Graphical User Interface for Photovoltaic Power Plant Operation and Maintenance Management Dashboard Platform for Electronic Devices

CN310062530SActive Publication Date: 2026-06-30深圳创维光伏智慧能源有限公司

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
深圳创维光伏智慧能源有限公司
Filing Date
2025-03-07
Publication Date
2026-06-30

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Graphical User Interface for Photovoltaic Power Plant Operation and Maintenance Management Dashboard Platform for Electronic Equipment. 2. Intended use of this design: for use in an electronic device. 3. The key design feature of this product is its graphical user interface. 4. The picture or photo that best illustrates the key design points: Design 1 front view. 5. Design 1 is designated as the basic design. 6. Uses of the graphical user interface: for monitoring the progress of work order processing, analyzing fault distribution, and evaluating operation and maintenance efficiency in photovoltaic power plants. 7. Human-computer interaction method of graphical user interface: In Designs 1 to 8, the main view is the homepage, displaying data related to the operation and maintenance of photovoltaic power plants nationwide, including information from modules such as newly added work orders today, work orders in progress, distribution range of overdue work orders, work order closure trend, work order data statistics, sources of work orders in progress, distribution of work orders in progress, distribution points of major faults, trend of newly added work orders, distribution of processed work orders, and causes of processed faults. Among them, the modules for distribution of work orders in progress and distribution of processed work orders can display all data related to agents, operators, and self-operated maintenance. Clicking or hovering the pie icon button in the upper right corner of the "Distribution Range of Overdue Work Orders" module in the main view of Design 1 will bring up the interface changes in Design 1. The status diagram displays data related to the module's non-timeout, maintenance provider, agent, and self-maintenance. Clicking the "Back" button in the "Timeout Work Order Distribution Range" module of the interface change status diagram 1 returns to the main view of Design 1. In the main view of Design 2, clicking or hovering the mouse over the "Year" button in the upper right corner of the "Work Order Closure Trend" module enters the interface change status diagram of Design 2, displaying data on the number of closed work orders, the proportion of timely closed-loop work orders, and the average processing time for that module in the current year. In the main view of Design 3, clicking or hovering the mouse over the pie chart icon button in the upper right corner of the "Distribution of Work Orders in Processing" module enters the interface change status diagram of Design 3, displaying data on the remaining processing, pending orders, pending submissions, and pending resolutions for that module. For data information that is pending review or has failed review, click the "Back" button in the "Processing Work Order Distribution" module of the Design 3 interface status diagram to return to the Design 3 main view. In the Design 4 main view, click or hover the mouse over the data module under the "Main Fault Distribution Points" module to display the relevant data information of that module. Click or hover the mouse over the "Inverter" data module under the "Main Fault Distribution Points" module to enter the Design 4 interface status diagram. In the Design 5 main view, click or hover the pie chart icon button in the upper right corner of the "New Work Order Trend" module to enter the Design 5 interface status diagram, which displays the cumulative new work orders, inverter fault alarms, equipment offline, inefficiency screening, preventive maintenance, and customer information related to that module. For complaints and other data, click the "Back" button in the "New Work Order Trend" module of the Design 5 interface change status diagram to return to the Design 5 main view; in the Design 6 main view, click or hover the bar icon button in the "Distribution of Processed Work Orders" module to display the data information associated with that bar icon, and click or hover the bar icon button for the corresponding region in the "Distribution of Processed Work Orders" module to enter the Design 6 interface change status diagram; in the Design 7 main view, click or hover the pie icon button in the upper right corner of the "Causes of Processed Faults" module to enter the Design 7 interface change status diagram, and click the "Back" button in the "Causes of Processed Faults" module of the Design 7 interface change status diagram to return to the main view;In the Design 8 main view, clicking or hovering the circular icon button in the "Processed Fault Causes" module displays data on the associated point ratio and average processing time. Clicking or hovering the corresponding "Grid Voltage Limitation" circular icon button in the "Processed Fault Causes" module leads to the Design 8 interface status change diagram.
Need to check novelty before this filing date? Find Prior Art