Golf system graphical user interface for electronic device

CN310039679SActive Publication Date: 2026-06-19SHENZHEN QIANHAI FANMEI IMAGE TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
SHENZHEN QIANHAI FANMEI IMAGE TECH CO LTD
Filing Date
2024-09-05
Publication Date
2026-06-19

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Graphical User Interface for a Golf System for Electronic Devices. 2. Intended use of this design: for use in an electronic device. 3. The key design features of this product are its graphical user interface. 4. The picture or photo that best illustrates the key design points: Design 1 front view. 5. Design 1 is designated as the basic design. 6. Purpose of the graphical user interface: This design is for a golf system developed for electronic devices, serving as the operation and management interface for the golf system. 7. Human-computer interaction methods of graphical user interface: I. (1) The main view of Design 1 is the main interface. Click on the history of the main interface to enter the interface change state diagram of Design 1. (2) Design 1 Interface Change Status Diagram 1 Click on the [Start Date - End Date] area to enter the Design 1 Interface Change Status Diagram 2. (3) Design 1 interface change state diagram 2 will display the current month (this interface takes August as an example). Click [August 2024] to enter Design 1 interface change state diagram 3. (4) Design 1 Interface Change Status Diagram 3, click the [page turning icon] on the right of August 2024, then hold down the area of ​​the month and slide it up to select May, and finally click [complete] to enter Design 1 Interface Change Status Diagram 4. (5) Design 1 Interface Change Status Diagram 4, click the number [13], the start date is May 13, 2024, and then click the [page turning icon] on the right side of May 2024 above to enter Design 1 Interface Change Status Diagram 5. (6) Design 1 interface change state diagram 5, press and hold the month area and slide up to select June, and finally click [Complete] to enter Design 1 interface change state diagram 6. (7) Design 1 interface change state diagram 6, click the number [17], the end date is June 17, 2024, then click [Confirm] to enter Design 1 interface change state diagram 7. (8) Design 1 Interface Change Status Diagram 7 Click on [Search Historical Stadiums] to enter Design 1 Interface Change Status Diagram 8. (9) Design 1 Interface Change Status Diagram 8: Enter [Dongguan Fengjing Golf Club], then click the [Search Icon] on the keypad to enter Design 1 Interface Change Status Diagram 9. (10) Swipe up any area of ​​the screen in the Design 1 interface change state diagram 9 to enter the Design 1 interface change state diagram 10, where you can view the SG score and recap diagram for each hole. II. (1) The main view of Design 2 is the main interface. Click on the history of Design 2 to enter the interface change state diagram 1. (2) Design 2 Interface Change Status Diagram 1 Click [SG] to enter Design 2 Interface Change Status Diagram 2. (3) Design 2 Interface Change Status Diagram 2 Click on the [Start Date - End Date] area to enter the Design 2 Interface Change Status Diagram 3. (4) Design 2 Interface Change Status Diagram 3 Click the [Page Turning Icon] on the right in August 2024 to enter Design 2 Interface Change Status Diagram 4. (5) Design 2 interface change state diagram 4, press and hold the month area and slide up to select May, then click [Complete] to enter Design 2 interface change state diagram 5. (6) Design 2 interface change state diagram 5, click to select number [13], then click [Confirm], the start date is May 13, 2024, then click the [page turning icon] on the right of May 2024 to enter Design 2 interface change state diagram 6. (6) Design 2 interface change state diagram 6, press and hold the month area and slide down to select June, then click [Complete] to enter Design 2 interface change state diagram 7. (7) Design 2 interface change state diagram 7, click the number [17], then click [Confirm], the end date is June 17, 2024, enter the Design 2 interface change state diagram 8. (8) Design 2 Interface Change Status Diagram 8 Click on [Search Historical Stadiums] to enter the Design 2 interface change status diagram 9. (9) Design 2 Interface Change Status Diagram 9: Enter [Dongguan Fengjing Golf Club], then click the [Search Icon] on the keypad to enter Design 2 Interface Change Status Diagram 10. 8. Other situations requiring explanation: Other explanation: The gray areas in the view represent variable screens.
Need to check novelty before this filing date? Find Prior Art