Gaming Machines
The gaming machine addresses insufficient energy savings in pachinko machines by using a frame design and handle torque variations to adjust performance device outputs, achieving energy-efficient operation.
Patent Information
- Application Number
- JP2020153692
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-09-14
- Publication Date
- 2024-10-03
- Estimated Expiration
- 2040-09-14
AI Technical Summary
Conventional gaming machines, such as pachinko machines, do not achieve sufficient energy savings in their performance controls, particularly in audio and light emission, despite existing technologies.
The gaming machine incorporates a main body with an inner and front frame that can be opened and closed, featuring a handle with varying operating torques and a production control mechanism that adjusts output based on symbol variation and player interaction, along with reduced performance device outputs during idle states.
This configuration enhances energy savings by optimizing performance device usage and reducing unnecessary power consumption during idle periods.
Smart Images

Figure 0007560979000001 
Figure 0007560979000002 
Figure 0007560979000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a gaming machine, and more particularly to a gaming machine capable of appropriate control of presentation devices. [Background technology]
[0002] Conventionally, in pachinko machines, which are one type of gaming machine, various kinds of performance control are executed in accordance with the change in the symbols. Examples of performance control include sound control corresponding to the change in the symbols or the game state, and light emission control using LEDs or the like arranged on the frame or game board. Patent Document 1 discloses a control that reduces the volume of the sound when a predetermined condition is met, and this control aims to save energy. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 6036929 Summary of the Invention [Problem to be solved by the invention]
[0004] However, the control according to the above-mentioned patent document does not sufficiently conserve energy. Therefore, the present invention provides a gaming machine that can further conserve energy. [Means for solving the problem]
[0005] In order to solve the above problems, the present invention provides a gaming machine including an inner frame capable of accommodating a gaming board forming a gaming area having a start port and an outlet port, a main frame having a front frame that can be opened and closed relative to the inner frame, and a performance control means for operating a predetermined performance device to express a predetermined performance during the variable display of a pattern that is variably displayed based on the detection of a gaming ball entering the start port, wherein if a predetermined time has elapsed since the transition to a variation end state in which the variable display of the patterns has ended, even if the game ball entering the outlet port has been detected before the predetermined time has elapsed, the performance control means reduces the output of the performance device based on the lapse of the predetermined time, and the main frame is capable of adjusting the launching force of the gaming ball and is equipped with a handle that can be rotated from an initial position to a predetermined maximum rotation position by operation by a player, and the handle has a finger grip portion that protrudes outward in the rotational radial direction of the handle, and the outermost point of the finger grip portion in the rotational radial direction protrudes below the lower edge of the main frame at the initial position and the maximum rotation position of the handle. Without the above, the operation torque required to rotate the handle from its initial position is defined as a first operation torque, the operation torque required to rotate the handle from its initial position to the left-hand reference position is defined as a second operation torque, and the operation torque required to rotate the handle from its initial position to the maximum rotation position is defined as a third operation torque. The second operation torque is greater than the first operation torque, the third operation torque is greater than the second operation torque, and the third operation torque is more than twice the first operation torque and less than twice the second operation torque. The composition was as follows. It should be noted that the above summary of the invention does not list all of the necessary features of the present invention, and each of the configurations that make up the group of features can also be an invention. Effect of the Invention
[0006] According to the gaming machine having each of the above configurations, it is possible to achieve energy conservation. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is a schematic perspective view of a pachinko machine. [Diagram 2] FIG. 2 is a schematic perspective view of a handle unit. [Diagram 3] FIG. [Figure 4] FIG. 2 is a schematic perspective view showing the internal structure of the handle unit. [Diagram 5] 4 is a graph showing changes in steering wheel operation torque. [Figure 6] FIG. [Figure 7] FIG. 2 is a control block diagram of a pachinko machine. [Figure 8] A diagram showing an overview of the special drawing win / loss determination table. [Figure 9] A diagram showing an overview of the special chart type determination table. [Figure 10] A diagram showing an overview of a variation pattern determination table. [Figure 11] FIG. 13 is a diagram showing an overview of a special game control table. [Figure 12] FIG. 13 is a diagram showing an overview of a game status setting table. [Figure 13] FIG. 13 is a diagram showing an overview of a general drawing pass / fail determination table. [Figure 14] A diagram showing an overview of the general map fluctuation pattern determination table. [Figure 15] FIG. 4 is a diagram showing an outline of an opening / closing body actuation table. [Figure 16] FIG. 11 is a flow chart showing CPU initialization processing of the main control circuit. [Figure 17] FIG. 4 is a flow chart showing a save process during power interruption of the main control circuit. [Figure 18] FIG. 11 is a flow chart showing timer interrupt processing of the main control circuit. [Figure 19] FIG. 11 is a flow chart showing a switch management process of the main control circuit. [Figure 20] A flow chart showing the first starting port passing processing of the main control circuit. [Figure 21] A flow chart showing the second starting port passing processing of the main control circuit. [Figure 22] A flow chart showing the special pattern random number acquisition process of the main control circuit. [Figure 23] A diagram explaining the special chart game management phase. [Figure 24] A flow chart showing the special game management processing of the main control circuit. [Diagram 25] A flow chart showing the special pattern change waiting process of the main control circuit. [Figure 26] A flow chart showing the processing during special pattern variation of the main control circuit. [Figure 27] A flow chart showing the processing after the special pattern has stopped by the main control circuit. [Figure 28] A flow chart showing the processing before opening of the large prize opening of the main control circuit. [Figure 29] A flow chart showing the large prize opening / closing switching process of the main control circuit. [Diagram 30] A flow chart showing the large prize opening control processing of the main control circuit. [Diagram 31] A flow chart showing the effective processing of closing the large prize opening of the main control circuit. [Diagram 32] A flow chart showing the large prize opening end wait processing of the main control circuit. [Diagram 33] FIG. 4 is a flowchart showing a process of determining whether to reduce output of the main control circuit. [Diagram 34] A figure showing an example of a performance pattern S. [Diagram 35] A diagram showing the flow of the changing display of the performance pattern S. [Diagram 36] A flow chart showing the sub-CPU initialization processing of the performance control circuit. [Figure 37] 13 is a flow chart showing the sub timer interrupt processing of the performance control circuit. [Figure 38] A flow chart showing the variable pattern command receiving processing of the performance control circuit. [Figure 39] A figure showing an example of a variable performance pattern determination table. [Diagram 40] 11 is a flow chart showing the time schedule management process of the performance control circuit. [Diagram 41] 11 is a flow chart showing the low-output execution process of the performance control circuit. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] The present invention will be described in detail below through embodiments, but the following embodiments do not limit the invention according to the claims, and not all of the combinations of features described in the embodiments are necessarily essential to the solution of the invention.
[0009] [Overall configuration of the gaming machine] A pachinko machine 1 as an example of a gaming machine mainly comprises an outer frame 2 of a vertically rectangular shape installed in an island facility of a gaming parlor, an inner frame (middle door) 3 attached to one side of the outer frame 2 by a hinge mechanism so as to be freely opened and closed, a game board 30 (see FIG. 10) housed in the inner frame 3, a front frame (front door) 4 pivoted to be openable and closable in front of the inner frame 3, a glass window 4A arranged in the center, and a receiving tray 6 arranged below the glass window 4A, a handle unit 7 protruding forward from one side of the lower part of the front frame 4, and a speaker unit 8 as a kind of presentation device arranged on both sides of the upper part of the front frame 4. The sound output control of the speaker unit 8 is mainly executed by a presentation control circuit 200. When the front frame 4 is closed on the inner frame 3 side, a player seated in front of the pachinko machine 1 can see the game area 31 (see FIG. 10) of the game board 30 housed in the inner frame 3 through a glass window 4A arranged in the front frame 4. A plurality of panel side LED boards Q are arranged inside the front frame 4 as a type of performance device. The panel side LED board Q is equipped with a large number of LEDs capable of emitting multicolor light. The light emission control of the panel side LED board Q is mainly executed by the performance control circuit 200. Note that in this example, an LED board equipped with a plurality of LEDs is used as an example, but a board capable of emitting light using an incandescent bulb or 7 segments may also be used.
[0010] An operation mechanism 9 is provided in the center of the tray 6 as an operation means that can be operated by the player at will. The operation mechanism 9 is composed of a circular push button 9A that can be pressed by the player, and a dial 9B that can be rotated around the push button 9A by the player. The operation mechanism 9 is connected to a performance control circuit 200 described later, and signals output from the push button 9A and the dial 9B are input to the performance control circuit 200. A ball lending switch 10A and a return switch 10B are provided in the tray 6. The ball lending switch 10A and the return switch 10B are connected to a payout control circuit 150 described later. When the ball lending switch 10A is operated by the player, the payout control circuit 150 executes control to pay out game balls to the player that correspond to the number of balls that can be lent recorded on a recording medium such as an IC card. When the return switch 10B is operated, a recording medium return operation is executed from an IC card reader (not shown) connected to the gaming machine 1.
[0011] [Handle unit configuration] FIG. 2 is an enlarged perspective view showing the appearance of the handle unit 7. As shown in the figure, the handle unit 7 includes a substantially hemispherical holding portion 700 that bulges forward, a handle 800 that is provided on the outer periphery of the holding portion 700 so as to be rotatable about the center of the holding portion 700, and a base body 900 that can be fixed to the front frame 4 from the front side. The handle 800 has an annular portion 810 along the outer periphery of the hemispherical holding portion 700 and three finger hooks 820A to 820C that protrude radially outward on the annular portion 810. The three finger hooks 820A to 820C are shaped so that any finger (e.g., thumb, index finger, middle finger) can be hooked on them when the player rotates the handle 800. In the illustrated example, the apex is shifted to one side in the circumferential direction, and the other side in the circumferential direction is a curved long side, and one side in the circumferential direction is a curved short side, forming a substantially triangular (wave-shaped) shape. When a player places any finger on the finger rests 820A to 820C and rotates the handle 800 from the initial position shown in the figure in the other circumferential direction (rightward), the handle 800 can be rotated in the other direction, for example, up to a range of 100° to 120°. The operation amount (rotation angle) of the handle 800 is approximately proportional to the launch force of the launch mechanism not shown in the figure, and when the handle 800 is rotated to the maximum operation amount, for example, the game ball is shot out with a launch force that lands on and flows down the right-hand hitting area ER described later. On the other hand, by displacing the operation amount in one direction in the circumferential direction, the launch force gradually weakens, and the game ball tends to land on and flow down the left-hand hitting area EL.
[0012] Next, the dimensions of each part of the handle unit 7 will be described with reference to FIG. 3. In the following description, the reference point for the dimensions is the center O of the hemispherical holding part 700. As shown in the figure, the dimension D1 to the outermost point (outermost part) of the finger hook part 820A is set to 53.4 mm. The dimension D2 to the outermost point of the finger hook part 820B is set to 45.6 mm. The dimension D3 to the outermost point of the finger hook part 820C is set to 39.3 mm. The dimension D4 to the annular part 810 excluding the finger hook parts 820A to 820C is set to 34.6 mm. The dimension D5 to the lower edge S1 of the front frame 4 is set to 40 mm. The dimension D6 to the right edge T1 of the front frame 4 is set to 49.1 mm.
[0013] With the front frame 4 closed relative to the inner frame 3, the dimension D7 to the lower edge S2 of the inner frame 3 is set to 45.0 mm. Also, the dimension D8 to the right edge T2 of the inner frame 3 is set to 51.1 mm.
[0014] Next, the relationship between the main body frame and the multiple finger hooks 820A to 820C formed on the handle 800 of the handle unit 7 set to the above dimensions will be described. In the initial position of the handle 800 shown in the figure, the outermost points of the finger hooks 820A to 820 do not protrude below the lower edge of the main body frame (either the lower edge S1 of the front frame 4 or the lower edge S2 of the inner frame 3). In addition, when the handle 800 is displaced from θ1, which is the angle of the initial position, to θ2, which is the angle of the maximum rotation position, the outermost points of the finger hooks 820A to 820 at the maximum rotation position do not protrude below the lower edge of the main body frame (either the lower edge S1 of the front frame 4 or the lower edge S2 of the inner frame 3). With this configuration, even if the main body frame is temporarily placed on the floor surface or the like when attaching it to the outer frame 2, the finger hooks 820A to 820C do not come into contact with the floor surface, so that the handle 800 is not damaged and the risk of component damage can be reduced. In the above example, the positional relationship of the finger hooks 820A to 820C at the initial position and the maximum rotation position of the handle 800 has been described, but the finger hooks 820A to 820C may be configured not to protrude below the lower edge of the main body frame at any rotation position of the handle 800.
[0015] In addition, in the initial position of the handle 800, the outermost points of the finger hooks 820A to 820 do not protrude rightward from the right edge of the main frame (either the right edge T1 of the front frame 4 or the right edge T2 of the inner frame 3). In addition, in the maximum rotation position of the handle 800, the outermost points of the finger hooks 820A to 820 do not protrude rightward from the right edge of the main frame (either the right edge T1 of the front frame 4 or the right edge T2 of the inner frame 3). Furthermore, the handle 800 may be configured such that the finger hooks 820A to 820C do not protrude rightward from the right edge of the main frame at any rotation position. In addition, when the handle 800 is rotated to the maximum rotation position, the outermost point of the finger hook 820A, which has the largest radially outward protruding dimension, is not located at the lowest point of the rotation trajectory of the handle 800.
[0016] Next, the internal structure of the handle unit 7 will be described with reference to FIG. 4. FIG. 4 is a perspective view showing the inside of the handle unit 800 with the holding part 700 removed. As shown in the figure, in the assembled state of the handle unit 7, the handle 800 is rotatably attached via a central shaft 910 protruding from a cylindrical base body 900 fixed to the front frame 4 and a guide shaft 920 protruding around the central shaft. The central shaft 910 passes through a circular hole formed at the center of the flat part 830 of the handle 800. The multiple guide shafts 920 pass through multiple guide holes 830A; 830B formed around the flat part 830 and extending in the circumferential direction. When the handle 800 is rotated from the initial position, the multiple guide shafts 920 come into contact with the circumferential ends of the corresponding guide holes 830A; 830B, and further rotation is restricted. In other words, guide shaft 920 and guide holes 830A; 830B have both a function of guiding the rotation of handle 800 and a function as a stopper that restricts the rotatable angle within a certain range.
[0017] The handle 800 is provided with a ring slider 840 that is supported by and penetrates the central shaft 910. The ring slider 840 is supported by the central shaft 910, and a coil spring 845 is wound around the outer periphery of the ring slider 840. One end of the coil spring 845 is hooked to the spring receiving piece 915 of the base body 900, and the other end is hooked to the spring receiving piece 815 of the handle 800. Therefore, the coil spring 845 constantly exerts a rotational force on the handle 800 in the direction of the initial position, and when the player releases his grip on the handle 800, the handle 800 returns to the initial position and comes to a standstill.
[0018] On the other hand, when the handle 800 is in the initial position shown in the figure and the player rotates the handle 800 to the right, the handle 800 rotates against the elastic force of the coil spring 845 and stops at the maximum rotation position.
[0019] Next, the operation torque required when rotating the handle 800 from the initial position to the maximum rotation position will be described. FIG. 5 is a graph showing the change in operation torque in the first and second embodiments. In the graph, the initial position is a position where the rotation angle is 0°, the left-hand hit reference position is a position where the rotation angle (first operation angle) is in the range of 45° to 60°, and the right-hand hit reference position (maximum rotation position) is a position where the rotation angle (second operation angle) is in the range of 100° to 120°. The first operation angle may be set to half or less of the second operation angle. The reason why the left-hand hit reference position and the right-hand hit reference position have a certain range is because the range in which the game ball can be hit into the left-hand hit area EL and the right-hand hit area ER differs depending on the arrangement of the nails arranged on the game board 30 and the board configuration.
[0020] As shown in the graph, in this embodiment, the minimum operating torque T required to rotate the handle 800 from the initial position is set to 6.8 N. The operating torque T required to rotate the handle 800 from the left-handed reference position to the right-handed reference position is set to 13.6 N. The operating torque T required to maintain the handle 800 at the right-handed reference position is set to 23.8 N. In other words, if the operating torque required to rotate the handle 800 from its initial position is defined as the first operating torque, the operating torque required to rotate the handle 800 from its initial position to the left-hand hit reference position is defined as the second operating torque, and the operating torque required to rotate the handle 800 from its initial position to the right-hand hit reference position is defined as the third operating torque, the second operating torque is greater than the first operating torque and the third torque is greater than the second torque, and particularly in Example 1, the third operating torque is less than twice the second torque.
[0021] That is, in comparison with Comparative Example 1 and Comparative Example 2, the gradient of increase in the operation torque from the initial position to the right hit reference position is gentle, and in particular, the difference between the operation torque T at the right hit reference position where the operation torque is the largest and the operation torque T at the left hit reference position is small, so that the fatigue of the player can be alleviated and the burden can be reduced. Also, since the second operation torque is less than twice the first torque, the fatigue of the player can be alleviated and the burden can be reduced in the same manner as above.
[0022] [About the game board configuration] As shown in FIG. 6, the game board 30 housed in the inner frame 3 has a game area 31 partitioned into a substantially circular shape by the outer guide rail 27 and the inner guide rail 28. The game area 31 is a space formed between the front surface of the game board 30 and the rear surface of the glass window 4A. Numerous nails and windmills (not shown) are arranged on the game board 30, and a game ball launched by a launching mechanism (not shown) by the player's operation of the handle unit 7 flows down in the game area 31 while being irregularly guided by the numerous nails and windmills. The game area 31 is divided into a left hitting area EL and a right hitting area ER, roughly with a line CL as a boundary, and the strength of the game ball launch can be adjusted by operating the handle unit 7 to select which area the game ball will flow down onto.
[0023] On the surface of the game board 30, game components such as a first start component 60, a second start component 62, a big prize device 64 as an attacker, a plurality of general prize components 66, and a passing gate 68 are arranged. When a game ball enters these start components or prize components, it is detected by switches (first start port detection switch SW1, second start port detection switch SW2, big prize port detection switch SW3, general prize port detection switch SW4, gate detection switch SW5) built into each component. When a game ball enters the first start component 60 or the second start component 62, in addition to paying out prize balls, the main control circuit 100 opens the big prize device 64 and executes various lotteries, including a lottery regarding the possibility of a special game (big prize game, small prize game) that creates an advantageous state for the player, a lottery for determining the mode of the special game, or a game state after the special game. That is, the entry of a game ball into the first starting component 60 or the second starting component 62 serves as an opportunity to take part in the various lotteries described above.
[0024] A plurality of board-side LED boards R are arranged on the game board 30 as a type of performance device. A large number of LEDs capable of emitting multicolor light are mounted on the board-side LED boards R. The light emission control of the board-side LED boards R is mainly performed by the performance control circuit 200.
[0025] The first starting part 60 is located at the approximate center of the game board 30 in the left-right direction, and has a ball entry port (starting port) that opens upward and is not shown in the figure. The second starting part 62 has an opening / closing body 63 that can be in a closed state shown by a dashed line in FIG. 10 and an open state shown by a solid line, and the difficulty of getting a ball into the second starting part 62 changes depending on the state of the opening / closing body 63. Specifically, when the opening / closing body 63 is in a closed state upright in the vertical direction, it is extremely difficult or impossible to get a ball into the starting port (not shown in the figure) of the second starting part 62 due to the relationship with the obstacle part located directly above the second starting part 62. On the other hand, when the opening / closing body 63 is in an open state tilted in the left-right direction, it is easy to get a ball into the second starting part 62 due to the relationship with the obstacle part located directly above the second starting part 62.
[0026] The opening operation of the opening / closing body 63 is executed when a lottery regarding whether or not the opening operation of the opening / closing body 63 should be executed by the main control circuit 100 in response to the passage of a game ball through a passing gate 68 arranged within the game area 31 results in a winning result.
[0027] The big prize device 64 disposed below the second starting component 62 includes a horizontally long rectangular big prize opening 64A and an opening / closing body 64B that closes or opens the front of the big prize opening 64A. The opening / closing body 64B can be opened in the front-rear direction with the lower side as the center of rotation according to the operation of the solenoid SOL2. When the opening / closing body 64B is in the closing operation, it closes the big prize opening 64A while standing upright parallel to the surface of the game board 30, and when it is in the opening operation, the upper side rotates forward to open the opening / closing body 64B, which receives the game balls flowing down from upstream and guides them to the big prize opening 64A side.
[0028] At the bottom of the game area 31, an out hole 69 is provided to collect game balls that have not entered any of the winning components. Game balls that have entered the out hole 69 are detected by an out ball detection switch SW6 disposed behind the game board 30, and then discharged to the outside. Note that a plurality of out holes 69 may be provided. In this case, all out balls can be detected by disposing an out ball detection switch SW6 in a discharge trough that collects and discharges game balls that have entered each out hole 69. The out balls detected by the out ball detection switch SW6 are constantly counted by an out ball counter provided in the main control circuit 100. The value of the counter (the number of out balls) is output to a host computer or the like not shown via an external information output terminal board 151. Also, a configuration may be adopted in which a number of out balls designation command including the value of the counter is transmitted to the performance control circuit 200 side described later. With this configuration, it is also possible to notify the player of a more accurate difference in the number of balls calculated from the winning balls and the number of out balls acquired in the special game described below.
[0029] The performance display device 50, which is a liquid crystal display device, is provided in the approximate center of the game board 30 as a type of performance device. The performance display device 50 is, for example, a display device equipped with a liquid crystal display, and has a performance display unit 50A that can display various images such as images related to the performance pattern S described below, images related to variable performances displayed in conjunction with the variable display of the performance pattern S, and images displayed during special games. In general, a player progresses through the game while visually checking the performances based on the various image displays displayed on the performance display unit 50A. The display control of images on the performance display device 50 is executed by the performance control circuit 200.
[0030] Outside the play area 31 of the play board 30, there are provided a first special symbol display device 35A, a second special symbol display device 35B, a first special symbol reserved display device 36A, a second special symbol reserved display device 36B, a normal symbol display device 37, and a normal symbol reserved display device 38. Each display device is controlled by the main control circuit 100 according to the progress of the game, and notifies the player of the game status by changes in its display.
[0031] [About the internal structure of a pachinko machine] 7 is a block diagram showing the configuration of the control means responsible for controlling the pachinko machine 1. As shown in the figure, the pachinko machine 1 is equipped with a main control circuit 100 that mainly controls basic operations related to the overall game, a payout control circuit 150 that mainly controls the payout operation of game balls, a launch control circuit 160 that mainly controls the launch operation of game balls, and a performance control circuit 200 that mainly controls each of the above-mentioned performance devices.
[0032] The main control circuit 100 comprises a (main) CPU 100a, a (main) ROM 100b, and a (main) RAM 100c. The CPU 100a of the main control circuit 100 reads out a program prestored in the ROM 100b in response to inputs from each detection switch and an internal timer, which will be described later, and performs arithmetic processing according to the program. The main control circuit 100 also directly controls each of the above-mentioned devices connected to the main control circuit 100, and transmits various commands to other control circuits. At this time, the RAM 100c also functions as a work area during arithmetic processing by the CPU 100a, and temporarily stores various data and commands required for the calculation.
[0033] As shown in Figure 7, the main control circuit 100 is connected to a first start port detection switch SW1 which detects the entry of a game ball into the first start component 60, a second start port detection switch SW2 which detects the entry of a game ball into the second start component 62, a large prize port detection switch SW3 which detects the entry of a game ball into the large prize device 64, a general prize port detection switch SW4 which detects the entry of game balls into the multiple general prize components 66, a gate detection switch SW5 which detects the passage of a game ball through the passing gate 68, and an out ball detection switch SW6, and the detection signals output from each detection switch are input to the main control circuit 100.
[0034] Also connected to the main control circuit 100 are a solenoid SOL1 for opening and closing the opening / closing body 63 provided in the second starting component 62, and a solenoid SOL2 for opening and closing the opening / closing body 64B provided in the big prize device 64. These solenoids SOL1 and SOL2 are directly controlled by the main control circuit 100. Also connected to the main control circuit 100 are the first special symbol display device 35A, the second special symbol display device 35B, the first special symbol reserved display device 36A, the second special symbol reserved display device 36B, the normal symbol display device 37, and the normal symbol reserved display device 38, and these display devices are directly controlled by the main control circuit 100.
[0035] The payout control circuit 150 and the performance control circuit 200 are connected to the main control circuit 100. The payout control circuit 150 is a microcomputer equipped with a CPU, ROM, and RAM (not shown) like the main control circuit 100, and is connected to the main control circuit 100 so as to be able to communicate with it. In addition, an external information output terminal board 151 is connected to the main control circuit 100 and the payout control circuit 150. The external information output terminal board 151 transmits various information related to the progress of the game output from the main control circuit 100 (CPU 100a) and the payout control circuit 150 (payout CPU not shown) to a host computer provided in the parlor where the pachinko machine 1 is installed.
[0036] The payout control circuit 150 is connected to a payout motor 152 for paying out game balls (prize balls, loan balls) to a player, and a ball counting switch 153. The payout control circuit 150 controls the payout motor 152 so that a predetermined number of prize balls is paid out based on prize ball number information included in the payout command transmitted from the main control circuit 100. The prize balls paid out by driving the payout motor 152 are detected by the ball counting switch 153, and the payout control circuit 150 side determines whether the appropriate prize balls have been paid out. In addition, the payout control circuit 150 controls the payout motor 152 so that a predetermined loan number is paid out based on an input from the ball loan switch 10A. The loan balls paid out by driving the payout motor 152 are detected by the ball counting switch 153, and the payout control circuit 150 side determines whether the appropriate loan balls have been paid out. In addition, various switches are connected to the payout control circuit 150, such as a tray full detection switch that detects when more than the allowable number of game balls are stored in the receiving tray 6, and a door open detection switch that detects when the doors of the front frame 4 or inner frame 3 are open.
[0037] The launch control circuit 160 is connected to a touch sensor 161 mounted in the handle unit 7, a launch volume 162, a ball feed motor 163 that sends game balls stored in the tray 6 into a launch mechanism not shown in the figure, and a ball launch motor 164 housed in the launch mechanism. The launch control circuit 160 controls the ball launch motor 164 based on an input signal from the launch volume 162 that changes according to the amount of operation of the handle unit 7 by the player, on the condition of launch permission from the payout control circuit 150 and input from the touch sensor 161, and launches the game balls stored in the tray 6 into the play area 31 with a predetermined launch force. The input information of the touch sensor 161 is transmitted to the main control circuit 100 side via the payout control circuit 150. The main control circuit 100 may control the performance device based on the input information (presence or absence of input) of the touch sensor 161.
[0038] The performance control circuit 200 controls various performance displays during game progress and standby. The performance control circuit 200 includes a (sub) CPU 200a, a (sub) ROM 200b, and a (sub) RAM 200c, and is connected to the main control circuit 100 so that communication (one-way communication) is possible only from the main control circuit 100 to the performance control circuit 200. The performance control circuit 200 reads out a program prestored in the ROM 200b and performs arithmetic processing based on various commands related to performance transmitted from the main control circuit 100 and input signals from an internal timer, and executes image control of the performance display unit 50A of the performance display device 50 connected to the performance control circuit 200. The performance control circuit 200 also executes sound output control to output sounds such as music (BGM) and sound effects from the speaker unit 8 during game progress (for example, during the variation of special symbols and during execution of special games). The performance control circuit 200 also executes light emission control to cause the LEDs mounted on the panel side LED board Q arranged on the front frame 4 and the board side LED board R arranged on the game board 30 to emit light in various patterns according to the progress of the game. At this time, the RAM 200c functions as a work area during the calculation processing of the CPU 200a, and temporarily stores various data and commands required for the calculation.
[0039] The performance control circuit 200 is connected to the CPU 200a and includes an image control means such as a VDP for receiving various commands related to image display transmitted from the CPU 200a and displaying various images on the performance display unit 50A, and a VRAM for temporarily storing various data required during the image display process. The performance control circuit 200 also includes audio control means such as audio data related to multiple songs and sound effects and an audio synthesis LSI. The performance control circuit 200 also includes multiple light emission pattern data and light emission control means such as a driver circuit between each LED board Q, R. The performance control circuit 200 controls these multiple performance devices according to the progress of the game. The performance control circuit 200 can also reduce the output of each of the performance devices compared to the normal state according to the game situation.
[0040] For example, in this example, a volume reduction process can be executed to reduce or turn off the volume of the music played during the special symbol fluctuation or in the fluctuation waiting state before the fluctuation in response to the establishment of a predetermined condition. Also, for example, a light emission reduction process can be executed to reduce the brightness or turn off the LED that emits light during the special symbol fluctuation or in the fluctuation waiting state in response to the establishment of a predetermined condition. These reduction processes will be described later.
[0041] The performance control circuit 200 is connected to the aforementioned operation mechanism 9, which can be operated at will by the player, and can execute the aforementioned controls in accordance with the timing of operation (pressing) of a push button 9A arranged on the operation mechanism 9, for example, to express a predetermined performance in accordance with the operation timing of the operation mechanism 9.
[0042] Although not shown in the figure, a power supply circuit is connected to each of the above-mentioned control circuits, and by operating a power switch provided on the power supply circuit, power is supplied from an external power source on the gaming establishment side, and the external power is generated as a power source necessary for the operation of each control circuit, and each control circuit is started by supplying the generated power to each control circuit. The power supply circuit is also equipped with a backup power source such as a capacitor, and in the event of a power outage, power is supplied from the backup power source to the main control circuit 100 and the payout control circuit 150, and various data and commands stored in the RAM of these two control circuits are retained. The power supply circuit is also equipped with a dedicated backup power source for the performance control circuit 200, and in the event of a power outage, some of the various data and commands stored in the RAM are stored in a separately equipped backup RAM by power supply from the dedicated backup power source.
[0043] Below, we will outline the flow of play on the pachinko machine 1 configured as above. When the game ball flowing down in the game area 31 enters the first starting part 60 or the second starting part 62 by the operation of the handle unit 7 by the player, the main control circuit 100 executes various lotteries such as a lottery for playing a special game (so-called a big win game) (hereinafter also referred to as a special symbol win lottery), a lottery for determining the type of special symbol (hereinafter also referred to as a special symbol type determination lottery), and a lottery for determining the variation pattern of the special symbol (hereinafter also referred to as a special symbol variation pattern determination lottery). If the result of the special symbol win lottery among the above lotteries is a "big win" or a "small win", the big win opening 64A of the big win device 64 is opened, and a special game (small win game, big win game) that makes it easier for the game ball to enter is executed. Below, an overview of each lottery is explained.
[0044] First, when the game ball enters the first starting component 60 or the second starting component 62, various random numbers such as a random number for determining whether or not a special game ball is won, a random number for determining the type of special game ball, and a random number for determining the variation pattern, which are referenced in the special game ball lottery, are simultaneously acquired, and the acquired random numbers are stored in a reserved memory area of the RAM 100c. In the following description, the various random numbers acquired upon the ball entering the first starting component 60 may be collectively referred to as the special 1 reservation, and the various random numbers acquired upon the ball entering the second starting component 62 may be collectively referred to as the special 2 reservation. Furthermore, the special 1 reservation and the special 2 reservation may be collectively referred to as the start information.
[0045] The reserved memory area includes a first special chart reserved memory area and a second special chart reserved memory area that can store the special 1 reserved and the special 2 reserved independently. The first special chart reserved memory area and the second special chart reserved memory area each have four memory sections (first memory section to fourth memory section). When the game ball enters the first starting part 60, the special 1 reserved is stored in the first memory section of the first special chart reserved memory area in order, and when the game ball enters the second starting part 62, the special 2 reserved is stored in the first memory section of the second special chart reserved memory area in order. However, the number of special 1 reserved and the number of special 2 reserved that can be stored in the first special chart reserved memory area and the second special chart reserved memory area are set to four, respectively, and the number of reserved items does not increase beyond the upper limit of each reserved memory area.
[0046] [About the lottery process] 8 is a diagram showing an overview of the special drawing win / loss determination table TB referred to in the special drawing win / loss lottery. When the game ball enters the first starting part 60 or the second starting part 62, one special drawing win / loss determination random number is obtained from the range of 0 to 65535. As shown in the figure, the special chart hit / miss judgment table TB is subdivided into a low probability special chart hit / miss judgment table TB1A which is referenced when the game state is a low probability of special chart and the special chart hit / miss judgment random number is obtained based on the ball entering the first starting component 60, a low probability special chart hit / miss judgment table TB1B which is referenced when the game state is a low probability of special chart and the special chart hit / miss judgment random number is obtained based on the ball entering the second starting component 62, a high probability special chart hit / miss judgment table TB2A which is referenced when the game state is a high probability of special chart and the special chart hit / miss judgment random number is obtained based on the ball entering the first starting component 60, and a high probability special chart hit / miss judgment table TB2B which is referenced when the game state is a high probability of special chart and the special chart hit / miss judgment random number is obtained based on the ball entering the second starting component 62.
[0047] In each special chart hit / miss judgment table, a judgment result ("big hit", "small hit", "miss") corresponding to the special chart hit / miss judgment random number from 0 to 65535 is specified. For example, when the low probability special chart hit / miss judgment table TB1A; TB1B is referenced, the probability that the judgment result will be a "big hit" is about 1 in 199, and the probability that the judgment result will be a "small hit" is about 1 in 100. In contrast, when the high probability special chart hit / miss judgment table TB2A;TB2B is referred to, the probability that the judgment result will be a "big hit" is about 1 / 19.9, which is 10 times the probability of the low probability special chart hit / miss judgment table TB1A;TB1B, and the probability of the "small hit" is about 1 / 100. If the special chart hit / miss judgment random number acquired above is a random number corresponding to a "big hit", the judgment result is a big hit, if it is a random number corresponding to a "small hit", the judgment result is a small hit, and if it is a random number corresponding to a "miss", the judgment result is a miss. Details will be described later, but in the small hit game executed when the judgment result is a "small hit", a small hit game that opens the large winning port 64A of the large winning device 64 is executed in the same way as the big hit game executed when the judgment result is a "big hit", but the opening pattern is a pattern in which fewer prize balls are obtained than the opening pattern in the "big hit game".
[0048] As described above, the special chart low probability state is a game state in which the lottery result is determined by referring to the special chart win / loss judgment table TB1 for low probability in the special chart win / loss lottery. On the other hand, the special chart high probability state is a game state in which the lottery result is determined by referring to the special chart win / loss judgment table TB2 for high probability in the special chart win / loss lottery, and it can be said that the judgment result is more likely to be a "jackpot" than the special chart low probability state, and it is easier to win the special game (jackpot game) described above.
[0049] 9 is a diagram showing an outline of the special chart type determination table TB referred to in the special chart type determination lottery. As shown in the figure, the special chart type determination table TB is divided into a special chart type determination table TB1, which is obtained when the special chart type determination random number is acquired by the ball entering the first starting part 60 and is referred to when the result of the special chart hit lottery is a "big hit", a special chart type determination table TB2, which is obtained when the special chart type determination random number is acquired by the ball entering the second starting part 62 and is referred to when the result of the special chart hit lottery is a "big hit", a special chart type determination table TB3, which is referred to when the result of the special chart hit lottery is a "small hit", and a special chart type determination table TB4, which is referred to when the result of the special chart hit lottery is a miss.
[0050] When the ball enters the first starting part 60 or the second starting part 62, for example, one special symbol type determination random number is obtained from the range of 0 to 99. As shown in the figure, the special symbol type determination table TB1 to the special symbol type determination table TB3 specify the special symbol type corresponding to the special symbol type determination random number from 0 to 99 at a predetermined rate (selection rate). For example, when the special symbol type determination table TB1 is referenced and the obtained special symbol type determination random number is in the range of 0 to 9, the special symbol type is determined as the big win symbol A, when it is in the range of 10 to 59, the special symbol type is determined as the big win symbol B, and when it is in the range of 60 to 99, the special symbol type is determined as the big win symbol C. In other words, the result of the special symbol hit lottery triggered by the ball entering the first starting part 60 is "big win", and when the special symbol type determination table TB1 is referenced, the selection rates of the big win symbols A to C are 10%, 50%, and 40%, respectively.
[0051] Also, for example, when the special symbol type determination table TB2 is referenced, if the acquired special symbol type determination random number is in the range of 0 to 49, the special symbol type is determined as the jackpot symbol A, if it is in the range of 50 to 59, the special symbol type is determined as the jackpot symbol B, and if it is in the range of 60 to 99, the special symbol type is determined as the jackpot symbol D. In other words, the result of the special symbol win / loss lottery triggered by the ball entering the second starting part 62 is "jackpot", and the selection rates of the jackpot symbol A, jackpot symbol B, and jackpot symbol D when the special symbol type determination table TB2 is referenced are 50%, 10%, and 40%, respectively.
[0052] In addition, when the result of the special chart hit lottery is "small hit", the special chart type determination table TB3 is referred to, and when the acquired special chart type determination random number is in the range of 0 to 79, the special chart type is determined as small hit pattern Z1, when it is in the range of 80 to 89, the special chart type is determined as small hit pattern Z2, and when it is in the range of 90 to 99, the special chart type is determined as small hit pattern Z3. In other words, when the judgment result of the special chart hit lottery is "small hit" and the special chart type determination table TB3 is referred to, the selection rates of the small hit pattern Z1 to the small hit pattern Z3 are 80%, 10%, and 10%, respectively.
[0053] In addition, when the result of the special chart winning / losing lottery is "losing," the special chart type determination table TB4 is referenced, and the special chart type is unconditionally determined to be special chart X (losing chart X) regardless of the range of the special chart type determination random number.
[0054] 10(a) is a diagram showing an example of a variation pattern determination table TB referred to in the special chart variation pattern determination lottery. When a ball enters the first starting part 60 or the second starting part 62, for example, one variation pattern determination random number is obtained from the range of 0 to 99, and a variation pattern number corresponding to the obtained variation pattern determination random number is determined from the variation pattern determination tables TB1 to TB3. In this embodiment, the variation pattern determination table is divided into a variation pattern determination table TB1 that is referred to when the current game state is "normal low probability", a variation pattern determination table TB2 that is referred to when the current game state is "normal high probability", and a variation pattern determination table TB3 that is referred to when the result of the special lottery is "small win" regardless of the current game state. When the ball enters the first starting part 60 or the second starting part 62, for example, one variation pattern determination random number is obtained from the range of 0 to 99, and one variation pattern number corresponding to the variation pattern determination random number is determined from any one of the above variation pattern determination tables TB.
[0055] As shown in the figure, the fluctuation pattern determination tables TB1 and TB2 prescribe a fluctuation pattern number (e.g., "01H") corresponding to the fluctuation pattern determination random number depending on the result of the special chart win / loss lottery (special chart determination result) determined by the above-mentioned lottery and the number of reserved memories. In addition, the variation pattern determination table TB3 is a table that is referenced when the result of the special pattern lottery determined by the above-mentioned lottery is "small win", and one variation pattern number (in the illustrated example, "08H" to "10H") is specified to correspond to the special pattern type (small win pattern Z1 to Z3) regardless of the variation pattern determination random number. Note that the variation pattern determination tables TB1 and TB2 are particularly illustrative, and for example, a different variation pattern number may be determined depending on the special pattern type in addition to the result of the special pattern lottery and the number of reserved memories.
[0056] As shown in FIG. 10(b), each of the variation pattern numbers defined in the variation pattern determination tables TB1, TB2, and TB3 is associated with a variation time (seconds). The variation time shown in the figure is the variation display time of the special pattern displayed on the first special pattern display device 35A or the second special pattern display device 35B, the variation time of the performance pattern S that is displayed approximately in synchronization with the variation display of the special pattern on the performance display unit 50A, and the time of the variable performance displayed along with the variation of the performance pattern S. In this embodiment, the variation time corresponding to the variation pattern numbers defined in the variation pattern determination tables TB1 to TB3 is set to, for example, 1.5 seconds at the shortest and 150 seconds at the longest. In addition, when the game state is a normal pattern high probability, the variation pattern determination table TB2 is referred to, and the variation time (average variation time) of one special pattern is significantly shortened (for example, to one-third) compared to when the normal pattern is low probability, thereby improving game efficiency.
[0057] When a fluctuation pattern number is determined from any of the above-mentioned fluctuation pattern determination tables TB1 to TB3, a fluctuation pattern command including the fluctuation pattern number and information relating to the fluctuation time (fluctuation time information) is transmitted to the performance control circuit 200, and together with the fluctuation display of the performance pattern S, a fluctuation performance expressing various performances according to each fluctuation pattern number is displayed on the performance display unit 50A.
[0058] In particular, in this embodiment, the variation pattern determination table TB3, which is referred to when the result of the special drawing lottery is a "small win", is assigned the same number as the variation pattern number that is likely to be selected (has high reliability and expectation of a big win) when the result of the special drawing lottery is a "big win". Specifically, for example, the variation pattern number "08H" is set to a selection rate of 5% when the result of the special drawing lottery is a "miss". On the other hand, when the result of the special drawing lottery is a "big win", the selection rate increases to 10%. Also, the variation pattern number "09H" is set to a selection rate of 4% when the result of the special drawing lottery is a "miss". On the other hand, when the result of the special drawing lottery is a "big win", the selection rate increases to 15%. In addition, the selection rate of the variation pattern number "10H" is only 1% when the result of the special drawing lottery is "miss", but when the result of the special drawing lottery is "jackpot", the selection rate increases to 20%. In other words, the variation pattern numbers "08H" to "10H" are generally unlikely to be selected in the case of "miss" and are likely to be selected in the case of "jackpot", and when the variation performance described below is executed according to the variation pattern number, the player will watch the game with a higher sense of trust and expectation for the jackpot than when the variation performance is executed according to other variation pattern numbers. As described above, the variation pattern determination table TB3, which is referred to when the result of the special chart lottery is a "small win", specifies the variation pattern number linked to the above-mentioned highly reliable variation presentation, so when the variation pattern number is determined from the variation pattern determination table TB3, even if the "big win game" is not won as a result of the highly reliable and highly expected variation presentation, the "small win game" will always be won. Note that the reliability and expectation of the "big win" increases in the order of "08H", "09H", and "10H" due to the above-mentioned selection rate.
[0059] The main control circuit 100 controls the first special symbol display device 35A or the second special symbol display device 35B at the same time as transmitting the variable pattern command, and starts the variable display of the special symbol on either display device. After that, the main control circuit 100 controls the first special symbol display device 35A or the second special symbol display device 35B based on the fact that the variable display time has elapsed, and transmits a special symbol stop designation command to the performance control circuit 200 side, which will be described later, and stops the variation of the performance symbol S displayed on the performance display unit 50A. Details of the processing related to these variable displays will be described later.
[0060] As explained above, the main control circuit 100 executes the above-mentioned special symbol win / loss lottery, special symbol type determination lottery, and special symbol change pattern determination lottery at the start of the special symbol change, and notifies the result of the special symbol win / loss lottery related to the possibility of special game execution based on the final stopping state of the special symbol and the performance symbol S. In addition, hereinafter, various lottery processes related to the execution of these special games may be collectively referred to as special symbol games. In addition, generally, the player will recognize the result of the special symbol win / loss lottery based on the stopping state of the performance symbol S, which is displayed in a variably synchronized manner with the display of the special symbol change. In addition, the specific processing related to the above series of lotteries will be described later with reference to FIG. 25 and subsequent figures.
[0061] [Special games] FIG. 11 is a diagram showing an outline of the special game control table TB, which is referred to when the result of the special game lottery is a "big win" or a "small win" and a special game (big win game, small win game) advantageous to the player is executed. Various data for controlling the special game is stored in this special game control table TB, and during the special game, the solenoid SOL2 for opening and closing the opening / closing body 64B is driven and controlled by referring to the table. Note that a plurality of special game control tables TB are provided for each special game type, and a corresponding table is set at the start of the special game according to the determined special game type, but here, control data corresponding to all special game types is shown in one table.
[0062] The special game is composed of a plurality of rounds of games in which the big prize opening 64A (opening / closing body 64B) is opened and closed a predetermined number of times (one time in this example). In the special game control table TB, the opening time (waiting time until the first round game starts), the maximum number of times the special electric device operates (the number of round games executed during one special game), the number of times the special electric device opens and closes (the number of times the large prize opening 64A opens during one round (R)), the solenoid power supply time (the power supply time of the solenoid SOL2 for each opening of the large prize opening 64A, i.e., the opening time of one large prize opening 64A), the specified number (the maximum number of wins that can be won into the large prize opening 64A in one round game), the effective time for closing the large prize opening (the closing time of the large prize opening 64A between round games, i.e., the interval time), and the ending time (waiting time from the end of the last round game until the normal special game (display of changing special symbols) is resumed) are pre-stored as control data for the special game for each type of special symbol as shown in the figure.
[0063] For example, when a special game (jackpot game) is executed when the special symbol type is jackpot symbol A, the special game continues in a round until either of the following conditions is met: the opening action of the opening / closing body 64B caused by energizing the solenoid SOL2 opens the jackpot opening 64A for 29 seconds, or nine game balls (count C=9) enter the jackpot opening 64A, and the round is repeated 16 times. In addition, when a special game (jackpot game) is executed when the special symbol type is jackpot symbol B, the round continues until one of the following conditions is met as the mode of the special game: the jackpot opening 64A is opened for 29 seconds by the opening action of the opening / closing body 64B, or nine game balls (count C=9) enter the jackpot opening 64A, and the round is repeated eight times. In addition, when a special game (jackpot game) is executed when the special symbol type is jackpot symbol C, the round continues until one of the following conditions is met as the mode of the special game: the jackpot opening 64A is opened for 29 seconds by the opening action of the opening / closing body 64B, or nine game balls (count C=9) enter the jackpot opening 64A, and the round is repeated 10 times. In addition, when a special game (jackpot game) is executed when the special symbol type is jackpot symbol D, the round continues until one of the following conditions is met as the mode of the special game: the jackpot opening 64A is opened for 29 seconds by the opening action of the opening / closing body 64B, or nine game balls (count C=9) enter the jackpot opening 64A, and the round is repeated eight times.
[0064] In addition, when a special game (small win game) is executed when the special symbol type is "small win symbol Z1," the round continues until one of the following conditions is met as the mode of the special game: the large prize opening 64A is opened for one second by the opening action of the opening / closing body 64B, or nine game balls (count C=9) enter the large prize opening 64A, and the round is executed once. In addition, when a special game (small win game) is executed when the special symbol type is "small win symbol Z2," the round continues until one of the following conditions is met as the mode of the special game: the large prize opening 64A is opened for one second by the opening action of the opening / closing body 64B, or nine game balls (count C=9) enter the large prize opening 64A, and the round is executed twice. In addition, when a special game (small win game) is executed when the special symbol type is "small win symbol Z3", the round continues until one of the following conditions is met as the mode of the special game: the large prize opening 64A is opened for one second by the opening action of the opening / closing body 64B, or nine game balls (count C=9) enter the large prize opening 64A, and the round is executed three times. In this embodiment, as in the case of the big win game, the number of rounds of the small win game is different. When the small win game is executed based on the special symbol type being "small win symbol Z1", about 4 to 5 game balls enter the large prize opening 64A at the same time by one opening operation of the opening / closing body 64B, so that it is possible to obtain about 60 to 75 game balls. Also, when the small win game is executed based on the "small win symbol Z2", about 8 to 9 game balls enter the large prize opening 64A by a total of two opening operations of the opening / closing body 64B, so that it is possible to obtain about 120 to 150 game balls. Also, when the small win game is executed based on the "small win symbol Z3", about 12 to 15 game balls enter the large prize opening 64A at the same time by a total of three opening operations of the opening / closing body 64B, so that it is possible to obtain about 180 to 225 game balls. In other words, in this embodiment, there are multiple types of small win games depending on the special symbol type, and there is a difference in the number of prize balls that can be obtained when each small win game is executed, and it is possible to obtain the greatest number of prize balls when the special symbol type is small win symbol Z3.
[0065] [About game status] FIG. 12 is a diagram showing an outline of the game state setting table TB, which is referred to in order to set the game state after the special game (jackpot game) when the above-mentioned special game is played. When a small win game is played, the game state after the special game does not change. In other words, not only is there a difference in the number of prize balls that can be acquired during the special game between a big win and a small win, but there is also a difference in whether the game state after the special game changes. As shown in the figure, the game state setting table TB specifies the game state after the special game and the number of games (special game high probability number, normal game high probability number) that the game state continues in accordance with the special game type (jackpot pattern).
[0066] As shown in the game state setting table TB, in this embodiment, when the special symbol type is the big win symbol A or the big win symbol B, the game state after the special game is a state of high probability of special symbols and high probability of normal symbols. In addition, the game state continues until the special symbols change 10,000 times. On the other hand, if the special symbol type is the jackpot symbol C or the jackpot symbol D, the game state after the special game will be a state of low probability of special symbols and high probability of normal symbols. In addition, the game state will continue until the special symbols change 100 times.
[0067] The number of times of play is set as the count value (number of times of special chart high probability, number of times of normal chart high probability) of the special chart high probability count cut counter and the normal chart high probability count cut counter described later, and is subtracted each time the special chart game is executed. When the count value becomes 0, the game state transitions to special chart low probability and normal chart low probability. The number of special chart types and the combination of game states can be changed as appropriate depending on the specifications of the pachinko machine 1, and by further subdividing and setting the special chart types, it is also possible to further subdivide and set the form of the special game and the game state after the special game.
[0068] Here, the "special chart low probability" is a state in which the special chart hit / miss judgment table TB1A or TB1B for low probability shown in Fig. 8 is referenced in the special chart hit / miss lottery described above (jackpot probability = 1 in 199). Also, the special chart high probability is a state in which the special chart hit / miss judgment table TB2A or TB2B for high probability shown in Fig. 8 is referenced (jackpot probability = 1 in 19.9). In addition, "low probability of normal drawing" refers to a state in which the variation pattern determination table TB1 shown in FIG. 10 is referenced in the above-mentioned special drawing variation pattern determination lottery, the low probability normal drawing win / loss determination table TB1 shown in FIG. 13 is referenced in the below-mentioned normal drawing win / loss lottery, and when the judgment result is "win", the low probability normal drawing variation pattern determination table TB1 shown in FIG. 14 is referenced. In addition, "high probability of normal drawing" refers to a state in which the variation pattern determination table TB2 is referenced in the above-mentioned special drawing variation pattern determination lottery, the high probability normal drawing win / loss determination table TB2 shown in FIG. 13 is referenced in the below-mentioned normal drawing win / loss lottery, and when the judgment result is "win", the high probability normal drawing variation pattern determination table TB2 shown in FIG. 14 is referenced.
[0069] As explained above, in the pachinko machine 1, various lotteries are executed when a ball enters the first start component 60 or the second start component 62, and if the result of the various lotteries is a predetermined result, a special game advantageous to the player is executed, and the game state after the special game is switched. Meanwhile, in the pachinko machine 1, a lottery (a lottery for determining whether or not a normal game can be executed, a lottery for determining whether or not a normal game can be executed by opening the opening / closing body 63 provided on the second start component 62, etc.) is also executed independently of various lotteries regarding the execution of the special game. Below, an overview of various lottery processes (normal game) regarding the execution of a normal game will be explained.
[0070] When the game ball passes through the passing gate 68 while flowing down the game area 31, a random number for determining whether the game is a winning or losing regular game is obtained, which is referred to in the lottery for determining whether the game is a winning or losing regular game described later, and the obtained random number is stored in the reserved memory area of the RAM 100c. Here, the reserved memory area has a regular game memory area capable of storing the random number for determining whether the game is a winning or losing regular game, and the regular game memory area has four memory sections (first memory section to fourth memory section). Then, when the game ball passes through the passing gate 68, the regular game game hit determination random number is stored in order from the first memory section. However, the number of reserved regular games that can be stored in the reserved regular game memory area is set to four, and the number of reserved regular games does not increase beyond the upper limit.
[0071] FIG. 13 is a diagram showing an outline of the normal winning / losing judgment table TB referred to in the normal winning / losing lottery. When the game ball passes through the passing gate 68, one normal winning / losing judgment random number is obtained, for example, from the range of 0 to 99. As shown in the figure, the normal winning / losing judgment table TB is subdivided into a low probability normal winning / losing judgment table TB1 referred to when the game state is the above-mentioned "normal winning / losing low probability", and a high probability normal winning / losing judgment table TB referred to when the game state is "normal winning / losing high probability".
[0072] In each table, a judgment result ("hit" or "lose") corresponding to the normal winning / losing judgment random number from 0 to 99 is specified, and if the acquired normal winning / losing judgment random number is a random number corresponding to "hit", the judgment result is a win, and if it is a random number corresponding to "lose", the judgment result is a miss. Also, as is clear from each table, the probability that the judgment result of the normal winning / losing lottery regarding the opening and closing of the opening / closing body 63 triggered by the passage of the passing gate 68 will be "hit" (winning probability) is set higher in the case of a normal winning probability than in the case of a normal winning probability low.
[0073] FIG. 14 is a diagram explaining the normal pattern variation pattern determination table TB referred to in the normal pattern variation pattern determination lottery. When the above-mentioned normal pattern win / loss lottery is performed, the normal pattern variation time is determined based on the normal pattern variation pattern determination table TB. As shown in the figure, the normal pattern variation pattern determination table TB is subdivided into a low probability normal pattern variation pattern determination table TB1 that is referenced when the game state is "low probability of normal pattern" and a high probability normal pattern variation pattern determination table TB2 that is referenced when the game state is "high probability of normal pattern", and each table specifies the normal pattern variation pattern determination random number and the corresponding variation time.
[0074] When the game ball passes through the passage gate 68, for example, one random number for determining a normal variation pattern is obtained from the range of 0 to 99. As shown in the figure, in each table, the variation time corresponding to the random number for determining a normal variation pattern from 0 to 99 is specified at a predetermined rate (selection rate), and one variation time corresponding to the obtained random number for determining a normal variation pattern is determined.
[0075] Comparing the two tables TB1 and TB2, the high probability regular pattern variation table TB2 specifies a variation time that is shorter than the low probability regular pattern variation table TB1, and when the regular pattern is high probability, the time until the result of the regular pattern lottery is derived is shorter than when the regular pattern is low probability. When the regular pattern variation time is determined, the regular pattern variation display displayed on the regular pattern display device 37 starts for the determined variation time, and after the variation time has elapsed, it is stopped and displayed in a manner that shows the result of the regular pattern lottery.
[0076] Here, the normal pattern display device 37 is configured, for example, in the form of an arrangement of multiple LED lamps, and while the varying display is in progress, the multiple lamps flash, and if the result of the normal pattern win / lose lottery is a win, one of the multiple LED lamps lights up and stops, and if it is a loss, for example, all of the LED lamps or some of the lamps are turned off.
[0077] [Regarding regular play] 15 is a diagram showing an overview of the opening / closing body operation table TB that is referenced in a normal game that is executed when the result of the normal symbol winning / losing lottery is a winning one and the normal symbol stops in a state indicating a winning one. As shown in the figure, the opening / closing body operation table TB specifies the number of times the opening / closing body 63 is opened and closed, and the opening time per opening operation, and is subdivided into a low probability opening / closing body operation table TB1 that is referenced when the game state is "low probability of normal symbol," and a high probability opening / closing body operation table TB2 that is referenced when the game state is "high probability of normal symbol."
[0078] When a gaming ball passes through the passage gate 68, one opening / closing body operation pattern determination random number is obtained, for example, from a range of 0 to 99. As shown in the figure, in each table, the number of times the opening / closing body 63 is opened and closed and the opening time corresponding to the opening / closing body operation pattern determination random numbers from 0 to 99 are specified at a predetermined ratio (selection rate), and the opening time of one opening of the opening / closing body 63 corresponding to the opening / closing body operation pattern determination random number is determined.
[0079] Comparing the two tables, in the case of a "normal low probability," the opening time of the opening / closing body 63 is "0.3 seconds" or "1.5 seconds," and the number of times it is opened is "1 time," whereas in the case of a "normal high probability," the opening time is "1.2 seconds," and the number of times it is opened is 3 times. Therefore, in the case of a "normal high probability," the game ball can be more efficiently placed into the second starting part 62.
[0080] In this way, when the game state is "high probability of winning a normal symbol," the probability that the result of the normal symbol winning / losing lottery will be "win" is higher than when it is "low probability of winning a normal symbol," the change time of the normal symbol is significantly shortened, and the total opening time of the opening / closing body 63 is longer, making it easier for the game ball to enter the second starting part 62, and it is possible to efficiently play the above-mentioned special symbol game triggered by the ball entering the second starting part 62 while minimizing the consumption of game balls.
[0081] In this embodiment, the "low probability of winning" and the "high probability of winning" are created by combining three elements: the probability of winning the normal symbol lottery, the time during which the normal symbols change, and the total opening time (number of openings, opening time) of the opening / closing body 63. However, this is not limited to this, and it is also possible to create multiple game states by using one or more of the above three elements. Below, the main processing by the main control circuit 100 in the above-mentioned pachinko machine 1 will be explained using multiple flowcharts.
[0082] [CPU Initialization Processing of the Main Control Circuit 100] 16 is a diagram showing an overview of a CPU initialization process executed by the CPU 100a of the main control circuit 100. When external power is supplied to the power supply circuit, power is supplied to the CPU 100a and a system reset is input, and the CPU 100a performs the following CPU initialization process (step S100).
[0083] (Step S100-1) When the power is turned on, the CPU 100a reads a boot program from the ROM 100b as an initial setting process, and performs setting processes necessary for executing various processes.
[0084] (Step S100-3) The CPU 100a sets a wait time in the timer counter. The wait time is a startup waiting time for the payout control circuit 150 and the performance control circuit 200. When the wait time has elapsed, the payout control circuit 150 and the performance control circuit 200 become able to receive various commands transmitted from the main control circuit 100.
[0085] (Step S100-5) The CPU 100a judges whether a power interruption warning signal has been detected. A power interruption detection circuit is connected to the main control circuit 100, and when the power supply voltage falls below a predetermined value, the power interruption warning signal is output from the power supply detection circuit. If a power interruption warning signal has been detected, the process proceeds to step S100-3, and if a power interruption warning signal has not been detected, the process proceeds to step S100-7.
[0086] (Step S100-7) The CPU 100a judges whether the wait time set in step S100-3 has elapsed or not. If it is judged that the wait time has elapsed, the process proceeds to step S100-9, and if it is judged that the wait time has not elapsed, the process proceeds to step S100-5.
[0087] (Step S100-9) The CPU 100a executes the processes required to permit access to the main RAM 100c.
[0088] (Step S100-11) The CPU 100a judges whether the RAM clear signal is on or not. A RAM clear button (not shown) is provided on the rear of the pachinko machine 1, and when this RAM clear button is pressed, a RAM clear detection switch detects the pressing of the RAM clear button and outputs a RAM clear signal to the main control circuit 100. Here, if the power is turned on with the RAM clear button pressed, it is judged that the RAM clear signal is on. If it is judged that the RAM clear signal is on, the process proceeds to step S100-13, and if it is judged that the RAM clear signal is not on, the process proceeds to step S100-19.
[0089] (Step S100-13) The CPU 100a performs an initialization process to clear data in the RAM 100c that is to be cleared when the power is turned on (when the RAM 100c is reset to clear the data).
[0090] (Step S100-15) The CPU 100a performs a transmission process (a process of storing in a transmission buffer) of a sub-command (RAM clear designation command) for notifying the performance control circuit 200 that the RAM 100c has been cleared.
[0091] (Step S100-17) The CPU 100a performs a transmission process (a process of storing in a transmission buffer) of a payout command (RAM clear designation command) for notifying the payout control circuit 150 that the RAM 100c has been cleared.
[0092] (Step S100-19) The CPU 100a executes the processing required to calculate the checksum.
[0093] (Step S100-21) The CPU 100a judges whether the checksum calculated in step S100-19 does not match the checksum saved when the power was turned off. If it is judged that they do not match, the process proceeds to step S100-13, and if it is judged that they do match (match), the process proceeds to step S100-23.
[0094] (Step S100-23) The CPU 100a performs an initialization process to clear data in the RAM 100c that is to be cleared when the power is restored (when the RAM 100c is not cleared and data before the power is turned off is maintained).
[0095] (Step S100-25) The CPU 100a performs a transmission process (a process of storing in a transmission buffer) of a subcommand (power restoration command) for notifying the performance control circuit 200 that the power has been restored from a power interruption.
[0096] (Step S100-27) The CPU 100a performs a transmission process (a process of storing in a transmission buffer) of a dispensing command (power restoration command) for notifying the dispensing control circuit 150 that the power has been restored from a power outage.
[0097] (Step S100-29) The CPU 100a executes power-on sub-command set processing (processing to store in a transmission buffer) to send a power-on special chart type designation command indicating the special chart type, a special 1 reservation designation command indicating the special 1 reservation number, and a special 2 reservation designation command indicating the special 2 reservation number.
[0098] (Step S100-31) The CPU 100a sets the timer interrupt period.
[0099] (Step S100-33) The CPU 100a performs a process for inhibiting interrupts. This process inhibits the execution of an interrupt process for receiving data (main command) from the dispensing control circuit 150 (not shown in the figure) during a timer interrupt, and the execution of the timer interrupt process shown in FIG. 18.
[0100] (Step S100-35) The CPU 100a updates the initial value update random number for the special drawing type determination random number. The initial value update random number for the special drawing type determination random number is for determining the initial value and the end value of the special drawing type determination random number. In other words, when the special drawing type determination random number goes through one cycle from the initial value update random number for the special drawing type determination random number to the initial value update random number for the special drawing type determination random number-1 by the update process of the special drawing type determination random number described later, the special drawing type determination random number is updated to the initial value update random number for the special drawing type determination random number at that time.
[0101] (Step S100-37) The CPU 100a analyzes the reception data (main command) received from the payout control circuit 150, and executes various processes according to the reception data.
[0102] (Step S100-39) The CPU 100 a performs processing for transmitting the sub-commands stored in the transmission buffer to the performance control circuit 200 .
[0103] (Step S100-41) The CPU 100a performs a process for permitting an interrupt.
[0104] (Step S100-43) The CPU 100a updates the fluctuation pattern determination random number, and thereafter repeats the process from step S100-33 (hereinafter, for convenience, the process of repeating steps S100-33 to S100-43 is referred to as a main loop process).
[0105] Next, a description will be given of interrupt processing in the main control circuit 100. Here, a description will be given of a power-off save processing (XINT interrupt processing) and a timer interrupt processing.
[0106] [Power off save process of the main control circuit 100 (XINT interrupt process)] 17 is a flow chart for explaining the power-off save process (XINT interrupt process) in the main control circuit 100. The CPU 100a monitors the power-off detection circuit, and when the power supply voltage falls below a predetermined value (a power-off warning signal is input), it interrupts the main loop process of the CPU initialization process described above to execute the power-off save process. Note that in this embodiment, the power-off save process is set not to interrupt during a timer interrupt process described below.
[0107] (Step S300-1) When the power-off warning signal is input, the CPU 100a saves the registers.
[0108] (Step S300-3) The CPU 300a checks the power-off warning signal.
[0109] (Step S300-5) If CPU 100a determines as a result of step S300-3 that a power-off warning signal has been detected, it proceeds to step S300-11, and if it determines that a power-off warning signal has not been detected, it proceeds to step S300-7.
[0110] (Step S300-7) The CPU 100a restores the registers.
[0111] (Step S300-9) The CPU 100a performs a process for permitting an interrupt, and ends the power-off save process without performing the save process (the power-off save process after step S300-11).
[0112] (Step S300-11) The CPU 100a executes an output port clear process to stop the output of the output port.
[0113] (Step S300-13) The CPU 100a executes a checksum setting process for calculating and storing a checksum.
[0114] (Step S300-15) The CPU 100a executes a RAM protect setting process required to prohibit access to the RAM 100c.
[0115] (Step S300-17) In order to set a power interruption occurrence monitoring time, the CPU 100a sets a predetermined number of times the power interruption detection signal has been detected as a counter value of a loop counter.
[0116] (Step S300-19) The CPU 100a checks the power-off warning signal.
[0117] (Step S300-21) The CPU 100a judges whether a power-off warning signal has been detected. If it is judged that a power-off warning signal has been detected, the process proceeds to step S300-17. If it is judged that a power-off warning signal has not been detected, the process proceeds to step S300-23.
[0118] (Step S300-23) The CPU 100a decrements the value of the loop counter set in step S300-17 above by one.
[0119] (Step S300-25) The CPU 100a judges whether the counter value of the loop counter is 0. As a result, if it is judged that the counter value is not 0, the process proceeds to step S300-19, and if it is judged that the counter value is 0, the process proceeds to the above-mentioned CPU initialization process (step S100).
[0120] In addition, if a power outage actually occurs, the operation of the pachinko machine 1 will be stopped while steps S300-17 to S300-25 are being looped.
[0121] [Timer interrupt processing of the main control circuit 100] 18 is a flowchart explaining the timer interrupt process in the main control circuit 100. The main control circuit 100 is provided with a reset clock pulse generating circuit that generates a clock pulse at a predetermined cycle (4 ms in this embodiment, but 2 ms may also be used). When a clock pulse is generated by the reset clock pulse generating circuit, it interrupts the main loop process of the CPU initialization process (step S100) and executes the following timer interrupt process.
[0122] (Step S400-1) The CPU 100a saves the registers.
[0123] (Step S400-3) The CPU 100a performs a process for permitting an interruption. This process permits an interruption process for receiving reception data (main command) from the dispensing control circuit 150 (not described in detail (illustrated)) during the timer interruption.
[0124] (Step S400-5) The CPU 100a outputs the common data set in the common output buffer to the output port and executes dynamic port output processing which controls the lighting of the first special pattern display device 35A, the second special pattern display device 35B, the first special pattern reserve display device 36A, the second special pattern reserve display device 36B, the normal pattern display device 37, and the normal pattern reserve display device 38.
[0125] (Step S400-7) The CPU 100a reads various input port information and executes a port input process for accurately acquiring the latest switch states of various devices connected to the main control circuit 100.
[0126] (Step S400-9) The CPU 100a performs a timer update process to update various timer counters. Here, the timer counters are decremented every time the timer interrupt process of the main control circuit 100 is performed, unless otherwise specified, and the decrement stops when the timer counter reaches 0. In this example, a special symbol stop timer that counts the elapsed time after the special symbol stops, and a general winning port timer that counts the elapsed time after the game ball enters the general winning component 66 are provided.
[0127] (Step S400-11) The CPU 100a executes an update process for the initial value update random number for the special chart type determination random number, similar to step S100-35 above.
[0128] (Step S400-13) The CPU 100a performs a process of updating the special pattern type determination random number. Specifically, the random number counter is updated by adding 1, and when the result of the addition exceeds the maximum value of the random number range, the random number counter is returned to 0, and when the random number counter has completed one cycle, the random number is updated based on the value of the initial value update random number for the special pattern type random number at that time.
[0129] In this embodiment, the special drawing hit / miss judgment random number and the normal drawing hit / miss judgment random number use hardware random numbers updated by a hardware random number generation unit built into the main control circuit 100. The hardware random number generation unit updates each of the random numbers according to a certain rule, automatically changes the random number sequence every time the random number sequence goes through one cycle, and changes the start value every time the system is reset. In this embodiment, the special drawing hit / miss judgment random number and the normal drawing hit / miss judgment random number use hardware random numbers updated by a hardware random number generation unit as the random numbers for judgment, but when using software random numbers as the random numbers for judgment, the initial value can be changed by providing an initial value update random number like the special drawing type determination random number.
[0130] (Step S500) The CPU 100a executes a switch management process to determine whether or not a signal has been input from the first start hole detection switch SW1, the second start hole detection switch SW2, the special prize hole detection switch SW3, the general prize hole detection switch SW4, and the gate detection switch SW5 based on the process of step S400-7. Details of the process will be described later with reference to FIG.
[0131] (Step S600) The CPU 100a executes a special game management process. Details of this process will be described later with reference to FIG.
[0132] (Step S700) The CPU 100a executes a general game management process for controlling the progress of the general game. Although detailed explanations are omitted, the general game management process is a process of loading a general game management phase (not shown) described later and selecting a general game control module corresponding to the loaded general game management phase, and various processes related to the general game are executed by calling a general game control module corresponding to a plurality of general game management phases described later.
[0133] (Step S400-15) The CPU 100a executes an error management process for determining various errors and making settings according to the error determination results.
[0134] (Step S400-17) The CPU 100a checks the inputs of the first start hole detection switch SW1, the second start hole detection switch SW2, the big prize hole detection switch SW3, and the general prize hole detection switch SW4, and executes prize hole switch processing to increment the corresponding prize ball control counters, etc.
[0135] (Step S400-19) The CPU 100a executes a payout control management process to create a payout command based on the counter value of the counter for controlling winning balls set in the above step S400-17, and to transmit the command to the payout control circuit 150.
[0136] (Step S400-21) The CPU 100a executes an external information management process for setting output data for external information to be output from the external information output terminal board 151 to the outside (storing it in an output port buffer).
[0137] (Step S400-23) The CPU 100a executes an LED display setting process that sets common data for controlling the lighting of various displays (LEDs) such as the first special pattern display device 35A, the second special pattern display device 35B, the first special pattern reserve display device 36A, the second special pattern reserve display device 36B, the normal pattern display device 37, and the normal pattern reserve display device 38 in a common output buffer (storing it in an output port buffer).
[0138] (Step S400-25) The CPU 100a executes a solenoid output image synthesis process to synthesize the solenoid output images of the solenoid SOL1 for opening and closing the opening / closing body 63, and the solenoid SOL2 for opening and closing the opening / closing body 64B, and set them in the output port buffer (store them in the output port buffer).
[0139] (Step S400-27) The CPU 100a executes a port output process for outputting the values of the common output buffers stored in the respective output port buffers to the output ports (excluding those output in the dynamic port output process of step S400-5).
[0140] (Step S400-29) The CPU 100a restores the registers and ends the timer interrupt process. Among the timer interrupt processes described above, the switch management process in step S500 and the special game management process in step S600 will be described in detail below.
[0141] [Switch management process] FIG. 19 is a flowchart illustrating the switch management process (step S500) in the main control circuit 100.
[0142] (Step S500-1) The CPU 100a judges whether the gate detection switch SW5 is turned on, that is, whether a detection signal has been input from the gate detection switch SW5 based on the passage of the game ball through the passage gate 68. If the result of the judgment is that a detection signal has been input, the process proceeds to step S510, and if no input has been input, the process proceeds to step S500-3.
[0143] (Step S510) The CPU 100a executes a gate passing process based on the passage of the game ball through the passing gate 68. Here, the gate passing process is a process of acquiring the above-mentioned normal winning / loosening judgment random number, and storing the acquired normal winning / loosening judgment random number in one of the first to fourth storage units, on the condition that the current normal reserve memory number is less than the upper limit that can be stored in the normal reserve memory area. In addition, when the storage is controlled by the performance control circuit, such as displaying the display screen D1, a normal reserve designation command indicating the normal reserve memory number X3 stored in the normal reserve memory area is set in the transmission buffer (stored in the transmission buffer). In addition, by executing this process, the corresponding parts of the reserve display unit of the normal pattern reserve display device 38, which is provided in plurality in correspondence with the upper limit number of the normal reserve memory number X3, are lit up by the process of step S400-5. In addition, in the gate passing process, a gate switch passing designation command indicating that the game ball has passed through the normal pattern passing gate 68 is set in the transmission buffer (stored in the transmission buffer).
[0144] (Step S500-3) The CPU 100a judges whether the first start hole detection switch SW1 is turned on, that is, whether a detection signal is input from the first start hole detection switch SW1 based on the entry of a game ball into the first starting component 60. If the result of the judgment is that a detection signal has been input, the process proceeds to step S520, and if there is no input, the process proceeds to step S500-5.
[0145] (Step S520) The CPU 100a executes a first start opening passage process based on the entry of the game ball into the first start component 60. Details of the first start opening passage process will be described later with reference to FIG.
[0146] (Step S500-5) The CPU 100a judges whether the second start hole detection switch SW2 is turned on, that is, whether a detection signal is input from the second start hole detection switch SW2 based on the ball entering the second start component 62. If the result of the judgment is that a detection signal has been input, the process proceeds to step S530, and if there is no input, the process proceeds to step S500-7.
[0147] (Step S530) The CPU 100a executes a second start opening passage process based on the entry of the gaming ball into the second start component 62. Details of the second start opening passage process will be described later with reference to FIG.
[0148] (Step S500-7) The CPU 100a judges whether the special prize opening detection switch SW3 is turned on, that is, whether a detection signal is input from the special prize opening detection switch SW3 based on the entry of a game ball into the special prize device 64 (special prize opening 64A). If the result of the judgment is that a detection signal is input from the special prize opening detection switch SW3, the process proceeds to step S500-9, and if there is no input, the process proceeds to step S500-11.
[0149] (Step S500-9) The CPU 100a increments the special prize opening winning ball number counter by one, and moves the process to step S500-11.
[0150] (Step S500-11) The CPU 100a judges whether the general winning hole detection switch SW4 disposed in the general winning component 66 is turned on, that is, whether a detection signal is input from the general winning hole detection switch SW4 based on the entry of a game ball into the general winning component 66. If the result of the judgment is that a detection signal is input from the general winning hole detection switch SW4, the process proceeds to step S500-13, and if there is no input, the switch management process is terminated.
[0151] (Step S500-13) The CPU 100a sets a predetermined count value (e.g., a count value equivalent to 5 seconds) in the general prize winning port timer based on the input (ON edge or OFF edge) of the general prize winning port detection switch SW4, and ends the switch management process. The count value set in the process is updated in the above-mentioned step S400-9. Note that in this example, multiple general prize winning components 66 are provided, and a count value is set when there is an input from any of the detection switches SW4 corresponding to each general prize winning component 66.
[0152] [First starting gate passage process] FIG. 20 is a flowchart illustrating the first start port passing process in the main control circuit 100 (step S520).
[0153] (Step S520-1) The CPU 100a sets "00H" as the special symbol identification value. Here, the special symbol identification value is for identifying whether the reserved type is special 1 reserved or special 2 reserved. For example, the special symbol identification value "00H" indicates special 1 reserved, and the special symbol identification value "01H" indicates special 2 reserved.
[0154] (Step S520-3) The CPU 100a sets the address of the special pattern 1 reserved ball number counter.
[0155] (Step S535) The CPU 100a executes the special symbol random number acquisition process and ends the first start port passing process. This special symbol random number acquisition process is executed using a module common to the second start port passing process (step S530). Therefore, the details of the special symbol random number acquisition process will be explained after the explanation of the second start port passing process.
[0156] [Second starting port passing process] FIG. 21 is a flowchart illustrating the second start port passing process in the main control circuit 100 (step S530).
[0157] (Step S530-1) The CPU 100a sets "01H" as the special symbol identification value.
[0158] (Step S530-3) The CPU 100a sets the address of the special pattern 2 reserved ball number counter.
[0159] (Step S535) The CPU 300a executes a special symbol random number acquisition process, which will be described later, and ends the process.
[0160] [Special design random number acquisition process] 22 is a flowchart explaining the special symbol random number acquisition process (step S535) in the main control circuit 100. This special symbol random number acquisition process is executed using a common module in the above-mentioned first start hole passing process (step S520) and second start hole passing process (step S530).
[0161] (Step S535-1) The CPU 100a loads the special symbol identification value set in the above step S520-1 or step S530-1.
[0162] (Step S535-3) The CPU 100a loads the number of reserved balls for the target special symbol. Here, if the special symbol identification value loaded in the above step S535-1 is "00H", the counter value of the reserved ball counter for the special symbol 1, i.e., the reserved number for special 1, is loaded. Also, if the special symbol identification value loaded in the above step S535-1 is "01H", the counter value of the reserved ball counter for the special symbol 2, i.e., the reserved number for special 2, is loaded.
[0163] (Step S535-5) The CPU 100a loads the special drawing win / loss determination random number updated by the hardware random number generation unit.
[0164] (Step S535-7) The CPU 100a judges whether the number of reserved balls with the target special symbol (the number of reserved balls with the special symbol 1 or the number of reserved balls with the special symbol 2) loaded in the above step S535-3 is equal to or greater than the upper limit of 4. If it is judged to be equal to or greater than the upper limit, the CPU 100a ends the special symbol random number acquisition process. If it is judged to be equal to or greater than the upper limit, the CPU 100a proceeds to step S535-9.
[0165] (Step S535-9) The CPU 100a updates the counter value of the target special pattern reserved ball count counter (special pattern 1 reserved ball count counter or special pattern 2 reserved ball count counter) to a value obtained by adding "1" to the current counter value.
[0166] (Step S535-11) The CPU 100a calculates a target storage section (first storage section to fourth storage section) that is a target for saving the acquired special drawing win / loss determination random number among the storage sections of the special drawing reservation storage area.
[0167] (Step S535-13) The CPU 100a obtains the special drawing win / loss determination random number loaded in step S535-5, the special drawing type determination random number updated in step S400-13, and the variation pattern determination random number updated in step S100-43, and stores them in the target memory unit calculated in step S535-11.
[0168] (Step S535-15) The CPU 100a executes the acquisition time performance judgment process based on the various random numbers stored in the target storage unit in the above step S535-13. Although detailed explanations are omitted, the acquisition time performance judgment process is a process in which, when a new random number is stored by each of the above processes, a special pattern win / lose lottery process, a special pattern type determination process, and a change pattern determination process are executed prior to the special pattern change waiting process shown in FIG. 28 described later, and information corresponding to the lottery result derived by these lotteries (pre-determination information) is transmitted to the performance control circuit 200 side as a look-ahead designation command at the time when the new random number is stored. By transmitting the look-ahead designation command to the performance control circuit 200 side in advance, the performance control circuit 200 side can display the result of the special pattern win / lose lottery ("big win", "small win", "miss") and a predetermined performance (look-ahead performance) suggesting a change pattern on the performance display unit 50A before the special pattern change waiting process based on the reservation for which the look-ahead designation command is generated is executed based on the information contained in the look-ahead designation command.
[0169] (Step S535-17) The CPU 100a loads the counter values of the special pattern 1 reserved ball number counter and the special pattern 2 reserved ball number counter.
[0170] (Step S535-19) The CPU 100a sets the special symbol reservation command in the transmission buffer based on the counter value loaded in step S535-17, and ends the special symbol random number acquisition process (step S535). Here, the special symbol 1 reservation command is set based on the counter value (special 1 reservation number) of the special symbol 1 reservation ball number counter, and the special symbol 2 reservation command is set based on the counter value (special 2 reservation number) of the special symbol 2 reservation ball number counter.
[0171] By transmitting the special 1 reserve command or the special 2 reserve command to the performance control circuit 200, the performance control circuit 200 can grasp the current special 1 reserve number and the special 2 reserve number. Specifically, the performance control circuit 200 is provided with a special 1 reserve ball number counter and a special 2 reserve ball number counter whose counter value increases in response to receiving the special 1 reserve command and the special 2 reserve command, and the special 1 reserve number and the special 2 reserve number are updated in real time. In addition, when the special 1 reserve command or the special 2 reserve command is transmitted to the performance control circuit 200, the performance control circuit 200 performs control to increase the number of predetermined reserve numbers indicating the special 1 reserve number and the special 2 reserve number displayed on a part of the performance display unit 50A, for example, so that the current special 1 reserve number and the special 2 reserve number can be visually recognized by the player. In addition, by executing this process, the corresponding parts of the reserve display units of the first special pattern reserve display device 36A and the second special pattern reserve display device 36B, which are provided in plurality to correspond to the upper limit numbers of special 1 reserve numbers and special 2 reserve numbers, are lit up by the processing of step S400-5.
[0172] 23 is a diagram for explaining the special game management phase. As described above, in this embodiment, various lottery processes (special game) regarding the possibility of a special game triggered by the entry of a game ball into the first start part 60 or the second start part 62, and various lottery processes (normal game) regarding the possibility of a normal game triggered by the passage of a game ball through the passage gate 68 proceed simultaneously in parallel. The special symbol game is executed step by step and repeatedly each time the game ball enters the first starting component 60 or the second starting component 62, and the main control circuit 100 manages each process related to the special symbol game by a special symbol game management phase.
[0173] As shown in FIG. 23, the ROM 100b stores a plurality of special game control modules for controlling the execution of special game, and each of these special game control modules is associated with a special game management phase. Specifically, when the special game management phase is "00H", a module for executing "special pattern change waiting process" is called, when the special game management phase is "01H", a module for executing "special pattern change in progress process" is called, when the special game management phase is "02H", a module for executing "special pattern stop post-processing" is called, when the special game management phase is "03H", a module for executing "large prize opening pre-processing" is called, when the special game management phase is "04H", a module for executing "large prize opening opening control process" is called, when the special game management phase is "05H", a module for executing "large prize opening closing valid process" is called, and when the special game management phase is "06H", a module for executing "large prize opening end wait process" is called.
[0174] [Special game management processing] FIG. 24 is a flowchart illustrating the special game management process (step S600) in the main control circuit 100.
[0175] (Step S600-1) The CPU 100a loads the special game management phase.
[0176] (Step S600-3) The CPU 100a selects a special game control module corresponding to the special game management phase loaded in the above step S600-1.
[0177] (Step S600-5) The CPU 100a calls the special game control module selected in step S600-3 above and starts processing.
[0178] (Step S600-7) The CPU 100a loads a special game timer that manages the control time related to the special game, and ends the special game management process.
[0179] [Special pattern change waiting process] 25 is a flowchart explaining the special symbol change waiting process in the main control circuit 100. This special symbol change waiting process is executed when the special symbol game management phase is "00H".
[0180] (Step S610-1) The CPU 100a judges whether the counter value of the special symbol 2 reserved ball counter, that is, the special 2 reserved number is "1" or more. If the result of the judgment is that the special 2 reserved number is "1" or more, the process moves to step S610-7, and if the special 2 reserved number is not "1" or more, the process moves to step S610-3.
[0181] (Step S610-3) The CPU 100a judges whether the counter value of the special symbol 1 reserved ball counter, that is, the special 1 reserved number is "1" or more. As a result, if it is judged that the special 1 reserved number is "1" or more, the process proceeds to step S610-7, and if it is judged that the special 1 reserved number is not "1" or more, the process proceeds to step S610-5.
[0182] (Step S610-5) The CPU 100a executes a customer waiting setting process to set (store) a customer waiting command in a transmission buffer and transfers the process. When the customer waiting command is transmitted to the performance control circuit 200, the performance control circuit 200 transmits a predetermined command to the VDP based on the fact that a predetermined time has elapsed since the reception of the customer waiting command, and causes the performance display unit 50A to display a demo performance display indicating that the machine is in a customer waiting state. Examples of the demo performance display include an introduction to a character or story unique to the gaming machine, or a display of the manufacturer.
[0183] (Step S615) The CPU 100a executes a low-output determination process and ends the special symbol variation waiting process. The low-output determination process will be described later.
[0184] (Step S610-7) The CPU 100a subtracts "1" from the counter value of the target special pattern reserved ball count counter corresponding to the special 1 reserved or special 2 reserved, sets (stores in the transmission buffer) a special 1 reserved subtraction designation command or a special 2 reserved subtraction designation command indicating that the special 1 reserved or special 2 reserved has been subtracted by "1", and block-transfers the special 2 reserved stored in the first memory unit to the fourth memory unit of the second special pattern reserved memory area, or the special 1 reserved stored in the first memory unit to the fourth memory unit of the first special pattern reserved memory area, to the memory unit with the next smaller ordinal number. Specifically, RAM 100c is provided with a 0th memory unit to be processed, and if it is determined in step S610-1 above that the number of special 2 reservations is "1" or more, the special 2 reservations stored in the 1st to 4th memory units of the second special chart reservation memory area are transferred to the 0th to 3rd memory units, and the 4th memory unit is cleared. In addition, in the above step S610-3, when it is determined that the number of reserved special 1 is "1" or more, the reserved special 1 stored in the first storage unit to the fourth storage unit of the first special symbol reservation storage area is transferred to the zeroth storage unit to the third storage unit, and the fourth storage unit is cleared. In addition, a game status confirmation designation command is set in the transmission buffer (stored in the transmission buffer) based on the information of the special symbol probability status flag and the normal symbol probability status flag.
[0185] By transmitting the special 1 reservation reduction command or the special 2 reservation reduction command to the performance control circuit 200 side, information on the reduced special 1 reservation number or special 2 reservation number is transmitted to the performance control circuit 200 side. Upon receiving the special 1 reservation reduction command or the special 2 reservation reduction command, the performance control circuit 200 subtracts one from the counter value of the special 1 reservation ball number counter or the special 2 reservation ball number counter. In addition, based on receiving the special 1 reservation reduction command or the special 2 reservation reduction command, the performance control circuit 200 transmits a command to the VDP to reduce the number of the predetermined reservation number display that has increased based on the special 1 reservation designation command or the special 2 reservation designation command, and makes the reduced special 1 reservation number and special 2 reservation number visible and recognizable to the player on the performance display unit 50A. In addition, by executing this process, the corresponding part of the reservation display unit of either the first special pattern reservation display device 36A or the second special pattern reservation display device 36B is turned off by the process of step S400-5. Furthermore, when a game status confirmation command is sent to the performance control circuit 200, information on the current game status is transmitted to the performance control circuit 200 each time the special symbol starts to vary.
[0186] (Step S610-9) The CPU 100a loads the reserved type, the special pattern probability state flag which identifies whether the special pattern has a low probability or a low probability, and the special pattern hit / miss judgment random number transferred to the 0th memory unit, selects the corresponding special pattern hit / miss judgment table TB1 for low probability or the special pattern hit / miss judgment table TB2 for high probability in Figure 8, performs the special pattern hit / miss lottery process, and stores data related to the lottery result ("big hit", "small hit", "miss") (special pattern hit / miss judgment data).
[0187] (Step S610-11) The CPU 100a executes a special chart type determination process for determining a special chart type. Here, if the result of the special chart win / loss lottery in step S610-9 is a "big win", the reserved type and the special chart type determination random number transferred to the 0th storage unit are loaded, a special chart type (big win pattern) is extracted from either the special chart type determination table TB1;TB2, and data (special chart type data) related to the extracted special chart type is stored. Also, if the result of the special chart win / loss lottery is a "small win", the special chart type determination random number transferred to the 0th storage unit is loaded, a special chart type (small win pattern) corresponding to the special chart type determination random number is extracted from the special chart type determination table TB3, and data (special chart type data) related to the extracted special chart type is stored. On the other hand, if the result of the special pattern winning / losing lottery in step S610-9 is "losing," the special pattern type related to the special pattern X (losing pattern X) is extracted from the special pattern type determination table TB4, and the special pattern type data related to the special pattern X is stored. After storing the special chart type data, a special chart type designation command corresponding to the special chart type data is set in the transmission buffer (stored in the transmission buffer). That is, by transmitting the special chart type designation command, information on the extracted special chart type is transmitted to the performance control circuit 200 side every time the special chart type determination process is performed.
[0188] (Step S610-13) The CPU 100a saves the special symbol stop symbol number corresponding to the special symbol type extracted in the above step S610-11. The first special symbol display device 35A and the second special symbol display device 35B are each composed of 7 segments, and each segment constituting the 7 segments is associated with a number (counter value). The special symbol stop symbol number determined here indicates the number (counter value) of the segment that will finally be lit up.
[0189] (Step S610-14) The CPU 100a executes a special pattern variation pattern determination lottery to determine the variation pattern of the special pattern. Specifically, if the result of the special pattern win / loss lottery is a "small win", the CPU 100a refers to the variation pattern determination table TB3 and selects and determines a variation pattern number (in this example, one of "08H" to "10H") corresponding to the special pattern type (small win pattern). If the result of the special pattern win / loss lottery is other than a "small win", the CPU 100a loads a normal pattern probability state flag that identifies the above-mentioned "normal pattern low probability" or "normal pattern high probability". If the game state is "normal pattern low probability", the CPU 100a refers to the variation pattern determination table TB1, and if it is "normal pattern high probability", the CPU 100a refers to the variation pattern determination table TB2 and selects and determines a variation pattern number corresponding to the result of the special pattern win / loss lottery ("big win", "miss") and the variation pattern determination random number transferred to the 0th memory unit according to the reserved memory number from one of the variation pattern determination tables TB. The CPU 100a extracts from the variation pattern determination table TB table, and sets (stores in the transmission buffer) a variation pattern command including the determined variation pattern number and the variation time corresponding to the variation pattern number. By transmitting the variation pattern command to the performance control circuit 200 side, the performance control circuit 200 side determines more specific content of the variation performance according to the variation pattern number, and transmits a command including information regarding the determined content of the variation performance to the VDP, thereby displaying various variation performances on the performance display unit 50A together with the variation display of the performance pattern S.
[0190] (Step S610-15) The CPU 100a loads the fluctuation time corresponding to the fluctuation pattern number extracted in step S610-14, and sets it in the special symbol fluctuation timer.
[0191] (Step S610-17) The CPU 100a judges whether the result of the special symbol winning / losing lottery in the above step S610-9 is a "jackpot", and if it is a "jackpot", loads the special symbol type data stored in the above step S610-11 and checks the type of the special symbol. Then, referring to the game state setting table TB shown in FIG. 13, it judges the game state to be set after the special game (jackpot game) ends, and saves the judgment result in the game state reserve flag (special symbol probability state reserve flag, normal symbol probability state reserve flag), the special symbol high probability number cut reserve counter, and the normal symbol high probability number cut reserve counter. Here, the game state set at the time of winning the special game is stored.
[0192] (Step S610-19) The CPU 100a executes a process of setting a special symbol display counter in order to start the variable display of the special symbol in the first special symbol display device 35A or the second special symbol display device 35B. A counter value is associated with each segment of the 7-segment that constitutes the first special symbol display device 35A and the second special symbol display device 35B, and the segment corresponding to the counter value set in the special symbol display counter is controlled to light up. Here, the counter value corresponding to the segment to be lit at the start of the variable display of the special symbol is set in the special symbol display counter. The special symbol display counter is provided separately as a special symbol 1 display counter corresponding to the first special symbol display device 35A and a special symbol 2 display counter corresponding to the second special symbol display device 35B, and here, a counter value is set in the counter corresponding to the reservation type.
[0193] (Step S610-21) The CPU 100a updates the special symbol game management phase to "01H" and ends the special symbol change waiting process. By executing the series of special symbol change waiting processes, the first special symbol display device 35A or the second special symbol display device 35B starts to display the special symbol change, and the effect display unit 50A starts to display the effect symbol S change in approximately synchronization with the special symbol change.
[0194] [Special pattern change processing] 26 is a flowchart explaining the special symbol variation process in the main control circuit 100. The special symbol variation process is executed when the special symbol game management phase is "01H".
[0195] (Step S620-1) The CPU 100a executes a process to update the special symbol variation base counter. The special symbol variation base counter is set to a counter value that completes one revolution in a predetermined cycle (e.g., 100 ms). Specifically, if the counter value of the special symbol variation base counter is "0", a predetermined counter value (e.g., 25) is set, and if the counter value is "1" or more, the counter value is updated to a value obtained by subtracting "1" from the current counter value.
[0196] (Step S620-3) The CPU 100a judges whether the counter value of the special symbol variation base counter updated in the above step S620-1 is "0". If the counter value is "0", the process proceeds to step S620-5. If the counter value is not "0", the process proceeds to step S620-9.
[0197] (Step S620-5) The CPU 100a performs a special symbol fluctuation timer update process for subtracting a predetermined value from the timer value of the special symbol fluctuation timer set in the above step S610-15.
[0198] (Step S620-7) The CPU 100a judges whether the timer value of the special symbol fluctuation timer updated in the above step S620-5 is "0". If the timer value is "0", the process proceeds to step S620-15, and if the timer value is not "0", the process proceeds to step S620-9.
[0199] (Step S620-9) The CPU 100a updates the special symbol display timer that measures the lighting time of each of the 7-segment segments that constitute the first special symbol display device 35A and the second special symbol display device 35B. Specifically, if the timer value of the special symbol display timer is "0", a predetermined timer value is set, and if the timer value is "1" or more, the timer value is updated to a value obtained by subtracting "1" from the current timer value.
[0200] (Step S620-11) The CPU 100a judges whether the timer value of the special symbol display timer is "0". If it is judged that the timer value of the special symbol display timer is "0", the process proceeds to step S620-13, and if it is judged that the timer value of the special symbol display timer is not "0", the process during the special symbol variation is terminated.
[0201] (Step S620-13) The CPU 100a updates the counter value of the special symbol display symbol counter to be updated. As a result, each segment constituting the 7-segment display is sequentially lit at predetermined time intervals.
[0202] (Step S620-15) The CPU 100a updates the special game management phase to "02H".
[0203] (Step S620-17) The CPU 100a saves the special symbol stop symbol number (counter value) determined in step S610-13 in the target special symbol display symbol counter. As a result, the determined special symbol is stopped and displayed on the first special symbol display device 35A or the second special symbol display device 35B.
[0204] (Step S620-19) The CPU 100a sets (stores in the transmission buffer) a special symbol stop designation command indicating that the special symbol is stopped and displayed on the first special symbol display device 35A or the second special symbol display device 35B. When the special symbol stop designation command is transmitted to the performance control circuit 200, the performance control circuit 200 transmits a predetermined command to the VDP, and stops and displays the changing performance symbol S on the performance display unit 50A in approximately synchronization with the stopped display of the special symbol.
[0205] (Step S620-21) The CPU 100a sets a special symbol variation stop time (fixed time) which is the time for stopping and displaying the special symbol in a special game timer, and transfers the process.
[0206] (Step S620-23) The CPU 100a sets a predetermined count value (for example, a count value corresponding to 5 seconds) to the special symbol stop timer and ends the special symbol change process. The count value set in the process is updated in the above-mentioned step S400-9. In this way, the count value of the special symbol stop timer is set to the initial value every time the change of the special symbol stops.
[0207] [Special pattern post-stop processing] 27 is a flowchart for explaining the special symbol stop post-processing in the main control circuit 100. This special symbol stop post-processing is executed when the special symbol game management phase is "02H".
[0208] (Step S630-1) The CPU 100a judges whether the timer value of the special game timer set in the above step S620-21 is "0". If it is judged that the timer value of the special game timer is not "0", the process after the special symbol stop is terminated, and if it is judged that the timer value of the special game timer is "0", the process proceeds to step S630-3.
[0209] (Step S630-3) The CPU 100a checks the result of the special drawing.
[0210] (Step S630-5) The CPU 100a judges whether the result of the special drawing lottery is a "jackpot". If it is judged to be a "jackpot", the process proceeds to step S630-17, and if it is judged not to be a "jackpot", the process proceeds to step S630-7.
[0211] (Step S630-7) The CPU 100a executes a count cut management process. Here, the special symbol probability state flag is loaded to check whether the current game state is "special symbol low probability" or "special symbol high probability". If the game state is "special symbol high probability", the counter value of the special symbol high probability count cut counter is updated to a value obtained by subtracting "1" from the current counter value. If the counter value becomes "0" as a result of updating the special symbol high probability count cut counter, the special symbol probability state flag corresponding to the special symbol low probability is set. As a result, in the game state of the special symbol high probability, when the special symbol is confirmed a predetermined number of times without winning a "jackpot", the game state will transition from the special symbol high probability to the special symbol low probability.
[0212] Also, the normal symbol probability state flag is loaded to check whether the current game state is "normal symbol low probability" or "normal symbol high probability". Then, if the game state is "normal symbol high probability", the counter value of the normal symbol high probability count cut counter is updated to a value obtained by subtracting "1" from the current counter value. Note that, if the counter value becomes "0" as a result of updating the normal symbol high probability count cut counter, the flag corresponding to "normal symbol low probability" is set. As a result, in the game state of "normal symbol high probability", when the special symbol is confirmed a predetermined number of times without winning a "jackpot" in the game state of "normal symbol high probability", the game state will transition from "normal symbol high probability" to "normal symbol low probability". Also, in the case where the game state transition is performed in the step S630-7, the CPU 100a sets (stores in the transmission buffer) a game state change designation command for transmitting the game state after the transition to the performance control circuit 200. As a result, the change in the game state is transmitted to the performance control circuit 200 side.
[0213] (Step S630-9) The CPU 100a sets (stores in the transmission buffer) a game state confirmation designation command at the time of special symbol determination, which indicates the game state at the time when the special symbol is determined.
[0214] (Step S630-11) The CPU 100a sets (stores in the transmission buffer) a count command for transmitting the special symbol high probability count and the normal symbol high probability count updated in the above step S630-7 to the performance control circuit 200. That is, by the processing of the above step S630-9 and the step S630-11, each time a special symbol is determined, the game state at that time and the special symbol high probability count and the normal symbol high probability count are transmitted to the performance control circuit 200.
[0215] (Step S630-13) The CPU 100a judges whether the result of the special drawing lottery is a "small win". If it is judged to be a "small win", the process proceeds to step S630-17, and if it is judged not to be a "small win", the process proceeds to step S630-15.
[0216] (Step S630-15) The CPU 100a updates the special symbol game management phase to "00H" and ends the special symbol stop post-processing. This ends the special symbol game management process based on the special symbol 1 reservation or special symbol 2 reservation (start information) of 1, and if the special symbol 1 reservation or special symbol 2 reservation is stored, the process for starting the variable display of the special symbol based on the next reservation will be performed.
[0217] (Step S630-17) The CPU 100a sets data defined in the special game control table TB shown in FIG. 12 according to the determined special symbol type (big win symbol, small win symbol).
[0218] (Step S630-19) The CPU 100a performs a special electric role maximum operation count setting process. Specifically, by referring to the data set in the above step S630-17, the special electric role maximum operation count counter is set to a predetermined number (counter value corresponding to the special chart type = number of rounds) as a counter value.
[0219] The special electric device maximum operation count counter indicates the number of rounds that can be executed in the special game that is about to start. Meanwhile, the RAM 100c is provided with a special electric device continuous operation count counter, and the current number of rounds is managed by adding "1" to the counter value of the special electric device continuous operation count counter at the start of each round of play (processing of step S640-3 described later). Here, with the start of a special game, processing is also executed to reset (update to "0") the counter value of the special electric device continuous operation count counter.
[0220] (Step S630-21) The CPU 100a refers to the data set in the above step S630-17, and saves a predetermined opening time as a timer value in the special game timer.
[0221] (Step S630-23) The CPU 100a sets (stores in the transmission buffer) an opening designation command for transmitting the start of a special game to the presentation control circuit 200. When the opening designation command is transmitted, the presentation control circuit 200 transmits a predetermined command to the VDP, and for example, prior to the start of a special game, a predetermined opening presentation that notifies the player that a special game (big win game, small win game) is about to start, and the following special game presentation are displayed on the presentation display unit 50A.
[0222] (Step S630-25) The CPU 100a updates the special symbol game management phase to "03H" and ends the special symbol stop processing. This starts the special game (big win game, small win game).
[0223] [Pre-opening process for the big prize hole] 28 is a flowchart for explaining the large prize opening pre-processing in the main control circuit 100. This large prize opening pre-processing is executed when the special game management phase is "03H".
[0224] (Step S640-1) The CPU 100a judges whether the timer value (opening time) set in the above step S630-21 is not "0". If it is judged that the timer value is not "0", the process before opening the big prize opening is terminated, and if it is judged that the timer value is "0", the process proceeds to step S640-3.
[0225] (Step S640-3) The CPU 100a updates the counter value of the special electric role continuous operation number counter to a value obtained by adding "1" to the current counter value.
[0226] (Step S640-5) The CPU 100a sets (stores in the transmission buffer) a command to specify the opening of the large prize opening 64A (specifically, a command indicating the round to be executed (1R, 2R, etc.)) to transmit the start of opening of the large prize opening 64A (start of round play) to the performance control circuit 200. When the command to specify the opening of the large prize opening is transmitted to the performance control circuit 200, the performance control circuit 200 transmits a predetermined command to the VDP, and displays, for example, a display regarding the current number of rounds on the performance display unit 50A. In addition, by transmitting information (commands) regarding the number of balls that have passed the large prize opening detection switch SW3 during special play (large prize play, small prize play) and the number of balls that have been instructed to the payout control circuit 150 during special play to the performance control circuit 200, the number of balls that have entered the game balls and the number of prize balls can be displayed on the performance display unit 50A.
[0227] (Step S641) The CPU 100a executes a special prize opening / closing switching process, which will be described later with reference to FIG.
[0228] (Step S640-7) The CPU 100a updates the special game management phase to "04H" and ends the pre-opening process for the large prize opening.
[0229] [Big prize opening / closing switching process] FIG. 29 is a flow chart for explaining the special prize opening opening / closing switching process in the main control circuit 100. As shown in FIG.
[0230] (Step S641-1) The CPU 100a judges whether the counter value of the special electric role opening / closing switching counter is the upper limit value of the special electric role opening / closing switching count (the number of times the special winning opening 64A is opened / closed during one round of play) (in this embodiment, it judges whether it is "1"). As a result, if it is judged that the counter value is the upper limit value, the special winning opening opening / closing switching process is terminated, and if it is judged that the counter value is not the upper limit value, the process proceeds to step S641-3.
[0231] (Step S641-3) The CPU 100a refers to the data in the special game control table TB, and extracts solenoid control data for controlling the energization of the solenoid SOL2, and timer data which is the energization time or de-energization time of the solenoid SOL2, based on the counter value of the special electric device opening / closing switching count counter.
[0232] (Step S641-5) The CPU 100a executes a special prize opening solenoid energization control process to start energization of the solenoid SOL2 or to stop energization of the solenoid SOL2 based on the solenoid control data extracted in the above step S641-3. By executing this special prize opening solenoid energization control process, the energization start or energization stop of the solenoid SOL2 is controlled in the above steps S400-25 and S400-27.
[0233] (Step S641-7) The CPU 100a saves the timer value based on the timer data extracted in the above step S641-3 in the special game timer. The timer value saved in the special game timer here is the maximum opening time of the special winning opening 64A once.
[0234] (Step S641-9) The CPU 100a judges whether the solenoid SOL2 is in the energization start state, that is, whether the control process to start energization of the solenoid SOL2 has been performed in the above step S641-5. If it is judged to be in the energization start state, the process proceeds to step S641-11, and if it is judged not to be in the energization start state, the big prize opening opening / closing switching process is terminated.
[0235] (Step S641-11) The CPU 100a updates the counter value of the special electric role opening / closing switching counter to a value obtained by adding "1" to the current counter value, and ends the large prize opening opening / closing switching process.
[0236] [Big prize opening control process] 30 is a flowchart for explaining the special prize opening control process in the main control circuit 100. This special prize opening control process is executed when the special game management phase is "04H".
[0237] (Step S650-1) The CPU 100a judges whether the timer value of the special game timer saved in the above step S641-7 is "0". If it is judged that the timer value of the special game timer is not "0", the process proceeds to step S650-5, and if it is judged that the timer value of the special game timer is "0", the process proceeds to step S650-3.
[0238] (Step S650-3) The CPU 100a judges whether the counter value of the special electric role open / close switching counter is the upper limit value of the special electric role open / close switching count. If it is judged that the counter value is the upper limit value, the process proceeds to step S650-7, and if it is judged that the counter value is not the upper limit value, the process proceeds to step S641.
[0239] (Step S641) In the above step S650-3, when it is determined that the counter value of the special electric role opening / closing switching number counter is not the upper limit value of the special electric role opening / closing switching number, the CPU 100a executes the process of the above step S641.
[0240] (Step S650-5) The CPU 100a judges whether the counter value of the special prize opening winning ball counter updated in the above step S500-9 has reached a specified number, that is, whether the same number of game balls as the maximum number of winning balls in one round have entered the special prize opening 64A. If it is judged that the specified number has not been reached, the special prize opening opening opening control process is terminated, and if it is judged that the specified number has been reached, the process proceeds to step S650-7.
[0241] (Step S650-7) The CPU 100a executes a special prize opening closing process required to close the special prize opening 64A by stopping the energization of the solenoid SOL2. This causes the special prize opening 64A to be in a closed state.
[0242] (Step S650-9) The CPU 100a saves the effective time (interval time) for closing the special winning port in the special game timer.
[0243] (Step S650-11) The CPU 100a updates the special game management phase to "05H".
[0244] (Step S650-13) The CPU 100a sets in the transmission buffer (stores in the transmission buffer) a special prize opening closure designation command indicating that the special prize opening 64A has been closed, and ends the special prize opening opening control process.
[0245] [Large prize winning hole closure effective processing] 31 is a flowchart for explaining the special prize opening closing validity process in the main control circuit 100. This special prize opening closing validity process is executed when the special game management phase is "05H".
[0246] (Step S660-1) The CPU 100a judges whether the timer value of the special game timer saved in the above step S650-9 is "0". If it is judged that the timer value of the special game timer is not "0", the CPU 100a ends the special prize opening closure valid processing, and if it is judged that the timer value of the special game timer is "0", the CPU 100a moves the processing to step S660-3.
[0247] (Step S660-3) The CPU 100a judges whether the counter value of the special electric device continuous operation counter matches the counter value of the special electric device maximum operation counter, that is, whether a preset number of rounds have been played. If it is judged that the counter value of the special electric device continuous operation counter matches the counter value of the special electric device maximum operation counter, the process proceeds to step S660-9, and if it is judged that they do not match, the process proceeds to step S660-5.
[0248] (Step S660-5) The CPU 100a updates the special game management phase to "03H".
[0249] (Step S660-7) The CPU 100a saves the predetermined special prize opening closing time in the special game timer and ends the special prize opening closing validity process, thereby starting the next round of games.
[0250] (Step S660-9) The CPU 100a executes an ending time setting process for saving the ending time in a special game timer.
[0251] (Step S660-11) The CPU 100a updates the special game management phase to "06H".
[0252] (Step S660-13) The CPU 100a sets an ending designation command indicating the start of the ending in the transmission buffer (stores it in the transmission buffer) and ends the large prize opening closing validity process. By transmitting the ending designation command, the performance control circuit 200 transmits a predetermined command to the VDP and causes the performance display unit 50A to display a predetermined ending performance that notifies the player that the special game (large win game, small win game) has ended.
[0253] [Wait processing for the end of the large prize slot] 32 is a flowchart explaining the large prize opening end wait process in the main control circuit 100. This large prize opening end wait process is executed when the special game management phase is "06H".
[0254] (Step S670-1) The CPU 100a judges whether the timer value of the special game timer saved in the above step S660-9 is not "0". If it is judged that the timer value of the special game timer is not "0", the CPU 100a ends the waiting process for the end of the special winning port, and if it is judged that the timer value of the special game timer is "0", the CPU 100a moves the process to step S670-3.
[0255] (Step S670-3) The CPU 100a executes a game state setting process for setting the game state after the special game ends. Specifically, the CPU 100a loads the special symbol probability state preliminary flag and the normal symbol probability state preliminary flag saved in the above step S610-17, and saves data related to the game state. In addition, the CPU 100a loads the special chart high probability count cut spare counter and the normal chart high probability count cut spare counter saved in step S610-17, and saves the special chart high probability count and normal chart high probability count corresponding to the special chart type in the special chart high probability count cut counter and normal chart high probability count cut counter, respectively. In addition, in the case of a "small win", the game state before and after the small win game does not change.
[0256] (Step S670-5) The CPU 100a sets in the transmission buffer (stores in the transmission buffer) a game state change designation command for transmitting the game state to be set after the special game ends.
[0257] (Step S670-7) The CPU 100a sets in the transmission buffer (stores in the transmission buffer) a count command corresponding to the number of times of high probability of the special drawing and the number of times of high probability of the normal drawing saved in the above step S670-3.
[0258] (Step S670-9) The CPU 100a updates the special symbol game management phase to "00H" and ends the waiting process for the end of the special winning port. As a result, if the special 1 reserve or special 2 reserve is stored, the variable display of the special symbol will be resumed after the end of the special game (big win game, small win game).
[0259] [Low output determination process] 33 is a flowchart showing the low output determination process (step S615) in the main control circuit 100. The low output determination process is executed when the special 1 reservation and the special 2 reservation are 0.
[0260] (Step S615-1) The CPU 100a judges whether the count of the timer during special symbol stop is "0", and if it is "0", the process proceeds to step S615-3, and if it is not "0", the process ends the low output judgment process. That is, the CPU 100a transfers the process to step S615-3 if 5 seconds or more have passed since the last variable stop of the special symbol.
[0261] (Step S615-3) The CPU 100a judges whether the count value of the general winning port timer is "0", and if it is "0", the process proceeds to step S615-5, and if it is not "0", the process ends the low output judgment process. That is, the CPU 100a shifts the process to step S615-5 if 5 seconds or more have passed since the last ball entered the general winning component 66.
[0262] (Step S615-5) The CPU 100a determines whether there is an input from the touch sensor 161, and if there is no input, the process proceeds to step S615-7, whereas if there is an input, the output reduction determination process ends.
[0263] (Step S615-7) The CPU 100a sets (stores) a low-output confirmation command in the transmission buffer and ends the low-output determination process when 5 seconds or more have passed since the last stop of the special pattern variation, 5 seconds or more have passed since the last ball entered the general winning component 66, and there is no input from the touch sensor 161. Note that the configuration may not require input from the touch sensor 161. In this way, the low-output confirmation command is set when the above condition is met, in other words, when there is a high probability that the player is not playing. On the other hand, the discharge of out balls detected by the out ball detection switch SW6 is not a condition for whether or not to transmit the low-output command. In other words, when a predetermined time has elapsed since the transition to the end-of-variation state following the end of the display of the special pattern variation, even if the CPU 100a detects a game ball entering the outlet 69 before the predetermined time has elapsed, the CPU 100a is configured to send a low-output confirmation command to reduce the output of the presentation device based on the elapse of the predetermined time, regardless of whether the ball has entered the outlet.
[0264] The above describes the main control processing by the main control circuit 100, but on the effect control circuit 200 side, various effects are executed based on the reception of various commands transmitted from the main control circuit 100, such as a variable effect that is displayed approximately in sync with the variable display of the special symbol, and a special game effect that is displayed during a special game that can be executed after the special symbol stops. These effects executed by the effect control circuit 200 will be explained below.
[0265] [About the changing effects] Based on the reception of the variable pattern command, the performance control circuit 200 executes a variable performance determination process to start the variable display of the performance pattern S, and executes various variable performances according to the type of the variable pattern command along with the variable display of the performance pattern S. Below, the contents of the variable performance determined by the processing of the performance control circuit 200 and displayed on the performance display unit 50A will be explained, and the main processing of the performance control circuit 200 that realizes the variable performance will be explained.
[0266] [Performance design] First, an example of the performance pattern S that changes in response to the change in the special pattern will be outlined. FIG. 34(a) is a diagram showing an example of the performance pattern S. As shown in the figure, the performance pattern S is displayed (scrolled) in a vertical direction, for example, in the changeable areas AL, AC, and AR of the performance display unit 50A. Also, as shown in FIG. 34(b), the performance pattern S is composed of an image (performance pattern "1" to performance pattern "8") that combines consecutive numbers from 1 to 8 and predetermined different characters corresponding to each number. Note that the performance pattern "8" and the performance pattern "1" are set as consecutive patterns.
[0267] Fig. 35 is a diagram showing the basic flow from when the performance pattern S starts to change display to when it stops displaying in one change display. As shown in Fig. 35(a), when the change display of the performance pattern S starts, it is scrolled downward with a predetermined time difference in the order of the change areas AL, AR, and AC. Then, as shown in Fig. 35(b), after a predetermined time has elapsed from the start of the change display of the performance pattern S, the performance pattern S in each change area AL, AC, and AR changes at high speed, making it difficult to visually recognize the contents of the performance pattern S (number display, character). Next, as shown in FIG. 35(c), at the end of the variable time, for example, the performance pattern S of the variable area AL is displayed first, and then the performance patterns S of the variable areas AR and AC are displayed in that order. Then, as shown in FIG. 35(d), finally, in response to the performance control circuit 200 receiving the special pattern stop designation command set in step S620-19 of FIG. 26, the performance pattern S related to the variable area AC is displayed in a stopped state, and all the performance patterns S are displayed in a predetermined arrangement. Here, the final arrangement of the performance patterns S is determined based on the result of the special pattern winning / losing lottery and the variable performance number described later. In addition, from the start of the display of the performance pattern S to the stop of the change, various variable performances such as so-called notice performance, reach, and super (SP) reach are expressed by still images and videos, etc., to liven up the game until the performance pattern S is displayed in a stopped state.
[0268] During the above-mentioned variation performance (while the special symbols are varying), the speaker unit 8 outputs BGM during the variation, the stopping sound of each performance symbol S, or sound effects corresponding to the advance notice performance or reach performance. At the same time, the LEDs mounted on the panel side LED board Q and the board side LED board R emit light in a pattern corresponding to the variation performance. In other words, the variation performance executed during the variation of the special symbols is expressed not only by the variation of the performance symbol S displayed on the performance display unit 50A, but also by the output of sound and the emission of LEDs, etc. The main processing of the performance control circuit 200 that realizes the variation performance is described below.
[0269] [CPU initialization process of the performance control circuit 200] FIG. 36 is a flowchart illustrating the sub-CPU initialization process of the performance control circuit 200 (step S1000).
[0270] (Step S1000-1) When the power is turned on, the CPU 200a reads a CPU initialization processing program from the ROM 200b, and initializes and sets flags and the like stored in the RAM 200c.
[0271] (Step S1000-3) Next, the CPU 200a performs a process of updating random numbers related to the determination of the variable performance (variable performance pattern determination random numbers, etc. in this example), and thereafter, repeats the process of step S1000-3 until an interrupt process is performed.
[0272] [Sub-timer interrupt processing of the performance control circuit 200] 37 is a flow chart explaining the sub timer interrupt process (step S1100) of the performance control circuit 200. The performance control circuit 200 is provided with a reset clock pulse generating circuit (not shown) that generates a clock pulse at a predetermined cycle. When the reset clock pulse generating circuit generates a clock pulse, the CPU 200a reads a timer interrupt process program and starts the sub timer interrupt process.
[0273] (Step S1100-1) The CPU 200a saves the registers.
[0274] (Step S1100-3) The CPU 200a performs processing to permit the interrupt.
[0275] (Step S1100-5) The CPU 200a performs update processing of various timer counters used in the performance control circuit 200. Here, unless otherwise specified, the various timer counters are decremented by 1 each time the performance control circuit 200 executes a sub-timer interrupt process, and the decrement stops when the counter reaches 0.
[0276] (Step S1200) The CPU 200a analyzes the commands stored in the receive buffer of the RAM 200c and performs various processes according to the received commands. In the performance control circuit 200, when the various commands described above are transmitted from the main control circuit 100, a command reception interrupt process (not shown) is performed and the command transmitted from the main control circuit 100 is stored in the receive buffer. Here, the command stored in the receive buffer is analyzed by the command reception interrupt process.
[0277] (Step S1300) The CPU 200a measures the elapsed time of the variable performance, and performs a time schedule management process by referring to a time table set for each variable performance and executing a process corresponding to the corresponding time stored in the time table during the variable performance. The details of this time schedule management process will be described later.
[0278] (Step S1100-7) The CPU 200a transmits and outputs commands (internal commands) and various data and internal commands set in the transmission buffer of the RAM 200c to the VDP for the above-mentioned image control of the performance display unit 50A, the voice synthesis LSI for voice control, or the driver circuit for LED lighting control, etc.
[0279] (Step S1100-9) The CPU 200a restores the register and ends the sub timer interrupt process.
[0280] [Fluctuation pattern command reception processing] Fig. 38 is a flow chart for explaining the variation pattern command receiving process (step S1210) executed when a variation pattern command is received, in the command analysis process of step S1200 of Fig. 37. As described above, the variation pattern command is set in the main control circuit 100 in step S610-14 of Fig. 25, and then transmitted to the performance control circuit 200 by the sub-command transmitting process of step S100-39 (see Fig. 16).
[0281] (Step S1210-1) When the fluctuation pattern command is received, the CPU 200a analyzes the received fluctuation pattern command.
[0282] (Step S1210-3) The CPU 200a acquires the variable performance pattern determination random number (0 to 249) updated in the above step S1000-3, and refers to the variable performance pattern determination table TB corresponding to the variable performance pattern number, and determines a specific variable performance from the variable performance pattern table.
[0283] FIG. 39 is a schematic diagram showing an example of the variable performance pattern determination table TB. As shown in the figure, the variable performance pattern determination table TB is subdivided according to the result of the special chart winning / losing lottery and the variable pattern number determined by the main control circuit 100. In the figure, as an example of the variable performance pattern determination table TB, a variable performance pattern determination table TB that is referenced when the result of the special chart winning / losing lottery is a "big win" or a "small win" and the variable pattern number is any of "08H" to "10H" is shown. Of course, there is also a variable performance pattern determination table TB that is referenced when the result of the special chart winning / losing lottery is a "losing" lottery and the variable pattern number is any of "08H" to "10H".
[0284] In the variable performance pattern determination table TB in the figure, multiple variable performance numbers are specified for the range of the variable pattern determination random number from 0 to 249. Each variable performance number is associated with a specific content of the variable performance such as the first half miss reach A1 to the first half miss reach C3. Although not shown in the figure, the variable performance number may also be specified with the presence or absence of a notice before the reach, the presence or absence of a type button operation performance, etc., and even if the same variable pattern number is determined in the main control circuit 100, the pattern of the variable performance developed on the performance display unit 50A will be different depending on the difference in the variable performance number. Note that the variable performance content in the figure is added for the convenience of explanation and is not actually specified. In addition, as the specific content of the variable performance, there are various variable performances such as normal reach, long reach, and super reach in addition to the contents shown above.
[0285] As described above, the presentation control circuit 200 refers to the result of the special drawing and one of the variable presentation pattern determination tables TB corresponding to the variable presentation pattern number, and determines one variable presentation number (variable presentation pattern) from the referenced variable presentation pattern determination table TB that corresponds to the acquired variable presentation pattern determination random number.
[0286] (Step S1210-5) The CPU 200a sets (stores in the transmission buffer) a variable performance execution command for executing the specific variable performance determined in step S1210-3 in the transmission buffer and transfers the process. The variable performance execution command set here includes information on the variable performance number, etc. The variable performance execution command is transmitted as an internal command to the VDP, and the VDP starts image display control for displaying the variable performance corresponding to the variable performance number. Also, the music data, light-emitting pattern data, and internal command corresponding to the variable performance number are set in the transmission buffer, and the variable BGM and LED light emission corresponding to the variable performance are started. In addition to the variable BGM that plays while the special pattern is changing, the variable waiting BGM that plays when the special pattern is stopped is set. For example, the variable waiting BGM is a song in which the bass sound, snare drum, and bass drum are emphasized and the high tone is suppressed compared to the variable BGM, and the high tone part is superimposed in response to the change of the special pattern, so that it changes continuously to the variable BGM.
[0287] (Step S1210-7) The CPU 200a sets data in a time table that specifies the display time of the moving image or image corresponding to the variable performance number (variable performance) determined in the above step S1210-3 and the timing of the stop display of the performance pattern S.
[0288] (Step S1210-9) The CPU 200a resets the variable time measuring timer to measure the execution time of the variable performance, and ends the variable pattern command receiving process. The variable time measuring timer reset here has a counter value added at each timer interruption process in the time schedule management process of step S1300, thereby measuring the execution time of the variable performance, and a predetermined control process is executed at each period specified in the time table.
[0289] [Time schedule management process] Fig. 40 is a flow chart explaining the time schedule management process (step S1300). As described above, the CPU 200a sets the variable performance execution command in the transmission buffer, and the command is transmitted as an internal command to the VDP that controls the performance display unit 50A in step S1100-7, whereby the variable display of the performance pattern S is started on the performance display unit 50A, and the variable performance is started in various forms in accordance with the variable display. The time schedule management process manages the time of displaying various performances that are expressed during the execution of the variable performance.
[0290] (Step S1300-1) First, the CPU 200a increments the counter value of the variable time measuring timer to update the execution time of the variable performance. As described above, the counter value of the variable time measuring timer is reset every time in step S1210-9.
[0291] (Step S1300-3) The CPU 200a refers to the time table, sets various internal commands in the transmission buffer according to the current execution time of the variable performance, and controls the performance display device 50 so that a specified performance is performed at a specified time on the performance display unit 50A, and then terminates the time schedule management process.
[0292] [Low power execution process] Fig. 41 is a flow chart for explaining the low-output confirmation command receiving process (step S1220) executed when a low-output confirmation command is received, during the command analysis process of step S1200 in Fig. 37. As described above, the low-output confirmation command is set in the main control circuit 100 in step S615-7 in Fig. 33, and then transmitted to the performance control circuit 200 by the sub-command transmitting process of step S100-39 (see Fig. 16).
[0293] (Step S1220-1) The CPU 200a executes the volume reduction process based on the reception of the low output confirmation command and moves to the next process. In this process, the volume of the aforementioned BGM during the change and BGM waiting for the change that were playing during the change of the special pattern is reduced. In addition, the reduction in the volume includes erasing the volume.
[0294] (Step S1220-3) The CPU 200a executes the light emission reduction process and ends the output execution process. In this process, the LEDs that were emitting light during the variation of the special symbol or while waiting for the variation are turned off or the brightness is reduced, or the number of LEDs that are lit is reduced.
[0295] By executing such low-power processing, it becomes possible to significantly reduce the power consumption by each performance device when the player is not playing. After the execution of these low-power processing, when the player resumes playing, the main control circuit 100 transmits a performance permission command based on the input of the touch sensor 161. Upon receiving the performance permission command, the CPU 200a outputs the change waiting BGM at a normal volume. Also, it lights up the LED in a change waiting pattern. Furthermore, after that, when the game ball enters the first start component 60 or the second start component 62 and the special pattern starts to change, the change BGM corresponding to the change performance and the lighting of the LED in a specific pattern start.
[0296] Although the present invention has been described above based on the embodiments, it is clear to those skilled in the art that the technical scope of the present invention is not limited to the above-mentioned embodiments, and various modifications and improvements can be made by combining the embodiments. Moreover, it is clear from the claims that such various modifications and improvements can also be included in the technical scope of the present invention.
[0297] For example, in the above embodiment, the BGM during the change may be different depending on the game state. In the above embodiment, the input or absence of the out ball detection switch SW6, specifically, the elapsed time after the input of the out ball detection switch SW6, is not a condition for the low output processing, but the input or absence of the operation mechanism 9 (push button 9A, dial 9B), the ball lending switch 10A, and the return switch 10B may not be a condition for the low output processing. More specifically, even if a predetermined time has elapsed since the last input of the out ball detection switch SW6, the operation mechanism 9, the ball lending switch 10A, and the return switch 10B, the low output processing may not be executed. In the above embodiment, the target of the low output processing is the sound coming from the speaker unit 8 and the light emitted by the LED, but only one of them may be the target. Also, the count of the elapsed time may be executed on the performance control circuit 200 side.
[0298] In the above embodiment, the CPU 100a that executes the special symbol random number acquisition process (step S535) of FIG. 22 constitutes the start information acquisition means. Also, the CPU 100a that executes the special symbol win / lose lottery process (step S610-9) of FIG. 25 constitutes the win / lose lottery means. Also, the CPU 100a that executes the special symbol type determination lottery process (step S610-11) of FIG. 25 constitutes the win type determination means according to the present invention. Also, the CPU 100a that executes the special symbol variation pattern determination lottery process (step S610-14) of FIG. 25 constitutes the variation pattern determination means according to the present invention. Also, the CPU 100a that executes the processes of FIG. 28 to FIG. 32 constitutes the special game execution means. Also, the CPU 100a that executes the number of times cut management process (step S630-7) of FIG. 27 and the game state setting process (step S670-3) of FIG. 32 constitutes the game state setting means. Moreover, the CPU 100a that executes the low-output determination process (step S615) in Fig. 33 constitutes low-output determination means. Moreover, the CPU 200a that executes the processes related to the overall performance control in Fig. 36 and Fig. 37 constitutes performance control means. In particular, the CPU 200a that executes the low-output confirmation designation command reception process (step S1220) in Fig. 41 constitutes low-output execution means. [Explanation of symbols]
[0299] 1 Pachinko machine, 8 Speaker unit, 30 Game board, 35A 1st special pattern display device, 35B 2nd special pattern display device, 50A Performance display unit, 60 First starting part, 62 second starting part, 64 big prize device, 68 passing gate, 100 main control circuit, 100a main CPU, 100b main ROM, 100c main RAM, 150 payout control circuit, 200 performance control circuit, 200a sub CPU, 200b Sub-ROM, 200c Sub-RAM, Q Panel side LED board, R LED board on panel side
Claims
[Claim 1] A main body frame having an inner frame capable of accommodating a game board forming a game area having a start opening and an exit opening, and a front frame that can be opened and closed relative to the inner frame; a performance control means for operating a predetermined performance device to express a predetermined performance during the variably displayed pattern based on the detection of the entry of a game ball into the starting hole; A gaming machine comprising: When a predetermined time has elapsed since the transition to a variation end state in which the variation display of the pattern has ended, even if the game ball entering the outlet has been detected before the predetermined time has elapsed, the performance control means reduces the output of the performance device based on the elapse of the predetermined time, the main body frame is provided with a handle that can adjust the launching force of the game ball and can be rotated by a player from an initial position to a predetermined maximum rotation position; The handle has a finger hook portion protruding radially outward of the handle, the outermost point of the finger grip in the rotational radial direction does not protrude below the lower edge of the main body frame at the initial position and the maximum rotation position of the handle, an operation torque required to rotate the handle from an initial position is defined as a first operation torque; The operation torque required to rotate the handle from the initial position to the left-hand hit reference position is defined as a second operation torque. If an operation torque required to rotate the handle from the initial position to the maximum rotation position is defined as a third operation torque, The second operating torque is greater than the first operating torque, The third operating torque is greater than the second operating torque, The third operating torque is equal to or greater than twice the first operating torque and equal to or less than twice the second operating torque. A gaming machine characterized by:
Citation Information
Patent Citations
Pressure transducer and driving method thereof
JP1985036929A
Game machine
JP2013188324A
Game machine
JP2014033793A
Game machine
JP2014184009A
Game machine
JP2019180832A
