Co2 emission prediction method and co2 emission prediction system
The method and system enhance CO2 emission prediction accuracy by classifying building use and applying correction coefficients, enabling precise forecasting and reduction strategies during building planning.
Patent Information
- Application Number
- JP2023048839
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-24
- Publication Date
- 2024-10-07
AI Technical Summary
Existing methods for predicting CO2 emissions associated with building operations after completion lack accuracy due to the lack of classification by building use, leading to inaccurate emission predictions during the planning stage.
A method and system for estimating CO2 emissions that involves obtaining data on the total area and purpose of buildings, calculating emissions intensity per unit area and period, and using a CO2 emissions prediction server to accurately forecast emissions by classifying building use and applying correction coefficients.
Enables high-accuracy prediction of CO2 emissions associated with building operations, allowing for effective reduction measures during the planning stage.
Smart Images

Figure 2024137347000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method and system for predicting CO2 emissions. [Background technology]
[0002] In recent years, global warming, i.e. the greenhouse effect caused by an increase in the concentration of CO2 (carbon dioxide) in the atmosphere, has become a serious problem that has a negative impact on ecosystems, etc. For this reason, there is a demand for a reduction in CO2 emissions on a global scale, and efforts are being made to reduce CO2 emissions associated with the construction of buildings and with the operation of buildings after completion.
[0003] Incidentally, in order to efficiently reduce CO2 emissions, it is necessary to accurately predict the CO2 emissions associated with the construction of the building and the CO2 emissions associated with the operation of the building after completion at the planning stage of the building. By accurately predicting these CO2 emissions related to the building, it is possible to take appropriate measures to reduce CO2 emissions. Here, the CO2 emissions associated with the operation of the building after completion can be calculated from the total floor area and the CO2 emission unit corresponding to the total floor area. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2007-18061 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, the CO2 emissions per unit area used to calculate the amount of CO2 emissions from the operation of a building after completion was not classified by the building's use, so the calculated CO2 emissions were often inaccurate. This resulted in low accuracy in the prediction of the amount of CO2 emissions from the operation of a building after completion, which was made during the planning stage of the building.
[0006] The present invention aims to accurately predict, at the planning stage of a building, the amount of CO2 emissions associated with the operation of a building after completion. [Means for solving the problem]
[0007] Some embodiments of the present invention are a method for predicting CO2 emissions associated with the operation of a building after completion, which includes obtaining data on the total floor area of the completed building, and calculating CO2 emissions associated with the operation of the completed building during a first period after completion from the CO2 emission unit per unit total floor area and per unit period of a building with the same use as the completed building and for which CO2 emissions have been calculated, and the data on the total floor area of the completed building.
[0008] Some embodiments of the present invention are a CO2 emissions prediction system that predicts CO2 emissions associated with the operation of a building after completion, and include an acquisition unit that acquires data on the total floor area of the completed building, and a calculation unit that calculates the CO2 emissions associated with the operation of the completed building during a first period after completion from the CO2 emissions per unit total floor area and per unit period of a building with the same use as the completed building and for which CO2 emissions have been calculated, and the data on the total floor area of the completed building.
[0009] Other features of the present invention will become apparent from the following specification and drawings. Effect of the Invention
[0010] According to some embodiments of the present invention, it is possible to accurately predict, at the planning stage of a building, the amount of CO2 emissions associated with the operation of the building after completion. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a schematic diagram of a CO2 emission prediction system 100 according to this embodiment. [Diagram 2] FIG. 2 is a functional block diagram of the CO2 emission prediction server 10 of this embodiment. [Diagram 3] Fig. 3A is an explanatory diagram showing an example of the master data of the premium coefficient by work type. Fig. 3B is an explanatory diagram showing an example of the master data of the CO2 emission intensity by energy. Fig. 3C is an explanatory diagram showing an example of the master data of the CO2 emission intensity by material. [Figure 4] FIG. 4 is an explanatory diagram showing an example of vehicle / construction machine master data. [Diagram 5] FIG. 5 is an explanatory diagram illustrating an example of economic indicator master data. [Figure 6] Figure 6 is a flow diagram of the procedure for predicting CO2 emissions associated with the construction of a planned building. [Figure 7] FIG. 7 is an explanatory diagram showing the calculation results of the CO2 emission intensity by use of the planned building. [Figure 8] FIG. 8 is an explanatory diagram showing an example of an input / output screen in the CO 2 emission prediction system 100. As shown in FIG. [Figure 9] FIG. 9 is an explanatory diagram showing an example of a predicted result of CO2 emissions accompanying the construction of a planned building. [Figure 10] Figure 10 is a flow diagram of the procedure for predicting CO2 emissions associated with the operation of a building after completion. [Figure 11] FIG. 11 is an explanatory diagram showing the calculation results of the CO2 emission intensity per total floor area of a building by use after completion. [Figure 12] FIG. 12 is an explanatory diagram showing an example of a predicted result of CO2 emissions associated with the operation of a building after completion. [Figure 13] FIG. 13 is an explanatory diagram showing an example of an output screen of the predicted results of the amount of CO2 emissions associated with the construction of a planned building and the amount of CO2 emissions associated with the operation of the building after completion. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] At least the following points will become apparent from the following specification and drawings.
[0013] A method for predicting CO2 emissions associated with the operation of a completed building is disclosed, which involves obtaining data on the total floor area of the completed building, and calculating the CO2 emissions associated with the operation of the completed building during a first period after completion from the CO2 emission unit per unit total floor area and per unit period of a building with the same use as the completed building and for which CO2 emissions have already been calculated, and the data on the total floor area of the completed building.
[0014] According to this method for predicting CO2 emissions, it is possible to accurately predict the amount of CO2 emissions associated with the operation of a building after completion at the planning stage of the building.
[0015] It is desirable to calculate the amount of CO2 emissions associated with the operation of the completed building in a second period after the first period by discounting the amount of CO2 emissions associated with the operation of the completed building in the first period at a first rate.
[0016] This makes it possible to accurately predict the amount of CO2 emissions associated with the operation of a building after completion at the planning stage of the building.
[0017] It is desirable to calculate the CO2 emissions associated with the operation of the building after completion in a third period after the second period by discounting the CO2 emissions associated with the operation of the building after completion in the first period by a second rate that is greater than the first rate.
[0018] This makes it possible to accurately predict the amount of CO2 emissions associated with the operation of a building after completion at the planning stage of the building.
[0019] At the start of the third period, it is desirable to add the CO2 emissions associated with the construction of the same building as the completed building.
[0020] This makes it possible to accurately predict the amount of CO2 emissions associated with the operation of a building after completion at the planning stage of the building.
[0021] A CO2 emissions prediction system has been revealed that predicts CO2 emissions associated with the operation of a building after completion, comprising an acquisition unit that acquires data on the total floor area of the completed building, and a calculation unit that calculates the CO2 emissions associated with the operation of the completed building during a first period after completion from the CO2 emissions per unit total floor area and per unit period of a building with the same use as the completed building and for which CO2 emissions have been calculated, and the data on the total floor area of the completed building.
[0022] Such a CO2 emission prediction system makes it possible to accurately predict the amount of CO2 emissions associated with the operation of a building after completion.
[0023] Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings. The same or equivalent components, members, etc. shown in each drawing are designated by the same reference numerals, and duplicated descriptions will be omitted as appropriate.
[0024] ===This embodiment=== <Summary> FIG. 1 is a schematic diagram of a CO2 emission prediction system 100 according to this embodiment.
[0025] The CO2 emission prediction system 100 is a system for predicting the amount of CO2 emissions associated with the construction of a building and the amount of CO2 emissions associated with the operation of the building after completion. As shown in FIG. 1, the CO2 emission prediction system 100 includes a terminal 1, a terminal 2, a CO2 emission prediction server 10, a terminal 3, and a terminal 4.
[0026] Terminal 1 is a terminal for inputting building construction performance data at the time of building construction for a constructed building, and transmitting the input building construction performance data to CO2 emission prediction server 10. In CO2 emission prediction system 100 of this embodiment, terminal 1 is a personal computer. However, terminal 1 may also be a smartphone or a tablet-type mobile terminal. Terminal 1 is equipped with hardware such as a CPU, memory, storage device, communication module, display device (e.g., liquid crystal display), input device (e.g., keyboard and mouse), etc., which are not shown.
[0027] Terminal 2 is a terminal for inputting post-construction performance data regarding a building in operation after completion of the building, and for transmitting the input post-construction performance data to CO2 emission prediction server 10. In CO2 emission prediction system 100 of this embodiment, terminal 2 is a personal computer. However, terminal 2 may also be a smartphone or a tablet-type mobile terminal. Terminal 2 is equipped with hardware such as a CPU, memory, storage device, communication module, display device (e.g., liquid crystal display), input device (e.g., keyboard and mouse), etc., which are not shown.
[0028] The CO2 emission prediction system 100 may not have at least one of the above-mentioned terminal 1 and terminal 2. In this case, the CO2 emission prediction server 10 described later may have an input device (e.g., a keyboard or a mouse), and the building construction performance data and the building completion performance data may be directly input to the CO2 emission prediction server 10 via the input device.
[0029] The CO2 emission prediction server 10 is a device for predicting the amount of CO2 emissions associated with the construction of a planned building and the amount of CO2 emissions associated with the operation of the building after completion by acquiring actual data during the construction of the building and actual data after completion of the building, and performing calculations.
[0030] In the CO2 emission prediction system 100 of this embodiment, various types of hardware and various types of software (not shown) of the CO2 emission prediction server 10 cooperate with each other to execute various processes in the CO2 emission prediction server 10. The CO2 emission prediction server 10 is, for example, a computer such as a server, and is composed of an arithmetic unit (such as a CPU), a memory, a storage device, a communication device, etc. The storage device stores programs and various types of data related to the various processes executed by the CO2 emission prediction server 10.
[0031] The arithmetic device reads out the programs stored in the storage device into the memory and executes them, thereby executing various processes in the CO2 emission prediction server 10. The CO2 emission prediction server 10 may include multiple computers. The various processes in the CO2 emission prediction server 10 may be executed by the multiple computers working together via a network.
[0032] In the CO2 emission prediction system 100 shown in Fig. 1, the CO2 emission prediction server 10 is connected to one terminal 1 and one terminal 2 via a communication network. Here, the "communication network" is, for example, the Internet, a wireless communication network, a telephone line network, a LAN, a VAN, etc. However, the CO2 emission prediction server 10 is connected to many terminals 1 and many terminals 2 via the communication network, and can acquire building construction performance data during building construction for many buildings and post-construction performance data after the buildings are completed for many buildings.
[0033] The CO2 emission prediction server 10 may perform supervised learning. Here, "supervised learning" is machine learning that enables an artificial intelligence to recognize patterns from data given in advance and to make predictions for newly input data. In order for an artificial intelligence using a trained model obtained by supervised learning to make highly accurate predictions, it needs teacher data with a suitable amount of information. In other words, the more teacher data used in supervised learning of the artificial intelligence, the higher the reliability of the predictions of the artificial intelligence. The CO2 emission prediction server 10 can obtain building construction performance data for many buildings at the time of building construction and building completion performance data for many buildings after the buildings are completed, and perform supervised learning.
[0034] The terminal 3 is a terminal for inputting data for predicting CO2 emissions associated with the construction of a planned building at the planning stage of the building, and transmitting the input data to the CO2 emission prediction server 10. The terminal 3 further displays the prediction results of CO2 emissions associated with the construction of a planned building and the prediction results of CO2 emissions associated with the operation of the building after completion. In the CO2 emission prediction system 100 of this embodiment, the terminal 3 is a personal computer. However, the terminal 3 may be a smartphone or a tablet-type mobile terminal. The terminal 3 is equipped with hardware such as a CPU, memory, storage device, communication module, display device (e.g., liquid crystal display), input device (e.g., keyboard and mouse), etc., which are not shown.
[0035] The terminal 4 is a terminal for inputting data for predicting CO2 emissions associated with the operation of a building after completion during the planning stage of the building, and for transmitting the input data to the CO2 emission prediction server 10. The terminal 4 further displays the prediction results of CO2 emissions associated with the construction of a planned building and the prediction results of CO2 emissions associated with the operation of the building after completion. In the CO2 emission prediction system 100 of this embodiment, the terminal 4 is a personal computer. However, the terminal 4 may be a smartphone or a tablet-type mobile terminal. The terminal 4 is equipped with hardware such as a CPU, memory, storage device, communication module, display device (e.g., liquid crystal display), input device (e.g., keyboard and mouse), etc., which are not shown.
[0036] In the CO2 emission prediction system 100 shown in FIG. 1, the CO2 emission prediction server 10 is connected to one terminal 3 and one terminal 4 via a communication network. However, the CO2 emission prediction server 10 may be connected to many terminals 3 and many terminals 4 via a communication network. In addition, in the CO2 emission prediction system 100 shown in FIG. 1, the terminal 3 and the terminal 4 are illustrated as separate terminals, but the terminal 3 and the terminal 4 may be the same terminal. Furthermore, the CO2 emission prediction system 100 may not have at least one of the above-mentioned terminals 3 and terminal 4. In this case, the CO2 emission prediction server 10 may have an input device (e.g., a keyboard or a mouse), and data for predicting CO2 emissions associated with the operation of a planned building to be planned or data for predicting CO2 emissions associated with the operation of a building after completion may be directly input via the input device. In addition, the CO2 emission prediction server 10 may have a display device (e.g., a liquid crystal display), and the predicted results of CO2 emissions associated with the construction of a planned building to be planned or the predicted results of CO2 emissions associated with the operation of a building after completion may be displayed via the display device.
[0037] <Function> FIG. 2 is a functional block diagram of the CO2 emission prediction server 10 of this embodiment.
[0038] The CO 2 emission prediction server 10 includes an acquisition unit 11 , a calculation unit 12 , a recording unit 15 , and a display unit 16 .
[0039] The acquisition unit 11 is a part of the CO2 emission prediction server 10 that acquires building construction performance data at the time of building construction for a constructed building and building post-completion performance data for a building in operation after completion. In this embodiment, the acquisition unit 11 acquires the building construction performance data from the terminal 1 and acquires the building post-completion performance data from the terminal 2. The acquisition unit 11 then transmits the acquired building construction performance data and building post-completion performance data to the calculation unit 12 so that the calculation unit 12 performs calculations. The acquisition unit 11 also transmits the acquired building construction performance data and building post-completion performance data to the recording unit 15 so that the recording unit 15 records them.
[0040] As shown in Fig. 2, the building construction performance data includes building information (use and total floor area) data, construction cost data, and calculated CO2 emission data for buildings that have been constructed. However, the building construction performance data may include data other than the data listed above. As shown in Fig. 2, the building completion performance data includes building information (use and total floor area) data, and calculated CO2 emission data for buildings that are in operation. However, the building completion performance data may include data other than the data listed above.
[0041] The CO2 emission forecasting server 10 may acquire master data commonly used in various processes to be executed through the acquisition unit 11. As shown in FIG. 2, the master data includes work-type premium coefficient master data, energy-specific CO2 emission intensity master data, material-specific CO2 emission intensity master data, vehicle / construction machine master data, and economic indicator master data. However, the master data may include data other than the listed data. The acquisition unit 11 transmits the acquired master data to the calculation unit 12 so that the calculation unit 12 performs calculations. The acquisition unit 11 also transmits the acquired master data to the recording unit 15 so that the recording unit 15 records the master data.
[0042] A specific example of the master data will be described later.
[0043] Furthermore, the acquisition unit 11 is also a part that acquires data for predicting CO2 emissions associated with the construction of a planned building in the planning stage of the building and data for predicting CO2 emissions associated with the operation of the building after completion (hereinafter, these may be collectively referred to as "various data for prediction in the planning stage of the building"). In this embodiment, the acquisition unit 11 acquires data for predicting CO2 emissions associated with the construction of a planned building from the terminal 3, and acquires data for predicting CO2 emissions associated with the operation of the building after completion from the terminal 4. Then, the acquisition unit 11 transmits various data for prediction in the planning stage of the building to the calculation unit 12 so that the calculation unit 12 performs calculation. Furthermore, the acquisition unit 11 transmits various data for prediction in the planning stage of the building to the recording unit 15 so that the recording unit 15 records it.
[0044] The various data for prediction in the planning stage of a building include building information (use and total floor area) data, construction cost data, data on the number of vehicles and construction machines, and material data, as shown in Fig. 2. However, the various data for prediction in the planning stage of a building may include data other than the data listed above.
[0045] The calculation unit 12 is a part that predicts the amount of CO2 emissions associated with the construction of a planned building and the amount of CO2 emissions associated with the operation of the building after completion by performing calculation processing using the data acquired by the above-mentioned acquisition unit 11. The calculation unit 12 may receive data from the acquisition unit 11 and perform calculation processing, or may read data recorded in the recording unit 15 from the acquisition unit 11 and perform calculation processing.
[0046] The calculation unit 12 has a construction CO2 emission calculation unit 13 and a post-completion CO2 emission calculation unit 14.
[0047] The construction CO2 emission calculation unit 13 is a part of the calculation unit 12 that calculates the amount of CO2 emission associated with the construction of the planned building. The construction CO2 emission calculation unit 13 calculates the amount of CO2 emission associated with the construction of the planned building using the data acquired by the acquisition unit 11, and transmits the calculation result to the recording unit 15.
[0048] The post-completion CO2 emission calculation unit 14 is a part of the calculation unit 12 that predicts the CO2 emission associated with the operation of the building after completion. The post-completion CO2 emission calculation unit 14 calculates the CO2 emission associated with the operation of the building after completion using the data acquired by the acquisition unit 11, and transmits the calculation result to the recording unit 15.
[0049] The recording unit 15 is a part of the CO2 emission prediction server 10 that records the data acquired by the acquisition unit 11 described above, the calculation results of the CO2 emissions associated with the construction of the planned building calculated by the construction CO2 emission calculation unit 13, and the calculation results of the CO2 emissions associated with the operation of the building after completion calculated by the post-completion CO2 emission calculation unit 14.
[0050] The display unit 16 is a part of the CO2 emission prediction server 10 for outputting the calculation results of the CO2 emissions associated with the construction of the planned building and the calculation results of the CO2 emissions associated with the operation of the building after completion to an external display device (for example, the terminal 3 or the terminal 4). The display unit 16 reads out the calculation results of the CO2 emissions associated with the construction of the planned building and the calculation results of the CO2 emissions associated with the operation of the building after completion from the recording unit 15, and transmits a command to output them to an external display device (for example, the terminal 3 or the terminal 4).
[0051] <Master data> The master data commonly used in various processes executed by the CO2 emission prediction server 10 will be described in detail below.
[0052] ·Master data for labor-type premium coefficients FIG. 3A is an explanatory diagram illustrating an example of work-type surcharge coefficient master data.
[0053] The work type premium coefficient master data is data of coefficients for weighting the CO2 emissions by work type when the CO2 emissions associated with the construction of a planned building are classified by work type in the construction of the building. According to the work type premium coefficient master data shown in Fig. 3A, for example, when the work type is "excavation", the premium coefficient is "AAA". This means that of the CO2 emissions emitted by the entire construction of the building, the CO2 emissions emitted by "excavation" are considered at the rate of AAA.
[0054] According to the work type premium coefficient master data shown in FIG. 3A, for example, when the work type is "lifting", the premium coefficient is "BBB". This means that, among the CO2 emissions emitted during the entire construction work of the building, the CO2 emissions emitted by "lifting" are considered at a premium rate of BBB. Here, the premium coefficient BBB when the work type is "lifting" is greater than the premium coefficient AAA when the work type is "excavation". In this case, when comparing the CO2 emissions emitted by "excavation" and the CO2 emissions emitted by "lifting" among the CO2 emissions emitted during the entire construction work of the building, the CO2 emissions emitted by "lifting" are weighted more heavily than the CO2 emissions emitted by "excavation".
[0055] In the CO2 emission prediction system 100 of this embodiment, the CO2 emission prediction server 10 can correct and calculate the CO2 emission associated with the construction of a planned building by referring to the surcharge coefficient for each type of work of the planned building construction recorded as the master data of the surcharge coefficient for each type of work. This makes it possible to more accurately predict the CO2 emission associated with the construction of a building at the planning stage of the building.
[0056] Master data on CO2 emission intensity by energy source FIG. 3B is an explanatory diagram illustrating an example of the master data of CO2 emission intensity by energy.
[0057] The CO2 emission intensity by energy source master data is a coefficient used to classify the CO2 emissions associated with the construction of a planned building into CO2 emissions from "diesel" and CO2 emissions from "electricity." According to the CO2 emission intensity by energy source master data shown in Figure 3B, the CO2 emission intensity for "diesel" is ABCt-CO2 / kL, and the CO2 emission intensity for "electricity" is DEFt-CO2 / kWh. This means that the CO2 emissions emitted when using "diesel" are ABCt (CO2 equivalent) per 1kL, and the CO2 emissions emitted when using "electricity" are DEFt (CO2 equivalent) per 1kWh.
[0058] In the CO2 emission prediction system 100 of this embodiment, the CO2 emission prediction server 10 can calculate the amount of "diesel" or "electricity" usage from the amount of CO2 emissions by energy (i.e., by diesel or electricity) associated with the construction of a planned building by referring to the master data of CO2 emission unit by energy.
[0059] Master data on CO2 emission intensity by material FIG. 3C is an explanatory diagram showing an example of master data of CO2 emission intensity by material.
[0060] The master data on CO2 emission intensity by material is a coefficient used to calculate the amount of CO2 emitted when producing materials used in the construction of a building. According to the master data on CO2 emission intensity by material shown in Figure 3C, the CO2 emission intensity of "concrete (normal)" is AA1t-CO2 / m 3 This means that the amount of CO2 emitted when producing "concrete (normal)" is 3 This means that the amount is 1 t of AA (CO2 equivalent) per unit of construction. In the CO2 emission prediction system 100 of this embodiment, the CO2 emission prediction server 10 can calculate the amount of CO2 emission emitted in producing materials used in the construction of a building, separately from the amount of CO2 emission emitted in the construction of the building, by referring to the master data of the CO2 emission intensity by material.
[0061] · Vehicle and construction machinery master data FIG. 4 is an explanatory diagram showing an example of vehicle / construction machine master data.
[0062] The vehicle and construction machinery master data is a coefficient that is the basis for calculating the daily fuel consumption of vehicles and construction machinery used in the construction of buildings. As shown in Figure 4, the daily operating hours (C) are calculated for each vehicle and construction machinery from the annual operating hours (A) and the number of operating days per year (B). The daily fuel consumption (E) of vehicles and construction machinery is calculated from the daily operating hours (C) and fuel efficiency (i.e., fuel consumption per hour, D). According to the vehicle and construction machinery master data shown in Figure 4, the calculation basis for the fuel consumption of "trailers" classified as "transport vehicles" is E01 liters per day.
[0063] In the CO2 emission prediction system 100 of this embodiment, the CO2 emission prediction server 10 can calculate the fuel consumption amount for each vehicle and construction machinery from the data on the number of vehicles and construction machinery used in the construction of a building by referring to the vehicle and construction machinery master data.
[0064] Economic indicators master data FIG. 5 is an explanatory diagram illustrating an example of economic indicator master data.
[0065] The economic indicator master data is a correction coefficient used when correcting the construction cost data for the construction of a planned building using economic indicators. The economic indicator master data shown in Figure 5 uses the "Construction Cost Deflator" published by the Ministry of Land, Infrastructure, Transport and Tourism. The correction coefficient for construction costs corresponding to the construction year of the planned building can be calculated as a predicted value by referring to the economic indicator master data and using data analysis tools, etc.
[0066] Here, the economic indicator master data is shown by a solid line graph in FIG. 5. FIG. 5 shows the coefficients of construction work costs for each year from 1960 to 2021 in a line graph, with the coefficient of construction work costs for 2015 set to 100. However, the coefficient of construction work costs for 2021 is a provisional value. Here, when calculating the corrected construction work costs for 2022 using the coefficient for 2021, the product of the construction work costs before correction for 2022 and the value obtained by dividing the coefficient of the construction work costs for 2021 on the economic indicator master data by the coefficient of the construction work costs before correction for 2022 is calculated.
[0067] First, the coefficient of construction work costs before the correction in fiscal year 2022 can be calculated as a predicted value of "115.07" using data analysis tools, etc. This predicted value is calculated as the median between the upper limit (here, 118.57) and the lower limit (here, 111.58). In addition, since the coefficient of construction work costs for fiscal year 2021 is "113.90", the value obtained by dividing the coefficient of construction work costs for fiscal year 2021 by the coefficient of construction work costs before the correction in fiscal year 2022 is 113.90 / 115.07=98.44. This shows that the construction work costs for fiscal year 2022 are declining due to the effects of inflation. Therefore, the construction work costs after the correction in fiscal year 2022 can be calculated by multiplying the construction work costs before the correction in fiscal year 2022 by 0.9844.
[0068] <Procedure for predicting CO2 emissions associated with the construction of a planned building> Figure 6 is a flow diagram of the procedure for predicting CO2 emissions associated with the construction of a planned building.
[0069] The flow diagram shown in Fig. 6 shows the flow of various processes executed by the CO2 emission prediction server 10. As shown in Fig. 6, the CO2 emission prediction server 10 performs processes related to a constructed building, and then performs processes related to a planned building.
[0070] As described later, in the process for constructed buildings (S001 to S003), the CO2 emission intensity of the same-use building is calculated from the construction cost data of the constructed building (hereinafter sometimes referred to as the "same-use building") that has the same use as the planned building and whose CO2 emissions have been calculated, and the calculated CO2 emission data of the same-use building. Also, as described later, in the process for planned buildings (S004 to S007), the CO2 emission associated with the construction of the planned building is calculated by multiplying the construction cost data of the planned building by the CO2 emission intensity of the same-use building.
[0071] In the procedure for predicting the amount of CO2 emissions accompanying the construction of a planned building in this embodiment, the CO2 emissions intensity classified by the building's use can be used, so that the amount of CO2 emissions accompanying the construction of a building can be predicted with high accuracy. In other words, the CO2 emissions prediction system 100 in this embodiment can calculate the amount of CO2 emissions accompanying the construction of a building using the CO2 emissions intensity classified by the building's use, so that the amount of CO2 emissions accompanying the construction of a building can be predicted with high accuracy.
[0072] Hereinafter, with reference to FIG. 6, a procedure for predicting CO2 emissions accompanying the construction of a planned building will be described as various processes executed by the CO2 emission prediction server 10 of the CO2 emission prediction system 100.
[0073] First, the CO2 emission prediction server 10 acquires building information data and construction cost data from the building construction performance data on a completed building (S001). The building information data includes at least data on the purpose of the building from the information on the completed building. However, the building information data may further include the total floor area, the year of completion, etc. in addition to the data on the purpose of the building.
[0074] Next, the CO2 emission prediction server 10 acquires calculated CO2 emission data from the building construction performance data on the constructed building (S002). The CO2 emission prediction server 10 acquires the calculated CO2 emission data by linking it to the data on the building use acquired in the above-mentioned S001.
[0075] Here, the CO2 emission prediction server 10 performs the above-mentioned processes of S001 and S002 for multiple constructed buildings. As a result, the CO2 emission prediction server 10 can obtain information that links calculated CO2 emission data by use of multiple buildings.
[0076] Next, the CO2 emission prediction server 10 calculates the CO2 emission intensity for each building use (S003). Specifically, the calculation unit 12 (construction CO2 emission calculation unit 13) of the CO2 emission prediction server 10 calculates the CO2 emission intensity for each building use from the building information data including data on the building use among the building construction performance data on the constructed building, the construction work cost data, and the calculated CO2 emission data. The calculation unit 12 (construction CO2 emission calculation unit 13) of the CO2 emission prediction server 10 divides the calculated CO2 emission data by the construction work cost data for each building use, thereby obtaining the CO2 emission per unit construction work cost, i.e., the CO2 emission intensity.
[0077] FIG. 7 is an explanatory diagram showing the calculation results of CO2 emission intensity by building use.
[0078] As shown in Figure 7, the CO2 emission intensity for "offices and government buildings" is AA01t-CO2 / 100 million yen. This means that the CO2 emissions emitted in the construction of buildings related to "offices and government buildings" are AA01t (CO2 equivalent) per 100 million yen of construction costs.
[0079] Next, as shown in Fig. 6, the CO2 emission prediction server 10 acquires data for predicting CO2 emissions associated with the construction of the planned building (the above-mentioned "various data for prediction in the planning stage of a building"). Specifically, the CO2 emission prediction server 10 acquires building information data and construction cost data of the planned building (S004). The building information data includes at least data on the intended use of the building among the information on the planned building. However, the building information data may further include the total floor area, the year of completion, etc. in addition to the data on the intended use of the building.
[0080] Next, the CO2 emission prediction server 10 calculates a predicted CO2 emission amount for the planned building (S005). The calculation of the predicted CO2 emission amount will be described with reference to an example of an input / output screen in the CO2 emission prediction system 100 shown in FIG.
[0081] Fig. 8 is an explanatory diagram showing an example of an input / output screen in the CO2 emission prediction system 100. Fig. 9 is an explanatory diagram showing an example of a prediction result of the CO2 emission associated with the construction of a planned building.
[0082] In this embodiment, the input / output screen shown in Fig. 8 is an example of a screen displayed on the terminal 3. Hereinafter, the information input by the person in charge on the terminal 3 and the results calculated by the CO2 emission prediction server 10 will be described together with reference to Fig. 8.
[0083] The person in charge inputs information on the outline of the construction work for the planned building in the "A. Construction Overview (Construction Costs, Construction Period, etc.)" column as shown in Figure 8. Specifically, the person in charge inputs the contract amount of "XXX billion yen" as the construction cost in the "A. Construction Overview (Construction Costs, Construction Period, etc.)" column, and also inputs information on the construction period (in addition to the construction period, information on the start date and completion date).
[0084] The person in charge also inputs the intended use of the planned building in the "B. CO2 emission unit" field. In Fig. 8, "accommodation facilities and others" has been input as the intended use of the planned building. Here, the calculation results of the CO2 emission unit for each intended use of the building shown in Fig. 7 above have been saved in advance in terminal 3, and the CO2 emission unit corresponding to the intended use input in the "B. CO2 emission unit" field is output. Specifically, the "B. CO2 emission unit" field displays "AA09 (t-CO2 / 100 million yen)", which is the CO2 emission unit corresponding to "accommodation facilities and others".
[0085] The "C. Total CO2 emissions" column shows the construction costs (here, "○×△ billion yen") entered by the person in charge in the "A. Construction overview (construction costs, construction period, etc.)" column mentioned above, and the CO2 emissions unit cost (here, AA09 (t-CO2 / 100 million yen)) corresponding to the planned building's use (here, AA09 (t-CO2 / 100 million yen)) entered by the person in charge in the "B. CO2 emissions unit cost" column. The CO2 emissions associated with the construction of the planned building are then calculated by multiplying the data on the construction costs (here, "○×△ billion yen") for the planned building by the CO2 emissions unit cost (here, AA09 (t-CO2 / 100 million yen)) for the planned building's use. For the planned building in this case, the calculated CO2 emissions are shown as ◆■▲ (t-CO2).
[0086] Next, the person in charge inputs multiple forecast volumes for each year and month in the "D. Forecast Volume and CO2 Emissions" column. This calculates the CO2 emissions associated with the construction of the planned building corresponding to each of the multiple forecast volumes.
[0087] The person in charge also inputs the type of work for the planned building in the "E. Calculation of surcharge adjustments based on work type, etc. (1)" column. This automatically calculates and displays the surcharge coefficient corresponding to the type of work for the planned building in the "F. Calculation of surcharge adjustments based on work type, etc. (2)" column. The result of the calculation of the corrected CO2 emissions associated with the construction of the planned building is then displayed in the "G. Corrected CO2 emissions" column.
[0088] Next, the CO2 emission prediction server 10 calculates the fuel consumption amount for each vehicle and construction machine from the data on the number of vehicles and construction machines used in the construction of the building by referring to the vehicle and construction machine master data (S006). Furthermore, the CO2 emission prediction server 10 calculates the CO2 emission amount emitted when producing the materials used in the construction of the building, separately from the CO2 emission amount emitted in the construction of the building, by referring to the master data on the CO2 emission intensity by material (S007).
[0089] <Procedure for predicting CO2 emissions associated with the operation of a building after completion> Figure 10 is a flow diagram of the procedure for predicting CO2 emissions associated with the operation of a building after completion.
[0090] The flow diagram shown in Fig. 10 shows the flow of various processes executed by the CO2 emission prediction server 10. As shown in Fig. 10, the CO2 emission prediction server 10 performs processes related to buildings in operation, and then performs processes related to buildings not yet in operation.
[0091] As described later, in the process for buildings in operation (S101 to S103), the CO2 emission intensity per unit total floor area and per unit period of a building with the same purpose is calculated from data on the total floor area of a constructed building (hereinafter sometimes referred to as a "building with the same purpose") that has the same purpose as the completed building before operation and whose CO2 emissions have been calculated, and data on the calculated CO2 emissions of the building with the same purpose. Also, as described later, in the process for buildings before operation (S104 to S107), the CO2 emissions associated with the operation of the completed building are calculated by multiplying data on the total floor area of the completed building before operation by the CO2 emission intensity per unit total floor area and per unit period of the building with the same purpose.
[0092] In addition, the CO2 emission intensity per unit total floor area and per unit period of a building for the same purpose can be calculated by referring to academic papers, etc., so that the processing for completed buildings in operation (S101 to S103) does not need to be carried out.
[0093] In the procedure for predicting the amount of CO2 emissions accompanying the operation of a building after completion of this embodiment, the CO2 emission intensity classified by the building's use can be used, so that the amount of CO2 emissions accompanying the operation of a building after completion can be predicted with high accuracy. In other words, the CO2 emission prediction system 100 of this embodiment can calculate the amount of CO2 emissions accompanying the operation of a building after completion using the CO2 emission intensity classified by the building's use, so that the amount of CO2 emissions accompanying the operation of a building after completion can be predicted with high accuracy.
[0094] Hereinafter, with reference to FIG. 10, a procedure for predicting CO2 emissions associated with the operation of a building after completion will be described as various processes executed by the CO2 emission prediction server 10 of the CO2 emission prediction system 100.
[0095] First, the CO2 emission prediction server 10 acquires building information data from the post-construction performance data on buildings in operation (S101). The building information data includes at least data on the building's use and total floor area from the information on the buildings in operation. However, the building information data may further include the year of completion, etc., in addition to the data on the building's use and total floor area.
[0096] Next, the CO2 emission prediction server 10 acquires calculated CO2 emission data from the post-construction performance data on the completed building in operation (S102). The CO2 emission prediction server 10 acquires the calculated CO2 emission data by linking it to the data on the use of the building acquired in S101 described above.
[0097] Here, the CO2 emission prediction server 10 performs the above-mentioned processes of S101 and S102 for multiple constructed buildings. As a result, the CO2 emission prediction server 10 can obtain information that links calculated CO2 emission data by use of multiple buildings.
[0098] Next, the CO2 emission prediction server 10 calculates the CO2 emission intensity for each building use (S103). Specifically, the calculation unit 12 (post-completion CO2 emission calculation unit 14) of the CO2 emission prediction server 10 calculates the CO2 emission intensity for each building use from the building information data including data on the building use and total floor area among the post-completion performance data on the completed building in operation, and the calculated CO2 emission data. The calculation unit 12 of the CO2 emission prediction server 10 (post-completion performance data on the completed building in operation) divides the calculated CO2 emission data by the total floor area for each building use, thereby obtaining the CO2 emission per unit total floor area and per unit period, i.e., the CO2 emission intensity.
[0099] Fig. 11 is an explanatory diagram showing the calculation results of the CO2 emission intensity per total floor area by use of the building after completion. Fig. 12 is an explanatory diagram showing an example of the prediction results of the CO2 emission associated with the operation of the building after completion.
[0100] As shown in Figure 11, the CO2 emission intensity (total energy) for the "office" is EE02kg CO2 / m 2 This means that the amount of CO2 emitted from the operation of an "office" building is approximately 100% for every 1 m2 of total floor space. 2 This means that the CO2 equivalent is 0.2 kg per year.
[0101] Next, as shown in FIG. 10, the CO2 emission prediction server 10 acquires data for predicting CO2 emissions associated with the operation of the building after completion (the above-mentioned "various data for prediction in the planning stage of a building"). Specifically, the CO2 emission prediction server 10 acquires building information data of the completed building before operation (S104). The building information data includes at least data on the building's use and total floor area among the information on the completed building before operation. However, the building information data may further include the year of completion, etc., in addition to the data on the building's use and total floor area.
[0102] Next, the CO2 emission prediction server 10 calculates a predicted CO2 emission amount for the building after completion and before operation (S105).
[0103] Here, the CO2 emission prediction server 10 may calculate the CO2 emission associated with the operation of the building after completion in a second period (e.g., 26 to 49 years after completion) after the first period by discounting the CO2 emission associated with the operation of the building after completion in a first period (e.g., 1 to 25 years after completion) at a first rate (e.g., 25%). This allows correction of the predicted CO2 emission due to facility renovation.
[0104] The CO2 emission prediction server 10 may also calculate the CO2 emission associated with the operation of the building after completion in a third period (e.g., 50 years or more after completion) after the second period (e.g., 26 to 49 years after completion) by discounting the CO2 emission associated with the operation of the building after completion in a first period (e.g., 1 to 25 years after completion) by a second rate (e.g., 50%) that is greater than the first rate (e.g., 25%). This allows correction of the predicted CO2 emission due to demolition and reconstruction.
[0105] Furthermore, at the start of the third period (for example, 50 years after completion), the CO2 emissions associated with the construction of the same building as the completed building may be added.
[0106] FIG. 13 is an explanatory diagram showing an example of an output screen of the predicted results of the amount of CO2 emissions associated with the construction of a planned building and the amount of CO2 emissions associated with the operation of the building after completion.
[0107] Area A of Figure 13 shows the calculation results of the CO2 emissions associated with the construction of the planned building together with a graph. Area B of Figure 13 shows the calculation results of the fuel consumption by vehicle and construction machinery together with a graph. Area C of Figure 13 shows the calculation results of the CO2 emissions emitted when producing materials used in the construction of the building. Areas D and E of Figure 13 show the calculation results of the CO2 emissions associated with the operation of the building after completion together with a graph.
[0108] In this way, in Figure 13, by illustrating the calculation results, etc. in graphs, etc., all parties involved, including the client, can intuitively and easily understand the contents.
[0109] ===Other=== The above-described embodiment is for the purpose of facilitating understanding of the present invention, and is not intended to limit the present invention. The present invention may be modified or improved without departing from the spirit thereof, and it goes without saying that the present invention includes equivalents thereof. [Explanation of symbols]
[0110] 1,2,3,4 Terminal 10 CO2 Emissions Prediction Server 11 Acquisition Department 12 Arithmetic section 13 Construction CO2 emissions calculation department 14 Post-completion CO2 emissions calculation department 15 Recording Section 16 Display 100 CO2 Emissions Prediction System
Claims
1. CO2 emissions from operating the building after completion 2 1. A method for forecasting emissions, comprising the steps of: Obtaining data on the total floor area of the building after completion; The building will be used for the same purpose as the building after completion. 2 CO emissions per unit of floor area and per unit period for buildings with the same purpose for which emissions have already been calculated 2 From the emission intensity and the data on the total floor area of the completed building, the CO 2 Calculating emissions; CO 2 How emissions are predicted.
2. CO2 associated with the operation of the building after completion during the first period 2 The CO2 emissions associated with the operation of the building after completion in a second period after the first period are discounted at a first rate. 2 Calculating emissions; 2. The CO 2 How emissions are predicted.
3. CO2 associated with the operation of the building after completion during the first period 2 The CO emissions associated with the operation of the building after completion in a third period after the second period are discounted by a second rate that is greater than the first rate. 2 Calculating emissions; 3. The CO 2 How emissions are predicted.
4. At the start of the third period, the CO2 generated by the construction of the same building as the completed building 2 Adding up emissions, The CO according to claim 3 2 How emissions are predicted.
5. CO2 emissions from operating the building after completion 2 CO emissions forecast 2 1. An emissions forecasting system, comprising: An acquisition unit for acquiring data on the total floor area of the building after completion; The building will be used for the same purpose as the building after completion. 2 CO emissions per unit of floor area and per unit period for buildings with the same purpose for which emissions have already been calculated 2 From the emission intensity and the data on the total floor area of the completed building, the CO 2 A calculation unit that calculates an emission amount; CO equipped with 2 Emissions forecasting system.
Citation Information
Patent Citations
Evaluating system for building operation performance
JP2001349598A
Energy-saving support apparatus and program
JP2011134147A
Environmental load calculation system
JP2015041117A
Apparatus, method and program for calculating greenhouse gas emissions
JP7133700B1
Method for calculating emission of carbon dioxide in construction work
JP2007018061A