Graphical user interface for energization station inspection announcements for electronic devices
CN309595560SActive Publication Date: 2025-11-11SICHUAN HONGHE COMM CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430479399.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2025-11-11
- Estimated Expiration
- 2039-07-30
Smart Images

Figure 000001_ABST
Abstract
1. The name of the design product: the graphic user interface of the inspection announcement of the energy station for electronic equipment. 2. The use of the design product: an electronic equipment. 3. The design points of the design product: the graphic user interface in the screen. 4. The picture or photo that best shows the design points: design 1 front view. 5. The design for which protection is sought contains color. 6. No design points, omit the rest of the views. 7. Design 1 is designated as the basic design. 8. The use of the graphic user interface: the graphic user interface of the present application as the interface of the energy station software. 9. The area of the graphic user interface in the product: the gray area in design 1 front view, design 1 change state diagram 1, design 1 change state diagram 2, design 1 change state diagram 3, design 1 change state diagram 4, design 1 change state diagram 5, design 2 front view, design 2 change state diagram, design 3 front view, and design 3 change state diagram are all variable content screens. 10. The change state description of the graphic user interface: design 1 front view is the main interface of the energy station software, sliding down design 1 front view enters design 1 change state diagram 1, sliding down design 1 change state diagram 1 enters design 1 change state diagram 2, sliding down design 1 change state diagram 2 enters design 1 change state diagram 3, sliding down design 1 change state diagram 3 enters design 1 change state diagram 4, sliding down design 1 change state diagram 4 enters design 1 change state diagram 5, clicking the inspection announcement function in design 1 change state diagram 5 enters design 1 change state diagram 6, and clicking the inspection announcement information in design 1 change state diagram 6 enters design 1 change state diagram 7; design 2 front view is the main interface of the energy station software, and the command dispatching task on the line pops up the command dispatching information, entering design 2 change state diagram; design 3 front view is the main interface of the energy station software, and the remote consultation task on the line pops up the remote consultation information, entering design 3 change state diagram.
Need to check novelty before this filing date? Find Prior Art