Flow approval graphical user interface for electronic devices

CN309801648SActive Publication Date: 2026-02-17PING AN INT FINANCIAL LEASING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202530095804.3
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2025-03-03
Publication Date
2026-02-17
Estimated Expiration
2040-03-03

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of the design product: flow approval graphical user interface of electronic device. 2. The use of the design product: for an electronic device. 3. The design points of the design product: in the graphical user interface. 4. The picture or photo that best shows the design points: design 1 front view. 5. Design 1 is designated as the basic design. 6. The use of the graphical user interface: for approving the flow. 7. The human-computer interaction mode of the graphical user interface: in design 1, click the "go to approval" button at the lower right corner of the approval item in the first column of the front view, switch to interface change state figure 1, click the "approval content" button in the middle of interface change state figure 1, switch to interface change state figure 2, click the "attachment" button in the middle of interface change state figure 2, switch to interface change state figure 3, click the "agree" button at the lower right corner of interface change state figure 3, switch to interface change state figure 4, click the "confirm submission" button at the bottom of interface change state figure 4 to complete the flow approval; in design 2, click the search icon at the upper right corner of the front view, switch to interface change state figure 1, enter "XXXX" in the search bar at the top of interface change state figure 1 and click the "search" button on the right, switch to interface change state figure 2, click the "go to approval" button at the lower right corner of the approval item in the first column of interface change state figure 2, switch to interface change state figure 3, click the "approval content" button in the middle of interface change state figure 3, switch to interface change state figure 4, click the "attachment" button in the middle of interface change state figure 4, switch to interface change state figure 5, click the "agree" button at the lower right corner of interface change state figure 5, switch to interface change state figure 6, click the "confirm submission" button at the bottom of interface change state figure 6 to complete the flow approval.
Need to check novelty before this filing date? Find Prior Art