Environmental load estimation device, environmental load estimation system and environmental load estimation method
The environmental load estimation device addresses inaccuracies in existing systems by integrating diverse data sources and categorizing attributes to enhance real-time accuracy and precision in CO2 emission calculations, supporting sustainable practices.
Patent Information
- Application Number
- JP2023048418
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-24
- Publication Date
- 2024-10-07
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing environmental load estimation systems lack real-time accuracy and data consistency, as they rely on fixed reference values and do not effectively incorporate data from various operators, leading to inaccuracies in calculating CO2 emissions.
An environmental load estimation device that combines and processes data from multiple sources, including business systems and open data providers, to estimate detailed environmental loads by categorizing data attributes and selecting appropriate estimation methods based on data accuracy, ensuring consistency with calculation formulas.
Enhances the real-time nature and accuracy of environmental load estimation by utilizing business data, allowing for precise calculations of CO2 emissions and promoting sustainable practices through improved data integration and method selection.
Smart Images

Figure 2024137063000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an environmental load estimation device, an environmental load estimation system, and an environmental load estimation method. [Background technology]
[0002] In recent years, reducing CO2 emissions has become a major social goal in order to achieve the Sustainable Development Goals (SDGs). In particular, since transportation has a significant impact on the environment, including air pollution and global warming, reducing CO2 emissions from travel has become an important issue. Public transportation such as trains and buses have lower CO2 emissions per unit of transportation (passenger-kilometer basis) compared to private cars, so it is important for individual users to use public transportation to reduce CO2 emissions from travel. If it were possible to detect the means of transportation (train, bus, car, walking, etc.) from communication information obtained from each user's smartphone, while estimating the energy consumption related to operation and visualizing the amount of CO2 emissions reduction per person for the section and train that each user rode, it would be possible to promote a modal shift for each user and move towards a sustainable social structure. Furthermore, by providing such user trends to public transportation operators (hereinafter referred to as "operators"), the operators will be able to use this trend data to operate their businesses more efficiently, bringing us one step closer to realizing an environmentally friendly society.
[0003] In addition, to calculate CO2 emissions from employee commuting, which is one item of supply chain emissions, it is common to multiply the CO2 emissions per unit of transportation defined for each mode of transportation (private car, airplane, bus, train, etc.) (the CO2 emissions required to transport one person one kilometer) by the distance traveled.
[0004] However, even for the same transportation mode, the environmental impact differs depending on the vehicle's performance, etc. For example, in the case of private cars, it is generally known that electric vehicles emit less CO2 than gasoline-powered vehicles. Even in the railway industry, new vehicles that can reduce CO2 and NOx emissions have a lower environmental impact than conventional vehicles, and the environmental impact per person varies depending on the number of passengers. Although it is possible to calculate the environmental impact in more detail by utilizing various data possessed by railway operators, the format and accuracy of the data provided by each operator often differs. Also, even if the calculation formula for the same environmental impact value is used, the type, format, and accuracy of the data required by each calculation formula often differs, making it difficult to determine the accuracy of the environmental impact value.
[0005] As a system for maintaining interest in contributing to the SDGs, Patent Document 1 discloses an SDGs contribution point system including: a movement detection unit that detects when a user starts a movement from a start location and when the user ends the movement at an end location; a movement content determination unit that determines the movement content including the start location, end location, and information on the means of movement and records it in a movement history recording unit; an environmental load calculation unit that calculates a first CO2 emission amount per person related to a movement using a passenger transportation service and a second CO2 emission amount per person assuming that the user travels from the start location to the end location in a commonly used passenger car; and an SDGs application having a point calculation unit that calculates and records the points to be awarded to the user according to the reduction amount of the first CO2 emission amount from the second CO2 emission amount. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2023-18710 A Summary of the Invention [Problem to be solved by the invention]
[0007] In Patent Document 1, the type of carriage of the train traveled, the type of express or limited express train, the weight of the carriage, information on the power generation means, the weather, etc. are taken into consideration, and the amount of CO2 emissions per person is calculated by dividing it proportionately by the number of passengers. However, in Patent Document 1, basic information is set in advance as a reference value and fixed, and data from operators such as railway operators cannot be reflected in real time, so there is room for improvement in the calculated results. Therefore, an object of the present disclosure is to provide an environmental load estimation device, an environmental load estimation system, and an environmental load estimation method that utilize data from businesses to improve the real-time nature and accuracy of data related to environmental load estimation. [Means for solving the problem]
[0008] In order to solve the above-mentioned problems, one of the representative environmental load estimation devices of the present invention is an environmental load estimation device that estimates an environmental load by combining and processing a plurality of pieces of information. The environmental load estimation device includes a data acquisition unit capable of acquiring data from each of the business system device, the open data providing device, and the travel route collection device. a detailed environmental load estimation unit that estimates a detailed environmental load per capita by substituting input data including the data acquired by the data acquisition unit and data held by the environmental load estimation device into an estimation method that is consistent with the input data; The system further includes a route environmental load estimating unit that combines the detailed environmental load with information on the user's travel route to estimate the user's route environmental load. Effect of the Invention
[0009] According to the present disclosure, it is possible to provide an environmental load estimation device, an environmental load estimation system, and an environmental load estimation method that utilize data from businesses to improve the real-time nature and accuracy of data related to environmental load estimation. Problems, configurations and effects other than those described above will become apparent from the following description of the preferred embodiment of the invention. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a diagram illustrating an example of a hardware configuration according to an embodiment of the present disclosure. [Diagram 2] FIG. 2 is a diagram illustrating an example of a configuration of an environmental load estimation device according to an embodiment of the present disclosure. [Diagram 3] FIG. 3 is a schematic diagram illustrating an example of an estimation method for estimating an environmental load. [Figure 4] FIG. 4 is a schematic diagram illustrating the continuation attribute. [Diagram 5] FIG. 5 is a schematic diagram illustrating causal attributes. [Figure 6] FIG. 6 is a schematic diagram illustrating independent attributes. [Figure 7] FIG. 7 is a flowchart showing a main flow of the environmental load estimation. [Figure 8] FIG. 8 is a flowchart of detailed environmental load estimation. [Figure 9] Figure 9 is a flowchart for estimating the environmental impact of each train. [Figure 10] FIG. 10 is a flowchart of the estimation method when the attribute of the data is a continuous attribute. [Figure 11] FIG. 11 is a flowchart of an estimation method when the attribute of data is a causal attribute. [Figure 12] FIG. 12 is a flowchart of an estimation method when the attributes of data are independent attributes. [Figure 13] FIG. 13 is a diagram showing an example of data to be substituted into the calculation formula of the estimation method. [Figure 14] FIG. 14 is a diagram illustrating data for estimating the number of passengers. [Figure 15] FIG. 15 is a diagram illustrating data for estimating the environmental load for each train. [Figure 16] FIG. 16 is a diagram illustrating data for estimating the environmental load for each train. [Figure 17]FIG. 17 is a diagram illustrating data for estimating the environmental load for each train. [Figure 18] FIG. 18 is a diagram showing an example of output of the personal environmental load value. [Figure 19] FIG. 19 is a flowchart showing a method for estimating the environmental load of a route. [Figure 20] FIG. 20 is a diagram showing an example of data for acquiring passenger routes and routes of transportation facilities. [Figure 21] FIG. 21 is a diagram for explaining an example in which a travel route is decomposed into fragments. [Figure 22] FIG. 22 is a diagram illustrating an example of data that integrates information on the routes and trains used by passengers. [Figure 23] FIG. 23 is a diagram illustrating an example of integrating the environmental loads for each fragment. [Figure 24] FIG. 24 is a diagram showing an example of visualizing the environmental load in the form of a heat map. [Diagram 25] FIG. 25 is a diagram showing an example of visualization of environmental load in the form of a diagram. [Figure 26] FIG. 26 is a diagram showing an example of visualizing the estimated environmental load values in the form of a route search or a movement history display. [Figure 27] FIG. 27 is a diagram for explaining a use example of the environmental load estimated value. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the present invention is not limited to the embodiment. In addition, in the description of the drawings, the same parts are denoted by the same reference numerals. When there are multiple components having the same or similar functions, they may be described by using the same reference numerals with different subscripts, or when there is no need to distinguish between these multiple components, the subscripts may be omitted. In order to facilitate understanding of the invention, the position, size, shape, range, etc. of each component shown in the drawings may not represent the actual position, size, shape, range, etc. Therefore, the present invention is not necessarily limited to the position, size, shape, range, etc. disclosed in the drawings.
[0012] Furthermore, terms such as "first," "second," and "third" may be used to describe various elements or components in this disclosure, but these elements or components should not be limited by these terms. These terms are used only to distinguish one element or component from another element or component. Thus, a first element or component discussed below could be termed a second element or component without departing from the teachings of the inventive concepts.
[0013] In addition, in this disclosure, "data accuracy" refers to the accuracy of data such as input values and output values used in this disclosure. However, the method of expressing data accuracy is not limited to the accuracy rate defined as a percentage or significant figures that are used as indicators of general accuracy. In this disclosure, "data accuracy" refers to an indicator that expresses the characteristics of data, such as the presence or absence of data, whether it is a predicted value or an actual value, the frequency of data acquisition, and the unit of measurement. In other words, it refers to the "usable level" and "effectiveness" for determining whether it can be used as data. In particular, the accuracy of data on the total environmental load value of the output value in this disclosure may be referred to as "estimated accuracy information." The format of the estimated accuracy information may be a numerical value (such as a percentage), or the actually used formula and data and their accuracy may be used as the estimated accuracy information.
[0014] In this disclosure, a unit by which environmental load can be estimated is referred to as an "environmental load estimation category." In addition, in the present disclosure, the input data and the estimation method or calculation formula being "consistent" means that the quality and accuracy of the input data are consistent with the quality and accuracy assumed by the estimation method or calculation formula, and that the estimation method or calculation formula can calculate an estimated value with the accuracy intended by the estimation method or calculation formula, in other words, that the estimation method or calculation formula is "effective."
[0015] In addition, in this disclosure, there are three types of "data attributes": A:Continuous attribute Data with attributes that do not change in content or accuracy for each environmental impact estimation category and allow data from the previous estimation category to be used continuously. B: Causal attribute The content and accuracy of the data may change for each estimated category of environmental impact, but the content of the change has a causal relationship with the data of the previous estimated category, and the data has attributes that result in little change in the accuracy of the data. C: Independent attribute Data with attributes in which the content and precision of data often change for each estimated classification of environmental impact, and the content of the changes is not causally related to the data of the previous estimated classification and is independent of the previous estimated classification, and therefore the precision of the data is likely to have changed as well.
[0016] <Hardware configuration example> First, with reference to FIG. 1, an example of a hardware configuration for implementing an embodiment of the present disclosure will be described. The hardware configuration example according to the embodiment of the present disclosure may be configured with any appropriate computing system. The main components of the hardware constituting the environmental load estimation system are an environmental load estimation device 10, a business system device 30 connectable via a network 20, an open data providing device 40, a travel route collecting device 50, and an application server 60. The environmental load estimation device 10 includes a storage device 101, a memory 110, a CPU 120, a UI device 130, and a communication device 140. These components can be interconnected via a bus 150.
[0017] The storage device 101 can be configured with an appropriate non-volatile storage element such as an SSD (Solid State Drive) or a hard disk drive, and can store a program 102 and data 103. Moreover, the memory 110 can be composed of a volatile storage element such as a RAM. The CPU 120 may be equipped with one or more CPUs, or may be a single CPU system. The CPU 120 executes the program 102 stored in the storage device 101 by, for example, reading the program 102 into the memory 110, and performs overall control of the device itself as well as various judgments, calculations, and control processes.
[0018] UI devices 130 may include user output devices, such as a video display, speakers, television, etc., and user I / O devices, such as user input devices, such as a keyboard, mouse, keypad, touchpad, trackball, buttons, light pen, or other pointing device.
[0019] The network 20 is a path that allows connection and communication between the business system device 30, the open data providing device 40, the travel route collecting device 50, and the application server 60 via the communication device 140 of the environmental load estimation device 10. In addition, there may be multiple business system devices 30, open data providing devices 40, travel route collection devices 50, and application servers 60, as long as they are capable of connecting to and communicating with the environmental load estimation device 10 via the necessary networks 20. Moreover, data contained in the business system device 30, the open data providing device 40, and the travel route collecting device 50 will be described later.
[0020] Individual users may receive the environmental load estimation results via the app server 60 on a desktop computer, portable computer, laptop, tablet computer, pocket computer, telephone, smartphone, or any other suitable electronic device. In addition, businesses can also receive the results of environmental load estimation via the application server 60. The application server 60 can provide smartphone applications for individual users, applications for use in travel expense settlement for general companies, applications for use in automating business operations within a business, and the like. Furthermore, the environmental load estimation results do not necessarily have to be received through the application server 60. The environmental load estimation results may be received via another route via the network 20.
[0021] <Environmental load estimation device> Next, a configuration of the environmental load estimation device 10 will be described with reference to Fig. 2. Fig. 2 is a diagram illustrating an example of a configuration of the environmental load estimation device according to an embodiment of the present disclosure. The environmental load estimation device 10 is connected to various external devices and servers via the network 20 as described above. The environmental load estimation device 10 includes a data acquisition unit 201 that acquires various data, a detailed environmental load estimation unit 203 that estimates detailed environmental loads from the various data, a route environmental load estimation unit 205 that estimates route environmental loads, and a data distribution unit 207 that distributes the estimation results, etc. The environmental load estimation device 10 also stores various data acquired by the data acquisition unit, and is provided with basic data 211, statistical data 213, plan data 215, measurement data 217, estimation method pattern 220, detailed environmental load 230, and route environmental load 240 as information necessary for the detailed environmental load estimation unit 203 and route environmental load estimation unit 205 to carry out processing. Examples of data stored in the basic data 211, the statistical data 213, the plan data 215, and the measurement data 217 will be described in detail later.
[0022] Data acquisition in the environmental load estimation device 10 may be a pull type in which the environmental load estimation device 10 transmits a request to the business system device 30, the open data providing device 40, the travel route collection device 50, etc. to acquire data, or a push type in which data transmitted from the business system device 30, the open data providing device 40, the travel route collection device 50, etc. is acquired. The data acquisition source may be an external device such as the business system device 30, the open data providing device 40, or the travel route collecting device 50, or may be a storage medium within the environmental load estimation device 10.
[0023] Furthermore, the timing of data acquisition may be at regular intervals or at any arbitrary timing such as when the data is generated, and data to be used at each stage of estimating the detailed environmental load and estimating the route environmental load may be acquired each time. As for data distribution, the environmental load estimation apparatus may distribute data in a push-type manner by transmitting the data itself, or may wait for a request from the data destination and distribute the data in a pull-type manner. Here, the data delivery destination is assumed to be an external device, but it is preferable that the data to be delivered is stored temporarily or permanently in a storage medium within the environmental load estimation apparatus 10. Furthermore, the timing of data delivery may be either at regular intervals or at any arbitrary timing, such as upon request from an application.
[0024] <Estimation method> Next, types of environmental loads and methods of estimating them will be described with reference to Fig. 3. Fig. 3 is a schematic diagram illustrating an example of a method for estimating environmental loads. There are various indicators of environmental impact, such as power consumption, CO2 emissions, and greenhouse gas emissions such as fluorocarbons, methane, and NOX. There are also many methods and algorithms for calculating these values. For example, Figure 3 shows that there are multiple estimation methods (estimation methods 1 and 2) for data (data d) that you want to estimate as an output. Estimation method 1 estimates data d as an output using calculation formulas X and Y, and estimation method 2 estimates data d as an output using calculation formula Z.
[0025] In estimation method 1, the calculation formula X used first requires data a that meets a certain level of accuracy, which becomes the input for calculation formula X. The accuracy of data a is determined by calculation formula X, and if data a that meets this accuracy requirement does not exist, it is difficult to calculate a highly accurate estimate even if estimation method 1 is adopted. In estimation method 1, data b calculated by formula X is the output of formula X and also serves as the input to the next formula Y. In calculation formula Y, data b and data c are used as inputs to calculate data d. Again, the accuracy of the data required as input to calculation formula Y is determined by calculation formula Y, and if data b and data c do not satisfy this accuracy requirement, it is difficult for estimation method 1 to derive an accurate estimated value. In other words, it is difficult to derive an accurate estimate unless the input data is substituted into an estimation method that is consistent with the data.
[0026] On the other hand, there may be an estimation method other than estimation method 1, called estimation method 2. In estimation method 2, data d is estimated as the output using only calculation formula Z. The accuracy of the data required as input to calculation formula Z is determined by calculation formula Z, and if data e does not satisfy this accuracy requirement, estimation method 2 cannot be adopted.
[0027] The accuracy of data d estimated by estimation method 1 and estimation method 2 may differ. However, as described above, by determining the accuracy of the input data required by the calculation formula used in each estimation method and evaluating the accuracy of various data, it is possible to rationally select an estimation method and estimate the environmental load that is most appropriate for the purpose.
[0028] In other words, there is a wide variety of data and calculation formulas available, and when estimating environmental impacts by combining data and calculation formulas of different accuracies, it is necessary for the party estimating the environmental impact, for example the application server, to evaluate the accuracy of the data so that it can determine whether or not the data can be used. By doing so, in the example of Figure 3, the accuracy of the available data is estimated and stored, and the application server determines whether to select estimation method 1 or estimation method 2, thereby enabling the necessary data d to be obtained. For this reason, in the present disclosure, the accuracy of data required for each calculation formula is determined in advance, the accuracy of the data is determined according to the type of data, and accurate estimates are derived by substituting the data into an estimation method or calculation formula that is consistent with the data. More specifically, the accuracy of the data is used to determine whether or not the data obtained for each estimation method or calculation formula can be used.
[0029] If the method of calculating an estimated value by substituting such data into a calculation formula is applied to, for example, calculating the environmental impact of public transportation travel, it becomes possible to estimate environmental impact data in detail. As a result, when a business operator calculates supply chain emissions, it will be able to more accurately calculate emissions due to employee travel using an app or the like. In addition, by allowing individual users such as consumers to accurately understand the environmental impact of their own actions, it is expected that this will promote a modal shift and contribute to raising environmental awareness.
[0030] <Switching data attributes and estimation methods> Next, the classification of data attributes and switching of estimation methods employed in the present disclosure will be described with reference to FIGS. In this disclosure, data attributes are classified into three types, enabling the selection of estimation methods and calculation formulas to be implemented efficiently. 4 to 6, switching of the environmental load estimation method is explained using a vehicle running on a railway line as an example, but the present disclosure is not limited to the environmental load of a railway vehicle running between stations. For example, the present disclosure can be applied to the calculation of the environmental load caused by using various facilities at a station, and can be applied to route buses and any other situations where the calculation of the environmental load is required.
[0031] Figures 4 to 6 show a model for estimating the amount of electricity used, which is an index of the environmental load when traveling between stations X and Y, and the amount of electricity used, which is an index of the environmental load when traveling between stations Y and Z after arriving at station Y. Generally, when estimating the amount of electricity, the amount of electricity is estimated for each station between the time a train departs from one station and the time it stops at the next station. In other words, data for estimating the environmental impact for each station is collected, and the data is substituted into a calculation formula to calculate the environmental impact for each station. Specifically, data for estimating the amount of electric power includes, for example, the type of vehicle, delay time, and run curve (a graph in which the horizontal axis indicates the running position and the vertical axis indicates the speed at each point as a curve in accordance with the change in the running position of the train). The environmental load differs depending on the type of vehicle, and the subsequent run curve also differs depending on the delay time, which affects the run curve and thus the calculation of the environmental load. The amount of electric power required to run the vehicle changes depending on the run curve, which changes the environmental load. In other words, in order to estimate the environmental load, it is necessary to collect these data for each estimation category of the environmental load, assess the accuracy of the collected data, and select a calculation formula that is suitable for the situation in which the data was obtained. In other words, an estimation method is selected for each estimation category, and a decision process is required to switch the estimation method for each station interval (each estimation category). However, by classifying the attributes of the data to be substituted into the calculation formula into A: continuous attributes, B: causal attributes, and C: independent attributes, it is possible to reduce the number of times the decision to switch estimation methods must be made, and thus reduce the calculation load on the environmental load estimation device.
[0032] (Example of continuation attribute) First, referring to Fig. 4, the continuing attribute will be described using an example of vehicle model data 400. In Fig. 4, the vehicle model data 400 surrounded by a solid line is the continuing attribute, and the other data surrounded by a dotted line is an attribute other than the continuing attribute. 4, vehicle type data 400 does not change from the time the same train departs from the starting station to the time it arrives at the end station, so the content and accuracy of the data are always constant and do not change with the progress of the train's operation along the way. In other words, for data with such continuous attributes, if the accuracy of the data is checked at the starting station (first environmental load estimation category) and the accuracy satisfies the accuracy required by the calculation formula, there is no need to check the accuracy of the data again between stations along the way (later environmental load estimation category) and reconsider the selection method. Specifically, if model data cannot be obtained at the starting station, the estimation method including a formula that requires model identification cannot be adopted, and must be changed to an estimation method including a formula that does not require model identification. The estimation method adopted at the starting station continues until the train arrives at the destination, and there is no need to make a decision to switch estimation methods between stations along the way.
[0033] (Example of causal attribution) Next, causal attributes will be described with reference to Fig. 5 using an example of delayed data 500, 501, and 502. In Fig. 5, delayed data 500, 501, and 502 surrounded by solid lines are causal attributes, and other data surrounded by dotted lines are attributes other than causal attributes. In Fig. 5, delay data 500, 501, 502 generally change in relation to the delay time between the previous stations (previous environmental load estimation category). In other words, except in the case of an accident or the like, the delay time between the previous stations tends to gradually increase or decrease. For this reason, for data having causal attributes, the estimation method used between the previous stations may be continued and used for the next station (next environmental load estimation category), or the estimation method may be changed due to changes in the accuracy of the delay data. Specifically, if the estimation method has been changed due to insufficient accuracy in delay data 500 between stations X and Y, and the accuracy of delay data 501 has been restored in the next station interval (between stations Y and Z), the estimation method may be reverted to that used in the previous station interval (between stations before station X); if accuracy has not been restored in delay data 502, the estimation method used in the previous station interval (between stations X and Y) will continue to be used.
[0034] (Example of an independent attribute) Next, with reference to Fig. 6, an independent attribute will be described using an example of run curves 600 and 601. In Fig. 6, run curves 600 and 601 surrounded by solid lines are independent attributes, and other data surrounded by dotted lines are attributes other than the independent attribute. 6, a run curve 601 between stations Y and Z (the estimation section to be estimated) is basically unrelated to a run curve 600 between the previous stations (between stations X and Y) (the previous estimation section of the environmental load) in many cases. For this reason, for data with independent attributes, the estimation method may always be changed between stations due to changes in the accuracy of the data. Specifically, even if the estimation method was changed due to insufficient accuracy of run curve 600 caused by temporary data loss in the previous section between stations (between X and Y stations), there is a high possibility that the accuracy of run curve 601 will be sufficient in the next section between stations (between Y and Z stations). Therefore, it is necessary to basically judge the accuracy of the run curve between each station and to judge whether to switch the estimation method between each station.
[0035] In this way, by categorizing the method of determining when to switch estimation methods according to the characteristics of the data, it is possible to reduce the number of times the estimation method determination process is performed for each estimation category, thereby reducing the calculation load on the environmental load estimation device. Taking such measures is particularly effective when performing environmental load estimation in real time.
[0036] <Main flow> Next, the flow of environmental load estimation according to the present disclosure will be described with reference to FIG. 7 is a flowchart showing a main flow for estimating environmental load. The environmental load estimation in this disclosure is composed of two steps: step 700 "estimating detailed environmental load" and step 750 "estimating environmental load of route utilization."
[0037] In the following description, environmental load estimation will be described using train travel as an example, but the present disclosure is not limited to this and can be applied to various forms of travel such as buses and private cars. In the case of private cars, detailed environmental load can be estimated from the vehicle type, probe data (data obtained from various sensors installed in the traveling car), information on the roads traveled, etc. In addition, the environmental load of railway trains may be calculated not only for each station but also for each station or for each facility within a station. Naturally, when applied to buses, the method can be applied to various situations such as for each bus vehicle or each bus stop.
[0038] Although the details of the detailed environmental load estimation in this disclosure will be described later, the detailed environmental load estimation is an estimation process for estimating the environmental load per passenger from the start to the end of a service such as a public transportation service, that is, a process for generating data on the environmental load to be analyzed for each transportation service. Meanwhile, the environmental load estimation of the route of use in step 750 is an estimation process for estimating the environmental load for each user based on the route of the user who uses the mobility service. The details of the environmental load estimation of the route of use will be described later, but in order to estimate the environmental load of the route of use, it is necessary to acquire travel route information for each user.
[0039] The estimation of environmental impacts may be based on predicted values or on actual values. The accuracy of the estimates is higher when they are based on actual values, but the flow of calculation of the estimates is the same. The environmental impact estimation data based on predicted values can be used, for example, when a user searches for a route, to encourage the user (passenger) to change their behavior by showing the environmental impact estimation value for the route in the search result. On the other hand, the environmental impact estimation data based on actual values can be used, for example, to award eco-points according to the user's contribution to reducing the environmental impact based on the user's travel history, or when a company calculates the amount of CO2 emissions in the supply chain.
[0040] <Detailed Estimation of Environmental Impact> Next, an example of estimating detailed environmental loads such as power consumption and CO2 emissions for each passenger railroad train will be described with reference to Fig. 8. Fig. 8 is a flow chart for explaining in detail the content of estimating detailed environmental loads in step 700 shown in Fig. 7. The estimation of detailed environmental loads in Fig. 8 consists of three steps: step 801 "estimating environmental load for each train", step 802 "estimating environmental load per passenger", and step 803 "adding estimation accuracy information and storing as detailed environmental load". First, in step 801 "Estimation of environmental impact for each train", the environmental impact between each station on the route on which each train runs is estimated. The estimation of the environmental impact of each train will be described in detail later. Next, in step 802, "Estimation of environmental impact per passenger," the environmental impact of each train is divided by the data on the number of passengers between each station on each train to estimate the environmental impact per general passenger. In other words, the output of step 801 is apportioned by the number of passengers.
[0041] The estimation of the number of passengers will be described in detail later with reference to FIG. When this method is applied to freight trains rather than passenger trains, the allocation may be based on unit mass of freight rather than on the number of passengers. Then, in step 803 "add estimation accuracy information and store as detailed environmental load", the accuracy of the data is added to the calculated estimated value and stored as a detailed environmental load. Specifically, based on the accuracy of the calculation formula and the accuracy of the data (presence or absence of data, actual or predicted, real-timeness, acquisition frequency, measurement unit, etc.) used in "Estimation of environmental load for each train" in step 801 and "Estimation of environmental load per passenger" in step 802, "Estimation of environmental load for each passenger" is assigned to the total environmental load value, which is the final output. The format of the estimation accuracy information may be a numerical value (e.g., %), or the formula and data actually used and their accuracy may be assigned as the accuracy information.
[0042] In this way, by providing estimation accuracy information to the estimated value of the detailed environmental load, it becomes possible for an application that uses this data to select data that matches the purpose when using the data. In addition, by being able to estimate the environmental impact data of public transportation travel in detail, the environmental impact data can be used in a variety of apps. For example, when a business calculates supply chain emissions, it will be able to calculate more accurately the emissions caused by the movement of employees. Furthermore, it is expected to contribute to raising environmental awareness by allowing consumers to accurately understand the environmental impact of their own actions.
[0043] <Estimation of environmental impact for each train> Next, the "estimation of environmental load for each train" in step 801 in FIG. 8 will be described with reference to FIG. FIG. 9 is a flowchart illustrating the flow of estimating the environmental load for each train, classified according to data attributes. (Step 901) First, in step 901, the train and section for which the environmental load is to be estimated are specified.
[0044] (Step 902) Next, from step 902, the following steps 903 to 909 are repeated for the trains and sections for which the environmental load is to be estimated, in the order in which the trains run. Note that the order of repetition does not necessarily need to be limited to the order between stations in the target section or the order in which the trains run. It is also possible to repeat in the order of stations and trains that are used most frequently, or stations and trains that have a high need for environmental load estimation.
[0045] (Step 903) Next, candidates for the estimation method for estimating the environmental load are set in step 903. As the estimation method, various existing estimation methods can be adopted.
[0046] (Step 904) Next, in step 904, the attributes of the data to be substituted into the calculation formula of the candidate estimation method are classified into continuous attributes (A), causal attributes (B), and independent attributes (C), and steps 905 to 908 are performed based on each attribute.
[0047] (Step 905) Step 905 is a process for deciding the estimation method when the data has a continuous attribute. In step 905, an applicable estimation method is decided based on the data obtained between the first stations, and this estimation method is applied to all target sections. In other words, it is decided that the estimation method decided for the first time will continue to be used in the second and subsequent repetitions. This makes it unnecessary to decide on an estimation method for data with a continuous attribute during the repetitive flow in the target section, making it possible to reduce the calculation load for environmental load estimation. The estimation method to be adopted will be described in detail later.
[0048] (Steps 906 and 907) Step 906 is a process for determining an estimation method when data has a causal attribute. In step 906, an applicable estimation method is determined based on data obtained between certain stations, and in step 907, for the next station, the estimation method used between the previous station is adopted as a candidate estimation method, and it is determined whether the obtained data has an accuracy applicable to the estimation method used between the previous station. If applicable, the environmental load is estimated using the calculation formula of the estimation method used between the previous station. This makes it possible to narrow down the candidates for the estimation method to be adopted for data with causal attributes to the estimation method adopted between the previous station, and it becomes possible to reduce the calculation load of the environmental load estimation in relation to the estimation method determination. In other words, for data with causal attributes, it is considered that there are few cases in which the accuracy of the data changes significantly between the previous station and the next station, so there is a high probability that the estimation method adopted between the previous station is applicable. Therefore, the calculation load can be reduced by setting the estimation method adopted previously as a candidate for the next estimation method. However, if the accuracy of the data changes and the previous estimation method cannot be applied, it is necessary to select a different estimation method. The estimation method to be adopted will be described in detail later.
[0049] (Step 908) Step 908 is a process for determining an estimation method when data has independent attributes. When data has independent attributes, the rate at which data obtained between stations is applicable to the next station interval is low, so basically, an applicable estimation method is determined based on the data obtained between all stations, and the environmental load is estimated based on the estimation method.
[0050] In steps 905, 906, and 908, if one estimation method includes multiple calculation formulas or multiple data attributes, the accuracy of the data is taken into account for each calculation formula to determine whether the data can be used, i.e., whether it can be substituted. Details of the estimation method to be adopted will be described later.
[0051] (Step 909) Next, in step 909, the environmental load is calculated based on the estimation method described above, and the result is recorded.
[0052] (Step 910) Next, in step 910, steps 903 to 909 are repeated until the estimation of the environmental load is completed for stations in the target section and for the target train, and when the estimation is completed, the process proceeds to the end.
[0053] In other words, the method of estimating environmental load according to the present disclosure is a method of estimating environmental load by repeating the following first to fourth steps for each estimation category. (1) The first step is to select candidate estimation methods for each estimation category of environmental impact. (2) A second step of verifying the consistency between the accuracy of the data required by the calculation formula and the accuracy of the acquired data for the calculation formula and the data used in the estimation method set in the first step. (3) In the second step, if the accuracy of the data required by the calculation formula matches the accuracy of the acquired data, the third step is to estimate the environmental load using the estimation method. (4) In the second step, if the accuracy of the data required by the calculation formula does not match the accuracy of the acquired data, a method of estimation in which the accuracy of the data required by the calculation formula matches the accuracy of the acquired data is searched for, and if the accuracy of the data required by the calculation formula of the searched estimation method matches the accuracy of the acquired data, the fourth step is to estimate the environmental impact using the searched estimation method.
[0054] Furthermore, the environmental load estimation method of the present disclosure may include the following requirements. (5) In the case where the data used in the calculation formula has a continuous attribute, the estimation method adopted in the first estimation section is set as the candidate estimation method to be set in the first step for the first estimation section and thereafter. (6) In the case where the data used in the calculation formula has causal attributes, from the first estimation category onwards, the estimation method adopted in the previous estimation category is set as the candidate estimation method to be set in the first step.
[0055] <Details of estimation method for continuous attributes> Next, the details of the estimation method when the attribute of data is a continuous attribute will be described with reference to Fig. 10. Fig. 10 is a flowchart of the estimation method when the attribute of data is a continuous attribute, which has been roughly described in Fig. 9. Steps 902, 909, and 910, which have already been described with reference to FIG. 9, are the same as those in FIG. 9, and therefore the description thereof will be omitted.
[0056] (Step 1002 and Step 1060) After the estimation category of the environmental load is determined, the first step is to determine whether or not it is the initial estimation category, and if the answer is Yes, the process proceeds to the next step 1010. If the answer is No, the process proceeds to step 1060, where the estimation method p to be adopted for this category is determined to be the estimation method P1 adopted initially. In other words, if the data attribute is a continuous attribute, once the estimation method is determined for the first estimation section, the same estimation method as the first estimation method can be adopted for the second and subsequent estimation sections. This makes it possible to omit the calculation for determining the estimation method for the second and subsequent estimation sections, reducing the calculation load and enabling environmental impact estimation to be achieved.
[0057] (Step 1010 and Step 1020) If it is determined in step 1002 that this is the initial estimation section, an initial value is set to the candidate estimation method p in step 1010. That is, the estimation method is set to P0, for example, and the process proceeds to step 1020. In step 1020, data required for the estimation method P0 set in the previous step 1010 is obtained.
[0058] (Step 1030) Next, in step 1030, the accuracy of the data acquired in step 1020 is referenced to determine whether the acquired data can be used in estimation method P0. If the data cannot be used, the process proceeds to step 1040; if the data can be used, the process proceeds to step 1050.
[0059] (Step 1040) Next, if it is determined in step 1030 that the acquired data cannot be used, the estimation method is changed in step 1040. For example, the estimation method is changed to an estimation method Px other than the previously set P0, the process returns to step 1020, data necessary for the changed estimation method Px is acquired, and it is determined again in step 1030 whether the data can be used for that estimation method based on the accuracy of the data. In other words, the routine is repeated until a combination of an estimation method and data usable for that estimation method is found. In changing the estimation method in step 1040, an estimation method that does not care about the accuracy of the data may be prepared as the estimation method to be finally selected, so that the routine from step 1020 to step 1040 does not become an infinite routine, or an upper limit may be set on the number of times the routine is repeated, and if the upper limit is reached, a separate process may be performed.
[0060] (Step 1050 and Step 1060) Next, if it is determined in step 1030 that the acquired data can be used, then in step 1050, the estimation method is determined to be, for example, P1, and in step 1060, the determined estimation method P1 is stored so as to be used from the second time onwards.
[0061] <Details of estimation method for causal attributes> Next, the details of the estimation method when the attribute of data is a causal attribute will be described with reference to Fig. 11. Fig. 11 is a flowchart of the estimation method when the attribute of data is a causal attribute, which has been outlined in Fig. 9. Steps 902, 909, and 910 already described in FIG. 9, and steps 1010, 1020, 1030, and 1040 already described in FIG. 10 are the same as those in FIGS. 9 and 10, and therefore their description will be omitted or simplified.
[0062] (Step 1002 and Step 1010 onwards) After the section for estimating the environmental load is determined, in the first step, as in the case of continuous attributes, it is determined whether or not it is the first estimation section, and if the answer is Yes, in the same way as in the case of continuous attributes, an initial value of the estimation method is set in step 1010. Next, the estimation method for the first time (between the first station) is determined in steps 1020 to 1160, and calculation is performed in step 909, and the output result is recorded. Note that in the case of the first time, n=1 in step 1150, so p=P1.
[0063] (Step 1102) If it is not the first time, the process proceeds from step 1002 to step 1102, and the previously adopted estimation method is set as the estimation method candidate. In other words, p=P1, which is the estimation method adopted in the first section between stations, is provisionally set for the second section between stations. In the case of data with causal attributes, it is highly likely that data with the same accuracy as that previously adopted can be obtained, and therefore it is highly likely that the previously used estimation method can be adopted. Therefore, by setting the previously adopted estimation method first, it is possible to greatly reduce the calculation load for determining the estimation method.
[0064] <Details of estimation method in case of independent attributes> Next, the estimation method when the data attribute is an independent attribute will be described in detail with reference to Fig. 12. Fig. 12 is a flowchart of the estimation method when the data attribute is an independent attribute, which has been outlined in Fig. 9. Steps 902, 909, and 910 already described in FIG. 9, and steps 1010, 1020, 1030, and 1040 already described in FIG. 10 are the same as those in FIGS. 9 and 10, and therefore their description will be omitted or simplified.
[0065] When the data attributes are independent attributes, it is considered that the accuracy of the data is less affected by the accuracy of the data between previous stations. Therefore, regardless of the station interval, it is highly necessary to search for an estimation method from the initial value, obtain data, and determine the estimation method to be applied to the station interval. For this reason, in the case of an independent attribute, an initial value of the estimation method is set in step 1010, data is acquired in step 1020, and it is determined whether the data can be used in step 1030. If the data cannot be used, the estimation method is changed in step 1040, data is acquired again, and the process returns to step 1020 to acquire data necessary for the changed estimation method Px, and it is again determined in step 1030 based on the accuracy of the data whether the data can be used for that estimation method.
[0066] In other words, the routine is repeated until a combination of an estimation method and data that can be used for that estimation method is found. In changing the estimation method in step 1040, an estimation method that does not depend on the accuracy of the data may be prepared as the estimation method to be finally selected so that the routine from step 1020 to step 1040 does not become an infinite routine, or an upper limit may be set on the number of times the routine is repeated so that a separate process is performed when the upper limit is reached, just like in the case of continuous attributes and causal attributes.
[0067] (Step 1050) If the estimation method to be adopted can be determined in step 1050, calculation is performed and the output results are recorded in step 909, similar to the case of continuous attributes and causal attributes. However, in the case of independent attributes, since the estimation method between the stations will not be used later, it is not necessarily necessary to record the estimation method as was done in step 1060 for continuous attributes and step 1160 for causal attributes.
[0068] In addition, when it is necessary to substitute data of different attributes, A: continuous attribute, B: causal attribute, and C: independent attribute, into one calculation formula, it is possible to determine which attribute is to be applied preferentially, and set candidates for estimation methods assuming that the calculation formula is for the attribute that is prioritized. Specifically, the following (1) to (3) can be set. (1) If the calculation formula contains data of the A: continuous attribute, the process shown in FIG. 10 is carried out for the A: continuous attribute. (2) If the calculation formula does not include data of A: continuous attribute but does include B: causal attribute, the process shown in FIG. 11 is carried out for B: causal attribute. (3) Only when the calculation formula contains only data of the C: independent attribute, execute the process shown in FIG. 12 for C: independent attribute.
[0069] (Example of data for estimating the environmental impact of each train) Next, with reference to FIG. 13, an example of data to be substituted (input) into the calculation formula of the estimation method when estimating the environmental impact for each train will be described. FIG. 13 shows an example of data to be substituted into the calculation formula of the estimation method when estimating the environmental load for each train in step 801 described with reference to FIG. Figure 13 shows an example of data used to estimate the environmental impact of each passenger train. However, when estimating the environmental impact of other public transportation systems, facilities, equipment, etc., various data can be used depending on the object of measurement.
[0070] Column 1310 in Figure 13 classifies the types of data into data related to business systems provided by operators offering transportation services and generally usable open data provided by entities other than operators. In the estimation method for estimating the environmental load for each train, the above-mentioned data can be substituted into the calculation formula to estimate the environmental load, and the individual data and calculation formula can be publicly known. The information in columns 1320 to 1370 varies depending on the system or business that creates the data, and the information in FIG. 13 is only an example.
[0071] For example, the amount of electricity required to operate a train can be calculated from the amount of electricity used to run the train in the power management system, and the environmental impact can be estimated in terms of CO2 emissions from the source of that electricity and the supplier's energy procurement route. Many existing calculation formulas can be used to estimate the environmental load. In this disclosure, when adopting a calculation formula, the accuracy of data required for each calculation formula is determined in advance, and accuracy information including the presence or absence of data and the timing (frequency) of data acquisition is attached to the acquired data. Therefore, it is possible to accurately estimate the environmental impact by using a calculation formula suitable for the acquired data.
[0072] <Estimated number of passengers> Next, with reference to FIG. 14, data for estimating the number of passengers required to estimate the environmental load per passenger shown in FIG. 8 will be described. The number of train passengers can be estimated by using and appropriately combining data such as those shown in Figure 14. The data arrangement in Figure 14 differs only in that the planning data 1360 in Figure 13 has been changed to sales data 1450. Therefore, explanations of the same items as in Figure 13 will be omitted. Sales data 1450 in FIG. 14 is data related to sales that is generated in advance. For example, it is possible to directly estimate the number of passengers on a train from camera images in a surveillance camera system. The Beacon system in the system name is a system in which small transmitters (beacons) are installed at stations and bus stops, and when a user's smartphone receives a Bluetooth (registered trademark) signal from the beacon, a boarding record is stored on the smartphone. Using such a system, it is also possible to estimate the number of people boarding a train, etc., from communication information between the beacon and the smartphone. In the present disclosure, accuracy information including the presence or absence of data and the timing (frequency) of data acquisition is added to the data as explained in Fig. 14, similar to the data exemplified in Fig. 13. Therefore, it is possible to estimate the number of people accurately using a calculation formula suitable for the acquired data.
[0073] (Data entry example) Next, with reference to Figs. 15, 16 and 17, an example of input data for estimating the "environmental load for each train" described with reference to Fig. 13 will be described. FIG. 15 shows examples of two estimation methods. Pattern ID 1510 shows an ID for identifying the estimation method as a pattern ID. Input data 1520 shows data output by each estimation method, and in the example of FIG. 15, it shows that both estimation methods estimate the amount of power. Calculation formula ID 1540 shows a calculation formula used by each estimation method, and in the example of FIG. 15, it shows that the estimation method of pattern ID1 uses two calculation formulas F1 and F2, and the estimation method of pattern ID2 uses only one calculation formula F3. Furthermore, accuracy 1550 shows the accuracy of the amount of power to be output. The accuracy of the output value may be defined as a numerical value (such as %), or as high, medium, low, etc. It may also be an acquisition frequency (seconds, minutes, etc.) or a measurement unit (millimeters, kilos, etc.). The usage conditions 1560 indicate conditions for using the corresponding estimation method pattern. The usage conditions 1560 may be defined by a numerical value (e.g., delay time of X minutes or less), may be conditions based on location or time, or may be conditions based on data values.
[0074] Fig. 16 shows an example of a data attribute definition. The data ID 1610 indicates the ID for identifying the type of parameter to be substituted into the calculation formula by the data name. The data ID 1610 indicates only the data name, and does not include the value or precision of the data. Moreover, the classification 1620 defines the "data attributes" described with reference to FIG. In this way, by defining "data attributes" for each data ID 1610, it is possible to efficiently determine an estimation method equipped with an appropriate calculation formula by using data classification in estimating "environmental impact per train" as described in Fig. 9 etc. Note that data for which "data attributes" are not defined is all considered to have "independent attributes".
[0075] 17 shows an example of a definition of a calculation formula. A calculation formula ID 1710 indicates an ID for identifying the calculation formula. Furthermore, content 1720 stores a specific algorithm, a process flow, a mathematical expression, etc. as the calculation formula itself. Furthermore, the types of data to be input and data to be output are specified in input data 1730 and output data 1740. Precision 1750 stores the precision of output data 1740 when the corresponding calculation formula is used. Usage conditions 1760 store the conditions for using the corresponding calculation formula. For this reason, in the example of FIG. 17, there are two calculation formulas, F2 and F3, for calculating the amount of power as output data, and it can be seen that the data to be input differs for each formula, and the accuracy of the output data also differs.
[0076] As is clear from the above explanation, Figure 15 is a combination of the contents of Figures 16 and 17 for each estimation method, and Figure 15 makes it possible to provide estimation accuracy information for the "environmental load per train" data.
[0077] Next, with reference to FIG. 18, an example of output when "estimated accuracy information is added and stored as detailed environmental load" described in step 803 of FIG. 8 will be described. FIG. 18 shows the "environmental load per train" outputted from FIG. 15 divided by the number of passengers for each "estimated environmental load category" and plotted as individual environmental load values 1870. 18, an environmental load index 1810 indicates an index of an environmental load such as an amount of electric power or CO2 emissions. A train number 1820, an estimated section start point 1830, and an estimated section end point 1840 are information that specifies an estimated classification of an environmental load, and the estimated section start point 1830 and the estimated section end point 1840 may be kilometers (a value indicating the distance from the starting point in kilometers) instead of a station name. In addition, time information can be obtained by comparing the train number 1820, the estimated section start point 1830, and the estimated section end point 1840 with the timetable. Total environmental load value 1850 is the environmental load value for the corresponding train and section, i.e., the environmental load estimation category. Number of passengers 1860 is the number of passengers in the corresponding environmental load estimation category, and individual environmental load value 1870 is the total environmental load value 1850 divided by number of passengers 1860, which is the environmental load value per person. Furthermore, estimation method 1880 indicates which estimation method (calculation formula, data) was used, and accuracy 1890 indicates estimation accuracy information.
[0078] Next, estimation of the environmental load of a utilization route will be described with reference to Fig. 19. Fig. 19 is a flow chart for explaining in detail the estimation of the environmental load of a utilization route in step 750 shown in Fig. 7.
[0079] (Step 1910) In step 1910, the user's (sometimes referred to as passenger's) action route and the route of transportation can be acquired by various known methods. Examples of data for acquiring the passenger's route of transportation will be described later.
[0080] (Step 1920) In step 1920, the train to be used is identified based on the passenger's transportation route. For example, if you obtain a boarding certificate by holding your smartphone over a communications terminal inside the train, or if you link information such as your location and travel speed obtained from the smartphone's GPS to a timetable (planned or actual), it is possible to estimate which trains you can board based on the time you pass through the ticket gate.
[0081] (Step 1930) In step 1930, the passenger's route is decomposed into estimated segments (hereinafter, also referred to as "fragments") of environmental loads. A specific example of the decomposition into estimated segments will be described later.
[0082] (Step 1940, Step 1941, Step 1943, Step 1945) In step 1940 and thereafter, an environmental load is estimated for each estimation category generated in step 1930. First, in step 1941, the presence or absence of a detailed environmental load is confirmed for each fragment, and if detailed environmental load data exists, the detailed environmental load is acquired in step 1943. In step 1943, the detailed environmental load stored in step 803 described in FIG. 8 is used. If it is found in step 1941 that the detailed environmental load cannot be obtained, the process proceeds to step 1945, where an approximate environmental load is estimated. Here, the approximate environmental load is a value estimated using a known method such as the amount of CO2 emissions per unit transportation volume multiplied by the travel distance.
[0083] (Step 1950) In step 1950, the estimates for each fragment are aggregated. Examples of aggregated estimates are described below.
[0084] <Route data> Next, with reference to FIG. 20, an example of data for acquiring passenger behavior routes and transportation routes acquired in step 1910 in FIG. 19 will be described. In Fig. 20, system type 2010 indicates the type of system from which data is obtained, and mainly includes business systems provided by business operators and systems / devices that handle location information of users' smartphones, etc. In Fig. 20, representative systems included in these systems are indicated as system names 2020, and the types of data are indicated as data names 2030. Note that the information in columns 2020 to 2070 will differ depending on the system or business that creates the data, and the information in Figure 20 is only an example. The "location (GPS, etc.), time, and means of transportation" in the location and transportation app of the travel route collection device can estimate the location and means of transportation (walking, bicycle, car, bus, train, etc.) at each time based on data such as location, time, travel speed, acceleration, and vibration that can be obtained from the GPS and acceleration sensor of the smartphone. In addition, from information on whether the connection between the user's smartphone and the server is successful, it can be determined that, for example, if GPS cannot be obtained, there is a high possibility that the user is using the subway. By comparing this information with timetable and train location data from the operation management system held by the railway operator, it is possible to detect the railway used by the user and identify the train to be boarded with a high degree of accuracy.
[0085] Furthermore, data acquisition timing 2040 indicates the acquisition timing and frequency of each data. Planned data 2050, predicted data 2060, and actual data 2070 indicate the type of calculation basis for data related to the accuracy of each data. Planned data is based on information scheduled in advance, and indicates that the data has a certain degree of accuracy. Predicted data is information predicted from past analysis, etc., and indicates that the accuracy is low. Furthermore, actual data indicates that the information is acquired as the actual movement data from the current day to the next day onwards.
[0086] <Decomposition into fragments> Next, with reference to FIG. 21, an example in which a travel route is decomposed into fragments will be described. As shown in FIG. 21, when traveling from point A to point B, the route between station W and station Z can be decomposed into fragments 2100 of station W-station X, station X-station Y, and station Y-station Z.
[0087] <Passengers Route> Next, with reference to FIG. 22, an example of data integrating information on the passenger's route acquired in step 1910 of FIG. 19 and the train to be used identified in step 1920 will be described. In FIG. 22, passenger ID 2210 is an ID for identifying an individual passenger, and route sequence 2215 indicates the order of the route that the passenger will follow. The travel section start point 2220 and the travel section end point 2225 indicate the start point and end point of each fragment when the passenger's travel route is decomposed into fragments. In addition, the travel time start point 2230 and the travel time end point 2235 also indicate the travel start time and travel end time for each fragment. In addition, the transportation means 2240 indicates the transportation means used for each fragment. The data from the passenger ID 2210 to the transportation means 2240 is data that was assigned in step 1910 of FIG. 19. 19. The train number 2245 is information for identifying the train to be used, and is data assigned in step 1920 of FIG.
[0088] <Route environmental load> Next, an example of the result of calculating the route environmental load will be described with reference to Fig. 23. Fig. 23 shows an example in which a route is decomposed into fragments and the environmental load of each fragment is integrated. Passenger ID 2310, route sequence 2315, travel section start point 2325, travel section end point 2340, travel time start point 2325, travel time end point 2340, and travel means 2345 correspond to passenger ID 2210, route sequence 2215, travel section start point 2220, travel section end point 2225, travel time start point 2230, travel time end point 2235, and travel means 2240 in Fig. 22, respectively. Fragment 2320 is a number assigned to the fragment described in Fig. 21. 19. Moreover, the environmental load index 2350, the individual environmental load value 2355, the estimation method 2360, and the accuracy 2365 are the data added in steps 1943 and 1945 in FIG. In this case, even if the rough environmental load is estimated in step 1945 of FIG. 23, the route environmental load is shown for each fragment, but depending on the purpose of use, it may be possible to combine each transportation mode (walking, railroad, private car, etc.) or some fragments. Furthermore, the environmental load index 2350 may be converted to the same environmental load index (for example, by converting the amount of electricity into CO2 emissions) and estimated as a total value.
[0089] <Display pattern> Next, examples of displaying the results of estimation of environmental loads will be described with reference to Figs. Figures 24 and 25 are examples showing the estimation results of environmental load for each train for the latter case. Figure 24 is an example of visualizing the environmental load in the form of a heat map, showing the environmental load value per passenger, with the greater the environmental load being displayed in a darker background color. Figure 25 is an example of the estimated environmental load values displayed in the form of a train timetable. The vertical axis of the graph shows the distance between stations, and the horizontal axis shows time. The higher the environmental load value per person, the thicker the line shown, making it easy to see at a glance which trains have the highest environmental load at which times of day.
[0090] Next, FIG. 26 shows the estimated environmental load for each travel section in the form of a route search and travel history display for passengers. It can be seen at a glance that the CO2 emissions for the walking section 2610 from point A to station W are 0g, the CO2 emissions for the train travel section 2620 from station W to station X are 100g, and the CO2 emissions for the car travel section 2630 from station X to point B are 500g.
[0091] Next, with reference to FIG. 27, a use case of the estimated environmental load per passenger (power consumption, CO2 emission amount) will be described. FIG. 27 shows assumed users 2710 classified into individual passengers, users, businesses, and general companies. Also, the timing of provision value 2720 is classified into before and after. Here, before refers to, for example, a case in which the environmental load is predicted before the train starts running, and the information on the estimated environmental load value is distributed to the user by an app or the like using the information. When distributing information beforehand, it is considered that there is value in the real-time nature of the information and data provided. On the other hand, after the fact refers to, for example, a case in which the actual environmental load is estimated after the train starts running, and an app using the information is distributed to the user. When distributing information after the fact, it is considered that there is value in the accuracy of the information and data provided. The column "Use 2730" shows examples of specific uses, and the column "Value Provided" 2740 exemplifies the value that can be provided to society that is expected from each use.
[0092] Although the embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the gist of the present invention. For example, in the above-mentioned examples of estimating environmental load, cases were described in which a user travels from a starting point to a destination by foot, train, or car. However, it goes without saying that the estimation of environmental load to which the present disclosure can be applied is not limited to these modes of travel, and can be applied to any activity that generates environmental load. For example, even if no major movement is involved, if an environmental load is generated due to the use of equipment within a building or human behavior, by applying the estimation device or system disclosed herein to such an environmental load, an accurate estimate of the environmental load can be obtained, and the environmental load can be reduced. [Explanation of symbols]
[0093] 10:Environmental load estimation device 20: Network 30: Business system equipment 40: Open data provider 50: Travel route collection device 60: Application server 101: Storage device 102: Program 103: Data 110:Memory 120:CPU 130:UI device 140:Communication equipment 150: Bus 201: Data Acquisition Department 203: Detailed environmental load estimation section 205: Route environmental load estimation unit 207: Data Distribution Department 211: Basic Data 213:Statistical data 215: Planning data 217: Measurement data 220: Estimation method pattern 230:Detailed environmental load 240: Route environmental load
Claims
1. An environmental load estimation device that estimates an environmental load by combining and processing a plurality of pieces of information, A data acquisition unit capable of acquiring data from each of a business system device, an open data providing device, and a travel route collecting device; a detailed environmental load estimation unit that estimates a detailed environmental load per capita by substituting input data including the data acquired by the data acquisition unit and the data held by the environmental load estimation device into an estimation method consistent with the input data; and a route environmental load estimation unit that estimates a route environmental load of the user by combining the detailed environmental load with information on the user's travel route; An environmental load estimation device comprising:
2. the estimation method is defined by a combination of one or more calculation formulas and the input data; The detailed environmental load estimation unit assigns estimation accuracy information to the calculated value of the detailed environmental load.
2. The environmental load estimation device according to claim 1 .
3. The detailed environmental load estimation unit, when selecting the estimation method for each estimation category of environmental load of a travel route, A method for determining whether the estimation method can be used is changed depending on whether the input data used in the estimation method has a continuous attribute, a causal attribute, or an independent attribute.
3. The environmental load estimation device according to claim 2.
4. An environmental load estimation system in which an environmental load estimation device that estimates an environmental load by combining and processing a plurality of pieces of information, a business system device, an open data providing device, and a travel route collecting device are connected via a network, The environmental load estimation device includes: A data acquisition unit capable of acquiring data from a business system device, an open data providing device, and a travel route collection device; a detailed environmental load estimation unit that estimates a detailed environmental load per capita by substituting input data including the data acquired by the data acquisition unit and the data held by the environmental load estimation device into an estimation method consistent with the input data; a route environmental load estimation unit that estimates the route environmental load of the user by combining the detailed environmental load with information on the user's travel route; An environmental impact estimation system comprising:
5. The environmental load estimation device according to claim 1, The detailed environmental load estimation unit A first step of setting candidate estimation methods for each estimation category of environmental load; a second step of verifying the consistency between the accuracy of the data required by the calculation formula and the accuracy of the acquired data for the calculation formula and the data used in the estimation method set in the first step; In the second step, if the accuracy of the data required by the calculation formula matches the accuracy of the acquired data, the third step is to estimate the environmental load using the estimation method. a fourth step of searching for an estimation method in which the accuracy of the data required by the calculation formula and the accuracy of the acquired data are consistent when the accuracy of the data required by the calculation formula and the accuracy of the acquired data are not consistent in the second step, and estimating the environmental load using the estimation method found when the accuracy of the data required by the calculation formula of the found estimation method is consistent with the accuracy of the acquired data; The method for estimating environmental load comprises:
6. The method for estimating environmental load according to claim 5, The detailed environmental load estimation unit performs the second process. In the case where the data used in the calculation formula has a continuous attribute, the estimation method adopted in the first estimation section is set as a candidate for the estimation method to be set in the first step for the first estimation section and thereafter; In the case where the data used in the calculation formula has a causal attribute, the estimation method adopted in the previous estimation class is set as the candidate estimation method to be set in the first step for the first estimation class and thereafter.
1. A method for estimating environmental load comprising:
Citation Information
Patent Citations
Sustainable development goal contribution point system
JP2023018710A