Methods and apparatus related to GNSS measurement

EP4759040A1Pending Publication Date: 2026-06-17NOKIA TECHNOLOGIES OY

Patent Information

Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
NOKIA TECHNOLOGIES OY
Filing Date
2023-08-08
Publication Date
2026-06-17

AI Technical Summary

Technical Problem

Current technologies face challenges in allowing user equipment (UE) to simultaneously operate with non-terrestrial networks (NTN) and perform Global Navigation Satellite System (GNSS) measurements, particularly due to the need for pre-compensation in uplink transmissions for low-earth orbit satellites.

Method used

The UE is enabled to transmit an indication to a network node for a required GNSS measurement before the GNSS validity duration associated with the last successful measurement expires, allowing for either network-triggered or autonomous GNSS measurements.

Benefits of technology

This solution allows the UE to maintain synchronization and perform necessary GNSS measurements without disrupting NTN operations, thereby improving positioning accuracy and reducing power consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023111765_13022025_PF_FP_ABST
    Figure CN2023111765_13022025_PF_FP_ABST
Patent Text Reader

Abstract

Methods, apparatus and computer-readable medium are disclosed for a global navigation satellite system (GNSS) measurement. In an embodiment, there is provided a method for a user equipment (UE). The method comprises transmitting to a network node, an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with the last successful GNSS has expired. The indication is carried in at least one of: a GNSS validity duration report, an uplink medium access control (MAC) control element (CE), a scheduling request, or a radio resource control (RRC) message.
Need to check novelty before this filing date? Find Prior Art

Description

METHODS AND APPARATUS RELATED TO GNSS MEASUREMENTTECHNICAL FIELD

[0001] Embodiments of the disclosure generally relate to wireless communication technology, and more particularly, to methods and apparatus for triggering a global navigation satellite system (GNSS) measurement from a user equipment (UE) .BACKGROUND

[0002] The GNSS can be used by a user equipment (UE) to determine its position. This GNSS position information can be utilized to compensate for frequency offset (caused by Doppler shift) and timing offset in a radio propagation between the UE and a satellite. For example, for geosynchronous orbits satellites (height about 36000 km) , the UE has to compensate for a propagation delay. For low earth orbit satellites (height about 250 -1500 km) , the UE also has to compensate for Doppler and time shifts, which occur due to a satellite movement (about 28,000 km / h relative to the Earth) .

[0003] In a technique of internet of things (IoT) support for non-terrestrial networks (NTN) , it is assumed that a UE cannot operate GNSS and IoT NTN simultaneously. In other words, a UE is not able to communicate with the NTN system and simultaneously perform GNSS measurements. It is needed for the UE to perform pre-compensation of uplink transmissions in terms of time and frequency adjustments. Such pre-compensation is needed, when the NTN system is operating over low-earth orbit satellites, which move about 28,000 km / h relative to Earth. The pre-compensation is based on the UE being aware of the target satellite’s position (e.g., via satellite assistance information broadcast in SIB31 –as defined in 3GPP TS 36.331) and the UE’s own position acquired via a GNSS. By calculating the distance between the UE and the satellite and how the distance will change during a transmission, the UE can determine when to transmit. There currently exist certain challenge (s) for such case.SUMMARY

[0004] This summary is provided to introduce simplified concepts of the present disclosure. This summary is not intended to identify key features or essential features of the claimed subject matter, nor is it intended to be used to limit the scope of the claimed subject matter.

[0005] According to a first aspect of the disclosure, there is provided an apparatus for a user equipment (UE) . The apparatus comprises at least one processor, and at least one memory storing instructions  that, when executed on the at least one processor, cause the apparatus at least to transmit to a network node, an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with a last successful GNSS measurement has expired. The indication is carried in at least one of: a GNSS validity duration report, an uplink medium access control (MAC) control element (CE) , a scheduling request, or a radio resource control (RRC) message.

[0006] According to some embodiments, the apparatus may be further caused to receive from the network node a receipt of the indication, or a confirmation, or a triggering command for the required GNSS measurement.

[0007] According to some embodiments, the indication may be transmitted in case that a remaining time of the GNSS validity duration is longer than a pre-configured threshold.

[0008] According to some embodiments, the apparatus may be further caused to move to a RRC idle state in case that the transmission of the indication fails.

[0009] According to some embodiments, the apparatus may be further caused to move to a RRC idle state in case that no confirmation or no triggering command for the required GNSS measurement is received from the network node in response to the indication.

[0010] According to some embodiments, the apparatus may be further caused to be prohibited to perform uplink transmission after the transmission of the indication, until the required GNSS measurement is performed successfully.

[0011] According to some embodiments, the indication may indicate that the UE requests the network node to trigger the required GNSS measurement. The apparatus may be further caused to receive a triggering command from the network node for starting the required GNSS measurement.

[0012] According to some embodiments, the indication indicates that the UE starts the required GNSS measurement autonomously upon the transmission of the indication. The apparatus may be further caused to start the required GNSS measurement autonomously upon the transmission of the indication.

[0013] According to some embodiments, the indication may indicate that the UE starts the required GNSS measurement autonomously after an offset from the transmission of the indication. The apparatus is further caused to start the required GNSS measurement autonomously after an offset from the transmission of the indication.

[0014] According to some embodiments, the indication may indicate that the UE starts the required GNSS measurement autonomously either upon the transmission of the indication or after an offset from the transmission of the indication depending on a network pre-configuration. The apparatus is  further caused to start the required GNSS measurement autonomously either upon the transmission of the indication or after an offset from the transmission of the indication depending on the network pre-configuration.

[0015] According to some embodiments, the indication is carried in a GNSS validity duration report, and the indication comprises one or more values of validity duration in a GNSS-ValidationDuration Information element of the GNSS validity duration report. The indication may be 0 or a negative value which is defined as a value of validity duration. Alternatively, the indication may be a value of validity duration shorter than the remaining time of the GNSS validity duration associated with the last successful GNSS measurement.

[0016] According to some embodiments, the indication may be a flag.

[0017] According to some embodiments, the scheduling request may be transmitted using a dedicated configuration from a network.

[0018] According to a second aspect of the disclosure, there is provided an apparatus for a network node. The apparatus comprises at least one processor, and at least one memory storing instructions that, when executed on the at least one processor, cause the apparatus at least to receive from a user equipment (UE) , an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with the last successful GNSS measurement has expired. The indication is carried in at least one of: a GNSS validity duration report, an uplink medium access control (MAC) control element (CE) , a scheduling request, or a radio resource control (RRC) message.

[0019] According to some embodiments, the apparatus may be further caused to transmit to the UE, a receipt of the indication, or a confirmation, or a triggering command for the required GNSS measurement.

[0020] According to some embodiments, the indication may indicate one of the following: the UE requests the network node to trigger the required GNSS measurement, the UE starts the required GNSS measurement autonomously upon the transmission of the indication, the UE starts the required GNSS measurement autonomously after an offset from the transmission of the indication, or the UE starts the required GNSS measurement autonomously either upon the transmission of the indication or after an offset from the transmission of the indication depending on a network pre-configuration.

[0021] According to some embodiments, the indication may be carried in the GNSS validity duration report, and the indication comprises one or more values of validity duration in a GNSS-ValidationDuration Information element. The indication may be 0 or a negative value which is defined as a value of validity duration. Alternatively, the indication may be a value of validity duration shorter  than a remaining time of the GNSS validity duration associated with the last successful GNSS measurement.

[0022] According to some embodiments, the indication may be a flag.

[0023] According to some embodiments, the apparatus may be further configured to configure a dedicated configuration for the scheduling request.

[0024] According to a third aspect of the disclosure, there is provided a method performed at a user equipment (UE) . The method comprises transmitting to a network node, an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with the last successful GNSS has expired. The indication is carried in at least one of: a GNSS validity duration report, an uplink medium access control (MAC) control element (CE) , a scheduling request, or a radio resource control (RRC) message.

[0025] According to a fourth aspect of the disclosure, there is provided a method performed at a network node. The method comprises receiving from a user equipment (UE) , an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with the last successful GNSS measurement has expired. The indication is carried in at least one of: a GNSS validity duration report, an uplink medium access control (MAC) control element (CE) , a scheduling request, or a radio resource control (RRC) message.

[0026] According to a fifth aspect of the disclosure, there is provided a computer readable storage medium, on which instructions are stored. When executed by at least one processor, the instructions cause the at least one processor to perform any method according to the third or fourth aspect.

[0027] According to sixth aspect of the disclosure, there is provided computer program product comprising instructions which when executed by at least one processor, cause the at least one processor to perform any method according to the third or fourth aspect.

[0028] According to a seventh aspect of the disclosure, there is provided an apparatus for a user equipment (UE) , comprising: means for transmitting to a network node, an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with the last successful GNSS has expired. The indication is carried in at least one of: a GNSS validity duration report, an uplink medium access control (MAC) control element (CE) , a scheduling request, or a radio resource control (RRC) message.

[0029] According to an eighth aspect of the disclosure, there is provided an apparatus for a network node, comprising: means for receiving from a user equipment (UE) , an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity  duration of the UE associated with the last successful GNSS measurement has expired. The indication is carried in at least one of: a GNSS validity duration report, an uplink medium access control (MAC) control element (CE) , a scheduling request, or a radio resource control (RRC) message.

[0030] It is to be understood that the summary section is not intended to identify key or essential features of embodiments of the present disclosure, nor is it intended to be used to limit the scope of the present disclosure. Other features of the present disclosure will become easily comprehensible through the following description.BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Some example embodiments will now be described with reference to the accompanying drawings in which:

[0032] FIG. 1 illustrate an exemplary communication system architecture in which embodiments of the present disclosure can be implemented;

[0033] FIG. 2 shows a timeline of an exemplary procedure of GNSS measurement according to an embodiment of the present disclosure;

[0034] FIG. 3 is a flow chart depicting a method performed at a UE according to an embodiment of the present disclosure;

[0035] FIG. 4 is a flow chart depicting a method performed at a network node according to an embodiment of the present disclosure;

[0036] FIG. 5 is an exemplary signaling flow depicting an exemplary procedure according to an embodiment of the present disclosure;

[0037] FIG. 6 is an exemplary signaling flow depicting another exemplary procedure according to an embodiment of the present disclosure;

[0038] FIG. 7 is an exemplary signaling flow depicting yet another exemplary procedure according to an embodiment of the present disclosure; and

[0039] FIG. 8 shows a simplified block diagram of an apparatus according to an embodiment of the present disclosure.DETAILED DESCRIPTION

[0040] Some example embodiments will now be described in more detail hereinafter with reference to the accompanying drawings, in which some, but not all embodiments are shown. Indeed, the example embodiments may take many different forms and should not be construed as fixed to the embodiments set forth herein; rather, these embodiments are provided so that this disclosure will satisfy applicable legal requirements. Like reference numerals refer to like elements throughout.

[0041] References in the present disclosure to “one embodiment” , “an embodiment” , “an example embodiment” , and the like indicate that the embodiment described may include a particular feature, structure, or characteristic, but it is not necessary that every embodiment includes the particular feature, structure, or characteristic. Moreover, such phrases are not necessarily referring to the same embodiment. Further, when a particular feature, structure, or characteristic is described in connection with an example embodiment, it is submitted that it is within the knowledge of one skilled in the art to affect such feature, structure, or characteristic in connection with other embodiments whether or not explicitly described.

[0042] In the following description and claims, unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skills in the art to which this disclosure belongs.

[0043] As used herein, the terms “data, ” “content, ” “information, ” and similar terms may be used interchangeably to refer to data capable of being transmitted, received and / or stored in accordance with embodiments of the present invention. Thus, use of any such terms should not be taken to limit the spirit and scope of embodiments of the present invention.

[0044] As used in this application, the term “circuitry” may refer to one or more or all of the following:

[0045] (a) hardware-only circuit implementations (such as implementations in only analog and / or digital circuitry) and

[0046] (b) combinations of hardware circuits and software, such as (as applicable) :

[0047] (i) a combination of analog and / or digital hardware circuit (s) with software / firmware and

[0048] (ii) any portions of hardware processor (s) with software (including digital signal processor (s) ) , software, and memory (ies) that work together to cause an apparatus, such as a mobile phone or server, to perform various functions) and

[0049] (c) hardware circuit (s) and or processor (s) , such as a microprocessor (s) or a portion of a microprocessor (s) , that requires software (e.g., firmware) for operation, but the software may not be present when it is not needed for operation.

[0050] This definition of “circuitry” applies to all uses of this term in this application, including in any claims. As a further example, as used in this application, the term “circuitry” also covers an implementation of merely a hardware circuit or processor (or multiple processors) or portion of a hardware circuit or processor and its (or their) accompanying software and / or firmware. The term “circuitry” also covers, for example and if applicable to the particular claim element, a baseband integrated circuit or processor integrated circuit for a mobile device or a similar integrated circuit in server, a cellular network device, or other computing or network device.

[0051] As defined herein, a “computer-readable storage medium, ” which refers to a non-transitory physical storage medium (e.g., volatile or non-volatile memory device) , can be differentiated from a “computer-readable transmission medium, ” which refers to an electromagnetic signal. Such a medium may take many forms, including, but not limited to a non-transitory computer-readable storage medium (e.g., non-volatile media, volatile media) , and transmission media. Transmission media include, for example, coaxial cables, copper wire, fiber optic cables, and carrier waves that travel through space without wires or cables, such as acoustic waves and electromagnetic waves, including radio, optical and infrared waves. Signals include man-made transient variations in amplitude, frequency, phase, polarization or other physical properties transmitted through the transmission media. Examples of non-transitory computer-readable media include a magnetic computer readable medium (e.g., a floppy disk, hard disk, magnetic tape, any other magnetic medium) , an optical computer readable medium (e.g., a compact disc read only memory (CD-ROM) , a digital versatile disc (DVD) , a Blu-Ray disc, or the like) , a random access memory (RAM) , a programmable read only memory (PROM) , an erasable programmable read only memory (EPROM) , a FLASH-EPROM, or any other non-transitory medium from which a computer can read. The term computer-readable storage medium is used herein to refer to any computer-readable medium except transmission media. However, it will be appreciated that where embodiments are described to use a computer-readable storage medium, other types of computer-readable mediums may be substituted for or used in addition to the computer-readable storage medium in alternative embodiments.

[0052] In the following, the non-limiting term user equipment (UE) refers to any wireless device communicating with a network node and / or another UE in a cellular or mobile communication system. The UE may comprise any suitable device capable of at least perform cellular communication and satellite communication of GNSS. For example, the UE may be a data processing device equipped with a wireless transceiver for transmitting and receiving cellular communication signals, a GNSS  receiver for receiving satellite position signals, data processing and user interface apparatus. Non-limiting examples of a UE comprise IoT devices, enhance machine type communication (eMTC) devices, vehicle-mounted wireless terminal devices, mobile terminals (MTs) , wearable wireless devices, a mobile phone or what is known as a “smart phone” , a portable computer, personal data assistant (PDA) , or any combinations of these or the like.

[0053] In the following, the non-limiting term network node refers to any node that is a part of the radio access network (e.g., a radio access node or equivalent term) . The network node can communicate directly or indirectly with a UE and / or with other network nodes in a cellular communications network, to enable and / or provide wireless access to the UE, and / or to perform other functions (e.g., administration) in the cellular communications network. Non-limiting examples of a network node comprise a base station (BS) , a NodeB, eNodeB (eNB) , gNodeB (gNB) , an access point, or the like.

[0054] Embodiments of this disclosure may be implemented in a system of a non-terrestrial networks (NTN) . The typical NTN comprises NTN based on transparent payload (also called transparent payload NTN) and NTN based on regenerative payload (also called regenerative payload NTN) . FIG. 1 shows a system100A for transparent payload NTN. As shown in the upper part of FIG. 1, the system 100A comprises a user equipment (UE) 101, an eNB 102, a core network 103, a satellite 104, and an NTN gateway 105. A transparent payload NTN can be seen as a relay node on the network side, which changes the frequency carrier of the uplink and downlink RF signal, and filters and amplifies it before downlink transmission, but the waveform of the loaded signal remains unchanged. The satellite acts as a radio frequency relay. The satellite 104 repeats an LTE-Uu radio interface from a feeder link (between an NTN gateway 105 and the satellite 104) to the service link (between the satellite 104 and the UE 104) and vice versa. Different transparent satellites may be connected to a same eNB 102 on the ground.

[0055] The lower part of FIG. 1 shows a system 100B for regenerative payload NTN. The system 100B comprises a user equipment (UE) 101, an eNB 102, a core network 103, a satellite 104, and a NTN gateway 105. The satellite 104 hosts the eNB 102, and thus play a role of the entire or partial base station.

[0056] As noted, it is assumed that the UE cannot operate NTN communication and GNSS simultaneously. A UE will move to RRC Idle state, when the UE has to perform a GNSS measurement. Such a need is known to the network based on the UE reporting the remaining GNSS validity duration via the GNSS-ValidityDuration RRC information element, as defined 3GPP TS36.331:

[0057] – GNSS-ValidityDuration

[0058] The IE GNSS-ValidityDuration indicates the remaining GNSS validity duration in the UE. Value s10 corresponds to 10 seconds, s20 corresponds to 20 seconds and so on. Value min5 corresponds to 5 minutes, value min10 corresponds to 10 minutes and so on.

[0059] GNSS-ValidityDuration information element

[0060] However, moving to RRC Idle state would cause more overhead in terms of connection setup signaling, if a UE has a long connection time and is non-stationary, which means that the UE may need to move to RRC Idle state to measure GNSS multiple times. Therefore, standardization works (such as 3GPP work groups) on IoT support for NTN take the following as an objective: improved GNSS operations are needed for a new position fix for UE pre-compensation during long connection times and for reduced power consumption. Further, simultaneous GNSS and NTN narrow band (NB) -IoT / eMTC operation is not assumed.

[0061] According to agreements in the standardization works, a base station (e.g., an eNB) can trigger a UE to perform a GNSS measurement (which may be called as network triggered GNSS measurement) , e.g., when the current GNSS validity duration is about to expire, and that a UE may autonomously trigger a GNSS measurement (which may be called as autonomous GNSS measurement) if the UE does not receive such trigger from the eNB. Furthermore, a UE provides a remaining GNSS validity duration in an uplink MAC CE after completing the GNSS position fix measurement.

[0062] Specifically, a base station (such as eNB) may aperiodically trigger a GNSS measurement gap (MG) for a UE in which the UE can perform the GNSS measurement. During GNSS MG, the UE cannot monitor a physical downlink control channel (PDCCH) and perform other cellular communication. The trigger is based on a downlink media access control (MAC) control element (CE) . In this regard, a new downlink MAC CE may be introduced to trigger a UE in a Radio Resource Control (RRC) connected state to perform GNSS measurement. The base station (or other network node) is free to decide when to trigger GNSS measurement or a GNSS measurement gap. When the base station or network node triggers a GNSS measurement is up to network implementation.

[0063] For the GNSS measurement gap aperiodically triggered with an MAC CE, the duration for the GNSS measurement gap can be configured by a base station (such as eNB) . When a duration for a  GNSS measurement gap is not included in a configuration by eNB, the duration of the GNSS measurement gap may be equal to a time duration for GNSS measurement associated with a latest reported GNSS position fix.

[0064] A UE may report GNSS position fix time duration for measurement at least during the initial access stage. The position fix time duration defines the time the UE expects it requires to perform the GNSS measurement. Therefore, the eNB can use it to estimate the length of the GNSS MG. Basically the MG should be equal to or longer than the position fix time duration to allow the UE to perform and complete the GNSS measurement. Thus, the eNB may configure a corresponding GNSS MG duration for a UE based on the GNSS position fix time duration reported by the UE.

[0065] For GNSS measurement in RRC connected state, if an eNB aperiodically triggers a UE in RRC connected state to make GNSS measurement, the UE can re-acquire GNSS position fix within a gap. The UE is not required to transmit or receive any channel / signal within a duration of the aperiodic GNSS measurement gap before the UE re-acquires GNSS data (through the GNSS measurement) successfully.

[0066] An autonomous GNSS measurement or re-acquisition mechanism can be enabled or disabled by network. According to an agreement, the UE may re-acquire GNSS autonomously (when configured / enabled by the network) if the UE does not receive a trigger to make GNSS measurement from the network (such as an eNB or other network node) . For NB-IoT and eMTC, at least for the case where the network configuration does not include a periodicity (if supported) , for autonomous GNSS measurement or re-acquisition, the UE may re-acquire GNSS autonomously during a GNSS measurement timer, the start time of the autonomous GNSS measurement timer is based on the original GNSS validity duration. The autonomous GNSS measurement or re-acquisition can be periodic in certain conditions.

[0067] The UE may trigger GNSS measurement reporting every time upon completing a GNSS fix operation. In RRC connected mode, the UE may report a GNSS validation duration with an MAC CE. An uplink MAC CE for GNSS validity duration reporting may be used for a NB-IoT user plane solution and eMTC UE as well, in addition to a NB-IoT control plane solution. The reported GNSS validity duration is a remaining validity duration for the GNSS validity duration. This enables the UE and eNB to have a common understanding of the UE’s GNSS state, i.e., when it is valid and when it is outdated.

[0068] According to an agreement, at least for the case when frequency error and timing error are within frequency and timing error requirements with legacy closed loop time correction, uplink  transmission can be allowed in a duration after an original GNSS validity duration expires without GNSS re-acquisition.

[0069] To summarize, currently two ways of triggering a GNSS measurement are defined:

[0070] 1. Network (such as a base station) aperiodically triggers a UE to perform the GNSS measurement (which can be also called as network triggered GNSS measurement) . The network may trigger the GNSS measurement based on the UE’s previously reported remaining GNSS validity duration. As discussed above, currently a UE would trigger such reporting of remaining GNSS validity duration upon completing a GNSS fix operation. There is no discussion of a UE providing an updated validity duration “prematurely” . Alternatively, the network may trigger the GNSS measurement based on certain internal means of the network, e.g., after detecting that the UE’s uplink transmission is misaligned.

[0071] 2. UE autonomously triggers the GNSS measurement (which can be also called as autonomous GNSS measurement) , as discussed above with reference to the autonomous GNSS re-acquisition mechanism. A start time for the autonomous GNSS measurement is based on the original GNSS validity duration as reported to the network. Thus, the UE cannot start the autonomous measurement at any time, but only according to the previously reported GNSS validity duration. That is, UE can start the autonomous measurement upon the last successful GNSS measurement expires. This is to ensure the network knows when the UE is performing the GNSS measurement.

[0072] Currently, there is no mechanism for triggering a GNSS measurement by a UE at any time the UE detects a need for the GNSS measurement. For example, a UE may detect that its current GNSS position fix is invalid or becoming invalid, based on downlink measurements. For example, the UE may compare the expected time / frequency of a downlink signal, based on a previous determined location, and an actual time / frequency of the received downlink signal. If the difference between the expected and measured downlink signals exceeds a threshold the UE could detect a need for a new GNSS measurement. One way is to use physical random access channel (PRACH) for requesting a trigger command for the new GNSS measurement from eNB. However, the use of PRACH for requesting the trigger command will require dedicated resources for that specific PRACH to be interpreted by the network as a request for a new GNSS measurement. This results in PRACH resource fragmentation, which is not desirable.

[0073] FIG. 2 shows a timeline of an exemplary procedure of GNSS measurement in this scenario. In this exemplary procedure, when a UE detects that a new GNSS measurement is required, a current remaining GNSS validity duration associated with a last successful GNSS MG is still valid. In the last GNSS MG as shown at 210, the UE has performed GNSS measurement to re-acquire a GNSS position  fix successfully. The UE may report a GNSS validity duration of the re-acquired GNSS position fix to the eNB, as shown at 220. The reported GNSS validity duration indicates a time duration in which the re-acquired GNSS position fix is expected to be valid. Noted that the reported GNSS validity duration is a time duration referenced to a time of reporting the GNSS validity duration (as shown by 202) . In this regard, it is a remaining validity duration for a current GNSS position fix of the UE, i.e., the position fix obtained in step 210.

[0074] As time goes by, when the remaining time of the current validity period becomes that as shown at 204 and is far from expiry, the UE may detect that its position fix obtained in step 210 is invalid or becoming invalid (e.g., due to an unexpected movement) , and thus a new GNSS measurement is required. For example, the UE may determine that a new GNSS measurement is required by a detection of the UE’s mobility state change based on determining a time / frequency difference between a received downlink signal and an estimate based on a last known location of the UE. The requirement of the new GNSS measurement may be further determined by use of external means such as an accelerometer / gyroscope.

[0075] According to the solutions proposed in the present disclosure, the UE is allowed to transmit an indication indicating that the UE’s requirement for a new GNSS measurement as shown at 230, before the GNSS validity duration associated with the last successful GNSS MG has expired. Then, according to the indication, the UE may perform the new GNSS measurement as shown at 240 before the GNSS validity duration associated with the last successful GNSS MG has expired. The new GNSS measurement may be a network triggered GNSS measurement, or an autonomous GNSS measurement.

[0076] In accordance with some embodiments, the trigger may be or be comprised in a GNSS validity duration report. As mentioned above, traditionally, a UE transmits a report of GNSS validity duration (e.g., as defined in 3GPP TS36.331) upon completing an operation of GNSS position fix, i.e., after or at the end of a GNSS measurement. Current agreements do not define ae UE may transmit a new remaining GNSS validity duration besides after completing a GNSS measurement. Embodiments of the present disclosure enable a UE to reuse a GNSS validity duration report to indicate a need for a new GNSS measurement. It is proposed that the UE can transmit a new (remaining) GNSS validity duration report at any time, and not only after or at the end of a GNSS measurement.

[0077] The new (remaining) GNSS validity duration report may comprise a newly defined value of GNSS validity duration, to indicate that the UE requires a GNSS measurement. For example, the UE may transmit “0 s” or “-1 s” or another specified value as a GNSS validity duration, e.g., in the GNSS-ValidityDuration information element. In an example, “0 s” may be defined to indicate the UE will await a GNSS measurement gap trigger from a network node (such as a base station) ; “-1 s” may be defined indicate the UE will immediately start an autonomous GNSS measurement upon the  transmission of the GNSS validity duration report. In another example, “-1 s” may be defined to indicate the UE will start the autonomous GNSS measurement after an offset, e.g., UE-eNB round-trip time (RTT) , considering the report transmission time between UE and network, or after receiving a network acknowledgement of the GNSS validity duration report. In yet another embodiment, the new value may be defined to indicate the UE will either start the autonomous GNSS measurement or await the trigger depending on what is configured by the network, such as some pre-configuration from a network node (such as eNB) .

[0078] According to an embodiment, different from a traditional GNSS validity duration report, after transmitting the new GNSS validity duration, the UE is not allowed to perform any further uplink transmissions until it has performed the required new GNSS measurement successfully. This is because the UE may consider itself out of synchronization when or after transmitting the new GNSS validity duration.

[0079] In an embodiment, the new GNSS validity duration report may comprise a new estimated remaining GNSS validity duration, which is shorter than the remaining time of the previously reported validity duration. Taking the exemplary procedure of GNSS measurement shown in FIG. 2 as example, the remaining time of the previously reported validity duration is shown at the current remaining GNSS validity duration 204. It may be determined equally on the UE side and network side, based on the reported GNSS validity duration 202, taking into account a time elapsed from it, for example, by using a timer. The new estimated remaining GNSS validity duration reported at 230 may be shorter than the current remaining GNSS validity duration. This shorter remaining GNSS validity duration will inform the network that a GNSS measurement is needed, but not necessarily that the measurement is urgent.

[0080] In an embodiment, the new GNSS validity duration report may comprise a newly defined flag, to indicate that the UE requires a GNSS measurement. The flag may indicate that the UE would perform any one of the following operations: i) awaiting a GNSS measurement gap trigger from a network node; ii) immediately starting an autonomous GNSS measurement; iii) starting an autonomous GNSS measurement after an offset; iv) either starting the autonomous GNSS measurement or awaiting the trigger depending on what is configured by a network node.

[0081] Alternatively in some embodiments, a new uplink MAC CE can be defined to indicate the need for a new GNSS measurement before the expiry of the GNSS validity duration associated with the last successful GNSS MG. In accordance with an embodiment, the MAC CE can be a 1-bit indicator to deliver “true” or “false” , which indicates the UE requires a GNSS measurement or not. In accordance with an embodiment, the MAC CE may further indicate that UE would perform any one of the following operations: awaiting a GNSS measurement gap trigger from a network node; immediately starting an autonomous GNSS measurement; starting an autonomous GNSS measurement after an  offset; or either starting the autonomous GNSS measurement or awaiting the trigger depending on what is configured by a network node.

[0082] Alternatively in some embodiments, the UE may trigger a new GNSS measurement via a scheduling request (SR) which uses a dedicated SR configuration, or via a new-defined RRC message. The scheduling request or the RRC message may indicate that the UE needs a new GNSS measurement before the expiry of the GNSS validity duration associated with the last successful GNSS MG. For example, the scheduling request or the RRC message may indicate that UE would perform any one of the following operations: awaiting a GNSS measurement gap trigger from a network node; immediately starting an autonomous GNSS measurement; starting an autonomous GNSS measurement after an offset; or either starting the autonomous GNSS measurement or awaiting the trigger depending on what is configured by a network node.

[0083] The solutions of the present disclosure may be applicable to a UE (or a wireless device) and a network node in NTN environment involving GNSS, or any other positioning procedure and system, e.g., a 3GPP-based positioning procedure and system (which are commonly called as GNSS in this disclosure, for the sake of a brief description) . Hereinafter, the solutions of the present disclosure will be described in detail with reference to FIGs. 3-8.

[0084] FIG. 3 is a flow chart depicting a method performed at a UE according to an embodiment of the present disclosure. At block 310, the UE transmits to a network node (such as an eNB) , an indication indicating that the UE requires a GNSS measurement, before a GNSS validity duration of the UE associated with a last successful GNSS measurement has expired. The UE transmits the indication without having performed a recent GNSS measurement. In other words, the indication is not transmitted in response to a successful or failed GNSS measurement. According to embodiments of the present disclosure, the indication is carried in at least one of: a GNSS validity duration report, an uplink MAC CE, a SR, or a RRC message.

[0085] The GNSS validity duration report and the uplink MAC CE may be transmitted by using uplink transmission resources allocated to the UE. The uplink MAC CE may be a dedicated MAC CE. The SR may be transmitted using a dedicated SR configuration from the network, so that the network node can recognize that this SR comprises the indication. The RRC message may be a newly defined RRC message. In an embodiment, the UE may select using which one of a GNSS validity duration report, an uplink MAC CE, a SR, or a RRC message for transmitting the indication. In another embodiment, which one would be used for transmitting the indication is pre-configured by the network (e.g., the network node) , or pre-defined (e.g., in an agreement or specification) . The transmission of the indication enables a UE side (such as the UE) and a network side (such as the network node) to have  a common understanding on when and how the UE is going to perform the required GNSS measurement.

[0086] Although not shown in FIG. 3, in an embodiment, the method further comprises determining that the GNSS measurement is required. For example, the indication may be transmitted in response to a detection that a GNSS position fix of the UE is becoming invalid, and thus it can be determined that a GNSS measurement is required to re-acquire a new GNSS position fix.

[0087] Although not shown in FIG. 3, in an embodiment, the method further comprises receiving from the network node a receipt of the indication, or a confirmation of the indication, or a triggering command for the required GNSS measurement. The receipt, confirmation of the indication, and triggering command are received in response to the transmission of the indication.

[0088] In an embodiment, the indication is transmitted in case that a remaining time of the GNSS validity duration is longer than a pre-configured threshold. For example, the pre-configured threshold may be pre-configured by the network node. In an example, the UE may determine if the remaining time of the GNSS validity duration is longer than the pre-configured threshold, and trigger the transmission of the indication in case it is determined that the remaining time of the GNSS validity duration is longer than the pre-configured threshold. This is to prevent the UE from transmitting the indication close to the time where the network (e.g., the network node) will anyway trigger a new GNSS measurement or the time where the UE can trigger the autonomous measurement.

[0089] In an embodiment, the UE moves to a RRC idle state in case that the transmission of the indication fails. For example, if the transmission of the indication via any of the GNSS validity duration report, the SR, the uplink MAC CE or the RRC message fails for a network-configured times (e.g., 2 or 3 times) , the UE considers it is out of uplink synchronization. Then, the UE would move to the RRC idle state.

[0090] In an embodiment, the UE moves to a RRC idle state in case that no confirmation or no triggering command for the required GNSS measurement is received from the network node in response to the indication. In this regard, if the UE requested the network node to trigger the required GNSS measurement or confirm a MG for the required autonomous GNSS measurement, but failed to receive a new GNSS measurement triggering command or any confirmation from the network node, respectively, within a network-configured timer, then the UE considers it is out of uplink synchronization. Then, the UE would move to RRC Idle state.

[0091] In an embodiment, the UE is prohibited to perform uplink transmission after the transmission of the indication, until the required GNSS measurement is performed successfully.

[0092] In an embodiment, the indication may further indicate more details about the required GNSS measurement, such as the following four different ways to be used for performing about the required GNSS measurement. In an example, the indication indicates that the UE requests the network node to trigger the required GNSS measurement. Then, the method may further comprise receiving a triggering command from the network node for starting the required GNSS measurement.

[0093] In another example, the indication indicates that the UE starts the required GNSS measurement autonomously upon the transmission of the indication. Then, the method may further comprise starting the required GNSS measurement autonomously upon the transmission of the indication.

[0094] In yet another example, the indication indicates that the UE starts the required GNSS measurement autonomously after an offset from the transmission of the indication. Then, the method may further comprise starting the required GNSS measurement autonomously after an offset from the transmission of the indication.

[0095] In yet another example, the indication indicates that the UE starts the required GNSS measurement autonomously either upon the transmission of the indication or after an offset from the transmission of the indication depending on a network pre-configuration. Then, the method may further comprise starting the required GNSS measurement autonomously either upon the transmission of the indication or after an offset from the transmission of the indication depending on the network pre-configuration.

[0096] In an embodiment, the UE may select or set different values for the indication to indicate any one of the above different ways to be used for performing the required GNSS measurement. In another embodiment, it is default that the indication indicates only one of the above different ways to be used for performing the required GNSS measurement.

[0097] In some embodiments, the indication is carried in a GNSS validity duration report. The indication comprises one or more values of validity duration in a GNSS-ValidationDuration information element of the GNSS validity duration report. For example, the indication is 0 or a negative value (such as -1) which is defined as a value of validity duration. These specified values clearly differ themselves from other normal values of validity duration, and then would be easily recognized by a receiver as a trigger for a GNSS measurement, rather than a normal GNSS validity duration report. In another example, the indication is a value of validity duration shorter than a remaining duration of the GNSS validity duration associated with the last successful GNSS measurement. In this regard, the UE may determine the remaining duration of the GNSS validity duration associated with the last successful GNSS measurement, e.g., based on a timer, and then set the validity duration in GNSS validity duration report to a value much shorter than the determined determine remaining duration.

[0098] In some embodiments, the indication comprises a flag in the GNSS validity duration report. For example, the UE may set the flag to indicate that the UE requires the GNDSS measurement, and further select respective values for the flag to indicate any one of the above different ways to be used for performing the required GNSS measurement.

[0099] FIG. 4 is a flow chart depicting an exemplary method performed at a network node, such as an eNB, according to an embodiment of the present disclosure. At block 410, the network node receives from a UE, an indication indicating that the UE requires a GNSS measurement, before a GNSS validity duration of the UE associated with the last successful GNSS measurement has expired. The indication is carried in at least one of: a GNSS validity duration report, an uplink MAC CE, a SR, or a RRC message. According to the indication, the network node can have a common understanding as the UE on when and how the UE is going to perform the required GNSS measurement.

[0100] In an embodiment, the indication is carried in the GNSS validity duration report. As the GNSS validity duration report is not transmitted in response to a successful or failed recent GNSS measurement, the network node could recognize that the GNSS validity duration report is used to indicate a required GNSS measurement, rather than a normal GNSS validity duration report. The uplink MAC CE may be a dedicated MAC CE. The RRC message may be a newly defined RRC message.

[0101] Although not shown in FIG. 4, in an embodiment, the method further comprises configuring a dedicated configuration for the SR, so that the SR may be transmitted by the UE using the dedicated SR configuration.

[0102] Although not shown in FIG. 4, in an embodiment, the method further comprises transmitting to the UE, a receipt of the indication, or a confirmation, or a triggering command for the required GNSS measurement.

[0103] FIG. 5 is an exemplary signaling flow 500 depicting an exemplary procedure according to an embodiment of the present disclosure. As shown in FIG. 5, at step 510, a UE 501 transmits a GNSS validity duration report to a network node 502 (such as an eNB) upon performing a GNSS measurement successfully. The GNSS validity duration report comprises a GNSS validity duration associated with this successful GNSS measurement.

[0104] At step 520, during the GNSS validity duration reported in step 510, the UE 501 transmits to the network node 502 a new GNSS validity duration report. The new GNSS validity duration report may comprise a new GNSS validity duration or a flag, to indicate that the UE requires a GNSS measurement, as discussed above. In this example, the new GNSS validity duration or the flag indicates that the UE will await a GNSS measurement triggering command from the network node.

[0105] In response to receiving the new GNSS validity duration report, the network node 502 may transmit a GNSS measurement triggering command to the UE 501 to trigger a GNSS MG, as shown at step 530. Then, the UE 501 may perform a GNSS measurement in the triggered GNSS MG, as shown at step 540.

[0106] FIG. 6 is an exemplary signaling flow 600 depicting an exemplary procedure according to an embodiment of the present disclosure. As shown in FIG. 6, at step 610, a UE 601 transmits a GNSS validity duration report to a network node 602 (such as an eNB) upon performing a GNSS measurement successfully. The GNSS validity duration report comprises a GNSS validity duration associated with this successful GNSS measurement.

[0107] At step 620, during the GNSS validity duration reported in step 610, the UE 601 transmits to the network node 602 a new GNSS validity duration report. The new GNSS validity duration report may comprise a new GNSS validity duration or a flag, to indicate that the UE requires a GNSS measurement, as discussed above. In this example, the new GNSS validity duration or the flag indicates that the UE 601 will start an autonomous GNSS measurement upon the transmission of the new GNSS validity duration report.

[0108] Then, at step 630, after the transmission of the new GNSS validity duration report, the UE 601 may perform the autonomous GNSS measurement.

[0109] FIG. 7 is an exemplary signaling flow 700 depicting an exemplary procedure according to an embodiment of the present disclosure. As shown in FIG. 7, at step 710, a UE 701 transmits a GNSS validity duration report to a network node 702 (such as an eNB) upon performing a GNSS measurement successfully. The GNSS validity duration report comprises a GNSS validity duration associated with this successful GNSS measurement.

[0110] At step 720, during the GNSS validity duration reported in step 710, the UE 701 tries to transmit to the network node 702 a new GNSS validity duration report. The new GNSS validity duration report may comprise a new GNSS validity duration or a flag, to indicate that the UE requires a GNSS measurement, as discussed above. In this example, the UE 701 needs feedback from the network node 702, such as an acknowledgement, a confirmation, or a triggering command for a GNSS measurement. However, no feedback in response to the new GNSS validity duration report is received by the UE 701, as shown by the X mark at step 720. It is possible that the network node 702 does not receive the new GNSS validity duration report, or the network node 702 does not provide the feedback, or the provided feedback is lost during a transmission to the UE 701.

[0111] The UE 701 may try the transmission of the new GNSS validity duration report for several times, as shown at step 730.

[0112] If the UE 701 does not receive expected feedback from the network node 702 after trying pre-configured times, or for a pre-configured duration (e.g., since the first reporting in step 720) , the UE 701 may move to RRC Idle state. In this regard, a network configured timer may be set for waiting for the expected feedback.

[0113] The embodiments of the present disclosure address the issue on how a UE can inform a network node to update a previous reported GNSS validity duration, e.g., due to UE’s mobility state change. Through the embodiments, a common understanding between the UE and the network node on a measurement gap for a new GNSS measurement can be achieved.

[0114] Further, some embodiments of the present disclosure reuse a GNSS validity duration report to indicate the need for a GNSS measurement, before a GNSS validity duration associated with the last successful GNSS has expired. This decreases an impact of embodiments of the present disclosure on existing mechanisms for GNSS measurement. Meanwhile. the reuse of the GNSS validity duration report is signaling efficient and will allow the UE to react to whether the GNSS measurement is urgent or not.

[0115] Now reference is made to FIG. 8 illustrating a simplified block diagram of an apparatus 800 that may be embodied in / as a UE, or a network node (such as eNB) . The apparatus 800 may comprise at least one processor 801, such as a data processor (DP) and at least one memory 802 coupled to the at least one processor 801. The apparatus 800 may further comprise one or more transmitters TX, one or more receivers RX 803, or one or more transceivers coupled to the one or more processors 801 to communicate wirelessly and / or through wireline. For example, the transmitters TX / RX 803 may comprise a radio transceiver for transmitting and receiving cellular communication signals, and a GNSS receiver for receiving satellite position signals.

[0116] Although not shown, the apparatus 800 may have at least one communication interface, for example, the communicate interface can be at least one antenna, or transceiver as shown in the FIG. 8. The communication interface may represent any interface that is necessary for communication with other UEs and / or network nodes.

[0117] The processors 801 may be of any type suitable to the local technical environment, and may include one or more of the following: general purpose computers, special purpose computers, microprocessors, digital signal processors (DSPs) and processors based on multicore processor architecture, as non-limiting examples.

[0118] The memory 802 may be of any type suitable to the local technical environment and may be implemented using any suitable data storage technology, such as semiconductor-based memory  devices, magnetic memory devices and systems, optical memory devices and systems, fixed memory and removable memory, as non-limiting examples.

[0119] The memory 802 stores a program 804. The program 804 may include instructions that, when executed on the associated processor 801, enable the apparatus 800 to operate in accordance with the embodiments of the present disclosure. A combination of the at least one processor 701 and the at least one memory 802 may form processing circuitry or means 805 adapted to implement various embodiments of the present disclosure.

[0120] Various embodiments of the present disclosure may be implemented by computer program executable by one or more of the processors 801, software, firmware, hardware or in a combination thereof.

[0121] In general, the various exemplary embodiments may be implemented in hardware or special purpose circuits, software, logic, module, means or any combination thereof. For example, some aspects may be implemented in hardware, while other aspects may be implemented in firmware or software which may be executed by a controller, microprocessor or other computing device, although the invention is not limited thereto. While various aspects of the exemplary embodiments of this disclosure may be illustrated and described as block diagrams, flow charts, or using some other pictorial representation, it is well understood that these blocks, apparatus, systems, techniques or methods described herein may be implemented in, as non-limiting examples, means, module, hardware, software, firmware, special purpose circuits or logic, general purpose hardware or controller or other computing devices, or some combination thereof.

[0122] As such, it should be appreciated that at least some aspects of the exemplary embodiments of the disclosures may be practiced in various components such as integrated circuit chips and modules. It should thus be appreciated that the exemplary embodiments of this disclosure may be realized in an apparatus that is embodied as an integrated circuit, where the integrated circuit may comprise circuitry (as well as possibly firmware) for embodying at least one or more of a data processor, a digital signal processor, baseband circuitry and radio frequency circuitry that are configurable so as to operate in accordance with the exemplary embodiments of this disclosure.

[0123] It should be appreciated that at least some aspects of the exemplary embodiments of the disclosures may be embodied in computer-executable instructions, such as in one or more program modules, executed by one or more computers or other devices. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform particular tasks or implement particular abstract data types when executed by a processor in a computer or other device. The computer executable instructions may be stored on a computer readable medium, for example,  non-transitory computer readable medium, such as a hard disk, optical disk, removable storage media, solid state memory, RAM, etc. As will be appreciated by one of skills in the art, the function of the program modules may be combined or distributed as desired in various embodiments. In addition, the function may be embodied in whole or in part in firmware or hardware equivalents such as integrated circuits, field programmable gate arrays (FPGA) , and the like.

[0124] Further, while operations are depicted in a particular order, this should not be understood as requiring that such operations be performed in the particular order shown or in sequential order, or that all illustrated operations be performed, to achieve desirable results. In certain circumstances, multitasking and parallel processing may be advantageous. Likewise, while several specific implementation details are contained in the above discussions, these should not be construed as limitations on the scope of the present disclosure, but rather as descriptions of features that may be specific to particular embodiments. Certain features that are described in the context of separate embodiments may also be implemented in combination in a single embodiment. Conversely, various features that are described in the context of a single embodiment may also be implemented in multiple embodiments separately or in any suitable sub-combination.

[0125] The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments. As used herein, the singular forms “a” , “an” and “the” are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms “comprises” , “comprising” , “has” , “having” , “includes” and / or “including” , when used herein, specify the presence of stated features, elements, and / or components etc., but do not preclude the presence or addition of one or more other features, elements, components and / or combinations thereof. As used herein, the term “and / or” includes any and all combinations of one or more of the listed terms.

[0126] As used herein, the phrase “at least one of A and B” or “at least one of A or B” should be understood to mean “only A, only B, or both A and B. ” The phrase “A and / or B” should be understood to mean “only A, only B, or both A and B” .

[0127] The present disclosure includes any novel feature or combination of features disclosed herein either explicitly or any generalization thereof. Various modifications and adaptations to the foregoing exemplary embodiments of this disclosure may become apparent to those skilled in the relevant arts in view of the foregoing description, when read in conjunction with the accompanying drawings. However, any and all modifications will still fall within the scope of the non-limiting and exemplary embodiments of this disclosure.

Claims

1.An apparatus for a user equipment (UE) , the apparatus comprising:at least one processor; andat least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least to:transmit to a network node, an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with a last successful GNSS measurement has expired,wherein the indication is carried in at least one of:a GNSS validity duration report,an uplink medium access control (MAC) control element (CE) ,a scheduling request, ora radio resource control (RRC) message.2.The apparatus according to claim 1, wherein the apparatus is further caused to,receive from the network node a receipt of the indication, or a confirmation, or a triggering command for the required GNSS measurement.3.The apparatus according to claim 1 or 2, wherein the indication is transmitted in case that a remaining time of the GNSS validity duration is longer than a pre-configured threshold.4.The apparatus according to any of claims 1 to 3, wherein the apparatus is further caused to,move to a RRC idle state in case that the transmission of the indication fails.5.The apparatus according to any of claims 1 to 4, wherein the apparatus is further caused to,move to a RRC idle state in case that no confirmation or no triggering command for the required GNSS measurement is received from the network node in response to the indication.6.The apparatus according to any of claims 1 to 5, wherein the apparatus is further caused to:be prohibited to perform uplink transmission after the transmission of the indication, until the required GNSS measurement is performed successfully.7.The apparatus according to any of claims 1 to 6, wherein the indication indicates that the UE requests the network node to trigger the required GNSS measurement.8.The apparatus according to claim 7, wherein the apparatus is further caused to:receive a triggering command from the network node for starting the required GNSS measurement.9.The apparatus according to any of claims 1 to 6, wherein the indication indicates that the UE starts the required GNSS measurement autonomously upon the transmission of the indication; andand wherein the apparatus is further caused to start the required GNSS measurement autonomously upon the transmission of the indication.10.The apparatus according to any of claims 1 to 6, wherein the indication indicates that the UE starts the required GNSS measurement autonomously after an offset from the transmission of the indication;and wherein the apparatus is further caused to start the required GNSS measurement autonomously after an offset from the transmission of the indication.11.The apparatus according to any of claims 1 to 6, wherein the indication indicates that the UE starts the required GNSS measurement autonomously either upon the transmission of the indication or after an offset from the transmission of the indication depending on a network pre-configuration;and wherein the apparatus is further caused to start the required GNSS measurement autonomously either upon the transmission of the indication or after an offset from the transmission of the indication depending on the network pre-configuration.12.The apparatus according to any of claims 1 to 11, wherein the indication is carried in a GNSS validity duration report, and the indication comprises one or more values of validity duration in a GNSS-ValidationDuration Information element of the GNSS validity duration report.13.The apparatus according to claim 12, wherein the indication is 0 or a negative value which is defined as a value of validity duration.14.The apparatus according to claim 12, wherein the indication is a value of validity duration shorter than the remaining time of the GNSS validity duration associated with the last successful GNSS measurement.15.The apparatus according to any of claims 1 to 11, wherein the indication is a flag.16.The apparatus according to any of claims 1 to 11, wherein the scheduling request is transmitted using a dedicated configuration from a network.17.An apparatus for a network node, the apparatus comprising:at least one processor; andat least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least to:receive from a user equipment (UE) , an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with the last successful GNSS measurement has expired,wherein the indication is carried in at least one of:a GNSS validity duration report,an uplink medium access control (MAC) control element (CE) ,a scheduling request, ora radio resource control (RRC) message.18.The apparatus according to claim 17, wherein the apparatus is further caused to,transmit to the UE, a receipt of the indication, or a confirmation, or a triggering command for the required GNSS measurement.19.The apparatus according to any of claims 17 to 18, wherein the indication indicates one of the following:the UE requests the network node to trigger the required GNSS measurement,the UE starts the required GNSS measurement autonomously upon the transmission of the indication,the UE starts the required GNSS measurement autonomously after an offset from the transmission of the indication, orthe UE starts the required GNSS measurement autonomously either upon the transmission of the indication or after an offset from the transmission of the indication depending on a network pre-configuration.20.The apparatus according to any of claims 17 to 19, wherein the indication is carried in the GNSS validity duration report, and the indication comprises one or more values of validity duration in a GNSS-ValidationDuration Information element.21.The apparatus according to claim 20, wherein the indication is 0 or a negative value which is defined as a value of validity duration.22.The apparatus according to claim 20, wherein the indication is a value of validity duration shorter than a remaining time of the GNSS validity duration associated with the last successful GNSS measurement.23.The apparatus according to any of claims 17 to 19, wherein the indication comprises a flag in the GNSS validity duration report.24.The apparatus according to any of claims 17 to 19, wherein the apparatus is further caused to,configure a dedicated configuration for the scheduling request.25.A method performed at a user equipment (UE) , the method comprising:transmitting to a network node, an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with the last successful GNSS has expired,wherein the indication is carried in at least one of:a GNSS validity duration report,an uplink medium access control (MAC) control element (CE) ,a scheduling request configuration, ora radio resource control (RRC) message.26.A method performed at a network node, the method comprising:receiving from a user equipment (UE) , an indication indicating that the UE requires a global navigation satellite system (GNSS) measurement, before a GNSS validity duration of the UE associated with the last successful GNSS measurement has expired,wherein the indication is carried in at least one of:a GNSS validity duration report,an uplink medium access control (MAC) control element (CE) ,a scheduling request configuration, ora radio resource control (RRC) message.27.A computer-readable medium having computer program codes embodied thereon which, when executed on a computer, cause the computer to perform the method according to claim 25.28.A computer-readable medium having computer program codes embodied thereon which, when executed on a computer, cause the computer to perform the method according to claim 26.