Road Inspection Graphical User Interface for Electronic Devices
CN309080771SActive Publication Date: 2025-01-21QIANXUN SPATIAL INTELLIGENCE INC +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430273953.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-14
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2038-09-14
Smart Images

Figure 000001_ABST
Abstract
1. The name of the product of this design: Road inspection graphical user interface for electronic equipment. 2. Purpose of this design product: used to display a graphical user interface. 3. The design highlights of this appearance design product are the graphical user interface on the display screen. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. The rear view, left view, right view, top view and bottom view of Design 1 and 2 have no design key points, so the rear view, left view, right view, top view and bottom view of Design 1 and 2 are omitted. 6. Designate Design 1 as the base design. 7. Purpose of the graphical user interface: (1) The interface displayed in the main view of Design 1 is the startup page of the road inspection APP. During the startup process, the main view of Design 1 jumps to the interface change state diagram 1 of Design 1. The device is connected successfully, and the interface change state diagram 1 of design 1 jumps to the interface change state diagram 2 of design 1. Click the "Auxiliary Line" button in the shortcut function bar on the right side of Design 1 Interface Change Status Diagram 2 to turn on the Auxiliary Line function and enter Design 1 Interface Change Status Diagram 3. (2) The interface displayed in the main view of Design 2 is the startup page of the road inspection APP. During the startup process, the main view of Design 2 jumps to the Design 2 interface change state diagram 1. The device is connected successfully, and the interface changes from Design 2 State Diagram 1 to Design 2 State Diagram 2. Click on the small black round icon with a white water drop-shaped map icon in the upper left corner of Design 2 Interface Change Status Diagram 2 to display the inspection small map and enter Design 2 Interface Change Status Diagram 3. Click the "Start Job" button in the lower right corner of Design 2 Interface Change Status Diagram 3 to start the inspection job and enter Design 2 Interface Change Status Diagram 4.
Need to check novelty before this filing date? Find Prior Art