Gaming Machines
The gaming machine improves notification effect recognition by varying operation-based performances, addressing player impatience and distraction in gaming machines.
Patent Information
- Application Number
- JP2023105743
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-06-28
- Publication Date
- 2024-09-25
- Estimated Expiration
- 2040-06-04
AI Technical Summary
Players in gaming machines like pachinko machines may become impatient or distracted during multiple game operations within a valid operation period, making it difficult to recognize notification effects.
A gaming machine with performance means and control means that execute different types of game operations and notification performances based on operation validity periods, increasing the recognition of notification effects by varying the execution rates of one-shot announcement performances based on game operations.
Enhances the recognition of notification performances by making them easier to notice, reducing distractions, and maintaining player engagement during valid operation periods.
Smart Images

Figure 0007555628000001 
Figure 0007555628000002 
Figure 0007555628000003
Abstract
Description
[Technical field]
[0001] The present invention relates to gaming machines such as pachinko machines and slot machines. [Background technology]
[0002] Some gaming machines, such as pachinko machines, have a valid operation period and execute a notification effect when a gaming operation is performed within the valid operation period. For example, Patent Document 1 discloses: [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-103555 A Summary of the Invention [Problem to be solved by the invention]
[0004] In such gaming machines, if a player becomes impatient in performing a gaming operation, or if multiple gaming operations are required during the valid operation period, the player may become distracted by all of the multiple gaming operations, which may make it difficult for the player to recognize the notification display.
[0005] Therefore, the present invention has been made in consideration of the above-mentioned problems, and provides a gaming machine that can execute a notification display based on a gaming operation being performed within a valid operation period, while making the notification display easy to recognize. [Means for solving the problem]
[0006] According to the present invention, there is provided a gaming machine which includes an operation means, a presentation means, and a presentation control means for controlling the presentation means, and which provides a bonus when a predetermined provision condition is satisfied, the presentation means including a first presentation means and a second presentation means, the presentation control means being capable of causing the first presentation means to execute a first operation request presentation and a second operation request presentation as presentations requesting one or more gaming operations, and being capable of causing the first presentation means to execute a first notification presentation when a gaming operation is performed with the operation content requested in the first operation request presentation during an operation effective period related to the first operation request presentation, and being capable of causing the first presentation means to execute a second notification presentation when a gaming operation is performed with the operation content requested in the second operation request presentation during an operation effective period related to the second operation request presentation. When the predetermined granting condition is satisfied, the second presentation means can be caused to execute a one-shot announcement presentation for definitively notifying the granting of the benefit based on the fact that a gaming operation has been performed during an operation valid period related to the first operation request presentation, and when a gaming operation has been performed during an operation valid period related to the second operation request presentation, the one-shot announcement presentation is not executed, and with regard to the execution rate of the one-shot announcement presentation when the predetermined granting condition is satisfied, when a first gaming operation is performed during an operation valid period related to the first operation request presentation, the one-shot announcement presentation is executed at a higher rate than when a second gaming operation is performed during the operation valid period, or when a first gaming operation is performed during an operation valid period related to the first operation request presentation, the one-shot announcement presentation is executed. Gain, When a second game operation is performed during the operation valid period, the one-shot notification effect is not executed, and the first game operation during the operation valid period related to the first operation request effect is an operation that occurs after the second game operation during the operation valid period, and when a third game operation that occurs after the first game operation is performed during the operation valid period related to the first operation request effect, the one-shot notification effect is executed at a higher rate than when the first game operation is performed during the operation valid period, and the number of game operations requested in the first operation request effect and the number of game operations requested in the second operation request effect are different. The first gaming operation is a gaming operation performed after the second gaming operation is performed, and the third gaming operation is a gaming operation performed after the first gaming operation is performed.A gaming machine is provided that has the following features. Effect of the Invention
[0007] According to the present invention, there is provided a gaming machine which can execute a notification effect based on a gaming operation being performed within a valid operation period, while making the notification effect easily recognizable. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a front view of the gaming machine. [Diagram 2] FIG. 2 is a diagram showing a pattern display device disposed in the area II shown in FIG. [Diagram 3] FIG. 3 is a bird's-eye view showing the operation buttons and their surroundings arranged in the area III shown in FIG. [Figure 4] FIG. 4 is a diagram showing a game board installed in the gaming machine. [Diagram 5] FIG. 5 is a rear view of the gaming machine. [Figure 6] FIG. 6 is a block diagram showing a control configuration of the gaming machine. [Figure 7] FIG. 7 is a block diagram showing the functional configuration of the gaming machine. [Figure 8] Figure 8(a) is a schematic diagram showing a lottery table for determining whether a special pattern is selected, Figure 8(b) is a schematic diagram showing a lottery table for selecting a special pattern for stopping on special pattern 1, and Figure 8(c) is a schematic diagram showing a lottery table for selecting a special pattern for stopping on special pattern 2. [Figure 9] Figure 9(a) is a schematic diagram showing a special chart variation pattern selection table used in the special chart variation pattern derivation state PA, and Figure 9(b) is a schematic diagram showing a special chart variation pattern selection table used when a special chart variation pattern HNP is determined in the special chart variation pattern derivation state PA. [Figure 10] Figure 10(a) is a schematic diagram showing a special chart variation pattern selection table used in the special chart variation pattern derivation state PB, and Figure 10(b) is a schematic diagram showing a special chart variation pattern selection table used when the special chart variation pattern HNP is determined in the special chart variation pattern derivation state PB. [Figure 11] Figure 11(a) is a schematic diagram showing a special chart variation pattern selection table used in the special chart variation pattern derivation state PC, and Figure 11(b) is a schematic diagram showing a special chart variation pattern selection table used when the special chart variation pattern HNP is determined in the special chart variation pattern derivation state PC. [Figure 12] Figure 12(a) is a schematic diagram showing a special chart variation pattern selection table used in the special chart variation pattern derivation state PD, and Figure 12(b) is a schematic diagram showing a special chart variation pattern selection table used when a special chart variation pattern HNP is determined in the special chart variation pattern derivation state PD. [Figure 13] The description will be given with reference to Fig. 13(a) and Fig. 13(b). Fig. 13(a) is a state transition diagram showing the transition of the special chart variation pattern derivation state, and Fig. 13(b) is a diagram showing the relationship between the average variation time for each special chart variation pattern derivation state. [Figure 14] FIG. 14 is a diagram showing the flow of the development performance EC. [Figure 15] FIG. 15 is a diagram showing the flow of the development performance EA. [Figure 16] FIG. 16 is a diagram showing the flow of the development performance EB. [Figure 17] 17(a) to 17(c) are diagrams showing the flow of a cut-in performance. [Figure 18] Figures 18(a) and 18(b) are schematic diagrams showing lottery tables used for lottery determining the presentation mode of cut-in effects, with Figure 18(a) being a schematic diagram showing a lottery table used in states other than the special chart variation pattern derivation state PD, and Figure 18(b) being a schematic diagram showing a lottery table used in the special chart variation pattern derivation state PD. [Figure 19] FIG. 19 is a flow chart showing the process of controlling the instant announcement effect. [Figure 20]Figures 20(a) and 20(b) are schematic diagrams showing lottery tables used in point acquisition lottery draws, with Figure 20(a) being a schematic diagram showing a lottery table used in states other than the special chart variation pattern derivation state PD, and Figure 20(b) being a schematic diagram showing a lottery table used in the special chart variation pattern derivation state PD. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In all drawings, the same components are given the same reference numerals, and the description will be omitted as appropriate. In the following description, "front", "rear", "left", "right", "upper", and "lower" refer to the gaming machine 10 as viewed from the front side (player side) as shown in FIG. 1, unless otherwise specified. In the following explanation, "advantageous (degree of advantage)" refers to an advantage for the player, and further, unless otherwise specified, refers to an advantage in terms of the amount of prize balls (gaming media) obtained (including not only the payout of gaming balls but also the payout of medals), excluding aspects of presentation such as so-called premium images.
[0010] <Features of the present invention> Before describing the details of the gaming machine 10 in this embodiment, the features of the invention (the present invention) described in this embodiment will be described. In addition, when explaining the features, the configuration in parentheses is an example of the configuration of this embodiment corresponding to the immediately preceding configuration, and the configuration may be described in parentheses for the same purpose in the explanations of the gaming machine 10 that follow.
[0011] The present invention relates to The means of production, A performance control means (first sub-control board 200, second sub-control board 300) for controlling the performance means; A gaming machine that awards a special prize (jackpot) when a predetermined awarding condition is satisfied, The presentation means includes a first presentation means (main display unit 81) and a second presentation means (notification lamp 85). The performance control means includes: As a performance requesting one or more game operations, a first operation request performance (an operation request performance related to a development destination notification performance) and a second operation request performance (an operation request performance related to a cut-in performance) can be executed by the first performance means, During the operation effective period related to the first operation request performance, when a game operation is performed with the operation content requested in the first operation request performance, it is possible to cause the first performance means to execute a first notification performance (display of a specific image tg specifying the development performance to be executed); During the operation effective period related to the second operation request performance, when a game operation is performed with the operation content requested in the second operation request performance, it is possible to cause the first performance means to execute a second notification performance (display of a cut-in image kg); When the predetermined granting condition is satisfied, it is possible to cause the second performance means to execute a one-shot notification performance that definitively notifies the granting of the benefit based on the fact that a game operation has been performed during the operation validity period related to the first operation request performance, If a game operation is performed during the operation valid period related to the second operation request performance, the one-shot notification performance is not executed, Regarding the execution rate of the one-shot announcement performance when the above-mentioned predetermined granting conditions are satisfied, When a first game operation is performed during an operation effective period related to the first operation request performance, the one-shot notification performance is executed at a higher rate than when a second game operation is performed during an operation effective period related to the first operation request performance, Alternatively, when a first game operation is performed during the operation valid period related to the first operation request presentation, the one-shot notification presentation may be executed, whereas when a second game operation is performed during the operation valid period related to the first operation request presentation, the one-shot notification presentation is not executed, The first game operation is an operation subsequent to the second game operation, The above benefits include the first benefit (normal jackpot) and the second benefit (variable jackpot), which is more advantageous than the first benefit. Regarding the above benefits that will be granted when the above one-shot announcement performance is executed, A rate at which the benefit granted when the one-shot announcement performance is executed is the second benefit is higher than a rate at which the benefit granted when the one-shot announcement performance is executed is the first benefit. Alternatively, the bonus granted when the one-shot announcement performance is executed may be the second bonus, but the bonus granted when the one-shot announcement performance is executed may not be the first bonus. This is a gaming machine characterized by the above.
[0012] According to the present invention, it is possible to make the player easily recognize the second notification effect in addition to the first notification effect while reducing the frequency of execution of the one-shot notification effect. Furthermore, by increasing the player's attention to the one-shot notification effect, it is possible to enhance the effect of making the player easily recognize the second notification effect in addition to the first notification effect.
[0013] First, the operation means related to the game operation requested in the first operation request presentation and the operation means related to the game operation requested in the second operation request presentation may be different operation means.
[0014] Furthermore, the start timing of the above-mentioned one-shot notification effect does not necessarily have to start at the time when a game operation is performed during the operation valid period related to the above-mentioned first operation request effect, and may be any timing within the range of the timing from when a game operation is performed to when the operation valid period ends, such as the timing when the operation valid period has elapsed.
[0015] In addition, the first game operation may be an operation that follows the second game operation, assuming that the second game operation has been performed, or it may be an operation that follows the second game operation in the chronological order, without requiring that the second game operation be performed.
[0016] Furthermore, it is not necessarily necessary for the configuration of the present invention to be satisfied throughout the entire operation valid period related to the first operation request presentation, and it is sufficient for the configuration to be satisfied during a portion of the operation valid period.
[0017] In the embodiment described later, an example of applying the present invention to a pachinko machine is shown, but the first, second, and third inventions can also be applied to a slot machine that uses a predetermined number of medals to perform a pattern change that spins multiple reels, and pays out medals (game media) based on the result of the pattern change (the stopping state of the multiple reels). Examples of the bonuses in such gaming machines include big bonuses, regular bonuses, and ATs (assist times).
[0018] The gaming machine 10 having the above-mentioned features will be specifically described based on the following embodiment.
[0019] <Structure of the gaming machine 10> First, the structure of the gaming machine 10 will be described with reference to FIGS. Figure 1 is a front view of the gaming machine 10, Figure 2 is a diagram showing a pattern display device 90 arranged in area II shown in Figure 1, Figure 3 is a bird's-eye view showing a group of operation buttons arranged in area III shown in Figure 1 and their surroundings, Figure 4 is a diagram showing a game board 50 installed in the gaming machine 10, and Figure 5 is a rear view of the gaming machine 10. 1 to 5 are merely components necessary for explaining the gaming machine 10 of this embodiment, and components and functions not shown here may be added to the gaming machine 10. In addition, the gaming machine 10 does not necessarily have to include all of the components shown here, and some components or functions may be omitted as long as the effects of the present invention are not impaired.
[0020] The gaming machine 10 of this embodiment is a so-called pachinko machine, in which gaming balls are shot into a front area (hereinafter referred to as "game area 50a") of a gaming board 50 on which a large number of gaming nails (not shown) are erected, and a prize ball is obtained when the gaming ball enters a winning hole (for example, a big winning hole 55, etc.). In the following description, the entry of a gaming ball into a winning hole may be simply expressed as "entering (a winning hole)."
[0021] The gaming machine 10 comprises a rectangular outer frame 15 that opens at the front and rear, a middle frame 17 that detachably holds a gaming board 50 on the front side of the opening of the outer frame 15, and a front frame 20 configured to cover the front side of the gaming board 50.
[0022] The middle frame 17 is supported so as to be rotatable about the left end side by a hinge mechanism (not shown) on the same side as the hinge mechanism 21, and can be opened and closed to the front side of the outer frame 15. The middle frame 17 can be locked and unlocked by a cylinder lock 23 (inserting a door key into the cylinder lock 23 and turning the door key in the opposite direction to the unlocking direction of the front frame 20 (right in this embodiment)).
[0023] The front frame 20 is supported by a hinge mechanism 21 so as to be rotatable about the left end side, and can be opened and closed relative to the middle frame 17. The front frame 20 can be locked and unlocked by a cylinder lock 23 (by inserting a door key into the cylinder lock 23 and turning the door key in the opposite direction to the unlocking direction of the middle frame 17 (left in this embodiment)). In addition, the front frame 20 is provided with a transparent member 25 arranged to cover the playing area 50a, and the transparent member 25 protects the playing area 50a and the playing board 50 from view. The front frame 20 also has an upper ball tray 27 and a lower ball tray 29 for storing game balls, and the upper ball tray 27 and the lower ball tray 29 are spaced apart from each other vertically and are formed integrally with the front frame 20. In addition, the front frame 20 is provided with an operating handle 31 on the right side of the lower ball tray 29, and by rotating the operating handle 31, the game balls stored in the upper ball tray 27 are launched toward the game area 50a.
[0024] 1 to 5, the middle frame 17 has a middle frame open door sensor 76 that detects whether the middle frame 17 is in an open state or a closed state relative to the outer frame 15, and a front frame open door sensor 77 that detects whether the front frame 20 is in an open state or a closed state relative to the middle frame 17. In this embodiment, both of these door open sensors are ON in the open state and OFF in the closed state. However, these door open sensors may be configured to be OFF in the open state and ON in the closed state. This allows the gaming machine 10 to detect both the open / closed state of the middle frame 17 relative to the outer frame 15 and the open / closed state of the front frame 20 relative to the middle frame 17.
[0025] As shown in FIG. 3, a group of operation buttons operated by the player is arranged on the upper surface of the upper ball tray 27. The group of operation buttons includes a ball loan button 39a and a return button 39b for accepting a return operation of a prepaid card as a main operation unit 39 electrically connected to a main control board 100 described later, and includes a performance button 37 for switching the performance generated during a game or accepting a player's operation to obtain various information related to the gaming machine 10 as an operation unit electrically connected to a first sub-control board 200 described later, and cursor buttons 38 (upper cursor button 38a, lower cursor button 38b, left cursor button 38c, right cursor button 38d, middle cursor button 38e) for instructing operations to the up, down, left, and right directions, respectively. Each operation unit is provided with a sensor for detecting the operation, and the control board to be connected detects the operation of each operation unit by a change in the detection state of the sensor. In addition, a movable decorative body 22 that is operated by an actuator such as a motor (not shown) is provided on the side of the upper ball tray 27.
[0026] A ball ejection mechanism 36 is provided below the lower ball tray 29 to eject the game balls stored in the lower ball tray 29 downward. By operating this ball ejection mechanism 36, a bottom opening (not shown) formed on the bottom surface of the lower ball tray 29 opens, and the game balls fall naturally from the bottom opening and are ejected. Although not shown in the figure, the upper ball tray 27 is provided with a mechanism which, similar to the ball removal mechanism 36, can be operated to move the stored balls to the lower ball tray 29, and by operating both this mechanism and the ball removal mechanism 36, it is possible to remove the stored balls.
[0027] As shown in Fig. 1, a pair of speakers 33 (33a, 33b) are disposed on the left and right sides of the upper frame portion 32 of the front frame 20. The upper frame portion 32 and the left and right side frame portions 34a, 34b of the front frame 20 are formed of light-transmitting covers, and frame lamps 35 (35a, 35b, 35c) are disposed inside the covers. The speaker 33 and the frame lamps 35 can emit sounds or turn on or off in conjunction with effects and error effects that occur during play.
[0028] The performance display device 80 is composed of a main display unit 81 disposed approximately in the center of the game board 50, and a sub-display unit 82 disposed around the main display unit 81. The sub-display unit 82 further includes an upper sub-display unit 82a disposed above the main display unit 81, a left sub-display unit 82b disposed on the left side of the main display unit 81, and a right sub-display unit 82c disposed on the right side of the main display unit 81. Here, the main display unit 81 is a fixed liquid crystal display device, and the upper sub-display unit 82a, the left sub-display unit 82b, and the right sub-display unit 82c are movable liquid crystal display devices operated by actuators such as motors (not shown).
[0029] The main display unit 81 can display the changing display of a pattern row that is performed in conjunction with the changing display in the first special pattern display device 91 or the second special pattern display device 92 described below, and can also display various other effects. In the variable display of the pattern rows (decorative patterns) displayed on the main display unit 81, the displayed decorative patterns form three pattern rows. The direction of the variable display of each pattern row is not particularly limited, and may be, for example, the up-down direction, the left-right direction, the depth direction, or a combination of these (diagonal direction). Here, the depth direction refers to a virtual direction recognized by the player in a display mode that uses a method (e.g., perspective) that makes the player perceive the pattern row as if it is changing from the back of the main display unit 81 to the front or vice versa, even though in reality it is a planar changing display on the display screen of the main display unit 81. In addition, the decorative symbols in this embodiment include a "1 symbol" that imitates the number "1", a "2 symbol" that imitates the number "2", a "3 symbol" that imitates the number "3", a "4 symbol" that imitates the number "4", a "5 symbol" that imitates the number "5", a "6 symbol" that imitates the number "6", a "7 symbol" that imitates the number "7", an "8 symbol" that imitates the number "8", and a "9 symbol" that imitates the number "9", and these symbols are provided in each symbol row. In the following description, the "1 symbol", "3 symbol", "5 symbol", "7 symbol", and "9 symbol" may be collectively referred to as "odd number symbols", and the "2 symbol", "4 symbol", "6 symbol", and "8 symbol" may be collectively referred to as "even number symbols".
[0030] Each of the sub-display units 82 is not only provided mainly for displaying a performance image related to a performance, but is also configured to be movable. The initial positions of the upper sub-display unit 82a are on the upper side relative to the main display unit 81, the left sub-display unit 82b are on the left side relative to the main display unit 81, and the right sub-display unit 82c are on the right side relative to the main display unit 81, and each of the sub-display units 82 is configured to be movable from these initial positions to a position where the entire display area of the sub-display unit 82 overlaps with the display area of the main display unit 81.
[0031] In addition, in this embodiment, the performance display device 80 (main display unit 81, upper sub-display unit 82a, left sub-display unit 82b, right sub-display unit 82c) all use liquid crystal display devices, but the implementation of the present invention is not limited to this. For example, various types of display devices such as drum type and dot matrix type can be used as the performance display device 80.
[0032] A number of light emitting diodes (hereinafter abbreviated as "LEDs") are arranged on the lower right side of the main display unit 81, and these LEDs form the display area of the pattern display device 90, which displays special patterns and normal patterns. In addition, the symbol display device 90 is disposed in a position that is more difficult for the player to see than the main display unit 81, and the display area of the symbol display device 90 is smaller than the display area of the main display unit 81. In addition, the arrangement and number of LEDs in the pattern display device 90 in this embodiment are as shown in Figure 2, but this is just one example, and the arrangement and number of LEDs in the pattern display device 90 are not limited to this example.
[0033] The special symbols are symbols that are stopped and displayed as a result of a symbol change that determines whether or not to activate a special electric role (for example, the special electric role 65). The special symbols in this embodiment include a first special symbol displayed on the first special symbol display device 91 and a second special symbol displayed on the second special symbol display device 92. In addition, the special pattern may be abbreviated as "Special pattern", the first special pattern as "Special pattern 1", and the second special pattern as "Special pattern 2".
[0034] The normal symbol is a symbol that is stopped and displayed as a result of a symbol variation that determines whether or not to operate a normal electric role (for example, the normal electric role 61). The normal symbol in this embodiment is displayed on the normal symbol display device 93. In addition, normal patterns are sometimes abbreviated as "Fuzu", and normal electric devices are sometimes called "denchu".
[0035] In addition to the above-mentioned display devices, the symbol display device 90 is provided with a first special symbol reservation lamp 94, a second special symbol reservation lamp 95, and a normal symbol reservation lamp 96. The first special pattern reserve lamp 94 makes it possible to identify the number of pattern variations of reserved special pattern 1, the second special pattern reserve lamp 95 makes it possible to identify the number of pattern variations of reserved special pattern 2, and the normal pattern reserve lamp 96 makes it possible to identify the number of pattern variations of reserved normal patterns, and all of them make it possible to identify the corresponding number of pattern variations by the lighting state of the two LEDs (in this embodiment, right side only constantly lit = 1, left and right sides constantly lit = 2, right side flashing + left side constantly lit = 3, left and right flashing = 4).
[0036] In the following explanation, the pattern change in which the first special pattern display device 91 or the second special pattern display device 92 displays a special pattern in a variable manner and then stops displaying the special pattern will be referred to as the ``pattern change of the special pattern,'' and in the following explanation, the pattern change in which the normal pattern display device 93 displays a normal pattern in a variable manner and then stops displaying the normal pattern will be referred to as the ``pattern change of the normal pattern.'' In addition, in the following description, the change display of the pattern row (decorative pattern) displayed on the above-mentioned main display unit 81 may be referred to as "pattern change of decorative pattern" to distinguish it from "pattern change of special pattern" and "pattern change of normal pattern". In the following explanation, when the term "pattern change" is used, it means a pattern change of a special design unless otherwise specified.
[0037] As shown in FIG. 4, a number of obstacles such as game pegs (not shown), windmills 52, and decorative parts are arranged on the front of the game board 50, thereby defining a game area 50a in which the shot game ball can roll. Additionally, on the left and upper sides of the play area 50a, there are arranged a curved outer rail 51 and an inner rail 53 for guiding the game balls launched by rotating the operating handle 31 to the upper part of the play area 50a. The outer rail 51 is located outside the inner rail 53 with the center of the play area 50a as the reference point. Here, the windmill 52 is a nail-shaped mechanism for changing the direction in which the game balls fall.
[0038] The gaming machine 10 is capable of varying the strength of the game ball's launch depending on the amount of rotation (e.g., the angle of rotation) of the operating handle 31, and various obstacles are arranged in the gaming area 50a to make the game ball roll along either the first flow path X (so-called left hit), in which a game ball that is launched more weakly, or the second flow path Y (so-called right hit), in which a game ball that is launched more strongly, rolls.
[0039] In Figure 4, the main prize openings are shown as large prize opening 55, first start opening 57, second start opening 59, gate 63, and general prize opening 67, but the prize openings shown are only examples, and the number and arrangement of the openings may be changed as appropriate.
[0040] The large prize opening 55 is located in the lower right of the game area 50a. The large prize opening 55 is provided with a large prize opening sensor 72, and the result of detection by the large prize opening sensor 72 determines whether a prize has been won in the large prize opening 55, and the number of prize balls (15 in this embodiment) associated with the large prize opening 55 is awarded. In this embodiment, the obstacles are arranged so that more game balls roll toward the big prize opening 55 when rolling from the second flow path Y compared to when rolling from the first flow path X.
[0041] A special electric device 65 is disposed above the large prize opening 55. The special electric device 65 is a member that can be switched between an open state, in which it is easy to win a prize in the large prize opening 55, and a closed state, in which it is difficult to win a prize, and is switched to either the open state or the closed state by a special electric device solenoid 66. More specifically, the special electric device 65 is in an open state during a part of the jackpot game that starts when a jackpot is derived by the special winning / losing determination described later, and thus allows winning into the big prize winning hole 55. In this way, when the special electric device 65 is in an open state, winning into the big prize winning hole 55 becomes easier, so the jackpot game in which the chances of winning prize balls are greatly increased can be said to be an advantageous game state. In the jackpot game, the special electric device 65 is alternately set to an open state and a closed state, and one open state (sometimes referred to as a "round game", and the total number of round games that occur in one jackpot may be referred to as the "number of rounds") ends when a predetermined number (10 in this embodiment) of game balls have entered the jackpot opening 55, and the special electric device 65 enters a closed state. Note that one open state also ends when a sufficient time (30 s (seconds) in this embodiment) for a predetermined number of game balls to enter the big winning hole 55 has elapsed. Here, when the special electric device 65 is set from the open state to the closed state based on the winning of 10 game balls in one round of play, it cannot immediately return to the closed state. Therefore, there may be a case where more than 10 game balls win the big winning hole 55 in one round of play.
[0042] The first starting hole 57 is located at the lower center of the game area 50a. A first starting hole sensor 70 is attached to the first starting hole 57, and the winning of the first starting hole 57 is determined based on the detection result of the first starting hole sensor 70, and the number of prize balls (4 in this embodiment) associated with the first starting hole 57 is awarded. In at least some of the cases where the winning of the first starting hole 57 is determined, the pattern of the special chart 1 is changed. In addition, in the game area 50a of this embodiment, obstacles such as game nails are arranged so that more game balls roll toward the first starting hole 57 when they roll from the first flow path X compared to when they roll from the second flow path Y.
[0043] The second starting hole 59 is located in the lower right of the play area 50a. A second starting hole sensor 71 is attached to the second starting hole 59, and the winning of the second starting hole 59 is determined based on the detection result of the second starting hole sensor 71, and the number of winning balls associated with the second starting hole 59 (1 in this embodiment) is awarded. In at least some cases where a winning jackpot has been awarded at the second starting hole 59, the pattern on special chart 2 will change. In addition, in the game area 50a of this embodiment, obstacles such as game nails are arranged so that more game balls roll toward the second starting hole 59 when they roll from the second flow path Y compared to when they roll from the first flow path X.
[0044] A normal electric device 61 is disposed in the flow path connected to the second starting port 59. The normal electric device 61 is a member that can be switched between an open state in which it is easy to insert a game ball into the second starting port 59 and a closed state in which it is difficult to insert the ball, and is switched to either the open state or the closed state by a normal electric device solenoid 62. More specifically, the normal electric device 61 is in an open state at least in part of the normal winning game that is played by winning the pattern variation of the normal picture, and thus entry into the second starting hole 59 is permitted. In this way, when the normal electric device 61 is in an open state, entry into the second starting hole 59 is easy, so that the opportunity for the pattern variation of the special picture 2 to be executed can be greatly increased while suppressing the decrease in game balls due to the prize balls.
[0045] The gate 63 is located in the right center of the game area 50a. A gate sensor 74 is attached to the gate 63, and the winning of the gate 63 is determined based on the detection result of the gate sensor 74. In at least some cases where the winning of the gate 63 is determined, the pattern of the normal figure is changed.
[0046] The general winning opening 67 is located at the lower left of the game area 50a. A general winning opening sensor 73 is attached to the general winning opening 67, and a winning ball is determined based on the detection result of the general winning opening sensor 73, and the number of prize balls associated with the general winning opening 67 (4 in this embodiment) is awarded. In this embodiment, the obstacles are arranged so that more game balls roll toward the general winning opening 67 when rolling from the first flow path X compared to when rolling from the second flow path Y, but the obstacles may be arranged so that more game balls roll toward the general winning opening 67 when rolling from the second flow path Y. Also, a plurality of general winning openings 67 may be provided.
[0047] The out port 69 is disposed at the lowermost part of the game area 50a. Game balls that are launched into the game area 50a and do not enter any of the above-described winning ports fall into the out port 69 and are treated as out balls. In this embodiment, an out ball sensor 75 (not shown) for detecting out balls, which are game balls that have entered the winning ports and the out port, is provided.
[0048] In addition, an announcement lamp 85 is disposed on the front surface of the game board 50. The announcement lamp 85 is used in a one-shot announcement effect described later. When the lamp is in the lit state, the character "WIN" can be visually recognized as shown in FIG. 4, while when the lamp is in the unlit state, the character cannot be recognized. Note that the lit state is illustrated in FIG. 4.
[0049] On the back surface of the game board 50, as shown in FIG. 5, a main control board case 109 storing the main control board 100, a first sub-control board case 209 storing the first sub-control board 200, a second sub-control board case 309 storing the second sub-control board 300, a power control board case 509 storing the power control board 500, and a payout control board case 409 storing the payout control board 400 are mounted. In addition to the back surfaces of the first sub-control board case 209 and the second sub-control board case 309, an opening / closing cover 45 that covers a part of the back surface of the main control board case 109 is detachably mounted. Note that a RAM clear switch 43 is provided on the main control board 100. In addition, the board cases and covers covering the respective boards are configured by transparent members, and the corresponding boards are visible through the respective cases and covers.
[0050] The power supply control board 500 is composed of a normal power supply circuit 501 that generates normal power to be supplied to electronic and electrical components such as the control board mentioned above based on the primary power supply supplied from the game island's power supply equipment, a backup power supply circuit 502 that generates backup power, and a power interruption detection circuit 503 that detects power interruption (when the voltage supplied by the normal power supply drops to a specified voltage). In addition, a power switch 40 is connected to the power supply control board 500, and assuming that primary power is supplied from the power supply equipment of the game island, when the power switch 40 is turned ON, normal power is generated in the normal power supply circuit 501 of the power supply control board 500, and power is supplied to electronic and electrical components including the above-mentioned control boards (main control board 100, first sub-control board 200, second sub-control board 300, and payout control board 400). In addition, when a power interruption is detected by the power interruption detection circuit 503, the power supply control board 500 transmits a power interruption signal (NMI signal) to each of the main control board 100, the first sub-control board 200, and the dispensing control board 400. In addition, the backup power circuit 502 is configured to be charged when power is being supplied to the gaming machine 10 from the power supply equipment of the gaming island. In addition, the backup power supply circuit 502 may be provided on the dispensing control board 400, and the power interruption detection circuit 503 may not be provided on the power supply control board 500, but may be provided on each of the main control board 100, the first sub-control board 200, and the dispensing control board 400.
[0051] A game ball tank 46 for storing game balls supplied from the ball supply facility of the game island is disposed on the back of the game board 50, above the opening and closing cover 45. The game ball tank 46 is further connected to a payout passage 49 leading to the upper ball tray 27 via a tank rail 47 and a payout unit 48, and the balls paid out by the payout unit 48 are paid out to the upper ball tray 27 through the payout passage 49.
[0052] So far, the structure of the gaming machine 10 in this embodiment has been described, but this is only one specific example, and the present invention can also be implemented with a different configuration.
[0053] <Regarding the control configuration of the gaming machine 10> Next, a control configuration of the gaming machine 10 according to the present embodiment will be described with reference to Fig. 6. Fig. 6 is a block diagram showing a control configuration of the gaming machine 10. Note that the control configuration shown in Fig. 6 is necessary for explaining the gaming machine 10 of the present embodiment, and the gaming machine 10 may have a control configuration not shown in Fig. 6.
[0054] The main control board 100 is equipped with a CPU 101 which performs various calculation processes related to the game, a ROM 102 which stores data such as control programs and various lottery tables, a RAM 103 which functions as a work area and buffer memory that serves as a temporary storage area, an I / O port 104 which inputs and outputs signals between peripheral boards and each device, and a random number circuit 105 which operates in a system separate from the program processing by the CPU 101 and generates random numbers (hard random numbers), and these are connected to each other via an internal bus.
[0055] The CPU 101 executes various processes related to the main control of the game by reading out various control programs stored in the ROM 102 and performing arithmetic processing. The RAM 103 is backed up by a backup power source generated in a backup power circuit described later. Specifically, among the information stored in the RAM 103, various information is backed up so that when power is restored (when power is turned on) after a power outage, the data can be used to restore the gaming machine 10 to the state it was in immediately before the power outage. For example, in addition to the data of the stack pointer and each register held at the time of the power outage, information related to the game such as the state of the gaming machine 10 at that time (a game stop state or a game possible state), the current special drawing state, and the current normal drawing state are backed up. Note that this information is cleared (initialized) by a RAM clear process. Therefore, after the RAM is cleared, a special drawing variation pattern derivation state PA (low probability of special drawing and low probability of normal drawing described later) is newly set. Furthermore, when the RAM clear process is executed, the pattern string related to the decorative pattern is in a state in which the initial pattern combination (in this embodiment, "1 pattern-3 pattern-5 pattern") is stopped and displayed.
[0056] In this embodiment, at least an area in which such information related to the game is stored (sometimes referred to as the area of RAM 103 related to the game) is backed up, as well as an area in which the complement of the checksum and the backup flag related to the area of RAM 103 related to the game are stored (sometimes referred to as the backup information area of RAM 103 related to the game). Then, when power is restored, the gaming machine 10 returns to normal using the various pieces of information stored in the backed up area of RAM 103 related to the game and the backup information area of RAM 103 related to the game. In addition, the specific method of backup in this embodiment is not limited. For example, the area to be backed up in the RAM 103 may be realized with a configuration capable of holding data in a non-volatile manner even in a power-off state. As another example, in the RAM 103, a first memory configured to hold data in a non-volatile manner even in a power-off state and a second memory referenced during operation of the gaming machine 10 may be provided with different hardware. In that case, the gaming machine 10 may save information to be backed up from the second memory to the first memory when power is cut off, and recover the saved information from the first memory to the second memory when power is restored.
[0057] In addition, the main control board 100 is electrically connected to the first start port sensor 70, the second start port sensor 71, the large prize port sensor 72, the general prize port sensor 73, the gate sensor 74, the out ball sensor 75, the middle frame door opening sensor 76, the front frame door opening sensor 77, etc., and is configured to be able to input detection signals from these sensors to the CPU 101 via the I / O port 104.
[0058] In addition, the main control board 100 is electrically connected to the first special pattern display device 91, the second special pattern display device 92, the normal pattern display device 93, the first special pattern hold lamp 94, the second special pattern hold lamp 95, the normal pattern hold lamp 96, the normal electric role solenoid 62 and the special electric role solenoid 66, and is configured to be able to control these via the I / O port 104. Similarly, main control board 100 is electrically connected to main operation unit 39 and RAM clear switch 43, and is configured to be able to detect the operation of main operation unit 39.
[0059] The main control board 100 and the first sub-control board 200 are connected by eight parallel signal lines and one strobe line, and are connected so that communication is possible in only one direction, from the main control board 100 to the first sub-control board 200, and various performance control commands are transmitted from the main control board 100 to the first sub-control board 200. Furthermore, data cannot be transmitted from the first sub-control board 200 to the main control board 100, and the first sub-control board 200 is configured not to be able to request the main control board 100 to transmit data. In addition, in this embodiment, a parallel transmission method is used for transmitting data from the main control board 100 to the first sub-control board 200, but a serial transmission method may also be used.
[0060] The first sub-control board 200 comprises a CPU 201 which performs various arithmetic processing related to game presentation based on presentation control commands from the main control board 100, a ROM 202 which stores data such as presentation control programs and various lottery tables, a RAM 203 which functions as a work area or buffer memory that serves as a temporary storage area, and an I / O port 204 which inputs and outputs signals between peripheral boards and each device. These are interconnected via an internal bus, and the CPU 201 is configured to execute main control related to game presentation in accordance with the control program stored in ROM 202. In addition, the first sub-control board 200 is electrically connected to the performance button 37 and the cursor button 38, and is configured to be able to detect the operation of these operating sections.
[0061] In addition, the first sub-control board 200, through performance control processing based on performance control commands from the main control board 100, generates image control commands that instruct the image to be displayed on the second sub-control board 300, audio control commands that instruct the audio to be output to the audio control board 310, lamp control data for controlling the lighting of various lamps such as the frame lamp 35, and movement control data for controlling the movement of the movable decorative body 22 and the sub-display unit 82, etc. Here, the first sub-control board 200 is connected to the second sub-control board 300 and the voice control board 310 to enable two-way communication, and each control command (image control command, voice control command) is transmitted from the first sub-control board 200 to the second sub-control board 300 or the voice control board 310, while in response, a response command (ACK command) indicating that the control command was successfully received is transmitted from each control board (second sub-control board 300, voice control board 310) to the first sub-control board 200.
[0062] The first sub-control board 200 is also electrically connected to the frame lamp 35 and the notification lamp 85, and transmits lamp control data via the I / O port 204. The frame lamp 35 is configured such that its illumination is controlled by the lamp control data transmitted from the first sub-control board 200. Furthermore, the first sub-control board 200 is electrically connected to the movable ornament 22 and the sub-display unit 82, and transmits movement control data via the I / O port 204. The movable ornament 22 and the sub-display unit 82 are configured so that their movement is controlled by the movement control data transmitted from the first sub-control board 200.
[0063] The second sub-control board 300 is equipped with a CPU 301 that performs various arithmetic processing related to image presentation based on image control commands from the first sub-control board 200, a ROM 302 that stores image control programs and various data, a RAM 303 that functions as a work area and buffer memory that serves as a temporary storage area, and an I / O port 304 that inputs and outputs signals between peripheral boards and each device, and is configured so that the CPU 301 executes main control related to image presentation in accordance with the control program stored in ROM 302. In addition, the second sub-control board 300 is equipped with a VDP (not shown) that generates image data according to the content of the performance determined by a performance content determination means 225 (described later) based on a control signal received from the CPU 301, and a sound source IC that generates sound data according to the content of the performance based on a control signal received from the CPU 301. The VDP is a so-called image processor that reads image data stored in an image ROM in response to an instruction from the CPU 301, processes the image data, and transmits the generated image data to the main display unit 81 and the sub-display unit 82. A high-speed VRAM that is used for expanding and processing the image data read from the image ROM is also connected to this VDP.
[0064] The audio control board 310 includes a CPU 311 that performs various arithmetic processing related to audio performance based on audio control commands from the first sub-control board 200, a ROM 312 that stores audio control programs and audio data, a RAM 313 that functions as a work area or buffer memory serving as a temporary storage area, and an I / O port 314 that inputs and outputs signals between the peripheral boards and each device, and is configured such that the CPU 311 executes main control related to audio performance according to the control program stored in the ROM 312. Thus, the audio control board 310 reads audio data stored in the ROM 312 in response to audio control commands received from the first sub-control board 200, synthesizes the read audio data, and transmits the final synthesized audio data to the speaker 33 via an amplifier, thereby enabling the speaker 33 to output audio.
[0065] The dispensing control board 400 is mainly composed of a CPU, a ROM and a RAM (all not shown). In addition, the payout control board 400 is connected to the main control board 100 for two-way communication, and performs control to drive the payout unit 48 to pay out game balls based on a payout control command from the main control board 100, and also controls the launch of the game balls by synchronously driving the ball feeding mechanism and the launch mechanism based on the amount of operation of the operating handle 31.
[0066] The power supply control board 500 is composed of a normal power supply circuit that generates normal power to be supplied to electronic and electrical components such as the control board mentioned above based on the primary power supply supplied from the game island's power supply equipment, a backup power supply circuit that generates backup power, and a power interruption detection circuit that detects power interruption (when the voltage supplied by the normal power supply drops to a specified voltage) (all of which are not shown). In addition, a power switch 40 is connected to the power supply control board 500, and assuming that primary power is supplied from the power supply equipment of the game island, when the power switch 40 is turned ON, normal power is generated in the normal power supply circuit of the power supply control board 500, and power is supplied to electronic and electrical components including the above-mentioned control boards (main control board 100, first sub-control board 200, second sub-control board 300, and payout control board 400). In addition, when a power interruption is detected by the power interruption detection circuit, the power supply control board 500 transmits a power interruption signal (NMI signal) to each of the main control board 100, the first sub-control board 200, and the dispensing control board 400. In addition, the backup power circuit is configured to be charged when power is being supplied to the gaming machine 10 from the power supply equipment of the gaming island. In addition, the backup power supply circuit may be provided on the dispensing control board 400, and the power interruption detection circuit may not be provided on the power supply control board 500, but may be provided on each of the main control board 100, the first sub-control board 200, and the dispensing control board 400.
[0067] <Functional Configuration of the Gaming Machine 10> Next, the functional configuration of the gaming machine 10 according to this embodiment will be described with reference to Fig. 7. Fig. 7 is a block diagram showing the functional configuration of the gaming machine 10. Note that the functional configuration shown in Fig. 7 is necessary for explaining the gaming machine 10 of this embodiment, and the gaming machine 10 may have a functional configuration not shown in Fig. 7. Also, when explaining the functional configuration, Figs. 8 to 13 will be referred to as necessary.
[0068] As shown in FIG. 7, the main control board 100 is equipped with a ball entry determination means 110, a main random number generation means 115, a main hold control means 120, a pre-determination means 125, a special chart lottery means 130, a normal chart lottery means 135, a jackpot game control means 140, a pattern display control means 145, an electric gimmick control means 150, a game status control means 155, a main information storage means 160, a main error control means 165, a main command management means 170, a power restoration processing execution means 175, and a power outage processing execution means 180. These means are functional representations of what is realized by each control configuration on the main control board 100 described using FIG. 6.
[0069] First, the main information storage means 160 is a means for temporarily storing data read by the means included in the main control board 100, data derived by calculations in the means, etc., in the corresponding storage areas. In particular, the data (performance control commands) stored in the transmission command storage area of the main information storage means 160 is transmitted to the sub-command management means 270 of the first sub-control board 200 (described later) by the command transmission means after being stored.
[0070] The winning ball determination means 110 determines whether a ball has been won at each winning hole based on the detection results of a sensor provided at each winning hole.
[0071] The main random number generation means 115 is capable of generating multiple types of random numbers with different update ranges depending on the random number circuit 105, and when a win at a winning port is determined, it obtains (latches) one or more random numbers corresponding to that winning port from the random number circuit 105. More specifically, when it is determined that the first start gate 57 or the second start gate 59 has been won, the main random number generating means 115 obtains a random number for determining whether or not the special symbol has been won, a random number for drawing a special symbol stop symbol, and a random number for drawing a special symbol change pattern, which will be described later. When it is determined that the gate 63 has been won, the main random number generating means 115 stores a random number for determining whether or not the normal symbol has been won, a random number for drawing a normal symbol stop symbol, and a random number for drawing a normal symbol change pattern, which will be described later, in a corresponding storage area of the main information storage means 160. The random number circuit 105 monitors whether the multiple types of random numbers it updates are being updated normally, and if an update abnormality occurs in which the random numbers are not updated normally, information indicating the occurrence of the abnormality is written to a specific storage area of the random number circuit 105. Therefore, the CPU 101 can grasp that an update abnormality has occurred in the random number circuit 105.
[0072] The main reservation control means 120 controls the reservation of the pattern change of the special chart and the reservation of the pattern change of the normal chart. Regarding the special chart 1, the random number for determining whether the special chart is a hit or not, the random number for drawing the special chart stop pattern, and the random number for drawing the special chart change pattern, which are obtained as a result of winning the first starting port 57, are reserved (stored) as operation reservation information for the special chart 1. More specifically, the main hold control means 120 is provided with a hold counter (hereinafter referred to as the "special chart 1 hold counter") which is incremented by 1 each time the activation hold information of special chart 1 is held and decremented by 1 each time the activation hold information of special chart 1 is used (used in the draw by the special chart draw means 130), and stores the activation hold information in a storage area corresponding to the current special chart 1 hold counter of the main information storage means 160 until the value of the special chart 1 hold counter reaches an upper limit value (4 in this embodiment), and clears the used activation hold information each time the activation hold information is used, and controls the remaining activation hold information to be moved (shifted) from the current storage area to a storage area corresponding to a special chart 1 hold counter which is 1 less than the current special chart 1 hold counter, in order from the smallest special chart 1 hold counter. In addition, the main reservation control means 120 performs the same control as described above for special drawing 2 and ordinary drawing separately from special drawing 1, and the reservation counter for special drawing 2 is referred to as the special drawing 2 reservation counter. In addition, in the following explanation, "suspended operation information" may be expressed as "suspended pattern change" or simply as "suspended." In addition, when the main hold control means 120 updates (adds or subtracts) the operation hold information (hold counter) of special chart 1 or special chart 2, it generates a performance control command (hold command) including the special chart 1 hold counter and the special chart 2 hold counter, and stores the command in the transmission command storage area of the main information storage means 160. In this embodiment, when both the activation pending information corresponding to special drawing 1 and the activation pending information corresponding to special drawing 2 are reserved, a priority change is performed in which the activation pending information corresponding to special drawing 2 is used preferentially.
[0073] The advance judgment means 125 executes an advance judgment for a pre-reading performance targeting the pending activation information in at least some cases where the pending activation information of a special chart is pending at a predetermined advance judgment timing. More specifically, the pre-judgment means 125 reads out each random number of the operation pending information that has been reserved this time, and executes pre-judgment for each of the special chart hit / miss judgment, special chart stop pattern lottery, and special chart change pattern lottery, which will be described later. In each pre-judgment, a lottery table (not shown) that is the same as or equivalent to the lottery table used in the lottery corresponding to each pre-judgment is used. Therefore, the results of these pre-judgments will be the same as the results of the lottery that will be executed later. Furthermore, the pre-determination means 125 generates a performance control command (pre-determination command) including the derived result of the pre-determination, and stores the command in a transmission command storage area of the main information storage means 160. Since the pre-determination command is transmitted (generated and stored in the transmission command storage area of the main information storage means 160) at least part of the timing of the predetermined pre-determination, it will be transmitted following the above-mentioned reserved command. Here, the predetermined pre-determination timing refers to a timing that is not during a jackpot game, for example, a timing when the operation reservation information of the special chart is reserved. In this embodiment, if the operation reservation information of the special chart 1 is reserved during the normal chart high probability described below, the pre-determination is restricted, and therefore the transmission of the pre-determination command corresponding to the pre-determination is also restricted. On the other hand, if the operation reservation information of the special chart 2 is reserved during the normal chart low probability described below, the pre-determination may or may not be restricted.
[0074] The special drawing means 130 includes a special drawing hit / miss judgment means 131, a special drawing stop pattern lottery means 132, and a special drawing change pattern derivation means 133, and executes processing by each means in the order of the special drawing hit / miss judgment means 131, the special drawing stop pattern lottery means 132, and the special drawing change pattern derivation means 133. When the special drawing change start condition is satisfied, the special drawing lottery means 130 reads out the earliest operation pending information among the operation pending information reserved in the main information storage means 160. In addition, "the conditions for starting the change of the special chart are satisfied" means, for example, that all of the following conditions are satisfied: the player is not in a jackpot game, neither Special Chart 1 nor Special Chart 2 is in the process of changing the pattern (including when the pattern change related to Special Chart 1 or Special Chart 2 is displayed as stopped), and at least one of Special Chart 1 and Special Chart 2 has pending operation information.
[0075] Here, Figs. 8 to 12 are diagrams that typically show a lottery table used in the main control board 100, and will be referred to as necessary in the following description. In addition, in a lottery using a lottery table, including other lottery tables, the lottery values stored in the lottery table are added to the read random number in a predetermined order (if there is only one lottery value, the addition is performed once), and a result corresponding to the lottery value where a carry (overflow) occurs is derived as the result of the lottery. Similarly, in the explanation of the lottery table, the lottery table is given a name for convenience of explanation, but it is sufficient that the data such as the lottery value included in the lottery table corresponding to the name is identifiably stored in each ROM, and these names do not specify the area in which the data is stored. In the illustrated lottery table, there are items described for convenience of explanation, and if "-" or "0" is described as the lottery value, these do not necessarily indicate the data stored in each ROM. And, the result in which "-" or "0" is described as the lottery value will not win. Furthermore, if the same lottery value as the random number range used for the lottery (the number of random numbers that can be obtained in the range) is described in the lottery table, the result is derived 100%, so it is not necessary to perform a lottery. Furthermore, if the total value of the lottery values used in one lottery matches the random number range used in the lottery, a carry will always occur when adding the final lottery value, so that addition does not need to be performed, and in that case, the lottery values used in that addition themselves become unnecessary.
[0076] The special chart hit / miss judgment means 131 reads out a random number for the special chart hit / miss judgment for each pattern change, and executes a special chart hit / miss judgment to judge by lottery whether the winning is a jackpot or a miss by using the read out random number and a lottery table for the special chart hit / miss judgment. FIG. 8(a) is a diagram showing a schematic drawing of a lottery table for determining whether or not a special drawing is a hit, and the lottery table is used in common for special drawings 1 and 2. The range of random numbers used in the determination is 0 to 65535, so when the special drawing lottery state is low probability (hereinafter sometimes abbreviated as "low probability of special drawing"), a big hit is derived with a probability of 205 / 65536 (approximately 1 / 320). Similarly, when the special drawing state is in a high probability state (hereinafter sometimes abbreviated as "special drawing high probability"), a jackpot is derived with a probability of 600 / 65536 (approximately 1 / 109).
[0077] When the result of the special chart hit / miss judgment is a big hit, the special chart stop pattern drawing means 132 reads out a random number for the special chart stop pattern drawing, and determines the special chart stop pattern by drawing lots using the read out random number and a lottery table for the special chart stop pattern drawing. FIG. 8(b) is a diagram showing a schematic drawing of a drawing table for drawing the stop symbol of special symbol 1, and the range of random numbers used in the drawing is 0 to 99. Therefore, when a jackpot is derived from special symbol 1, symbol A is determined as the stop symbol with a probability of 50 / 100 (1 / 2), and symbol B is determined as the stop symbol with a probability of 50 / 100 (1 / 2). Here, pattern A is a pattern with 4 rounds, which is highly likely to be a special pattern and highly likely to be a normal pattern after the end of the jackpot game (hereinafter, it may be referred to as a "probable special pattern" and a jackpot related to this pattern may be referred to as a "probable special jackpot"). On the other hand, pattern B is a pattern with 4 rounds, which is highly likely to be a special pattern and highly likely to be a normal pattern after the end of the jackpot game (hereinafter, it may be referred to as a "normal pattern" and a jackpot related to this pattern may be referred to as a "normal jackpot"). Therefore, it can be said that pattern A is a more advantageous pattern than pattern B in the special pattern lottery state after the jackpot game. Figure 8(c) is a diagram showing a schematic drawing table for drawing the stop symbol of special symbol 2, and the range of random numbers used in the drawing is 0 to 99, similar to the drawing of the stop symbol of special symbol 1. Therefore, when a jackpot is derived in special symbol 2, symbol a is determined as the stop symbol with a probability of 75 / 100 (approximately 1 / 1.33), and symbol b is determined as the stop symbol with a probability of 25 / 100 (1 / 4). Here, pattern a is a probability variable pattern with 10 rounds and high probability of special and high probability of normal after the jackpot play, and pattern b is a normal pattern with 4 rounds and high probability of special and high probability after the jackpot play. Therefore, pattern a can be said to be a more advantageous pattern than pattern b in terms of the number of rounds. In the following explanation, a jackpot related to pattern a may be referred to as a 10R probability variable jackpot, and a jackpot related to pattern b may be referred to as a 4R probability variable jackpot. In addition, if the result of the special chart hit / miss judgment is not a jackpot, the special chart stop pattern lottery means 132 uniformly determines the stop pattern to be pattern C when special chart 1 is a miss, and pattern c when special chart 2 is a miss. In addition, in this embodiment, the rate at which the special chart becomes highly probable after the end of the jackpot game using the special chart 1 (50 / 100) is different from the rate at which the special chart becomes highly probable after the end of the jackpot game using the special chart 2 (100 / 100) (the pattern change of the special chart 2 is more favorable than the pattern change of the special chart 1). Although details are omitted, this difference is realized by providing a function to make the special chart highly probable after the end of the jackpot game when the game ball passes through the V winning area provided in the large winning port 55 during the jackpot game (when the sensor provided in the V winning area detects the game ball), and by changing whether or not to provide a round game in which it is easy to pass through the V winning area (in this embodiment, it is provided in the fourth round game of the easy winning period related to the probability variable jackpot) depending on the stopping pattern of the special chart.
[0078] In this way, in the above-mentioned embodiment, the jackpot won in the pattern change related to the special chart 2 is more advantageous than the jackpot won in the pattern change related to the special chart 1. According to this, the transition from the special chart change pattern derivation state PA to the special chart change pattern derivation state PD described later can further increase the interest in the game.
[0079] The special pattern variation pattern derivation means 133 has a plurality of types of special pattern variation pattern selection tables to be referred to when determining the special pattern variation pattern, and selects one special pattern variation pattern selection table for determining the current special pattern variation pattern based on the current special pattern variation pattern derivation state and the result of the current special pattern hit / miss judgment, determines one special pattern variation pattern using the selected special pattern variation pattern selection table and the random number for special pattern variation pattern selection, and determines the variation time based on the determined special pattern variation pattern. Here, the variation time refers to the time from the start of the pattern variation related to the special pattern (special pattern 1 or special pattern 2) to the end of the pattern variation. Although details of the transition conditions will be described later, the special chart variation pattern derivation state in this embodiment includes a special chart variation pattern derivation state PA, a special chart variation pattern derivation state PB, a special chart variation pattern derivation state PC, and a special chart variation pattern derivation state PD. The above-mentioned method of determining the special chart variation pattern is adopted in the pattern variation of the special chart 1 in the special chart variation pattern derivation state PA, and is adopted in the pattern variation of the special chart 2 in the special chart variation pattern derivation state PB, the special chart variation pattern derivation state PC, and the special chart variation pattern derivation state PD. In addition, in the pattern variation related to the other special chart in each special chart variation pattern derivation state, a predetermined special chart variation pattern is determined according to the result of the special chart hit / miss judgment.
[0080] FIG. 9(a) is a diagram showing a schematic diagram of a special pattern variation pattern lottery table used in the special pattern variation pattern derivation state PA, and the range of random numbers used in the lottery is 0 to 999. As shown in FIG. 9(a), in the special chart variation pattern derivation state PA, special chart variation patterns HNP to ASP-C can be determined. Specifically, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PA is a miss, the special chart fluctuation pattern HNP is determined with a probability of 900 / 1000 (approximately 1 / 1.11), the special chart fluctuation pattern HRP with a probability of 52 / 1000 (approximately 1 / 19.2), the special chart fluctuation pattern HSP1-A with a probability of 13 / 1000 (approximately 1 / 76.9), the HSP1-B with a probability of 11 / 1000 (approximately 1 / 90.9), the HSP2-A with a probability of 9 / 1000 (approximately 1 / 111), the HSP2-B with a probability of 7 / 1000 (1 / 143), the HSP3-A with a probability of 5 / 1000 (1 / 200), and the HSP3-B with a probability of 3 / 1000 (approximately 1 / 333). In this case, the special chart fluctuation pattern ASP1-A to the special chart fluctuation pattern ASP-C are not determined. Details will be described later using Figure 9 (b), but when the special pattern change pattern HNP is determined, the special pattern change pattern is further specified using the value of the special pattern 1 pending counter at the time when the pattern change starts. On the other hand, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PA is a jackpot, the probability of the special chart fluctuation pattern ASP1-A is 90 / 1000 (approximately 1 / 11.1), the probability of the special chart fluctuation pattern ASP1-B is 110 / 1000 (approximately 1 / 9.09), the probability of the special chart fluctuation pattern ASP2-A is 135 / 1000 (approximately 1 / 7.41), and the probability of the special chart fluctuation pattern ASP2-A is 165 / 1000 (approximately 1 / 6.06) In this case, special chart fluctuation pattern ASP2-B is determined, with a probability of 180 / 1000 (approximately 1 / 5.56) special chart fluctuation pattern ASP3-A, with a probability of 220 / 1000 (approximately 1 / 4.56) special chart fluctuation pattern ASP3-B, and with a probability of 100 / 1000 (1 / 10) special chart fluctuation pattern ASP-C. In this case, special chart fluctuation pattern HNP to special chart fluctuation pattern HSP3-B will not be determined. Here, in the explanation of the special chart variation patterns of this embodiment, when two special chart variation patterns are described with "~" between them, the description of the special chart variation pattern that exists between the special chart variation pattern described earlier and the special chart variation pattern described later, in the order described in the drawings, is omitted.
[0081] Figure 9(b) is a schematic diagram showing a special chart variation pattern lottery table used when a special chart variation pattern HNP is determined in the special chart variation pattern derivation state PA, and the range of the random numbers used in the lottery (different from the random numbers used in the lottery related to the special chart variation pattern lottery table shown in Figure 9(a)) is 0 to 999. As shown in Figure 9(b), the special chart fluctuation patterns HNP in the special chart fluctuation pattern derivation state PA include special chart fluctuation pattern HNP-A with a fluctuation time of 3200 ms (milliseconds), special chart fluctuation pattern HNP-B with a fluctuation time of 5600 ms, special chart fluctuation pattern HNP-C with a fluctuation time of 8000 ms, and special chart fluctuation pattern HNP-D with a fluctuation time of 11200 ms, in that order of increasing fluctuation time. Specifically, when the special chart 1 reserved counter is 3, the special chart fluctuation pattern HNP-A is determined with a probability of 1000 / 1000 (1 / 1). Similarly, when the special chart 1 reserved counter is 2, the special chart fluctuation pattern HNP-A is determined with a probability of 150 / 1000 (approximately 1 / 6.67), and the special chart fluctuation pattern HNP-B is determined with a probability of 850 / 1000 (approximately 1 / 1.18). When the special chart 1 reserved counter is 1, the special chart fluctuation pattern HNP-A is determined with a probability of 50 / 1000 (1 / 20), and the special chart fluctuation pattern HNP-B is determined with a probability of 150 / 1000 (approximately 1 / 6.67). When the pattern HNP-B is 800 / 1000 (1 / 1.25) probability, the special chart variation pattern HNP-C is determined, and when the special chart 1 reserved counter is 0, the special chart variation pattern HNP-B is determined with a probability of 50 / 1000 (1 / 20), the special chart variation pattern HNP-C is determined with a probability of 100 / 1000 (1 / 10), and the special chart variation pattern HNP-D is determined with a probability of 850 / 1000 (approximately 1 / 1.18). In the following explanation, when the reserved counter value of the reference target special chart is 3, it may be called "reserved 3", when the reserved counter value is 2, it may be called "reserved 2", when the reserved counter value is 1, it may be called "reserved 1", and when the reserved counter value is 0, it may be called "reserved 0". In this way, when the special pattern variation pattern HNP is determined in the special pattern variation pattern derivation state PA, the special pattern variation pattern (variation time) that is likely to be determined by the value of the special pattern 1 reserved counter differs. More specifically, the smaller the value of the special pattern 1 reserved counter, the more likely it is that a long pattern variation will be determined (the larger the value of the special pattern 1 reserved counter, the more likely it is that a short variation time will be determined). In addition, such a special chart fluctuation pattern HNP (hereinafter, sometimes referred to as "basic special chart fluctuation pattern") also exists in the special chart fluctuation pattern derivation state PB, the special chart fluctuation pattern derivation state PC, and the special chart fluctuation pattern derivation state PD, and in these special chart fluctuation pattern derivation states, the reserved counter to be referenced is different from that in the special chart fluctuation pattern derivation state PA, and the value of the special chart 2 reserved counter is referenced in both cases. Note that, as described later, in this embodiment, the special chart fluctuation pattern derivation state PD does not have multiple types of basic special chart fluctuation patterns, but multiple types of basic special chart fluctuation patterns may be provided in the special chart fluctuation pattern derivation state PD, as in other special chart fluctuation pattern derivation states, while ensuring the relationship of the average fluctuation time described later.
[0082] FIG. 10(a) is a diagram showing a schematic diagram of a special pattern variation pattern lottery table used in the special pattern variation pattern derivation state PA, and the range of random numbers used in the lottery is 0 to 999. As shown in FIG. 10(a), in the special chart variation pattern derivation state PB, special chart variation patterns HNP to ASP-F can be determined. Specifically, when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PB is a miss, the special chart fluctuation pattern HNP is determined with a probability of 960 / 1000 (approximately 1 / 1.04), the special chart fluctuation pattern HSP-D with a probability of 20 / 1000 (1 / 50), the special chart fluctuation pattern HSP-E with a probability of 15 / 1000 (approximately 1 / 66.7), and the special chart fluctuation pattern HSP-F with a probability of 5 / 1000 (1 / 200) is determined, and in this case, the special chart fluctuation pattern ASP-D to the special chart fluctuation pattern ASP-F are not determined. Note that, although details will be described later using FIG. 10(b), when the special chart fluctuation pattern HNP is determined, the special chart fluctuation pattern is further specified using the value of the special chart 2 reserved counter at the start of the pattern fluctuation, in the same way as when the special chart fluctuation pattern HNP is determined in the special chart fluctuation pattern derivation state PA. The method of determining the special chart variation pattern using this special chart 2 pending counter is also the same in the special chart variation pattern derivation state PC and the special chart variation pattern derivation state PD described below. On the other hand, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PB is a jackpot, special chart fluctuation pattern ASP-D is determined with a probability of 500 / 1000 (1 / 2), ASP-E with a probability of 350 / 1000 (approximately 1 / 2.86), and ASP-F with a probability of 150 / 1000 (approximately 1 / 6.67), and in such cases, special chart fluctuation pattern HNP to special chart fluctuation pattern HSP-F will not be determined. In this embodiment, when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PB is a miss, any one of the special chart fluctuation patterns HSP-D to HSP-F is determined at a rate of 40 / 1000 (1 / 25). On the other hand, when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PB is a miss, the special chart fluctuation pattern HNP is determined at a rate of 960 / 1000 (about 1 / 1.04). In addition, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PB is a big hit, one of the special chart fluctuation patterns ASP-D to ASP-F will be determined at a rate of 1000 / 1000 (1 / 1).
[0083] Figure 10(b) is a schematic diagram showing a special chart variation pattern lottery table used when a special chart variation pattern HNP is determined in the special chart variation pattern derivation state PB, and the range of the random numbers used in the lottery (different from the random numbers used in the lottery related to the special chart variation pattern lottery table shown in Figure 10(a)) is 0 to 999. As shown in FIG. 10(b), the special chart fluctuation pattern HNP in the special chart fluctuation pattern derivation state PB includes a special chart fluctuation pattern HNP-E with a fluctuation time of 1500 ms and a special chart fluctuation pattern HNP-F with a fluctuation time of 10000 ms. Specifically, when the special chart 2 reserved counter is 3, when the special chart 2 reserved counter is 2, and when the special chart 2 reserved counter is 1, the special chart variation pattern HNP-E is determined with a probability of 1000 / 1000 (1 / 1), and in these cases, the special chart variation pattern HNP-F is not determined. On the other hand, when the special chart 2 reserved counter is 0, the special chart variation pattern HNP-F is determined with a probability of 1000 / 1000 (1 / 1), and in these cases, the special chart variation pattern HNP-E is not determined. In addition, these special chart variation patterns are different from the special chart variation patterns that can be determined when the special chart variation pattern HNP is determined in the above-mentioned special chart variation pattern derivation state PA, the special chart variation patterns that can be determined when the special chart variation pattern HNP is determined in the special chart variation pattern derivation state PC described below, and the special chart variation patterns that can be determined when the special chart variation pattern HNP is determined in the special chart variation pattern derivation state PD described below. Therefore, it can be said that the special chart variation pattern HNP in the special chart variation pattern derivation state PB is different from the special chart variation pattern HNP in the special chart variation pattern derivation state PA, the special chart variation pattern HNP in the special chart variation pattern derivation state PC, and the special chart variation pattern HNP in the special chart variation pattern derivation state PD.
[0084] FIG. 11(a) is a diagram showing a schematic diagram of a special pattern variation pattern lottery table used in the special pattern variation pattern derivation state PC, and the range of random numbers used in the lottery is 0 to 999. As shown in FIG. 11(a), in the special chart variation pattern derivation state PC, special chart variation patterns HNP to ASP-I can be determined. Specifically, if the result of the special chart hit / miss judgment during special chart fluctuation pattern derivation state PC is a miss, special chart fluctuation pattern HNP is determined with a probability of 950 / 1000 (approximately 1 / 1.05), special chart fluctuation pattern HSP-G with a probability of 25 / 1000 (1 / 40), HSP-H with a probability of 15 / 1000 (approximately 1 / 66.7), and HSP-I with a probability of 10 / 1000 (1 / 100), and in such case, special chart fluctuation pattern ASP-G to special chart fluctuation pattern ASP-I will not be determined. On the other hand, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a jackpot, special chart fluctuation pattern ASP-G is determined with a probability of 500 / 1000 (1 / 2), ASP-H with a probability of 350 / 1000 (approximately 1 / 2.86), and ASP-I with a probability of 150 / 1000 (approximately 1 / 6.67). In such cases, special chart fluctuation pattern HNP to special chart fluctuation pattern HSP-I will not be determined. In this embodiment, when the result of the special chart hit / miss judgment is a miss in the special chart fluctuation pattern derivation state PC, one of the special chart fluctuation patterns HSP-G to HSP-I is determined at a rate of 50 / 1000 (1 / 20). On the other hand, when the result of the special chart hit / miss judgment is a miss in the special chart fluctuation pattern derivation state PC, the special chart fluctuation pattern HNP is determined at a rate of 950 / 1000 (about 1 / 1.05). In addition, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a jackpot, one of the special chart fluctuation patterns ASP-G to ASP-I will be determined at a rate of 1000 / 1000 (1 / 1).
[0085] Figure 11(b) is a schematic diagram showing a special chart variation pattern lottery table used when a special chart variation pattern HNP is determined in the special chart variation pattern derivation state PC, and the range of the random numbers used in the lottery (different from the random numbers used in the lottery related to the special chart variation pattern lottery table shown in Figure 11(a)) is 0 to 999. As shown in FIG. 11(b), the special chart fluctuation pattern HNP in the special chart fluctuation pattern derivation state PC includes a special chart fluctuation pattern HNP-G with a fluctuation time of 2000 ms and a special chart fluctuation pattern HNP-H with a fluctuation time of 12000 ms. Specifically, when the special chart 2 reserved counter is 3, when the special chart 2 reserved counter is 2, and when the special chart 2 reserved counter is 1, the special chart variation pattern HNP-G is determined with a probability of 1000 / 1000 (1 / 1), and in these cases, the special chart variation pattern HNP-H is not determined. On the other hand, when the special chart 2 reserved counter is 0, the special chart variation pattern HNP-H is determined with a probability of 1000 / 1000 (1 / 1), and in these cases, the special chart variation pattern HNP-G is not determined. In addition, these special chart variation patterns are different from the special chart variation patterns that can be determined when the special chart variation pattern HNP is determined in the above-mentioned special chart variation pattern derivation state PA, the special chart variation patterns that can be determined when the special chart variation pattern HNP is determined in the special chart variation pattern derivation state PB described later, and the special chart variation patterns that can be determined when the special chart variation pattern HNP is determined in the special chart variation pattern derivation state PD described later. Therefore, it can be said that the special chart variation pattern HNP in the special chart variation pattern derivation state PC is different from the special chart variation pattern HNP in the special chart variation pattern derivation state PA, the special chart variation pattern HNP in the special chart variation pattern derivation state PB, and the special chart variation pattern HNP in the special chart variation pattern derivation state PD.
[0086] FIG. 12(a) is a diagram showing a schematic diagram of a special pattern variation lottery table used in the special pattern variation pattern derivation state PD, and the range of random numbers used in the lottery is 0 to 999. As shown in Fig. 12(a), in the special chart variation pattern derivation state PD, the special chart variation pattern HNP to the special chart variation pattern ASPF can be determined. In particular, the special chart variation pattern HSP-G to the special chart variation pattern ASP-I are common to the special chart variation pattern derivation state PC. Specifically, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a miss, special chart fluctuation pattern HNP is determined with a probability of 965 / 1000 (approximately 1 / 1.04), special chart fluctuation pattern HSP-G with a probability of 30 / 1000 (approximately 1 / 33.3), HSP-H with a probability of 3 / 1000 (approximately 1 / 333), and HSP-I with a probability of 2 / 1000 (1 / 500), and in such case, special chart fluctuation pattern ASP-G to special chart fluctuation pattern ASP-I will not be determined. On the other hand, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a jackpot, special chart fluctuation pattern ASP-G is determined with a probability of 800 / 1000 (1 / 1.25), ASP-H with a probability of 150 / 1000 (approximately 1 / 6.67), and ASP-I with a probability of 50 / 1000 (1 / 20), and in such case, special chart fluctuation pattern HNP to special chart fluctuation pattern HSP-I will not be determined.
[0087] Thus, in this embodiment, when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a miss, any one of the special chart fluctuation patterns HSP-G to HSP-I is determined at a rate of 35 / 1000 (about 1 / 28.6), which is lower than the rate (1 / 20) at which any one of the special chart fluctuation patterns HSP-G to HSP-I is determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a miss. On the other hand, when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a miss, the special chart fluctuation pattern HNP is determined at a rate of 965 / 1000 (about 1 / 1.04), which is higher than the rate (about 1 / 1.05) at which the special chart fluctuation pattern HNP is determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a miss. In addition, if the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a jackpot, one of the special chart fluctuation patterns ASP-G to ASP-I will be determined at a rate of 1000 / 1000 (1 / 1).
[0088] In addition, the probability (approximately 1 / 33.3) that the special chart fluctuation pattern HSP-G is determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is higher than the probability (1 / 40) that the special chart fluctuation pattern HSP-G is determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is higher. On the other hand, the probability (approximately 1 / 333) that special chart fluctuation pattern HSP-H is determined when the result of the special chart hit / miss judgment is a miss during special chart fluctuation pattern derivation state PD is lower than the probability (approximately 1 / 66.7) that special chart fluctuation pattern HSP-H is determined when the result of the special chart hit / miss judgment is a miss during special chart fluctuation pattern derivation state PC, and the probability (1 / 500) that special chart fluctuation pattern HSP-I is determined when the result of the special chart hit / miss judgment is a miss during special chart fluctuation pattern derivation state PD is lower than the probability (1 / 100) that special chart fluctuation pattern HSP-I is determined when the result of the special chart hit / miss judgment is a miss during special chart fluctuation pattern derivation state PC. Furthermore, the probability (1 / 1.25) that the special chart fluctuation pattern ASP-G will be determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a jackpot is higher than the probability (1 / 2) that the special chart fluctuation pattern ASP-G will be determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a jackpot. On the other hand, the probability (approximately 1 / 6.67) that special chart fluctuation pattern ASP-H is determined when the result of the special chart hit / miss judgment in the special chart fluctuation pattern derivation state PD is a jackpot is lower than the probability (approximately 1 / 2.86) that special chart fluctuation pattern ASP-H is determined when the result of the special chart hit / miss judgment in the special chart fluctuation pattern derivation state PC is a jackpot, and the probability (1 / 20) that special chart fluctuation pattern ASP-I is determined when the result of the special chart hit / miss judgment in the special chart fluctuation pattern derivation state PD is a jackpot is lower than the probability (approximately 1 / 6.67) that special chart fluctuation pattern ASP-I is determined when the result of the special chart hit / miss judgment in the special chart fluctuation pattern derivation state PC is a jackpot.
[0089] Figure 12(b) is a schematic diagram showing a special chart variation pattern lottery table used when a special chart variation pattern HNP is determined in the special chart variation pattern derivation state PB, and the range of the random numbers used in the lottery (different from the random numbers used in the lottery related to the special chart variation pattern lottery table shown in Figure 12(a)) is 0 to 999. As shown in Figure 12, the special chart fluctuation pattern HNP in the special chart fluctuation pattern derivation state PD includes a special chart fluctuation pattern HNP-I having a fluctuation time of 1000 ms. Specifically, when the special chart 2 reserved counter = 3, when the special chart 2 reserved counter = 2, when the special chart 2 reserved counter = 1, and when the special chart 2 reserved counter = 0, the special chart variation pattern HNP-I is determined with a probability of 1000 / 1000 (1 / 1). In addition, this special chart variation pattern is different from the special chart variation pattern that can be determined when the special chart variation pattern HNP is determined in the above-mentioned special chart variation pattern derivation state PA, the special chart variation pattern that can be determined when the special chart variation pattern HNP is determined in the special chart variation pattern derivation state PB described later, and the special chart variation pattern that can be determined when the special chart variation pattern HNP is determined in the special chart variation pattern derivation state PC described later. Therefore, it can be said that the special chart variation pattern HNP in the special chart variation pattern derivation state PD is different from the special chart variation pattern HNP in the special chart variation pattern derivation state PA, the special chart variation pattern HNP in the special chart variation pattern derivation state PB, and the special chart variation pattern HNP in the special chart variation pattern derivation state PC.
[0090] In this embodiment, in order to reduce the development cost (data capacity) burden related to the special chart variation pattern derivation state PD, the special chart variation pattern that can be determined by lottery using the special chart variation pattern lottery table used in the special chart variation pattern derivation state PD is configured to include a part of the special chart variation pattern that can be determined by lottery using the special chart variation pattern lottery table used in the special chart variation pattern derivation state PC (special chart variation pattern HSP-G to special chart variation pattern ASP-I). Note that the special chart variation pattern that can be determined by lottery using the special chart variation pattern lottery table used in the special chart variation pattern derivation state PD may be composed only of the special chart variation pattern that can be determined by lottery using the special chart variation pattern lottery table used in the special chart variation pattern derivation state PC, or the same special chart variation pattern lottery table may be used in the special chart variation pattern derivation state PD and the special chart variation pattern derivation state PC. In addition, the special chart variation pattern selection table used in the special chart variation pattern derivation state PB may be used in the special chart variation pattern selection table used in the special chart variation pattern derivation state PC in this embodiment. In this case, the special chart variation pattern selection table used in the special chart variation pattern derivation state PC may or may not be replaced with the special chart variation pattern selection table used in the special chart variation pattern derivation state PB in this embodiment.
[0091] In addition, at the start of the pattern change, the special chart change pattern derivation means 133 generates a performance control command (change start command) including the result of the special chart hit / miss judgment, the determined stopping pattern of the special chart, and the determined special chart change pattern, and stores the command in the transmission command storage area of the main information storage means 160.
[0092] The regular map lottery means 135, like the special map lottery means 130, reads out the most recent pending operation information from the pending operation information stored in the main information storage means 160 when the regular map pattern is not changing, and uses the read random number to execute a regular map hit / miss judgment to determine whether the regular map is a hit or not, and if the regular map hit / miss judgment results in the regular map being controlled to an open state, executes a regular map stop pattern lottery to determine the stopping pattern of the regular map by lottery, and a regular map change pattern lottery to determine the change pattern (change time) of the regular map by lottery. More specifically, in the normal drawing hit / miss judgment, there are a normal drawing lottery state with a high probability (sometimes abbreviated as "normal drawing high probability") and a normal drawing lottery state with a low probability (sometimes abbreviated as "normal drawing low probability"). Although the drawing of the lottery table is omitted, in this embodiment, in the normal drawing high probability, the probability of a normal drawing hit is 65535 / 65536, and the remaining probability of a 1 / 65536 miss, while in the normal drawing low probability, the probability of a normal drawing hit is 1 / 65536, and the remaining probability of a 65535 / 65536 miss. Note that in the normal drawing low probability, it may be set so that the normal drawing does not hit (65536 / 65536 miss).
[0093] In the normal stop pattern lottery, as in the special stop pattern lottery, one stop pattern is determined by lottery using a lottery table (not shown) for normal stop pattern lottery from multiple types of stop patterns with different patterns that open the normal electric role 61. If the normal pattern is a miss, the stop pattern is determined uniformly as in the special pattern 1 and special pattern 2.
[0094] In addition, in the general map fluctuation pattern lottery, as in the special map fluctuation pattern lottery, one general map fluctuation pattern is determined from multiple types of general map fluctuation patterns by lottery using a lottery table (not shown) for general map fluctuation pattern lottery.
[0095] In this way, a high probability of winning a normal draw is more likely than a low probability of winning a normal draw, and it can be said to be a more advantageous state than a low probability of winning a normal draw.
[0096] When the result of the special symbol winning / losing lottery is a winning symbol, the winning game control means 140 determines the demo time for the winning symbol start demo and the demo time for the winning symbol end demo according to the winning symbol determined. In addition, at the start of a jackpot, the jackpot game control means 140 generates a presentation control command (jackpot start command) including a demo time related to the jackpot start demo and stores it in the transmission command storage area of the main information storage means 160, and at the end of the jackpot, generates a presentation control command (jackpot end command) including a demo time related to the jackpot end demo and stores it in the transmission command storage area of the main information storage means 160.
[0097] The pattern display control means 145 displays the special pattern 1 on the first special pattern display device 91 in a variable manner according to the variable time based on the special pattern variable pattern of the special pattern 1, and displays the special pattern 1 in a stopped pattern determined by the special pattern stop pattern lottery after the variable time has elapsed. Similarly, the special pattern 2 is displayed on the second special pattern display device 92 in a variable manner according to the variable time based on the special pattern variable pattern of the second special pattern, and displays the special pattern 2 in a stopped pattern determined by the special pattern stop pattern lottery after the variable time has elapsed. In addition, the pattern display control means 145 has a special chart game timer for managing the time (variation time, stop display time) related to the display of special chart 1 and special chart 2, and when the special chart is stopped (at the timing when the value of the special chart game timer becomes "0"), it generates a presentation control command (variation stop command) for requesting a fixed stop display of the decorative pattern, and stores the command in the transmission command storage area of the main information storage means 160. Here, the definite stop display of the decorative pattern refers to the final stop display of the decorative pattern in the pattern change, and is different from the provisional stop display of the decorative pattern that may occur during the execution of the pattern change. In the provisional stop display of the decorative pattern, for example, the decorative pattern displayed as stopped is accompanied by a movement in which the decorative pattern is slightly swaying up and down (so-called swaying change), while in the definite stop display of the decorative pattern, the decorative pattern displayed as stopped is not accompanied by a swaying change, and so on. Even if the same decorative pattern is displayed as stopped, the display mode of the decorative pattern displayed as stopped as definite is different from the display mode of the decorative pattern displayed as stopped provisionally. Therefore, the player can recognize whether the display of the decorative pattern is a definite stop display or a provisional stop display.
[0098] In addition, the pattern display control means 145 causes the normal map to be displayed on the normal pattern display device 93 in a variable manner in accordance with the normal map fluctuation pattern (fluctuation time) of the normal map, and after the fluctuation time has elapsed, causes the normal map to be displayed in a stopped pattern determined by a normal map stop pattern lottery. In addition, the symbol display control means 145 has a regular symbol game timer for managing the time related to the display of the regular symbol (variable time, stop display time).
[0099] In the above-mentioned big win game, the electric device control means 150 outputs a control signal to the special electric device solenoid 66, and opens the special electric device 65 according to an opening pattern corresponding to the stopping pattern of the special chart.
[0100] In addition, when the normal winning / losing lottery is won, the electric role control means 150 outputs a control signal to the normal electric role solenoid 62 to open the normal electric role 61 according to an opening pattern corresponding to the stopping pattern of the normal figure.
[0101] The game state control means 155 controls the special symbol lottery state. Specifically, as described above, the game state control means 155 sets the special symbol low probability regardless of the symbol related to the jackpot at the start of the jackpot game, maintains the special symbol low probability at the end of the jackpot game related to the normal jackpot, and sets the special symbol high probability at the end of the jackpot game related to the probability variable jackpot. In addition, the game state control means 155 controls the normal symbol lottery state. Specifically, the game state control means 155 sets the normal symbol low probability regardless of the symbol related to the jackpot at the start of the jackpot, sets the normal symbol high probability until the symbol changes a specified number of times when the specified number of times is satisfied, and sets the normal symbol low probability after the symbol changes a specified number of times.
[0102] Such special chart lottery state and normal chart lottery state change in link with the above-mentioned special chart variation pattern derivation state, and the transition of the special chart variation pattern derivation state is managed by the game state control means 155. The transition of the special chart variation pattern derivation state will be explained below with reference to Figures 13(a) and 13(b). Note that Figure 13(a) is a state transition diagram showing the transition of the special chart variation pattern derivation state, and Figure 13(b) is a diagram showing the relationship of the average variation time for each special chart variation pattern derivation state. As shown in Figure 13 (a), the special chart variation pattern derivation state is composed of a special chart variation pattern derivation state PA corresponding to low probability of special chart and low probability of normal chart, a special chart variation pattern derivation state PB corresponding to high probability of special chart and high probability of normal chart, a special chart variation pattern derivation state PC corresponding to low probability of special chart and high probability of normal chart, and a special chart variation pattern derivation state PD corresponding to low probability of special chart and high probability of normal chart, and one of these special chart variation pattern derivation states is set except during a jackpot game. And, the transition conditions between the special chart variation pattern derivation state PA and the special chart variation pattern derivation state PD include transition conditions (i) to (vi). Specifically, transition condition (i) is the end of the jackpot game related to the probability jackpot, transition condition (ii) is the end of the jackpot game related to the normal jackpot, transition condition (iii) is the end of the 100th pattern change, and transition condition (iv) is the end of the 160th pattern change (hereinafter referred to as "pattern change at the end of the special pattern change pattern derivation state PB"). Furthermore, transition condition (v) is the end of the pattern change where the number of pattern changes executed consecutively without a jackpot game in the special pattern low probability becomes 1000 (hereinafter referred to as "pattern change at the end of the special pattern change pattern derivation state PD"), and transition condition (vi) is the end of the pattern change where the number of pattern changes executed consecutively without a jackpot game in the special pattern change pattern derivation state PD becomes 1200 (hereinafter referred to as "pattern change at the end of the special pattern change pattern derivation state PD").
[0103] In this embodiment, the special chart variation pattern derivation state PC and the special chart variation pattern derivation state are both low probability of special chart and high probability of normal chart. Therefore, from the viewpoint of advantage, these special chart variation pattern derivation states can be said to be the same special chart variation pattern derivation state. Also, when a jackpot game related to a normal jackpot is played in the special chart variation pattern derivation state PC, the special chart variation pattern derivation state PC is set again after the jackpot game ends (the pattern variation count in transition condition (iii) starts from 0). Similarly, when a jackpot game related to a guaranteed jackpot is played in the special chart variation pattern derivation state PB, the special chart variation pattern derivation state PB is set again after the jackpot game ends (the pattern variation count in transition condition (iv) starts from 0). When the special chart variation pattern derivation state PB goes to the special chart variation pattern derivation state PC via the transition condition (ii) (not shown), this is an irregular case in which the game ball does not pass through the V entry area provided in the large prize opening 55 during the fourth round of play during the jackpot game, and if the game ball is launched toward the second flow path Y during the jackpot game related to the jackpot won on the special chart 2, the state will not be set to the special chart variation pattern derivation state PC based on the transition condition (ii) after the end of the jackpot game. Furthermore, in this embodiment, a normal jackpot is not derived in the pattern change related to the special chart 2, but a normal jackpot can be derived in the pattern change related to the special chart 2, and a transition from the special chart change pattern derivation state PD to the special chart change pattern derivation state PC via a jackpot game related to the normal jackpot may be made. However, in this case, it is preferable to make the rate of normal jackpots when a jackpot is determined by the special chart hit / miss judgment in the pattern change related to the special chart 2 lower than the rate of normal jackpots when a jackpot is determined by the special chart hit / miss judgment in the pattern change related to the special chart 1.
[0104] In this embodiment, the transition condition (v) is the number of pattern changes that are executed consecutively without a jackpot game in the special pattern low probability state. Therefore, after the transition from the special pattern change pattern derivation state PC to the special pattern change pattern derivation state PA, 100 pattern changes have already been counted, and the transition condition (v) is satisfied when 900 pattern changes are executed in the special pattern change pattern derivation state PA without a jackpot game. However, in this case, the count start timing for the number of pattern changes does not necessarily have to be the timing when the special pattern change pattern derivation state PC is set, and the count start timing for the number of pattern changes may be the timing of transition to the special pattern change pattern derivation state PA, and the threshold value may be 900. On the other hand, after transitioning from the special pattern variation pattern derivation state PB to the special pattern variation pattern derivation state PA, the count of the pattern variation starts from the transition point, so if 1000 pattern variations are executed in the special pattern variation pattern derivation state PA without a jackpot game, the transition condition (v) is satisfied. However, even in this case, the count start timing for the number of pattern variations does not necessarily have to be the timing of transition to the special pattern variation pattern derivation state PA, and the count start timing for the number of pattern variations may be the timing when the special pattern variation pattern derivation state PB is set, and the threshold value may be 1100. In addition, if a power outage and restoration occurs accompanied by the execution of a RAM clearing process, the number of times the pattern change related to transition condition (v) has been performed is cleared (initialized), whereas if a power outage and restoration occurs without the execution of a RAM clearing process, the number of times that the change has been performed is maintained. According to this, even if a jackpot is won in the special chart change pattern derivation state PD transition pattern change, it is possible to make it difficult to determine whether or not the RAM clear process has been executed.
[0105] In addition, the transition conditions among the above-mentioned transition conditions (i) to (vi) that are satisfied by the number of times the pattern change is performed include the end of the pattern change corresponding to the transition condition, that is, the transition condition is satisfied at the end of the pattern change corresponding to the transition condition, and the transition to the special pattern change pattern derivation state occurs, but this is not limited to this. In some or all of these transition conditions, the transition condition may include the start of the pattern change corresponding to the transition condition, that is, the transition condition may be satisfied at the start of the pattern change corresponding to the transition condition, and the transition to the special pattern change pattern derivation state may occur.
[0106] Furthermore, when the state transitions from the special pattern variation pattern derivation state PD to the special pattern variation pattern derivation state PA due to the transition condition (vi), the state does not transition to the special pattern variation pattern derivation state PD based on the number of times the pattern variation is performed, except when a new jackpot game is performed or when the RAM clear process is performed. Therefore, when a power outage occurs without the execution of the RAM clear process, the state does not transition to the special pattern variation pattern derivation state PD based on the number of times the pattern variation is performed.
[0107] As shown in Figure 13(b), the average fluctuation time of each of the special chart fluctuation pattern derivation state PA, the special chart fluctuation pattern derivation state PB, the special chart fluctuation pattern derivation state PC, and the special chart fluctuation pattern derivation state PD is shorter in the order of special chart fluctuation pattern derivation state PA, special chart fluctuation pattern derivation state PC, special chart fluctuation pattern derivation state PB, and special chart fluctuation pattern derivation state PD. This is due to the length of the fluctuation time related to the basic special chart fluctuation pattern that is most likely to be determined in each special chart fluctuation pattern derivation state.
[0108] In addition, when an update occurs to the special chart lottery state, the regular chart lottery state, and the special chart variation pattern derivation state, the game state control means 155 generates a presentation control command (game state designation command) including each state after the update, and stores the command in the transmission command storage area of the main information storage means 160. Furthermore, the game state control means 155 counts the number of times that the pattern change related to the transition to another special pattern change pattern derivation state is executed in each special pattern change pattern derivation state, and generates a performance control command including the number of times of the counted pattern change each time the pattern change is started, and stores the command in the transmission command area of the main information storage means 160. The information included in the performance control command may be included in the above-mentioned change start command.
[0109] As described above, the main information storage means 160 is a means for temporarily storing data read by each means, data derived by calculations or the like by each means, etc., in the corresponding storage areas.
[0110] The main error control means 165 monitors the input information of the I / O port 104 and judges whether or not the gaming machine 10 is in an error state. If it is judged that the gaming machine 10 is in an error state, a performance control command (error command) including information capable of identifying the error state is stored in a transmission command storage area of the main information storage means 160.
[0111] When a performance control command is stored in the transmission command storage area of the main information storage means 160, the main command management means 170 transmits the performance control command to the first sub-control board 200. In principle, each performance control command is transmitted in the order in which it is stored in the transmission command storage area of the main information storage means 160.
[0112] The power restoration process execution means 175 includes a restoration state setting means 176 and a playable state transition means 179 .
[0113] The return state setting means 176 executes a return state setting process to set a return state based on whether or not there is an abnormality in the RAM 103 when power is restored, the state at the time of the power outage immediately before the power restoration, the state of the RAM clear switch 43 when power is restored, and the state of the inner frame door open sensor 76 when power is restored. The return states set by this process include a game stop state and a game ready state (which may or may not involve a RAM clear process). Specifically, if there is an abnormality in the RAM 103 when power is restored, a game-stopped state is set regardless of the state of the RAM clear switch 43 and the state of the middle frame door open sensor 76 when power is restored. Also, if there is no abnormality in the RAM 103 when power is restored and the RAM clear switch 43 is ON (pressed state) when power is restored, the RAM clear process is executed and a playable state is set on the condition that the middle frame door open sensor 76 is ON when power is restored (if the middle frame door open sensor 76 is OFF when power is restored, the RAM clear process is not executed and the playable state is set), and if there is no abnormality in the RAM 103 when power is restored and the RAM clear switch 43 is OFF (not pressed state) when power is restored, the RAM clear process is not executed and the playable state is set. Here, the game stop state is a return state in which game progress is impossible by not executing processing according to the detection results of the sensors installed at each winning port (it is not necessary to look at the detection results of the sensors themselves). On the other hand, the playable state is a restored state in which the game can be played by executing a process according to the detection result of the sensor installed in each winning port. In particular, if the RAM clear process is not executed when the power is restored, the game returns to the playable state at the time of the last power outage. For example, if the last power outage was during a jackpot game, the game returns to the jackpot game that was being executed, and if the last power outage was during a pattern change, the game returns to the pattern change that was being executed.
[0114] In addition, whether or not there is an abnormality in RAM 103 is determined by executing a RAM abnormality check at the beginning of the recovery state setting process (specifically, a process which determines whether or not a backup flag is stored (whether or not the backup flag is ON) in the backup information area related to the target area, derives a checksum of the target area and the complement stored in the backup information area related to the area if the backup flag is stored (if the backup flag is ON), and if the calculation result is 0, determines that the target area is normal, and otherwise determines that the target area is abnormal) on the area related to the game in RAM 103.
[0115] The playable state transition means 179 executes a playable state transition process for transitioning to a playable state when the playable state is set. More specifically, in the game play state transition process, if the security signal output is ON, a process for turning the security signal output OFF and initial settings of the device are executed. In addition, during the initial setting of the device, processes such as sending a launch permission command to the payout control board 400 to permit the launch of game balls, setting the state in which balls will be valid when they enter each winning slot, and setting data to activate the random number circuit 105 are performed.
[0116] The power cut-off process execution means 180 executes a power cut-off process based on receiving a power cut-off signal from the power supply control board 500. Specifically, for an area of RAM 103 related to game play, a process is performed in which a checksum for that area is derived and the complement of that checksum is stored in a backup information area of RAM 103 related to game play, and a process is performed in which a backup flag indicating that a power cut process has been performed for that area is turned ON (a backup flag is stored in the backup information area of RAM 103 related to game play).
[0117] As shown in Figure 7, the first sub-control board 200 is equipped with a sub-random number generation means 210, a normal performance control means 220, a sub-error control means 230, a lamp control means 240, a movable prop control means 245, a volume adjustment means 250, a brightness adjustment means 255, a sub-information storage means 260, and a sub-command management means 270, and these means are functional representations of what is realized by each control configuration on the first sub-control board 200 described using Figure 6. Here, the sub-information storage means 260 is a means for temporarily storing data read by the means included in the first sub-control board 200, data derived by calculation in the means, etc., in the respective corresponding storage areas. Also, the performance control command transmitted from the main command management means 170 is stored in the received command storage area of the sub-information storage means 260 by the sub-command management means 270. In the following explanation, the storage of the performance control command transmitted from the main command management means 170 in the received command storage area of the sub-information storage means 260 by the sub-command management means 270 may be simply expressed as reception of the performance control command.
[0118] The sub-random number generating means 210 can generate random numbers (software random numbers) that are updated by program processing by the CPU 201, and obtains random numbers at the timing when each lottery (details will be described later) is executed by the normal performance control means 220.
[0119] The normal presentation control means 220 includes a presentation mode control means 221, a presentation route determination means 222, a sub-hold control means 223, a look-ahead presentation control means 224, a presentation content determination means 225, a decorative pattern control means 226, and a jackpot presentation control means 227.
[0120] When the presentation mode control means 221 receives a game state designation command, it controls the transition of the presentation mode in a manner consistent with the special chart variation pattern derivation state managed on the main control board 100 side. The presentation modes in this embodiment are broadly divided into normal, special chance, chance time, and play time, with normal mode corresponding to the special chart change pattern derivation state PA, special chart change pattern derivation state PB corresponding to special chart change pattern derivation state PC corresponding to chance time, and play time corresponding to the special chart change pattern derivation state PD.
[0121] When the presentation route determination means 222 receives a pre-determination command, it determines (sets) a presentation route corresponding to the reserved pattern change based on the result of the pre-determination included in the command (in this embodiment, the special pattern change pattern). Note that, when the special pattern change pattern corresponding to the pattern change is the above-mentioned special pattern change pattern HNP, the presentation route determination means 222 does not determine a presentation route when the pre-determination command is transmitted, and determines a presentation route based on the special pattern change pattern included in the change start command at the start of the pattern change (for example, in the special pattern change pattern derivation state PA, the special pattern change pattern HNP-A to special pattern change pattern HNP-D). Here, the presentation route refers to the presentation from the start to the end of the pattern change, and specifies the process of the presentation that notifies the result of the special pattern determination in the pattern change. The content of the presentation executed in the pattern change is determined by the presentation content determination means 225, which will be described later, in accordance with the presentation route corresponding to the pattern change.
[0122] The presentation route in this embodiment is roughly divided into a miss presentation route that notifies that the result of the special chart hit / miss judgment in the current pattern change is a miss (the result of the special chart hit / miss judgment in the current pattern change is not a hit), and a big win presentation route that notifies that the result of the special chart hit / miss judgment in the current pattern change is a big win. Furthermore, the miss presentation route includes a non-development miss presentation route in which the development presentation is not executed, and a development miss presentation route in which the development presentation is executed. Here, the development performance refers to a performance that is executed after the decorative symbols reach a reach state (a state in which all decorative symbols except one symbol row are displayed stationary and the remaining symbol rows are displayed in a variable manner), and at the end of which, it is announced whether the result of the special symbol hit / miss judgment in the current symbol change is a jackpot or not. Therefore, in a development performance that corresponds to a development miss performance route, a series of performances corresponding to that development performance are executed, and at the end of which, it is announced that the result of the special symbol hit / miss judgment in the current symbol change is not a jackpot. On the other hand, in a development performance that corresponds to a jackpot performance route, a series of performances corresponding to that development performance are executed, and at the end of which, it is announced that the result of the special symbol hit / miss judgment in the current symbol change is a jackpot. In addition, as described later, in this embodiment, in one presentation mode, each of the determined special chart variation patterns corresponds to one different presentation route. Therefore, in the following description, the presentation route for the special chart variation pattern may be simply expressed as a special chart variation pattern. However, multiple presentation routes may be made to correspond to one special chart variation pattern, and in this case, one presentation route may be determined from multiple presentation routes corresponding to the determined special chart variation pattern. Below, the contents of the presentation route corresponding to each special chart change pattern determined in each presentation mode will be explained.
[0123] First, the presentation routes corresponding to special chart fluctuation patterns HNP-A to HNP-D and special chart fluctuation pattern HRP, which are determined in the normal mode (special chart fluctuation pattern derivation state PA), correspond to the non-development miss presentation route described above. Specifically, the special pattern variation patterns HNP-A to HNP-D correspond to a presentation route that notifies the user that the result of the special pattern hit / miss judgment in the current pattern change is a miss, by the decorative pattern not being in a reach state and the decorative pattern being stopped and displayed in a spread pattern (a state in which all pattern rows are stopped and the same decorative pattern is not stopped in each pattern row). Here, the same decorative pattern refers to a decorative pattern imitating the same number, and the parts other than the numbers that make up the decorative pattern may be different. Similarly, different decorative patterns refer to decorative patterns imitating different numbers. The special pattern change pattern HRP corresponds to a performance route in which the decorative pattern reaches a reach state without pseudo-change, and then the decorative pattern stops and displays in a scattered manner without executing the development performance described later, thereby notifying the user that the result of the special pattern hit / miss judgment in this pattern change is a miss. Here, the pseudo-change refers to a period before the development performance starts, which is delimited by the stop of the decorative pattern based on a certain rule (for example, the stop of the decorative pattern in which the 7 pattern stops in the middle pattern row, such as "5 pattern-7 pattern-6 pattern"). Therefore, it can be said that the pseudo-change occurs only when the number of pseudo-changes is two. In other words, if the number of changes of the decorative pattern until the reach state is constituted is one, it can be said that the pseudo-change does not occur, and in that case, it can be said that one pseudo-change is executed. Note that the maximum number of pseudo-changes in this embodiment is three, but the maximum number of pseudo-changes is not limited to this, and any number of times equal to or greater than two may be adopted.
[0124] The special chart change patterns HSP1-A to HSP3-B correspond to the above-mentioned development miss performance route. Specifically, the special pattern change pattern HSP1-A and the special pattern change pattern HSP1-B correspond to a performance route in which the decorative pattern is in a reach state without pseudo-change, and then a development performance is executed to notify that the result of the special pattern hit / miss judgment in this pattern change is a miss, and the decorative pattern is stopped and displayed with a spread eye after the development performance ends. Note that the types of development performances corresponding to each special pattern change pattern are different from each other, and the development performance EA corresponds to the special pattern change pattern HSP1-A, and the development performance EB corresponds to the special pattern change pattern HSP1-B. The special chart fluctuation pattern HSP2-A and the special chart fluctuation pattern HSP2-B correspond to a performance route in which the decorative pattern reaches a reach state through two pseudo fluctuations, and then a development performance is performed to notify that the result of the special chart hit / miss judgment in this pattern fluctuation is a miss, and the decorative pattern is stopped and displayed with a spread eye after the development performance ends. Note that, like the special chart fluctuation pattern HSP1-A and the special chart fluctuation pattern HSP1-B, the types of development performances corresponding to each special chart fluctuation pattern are different from each other, and the development performance EA corresponds to the special chart fluctuation pattern HSP2-A, and the development performance EB corresponds to the special chart fluctuation pattern HSP2-B. The special chart fluctuation pattern HSP3-A and the special chart fluctuation pattern HSP3-B correspond to a performance route in which the decorative pattern reaches a reach state through three pseudo fluctuations, and then a development performance is performed to notify that the result of the special chart hit / miss judgment in this pattern fluctuation is a miss, and the decorative pattern stops and is displayed with a spread pattern after the development performance ends. Note that, like the special chart fluctuation pattern HSP1-A and the special chart fluctuation pattern HSP1-B, the types of development performances corresponding to each special chart fluctuation pattern are different from each other, and the development performance EA corresponds to the special chart fluctuation pattern HSP3-A, and the development performance EB corresponds to the special chart fluctuation pattern HSP3-B.
[0125] The special chart change pattern ASP1-A and the special chart change pattern ASP1-B correspond to the jackpot performance route described above. Specifically, the special pattern variation pattern ASP1-A and the special pattern variation pattern ASP1-B correspond to a performance route in which the decorative pattern reaches a reach state without pseudo-variation, and then a development performance is executed to notify that the result of the special pattern hit / miss judgment in this pattern change is a big hit, and the decorative pattern is displayed stopped with the pattern aligned (all pattern rows are stopped, and the same decorative pattern is stopped in each pattern row) after the development performance ends. Note that the types of development performance corresponding to each special pattern variation pattern are different from each other, and the development performance EA corresponds to the special pattern variation pattern ASP1-A, and the development performance EB corresponds to the special pattern variation pattern ASP1-B. The special chart fluctuation pattern ASP2-A and the special chart fluctuation pattern ASP2-B correspond to a performance route in which the decorative pattern reaches a reach state through two pseudo fluctuations, and then a development performance is executed to notify that the result of the special chart hit / miss judgment in this pattern fluctuation is a big hit, and after the development performance ends, the decorative pattern stops and is displayed with the pattern aligned. Note that, like the special chart fluctuation pattern ASP1-A and the special chart fluctuation pattern ASP1-B, the types of development performances corresponding to each special chart fluctuation pattern are different from each other, and the development performance EA corresponds to the special chart fluctuation pattern ASP2-A, and the development performance EB corresponds to the special chart fluctuation pattern ASP2-B. The special pattern variation pattern ASP3-A and the special pattern variation pattern ASP3-B correspond to a performance route in which the decorative pattern reaches a reach state through three pseudo variations, and then a development performance is executed to notify that the result of the special pattern hit / miss judgment in this pattern variation is a big hit, and after the development performance ends, the decorative pattern stops and is displayed with the pattern aligned. Note that, like the special pattern variation pattern ASP1-A and the special pattern variation pattern ASP1-B, the types of development performances corresponding to each special pattern variation pattern are different from each other, and the development performance EA corresponds to the special pattern variation pattern ASP3-A, and the development performance EB corresponds to the special pattern variation pattern ASP3-B. The special pattern change pattern ASP-C corresponds to a presentation route in which the decorative pattern reaches a reach state without any pseudo-change, and then a development performance EC is executed to notify that the result of the special pattern hit / miss judgment in this pattern change is a jackpot, and after the development performance ends, the decorative pattern is displayed stopped in a matching pattern.
[0126] In this way, in this embodiment, by making the same development performance correspond, the performance route corresponding to the special chart change pattern ASP1-A corresponds to the performance route corresponding to the special chart change pattern HSP1-A, the performance route corresponding to the special chart change pattern ASP1-B corresponds to the performance route corresponding to the special chart change pattern HSP1-B, the performance route corresponding to the special chart change pattern ASP2-A corresponds to the performance route corresponding to the special chart change pattern ASP2-B corresponds to the performance route corresponding to the special chart change pattern ASP2-B, the performance route corresponding to the special chart change pattern ASP3-A corresponds to the performance route corresponding to the special chart change pattern ASP3-A, and the performance route corresponding to the special chart change pattern ASP3-B corresponds to the performance route corresponding to the special chart change pattern HSP3-B. As a result, the contents of the performances of the corresponding performance routes are consistent from the start to the very end (the timing when the result of the special chart hit / miss judgment is shown by the development performance related to the performance route). Therefore, in the pattern change in which the development performance EA and the development performance EB are executed, the player can have a sense of expectation of winning the jackpot. In addition, the above-mentioned special chart change pattern in which the performance route in which the development performance EA and the development performance EB are executed is determined can also be said to be a special chart change pattern that expects a big win. These are the same in other performance modes described later. In addition, there is no corresponding development failure performance route for the special chart variation pattern ASP-C. Therefore, when the development performance EC is executed in the pattern variation, the player can be made to recognize the big win definitively. Therefore, it can be said that the performance route corresponding to the special chart variation pattern is a performance route that determines the big win, and the special chart variation pattern is a special chart variation pattern that determines the big win.
[0127] Also, as shown in Fig. 9(a), when the result of the special chart hit / miss judgment is a miss, within the range where the number of pseudo fluctuations is the same, the special chart change pattern corresponding to the performance route where the development performance EA is executed (for example, special chart change pattern HSP1-A) and the special chart change pattern corresponding to the performance route where the development performance EB is executed (for example, special chart change pattern HSP1-B) are less likely to be determined in that order. And when the result of the special chart hit / miss judgment is a jackpot, within the range where the number of pseudo fluctuations is the same, the special chart change pattern corresponding to the performance route where the development performance EA is executed (for example, special chart change pattern ASP1-A) and the special chart change pattern corresponding to the performance route where the development performance EB is executed (for example, special chart change pattern ASP1-B) are more likely to be determined in that order. And, as mentioned above, the development performance EC is executed only when a jackpot is won. Therefore, the expectation of winning the jackpot can be increased in the order of the development performance EA, the development performance EB, and the development performance EC. The degree of expectation of winning the jackpot related to such development performance is also the same in the relationship between the development performance ED, the development performance EE, and the development performance EF, and the relationship between the development performance EG, the development performance EH, and the development performance EI, which will be described later.
[0128] Furthermore, as shown in Fig. 9(a), when the result of the special chart hit / miss judgment is a miss, in the range of the same type of development performance, the special chart change pattern corresponding to the performance route where no pseudo fluctuation occurs (for example, special chart change pattern HSP1-A), the special chart change pattern corresponding to the performance route where the number of pseudo fluctuations is two (for example, special chart change pattern HSP2-A), and the special chart change pattern corresponding to the performance route where the number of pseudo fluctuations is three (for example, special chart change pattern HSP3-A) are more likely to be determined in that order. And, when the result of the special chart hit / miss judgment is a big hit, in the range of the same type of development performance, the special chart change pattern corresponding to the performance route where no pseudo fluctuation occurs (for example, special chart change pattern ASP1-A), the special chart change pattern corresponding to the performance route where the number of pseudo fluctuations is two (for example, special chart change pattern ASP2-A), and the special chart change pattern corresponding to the performance route where the number of pseudo fluctuations is three (for example, special chart change pattern ASP3-A) are more likely to be determined in that order. Therefore, the more times the pseudo fluctuation is executed, the higher the expectation of winning the jackpot.
[0129] As described above, in special chart fluctuation pattern HSP1-A, special chart fluctuation pattern HSP1-B, special chart fluctuation pattern HSP-C, special chart fluctuation pattern ASP1-A, special chart fluctuation pattern ASP1-B, and special chart fluctuation pattern ASP-C, the reach state is reached without any pseudo-fluctuation, in special chart fluctuation pattern HSP2-A, special chart fluctuation pattern HSP2-B, special chart fluctuation pattern ASP2-A, and special chart fluctuation pattern ASP2-B, the reach state is reached after two pseudo-fluctuations, and in special chart fluctuation pattern HSP3-A, special chart fluctuation pattern HSP3-B, special chart fluctuation pattern ASP3-A, and special chart fluctuation pattern ASP3-B, the reach state is reached after three pseudo-fluctuations. Therefore, the time to reach the reach state is longer in the order of the special pattern change pattern that reaches the reach state without pseudo-change, the special pattern change pattern that reaches the reach state with two pseudo-changes, and the special pattern change pattern that reaches the reach state with three pseudo-changes. However, in the pattern change that determines the special pattern change pattern ASP-C, the time to reach the reach state is longer than the special pattern change patterns that reach the reach state without other pseudo-changes (special pattern change pattern HSP1-A, special pattern change pattern HSP1-B, special pattern change pattern ASP1-A, and special pattern change pattern ASP1-B).
[0130] Next, the above-mentioned non-development miss performance route corresponds to the performance route corresponding to the special chart fluctuation pattern HNP-E and the special chart fluctuation pattern HNP-F, which can be determined in the special chart fluctuation pattern derivation state PB. Specifically, the special chart fluctuation pattern HNP-E and the special chart fluctuation pattern HNP-F correspond to a performance route that notifies the user that the result of the special chart hit / miss judgment in the current pattern change is a miss, by the decorative pattern not being in a reach state and the decorative pattern being stopped and displayed with a spread eye. This is also the case in the special chart fluctuation pattern derivation state PC and the special chart fluctuation pattern derivation state PD described later, so the explanation is omitted in these special chart fluctuation pattern derivation states.
[0131] The special chart change patterns HSP-D to HSP-F correspond to the development miss performance route described above. Specifically, for special pattern change patterns HSP-D to HSP-F, the decorative pattern will be in a reach state without pseudo-change, and then a development performance will be performed to notify that the result of the special pattern hit / miss judgment in this pattern change will be a miss, and after the development performance ends, the decorative pattern will be displayed in a scattered pattern. Note that the types of development performances corresponding to each special pattern change pattern are different from each other, and the development performance ED corresponds to the special pattern change pattern HSP-D, the development performance EE corresponds to the special pattern change pattern HSP-E, and the development performance EF corresponds to the special pattern change pattern HSP-F. In addition, the special chart fluctuation patterns ASP-D to ASP-F correspond to the jackpot performance route described above. Specifically, for special pattern variation patterns ASP-D to ASP-F, the decorative pattern will be in a reach state without pseudo variation, and then a development performance will be performed to notify that the result of the special pattern hit / miss judgment in this pattern change is a big hit, and after the development performance ends, the decorative pattern will be displayed stopped with the pattern aligned. Note that the types of development performances corresponding to each special pattern variation pattern are different from each other, and the development performance ED corresponds to the special pattern variation pattern ASP-D, the development performance EE corresponds to the special pattern variation pattern ASP-E, and the development performance EF corresponds to the special pattern variation pattern ASP-F.
[0132] The special chart fluctuation pattern HSP-G to special chart fluctuation pattern HSP-I, which can be determined by the special chart fluctuation pattern derivation state PC and the special chart fluctuation pattern derivation state PD, correspond to the above-mentioned development miss performance route. Specifically, for special pattern variation patterns HSP-G to HSP-I, the decorative pattern will be in a reach state without pseudo-variation, and then a development performance will be performed to notify that the result of the special pattern hit / miss judgment in this pattern change will be a miss, and after the development performance ends, the decorative pattern will be displayed in a scattered pattern. Note that the types of development performances corresponding to each special pattern variation pattern are different from each other, and the development performance EG corresponds to the special pattern variation pattern HSP-G, the development performance EH corresponds to the special pattern variation pattern HSP-H, and the development performance EI corresponds to the special pattern variation pattern HSP-I. In addition, the special chart fluctuation patterns ASP-G to ASP-I correspond to the jackpot performance route described above. Specifically, the special pattern variation patterns ASP-G to ASP-I correspond to a performance route in which the decorative pattern reaches a reach state without pseudo-variation, and then a development performance is executed to notify that the result of the special pattern hit / miss judgment in this pattern change is a big hit, and the decorative pattern stops and is displayed after the development performance ends. Note that the types of development performances corresponding to each special pattern variation pattern are different from each other, and the development performance EG corresponds to the special pattern variation pattern ASP-G, the development performance EH corresponds to the special pattern variation pattern ASP-H, and the development performance EI corresponds to the special pattern variation pattern ASP-I.
[0133] As described above, in this embodiment, when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a miss, the rate at which any of the special chart fluctuation patterns HSP-G to HSP-I (all of which correspond to the performance route in which the development performance is executed) is determined (about 1 / 28.6) is lower than the rate at which any of the special chart fluctuation patterns HSP-G to HSP-I are determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a miss (1 / 20). On the other hand, the rate at which the special chart fluctuation pattern HNP (a special chart fluctuation pattern corresponding to the performance route in which the development performance is not executed) is determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a miss (about 1 / 1.04) is higher than the rate at which the special chart fluctuation pattern HNP is determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a miss (about 1 / 1.05). Furthermore, when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a jackpot, and when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a jackpot, either of the special chart fluctuation patterns ASP-G to ASP-I will be determined at a rate of 1000 / 1000 (1 / 1).
[0134] Therefore, in this embodiment, the rate at which a special chart variation pattern corresponding to a performance route in which a development performance is executed is determined by a lottery using a special chart variation pattern lottery table related to the special chart variation pattern derivation state PD is lower than the rate at which the special chart variation pattern is determined by a lottery using a special chart variation pattern lottery table related to the special chart variation pattern derivation state PC. On the other hand, the rate at which a special chart variation pattern corresponding to a performance route in which a development performance is not executed is determined by a lottery using a special chart variation pattern lottery table related to the special chart variation pattern derivation state PD is higher than the rate at which the special chart variation pattern is determined by a lottery using a special chart variation pattern lottery table related to the special chart variation pattern derivation state PC. This makes it difficult to lose the novelty of the development presentation in the special chart variation pattern derivation state PC after passing through the special chart variation pattern derivation state PD, and contributes to suppressing a decline in interest in the game in the special chart variation pattern derivation state PC.
[0135] Furthermore, as described above, the probability (approximately 1 / 33.3) that the special chart fluctuation pattern HSP-G is determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is higher than the probability (1 / 40) that the special chart fluctuation pattern HSP-G is determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is higher. On the other hand, the probability (approximately 1 / 333) that special chart fluctuation pattern HSP-H is determined when the result of the special chart hit / miss judgment is a miss during special chart fluctuation pattern derivation state PD is lower than the probability (approximately 1 / 66.7) that special chart fluctuation pattern HSP-H is determined when the result of the special chart hit / miss judgment is a miss during special chart fluctuation pattern derivation state PC, and the probability (1 / 500) that special chart fluctuation pattern HSP-I is determined when the result of the special chart hit / miss judgment is a miss during special chart fluctuation pattern derivation state PD is lower than the probability (1 / 100) that special chart fluctuation pattern HSP-I is determined when the result of the special chart hit / miss judgment is a miss during special chart fluctuation pattern derivation state PC. Furthermore, the probability (1 / 1.25) that the special chart fluctuation pattern ASP-G will be determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PD is a jackpot is higher than the probability (1 / 2) that the special chart fluctuation pattern ASP-G will be determined when the result of the special chart hit / miss judgment during the special chart fluctuation pattern derivation state PC is a jackpot. On the other hand, the probability (approximately 1 / 6.67) that special chart fluctuation pattern ASP-H is determined when the result of the special chart hit / miss judgment in the special chart fluctuation pattern derivation state PD is a jackpot is lower than the probability (approximately 1 / 2.86) that special chart fluctuation pattern ASP-H is determined when the result of the special chart hit / miss judgment in the special chart fluctuation pattern derivation state PC is a jackpot, and the probability (1 / 20) that special chart fluctuation pattern ASP-I is determined when the result of the special chart hit / miss judgment in the special chart fluctuation pattern derivation state PD is a jackpot is lower than the probability (approximately 1 / 6.67) that special chart fluctuation pattern ASP-I is determined when the result of the special chart hit / miss judgment in the special chart fluctuation pattern derivation state PC is a jackpot.
[0136] Therefore, in this embodiment, when a special chart variation pattern corresponding to the performance route on which the development performance is executed is determined by lottery using the special chart variation pattern lottery table related to the special chart variation pattern derivation state PD, the rate at which a special chart variation pattern corresponding to the performance route on which the development performance is executed EG is determined is higher than the rate at which a special chart variation pattern corresponding to the performance route on which the development performance is executed EG is determined when a special chart variation pattern corresponding to the performance route on which the development performance is executed is determined by lottery using the special chart variation pattern lottery table related to the special chart variation pattern derivation state PC. On the other hand, when a special chart variation pattern corresponding to the performance route on which the development performance is executed is determined by lottery using the special chart variation pattern lottery table related to the special chart variation pattern derivation state PD, the rate at which a special chart variation pattern corresponding to the performance route on which the development performance is executed EH or the development performance EI is determined is lower than the rate at which a special chart variation pattern corresponding to the performance route on which the development performance is executed EH or the development performance EI is determined when a special chart variation pattern corresponding to the performance route on which the development performance is executed is determined by lottery using the special chart variation pattern lottery table related to the special chart variation pattern derivation state PC. This makes it difficult to impair the novelty of some of the development effects (development effects EH or development effects EI) in the special chart variation pattern derivation state PC after passing through the special chart variation pattern derivation state PD, and contributes to suppressing the decline in interest in the game in the special chart variation pattern derivation state PC. In particular, in contributing to this effect, it is preferable that the number of the above-mentioned part of the development effects (development effects EH or development effects EI) is greater than the number of the other development effects (development effects EG), as in this embodiment.
[0137] When the sub-reservation control means 223 receives a reserve command (hereinafter, may be simply expressed as the occurrence of a reserved winning), it sets performance data for displaying the number of reserved images corresponding to the special chart 1 reserve counter and the number of reserved images corresponding to the special chart 2 reserve counter in the reserve display area (not shown) of the main display unit 81 based on the information of the special chart 1 reserve counter and the special chart 2 reserve counter contained in the command. The reserved images are images that are the subject of reserve pre-reading performances that change into various forms that suggest the degree of advantage, such as the expectation degree of a jackpot game.
[0138] When a pre-reading performance control means 224 receives a pre-determination command, it determines the content of the pre-reading performance based on the result of the pre-determination included in the command. The pre-reading effect is an effect that suggests the expectation for the result of the special symbol hit / miss judgment in the pre-reading target symbol change and the content of the effect to be executed in the pre-reading target symbol change before the pre-reading target symbol change starts, for the purpose of increasing the interest in the game. The pre-reading target symbol change refers to the symbol change related to the main special symbol (special symbol 1 in the special symbol change pattern derivation state PA, and special symbol 2 in the special symbol change pattern derivation state PB, special symbol change pattern derivation state PC, or special symbol change pattern derivation state PD), which is reserved in the hold 1 to hold 3 state, or the hold 0 state and the symbol change related to the special symbol is being executed.
[0139] When the effect content determining means 225 receives a variation start command, it determines the content of the effect to be executed in the current pattern variation according to the presentation route already determined by the presentation route determining means 222. More specifically, the performance content determination means 225 determines the content of the performance (performance pattern) for each performance execution timing in the pattern change by a lottery using a performance pattern lottery table corresponding to the performance route determined by the performance route determination means 222. In this way, it is possible to change the content of the performance related to (executed according to) the determined performance route, and to provide a connection between the performances in one pattern change. Even if the same performance route is determined, it is also possible to diversify the performances to be executed. Note that the timing for determining the content of the performance can be, for example, the start of the pattern change.
[0140] In this embodiment, the presentation content determination means 225 is configured to execute a development destination notification presentation and a cut-in presentation as presentations that execute an operation request presentation that requests a game operation and that execute a notification presentation when the game operation requested by the operation request presentation is performed. The development destination notification presentation and the cut-in presentation will be described in detail later, but both of these presentations are presentations that are executed when the above-mentioned development presentation is executed.
[0141] When the decorative pattern control means 226 receives a variation start command, it determines the final (determined stopped) combination of decorative patterns (left pattern, center pattern, right pattern) based on the stopped pattern of the determined special pattern. Specifically, pattern A corresponds to a pattern consisting of odd-numbered patterns, pattern B corresponds to a pattern consisting of even-numbered patterns, and pattern C or pattern c corresponds to a pattern consisting of 7 patterns. Furthermore, pattern a corresponds to a pattern consisting of odd-numbered patterns excluding 7 patterns, and pattern b corresponds to a pattern consisting of odd-numbered patterns excluding 7 patterns. In addition, when matching the determined combination of decorative patterns to the stopping patterns of the special pattern, it is not necessary to have the above-mentioned correspondence. For example, if the combination of decorative patterns determined for the above-mentioned correspondence does not have a high expected value, such as matching an even-numbered pattern arrangement with pattern A, in some cases (a rate lower than the rate at which the above-mentioned correspondence is achieved), a combination of decorative patterns different from the above-mentioned correspondence may be adopted, and even in such cases, it can be said that the determined combination of decorative patterns corresponds to the stopping patterns of the special pattern.
[0142] When the jackpot start command is received, the jackpot effect control means 227 determines the content of the jackpot effect that notifies the player that a jackpot game is in progress based on the information included in the command, etc. The jackpot effect includes a start demo effect that notifies the player that a jackpot game is in progress, a round effect that notifies the player that a round game is in progress, and an end demo effect that notifies the player that a jackpot game is in progress.
[0143] The normal performance control means 220 reads out performance data for each device corresponding to each performance at the execution timing of that performance, in accordance with the content of the performance determined by the above-mentioned means provided in the first sub-control board 200. If the read performance data includes performance data related to images, an image control command is generated based on that performance data, and the command is stored in a transmission command storage area of the sub-information storage means 260. Furthermore, if the read performance data includes performance data related to sound, an audio control command related to sound is generated based on that performance data, and the command is stored in a transmission command storage area of the sub-information storage means 260. In particular, when the return state upon power restoration is a playable state accompanied by the execution of a RAM clear process, the normal presentation control means 220 reads presentation data for notifying that a playable state has been achieved accompanied by the execution of a RAM clear process, and when the return state upon power restoration is a playable state without the execution of a RAM clear process, the normal presentation control means 220 reads presentation data for notifying that a playable state has been achieved without the execution of a RAM clear process. Furthermore, when the recovery state upon power restoration is a game stop state, the normal presentation control means 220 reads out presentation data for notifying not only that the game has stopped, but also that it is necessary to execute a RAM clear process. Although details of these notifications are omitted, it is preferable that the notifications continue for a certain period of time (for example, 30 seconds) after execution has started, and the presentation device that executes the notifications does not matter.
[0144] When an error command is transmitted, the sub-error control means 230 determines an error presentation pattern, and reads out presentation data for executing an error presentation in accordance with the error presentation pattern. In addition, the error performance is executed with priority over the variable performance related to the pattern variation (the execution of the variable performance is regulated by the execution of the error performance). Here, the execution of the error performance with priority is not limited to the case where only the error performance is executed in the device related to the execution of the error performance and the device related to the execution of the variable performance are the same device, but includes the case where the error performance is executed in a manner that is easier to recognize than the variable performance in the device. In addition, the sub-error control means 230 may independently (independently of the main error control means 165) determine whether or not the gaming machine 10 is in an error state, and if it is determined that the gaming machine 10 is in an error state, read out presentation data for executing an error presentation.
[0145] The lamp control means 240 holds lamp control data for controlling the lighting of various lamps such as the frame lamp 35 and the announcement lamp 85. For example, if the performance data read out by the normal performance control means 220 contains performance data corresponding to a lamp, the lamp control means 240 reads out the lamp control data based on the performance data, and transmits the read lamp control data to the lamp to be executed.
[0146] When the performance data read by the normal performance control means 220 contains performance data corresponding to a movable prop, the movable prop control means 245 reads movement control data for controlling the movement of the movable decorative body 22 and the sub-display unit 82 from the ROM 202 based on the performance data, and transmits the read movement control data to the movable decorative body 22 and the sub-display unit 82 to control the movement of the movable decorative body 22 and the sub-display unit 82.
[0147] As described above, the sub-information storage means 260 is a means for temporarily storing data read out by the means provided in the first sub-control board 200, data derived by calculations in the means, etc. in the corresponding storage areas.
[0148] The sub-command management means 270 receives a performance control command transmitted from the main control board 100, and stores the received performance command in a received command storage area of the sub-information storage means 260. When an image control command is stored in the transmission command storage area of the sub-information storage means 260, the sub-command management means 270 transmits the image control command to the second sub-control board 300. When an audio control command or a volume adjustment command is stored in the storage area, the sub-command management means 270 transmits these commands to the audio control board 310. In addition, these commands are transmitted in the order in which they are stored in the transmission command storage area of the sub-information storage means 260, as a rule.
[0149] As described above, the gaming machine 10 according to this embodiment is configured to be able to execute a development notification effect and a cut-in effect as effects that execute an operation request effect that requests a gaming operation and that execute a notification effect when the gaming operation requested by the operation request effect is performed. In this embodiment, in order to make it easier to recognize the notification effects in these effects (development destination notification effects and cut-in effects), a one-shot notification effect, which will be described later, is used, and the details of this function will be explained below.
[0150] <About the development announcement and cut-in effects> First, prior to describing the details of the function relating to the above-mentioned one-shot announcement effect, the details of the development destination announcement effect and the cut-in effect according to this embodiment will be described with reference to Figs. Figures 14 to 16 are figures showing the flow of the development destination announcement performance, where Figure 14 shows the flow of the development destination announcement performance when the development destination performance EC is executed, Figure 15 shows the flow of the development destination announcement performance when the development destination performance EA is executed, and Figure 16 shows the flow of the development destination announcement performance when the development destination performance EB is executed. Fig. 17(a) to Fig. 17(c) are diagrams showing the flow of the cut-in performance. Fig. 18(a) and Fig. 18(b) are diagrams showing the lottery tables used in the lottery to determine the performance mode of the cut-in performance, Fig. 18(a) is a diagram showing the lottery table used in the special chart variation pattern derivation state PD, and Fig. 18(b) is a diagram showing the lottery table used in the special chart variation pattern derivation state PD. The range of random numbers used in the lottery related to these lottery tables is 0 to 99.
[0151] As shown in Figs. 14 to 16, the development destination notification performance according to this embodiment requires multiple operations on the performance button 37, and when the operation is performed, the type of development destination notification performance to be executed in the current pattern change is notified. In this embodiment, the development destination notification performance is a performance executed in a part of the pattern change in which the above-mentioned development performance is executed (regardless of the type of development performance, the probability of the development destination notification performance being executed is constant), and is a performance executed during the execution of the pattern change and before the occurrence of a reach state. In the development destination notification performance according to Fig. 14, the execution of the development destination performance EC is notified, in the development destination notification performance according to Fig. 15, the execution of the development destination performance EA is notified, and in the development destination notification performance according to Fig. 16, the execution of the development destination performance EC is notified. Note that Figs. 14 to 16 show the development destination notification performance executed in the special pattern change pattern derivation state PA, but the development destination notification performance is also executed in other special pattern change pattern derivation states.
[0152] As shown in Figure 14, in the development destination notification presentation when a development performance EC is executed, a specific image tg that identifies the type of development performance that will be executed subsequently is displayed in the display area related to the main display unit 81, and the development performance identified by the specific image tg is switched in the order of development performance EA, development performance EB, and development performance EC by multiple operations of the performance button 37, thereby notifying that the development performance EC will be executed. Specifically, in the first scene (the top leftmost scene) in the development notification performance, an instruction image sg including the text "Strengthen the development performance by repeatedly pressing the button" is displayed in the display area related to the main display unit 81. Incidentally, during the execution of the development notification performance, including the subsequent scenes, a decorative pattern is displayed variably in the display area 811 of the display area related to the main display unit 81. In the next scene (the middle scene in the upper row), a specific image tg1 specifying the execution of the development performance EA is displayed in the display area of the main display unit 81, along with a button image bg1, which is a button image bg that requests multiple operations on the performance button 37, and a meter image mg. Here, the meter image is an image that is displayed entirely in black at the start of display, and the area (length) of the black area decreases over time to indicate the remaining time of the acceptance period (operation valid period) for operations on the performance button 37. Then, in the development destination announcement performance, the button image bg1 and the meter image mg continue to be displayed for as long as the acceptance period remains (until just before the final scene described below). The scene at the top right is a scene after the operation of the performance button 37 is started in the scene at the top center, and in this scene, a specific image tg1 is displayed in the display area related to the main display unit 81, and a crack image hg that imitates a crack in the screen is displayed in front of the specific image tg1. Note that this crack image hg is an image that makes you expect the specific image tg1 to change into an image that specifies the execution of the development performance EB.
[0153] The scene at the left end of the lower row is the next scene after the scene at the right end of the upper row, and in this scene, a specific image tg2 that specifies the execution of the development performance EB is displayed in the display area related to the main display unit 81. This indicates that the development performance to be executed has been strengthened from the development performance EA to the development performance EB. The scene in the middle of the bottom row is the scene that occurs after operation of the effect button 37 is started in the scene at the far left of the bottom row, and in this scene, a specific image tg2 is displayed in the display area related to the main display unit 81, and a crack image hg that resembles a crack in the screen is displayed in front of the image. The scene at the far right of the bottom row is the next scene after the scene in the middle of the bottom row and is the last scene in the development announcement performance, and in this scene, a specific image tg3 specifying the execution of the development performance EC is displayed in the display area related to the main display unit 81, and this specific image tg announces that the development performance EC will be executed in this pattern change. In addition, the number of times that the effect button 37 is operated from when a specific image tg is displayed until the type of the specific image tg is changed is not particularly important, but it is preferable that the number of times of operation is greater the later the change occurs.
[0154] As shown in Figure 15, in the development destination notification presentation when a development performance EA is executed, a specific image tg is displayed in the display area related to the main display unit 81, and the development performance identified by the specific image tg is maintained as the development performance EA, thereby announcing that the development performance EA will be executed. Specifically, in the first scene (the top leftmost scene) in the development destination notification performance, an instruction image sg is displayed in the display area of the main display unit 81, similarly to FIG. In the next scene (the middle scene in the upper row), a specific image tg1 specifying the execution of the advanced performance EA is displayed in the display area related to the main display unit 81, and a button image bg1 and a meter image mg are also displayed. The scene at the far right of the top row is the scene that occurs after operation of the performance button 37 is started in the scene in the middle of the top row, and in this scene, a specific image tg1 is displayed in the display area related to the main display unit 81, and a crack image hg that resembles a crack in the screen is displayed in front of the image. The scene at the bottom left is the next scene after the scene at the top right, and in this scene, the specific image tg1 remains displayed in the display area related to the main display unit 81. This indicates that the development performance to be executed has not been strengthened from the development performance EA. The scene in the middle of the bottom row is the scene that occurs after operation of the effect button 37 is started in the scene at the far left of the bottom row, and in this scene, the display of a specific image tg1 is maintained in the display area related to the main display unit 81, and a crack image hg that resembles a crack in the screen is displayed in front of the image. The scene at the far right of the bottom row is the next scene after the scene in the middle of the bottom row and is the last scene in the development announcement performance, and in this scene, a specific image tg1 remains displayed in the display area related to the main display unit 81, and this specific image tg announces that a development performance EA will be executed in this pattern change.
[0155] As shown in Figure 16, in the development destination announcement performance when the development performance EB is executed, a specific image tg is displayed in the display area related to the main display unit 81, and the development performance identified by the specific image tg is switched from the development performance EA to the development performance EB, thereby announcing that the development performance EB will be executed. Specifically, in the first scene (the top leftmost scene) in the development destination announcement performance, an instruction image sg is displayed in the display area of the main display unit 81, similarly to FIG. 14 and FIG. In the next scene (the middle scene in the upper row), a specific image tg1 specifying the execution of the advanced performance EA is displayed in the display area related to the main display unit 81, and a button image bg1 and a meter image mg are also displayed. The scene at the far right of the top row is the scene that occurs after operation of the performance button 37 is started in the scene in the middle of the top row, and in this scene, a specific image tg1 is displayed in the display area related to the main display unit 81, and a crack image hg that resembles a crack in the screen is displayed in front of the image. The scene at the bottom left is the next scene after the scene at the top right, and in this scene, a specific image tg2 that specifies the execution of the development performance EB is displayed in the display area related to the main display unit 81. This indicates that the development performance to be executed has been strengthened from the development performance EA. The scene in the middle of the bottom row is the scene that occurs after operation of the effect button 37 is started in the scene at the far left of the bottom row, and in this scene, a specific image tg2 is displayed in the display area related to the main display unit 81, and a crack image hg that resembles a crack in the screen is displayed in front of the image. The scene at the far right of the bottom row is the next scene after the scene in the middle of the bottom row and is the last scene in the development announcement performance, and in this scene, a specific image tg2 remains displayed in the display area related to the main display unit 81, and this specific image tg announces that a development performance EB will be executed in this pattern change.
[0156] Next, as shown in Figures 17(a) to 17(c), the cut-in effect is an effect that requires a single operation of the effect button 37 and displays a cut-in image kg when the operation is performed. In this embodiment, the cut-in effect is an effect that is always executed while the above-mentioned development effect is being executed. The cut-in effect can be performed in a chance mode, a super hot mode, or a big win mode. The mode to be displayed is determined by a lottery to determine the mode, which will be described later. The display mode of the cut-in image kg differs depending on the determined mode.
[0157] 17(a) shows the flow of the cut-in effect related to the chance effect mode, and in this cut-in effect, as shown in the scene on the left, a button image bg2, which is a button image bg requesting one operation of the effect button 37, and a meter image mg are displayed in the display area related to the main display unit 81. During the execution of the cut-in effect, including the subsequent scenes, a decorative pattern is displayed variably in the display area 811 of the display area related to the main display unit 81, in the same manner as during the execution of the development destination announcement effect. Then, when the effect button 37 is operated in the left scene, a cut-in image kg1 including the word "chance" is displayed in the display area of the main display unit 81, as shown in the right scene.
[0158] 17(b) shows the flow of a cut-in effect relating to a super hot effect mode, in which, as shown in the left scene, a button image bg2 and a meter image mg are displayed in the display area related to the main display unit 81. When the effect button 37 is operated in the left scene, a cut-in image kg2 including the words "super hot" is displayed in the display area related to the main display unit 81, as shown in the right scene.
[0159] 17(c) shows the flow of a cut-in effect related to a big win effect mode, in which, as shown in the left scene, a button image bg2 and a meter image mg are displayed in the display area related to the main display unit 81. When the effect button 37 is operated in the left scene, a cut-in image kg3 including the word "Big Win" is displayed in the display area related to the main display unit 81, as shown in the right scene.
[0160] As shown in Figures 18(a) and 18(b), in the presentation mode determination lottery that determines the presentation mode of the cut-in performance, the lottery table to be used in the lottery is determined by referring to the current special chart variation pattern derivation state. Specifically, when the current special chart variation pattern derivation state is a special chart variation pattern derivation state other than the above-mentioned special chart variation pattern derivation state PD, it is determined to use the lottery table shown in Figure 18(a), and when the current special chart variation pattern derivation state is the special chart variation pattern derivation state PD, it is determined to use the lottery table shown in Figure 18(b).
[0161] In the lottery for determining the presentation mode using the lottery table shown in Figure 18(a), if the result of the special symbol hit / miss judgment for this pattern change is a miss, a chance presentation mode is determined with a probability of 80 / 100 (1 / 1.25), and a super hot presentation mode is determined with a probability of 20 / 100 (1 / 5), and in such case, a jackpot presentation mode is not determined. On the other hand, if the result of the special pattern hit / miss judgment in this pattern change is a jackpot, the chance presentation mode will be determined with a probability of 20 / 100 (1 / 5), the super hot presentation mode with a probability of 50 / 100 (1 / 2), and the jackpot presentation mode with a probability of 30 / 100 (approximately 1 / 3.33).
[0162] In the lottery for determining the presentation mode using the lottery table shown in Figure 18(b), if the result of the special symbol hit / miss judgment for this pattern change is a miss, the chance presentation mode is determined with a probability of 80 / 100 (1 / 1.25) and the super hot presentation mode is determined with a probability of 20 / 100 (1 / 5), just as in the case where the lottery table shown in Figure 18(a) is used, and in such case, the jackpot presentation mode is not determined. On the other hand, if the result of the special pattern hit / miss judgment in this pattern change is a jackpot, the chance presentation mode will be determined with a probability of 40 / 100 (1 / 2.5), the super hot presentation mode with a probability of 40 / 100 (1 / 2.5), and the jackpot presentation mode with a probability of 20 / 100 (1 / 5).
[0163] In this way, in the development destination notification performance in this embodiment, a button image bg1 is displayed which requests multiple operations on the performance button 37, and when the performance button 37 is operated with the operation content requested by that image, a specific image tg is displayed which specifies the type of development performance to be executed. In addition, in the cut-in performance, a button image bg2 is displayed requesting one operation of the performance button 37, and when the performance button 37 is operated in the manner requested by the image, a cut-in image kg relating to the performance mode determined by the performance mode determination lottery is displayed.
[0164] Therefore, in the gaming machine 10, the presentation control means (first sub-control board 200, second sub-control board 300) is capable of causing the first presentation means (main display unit 81) to execute a first operation request presentation (an operation request presentation related to a development destination notification presentation) and a second operation request presentation (an operation request presentation related to a cut-in presentation) as presentations requesting one or more game operations, and during the effective operation period related to the first operation request presentation, is capable of causing the first presentation means to execute a first notification presentation (display of a specific image tg which identifies the development presentation to be executed) when a game operation is performed with the operation content requested in the first operation request presentation, and during the effective operation period related to the second operation request presentation, is capable of causing the first presentation means to execute a second notification presentation (display of a cut-in image kg) when a game operation is performed with the operation content requested in the second operation request presentation.
[0165] In addition, in the cut-in performance, the big win performance mode can be determined when the result of the special pattern hit / miss judgment in the current pattern change is a big win, but it is not determined when the result of the special pattern hit / miss judgment in the current pattern change is a miss. Therefore, the big win performance mode is a performance mode that definitely notifies that a big win has been derived. Furthermore, as described above, the development performance EC is a development performance that definitively notifies that a jackpot has been derived, and therefore the display of the specific image tg3 that specifies the execution of the development performance EC in the development destination announcement performance can be said to be an image that definitively notifies that a jackpot has been derived. In this embodiment, when the current special chart variation pattern derivation state is the special chart variation pattern derivation state PA, if the special chart hit / miss judgment result is a big hit, the big hit performance mode is determined with a probability of about 1 / 3.33. On the other hand, the probability of executing the development destination notification performance when the development performance is executed is constant, and the probability of determining the special chart variation pattern ASP-C in which the development performance EC is executed when a big hit is derived in the special chart variation pattern derivation state PA is 1 / 10, which is lower than the above about 1 / 3.33. Therefore, it can be said that the cut-in image kg displayed in the cut-in performance has a higher accuracy of suggesting the probability of winning a jackpot than the specific image tg finally displayed in the development destination announcement performance. Note that, as a method for increasing the accuracy of suggesting the probability of winning a jackpot, any method that makes it easier for the player to guess the probability of winning a jackpot, such as increasing the probability of determining the mode in which the jackpot is confirmed as in this embodiment, or increasing the number of types of modes that suggest the probability of winning a jackpot (due to the fact that the probability of winning a jackpot is suggested in detail), may be adopted.
[0166] Therefore, in the gaming machine 10, the first notification effect (display of a specific image tg which specifies the development effect to be executed) and the second notification effect (display of a cut-in image kg) are effects which indicate the expected probability of a bonus (jackpot), and in other words, the second notification effect has a higher accuracy in indicating the expected probability of a bonus being awarded than the first notification effect. This can enhance the effect of increasing interest in the game by the second notification effect in which a one-shot notification effect is not executed.
[0167] As described above, in this embodiment, the development destination notification effect is an effect that is executed as part of the development effect, and the cut-in effect is an effect that is executed during the development effect. Therefore, these effects can be executed by the same pattern change. This can enhance the effects of the first and second functions described below.
[0168] Therefore, in other words, in the gaming machine 10, the presentation control means (first sub-control board 200, second sub-control board 300) is capable of executing a first operation request presentation (an operation request presentation related to a development destination notification presentation) and a second operation request presentation (an operation request presentation related to a cut-in presentation) with the same pattern change.
[0169] In addition, in this embodiment, in both the development destination notification effect and the cut-in effect, if no operation is performed on the effect button 37 during the operation valid period, the effect corresponding to the effect (display of the specific image tg that specifies the development effect to be executed, display of the cut-in image kg) is not executed. However, without being limited to this, even if the requested game operation is not performed, the effect corresponding to the effect may be executed based on the passage of the operation valid period.
[0170] Also, as shown in FIG. 18, in the cut-in performance in this embodiment, when the current special chart variation pattern derivation state is the special chart variation pattern derivation state PD, the probability (1 / 5) that a jackpot performance mode is determined is lower than the probability (approximately 1 / 3.33) that a jackpot performance mode is determined when the current special chart variation pattern derivation state is a special chart variation pattern derivation state other than the special chart variation pattern derivation state PD (particularly, the special chart variation pattern derivation state PB, or the special chart variation pattern derivation state PC). This makes it difficult to impair the novelty of the cut-in presentation in the special chart variation pattern derivation state after passing through the special chart variation pattern derivation state PD (particularly, the special chart variation pattern derivation state PB, or the special chart variation pattern derivation state PC), and suppresses a decline in interest in the game in the subsequent special chart variation pattern derivation state.
[0171] <About the One-Shot Announcement Production> In this embodiment, a one-shot notification effect can be executed based on the operation of the effect button 37 during the operation valid period related to the development destination notification effect. Here, the one-shot notification effect is an effect in which the notification lamp 85 switches from a non-illuminated state to a lit state, and the execution conditions of this effect will be described below with reference to Figs. 19 and 20. Fig. 19 is a flow of the one-shot notification performance control process. Fig. 20(a) and Fig. 20(b) are diagrams showing the lottery tables used in the point acquisition lottery, Fig. 20(a) is a diagram showing the lottery table used in the special chart variation pattern derivation state PD other than the special chart variation pattern derivation state PD, and Fig. 20(b) is a diagram showing the lottery table used in the special chart variation pattern derivation state PD. The range of the random numbers used in the lottery related to these lottery tables is 0 to 99.
[0172] The one-shot announcement effect control process which determines whether or not to execute the one-shot announcement effect is a process which is executed during the effective operation period for the development announcement effect when the result of the special symbol hit / miss determination in the current pattern change is a jackpot, and this process is not executed during the effective operation period for the cut-in effect, regardless of the result of the special symbol hit / miss determination in the current pattern change. As shown in Fig. 19, in the first step S202 in the one-shot notification effect control process, it is determined whether the derived jackpot is a guaranteed jackpot, and if the condition is met, the process proceeds to step S204, and if the condition is not met, the one-shot notification effect control process is terminated. Therefore, it can be said that the one-shot notification effect is an effect that definitely notifies that a jackpot (especially a guaranteed jackpot) has been derived. The one-shot notification effect control process also ends when the operation valid period ends. In step S204, it is determined whether or not the effect button 37 has been operated. If the condition is satisfied, the process proceeds to step S206, and if the condition is not satisfied, the process returns to step S204. In step S208, a point acquisition lottery is executed to determine the points to be acquired by the current operation of the effect button 37. In step S210, it is determined whether the total number of points acquired has reached 10. If this condition is met, the process proceeds to step S212, and if this condition is not met, the process returns to step S204. In step S212, the effect data for the one-shot notification effect is set, and the one-shot notification effect control process ends. Note that the one-shot notification effect is executed by setting the effect data.
[0173] In this way, in the one-shot notification effect control process in this embodiment, the points to be acquired are determined by a point acquisition lottery, and when the accumulated points reach 10, the one-shot notification effect is executed. Furthermore, the expected value of the points determined by the point acquisition lottery differs depending on the timing of the operation of the effect button 37 related to the execution of the lottery. This will be specifically described below.
[0174] As shown in Figures 20(a) and 20(b), in the point acquisition lottery, the timing at which the effect button 37 for this lottery is operated (hereinafter, may be referred to as "this operation timing") is referenced, and the lottery table referenced in this lottery differs depending on this timing. In particular, in this embodiment, the operation valid period is divided into an early stage, a middle stage, and an end stage, and the lottery table referenced differs depending on which of these periods the timing at which the effect button 37 is operated belongs to. Note that although the relationship between the lengths of the early stage, middle stage, and end stage does not matter, in this embodiment, these periods are made to be the same length. In addition, in the point acquisition lottery, the lottery table to be used in the lottery is determined by referring to the current special pattern variation pattern derivation state. Specifically, when the current special pattern variation pattern derivation state is a special pattern variation pattern derivation state other than the above-mentioned special pattern variation pattern derivation state PD, it is determined to use the lottery table group shown in Figure 20(a), and when the current special pattern variation pattern derivation state is the special pattern variation pattern derivation state PD, it is determined to use the lottery table group shown in Figure 20(b).
[0175] In the point acquisition lottery using the lottery table shown in Fig. 20(a), if the operation timing is at the beginning of the operation valid period, the probability of 0pt (points) is 70 / 100 (about 1 / 1.43), the probability of 1pt is 10 / 100 (1 / 10), the probability of 2pt is 10 / 100 (1 / 10), and the probability of 10 / 100 (1 / 10) is 10. Note that the forced 10pt means that the accumulated points are forced to become 10 points. If the timing of this operation falls in the middle of the operation validity period, there is a 60 / 100 (approximately 1 / 1.67) chance of 0 points, a 10 / 100 (1 / 10) chance of 1 point, a 10 / 100 (1 / 10) chance of 2 points, and a 20 / 100 (1 / 5) chance of a forced 10 points. If the timing of this operation is at the end of the operation validity period, there is a 50 / 100 (1 / 2) probability of 0 points, a 10 / 100 (1 / 10) probability of 1 point, a 10 / 100 (1 / 10) probability of 2 points, and a 30 / 100 (approximately 1 / 3.33) probability of a forced 10 points.
[0176] In the point acquisition lottery using the lottery table shown in Figure 20(b), if the current operation timing is at the beginning of the operation valid period, there is a 75 / 100 (approximately 1 / 1.33) probability of 0 points, a 10 / 100 (1 / 10) probability of 1 point, a 10 / 100 (1 / 10) probability of 2 points, and a 5 / 100 (1 / 20) probability of a forced 10 points. If the timing of this operation falls in the middle of the operation validity period, there is a 70 / 100 (1 / 1.43) probability of 0 points, a 10 / 100 (1 / 10) probability of 1 point, a 10 / 100 (1 / 10) probability of 2 points, and a 10 / 100 (1 / 10) probability of a forced 10 points. If the timing of this operation is at the end of the operation validity period, there is a 65 / 100 (approximately 1 / 1.54) chance of 0 points, a 10 / 100 (1 / 10) chance of 1 point, a 10 / 100 (1 / 10) chance of 2 points, and a 15 / 100 (approximately 1 / 6.67) chance of a forced 10 points.
[0177] Thus, in this embodiment, the probability of winning the forced 10 points through the point acquisition lottery increases in the following order: when the operation timing for the lottery is at the beginning of the valid operation period, when the operation timing for the lottery is in the middle of the valid operation period, and when the operation timing for the lottery is at the end of the valid operation period. In other words, from the perspective of the probability of winning the forced 10 points, it can be said that the rate at which the one-shot announcement effect will be executed is higher when the effect button 37 is operated during one period of the valid operation period than when the effect button 37 is operated during the period just before that one period of the valid operation period (hereinafter referred to as the "first function"). According to this, by having the player carefully perform the game operation required in the development destination notification performance, it is possible to make the player easily recognize the notification performance in the development destination notification performance. In addition, the condition for executing the one-shot announcement effect to cause this action does not necessarily have to use a point system as in this embodiment.
[0178] In addition, in this embodiment, as described above, the points acquired through the point acquisition lottery executed for each operation of the effect button 37 during the valid operation period are accumulated, and when the accumulated points reach 10 points, it is decided to execute the one-shot announcement effect. In other words, from the perspective of cumulative points, the rate at which the one-shot announcement effect is decided to be executed is higher when one operation is performed on effect button 37 and another operation (an operation subsequent to the one operation) is performed on effect button 37 than when the one operation is performed on effect button 37 and the other operation on effect button 37 is not performed (hereinafter referred to as the "second function"). This increases the attention paid to the later game operation among the game operations required in the development destination notification performance, making it easier to recognize the notification performance in the development destination notification performance. As with the second function, the condition for executing the one-shot announcement effect to cause the action does not necessarily have to use a point system as in this embodiment.
[0179] In this embodiment, as described above, a one-shot announcement effect is not executed in a cut-in effect, but the above-mentioned first function also contributes to careful performance of the game operations required in the cut-in effect, making it easier to recognize the announcement effect in the cut-in effect. Also, although different from the present embodiment, assuming that a one-shot notification effect is not executed in a cut-in effect, if the cut-in effect is an effect that requires multiple operations on effect button 37, the above-mentioned second function can increase attention to later game operations among the game operations required in the cut-in effect, making it easier to recognize the notification effect in the cut-in effect. Furthermore, by having the above-mentioned first or second function, the above-mentioned effect can be achieved even if the one-shot announcement effect is not executed in the cut-in effect, and therefore these functions also contribute to reducing the frequency of the one-shot announcement effect itself.
[0180] In this embodiment, a performance having both the first function and the second function is executed, but a performance having either one of them may be adopted. In particular, when at least the second function is present, it is assumed that the target performance requires multiple game operations, but when the first function is present, it is not necessarily required to require multiple game operations in the target performance, and one game operation may be required. Furthermore, as described below, in this embodiment, the probability, ratio, and frequency may be set so that a lower one does not win, as long as the relationship between the two is guaranteed.
[0181] Therefore, in the gaming machine 10, when a predetermined granting condition is satisfied, it is possible to cause the second presentation means (notification lamp 85) to execute a one-shot announcement effect that definitively notifies the granting of a bonus based on a gaming operation being performed during the effective operation period related to the first operation request effect (an operation request effect related to the development destination announcement effect), and when a gaming operation is performed during the effective operation period related to the second operation request effect (an operation request effect related to a cut-in effect), the one-shot announcement effect is not executed, and with regard to the execution rate of the one-shot announcement effect when a predetermined granting condition is satisfied, when a first gaming operation is performed during the effective operation period related to the first operation request effect, the one-shot announcement effect is executed at a higher rate than when a second gaming operation is performed during the effective operation period related to the first operation request effect, or when a first gaming operation is performed during the effective period related to the first operation request effect, the one-shot announcement effect can be executed, whereas when a second gaming operation is performed during the effective operation period related to the first operation request effect, the one-shot announcement effect is not executed, and the first gaming operation is an operation that comes after the second gaming operation.
[0182] Furthermore, in the gaming machine 10, the first operation request presentation (the operation request presentation related to the development destination announcement presentation) is a presentation that requests a plurality of gaming operations, and the first gaming operation is a gaming operation that is performed after the second gaming operation has been performed. In other words, with regard to the execution rate of the one-shot announcement presentation when a specified granting condition is satisfied, when the first gaming operation is performed, the one-shot announcement presentation is executed at a higher rate than when the second gaming operation is performed and the first gaming operation is not performed, or when the first gaming operation is performed, the one-shot announcement presentation can be executed, whereas when the second gaming operation is performed and the first gaming operation is not performed, the one-shot announcement presentation is not executed.
[0183] In addition, in the gaming machine 10, the first operation request presentation is a presentation requesting one gaming operation, the second gaming operation is a gaming operation in a first period of the operation valid period related to the first operation request presentation, and the first gaming operation is a gaming operation in a second period after the first period of the operation valid period related to the first operation request presentation.
[0184] Furthermore, in this embodiment, the number of game operations (2 or more) requested in the operation request presentation related to the development destination notification presentation is different from the number of game operations (1) requested in the operation request presentation related to the cut-in presentation. This makes it easier to recognize notification effects relating to operation request effects of different numbers of times.
[0185] Therefore, in other words, in the gaming machine 10, the number of gaming operations (2 or more) requested in the first operation request presentation (operation request presentation related to the development destination notification presentation) is different from the number of gaming operations (1) requested in the second operation request presentation (operation request presentation related to the cut-in presentation).
[0186] Also, as described above, this embodiment is configured so that the one-shot notification effect can be executed only when the derived jackpot is a guaranteed jackpot. It is not necessarily required to be configured like this, and the one-shot notification effect can be executed even when a normal jackpot is derived, but by configuring like this embodiment, the player's attention to the one-shot notification effect can be increased, and the effects related to the first function and the second function described above can be improved.
[0187] Therefore, in the gaming machine 10, there are a first benefit (normal jackpot) and a second benefit (high probability jackpot) which is more advantageous than the first benefit, and in other words, with regard to the benefit granted when the one-shot announcement effect is executed, the percentage of the benefit granted when the one-shot announcement effect is executed that is the second benefit is higher than the percentage of the benefit granted when the one-shot announcement effect is executed that is the first benefit, or while there are cases where the benefit granted when the one-shot announcement effect is executed is the second benefit, there are no cases where the benefit granted when the one-shot announcement effect is executed that is the first benefit.
[0188] <Other Modifications> Modifications not mentioned in the above description are listed below.
[0189] First, in this embodiment, the button image bg1 and the button image bg2 are predetermined, but at least one of these images may be made to suggest the probability of winning a jackpot depending on the state, like the performance state of the cut-in performance described above. In particular, when one of these images is made to suggest the probability of winning a jackpot depending on the state, it is preferable to target the button image bg2.
[0190] In addition, in each special chart variation pattern derivation state, if the special chart variation pattern is determined using the special chart variation pattern lottery table disclosed in this embodiment, the special chart variation pattern may be determined using another special chart variation pattern lottery table, or the special chart variation pattern may be determined without using the special chart variation pattern lottery table (without drawing). However, in each special chart variation pattern derivation state, it is preferable that the special chart variation pattern is determined using the special chart variation pattern lottery table disclosed in this embodiment for more than half of the period during which the special chart variation pattern derivation state continues.
[0191] In addition, in the above-mentioned embodiment, the transition from the special pattern variation pattern derivation state PA to the special pattern variation pattern derivation state PD occurs based on the number of times the pattern variation is performed, but is not limited to this. Specifically, in some cases where the pattern variation in which the result of the special pattern hit / miss judgment is a miss has ended (when the stop pattern of the special pattern at the time of miss becomes a specific stop pattern), the special pattern variation pattern derivation state PA may be transitioned to the special pattern variation pattern derivation state PD. Furthermore, in this case, it is preferable that the transition condition includes the end of the pattern variation corresponding to the transition condition, but instead of the end of the pattern variation, the start of the pattern variation corresponding to the transition condition may be included.
[0192] In addition, in the above-mentioned embodiment, the probability of winning a jackpot in the special chart variation pattern derivation state PA is the same as the probability of winning a jackpot in the special chart variation pattern derivation state PD, but this is not limited to this. The former probability may be lower than the latter probability. According to this, the transition from the special chart variation pattern derivation state PA to the special chart variation pattern derivation state PD can further increase the interest in playing.
[0193] In addition, in the present embodiment, as long as the relationship between the probability, rate, and frequency is guaranteed, the lower probability, rate, and frequency may not be a winner, or the higher probability, rate, and frequency may be a winner. In either case, the lottery may not be held at all. Furthermore, each lottery value in the lottery table illustrated in this embodiment is just an example, and as long as the magnitude relationship between the lottery tables is maintained, each lottery value may adopt any value within the range.
[0194] In the above explanation, the recovery state at the time of power recovery is determined by referring to the state of the RAM clear switch 43 at the time of power recovery, but it may be possible to refer to whether the time that the RAM clear switch 43 is in the ON state after power recovery exceeds a specified time (e.g., 3 seconds). In this way, the occurrence of erroneous RAM clear processing can be further suppressed.
[0195] In the above description, the state of the middle frame open door sensor 76 (open / closed state of the middle frame 17) was referenced when determining the return state when power was restored, but the return state may be set without reference to that state. In this case, the return state when power was restored may be set uniformly according to the case where the middle frame open door sensor 76 is ON (the middle frame 17 is open).
[0196] The present invention described above is not limited to the above description, and includes various modifications and improvements as long as the object of the present invention is achieved.
[0197] <Additional Notes> The present embodiment encompasses the following technical idea. (1) An operating means; The means of production, A performance control means for controlling the performance means; A gaming machine that awards a bonus when a predetermined awarding condition is satisfied, The presentation means includes a first presentation means and a second presentation means, The performance control means includes: As a performance requesting one or more game operations, a first operation request performance and a second operation request performance can be executed by the first performance means, During an operation effective period related to the first operation request performance, a first notification performance can be executed by the first performance means in response to a game operation being performed with the operation content requested in the first operation request performance; During an operation effective period related to the second operation request performance, when a game operation is performed with the operation content requested in the second operation request performance, it is possible to cause the first performance means to execute a second notification performance; When the predetermined granting condition is satisfied, it is possible to cause the second performance means to execute a one-shot notification performance that definitively notifies the granting of the benefit based on a game operation being performed during an operation valid period related to the first operation request performance, When a game operation is performed during the operation effective period related to the second operation request performance, the one-shot notification performance is not executed, Regarding the execution rate of the one-shot announcement performance when the predetermined granting condition is satisfied, When a first game operation is performed during an operation effective period related to the first operation request presentation, the one-shot notification presentation is executed at a higher rate than when a second game operation is performed during an operation effective period related to the first operation request presentation, Alternatively, when a first game operation is performed during the operation valid period related to the first operation request presentation, the one-shot notification presentation may be executed, whereas when a second game operation is performed during the operation valid period related to the first operation request presentation, the one-shot notification presentation is not executed, The first game operation is an operation subsequent to the second game operation, The privileges include a first privilege and a second privilege having a higher advantage than the first privilege, Regarding the benefit granted when the one-shot announcement performance is executed, A rate at which the bonus granted when the one-shot announcement performance is executed is the second bonus is higher than a rate at which the bonus granted when the one-shot announcement performance is executed is the first bonus. Alternatively, the bonus granted when the one-shot announcement performance is executed may be the second bonus, but the bonus granted when the one-shot announcement performance is executed may not be the first bonus. A gaming machine characterized by: (2) The gaming machine according to (1) above, The first notification effect and the second notification effect are effects that suggest the expectation of the award of the privilege, The second notification performance has a higher accuracy of suggesting the expectation of the award of the privilege than the first notification performance. A gaming machine characterized by: (3) The gaming machine according to (1) or (2) above, The number of game operations requested in the first operation request presentation is different from the number of game operations requested in the second operation request presentation. A gaming machine characterized by: (4) A gaming machine according to any one of (1) to (3) above, The first operation request effect is an effect that requests a plurality of game operations, The first gaming operation is a gaming operation performed after the second gaming operation is performed. Regarding the execution rate of the one-shot announcement performance when the predetermined granting condition is satisfied, When the first game operation is performed, the one-shot notification effect is executed at a higher rate than when the second game operation is performed and the first game operation is not performed. Alternatively, when the first game operation is performed, the one-shot notification effect may be executed, whereas when the second game operation is performed and the first game operation is not performed, the one-shot notification effect is not executed. A gaming machine characterized by: (5) A gaming machine according to any one of (1) to (3) above, The first operation request effect is an effect that requests one game operation, The second game operation is a game operation during a first period of an operation effective period related to the first operation request presentation, The first game operation is a game operation in a second period that is subsequent to the first period of an operation effective period related to the first operation request presentation. A gaming machine characterized by: [Explanation of symbols]
[0198] 10 Gaming machines 15 Outer Frame 17 Middle Frame 20 Front frame 21 Hinge mechanism 22 Movable Decorations 23 Cylinder lock 25 Transparent materials 27 Upper ball tray 29 Lower ball tray 31 Operating handle 32 Upper frame part 33(33a, 33b) Speaker 34a, 34b Left and right side frame parts 35(35a, 35b, 35c) Frame Lamp 36 Ball removal mechanism 37 Production button 38 Cursor Button 38a Up cursor button 38b Down cursor button 38c Left cursor button 38d Right cursor button 38e Middle cursor button 39 Main operation section 39a Ball loan button 39b Return button 40 Power Switch 43 RAM clear switch 46 Game Ball Tank 47 Tank Rail 48 Dispatch Unit 49 Dispatch Passage 50 Game Board 50a Gaming area 51 Outer rail 52 Windmill 53 Inner rail 54 Protective materials 55 Grand Prize Winner 57 First starting point 59 Second starting point 61 Normal Electric Devices 62 Normal electric accessory solenoid Gate 63 65 Special Electric Devices 66 Special electric device solenoid 67 General Prize Winners 69 Outlet 70 First starting sensor 71 Second starting port sensor 72 Large prize entrance sensor 73 General prize entry sensor 74 Gate Sensor 75 Out ball sensor 76 Middle frame door open sensor 77 Front frame door open sensor 80 Performance display device 81 Main display 82 Sub display 82a Upper sub display 82b Left sub display 82c Right sub display 85 Notification lamp 90 Pattern display device 91 First special pattern display device 92 Second special pattern display device 93 Ordinary pattern display device 94 1st special pattern reserved lamp 95 2nd Special Design Hold Lamp 96 Normal pattern hold lamp 100 Main control board 101 CPU 102 ROM 103 RAM 104 I / O ports 105 Random Number Circuit 109 Main control board case 110 Ball entrance determination method 115 Main random number generator 120 Main Hold Control Means 125 Preliminary Judgment Measures 130 Special drawing lottery method 131 Means of determining whether or not a special drawing is correct 132 Special stop pattern lottery means 133 Means for deriving special chart variation patterns 135 General drawing method 140 Jackpot game control means 145 Pattern display control means 150 Electrical device control means 155 Game status control means 160 Main information storage means 165 Main Error Control Measures 170 Main Command Management Method 175 Power restoration processing execution means 176 Return state setting means 179 Means for transitioning to playable state 180 Power cut processing execution means 200 1st sub-control board 201 CPU 202 ROM 203 RAM 204 I / O ports 209 1st sub-control board case 210 Sub-random number generator 220 Normal Production Control Means 221 Presentation mode control means 222 Means of determining the direction route 223 Sub-hold control means 224 Predictive performance control means 225 Means for determining production content 226 Decorative pattern control means 227 Jackpot performance control means 230 Sub-error Control Measures 240 Lamp control means 245 Movable object control means 260 Sub-information storage means 270 Subcommand Management Method 300 Second sub-control board 301 CPU 302 ROM 303 RAM 304 I / O ports 309 Second sub-control board case 310 Voice control board 311 CPU 312 ROM 313 RAM 314 I / O ports 400 Dispatch control board 409 Dispensing control board case 500 Power supply control board 501 Normal power circuit 502 Backup power circuit 503 Power interruption detection circuit 509 Power supply control board case 811 Display area X First flow path Y Second flow path sg Instruction Image bg button image bg1 button image bg2 button image mg meter image tg specific image tg1 specific image tg2 specific image tg3 specific image hg crack image kg Cut-in image kg1 Cut-in image kg2 cut-in image kg3 cut-in image
Claims
[Claim 1] An operating means; The means of production, A performance control means for controlling the performance means; A gaming machine that awards a bonus when a predetermined awarding condition is satisfied, The presentation means includes a first presentation means and a second presentation means, The performance control means includes: As a performance requesting one or more game operations, a first operation request performance and a second operation request performance can be executed by the first performance means, During an operation effective period related to the first operation request performance, a first notification performance can be executed by the first performance means in response to a game operation being performed with the operation content requested in the first operation request performance; During an operation effective period related to the second operation request performance, when a game operation is performed with the operation content requested in the second operation request performance, it is possible to cause the first performance means to execute a second notification performance; When the predetermined granting condition is satisfied, it is possible to cause the second performance means to execute a one-shot notification performance that definitively notifies the granting of the benefit based on a game operation being performed during an operation valid period related to the first operation request performance, When a game operation is performed during the operation effective period related to the second operation request performance, the one-shot notification performance is not executed, Regarding the execution rate of the one-shot announcement performance when the predetermined granting condition is satisfied, When a first game operation is performed during an operation effective period related to the first operation request performance, the one-shot notification performance is executed at a higher rate than when a second game operation is performed during the operation effective period; Alternatively, when a first game operation is performed during an operation effective period related to the first operation request performance, the one-shot notification performance may be executed, and when a second game operation is performed during the operation effective period, the one-shot notification performance is not executed, The first game operation during an operation valid period related to the first operation request presentation is an operation subsequent to the second game operation during the operation valid period, When a third game operation subsequent to the first game operation is performed during an operation effective period related to the first operation request performance, the one-shot notification performance is executed at a higher rate than when the first game operation is performed during the operation effective period, The number of game operations requested in the first operation request presentation is different from the number of game operations requested in the second operation request presentation, The first gaming operation is a gaming operation performed after the second gaming operation is performed, The third gaming operation is a gaming operation performed after the first gaming operation is performed. A gaming machine characterized by:
Citation Information
Patent Citations
Game machine
JP2017023686A
Game machine
JP2018015393A
Game machine
JP2018020177A
Game machine
JP2019103555A
JPP7305192B
