Scheduling method, parameter transmission method, apparatus, device, system, and medium

By predicting transmission parameters for cells within the radio unit's coverage area and dynamically allocating resources, the method optimizes fronthaul bandwidth usage, addressing the high cost and limited availability of optical fiber in fronthaul networks.

JP2024545529AActive Publication Date: 2024-12-09HUAWEI TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2024539599
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-12-31
Filing Date
2022-12-23
Publication Date
2024-12-09
Estimated Expiration
2042-12-23

AI Technical Summary

Technical Problem

The high cost of optical fiber deployment in fronthaul networks and the limited bandwidth availability necessitate efficient scheduling methods to optimize channel parameters and reduce bandwidth usage.

Method used

A scheduling method that predicts transmission parameters for each cell within the signal coverage area of a radio unit, allowing the baseband unit to dynamically allocate resources based on predicted and actual transmission parameters, ensuring the maximum transmission bandwidth does not exceed the sum of individual cell requirements, thereby optimizing fronthaul bandwidth usage.

Benefits of technology

This approach effectively saves fronthaul bandwidth by ensuring that cells do not simultaneously reach peak load, resulting in significant bandwidth savings, with up to 50% savings demonstrated in certain scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024545529000001_ABST
    Figure 2024545529000001_ABST
Patent Text Reader

Abstract

The present application discloses a scheduling method, a parameter transmission method, an apparatus, a device, a system, and a medium belonging to the field of communication technology. The method includes: obtaining a first predicted transmission parameter of each of a plurality of cells, the first predicted transmission parameter indicating a predicted transmission parameter required by each cell during scheduling in a current periodicity, the plurality of cells being cells included in a signal coverage area of ​​a wireless unit RU, a maximum transmission bandwidth between the RU and a BU being smaller than a sum of the maximum transmission bandwidth required by the plurality of cells, and scheduling at least one of the plurality of cells based on the first predicted transmission parameter of the plurality of cells. In the present application, it can be ensured that the maximum transmission bandwidth between the RU and a BU is smaller than a sum of the maximum transmission bandwidth required by the plurality of cells, thereby saving fronthaul bandwidth when the plurality of cells do not reach a peak load at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present application relates to the field of communication technologies, and in particular to a scheduling method, a parameter transmission method, an apparatus, a device, a system, and a medium. [Background technology]

[0002] A base station typically consists of a baseband unit (BU) and a radio unit (RU). Includes BU and RU usually use optical fiber. Through The network between the BU and the RU is called the fronthaul network. The cost of deploying optical fiber is high, so fronthaul bandwidth is a scarce resource.

[0003] Currently, the fronthaul bandwidth is determined by the channel parameters in the fronthaul network, such as the number of available physical radio resource blocks (RBs), the number of available RBs, and the number of available RBs. AboutThe number of downlink data channel (e.g., physical downlink shared channel, PDSCH) beams, the number of downlink data channel layers, the number of downlink control channel (e.g., physical downlink control channel, PDCCH) beams, the number of downlink control channel layers, the number of uplink data channel (e.g., physical uplink shared channel, PUSCH) beams, the number of uplink data channel layers, the number of uplink control channel (e.g., physical uplink control channel, PUCCH) beams, the number of uplink control channel layers, etc. Therefore, how to perform scheduling based on channel parameters to save fronthaul bandwidth is currently an urgent problem to be solved. Summary of the Invention

[0004] The present application provides a scheduling method, a parameter transmission method, an apparatus, a device, a system, and a medium for saving fronthaul bandwidth.

[0005] According to a first aspect, a scheduling method is provided, in which a first predicted transmission parameter for each of a plurality of cells is obtained, the first predicted transmission parameter being a transmission parameter for each of the cells during scheduling in a current periodicity. Required The RU and the BU may include a signal coverage area of ​​the RU and a maximum transmission bandwidth between the RU and the BU is less than a sum of the maximum transmission bandwidths required by the plurality of cells. At least one of the plurality of cells is scheduled based on the first predicted transmission parameters of the plurality of cells.

[0006] It should be noted that the multiple cells may be all cells in the signal coverage area of ​​the RU, or may be some cells in the signal coverage area of ​​the RU. In addition, the multiple cells may be multiple cells that provide coverage to a base station, or may be all cells that share the same fronthaul bandwidth. This is not a limitation in this application.

[0007] In addition, the maximum transmission bandwidth between the RU and the BU is the maximum amount of data transmitted by the fronthaul network between the RU and the BU per unit time, and the maximum transmission bandwidth required by each cell refers to the maximum amount of data transmitted by each cell per unit time through the fronthaul network when each cell reaches its peak load.

[0008] In this application, there are two ways in which the BU obtains the first predicted transmission parameters of each of the multiple cells, which will be described separately hereinafter.

[0009] In a first embodiment, the RU may select each of the cells during scheduling in the current periodicity. Required The RU predicts required transmission parameters to obtain first predicted transmission parameters for each cell. The RU transmits the first predicted transmission parameters for each of the plurality of cells to the BU. The BU receives the first predicted transmission parameters for each of the cells transmitted by the RU.

[0010] In a second embodiment, the BU is configured to schedule each of the plurality of cells during the scheduling in the current periodicity. Required Required transmission parameters are predicted to obtain first predicted transmission parameters for each cell.

[0011] In other words, in the first embodiment, during scheduling in the current periodicity, each cell Required The required transmission parameters are ByIn the second embodiment, each cell is scheduled during the current periodicity. Required The required transmission parameters are By Predicted.

[0012] During scheduling in the current periodicity, each cell Required Regardless of whether the RU or the BU predicts the required transmission parameters, the prediction method is the same. Therefore, in the above two embodiments, each of the multiple cells during scheduling in the current periodicity Required The implementation process of predicting the required transmission parameters includes obtaining second predicted transmission parameters and actual transmission parameters of each of the plurality of cells, the second predicted transmission parameters being obtained during scheduling of the respective cells in a previous periodicity. Required The actual transmission parameters are the expected transmission parameters required for each cell during scheduling in the previous periodicity. Real and determining a first predicted transmission parameter for each cell based on the second predicted transmission parameter and the actual transmission parameter of each of the plurality of cells.

[0013] It should be noted that the multiple cells may be cells of the same standard or cells of different standards. If the multiple cells are cells of different standards, the multiple cells may include cells of two different standards, or , may include cells of more than two standards, i.e., the plurality of cells may include cells of at least two standards, which may include LTE and NR, and may further include another standard.

[0014] Optionally, multiple cells may have the same coverage area. ,or , multiple cells ,another Each of the base stations may have different coverage areas.

[0015] The first predicted transmission parameter includes a predicted channel parameter or a predicted transmission bandwidth. The predicted channel parameter is a parameter that is determined based on the predicted transmission bandwidth of each cell during scheduling in the current periodicity. Required The predicted physical channel parameters required indicate the predicted transmission bandwidth required by the respective cell during scheduling in the current periodicity.

[0016] In some embodiments, the predicted channel parameters include at least one of the following parameters: a quantity of downlink valid physical RBs, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas, i.e., the predicted channel parameters include at least one of the quantity of downlink valid physical RBs, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas.

[0017] In some other embodiments, the predicted channel parameters include the number of user equipments of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel, and a sounding reference channel, and resource information occupied by each user equipment. In other words, the predicted channel parameters include the number of user equipments of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel, and a sounding reference channel (e.g., a channel configured to transmit a sounding reference signal (SRS)), and resource information occupied by each user equipment.

[0018] For each of the downlink data channel, the downlink control channel, the uplink data channel, or the uplink control channel, the resource information occupied by each user equipment of the channel includes at least one of the following parameters: the number of RBs, the number of channel layers of each RB, and the number of channel physical antennas or the number of channel beams of each RB. For the sounding reference channel, the resource information occupied by each user equipment of the channel includes at least one of the following parameters: the number of RBs, the number of channel physical antennas of each RB, and the number of sounding reference signal symbols of each radio frame.

[0019] identification It should be noted that whether the parameters are included in the predicted channel parameters depends on the capabilities of the BU and RU, respectively. That is, identification Whether these parameters are included in the predicted channel parameters depends on the function of the fronthaul network between the BU and the RU. of Split of rear of Conducted by BU Function , and Conducted by RU function The predicted channel parameters vary with the dividing line.

[0020] Based on the above description, the first predicted transmission parameter includes a predicted channel parameter or a predicted transmission bandwidth. In various cases, the manner in which the BU schedules at least one of the multiple cells according to the first predicted transmission parameters of the multiple cells is different. Therefore, the following describes the cases individually.

[0021] In a first case, the first predicted transmission parameters include predicted channel parameters, in which the BU may determine schedulable channel parameters of the at least one cell based on the predicted channel parameters of the multiple cells and the maximum allowable channel parameters of the RU, and the BU schedules the at least one cell based on the schedulable channel parameters of the at least one cell.

[0022] The schedulable channel parameters of a cell are the parameters that the cell Used for This refers to the maximum channel parameters that can be used by a cell during scheduling with the current periodicity. Real The channel parameters used in the determination do not exceed the schedulable channel parameters.

[0023] Based on the above description, the multiple cells may be cells of the same standard, or may be cells of two different standards. In various cases, the manner of determining the schedulable channel parameters of at least one cell based on the predicted channel parameters of the multiple cells and the maximum allowable channel parameters of the RU is different. Therefore, the following describes the cases separately.

[0024] Case 1: The multiple cells are cells of the same standard. In this case, the BU may determine the sum of the predicted channel parameters of the multiple cells to obtain a total predicted channel parameter. If the total predicted channel parameter is greater than the maximum allowable channel parameter of the RU, the BU determines the schedulable channel parameter of the at least one cell based on the maximum allowable channel parameter of the RU and a ratio of each predicted channel parameter of the at least one cell to the total predicted channel parameter.

[0025] That is, in the case where the total predicted channel parameter is greater than the maximum allowable channel parameter of the RU, for any cell among the at least one cell, a ratio of the predicted channel parameter of that cell to the total predicted channel parameter is determined, and the maximum allowable channel parameter of the RU is multiplied by that ratio to obtain the schedulable channel parameter of that cell.

[0026] Optionally, if the total predicted channel parameter is less than or equal to the maximum allowable channel parameter of the RU, the predicted channel parameter of the respective cell is used as the schedulable channel parameter, i.e., for at least one cell, the predicted channel parameter of the at least one cell is used as the respective schedulable channel parameter.

[0027] In case 1, for multiple cells of the same standard, a predicted channel parameter of each cell in a current periodicity is determined, and a schedulable channel parameter of each of the at least one cell is dynamically determined based on the maximum allowable channel parameter of the RU and the predicted channel parameter of each cell in the current periodicity to schedule the at least one cell, i.e., the multiple cells share the maximum allowable channel parameter of the RU; ,So The schedulable channel parameters of each cell are determined based on the peak load that may be reached by the respective cell. Decisions are made as needed, not at random. In this way, fronthaul bandwidth can be saved if multiple cells do not reach peak loads at the same time. , K Site 1 In Experiments have demonstrated that 20% of the fronthaul bandwidth can be saved.

[0028] Case 2: The multiple cells contain cells of two different specifications, and those cells teeth,A cell of a first standard and a cell of a second standard. In this case, the BU may determine a sum of predicted channel parameters of cells of the same standard in the multiple cells to obtain a total predicted channel parameter of the first standard and a total predicted channel parameter of the second standard. If the sum of the total predicted channel parameter of the first standard and the total predicted channel parameter of the second standard is greater than the maximum allowable channel parameter of the RU, the schedulable channel general parameter of the first standard and the schedulable channel general parameter of the second standard are determined based on the maximum allowable channel parameter of the RU. The schedulable channel parameter of each cell of the first standard in the at least one cell is determined based on the total schedulable channel parameter of the first standard and a ratio of the predicted channel parameter of each cell of the first standard in the at least one cell to the total predicted channel parameter of the first standard. The schedulable channel parameter of each cell of the second standard in the at least one cell is determined based on the total schedulable channel parameter of the second standard and a ratio of the predicted channel parameter of each cell of the second standard in the at least one cell to the total predicted channel parameter of the second standard.

[0029] As an example, an implementation process for determining a total schedulable channel parameter of a first standard and a total schedulable channel parameter of a second standard based on a maximum allowable channel parameter of an RU includes: subtracting a total predicted channel parameter of the first standard from the maximum allowable channel parameter of the RU to obtain a total schedulable channel parameter of the second standard; and using the total predicted channel parameter of the first standard as the total schedulable channel parameter of the first standard.

[0030] No. The total schedulable channel parameters of the first standard and the second standard are Alternatively Other forms DecideFor example, the total predicted channel parameter of the second standard is subtracted from the maximum allowable channel parameter of the RU to obtain the schedulable channel general parameter of the first standard, and the total predicted channel parameter of the second standard is used as the schedulable channel general parameter of the second standard. As another example, the sum of the total predicted channel parameter of the first standard and the total predicted channel parameter of the second standard is determined to obtain the total predicted channel parameter of all cells, and a ratio of the total predicted channel parameter of the first standard to the total predicted channel parameter of all cells is determined. The ratio is multiplied by the maximum allowable channel parameter of the RU to obtain the total schedulable channel parameter of the first standard. The ratio of the total predicted channel parameter of the second standard to the total predicted channel parameter of all cells is determined. The ratio is multiplied by the maximum allowable channel parameter of the RU to obtain the total schedulable channel parameter of the second standard.

[0031] Optionally, if the sum of the total predicted channel parameter of the first standard and the total predicted channel parameter of the second standard is less than or equal to the maximum allowable channel parameter of the RU, the predicted channel parameter of the respective cell is used as the schedulable channel parameter, i.e., for at least one cell, the predicted channel parameter of the at least one cell is used as the respective schedulable channel parameter.

[0032] In case 2, for cells of two different standards, a predicted channel parameter of each cell at a current periodicity is determined, and a total schedulable channel parameter of the two standards is dynamically determined based on a maximum allowable channel parameter of an RU and a predicted channel parameter of each cell at a current periodicity, whereby a respective schedulable channel parameter of at least one cell is dynamically determined to schedule at least one cell. That is, the two standards share a maximum allowable channel parameter of an RU, and a total schedulable channel parameter of the two standards is determined as necessary, whereby a respective schedulable channel parameter of each cell is dynamically determined. ,So Based on the peak load that can be reached by each cell, Decisions are made as needed, not at random. In this way, fronthaul bandwidth can be saved if multiple cells do not reach peak loads simultaneously. In addition, in the case that the two standards occupy the same spectrum bandwidth and have the same channel parameters, , K Base 2 In Experiments have demonstrated that 50% of the fronthaul bandwidth can be saved.

[0033] In a second case, the first predicted transmission parameter includes a predicted transmission bandwidth. In this case, the BU may determine predicted channel parameters of the multiple cells based on the predicted transmission bandwidths of the multiple cells, and determine schedulable channel parameters of the at least one cell based on the predicted channel parameters of the multiple cells and a maximum allowable channel parameter of the RU. The BU schedules the at least one cell based on the schedulable channel parameters of the at least one cell.

[0034] According to a second aspect, a parameter transmission method is provided, in which each of a plurality of cells during scheduling in a current periodicity is RequiredThe required transmission parameters are predicted to obtain first predicted transmission parameters for each cell, and the first predicted transmission parameters for each cell are sent to a baseband unit BU, the multiple cells are cells included in a signal coverage area of ​​a radio unit RU, and a maximum transmission bandwidth between the RU and the BU is smaller than a sum of the maximum transmission bandwidths required by the multiple cells.

[0035] Optionally, each of the plurality of cells during scheduling in the current periodicity Required The required transmission parameters are predicted to obtain first predicted transmission parameters for each cell, Obtaining a second predicted transmission parameter and an actual transmission parameter of each cell, the second predicted transmission parameter being obtained during scheduling in a previous periodicity. Required The actual transmission parameters are the expected transmission parameters required for each cell during scheduling in the previous periodicity. Real indicating transmission parameters used in the and determining a first predicted transmission parameter for each cell based on the second predicted transmission parameter and the actual transmission parameter for each cell.

[0036] Optionally, the first predicted transmission parameter comprises a predicted channel parameter or a predicted transmission bandwidth, the predicted channel parameter being a predicted transmission bandwidth for each cell during scheduling in the current periodicity. Required 4 indicates the required predicted physical channel parameters.

[0037] Optionally, the predicted channel parameters include at least one of the following parameters: a quantity of downlink valid physical radio resource blocks RB, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas.

[0038] Optionally, the predicted channel parameters include a quantity of user equipment of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel, and a sounding reference channel, and resource information occupied by each user equipment.

[0039] Optionally, the resource information occupied by each user equipment of each of the downlink data channel, the downlink control channel, the uplink data channel, or the uplink control channel includes at least one of the following parameters: a number of RBs, a number of channel layers for each RB, and a number of channel physical antennas or a number of channel beams for each RB.

[0040] The resource information occupied by each user equipment of the sounding reference channel includes at least one of the following parameters: the number of RBs, the number of channel physical antennas of each RB, and the number of sounding reference signal symbols in each radio frame.

[0041] Optionally, the plurality of cells are cells of the same standard, or the plurality of cells includes cells of two separate standards.

[0042] Optionally, the two separate standards include Long Term Evolution LTE and New Radio NR.

[0043] Optionally, the multiple cells have the same coverage area.

[0044] According to a third aspect, there is provided a scheduling device, the scheduling device having the capability of performing the actions of the scheduling method in the first aspect, the scheduling device including at least one module, the at least one module being configured to perform the scheduling method provided in the first aspect.

[0045] That is, this scheduling device an acquisition module configured to acquire a first predicted transmission parameter of each of the plurality of cells, the first predicted transmission parameter being a transmission parameter of each of the plurality of cells during scheduling in the current periodicity; Required indicating the expected transmission parameters required; an acquisition module, the plurality of cells being cells included in a signal coverage area of ​​a radio unit RU, and a maximum transmission bandwidth between the RU and a baseband unit BU being smaller than a sum of the maximum transmission bandwidths required by the plurality of cells; and a scheduling module configured to schedule at least one of the plurality of cells based on the first predicted transmission parameters of the plurality of cells.

[0046] Optionally, the acquisition module further comprises: and a receiving sub-module configured to receive a first predicted transmission parameter of the respective cell transmitted by the RU.

[0047] Optionally, the acquisition module further comprises: During scheduling in the current periodicity, each cell Required A prediction sub-module configured to predict required transmission parameters to obtain first predicted transmission parameters for each cell.

[0048] Optionally, the prediction submodule: Obtaining a second predicted transmission parameter and an actual transmission parameter of each cell, the second predicted transmission parameter being obtained during scheduling in a previous periodicity. Required The actual transmission parameters are the expected transmission parameters required for each cell during scheduling in the previous periodicity. Real indicating transmission parameters used in the determining a first predicted transmission parameter for each cell based on the second predicted transmission parameter and the actual transmission parameter for each cell.

[0049] Optionally, the first predicted transmission parameters include predicted channel parameters, the predicted channel parameters being determined based on the predicted channel parameters for each cell during scheduling in the current periodicity. Required 4 indicates the required predicted physical channel parameters.

[0050] The scheduling module a schedulable parameter determination submodule configured to determine a schedulable channel parameter of at least one cell based on the predicted channel parameters of the multiple cells and a maximum allowable channel parameter of the RU; and a scheduling submodule configured to schedule the at least one cell based on the schedulable channel parameters of the at least one cell.

[0051] Optionally, the first predicted transmission parameter comprises a predicted transmission bandwidth.

[0052] The scheduling module a predicted channel parameter determination submodule configured to determine a predicted channel parameter of each cell based on a predicted transmission bandwidth of the plurality of cells, the predicted channel parameter being determined for each cell during scheduling in the current periodicity; Required a predicted channel parameter determination submodule indicating the predicted physical channel parameters required; a schedulable parameter determination submodule configured to determine a schedulable channel parameter of at least one cell based on the predicted channel parameters of the multiple cells and a maximum allowable channel parameter of the RU; and a scheduling submodule configured to schedule the at least one cell based on the schedulable channel parameters of the at least one cell.

[0053] Optionally, the multiple cells are cells of the same specification.

[0054] The schedulable parameter determination submodule includes: determining a sum of predicted channel parameters of a plurality of cells to obtain a total predicted channel parameter; and if the total predicted channel parameter is greater than the maximum allowable channel parameter, determining a schedulable channel parameter of the at least one cell based on the maximum allowable channel parameter and a ratio of the predicted channel parameter of each of the at least one cell to the total predicted channel parameter.

[0055] Optionally, the plurality of cells includes cells of two different specifications, and the cells teeth, A first standard cell and a second standard cell.

[0056] The schedulable parameter determination submodule includes: determining a sum of predicted channel parameters among cells of the same standard in the plurality of cells to obtain a total predicted channel parameter for the first standard and a total predicted channel parameter for the second standard; determining a total schedulable channel parameter of the first standard and a total schedulable channel parameter of the second standard based on the maximum allowable channel parameter if the sum of the total predicted channel parameter of the first standard and the total predicted channel parameter of the second standard is greater than the maximum allowable channel parameter; determining a schedulable channel parameter of each cell of the first standard in the at least one cell based on a total schedulable channel parameter of the first standard and a ratio of a predicted channel parameter of each cell of the first standard in the at least one cell to a total predicted channel parameter of the first standard; and determining a schedulable channel parameter of each cell of the second standard in the at least one cell based on a total schedulable channel parameter of the second standard and a ratio of a predicted channel parameter of each cell of the second standard in the at least one cell to a total predicted channel parameter of the second standard.

[0057] Optionally, the predicted channel parameters include at least one of the following parameters: a quantity of downlink valid physical radio resource blocks RB, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas.

[0058] Optionally, the predicted channel parameters include a quantity of user equipment of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel, and a sounding reference channel, and resource information occupied by each user equipment.

[0059] Optionally, the resource information occupied by each user equipment of each of the downlink data channel, the downlink control channel, the uplink data channel, or the uplink control channel includes at least one of the following parameters: a number of RBs, a number of channel layers for each RB, and a number of channel physical antennas or a number of channel beams for each RB.

[0060] The resource information occupied by each user equipment of the sounding reference channel includes at least one of the following parameters: the number of RBs, the number of channel physical antennas of each RB, and the number of sounding reference signal symbols in each radio frame.

[0061] Optionally, the two separate standards include Long Term Evolution LTE and New Radio NR.

[0062] Optionally, the multiple cells have the same coverage area.

[0063] According to a fourth aspect, there is provided a parameter transmission device having a function of performing the actions of the parameter transmission method in the first aspect, the parameter transmission device including at least one module, the at least one module being configured to perform the parameter transmission method provided in the second aspect.

[0064] That is, this parameter transmission device: Each of the plurality of cells during scheduling in the current periodicity Required a parameter prediction module configured to predict required transmission parameters to obtain first predicted transmission parameters for each cell; a transmitting module configured to transmit the first predicted transmission parameters of the respective cells to the baseband unit BU, The multiple cells are cells included in the signal coverage area of ​​the wireless unit RU, and the maximum transmission bandwidth between the RU and the BU is the multiple cells. Required less than the total maximum transmission bandwidth required.

[0065] Optionally, the parameter prediction module comprises: Obtaining a second predicted transmission parameter and an actual transmission parameter of each cell, the second predicted transmission parameter being obtained during scheduling in a previous periodicity. Required The actual transmission parameters are the expected transmission parameters required for each cell during scheduling in the previous periodicity. Real indicating transmission parameters used in the determining a first predicted transmission parameter for each cell based on the second predicted transmission parameter and the actual transmission parameter for each cell.

[0066] Optionally, the first predicted transmission parameter comprises a predicted channel parameter or a predicted transmission bandwidth, the predicted channel parameter being a predicted transmission bandwidth for each cell during scheduling in the current periodicity. Required 4 indicates the required predicted physical channel parameters.

[0067] Optionally, the predicted channel parameters include at least one of the following parameters: a quantity of downlink valid physical radio resource blocks RB, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas.

[0068] Optionally, the predicted channel parameters include a quantity of user equipment of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel, and a sounding reference channel, and resource information occupied by each user equipment.

[0069] Optionally, the resource information occupied by each user equipment of each of the downlink data channel, the downlink control channel, the uplink data channel, or the uplink control channel includes at least one of the following parameters: a number of RBs, a number of channel layers for each RB, and a number of channel physical antennas or a number of channel beams for each RB.

[0070] The resource information occupied by each user equipment of the sounding reference channel includes at least one of the following parameters: the number of RBs, the number of channel physical antennas of each RB, and the number of sounding reference signal symbols in each radio frame.

[0071] Optionally, the plurality of cells are cells of the same standard, or the plurality of cells includes cells of two separate standards.

[0072] Optionally, the two separate standards include Long Term Evolution LTE and New Radio NR.

[0073] Optionally, the multiple cells have the same coverage area.

[0074] According to a fifth aspect, a BU is provided, the BU including a processor and a memory, the memory configured to store a computer program for performing the scheduling method provided in the first aspect, the processor configured to execute the computer program stored in the memory to perform the scheduling method according to the first aspect.

[0075] Optionally, the BU may further include a communication bus, which is configured to establish a connection between the processor and the memory.

[0076] According to a sixth aspect, there is provided an RU, the RU including a processor and a memory, the memory configured to store a computer program for performing the parameter transmission method provided in the first aspect, the processor configured to execute the computer program stored in the memory to perform the parameter transmission method according to the first aspect.

[0077] Optionally, the RU may further include a communication bus configured to establish a connection between the processor and the memory.

[0078] According to a seventh aspect, there is provided a scheduling system, the system including a RU and a BU.

[0079] The RU is responsible for scheduling each of the multiple cells during the current periodicity. Required It is configured to predict required transmission parameters to obtain first predicted transmission parameters for each cell, and send the first predicted transmission parameters for each cell to the BU.

[0080] The BU is configured to receive the first predicted transmission parameters of the respective cells transmitted by the RU, and schedule at least one of the multiple cells based on the first predicted transmission parameters of the multiple cells.

[0081] The multiple cells are cells included in a signal coverage area of ​​the radio unit RU, and the maximum transmission bandwidth between the RU and the baseband unit BU is smaller than the sum of the maximum transmission bandwidths required by the multiple cells.

[0082] According to an eighth aspect, there is provided a computer readable storage medium storing instructions which, when executed on a computer, enable the computer to perform the steps of the scheduling method according to the first aspect or to perform the steps of the parameter transmission method according to the second aspect.

[0083] According to a ninth aspect there is provided a computer program product comprising instructions which, when executed on a computer, enable the computer to perform the steps of the scheduling method according to the first aspect or to perform the steps of the parameter transmission method according to the second aspect.

[0084] In other words, a computer program is provided which, when executed on a computer, enables the computer to perform the steps of the scheduling method according to the first aspect or to perform the steps of the parameter transmission method according to the second aspect.

[0085] The technical effects obtained in the second to ninth aspects are similar to those obtained by using the corresponding technical means in the first aspect, and the details will not be described again here.

[0086] The technical solutions provided in this application can bring at least the following beneficial effects:

[0087] The maximum transmission bandwidth required by each cell refers to the maximum amount of data transmitted by each cell through the fronthaul network per unit time when each cell reaches a peak load. However, it is impossible for all cells to reach the peak load at the same time. Therefore, in the present application, a first predicted transmission parameter of each of the plurality of cells is obtained, and at least one of the plurality of cells is scheduled based on the first predicted transmission parameters of the plurality of cells. At least one cell Required The required channel parameters are not determined based on the peak load that may be reached by each cell for scheduling the at least one cell. In this manner, it can be ensured that the maximum transmission bandwidth between the RU and the BU is smaller than the sum of the maximum transmission bandwidths required by multiple cells, thereby saving the fronthaul bandwidth when multiple cells do not reach the peak load at the same time. [Brief description of the drawings]

[0088] [Figure 1] FIG. 1 is a schematic diagram of a system architecture according to an embodiment of the present application. [Diagram 2] FIG. 2 is a schematic diagram of another system architecture according to an embodiment of the present application. [Diagram 3] FIG. 1 is a schematic diagram of multiple networking topologies according to an embodiment of the present application. [Figure 4] FIG. 2 is a system block diagram of a BU and a RU according to an embodiment of the present application. [Diagram 5] FIG. 2 is a schematic diagram of the structure of a network device according to an embodiment of the present application; [Figure 6] 2 is a flowchart of a scheduling method according to an embodiment of the present application; [Figure 7] FIG. 2 is a schematic diagram of functional division between a BU and a RU according to an embodiment of the present application; [Figure 8] FIG. 2 is another schematic diagram of functional division between a BU and a RU according to an embodiment of the present application; [Figure 9] FIG. 2 is a schematic diagram of a single-standard cell according to an embodiment of the present application. [Figure 10] 1 is a schematic diagram of a multistandard cell according to an embodiment of the present application; [Figure 11] FIG. 2 is a schematic diagram of the structure of a scheduling device according to an embodiment of the present application; [Figure 12] 1 is a schematic diagram of the structure of a parameter transmission device according to an embodiment of the present application; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0089] In order to make the objectives, technical solutions and advantages of the embodiments of the present application clearer, the following further describes the embodiments of the present application in detail with reference to the accompanying drawings.

[0090] Please refer to Figure 1. Figure 1 is a schematic diagram of a system architecture according to an embodiment of the present application. The system architecture includes a baseband unit (BU) and multiple radio units (RU). The BU: For communication Connected to multiple RUs via optical fiber CanPlease refer to Figure 2. Figure 2 is a schematic diagram of another system architecture according to an embodiment of the present application. This system architecture includes multiple BUs and multiple RUs, where the multiple BUs: For communication Connected to multiple RUs via optical fiber Can In other words, in this embodiment of the present application, one BU may be connected to multiple RUs, or multiple BUs may be connected to multiple RUs. Connected to It may continue.

[0091] The network between the BU and the RU is called a fronthaul network. There are multiple networking topologies between the BU and multiple RUs. See Figure 3. Figure 3 shows four networking topologies. Figure 3 In networking configuration (a), BUs and RUs communicate with each other through optical fibers. Figure 3 In networking configuration (b), the BUs use passive wavelength division multiplexing (WDM) mode Communicate with RU via. Figure 3 In networking configuration (c), the BU is an active WDM mode or optical transport network (OTN) mode Communicate with RU via. Figure 3 In networking type (d), the BUs are connected to a secret private network (SPN). mode Communicate with RU via.

[0092] Regardless of which networking topology is used, data is transmitted between the BU and the RU through a transmission medium, for example, optical fiber. The cost of optical fiber deployment is high. Therefore, the fronthaul bandwidth is a valuable resource. In order to save the fronthaul bandwidth, the BU and the RU are improved in the embodiment of the present application. Please refer to FIG. 4. FIG. 4 is a system block diagram of the BU and the RU according to the embodiment of the present application. The BU may include a long term evolution (LTE) module, a new radio (NR) module, and a parameter control module. Both the LTE module and the NR module include a cell management unit, a channel scheduling unit, and a baseband signal processing unit. The RU may include an LTE module, an NR module, and a parameter prediction module. Optionally, both the LTE module and the NR module in the RU may include a baseband signal processing unit.

[0093] For the RU, the parameter prediction module estimates the respective cell Required and configured to predict required transmission parameters for each cell in the NR during scheduling. Required It is further configured to predict the required transmission parameters to obtain predicted transmission parameters for each cell, and send the predicted transmission parameters for each cell to the BU.

[0094] With respect to the BU, the parameter control module is configured to schedule at least one cell based on the predicted transmission parameters of the respective cells in LTE and the predicted transmission parameters of the respective cells in NR.

[0095] It should be noted that the BU and RU may support one standard or multiple standards. For example, FIG. 4 is described by using an example in which the BU and RU support two standards. Optionally, the BU includes a building baseband unit (BBU), and the RU includes a remote radio unit (RRU). Alternatively, the BU includes a distributed unit (RRU). d unit, DU) or center Unit (centra l The BU includes a CU, and the RU includes an active antenna unit (AAU). In addition, with the development of technology and the evolution of system architecture, networks of other standards may further emerge. In this case, the BU and the RU may be divided or named in a different manner. In other words, the system architecture described in the embodiments of the present application is intended to more clearly describe the technical solutions in the embodiments of the present application, and does not constitute a limitation on the technical solutions provided in the embodiments of the present application. With the evolution of the system architecture, the technical solutions provided in the embodiments of the present application may also be applicable to similar technical problems.

[0096] Please refer to Figure 5. Figure 5 is a schematic diagram of the structure of a network device according to an embodiment of the present application. The network device can be the BU or RU shown in Figure 1 or Figure 2. The network device includes a processor 501 and a memory 502.

[0097] The processor 501 may be a general purpose central processing unit (CPU), a network processor (NP), a microprocessor, or one or more integrated circuits configured to implement the solutions of the present application, such as an application-specific integrated circuit (ASIC), a programmable logic device (PLD), or a combination thereof. The PLD may be a complex programmable logic device (CPLD), a field-programmable gate array (FPGA), a generic array logic (GAL), or any combination thereof.

[0098] The memory 502 may be, but is not limited to, a read-only memory (ROM), a random access memory (RAM), an electrically erasable programmable read-only memory (EEPROM), an optical disk (including a compact disc read-only memory (CD-ROM), a compact disk, a laser disk, a digital versatile disk, a Blu-ray disk, etc.), a magnetic disk storage medium or another magnetic storage device, or any other medium capable of carrying or storing the expected program code in the form of instructions or data structures and accessible by a computer. The memory 502 may exist independently and be connected to the processor 501. The memory 502 and the processor 501 may be integrated together.

[0099] Optionally, the network device may further include a communication bus 503 and at least one communication interface 504. The communication bus 503 is configured to transmit information between the aforementioned components. The communication bus 503 may be classified into an address bus, a data bus, a control bus, etc. For ease of illustration, only one thick line is used to represent a bus in the figure, but this does not mean that there is only one bus or only one type of bus.

[0100] The communication interface 504 is configured to communicate with another device or a communication network using any device, such as a transceiver. The communication interface 504 includes a wired communication interface and may further include a wireless communication interface. The wired communication interface may be, for example, an Ethernet interface. The Ethernet interface may be an optical interface, an electrical interface, or a combination thereof. The wireless communication interface may be, for example, a wireless local area network (WLAN) interface. k, The wireless LAN (WLAN) interface, a cellular network communication interface, or a combination thereof.

[0101] Optionally, in one embodiment In , the processor 501 may include one or more CPUs, for example, CPU 0 and CPU 1 shown in FIG.

[0102] Optionally, in one embodiment In , a network device may include multiple processors, such as processor 501 and processor 505 shown in FIG. 5. Each of the processors may be a single-core processor or a multi-core processor. A processor herein may be one or more devices, circuits, and / or processing cores configured to process data (e.g., computer program instructions).

[0103] In some embodiments, the memory 502 is configured to store program code 510 for performing embodiments of the present application, and the processor 501 may execute the program code 510 stored in the memory 502. The program code 510 may include one or more software modules. The network device may perform the method provided in the following embodiment of FIG. 6 through the processor 501 and the program code 510 in the memory 502.

[0104] Figure 6 is a flowchart of a scheduling method according to an embodiment of the present application. Please refer to Figure 6. The method includes the following steps:

[0105] Step 601: A BU obtains a first predicted transmission parameter of each of a plurality of cells, and the first predicted transmission parameter is a transmission parameter of each of the cells during scheduling in a current periodicity. Required The multiple cells are cells included in the signal coverage area of ​​the RU, and the maximum transmission bandwidth between the RU and the BU is less than the sum of the maximum transmission bandwidths required by the multiple cells.

[0106] It should be noted that the multiple cells may be all cells in the signal coverage area of ​​the RU, or may be some cells in the signal coverage area of ​​the RU. In addition, the multiple cells may be multiple cells that provide coverage to the base station, or may be all cells that share the same fronthaul bandwidth. This is not limited in this embodiment of the present application.

[0107] In addition, the maximum transmission bandwidth between the RU and the BU is the maximum amount of data transmitted per unit time by the fronthaul network between the RU and the BU. isThe maximum transmission bandwidth required by each cell refers to the maximum amount of data transmitted by each cell per unit time through the fronthaul network when each cell reaches its peak load.

[0108] In this embodiment of the present application, there are two ways in which the BU obtains the first predicted transmission parameters of each of the multiple cells, which will be described separately hereinafter.

[0109] In a first embodiment, the RU may select each of the cells during scheduling in the current periodicity. Required The RU predicts required transmission parameters to obtain first predicted transmission parameters for each cell. The RU transmits the first predicted transmission parameters for each of the plurality of cells to the BU. The BU receives the first predicted transmission parameters for each of the cells transmitted by the RU.

[0110] In a second embodiment, the BU is configured to schedule each of the plurality of cells during the scheduling in the current periodicity. Required Required transmission parameters are predicted to obtain first predicted transmission parameters for each cell.

[0111] In other words, in the first embodiment, during scheduling in the current periodicity, each cell Required The required transmission parameters are By In the second embodiment, each cell is scheduled during the current periodicity. Required The required transmission parameters are By Predicted.

[0112] During scheduling in the current periodicity, each cell Required Regardless of whether the RU or the BU predicts the required transmission parameters, the prediction method is the same. Therefore, in the above two embodiments, each of the multiple cells during scheduling in the current periodicity RequiredThe implementation process of predicting the required transmission parameters includes obtaining second predicted transmission parameters and actual transmission parameters of each of the plurality of cells, the second predicted transmission parameters being obtained during scheduling of the respective cells in a previous periodicity. Required The actual transmission parameters are the expected transmission parameters required for each cell during scheduling in the previous periodicity. Real and determining a first predicted transmission parameter for each cell based on the second predicted transmission parameter and the actual transmission parameter of each of the plurality of cells.

[0113] In the example, the first predicted transmission parameter of each of the plurality of cells is determined based on the second predicted transmission parameter and the actual transmission parameter of each of the plurality of cells according to Equation (1) below. CPredict k =CPredict k-1 +α(CUse k-1 -CPredict k-1 ) (1)

[0114] In the above formula (1), CPredict k CPredict is the first predicted transmission parameter of a cell among the cells. k-1 is the second predicted transmission parameter for the cell. α is a filtering coefficient, which is a known parameter. k-1 are the actual transmission parameters of the cell, i.e. the transmission parameters actually used by the cell during scheduling in the previous periodicity.

[0115] It should be noted that the second predicted transmission parameters may be obtained by prediction before scheduling in the previous periodicity, and the actual transmission parameters may be determined after the scheduling in the previous periodicity is completed. Similarly, the first predicted transmission parameters may be obtained by prediction before scheduling in the current periodicity. The specific time at which the prediction is performed is not limited in this application.

[0116] Periodic period is preset and can be adjusted according to actual requirements. For example, period , 20ms, 10m s , 5 ms, 1 ms, etc. In addition, for the first periodicity, the maximum allowable transmission parameter of the RU is divided equally based on the number of cells to allow each cell to be scheduled during the first periodicity. Required The required transmission parameters may be predicted and obtained.

[0117] The multiple cells may be cells of the same standard or cells of different standards. If the multiple cells are cells of different standards, the multiple cells may include cells of two different standards and also cells of more than two standards. That is, the multiple cells may include cells of at least two standards. The at least two standards may include LTE and NR, and may further include another standard.

[0118] Optionally, the multiple cells may have the same coverage area. In addition, the multiple cells may alternatively have separate coverage areas.

[0119] The first predicted transmission parameters include predicted channel parameters or predicted transmission bandwidths. The predicted channel parameters indicate predicted physical channel parameters required by each cell during scheduling in the current periodicity. The predicted transmission bandwidths indicate predicted physical channel parameters required by each cell during scheduling in the current periodicity. Required Indicates the expected transmission bandwidth required.

[0120] In some embodiments, the predicted channel parameters include at least one of the following parameters: a quantity of downlink valid physical RBs, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas, i.e., the predicted channel parameters include at least one of the quantity of downlink valid physical RBs, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas.

[0121] In some other embodiments, the predicted channel parameters include the number of user equipments of at least one of the channels: downlink data channel, downlink control channel, uplink data channel, uplink control channel, and sounding reference channel, and resource information occupied by each user equipment. In other words, the predicted channel parameters may include the number of user equipments of at least one of the channels: downlink data channel, downlink control channel, uplink data channel, uplink control channel, and sounding reference channel, and resource information occupied by each user equipment.

[0122] For each of the downlink data channel, the downlink control channel, the uplink data channel, or the uplink control channel, the resource information occupied by each user equipment of the channel includes at least one of the following parameters: the number of RBs, the number of channel layers of each RB, and the number of channel physical antennas or the number of channel beams of each RB. For the sounding reference channel, the resource information occupied by each user equipment of the channel includes at least one of the following parameters: the number of RBs, the number of channel physical antennas of each RB, and the number of sounding reference signal symbols of each radio frame.

[0123] identificationIt should be noted that whether the parameters are included in the predicted channel parameters depends on the capabilities of the BU and RU, respectively. That is, identification Whether these parameters are included in the predicted channel parameters depends on the function of the fronthaul network between the BU and the RU. of Split of rear of Conducted by BU Function , and Conducted by RU function The predicted channel parameters vary with the dividing line.

[0124] For example, referring to FIG. teeth, By using a dividing line Separated Features Split Shows. For uplink data, the BU functions include PDSCH modulation, PDCCH modulation, PDSCH mapping, PDCCH mapping, PDSCH precoding, PDCCH precoding, and framing, and the RU functions include orthogonal frequency division multiplexing (OFDM) signal generation. For downlink data, the RU functions include OFDM signal demodulation, and the BU functions include deframing, PUSCH channel estimation, PUCCH channel estimation, SRS processing, PUSCH demodulation, PUCCH demodulation, PUSCH decoding, and PUCCH decoding. In this case, the predicted channel parameters include at least one of the number of downlink effective physical RBs, the number of downlink antennas, the number of uplink effective physical RBs, and the number of uplink antennas.

[0125] As another example, referring to FIG. teeth, By using a dividing line Separated Features Split Shows.For uplink data, the BU functions include PDSCH modulation and PDCCH modulation, and the RU functions include PDSCH mapping, PDCCH mapping, PDSCH precoding, PDCCH precoding, framing, and OFDM signal generation. For downlink data, the RU functions include OFDM signal demodulation, deframing, PUSCH channel estimation, PUCCH channel estimation, SRS processing, PUSCH demodulation, PUCCH demodulation, and the BU functions include PUSCH decoding and PUCCH decoding. In this case, the predicted channel parameters may include the quantity of user equipments of at least one of the channels configured to transmit the PDSCH, PDCCH, PUSCH, PUCCH, and SRS, and resource information occupied by each user equipment.

[0126] It should be noted that Figures 7 and 8 are just two examples of functional division of BU and RU shown in the embodiment of the present application. The embodiment of the present application can be further applied to another scenario of functional division of BU and RU. The functional division of BU and RU is not limited in the embodiment of the present application.

[0127] Step 602: The BU schedules at least one of the multiple cells based on first predicted transmission parameters of the multiple cells.

[0128] Based on the above description, the first predicted transmission parameter includes a predicted channel parameter or a predicted transmission bandwidth. In various cases, the manner in which the BU schedules at least one of the multiple cells according to the first predicted transmission parameters of the multiple cells is different. Therefore, the following describes the cases individually.

[0129] In a first case, the first predicted transmission parameters include predicted channel parameters, in which the BU may determine schedulable channel parameters of the at least one cell based on the predicted channel parameters of the multiple cells and the maximum allowable channel parameters of the RU, and the BU schedules the at least one cell based on the schedulable channel parameters of the at least one cell.

[0130] The schedulable channel parameters of a cell are the parameters that the cell Used for The maximum channel parameters that can be used is That is, the channel parameters actually used by a cell during scheduling in the current periodicity do not exceed the schedulable channel parameters.

[0131] Based on the above description, the multiple cells may be cells of the same standard, or may be cells of two different standards. In various cases, the manner of determining the schedulable channel parameters of at least one cell based on the predicted channel parameters of the multiple cells and the maximum allowable channel parameters of the RU is different. Therefore, the following describes the cases separately.

[0132] Case 1: The multiple cells are cells of the same standard. In this case, the BU may determine the sum of the predicted channel parameters of the multiple cells to obtain a total predicted channel parameter. If the total predicted channel parameter is greater than the maximum allowable channel parameter of the RU, the BU determines the schedulable channel parameter of the at least one cell based on the maximum allowable channel parameter of the RU and a ratio of each predicted channel parameter of the at least one cell to the total predicted channel parameter.

[0133] That is, in the case where the total predicted channel parameter is greater than the maximum allowable channel parameter of the RU, for any cell among the at least one cell, a ratio of the predicted channel parameter of that cell to the total predicted channel parameter is determined, and the maximum allowable channel parameter of the RU is multiplied by that ratio to obtain the schedulable channel parameter of that cell.

[0134] For example, the predicted channel parameters include the number of downlink RBs. , Se The three cells are cell 1, cell 2, and cell 3. The number of downlink RBs in the predicted channel parameters of cell 1 is 0, the number of downlink RBs in the predicted channel parameters of cell 2 is 6, the number of downlink RBs in the predicted channel parameters of cell 3 is 6, and the number of downlink RBs in the maximum allowable channel parameters of the RU is 10. The total number of downlink RBs in the total predicted channel parameters of the three cells is 12. It is now assumed that cell 3 needs to be scheduled, and the ratio of the number of downlink RBs to the total number of downlink RBs of cell 3 is determined to be 1 / 2. The ratio is multiplied by the number of downlink RBs in the maximum allowable channel parameters to obtain that the number of downlink RBs in the schedulable channel parameters of the cells is 5.

[0135] Optionally, if the total predicted channel parameter is less than or equal to the maximum allowable channel parameter of the RU, the predicted channel parameter of the respective cell is used as the schedulable channel parameter, i.e., for at least one cell, the predicted channel parameter of the at least one cell is used as the respective schedulable channel parameter.

[0136] In case 1, for multiple cells of the same standard, a predicted channel parameter of each cell in a current periodicity is determined, and a schedulable channel parameter of each of the at least one cell is dynamically determined based on the maximum allowable channel parameter of the RU and the predicted channel parameter of each cell in the current periodicity to schedule the at least one cell, i.e., the multiple cells share the maximum allowable channel parameter of the RU; ,So The schedulable channel parameters of each cell are determined based on the peak load that may be reached by the respective cell. Decisions are made as needed, not at random. In this way, fronthaul bandwidth can be saved if multiple cells do not reach peak loads at the same time. , K Site 1 In Experiments have demonstrated that 20% of the fronthaul bandwidth can be saved.

[0137] For example, referring to Figure 9, this standard includes two cells, cell 0 and cell 1. The two cells share the maximum allowable channel parameters of the RU, and the schedulable channel parameters of the two cells are determined as needed. The schedulable channel parameters of the two cells are not determined based on the peak load that may be reached by each cell. In this manner, fronthaul bandwidth can be saved when the two cells do not reach the peak load at the same time.

[0138] Case 2: The multiple cells contain cells of two different specifications, and those cells teeth,A cell of a first standard and a cell of a second standard. In this case, the BU may determine a sum of predicted channel parameters of cells of the same standard in the multiple cells to obtain a total predicted channel parameter of the first standard and a total predicted channel parameter of the second standard. If the sum of the total predicted channel parameter of the first standard and the total predicted channel parameter of the second standard is greater than the maximum allowable channel parameter of the RU, the schedulable channel general parameter of the first standard and the schedulable channel general parameter of the second standard are determined based on the maximum allowable channel parameter of the RU. The schedulable channel parameter of each cell of the first standard in the at least one cell is determined based on the total schedulable channel parameter of the first standard and a ratio of the predicted channel parameter of each cell of the first standard in the at least one cell to the total predicted channel parameter of the first standard. The schedulable channel parameter of each cell of the second standard in the at least one cell is determined based on the total schedulable channel parameter of the second standard and a ratio of the predicted channel parameter of each cell of the second standard in the at least one cell to the total predicted channel parameter of the second standard.

[0139] As an example, an implementation process for determining a total schedulable channel parameter of a first standard and a total schedulable channel parameter of a second standard based on a maximum allowable channel parameter of an RU includes: subtracting a total predicted channel parameter of the first standard from the maximum allowable channel parameter of the RU to obtain a total schedulable channel parameter of the second standard; and using the total predicted channel parameter of the first standard as the total schedulable channel parameter of the first standard.

[0140] In addition, the total schedulable channel parameters of the first standard and the second standard may be determined in other manners. For example, the total predicted channel parameters of the second standard are subtracted from the maximum allowable channel parameters of the RU to obtain the schedulable channel general parameters of the first standard, and the total predicted channel parameters of the second standard are used as the schedulable channel general parameters of the second standard. As another example, the sum of the total predicted channel parameters of the first standard and the total predicted channel parameters of the second standard is determined to obtain the total predicted channel parameters of all cells, and a ratio of the total predicted channel parameters of the first standard to the total predicted channel parameters of all cells is determined. The ratio is multiplied by the maximum allowable channel parameter of the RU to obtain the total schedulable channel parameters of the first standard. The ratio of the total predicted channel parameters of the second standard to the total predicted channel parameters of all cells is determined. The ratio is multiplied by the maximum allowable channel parameter of the RU to obtain the total schedulable channel parameters of the second standard.

[0141] An implementation process for determining a schedulable channel parameter of each cell of a first standard in at least one cell based on a total schedulable channel parameter of the first standard and a ratio of the predicted channel parameter of each cell of the first standard in the at least one cell to a total predicted channel parameter of the first standard includes the following steps: For any cell of the first standard in the at least one cell, a ratio of the predicted channel parameter of that cell to the total predicted channel parameter of the first standard is determined. The ratio is multiplied by the total schedulable channel parameter of the first standard to obtain the schedulable channel parameter of that cell.

[0142] Similarly, an implementation process for determining a schedulable channel parameter of each cell of a second standard in at least one cell based on a total schedulable channel parameter of the second standard and a ratio of the predicted channel parameter of each cell of the second standard in the at least one cell to a total predicted channel parameter of the second standard includes the following steps: For any cell of the second standard in the at least one cell, a ratio of the predicted channel parameter of that cell to the total predicted channel parameter of the second standard is determined. The ratio is multiplied by the total schedulable channel parameter of the second standard to obtain the schedulable channel parameter of that cell.

[0143] Optionally, if the sum of the total predicted channel parameter of the first standard and the total predicted channel parameter of the second standard is less than or equal to the maximum allowable channel parameter of the RU, the predicted channel parameter of the respective cell is used as the schedulable channel parameter, i.e., for at least one cell, the predicted channel parameter of the at least one cell is used as the respective schedulable channel parameter.

[0144] In case 2, for cells of two different standards, a predicted channel parameter of each cell at a current periodicity is determined, and a total schedulable channel parameter of the two standards is dynamically determined based on a maximum allowable channel parameter of an RU and a predicted channel parameter of each cell at a current periodicity, whereby a respective schedulable channel parameter of at least one cell is dynamically determined to schedule at least one cell. That is, the two standards share a maximum allowable channel parameter of an RU, and a total schedulable channel parameter of the two standards is determined as necessary, whereby a respective schedulable channel parameter of each cell is dynamically determined. ,So Based on the peak load that can be reached by each cell, Decisions are made as needed, not at random.In this way, fronthaul bandwidth can be saved if multiple cells do not reach peak loads simultaneously. In addition, in the case that the two standards occupy the same spectrum bandwidth and have the same channel parameters, , K Base 2 In Experiments have demonstrated that 50% of the fronthaul bandwidth can be saved.

[0145] For example, referring to Figure 10, for two standards, LTE and NR, the two standards share the maximum allowable channel parameters of the RU, and the total schedulable channel parameters of the two standards are determined as needed, thereby determining the schedulable channel parameters of each cell of the two standards as needed. The schedulable channel parameters of each cell are not determined based on the peak load that may be reached by each cell. Taking the spectrum resource diagram in Figure 10 as an example, the two standards share the spectrum resources of the RU, and the spectrum resources required by the two standards are dynamically determined with different periodicities.

[0146] In a second case, the first predicted transmission parameter includes a predicted transmission bandwidth. In this case, the BU may determine predicted channel parameters of the multiple cells based on the predicted transmission bandwidths of the multiple cells, and determine schedulable channel parameters of the at least one cell based on the predicted channel parameters of the multiple cells and a maximum allowable channel parameter of the RU. The BU schedules the at least one cell based on the schedulable channel parameters of the at least one cell.

[0147] There is a mapping relationship between the transmission bandwidth and the physical channel parameters, so that for each of the multiple cells, a predicted channel parameter of each cell can be determined based on the predicted transmission bandwidth of each cell and the mapping relationship.

[0148] For the implementation process of determining the schedulable channel parameters of at least one cell based on the predicted channel parameters of multiple cells and the maximum allowable channel parameters of the RU, and the implementation process of scheduling the at least one cell based on the schedulable channel parameters of the at least one cell, please refer to the related description in the first case, and the details will not be described again here.

[0149] In this embodiment of the present application, a first predicted transmission parameter of each of the multiple cells is obtained, and a schedulable channel parameter of at least one of the multiple cells is determined based on the first predicted transmission parameter of the multiple cells and the maximum allowable channel parameter of the RU. In addition, the sum of the schedulable channel parameters of the multiple cells is not greater than the maximum allowable channel parameter of the RU. In other words, the multiple cells share the maximum allowable channel parameter of the RU, and each cell during scheduling in the current periodicity is determined based on the first predicted transmission parameter of the multiple cells and the maximum allowable channel parameter of the RU. In addition, the sum of the schedulable channel parameters of the multiple cells is not greater than the maximum allowable channel parameter of the RU. In other words, the multiple cells share the maximum allowable channel parameter of the RU, and the maximum allowable channel parameter of each cell during scheduling in the current periodicity is determined based on the first predicted transmission parameter of the multiple cells. Required The schedulable channel parameters of each of the at least one cell are dynamically determined by predicting the required transmission parameters, and the at least one cell can be scheduled based on the schedulable channel parameters of the at least one cell. The schedulable channel parameters of each cell are not determined based on the peak load that may be reached by each cell. In this manner, it can be ensured that the maximum transmission bandwidth between the RU and the BU is smaller than the sum of the maximum transmission bandwidths required by multiple cells, thereby saving fronthaul bandwidth when multiple cells do not reach the peak load simultaneously.

[0150] 11 is a schematic diagram of the structure of a scheduling device according to an embodiment of the present application. This scheduling device can be implemented as part or all of a BU by software, hardware, or a combination thereof. The BU can be the BU shown in FIG. 1 or FIG. 2. Referring to FIG. 11, this device includes: an acquisition module 1101 and a scheduling module 1102.

[0151] The acquisition module 1101 is configured to acquire a first predicted transmission parameter of each of the plurality of cells, the first predicted transmission parameter being a transmission parameter of each of the cells during scheduling in the current periodicity. Required The required predicted transmission parameters are shown below. For detailed implementation process, please refer to the corresponding content in the above embodiments. The details will not be described again here.

[0152] The multiple cells are cells included in a signal coverage area of ​​the radio unit RU, and the maximum transmission bandwidth between the RU and the baseband unit BU is smaller than the sum of the maximum transmission bandwidths required by the multiple cells.

[0153] The scheduling module 1102 is configured to schedule at least one of the plurality of cells according to the first predicted transmission parameters of the plurality of cells. For detailed implementation process, please refer to the corresponding content in the above embodiment. The details will not be described again here.

[0154] Optionally, the acquisition module 1101 comprises: and a receiving sub-module configured to receive a first predicted transmission parameter of the respective cell transmitted by the RU.

[0155] Optionally, the acquisition module 1101 comprises: During scheduling in the current periodicity, each cell RequiredA prediction sub-module configured to predict required transmission parameters to obtain first predicted transmission parameters for each cell.

[0156] Optionally, the prediction submodule: Obtaining a second predicted transmission parameter and an actual transmission parameter of each cell, the second predicted transmission parameter being obtained during scheduling in a previous periodicity. Required The actual transmission parameters are the expected transmission parameters required for each cell during scheduling in the previous periodicity. Real indicating transmission parameters used in the determining a first predicted transmission parameter for each cell based on the second predicted transmission parameter and the actual transmission parameter for each cell.

[0157] Optionally, the first predicted transmission parameters include predicted channel parameters, the predicted channel parameters being determined based on the predicted channel parameters for each cell during scheduling in the current periodicity. Required 4 indicates the required predicted physical channel parameters.

[0158] The scheduling module 1102 is a schedulable parameter determination submodule configured to determine a schedulable channel parameter of at least one cell based on the predicted channel parameters of the multiple cells and a maximum allowable channel parameter of the RU; and a scheduling submodule configured to schedule the at least one cell based on the schedulable channel parameters of the at least one cell.

[0159] Optionally, the first predicted transmission parameter comprises a predicted transmission bandwidth.

[0160] The scheduling module 1102 is a predicted channel parameter determination submodule configured to determine a predicted channel parameter of each cell based on a predicted transmission bandwidth of the plurality of cells, the predicted channel parameter being determined for each cell during scheduling in the current periodicity; Required a predicted channel parameter determination submodule indicating the predicted physical channel parameters required; a schedulable parameter determination submodule configured to determine a schedulable channel parameter of at least one cell based on the predicted channel parameters of the multiple cells and a maximum allowable channel parameter of the RU; and a scheduling submodule configured to schedule the at least one cell based on the schedulable channel parameters of the at least one cell.

[0161] Optionally, the multiple cells are cells of the same specification.

[0162] The schedulable parameter determination submodule includes: determining a sum of predicted channel parameters of a plurality of cells to obtain a total predicted channel parameter; and if the total predicted channel parameter is greater than the maximum allowable channel parameter, determining a schedulable channel parameter of the at least one cell based on the maximum allowable channel parameter and a ratio of the predicted channel parameter of each of the at least one cell to the total predicted channel parameter.

[0163] Optionally, the plurality of cells includes cells of two different specifications, and the cells teeth, A first standard cell and a second standard cell.

[0164] The schedulable parameter determination submodule includes: determining a sum of predicted channel parameters among cells of the same standard in the plurality of cells to obtain a total predicted channel parameter for the first standard and a total predicted channel parameter for the second standard; determining a total schedulable channel parameter of the first standard and a total schedulable channel parameter of the second standard based on the maximum allowable channel parameter if the sum of the total predicted channel parameter of the first standard and the total predicted channel parameter of the second standard is greater than the maximum allowable channel parameter; determining a schedulable channel parameter of each cell of the first standard in the at least one cell based on a total schedulable channel parameter of the first standard and a ratio of a predicted channel parameter of each cell of the first standard in the at least one cell to a total predicted channel parameter of the first standard; and determining a schedulable channel parameter of each cell of the second standard in the at least one cell based on a total schedulable channel parameter of the second standard and a ratio of a predicted channel parameter of each cell of the second standard in the at least one cell to a total predicted channel parameter of the second standard.

[0165] Optionally, the predicted channel parameters include at least one of the following parameters: a quantity of downlink valid physical radio resource blocks RB, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas.

[0166] Optionally, the predicted channel parameters include a quantity of user equipment of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel, and a sounding reference channel, and resource information occupied by each user equipment.

[0167] Optionally, the resource information occupied by each user equipment of each of the downlink data channel, the downlink control channel, the uplink data channel, and the uplink control channel includes at least one of the following parameters: a number of RBs, a number of channel layers for each RB, and a number of channel physical antennas or a number of channel beams for each RB.

[0168] The resource information occupied by each user equipment of the sounding reference channel includes at least one of the following parameters: the number of RBs, the number of channel physical antennas of each RB, and the number of sounding reference signal symbols in each radio frame.

[0169] Optionally, the two separate standards include Long Term Evolution LTE and New Radio NR.

[0170] Optionally, the multiple cells have the same coverage area.

[0171] In this embodiment of the present application, a first predicted transmission parameter of each of the multiple cells is obtained, and a schedulable channel parameter of at least one of the multiple cells is determined based on the first predicted transmission parameter of the multiple cells and the maximum allowable channel parameter of the RU. In addition, the sum of the schedulable channel parameters of the multiple cells is not greater than the maximum allowable channel parameter of the RU. In other words, the multiple cells share the maximum allowable channel parameter of the RU, and each cell during scheduling in the current periodicity is determined based on the first predicted transmission parameter of the multiple cells and the maximum allowable channel parameter of the RU. In addition, the sum of the schedulable channel parameters of the multiple cells is not greater than the maximum allowable channel parameter of the RU. In other words, the multiple cells share the maximum allowable channel parameter of the RU, and the maximum allowable channel parameter of each cell during scheduling in the current periodicity is determined based on the first predicted transmission parameter of the multiple cells. RequiredThe schedulable channel parameters of each of the at least one cell are dynamically determined by predicting the required transmission parameters, and the at least one cell can be scheduled based on the schedulable channel parameters of the at least one cell. The schedulable channel parameters of each cell are not determined based on the peak load that may be reached by each cell. In this manner, it can be ensured that the maximum transmission bandwidth between the RU and the BU is smaller than the sum of the maximum transmission bandwidths required by multiple cells, thereby saving fronthaul bandwidth when multiple cells do not reach the peak load simultaneously.

[0172] It should be noted that when the scheduling device provided in the above embodiment performs scheduling, the division among the above functional modules is only used as an example for description. In practical application, the above functions can be assigned to different functional modules for implementation based on requirements, that is, the internal structure of the device is divided into different functional modules to implement all or some of the above-mentioned functions. In addition, the scheduling device provided in the above embodiment and the scheduling method embodiment belong to the same concept. For the specific implementation process, please refer to the method embodiment. The details will not be described again here.

[0173] 12 is a schematic diagram of the structure of a parameter transmission device according to an embodiment of the present application. The parameter transmission device can be implemented as part or all of a RU by software, hardware, or a combination thereof. The RU can be the RU shown in FIG. 1 or FIG. 2. Referring to FIG. 12, the device includes a parameter prediction module 1201 and a transmission module 1202.

[0174] The parameter prediction module 1201 estimates each of the plurality of cells during scheduling in the current periodicity. Required and configured to predict the required transmission parameters to obtain the first predicted transmission parameters of each cell. For detailed implementation process, please refer to the corresponding content in the above embodiment. The details will not be described again here.

[0175] The sending module 1202 is configured to send the first predicted transmission parameters of each cell to the baseband unit BU. For detailed implementation process, please refer to the corresponding content in the above embodiment. The details will not be described again here.

[0176] The multiple cells are cells included in a signal coverage area of ​​a wireless unit RU, and the maximum transmission bandwidth between the RU and the BU is smaller than the sum of the maximum transmission bandwidths required by the multiple cells.

[0177] Optionally, the parameter prediction module 1201 comprises: Obtaining a second predicted transmission parameter and an actual transmission parameter of each cell, the second predicted transmission parameter being obtained during scheduling in a previous periodicity. Required The actual transmission parameters are the expected transmission parameters required for each cell during scheduling in the previous periodicity. Real indicating transmission parameters used in the determining a first predicted transmission parameter for each cell based on the second predicted transmission parameter and the actual transmission parameter for each cell.

[0178] Optionally, the first predicted transmission parameter comprises a predicted channel parameter or a predicted transmission bandwidth, the predicted channel parameter being a predicted transmission bandwidth for each cell during scheduling in the current periodicity. Required 4 indicates the required predicted physical channel parameters.

[0179] Optionally, the predicted channel parameters include at least one of the following parameters: a quantity of downlink valid physical radio resource blocks RB, a quantity of downlink antennas, a quantity of uplink valid physical RBs, and a quantity of uplink antennas.

[0180] Optionally, the predicted channel parameters include a quantity of user equipments of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel, and a sounding reference channel, and a resource occupied by each user equipment. S This includes information.

[0181] Optionally, the resource information occupied by each user equipment of each of the downlink data channel, the downlink control channel, the uplink data channel, or the uplink control channel includes at least one of the following parameters: a number of RBs, a number of channel layers for each RB, and a number of channel physical antennas or a number of channel beams for each RB.

[0182] The resource information occupied by each user equipment of the sounding reference channel includes at least one of the following parameters: the number of RBs, the number of channel physical antennas of each RB, and the number of sounding reference signal symbols in each radio frame.

[0183] Optionally, the plurality of cells are cells of the same standard, or the plurality of cells includes cells of two separate standards.

[0184] Optionally, the two separate standards include Long Term Evolution LTE and New Radio NR.

[0185] Optionally, the multiple cells have the same coverage area.

[0186] In this embodiment of the present application, a first predicted transmission parameter of each of the multiple cells is obtained, and a schedulable channel parameter of at least one of the multiple cells is determined based on the first predicted transmission parameter of the multiple cells and the maximum allowable channel parameter of the RU. In addition, the sum of the schedulable channel parameters of the multiple cells is not greater than the maximum allowable channel parameter of the RU. In other words, the multiple cells share the maximum allowable channel parameter of the RU, and each cell during scheduling in the current periodicity is determined based on the first predicted transmission parameter of the multiple cells and the maximum allowable channel parameter of the RU. In addition, the sum of the schedulable channel parameters of the multiple cells is not greater than the maximum allowable channel parameter of the RU. In other words, the multiple cells share the maximum allowable channel parameter of the RU, and the maximum allowable channel parameter of each cell during scheduling in the current periodicity is determined based on the first predicted transmission parameter of the multiple cells. Required The schedulable channel parameters of each of the at least one cell are dynamically determined by predicting the required transmission parameters, and the at least one cell can be scheduled based on the schedulable channel parameters of the at least one cell. The schedulable channel parameters of each cell are not determined based on the peak load that may be reached by each cell. In this manner, it can be ensured that the maximum transmission bandwidth between the RU and the BU is smaller than the sum of the maximum transmission bandwidths required by multiple cells, thereby saving fronthaul bandwidth when multiple cells do not reach the peak load simultaneously.

[0187] It should be noted that when the parameter transmission device provided in the above embodiment performs parameter transmission, the division among the above function modules is only used as an example for description. In practical application, the above functions can be assigned to different function modules for implementation based on requirements, that is, the internal structure of the device is divided into different function modules to implement all or some of the above-mentioned functions. In addition, the parameter transmission device provided in the above embodiment and the parameter transmission method embodiment belong to the same concept. For the specific implementation process thereof, please refer to the method embodiment. The details will not be described again here.

[0188] An embodiment of the present application further provides a scheduling system, which includes a RU and a BU.

[0189] The RU is responsible for scheduling each of the multiple cells during the current periodicity. Required It is configured to predict required transmission parameters to obtain first predicted transmission parameters for each cell, and send the first predicted transmission parameters for each cell to the BU.

[0190] The BU is configured to receive the first predicted transmission parameters of the respective cells transmitted by the RU, and schedule at least one of the multiple cells based on the first predicted transmission parameters of the multiple cells.

[0191] The multiple cells are cells included in a signal coverage area of ​​the radio unit RU, and the maximum transmission bandwidth between the RU and the baseband unit BU is smaller than the sum of the maximum transmission bandwidths required by the multiple cells.

[0192] For the detailed implementation process of the functions performed by the BU and RU, please refer to the corresponding content in the preceding embodiments, and the details will not be described again here.

[0193] All or part of the above-mentioned embodiments may be implemented by software, hardware, firmware, or any combination thereof. When software is used to implement the embodiments, all or part of the embodiments may be implemented in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer instructions are loaded and executed on a computer, the procedures or functions according to the embodiments of the present application are generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another. For example, the computer instructions may be transmitted from one network device or computer to another network device or computer in a wired (e.g., optical fiber) manner. The computer-readable storage medium may be any available medium accessible by a computer or data storage device, such as a server or data center, that integrates one or more available media. These available media include magnetic media (e.g., floppy disks, hard disks, or magnetic tapes), optical media (e.g., digital versatile discs (DVDs)), semiconductor media (e.g., solid state disks (SSDs)), and so on. - It should be noted that the computer-readable storage medium mentioned in this embodiment of the present application may be a non-volatile storage medium, or in other words, a non-transitory storage medium.

[0194] It should be understood that "at least one" referred to in this specification means one or more, and "multiple" referred to in this specification means two or more. In the description of the embodiments of the present application, unless otherwise specified, " / " means "or". For example, A / B can represent A or B. In this specification, "and / or" only describes the association relationship between associated objects, and indicates that three relationships may exist. For example, "A and / or B" can represent three cases: "only A exists", "both A and B exist", and "only B exists". In addition, for the purpose of clearly describing the technical solutions in the embodiments of the present application, terms such as "first" and "second" are used in the embodiments of the present application to distinguish between the same items or similar items that provide basically the same function or purpose. Those skilled in the art can understand that terms such as "first" and "second" do not limit the quantity or execution order, and terms such as "first" and "second" do not indicate clear differences.

[0195] The above descriptions are merely embodiments of the present application and are not intended to limit the present application. Nohara Any modifications, equivalent replacements, or improvements made without departing from the principles thereof shall fall within the scope of protection of this application.

Claims

1. 1. A scheduling method, the method comprising: obtaining first predicted transmission parameters for each of a plurality of cells, the first predicted transmission parameters indicating predicted transmission parameters required by the respective cell during scheduling in the current periodicity; The plurality of cells are cells included in a signal coverage area of ​​a radio unit (RU), and a maximum transmission bandwidth between the radio unit (RU) and a baseband unit (BU) is smaller than the sum of the maximum transmission bandwidths required by the plurality of cells; scheduling at least one of the plurality of cells based on the first predicted transmission parameters of the plurality of cells; The method includes:

2. Obtaining first predicted transmission parameters for each of the plurality of cells includes:

2. The method of claim 1, comprising receiving the first predicted transmission parameters for each cell transmitted by the RU.

3. Obtaining first predicted transmission parameters for each of the plurality of cells includes:

2. The method of claim 1, comprising predicting the transmission parameters required by each cell during scheduling in the current periodicity to obtain the first predicted transmission parameters for each cell.

4. predicting the transmission parameters required by each cell during scheduling in the current periodicity to obtain the first predicted transmission parameters for each cell, obtaining second predicted transmission parameters and actual transmission parameters for each cell, the second predicted transmission parameters indicating predicted transmission parameters required by the respective cell during scheduling in a previous periodicity, and the actual transmission parameters indicating transmission parameters actually used by the respective cell during scheduling in the previous periodicity; determining the first predicted transmission parameters for each cell based on the second predicted transmission parameters and the actual transmission parameters for each cell; 4. The method of claim 3, comprising:

5. the first predicted transmission parameters include predicted channel parameters, the predicted channel parameters being indicative of predicted physical channel parameters required by the respective cells during scheduling in the current periodicity; Scheduling at least one of the plurality of cells based on the first predicted transmission parameters of the plurality of cells includes: determining schedulable channel parameters for the at least one cell based on the predicted channel parameters for the plurality of cells and a maximum allowable channel parameter for the RU; scheduling the at least one cell based on the schedulable channel parameters of the at least one cell; 5. The method according to claim 1 , comprising:

6. the first predicted transmission parameter comprises a predicted transmission bandwidth; Scheduling at least one of the plurality of cells based on the first predicted transmission parameters of the plurality of cells includes: determining predicted channel parameters for the plurality of cells based on the predicted transmission bandwidths of the plurality of cells, the predicted channel parameters indicating predicted physical channel parameters required by the respective cells during scheduling in the current periodicity; determining schedulable channel parameters for the at least one cell based on the predicted channel parameters for the plurality of cells and a maximum allowable channel parameter for the RU; scheduling the at least one cell based on the schedulable channel parameters of the at least one cell; 5. The method according to claim 1 , comprising:

7. The plurality of cells are cells of the same specification, determining a schedulable channel parameter of the at least one cell based on the predicted channel parameters of the plurality of cells and a maximum allowable channel parameter of the RU; determining a sum of the predicted channel parameters for the plurality of cells to obtain a total predicted channel parameter; if the total predicted channel parameter is greater than the maximum allowable channel parameter, determining the schedulable channel parameter for the at least one cell based on the maximum allowable channel parameter and a ratio of the predicted channel parameter for each of the at least one cell to the total predicted channel parameter; The method according to claim 5 or 6, comprising:

8. the plurality of cells includes cells of two different standards, the two different standards being cells of a first standard and cells of a second standard, respectively; determining a schedulable channel parameter of the at least one cell based on the predicted channel parameters of the plurality of cells and a maximum allowable channel parameter of the RU; determining a sum of predicted channel parameters of cells of the same standard in the plurality of cells to obtain a total predicted channel parameter for the first standard and a total predicted channel parameter for the second standard; if the sum of the total predicted channel parameter of the first standard and the total predicted channel parameter of the second standard is greater than the maximum allowable channel parameter, determining a total schedulable channel parameter of the first standard and a total schedulable channel parameter of the second standard based on the maximum allowable channel parameter; determining a schedulable channel parameter of each cell of the first standard in the at least one cell based on the total schedulable channel parameter of the first standard and a ratio of a predicted channel parameter of each cell of the first standard in the at least one cell to the total predicted channel parameter of the first standard; determining a schedulable channel parameter of each cell of the second standard in the at least one cell based on the total schedulable channel parameter of the second standard and a ratio of a predicted channel parameter of each cell of the second standard in the at least one cell to the total predicted channel parameter of the second standard; The method according to claim 5 or 6, comprising:

9. 9. The method according to claim 5, wherein the predicted channel parameters include at least one of the following parameters: number of downlink valid physical radio resource blocks (RB), number of downlink antennas, number of uplink valid physical RBs, and number of uplink antennas.

10. 9. The method according to claim 5, wherein the predicted channel parameters include a quantity of user equipments of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel and a sounding reference channel, and resource information occupied by each user equipment.

11. The resource information occupied by each user equipment of each of the downlink data channel, the downlink control channel, the uplink data channel, or the uplink control channel includes at least one of the following parameters: a number of RBs, a number of channel layers of each RB, and a number of channel physical antennas or a number of channel beams of each RB; 11. The method of claim 10, wherein the resource information occupied by each user equipment of the sounding reference channel includes at least one of the following parameters: a number of RBs, a number of channel physical antennas of each RB, and a number of sounding reference signal symbols of each radio frame.

12. 9. The method of claim 8, wherein the two separate standards include Long Term Evolution LTE and New Radio NR.

13. The method of any one of claims 1 to 12, wherein the cells have the same coverage area.

14. 1. A parameter transmission method, the method comprising: predicting transmission parameters required by each of the plurality of cells during scheduling in the current periodicity to obtain first predicted transmission parameters for each cell; transmitting the first predicted transmission parameters of each cell to a baseband unit BU, the plurality of cells being cells included in a signal coverage area of ​​a radio unit RU, and a maximum transmission bandwidth between the RU and the BU being smaller than a sum of maximum transmission bandwidths required by the plurality of cells; The method includes:

15. Predicting transmission parameters required by each of a plurality of cells during scheduling in the current periodicity and obtaining first predicted transmission parameters for each cell includes: obtaining second predicted transmission parameters and actual transmission parameters for each cell, the second predicted transmission parameters indicating predicted transmission parameters required by the respective cell during scheduling in a previous periodicity, and the actual transmission parameters indicating transmission parameters actually used by the respective cell during scheduling in the previous periodicity; determining the first predicted transmission parameters for each cell based on the second predicted transmission parameters and the actual transmission parameters for each cell; 15. The method of claim 14, comprising:

16. 16. The method of claim 14 or 15, wherein the first predicted transmission parameters include predicted channel parameters or predicted transmission bandwidths, the predicted channel parameters indicating predicted physical channel parameters required by the respective cells during scheduling in the current periodicity.

17. 17. The method of claim 16, wherein the predicted channel parameters include at least one of the following parameters: number of downlink available physical radio resource blocks (RB), number of downlink antennas, number of uplink available physical RBs, and number of uplink antennas.

18. 17. The method of claim 16, wherein the predicted channel parameters include a quantity of user equipment of at least one of the following channels: a downlink data channel, a downlink control channel, an uplink data channel, an uplink control channel, and a sounding reference channel, and resource information occupied by each user equipment.

19. The resource information occupied by each user equipment of each of the downlink data channel, the downlink control channel, the uplink data channel, or the uplink control channel includes at least one of the following parameters: a number of RBs, a number of channel layers of each RB, and a number of channel physical antennas or a number of channel beams of each RB; 20. The method of claim 18, wherein the resource information occupied by each user equipment of the sounding reference channel includes at least one of the following parameters: a number of RBs, a number of channel physical antennas of each RB, and a number of sounding reference signal symbols of each radio frame.

20. 20. The method of any one of claims 14 to 19, wherein the plurality of cells are cells of the same standard, or the plurality of cells includes cells of two different standards.

21. 21. The method of claim 20, wherein the two separate standards include Long Term Evolution LTE and New Radio NR.

22. 22. The method of any one of claims 14 to 21, wherein the multiple cells have the same coverage area.

23. Scheduling device, comprising at least one module, said at least one module being configured to implement the steps of the method according to any one of claims 1 to 13.

24. Parameter transmission device, comprising at least one module, said at least one module being configured to perform the steps of the method according to any one of claims 14 to 22.

25. 14. A BU comprising a memory and a processor, the memory configured to store a computer program, and the processor configured to execute the computer program stored in the memory to perform the steps of the method according to any one of claims 1 to 13.

26. 23. A RU comprising a memory and a processor, the memory configured to store a computer program, and the processor configured to execute the computer program stored in the memory to perform the steps of the method according to any one of claims 14 to 22.

27. A scheduling system, comprising: an RU and a BU; The RU is configured to predict transmission parameters required by each cell of a plurality of cells during scheduling in a current periodicity to obtain first predicted transmission parameters of each cell, and to transmit the first predicted transmission parameters of each cell to the BU; the BU is configured to receive the first predicted transmission parameters of each cell transmitted by the RU, and schedule at least one of the plurality of cells based on the first predicted transmission parameters of the plurality of cells; The plurality of cells are cells included in a signal coverage area of ​​a radio unit (RU), and a maximum transmission bandwidth between the RU and a baseband unit (BU) is smaller than the sum of the maximum transmission bandwidths required by the plurality of cells.

28. 23. A computer readable storage medium storing instructions which, when executed on a computer, enable the computer to carry out the steps of the method according to any one of claims 1 to 22.

Citation Information

Patent Citations

  • Method and node for controlling connections in a communication network

    JP2010507299A

  • Method and system for exchanging messages in a wireless network - Patents.com

    JP2020535735A

  • Bandwidth scheduling method and apparatus

    US20210152246A1