A water-permeable slag dam

Permeable debris-blocking dams, through a combination of compacted dam body, rockfill erosion control layer, and erosion-resistant layer, solve the problems of disturbance and high material requirements during the construction of debris-blocking dams in debris flow control, achieving stability and permeability, and reducing environmental damage.

CN224549050UActive Publication Date: 2026-07-24POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
POWERCHINA HUADONG ENG CORP LTD
Filing Date
2025-07-18
Publication Date
2026-07-24

AI Technical Summary

Technical Problem

In existing debris flow control, common debris dam structures such as masonry and concrete are prone to causing surface disturbance and damage during construction, and have high material requirements.

Method used

The structure adopts a permeable slag barrier dam, including a roller-compacted dam body, a rockfill scour protection layer and an anti-scour layer. It utilizes geogrids, drainage pipes and no-fines concrete layers, and the materials are readily available locally, reducing disturbance.

Benefits of technology

It achieves structural stability, permeability, and erosion resistance, avoids disturbance and damage during construction, and allows materials to be sourced locally, reducing environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224549050U_ABST
    Figure CN224549050U_ABST
Patent Text Reader

Abstract

The application relates to a water-permeable slag retaining dam which comprises a roller compacted dam body, a rockfill anti-scour layer and a scouring-resistant layer. The roller compacted dam body is transversely arranged in a ditch body. The roller compacted dam body comprises multiple layers of geogrids and multiple drainage pipes. The multiple layers of geogrids are arranged in layers along the height direction of the roller compacted dam body. The multiple drainage pipes are arranged in the roller compacted dam body at intervals. The drainage pipes are connected with the upstream side and the downstream side of the roller compacted dam body. The rockfill anti-scour layer is arranged on the upstream side of the roller compacted dam body. The rockfill anti-scour layer has a preset stacking thickness. The scouring-resistant layer comprises a sand-free concrete layer. The sand-free concrete layer is arranged on the downstream side of the roller compacted dam body. The sand-free concrete layer has a preset stacking thickness. The water-permeable slag retaining dam needs simple materials, can be conveniently obtained from the site, and can effectively avoid disturbance or damage caused in the construction process.