invention utilizes different splicing combinations to connect the main template with the extension template and side templates, adapting to different pavement widths and allowing for multiple reuses without the need for repeated customization. By using the tongue-and-groove side template, the pavement filling construction can fit snugly against the already constructed pavement tongues and grooves on both sides, reducing damage to the pavement and improving the overall quality of the pavement. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the structure of an embodiment of the present utility model;
[0017] Figure 2 This is a schematic diagram of the main template structure according to an embodiment of the present utility model;
[0018] Figure 3 This is a schematic diagram of the extended template structure according to an embodiment of the present utility model;
[0019] Figure 4 This is a schematic diagram of the female tongue and groove edge template structure according to an embodiment of the present utility model;
[0020] Figure 5 This is a schematic diagram of the straight-edge template structure according to an embodiment of the present utility model;
[0021] Figure 6 This is a schematic diagram of the vertical stiffening plate structure of Embodiment 2 of this utility model;
[0022] In the picture:
[0023] Main template 1, force transmission rod hole 11, vertical stiffening plate 12, extension template 2, side template 3, first ear plate 4, second ear plate 5, third ear plate 6, fourth ear plate 7, bolt hole 8, female tongue and groove side template 9, straight edge template 10, female tongue and groove 91, sleeve 13, positioning nail 14. Detailed Implementation
[0024] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model without creative effort are within the protection scope of the present utility model.
[0025] Example 1:
[0026] Depend on Figure 1-5 As shown, a spliced airport pavement concrete end cap formwork includes a main formwork 1, extension formwork 2 located on both sides of the main formwork 1, and side formwork 3 located on both sides of the extension formwork 2. The main formwork 1 is provided with dowel bar holes 11 for fixing dowel bars. The main formwork 1 is provided with vertical stiffening plates 12 to increase overall rigidity. The main formwork 1 is made of steel, with a total length of 3.7m. There are 13 dowel bar holes 11 in total, with a diameter determined according to design requirements, usually 36mm. The spacing of the dowel bar holes 11 is as follows: the middle 11 are 0.3m apart, the rest are 0.25m apart, and the distance between the outermost dowel bar hole and the edge of the main formwork 1 is 0.1m. The extension formwork 2 has 4 holes, is made of steel, with a total length of 0.25m. The distances of the dowel bar holes 11 from the two sides are 0.1m and 0.15m respectively.
[0027] The main template 1 has first ear plates 4 on both sides, the extension template 2 has second ear plates 5 and third ear plates 6 on both sides respectively, and the side template 3 has a fourth ear plate 7 on one side. The first ear plate 4, second ear plate 5, third ear plate 6 and fourth ear plate 7 are all provided with bolt holes 8. The main template 1 and the extension template 2 are connected by the first ear plate 4 and the second ear plate 5 and bolts, and the extension template 2 and the side template 3 are connected by the third ear plate 6 and the fourth ear plate 7 and bolts.
[0028] The side template 3 includes a female tongue and groove side template 9 and a straight side template 10, and the female tongue and groove side template 9 is provided with a female tongue and groove 91.
[0029] The female tongue-and-groove side mold 9, consisting of two pieces, is made entirely of steel formwork, with a total length of 0.15m. The dimensions of the female tongue-and-groove 91 are determined according to design requirements, for example, it is set in the middle, protruding 40mm, with a height of 60-80mm. The straight edge mold 10, consisting of two pieces, is also made entirely of steel formwork, with a total length of 0.15m.
[0030] For airport pavement projects with a width of 4m, a main formwork and two straight-edge formworks are spliced together, with a total length of 4m and 13 dowel holes, for use as end cap formwork for opening the pavement; a main formwork and two tongue-and-groove edge formworks are spliced together for use as end cap formwork for filling the pavement.
[0031] For airport pavement projects with a width of 4.5m, a main formwork is spliced with 2 extension formworks and 2 straight edge formworks, with a total length of 4.5m and 15 dowel bar holes (6 in total), used as the end cap formwork for opening construction of airport pavement; a main formwork is spliced with 2 extension formworks and 2 tongue-and-groove edge formworks, used as the end cap formwork for filling construction of airport pavement.
[0032] For airport pavement projects with a width of 5m, a main formwork is spliced with 4 extended formworks and 2 straight edge formworks, with a total length of 5m and 17 dowel holes, for use as a plug formwork for opening the pavement; a main formwork is spliced with 4 extended formworks and 2 tongue-and-groove edge formworks for use as a plug formwork for filling the pavement.
[0033] Using steel formwork and stiffening plates enhances the overall rigidity and strength of the device. A support system can be added to further enhance overall rigidity and strength. Sealing strips can be installed on the edges of the steel formwork to strengthen the tightness of the formwork joints or the tongue-and-groove joints with the pavement, preventing grout leakage. Dowel bar holes can be fitted with dowel bar fixing devices to effectively and accurately fix the dowel bar positions. Bolt holes can be connected with bolts to effectively and stably connect the end cap formwork.
[0034] Example 2
[0035] The similarities between this embodiment and Embodiment 1 will not be repeated here. The differences are as follows:
[0036] like Figure 6 As shown, the vertical stiffening plate 12 is a right-angle plate, with one right-angle side fixed to the main template 1 and the other right-angle side in contact with the ground; the vertical stiffening plate 12 is fixed perpendicularly to the main template 1. A sleeve 13 is provided on the vertical stiffening plate 12, and a positioning nail 14 is inserted into the sleeve 13, which is fixed to the ground.
[0037] The vertical stiffening plate 12, sleeve 13 and positioning nail 14 can be easily fixed when the end cap formwork is erected, ensuring the vertical angle between the formwork and the ground, and simplifying the construction process.
[0038] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A spliced airport pavement concrete stub form, characterized by: Includes the main template, the extension templates located on both sides of the main template, and the side templates located on both sides of the extension templates; The main template has first ear plates on both sides, the extension template has second ear plates and third ear plates on both sides respectively, and the side template has a fourth ear plate on one side. The first ear plate, second ear plate, third ear plate and fourth ear plate are all provided with bolt holes. The main template and the extension template are connected by a first ear plate and a second ear plate, and the extension template and the side template are connected by a third ear plate and a fourth ear plate.
2. The spliced airport pavement concrete stub form of claim 1, wherein: The edge template includes a female tongue and groove edge template and a straight edge template, wherein the female tongue and groove edge template is provided with a female tongue and groove.
3. The spliced airport pavement concrete stub form of claim 1, wherein: The main template and the extension template are provided with force transmission rod holes for fixing the force transmission rod.
4. The spliced airport pavement concrete stub form of claim 1, wherein: The main template is equipped with vertical stiffening plates.
5. The spliced airport pavement concrete stub form of claim 4, wherein: The vertical stiffening plate is a right-angle plate, with one right-angle side fixed to the main template and the other right-angle side in contact with the ground; The vertical stiffening plate is fixed vertically to the main template.
6. The spliced airport pavement concrete stub form of claim 5, wherein: The vertical stiffening plate is provided with a sleeve, and a positioning nail is inserted into the sleeve and fixed to the ground.