Bottom concrete structure removal method

The method of using cutter grooves and core drilling allows for the efficient removal of bottom concrete structures in mountain tunnels by dividing them into blocks from the top surface, addressing space constraints and equipment obstacles, ensuring smooth dismantling and minimal disruption.

JP2025147838AActive Publication Date: 2025-10-07OKUMURA CORP
5 Cites 0 Cited by

Patent Information

Application Number
JP2024048288
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2025-10-07
Estimated Expiration
2044-03-25

AI Technical Summary

Technical Problem

Existing methods struggle to efficiently remove bottom concrete structures in mountain tunnels that are formed continuously with the pavement, especially when space is limited and existing equipment structures obstruct removal, making it difficult to divide and lift the concrete blocks.

Method used

A method involving cutter grooves and core drilling is used to divide the concrete structure into blocks by cutting from the top surface to the foundation, followed by transverse and longitudinal core drilling to create connecting grooves, and using power jacks to lift and remove the blocks, allowing for smooth removal without disrupting adjacent structures.

Benefits of technology

Enables the efficient division and removal of bottom concrete structures in mountain tunnels by working from the top surface, overcoming space constraints and existing equipment obstacles, facilitating the dismantling of corner structures without affecting adjacent equipment.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

To provide a bottom concrete structure removal method that enables a bottom concrete structure, which is continuously arranged at the side edge part of a pavement body formed at the bottom of a tunnel, to be removed by works performed at the upper face part.SOLUTION: A bottom concrete structure removal method comprises: a cutter-cutting process in which cutter grooves 11a, 11b, 11c are cut and formed extending in the axis direction X of a tunnel 50; a core-drilling process in which multiple core-removing holes 12 are drilled at adjacent positions in a crossing direction Y to form a cross-direction hole-linked groove 13 at both end parts of a removal-executing span S; a disconnect process in which a jack is mounted inside the cross-direction hole-linked groove 13 formed at one end part of the removal-executing span S and a pressing force is applied to disconnect a concrete block 14 of the part surrounded by the cutter grooves 11a, 11b, 11c and the cross-direction hole-linked groove 13 from the foundation part 52; and a lift-up removal process in which the concrete block 14 is lifted up with wire members 34 and removed.SELECTED DRAWING: Figure 5