Reservation communication control device, reservation communication control method and program
The reserved communication control device manages BDT reservations by predicting throughput reduction and ensuring compliance with throughput thresholds, preventing KPI deterioration and SLA violations in 5G networks.
Patent Information
- Application Number
- JP2023060960
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-04-04
- Publication Date
- 2024-10-30
- Estimated Expiration
- 2043-04-04
AI Technical Summary
BDT reservations in 5G networks can lead to KPI deterioration and SLA violations if not properly managed, particularly due to variations in the cell connection of terminal devices during BDT execution.
A reserved communication control device that predicts throughput reduction and determines whether BDT reservations can be completed within specified time slots while meeting throughput thresholds, using cell identification and throughput calculation to accept or reject reservation requests.
This approach prevents KPI deterioration and SLA violations by ensuring BDT reservations are handled appropriately, maintaining network performance.
Smart Images

Figure 0007576119000001 
Figure 0007576119000002 
Figure 0007576119000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a reservation communication control device, a reservation communication control method, and a program, and more particularly to a reservation communication control device, a reservation communication control method, and a program that can appropriately handle BDT reservations so as to avoid degradation of KPI due to execution of BDT and violation of BDT SLA. [Background technology]
[0002] In 5G networks, key performance indicators (KPIs) are used to calculate performance indicators such as throughput, call drop rate, and mute call rate.
[0003] Information about KPIs is calculated from events in the carrier's network, and for example, the carrier executes a network performance improvement plan based on its KPIs. The base station records the traffic KPIs and sends them to the data server.
[0004] In addition, in order to optimize network resources, the 5G network provides background data transmission (BDT), which transmits large amounts of data with relatively few time constraints (e.g., data for software updates) at a low priority. Such transmissions are scheduled, for example, during times when the network load is low. The network exposure function (NEF) / policy control function (PCF), which are network function parts of the 5G core network, have the function of reserving communications.
[0005] For example, Patent Document 1 discloses a method of updating a BDT policy through negotiation between an application function (AF) and a core network (CN). In this technology, the PCF determines the impact of degraded network performance and determines BDT policy information. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Special Publication No. 2022-537714 Summary of the Invention [Problem to be solved by the invention]
[0007] However, if BDT reservations are not handled properly, it can lead to a deterioration in KPIs, and new BDT reservations can cause existing BDT reservations to fail to meet their SLA (Service Level Agreement).
[0008] In particular, the throughput of the cell of the base station to which the terminal device is connected during the time period when the BDT is executed can have a significant impact on the KPI and the reservation SLA. Furthermore, unintended results can occur when the cell of the base station to which the terminal device is predicted to be connected when reserving the BDT differs from the cell of the base station to which the terminal device is actually connected when the BDT is executed.
[0009] An object of one aspect of the present invention is to realize a technology that can appropriately handle reservations for BDTs so as to avoid degradation of KPIs due to execution of BDTs, violation of SLAs related to BDTs, and the like. [Means for solving the problem]
[0010] A reservation communication control device according to one embodiment of the present invention is a reservation communication control device that controls the reservation of a background data transmission (BDT) and the execution of the reservation, and includes: a receiving unit that receives a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time zone; a first judgment unit that predicts a first throughput, which is the throughput of a cell identified by first cell information and to which the terminal device is connected during the execution time zone of the BDT of the reservation request, and judges whether the BDT of the reservation request can be completed by the cell during the execution time zone; a second judgment unit that predicts a second throughput obtained by subtracting the amount of throughput reduction caused by executing the BDT of the reservation request in the cell from the first throughput, and judges whether the second throughput of the cell is equal to or greater than a threshold; and a reservation acceptance / rejection determination unit that determines whether to accept or reject the reservation request based on the judgment result of the first judgment unit and the judgment result of the second judgment unit.
[0011] A reservation communication control method according to one embodiment of the present invention is a reservation communication control method for reserving a background data transmission (BDT) and controlling the execution of the reservation, the reservation request including the steps of receiving a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time zone, predicting a first throughput which is the throughput for the execution time zone of a cell identified by first cell information and to which the terminal device is connected during the execution time zone of the BDT of the reservation request, determining whether the BDT of the reservation request can be completed by the cell during the execution time zone, predicting a second throughput which is obtained by subtracting from the first throughput an amount of reduction in throughput due to the execution of the BDT of the reservation request in the cell, determining whether the second throughput of the cell is equal to or greater than a threshold, and deciding whether to accept or reject the reservation request based on the judgment result of the first judgment unit and the judgment result of the second judgment unit.
[0012] Each aspect of the present invention may be realized by a computer. In this case, a program that causes a computer to execute each step of the above-described method, and a computer-readable recording medium having the program recorded thereon, also fall within the scope of the present invention. Effect of the Invention
[0013] According to one aspect of the present invention, reservations for BDTs can be appropriately handled so as to avoid degradation of KPIs due to execution of the BDTs and violation of the SLAs of the BDTs. [Brief description of the drawings]
[0014] [Figure 1] FIG. 1 is a diagram illustrating an example of the configuration of a 5G communication system. [Diagram 2] 2 is a block diagram showing an example of a functional configuration of a reservation communication control device according to the first embodiment. FIG. [Diagram 3] FIG. 13 is a diagram illustrating an example of a position cell table. [Figure 4] FIG. 11 is a diagram illustrating an example of a method for calculating a predicted throughput. [Diagram 5] FIG. 10 is a diagram illustrating an example of a transmission schedule. [Figure 6] FIG. 13 is a diagram for explaining prediction of cell throughput taking into account the amount of degradation corresponding to the number of BDTs executed. [Figure 7] 13 is a flowchart illustrating an example of a reservation request acceptance process. [Figure 8] 11 is a flowchart illustrating an example of a transmission schedule generating process. [Figure 9] 13 is a flowchart illustrating an example of an influence calculation process. [Figure 10] 13 is a flowchart illustrating an example of a reservation acceptance / rejection determination process. [Figure 11] 13 is a flowchart illustrating another example of the reservation acceptance / rejection determination process. [Figure 12] 13 is a flowchart illustrating an example of a reservation execution control process. [Figure 13]11 is a block diagram showing an example of a functional configuration of a reservation communication control device according to a second embodiment. FIG. [Figure 14] FIG. 1 is a diagram illustrating an example of the configuration of a computer that executes instructions of a program, which is software that realizes each function. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0016] (5G communication system configuration) FIG. 1 is a diagram illustrating an example of the configuration of a 5G communication system 10 according to this embodiment.
[0017] As shown in Fig. 1, a core network 50 of a 5G communication system 10 is connected to a plurality of base stations. In reality, tens of thousands of base stations are connected to the core network 50, but in the example of Fig. 1, base stations 41-1 and 41-2 are shown. Note that the base stations 41-1 and 41-2 will be collectively referred to as base station 41 as appropriate.
[0018] The base station 41 is a cell indicated by an oval in the figure, and communicates with UE (User Equipment) 21, which is a terminal device located within the cell, which is a predetermined wireless communication area. In reality, one base station 41 can simultaneously communicate with several hundred UEs 21. The UE 21 may be, for example, a smartphone owned by a user, or an electronic device attached to a vehicle.
[0019] In the example of Fig. 1, a cell 42-1 corresponding to a base station 41-1 and a cell 42-2 corresponding to a base station 41-2 are shown. In this example, a part of the wireless communication area of the cell 42-1 and a part of the wireless communication area of the cell 42-2 overlap, and the UE 21 is located in this overlapping part. Therefore, the UE 21 can be connected to the base station 41-1 of the cell 42-1 and can be connected to the base station 41-2 of the cell 42-2. Note that the cell 42-1 and the cell 42-2 are collectively referred to as the cell 42 as appropriate.
[0020] The core network 50 is provided with a plurality of network functions (NFs). In the example of Fig. 1, a user plane function (UPF), a network publication function (NEF), and a policy control function (PCF) are shown as NFs of the core network 50. The core network 50 also has other NFs such as an access and mobility management function (AMF) and a session management function (SMF), but the description of these will be omitted here.
[0021] The UPF mainly executes control related to the transmission of user data. For example, communication between the UE 21 and the application server 60, or communication of user data between the UE 21 and the reservation communication control device 80 is performed via the UPF. The PCF and the NEF are NFs mainly related to the transmission of control signals. The PCF and the NEF have a function of making a reservation for the execution of communication by, for example, the application server 60 or the UE 21.
[0022] Each NF may be configured by a corresponding server, or may be configured by a plurality of servers such as a cloud. Furthermore, each NF may be configured by being implemented as software such as a virtual machine (VM) or a container.
[0023] 1 also illustrates an application server 60 that communicates with the UE 21 via the core network 50. The application server 60 is, for example, a server having a function of delivering data to the UE 21, and as one example, delivers data for updating software of the UE 21.
[0024] In the 5G communication system 10, in order to optimize network resources, background data transmission (BDT) is provided, which transmits a large amount of data with relatively few time constraints (e.g., data for software updates) with low priority. For example, data transmission from the application server 60 to the UE 21 is executed as a BDT. The BDT is reserved by, for example, the application server 60, the UE 21, etc., by specifying an execution time period and a data capacity.
[0025] The above-mentioned network resources include, for example, radio resources between UE 21 and base station 41, resources of the communication path between base station 41 and UPF, which is a network function part of the 5G network, and resources of the communication path between UPF and application server 60.
[0026] 1 also shows a reservation communication control device 80. The reservation communication control device 80 is, for example, a device that performs control related to reservation of a BDT executed between the application server 60 and the UE 21. The reservation communication control device 80 is, for example, configured by one or more servers that can communicate with the core network 50. Alternatively, the reservation communication control device 80 may be configured by being implemented as software such as a virtual machine or a container.
[0027] <First embodiment> (Example of the configuration of a reservation communication control device) 2 is a block diagram showing an example of the functional configuration of the reservation communication control device 80. In this example, a reservation request receiving unit 101, a cell checking unit 102, a transmission schedule generating unit 103, an influence calculating unit 104, and a reservation permission determining unit 105 are shown as functional blocks of the reservation communication control device 80. The reservation communication control device 80 further includes a reservation execution start state checking unit 106, an execution control unit 107, a position cell table 121, a cell / time slot-based throughput table 122, and a reservation table 123.
[0028] (Reservation request receiving unit) The reservation request receiving unit 101 receives a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time zone. The reservation request receiving unit 101 receives a reservation request for a BDT from, for example, an application server 60. The reservation request for a BDT includes, for example, identification information (such as an address) of the application server 60 which is the transmission source, identification information of the UE 21 which is the transmission destination, the capacity of data to be transmitted, and information specifying the time zone for transmission.
[0029] Furthermore, the reservation request receiving unit 101 receives location information of the UE 21 from the UE 21. Note that the location information may be information indicating the location of the UE 21 specified by, for example, latitude and longitude.
[0030] The location information does not necessarily have to be the current location of the UE 21. The location information may be, for example, a location where the UE 21 is located during the execution time period of the BDT. For example, if the UE 21 is an electronic device mounted on a vehicle, the location information may be information that identifies the location of a parking lot where the vehicle is parked.
[0031] (Cell Inquiry Department) The cell reference unit 102 acquires the location information via the reservation request receiving unit 101, and refers to the location cell table 121 to identify the cell 42 of the base station 41 to which the UE 21 at the location identified by the location information is connected.
[0032] The location cell table 121 is a table in which information that associates location information with a connectable cell at the location of the location information is described. FIG.
[0033] In the example of Fig. 3, "geomesh" is shown as the location information, and the latitude "lat" and longitude "lon" specified by the character string described as "geomesh" are shown. For example, when "geomesh" is "xn76fgre", the latitude (lat) is 35.6581 and the longitude (lon) is 139.7016. The location information of UE 21 acquired via reservation request receiving unit 101 may be, for example, "geomesh".
[0034] In the example of FIG. 3, "cellList" is shown as information on a cell corresponding to the location information. "cellList" shows a list of cells 42 of base stations 41 to which UE 21 at the location can be connected, that is, a list of cell candidates. For example, "cell1" in "cellList" describes identification information of a cell that is the first candidate, and "rsrp1" describes the electric field strength of the cell "cell1". Similarly, "cell2", "cell3", ... describes identification information of cells that are the second, third, ... candidates, and "rsrp2", "rsrp3", ... describes the electric field strength of the cells "cell2", "cell3", ....
[0035] The cell reference unit 102 searches the location cell table 121 using the location information of the UE 21 described as "geomesh" to identify the cell described in "cellList".
[0036] For example, when the location information of UE 21 is "xn76fgre", a cell having identification information "Cell-000" is described in "cellList". In this case, UE 21 is connected to the cell having identification information "Cell-000". Cell reference unit 102 supplies one cell described in "cellList" to transmission schedule generation unit 103 as first cell information indicating a cell to which UE 21 is connected during the execution time period of BDT.
[0037] Also, for example, when the location information of UE21 is "xn76fgrf", a cell with identification information "Cell-000" and a cell with identification information "Cell-004" are described in "cellList". In this case, UE21 is connected to either the cell with identification information "Cell-000" or the cell with identification information "Cell-004". The cell reference unit 102 supplies information for identifying the two cells described in "cellList" to the transmission schedule generation unit 103 as first cell information indicating the cell to which UE21 is connected during the execution time period of the BDT.
[0038] In this way, the cell reference unit 102 outputs the first cell information by referring to the location cell table 121. At this time, the cell reference unit 102 specifies one or more connectable cells in the location corresponding to the location information as cells to which the UE 21 is connected during the execution time period, and outputs the first cell information.
[0039] (Transmission schedule generation part) The transmission schedule generating unit 103 generates a transmission schedule indicating the time required to complete transmission of the data volume based on the information indicating the data volume included in the reservation request and the information indicating the time slot during which the transmission will be performed. The transmission schedule generating unit 103 generates the transmission schedule by referring to the cell / time slot-specific throughput table 122.
[0040] The cell / time slot throughput table 122 stores information indicating the predicted throughput for each cell in each time slot. For example, for a cell with identification information "Cell-000", information indicating the predicted throughput for the time slot from 20:00 to 21:00, the predicted throughput for the time slot from 21:00 to 22:00, ... is stored. Similarly, the predicted throughput for each time slot is stored for the cell with identification information "Cell-001", the cell with identification information "Cell-002", .... Note that even for the same time slot, the predicted throughput may be displayed by day of the week or date, for example.
[0041] The method of calculating the predicted throughput is arbitrary. For example, the predicted throughput may be calculated by collecting information indicating the throughput of each cell recorded by a network function unit or the like in the core network 50 for a certain period of time in the past and calculating an average value for each time period. The predicted throughput calculated in this manner is appropriately referred to as the first throughput. In other words, the first throughput is predicted based on the throughput in the execution time period of the cell predicted based on information related to past communications recorded by the core network 50.
[0042] 4 is a diagram for explaining an example of the first throughput calculation method, in which the vertical axis represents throughput, the horizontal axis represents time, and a curve shows the change in throughput of one cell over time.
[0043] A curve 201a in Fig. 4 indicates a throughput calculated by collecting information indicating the throughput of the cell recorded by the network function unit for the past month and calculating an average value for each time period. A curve 201b in Fig. 4 indicates a throughput predicted on the assumption that the throughput of the cell will change in the future in the same manner as the curve 201a. Note that, although an example of calculating an average value has been described here as an example of a method for calculating the first throughput, the calculation method is not limited to this. For example, the first throughput may be calculated by applying machine learning, statistical processing, or the like to information indicating the past throughput of the cell.
[0044] The transmission schedule generating unit 103 specifies the time to start transmission (hereinafter referred to as the transmission start time) based on information indicating the time period (hereinafter referred to as the execution time period) included in the reservation request when transmission is to be performed. The transmission schedule generating unit 103 also refers to the cell / time period specific throughput table 122 to obtain a predicted throughput for the time period after the cell transmission start time specified by the first cell information supplied from the cell querying unit 102. Then, the transmission schedule generating unit 103 specifies the time at which the transmission will be completed (hereinafter referred to as the transmission completion time) when transmission of data of the capacity included in the reservation request is started at the transmission start time.
[0045] Fig. 5 is a diagram for explaining an example of a transmission schedule. As an example, the figure shows a transmission schedule of a cell with identification information "Cell-000", with the horizontal axis representing time and vertical lines separating time periods. In this example, the time period from 20:00 to 21:00, the time period from 21:00 to 22:00, ..., and the time period from 07:00 to 08:00 are shown.
[0046] In the example shown in FIG. 5, for ease of explanation, time periods are shown as one-hour intervals, but in practice, the time periods may be divided into shorter intervals (for example, every 10 minutes).
[0047] The transmission schedules are shown by horizontally long rectangular frames in Fig. 5. In this example, transmission schedules TS1 to TS4 are shown.
[0048] The frame of each transmission schedule is drawn corresponding to the execution time period included in the reservation request. For example, the execution time period of the BDT related to the transmission schedule TS1 is the time period from 20:00 to 02:00, and the execution time period of the BDT related to the transmission schedule TS4 is the time period from 23:00 to 06:00.
[0049] In each transmission schedule, a certain portion of the frame corresponding to the transmission start time and the transmission completion time is shown hatched. For example, the BDT related to the transmission schedule TS1 has a data capacity of 63 GB, so if the transmission start time is 20:00, the transmission completion time is 01:00. Therefore, the BDT related to the transmission schedule TS1 can complete transmission within the execution time slot specified in the reservation request.
[0050] In addition, since the BDT related to the transmission schedule TS2 has a data capacity of 50 GB, if the transmission start time is 22:00, the transmission completion time will be approximately 01:00. Therefore, it is also possible for the BDT related to the transmission schedule TS2 to complete transmission within the execution time slot specified in the reservation request.
[0051] The transmission schedule generating unit 103 generates a transmission schedule based on not only the received reservation request but also the reservation information of the BDT stored in the reservation table 123 described later. For example, the transmission schedules TS1 to TS3 in Fig. 5 are generated based on the reservation information of the BDT stored in the reservation table 123, and the transmission schedule TS4 is generated based on the most recently received reservation request. The determination result of the transmission schedule generating unit 103 and the transmission schedule generated for each cell are supplied to the influence calculating unit 104.
[0052] The transmission schedule generating unit 103 determines whether the BDT corresponding to the most recently received reservation request can complete transmission within the execution time slot specified in the reservation request.
[0053] If it is determined that the BDT can complete the transmission within the execution time period specified in the reservation request, the transmission schedule generation unit 103 sets a first flag indicating whether or not the transmission can be completed within the execution time period to ON, and generates a transmission schedule, such as that shown in Figure 5.
[0054] On the other hand, if it is determined that the BDT cannot complete the transmission within the execution time period specified in the reservation request, the transmission schedule generating unit 103 sets the first flag to OFF. In this case, a transmission schedule such as that shown in FIG. 5 is not generated.
[0055] In addition, when the electric field strength of the cell to which the UE 21 is connected is low, the throughput of the transmission by the cell may be low. Therefore, for example, when the electric field strength of the cell described in the "cellList" in Fig. 3 is lower than a predetermined threshold, the throughput used when the transmission schedule generating unit 103 determines whether or not the transmission can be completed in the execution time slot may be corrected.
[0056] For example, the first throughput obtained by referring to the cell / time slot-specific throughput table 122 may be multiplied by a numerical value less than 1 according to the electric field strength to correct the value. Then, the time required to transmit the amount of data of the reservation request with the corrected throughput may be calculated, and it may be determined whether the transmission can be completed within the execution time slot.
[0057] In this way, the transmission schedule generation unit 103 predicts the first throughput, which is the throughput of the execution time period of the cell identified by the first cell information and to which the terminal device is connected during the execution time period of the BDT of the reservation request, and determines whether the BDT of the reservation request can be completed by the cell during the execution time period.
[0058] Then, the transmission schedule generating unit 103 performs such processing for each cell identified by the first cell information.
[0059] (Impact Calculation Section) The influence calculation unit 104 calculates the amount of throughput degradation caused by executing the BDT of the reservation request in the cell by referring to the transmission schedule supplied from the transmission schedule generation unit 103. The amount of throughput degradation is determined, for example, according to the number of BDTs executed in the time period.
[0060] Then, the influence calculation unit 104 predicts the second throughput by subtracting the amount of decrease calculated in accordance with the number of BDTs executed in the time period from the first throughput.
[0061] Fig. 6 is a diagram for explaining a prediction of a cell's throughput taking into account the amount of degradation corresponding to the number of BDTs executed in a given time period. In this figure, the horizontal axis represents time and the vertical axis represents throughput, and the change in throughput over time in one cell is shown by a curve.
[0062] Curve 201 indicates the first throughput of the cell. Curve 202 indicates the predicted throughput obtained by subtracting the amount of decrease corresponding to the number of BDTs executed in each time period from the value of the first throughput in that time period. The amount of decrease in throughput is expressed as a function using the number of BDTs executed as a parameter, and is actually calculated by a complex calculation. For the sake of simplicity, it will be described here that the throughput of the cell decreases by 1 Mbps when one BDT is executed, for example.
[0063] For example, at the time (23:45) indicated by the vertical dotted line in Fig. 5, four BDTs are executed, and the throughput drops by approximately 4 Mbps. Furthermore, the throughput for this time period (23:00-24:00) obtained by referring to the cell-by-time period throughput table 122 is 30 Mbps. Therefore, the impact calculation unit 104 calculates the amount of decrease in throughput for the time period 23:00-24:00 as 4 Mbps, and calculates the predicted throughput (second throughput) for the cell for the time period 23:00-24:00 as 26 Mbps (= 30 Mbps - 4 Mbps).
[0064] The influence calculation unit 104 calculates the second throughput at each time (e.g., every minute) from the transmission start time to the transmission completion time of the transmission schedule created based on the reservation request, and compares the calculated second throughput with a preset threshold. Here, the threshold is, for example, a lower limit throughput that is the lower limit of the throughput that should be realized by the cell, and is set based on, for example, a KPI.
[0065] For example, if the lower limit throughput of the cell "Cell-000" is 8 Mbps, the second throughput (26 Mbps) is equal to or greater than the lower limit throughput (8 Mbps). The influence calculation unit 104 calculates the second throughput in this manner and determines whether it is equal to or greater than the threshold.
[0066] When the second throughput is equal to or greater than the threshold, the influence calculation unit 104 sets a second flag indicating suitability of the lower limit requirement of the second throughput to ON. On the other hand, when the second throughput is less than the threshold, the influence calculation unit 104 sets the second flag to OFF.
[0067] In this way, the impact calculation unit 104 predicts the second throughput obtained by subtracting the amount of throughput reduction caused by executing the BDT of the reservation request in the cell from the first throughput, and determines whether the second throughput of the cell is greater than or equal to a threshold value.
[0068] Then, the influence calculation unit 104 performs such a determination for each cell identified by the first cell information supplied from the cell reference unit 102.
[0069] The determination result of the influence calculation unit 104 (ON / OFF of the second flag) is supplied to the reservation permission determination unit 105 together with the determination result of the transmission schedule generation unit 103 (ON / OFF of the first flag).
[0070] For a cell for which a transmission schedule has not been generated, the influence calculation unit 104 does not calculate the second throughput and compare it with the threshold value. This is because, in a cell for which a transmission schedule has not been generated, the BDT corresponding to the most recently received reservation request cannot be completed in the execution time slot specified in the reservation request, and therefore the BDT cannot be executed in this cell.
[0071] (Reservation availability decision section) The reservation acceptance / rejection determining unit 105 determines whether to accept or reject the reservation request received by the reservation request receiving unit 101 based on the results of the determination by the influence calculating unit 104 and the results of the determination by the transmission schedule generating unit 103 .
[0072] For example, if the BDT of the transmission schedule can complete transmission within the execution time period specified in the reservation request in all of the cells identified by the information supplied from the cell reference unit 102, and the second throughput is equal to or greater than the threshold in all of those cells, the reservation acceptance determination unit 105 accepts the reservation request.
[0073] In this way, the reservation acceptance / rejection decision unit 105 decides to accept the reservation request when the transmission schedule generation unit 103 determines that the BDT of the reservation request can be completed within the execution time period for all of the cells included in the first cell information, and when the impact calculation unit 104 determines that the second throughput is equal to or greater than the threshold for all of the cells.
[0074] When accepting a reservation request, the reservation acceptance determining unit 105 writes information included in the accepted reservation request into the reservation table 123. The reservation table 123 is a table that records information of the accepted reservation request for each cell. In this case, the reservation acceptance determining unit 105 writes reservation information including identification information of the cell specified by the first cell information supplied from the cell inquiry unit 102 and information included in the accepted reservation request into the reservation table 123.
[0075] On the other hand, if the BDT of the transmission schedule cannot complete the transmission within the execution time period specified in the reservation request in any of the cells identified by the information supplied from the cell reference unit 102, or if the second throughput in any of those cells is less than the threshold value, the reservation acceptance determination unit 105 rejects the reservation request.
[0076] The reservation acceptance / rejection decision unit 105 notifies the UE 21 and the application server 60 of the decision to accept or reject the reservation request. If the reservation request is accepted, the SLA (Service Level Agreement) is that the amount of data specified in the summary request is transmitted during the execution time slot, on condition that the location of UE 21 during the execution time slot corresponds to the location information received together with the reservation request.
[0077] In the above example, it has been explained that the reservation request is accepted if the transmission can be completed in the designated execution time slot in all of the candidate cells and the second throughput is equal to or greater than the threshold in all of the cells. However, for example, the reservation request may be accepted if the transmission can be completed in the designated execution time slot in any of the candidate cells and the second throughput is equal to or greater than the threshold.
[0078] That is, the reservation request may be accepted only for candidate cells that satisfy the requirements. If the cell can complete transmission within the specified execution time slot and has a second throughput equal to or greater than the threshold, the cell satisfies the requirements.
[0079] In this way, when the transmission schedule generation unit 103 determines that the BDT of the reservation request can be completed within the execution time period by one or more cells among the cells included in the first cell information, and the impact calculation unit 104 determines that the second throughput in the one or more cells is equal to or greater than a threshold value, the reservation acceptance determination unit 105 may specify the one or more cells and decide to accept the reservation request.
[0080] In this case, reservation information including identification information of the cell that satisfies the requirements and information included in the accepted reservation request is written to the reservation table 123. Then, when notifying the UE 21 and the application server 60 of the decision to accept the reservation request, the reservation acceptance decision unit 105 also notifies information related to the specified cell (i.e., the cell that satisfies the requirements). For example, when notifying the decision to accept the reservation request, the RFSP index (RAT / Frequency Selection Priority index) / SPID (Subscriber Profile ID for RAT / Frequency Priority) corresponding to the cell that satisfies the requirements, etc. may be notified.
[0081] (Reservation execution start status confirmation section) The reservation execution start state confirmation unit 106 confirms the state of the UE 21 at the start of execution of the BDT corresponding to the reservation request whose acceptance has been decided by the reservation acceptance decision unit 105. More specifically, the reservation execution start state confirmation unit 106 acquires, from the core network 50, second cell information that identifies the cell to which the UE 21 is connected at the start of execution of the BDT.
[0082] The reservation execution start state checking unit 106 acquires the transmission start time of each BDT by referring to the reservation table 123. When the transmission start time of the reserved BDT approaches (for example, one minute before the transmission start time), the reservation execution start state checking unit 106 identifies the cell to which the UE 21 specified in the reservation request for the BDT is connected.
[0083] The cell to which the UE 21 is connected can be identified, for example, by acquiring location information from a network function unit of the core network 50. In the example of FIG.
[0084] The reservation execution start state checking unit 106 supplies the execution control unit 107 with second cell information including the identification information of the specified cell.
[0085] (Executing Control Unit) The execution control unit 107 refers to the information supplied from the reservation execution start state confirmation unit 106 and controls the execution of the reserved BDT.
[0086] The execution control unit 107 acquires the transmission start time of each BDT by referring to the reservation table 123. The execution control unit 107 identifies the cell to which the UE 21 is connected based on the information supplied from the reservation execution start state confirmation unit 106 when starting the transmission of each BDT.
[0087] Then, for each BDT, executive control unit 107 determines whether or not the cell to which UE 21 is connected is different from the cell described in the reservation information.
[0088] If it is determined that the cell to which UE 21 is connected is different from the cell described in the reservation information, the execution control unit 107 stops the execution of the BDT. That is, if the transmission of the BDT that the reservation permission determination unit has decided to accept is to be executed in a cell different from the cell related to the decision to accept, the execution of the BDT is stopped. If it is executed in a different cell, the transmission may not be completed in the execution time slot of the reservation request, and even if the transmission is completed in the execution time slot, the lower limit value requirement of the cell throughput may not be satisfied.
[0089] In this way, the execution control unit 107 cancels the execution of the BDT of the reservation request when the cell identified by the second cell information is determined by the transmission schedule generation unit 103 to be able to complete the BDT of the reservation request within the execution time zone and is not included in the cells determined by the impact calculation unit 104 to have a second throughput equal to or greater than the threshold value.
[0090] On the other hand, if it is determined that the cell to which the UE 21 is connected corresponds to any of the cells described in the reservation information, the execution control unit 107 executes the transmission of the BDT.
[0091] (Reservation request acceptance process flow) Next, the flow of reservation request acceptance processing by the reservation communication control device will be described with reference to Fig. 7, which is a flowchart illustrating an example of the reservation request acceptance processing.
[0092] In step S20, the reservation request receiving unit 101 determines whether or not the customer has given consent to the reservation of the BDT, for example, whether or not the customer has agreed in advance to the conditions and restrictions for the reservation of the BDT.
[0093] The process of step S20 may not be executed.
[0094] If it is determined in step S20 that the customer agrees to the BDT reservation, the process of step S21 is executed, and if it is determined that the customer does not agree, the reservation request acceptance process ends.
[0095] In step S21, the reservation request receiving unit 101 receives a reservation request and location information.
[0096] At this time, a reservation request for the BDT is received from, for example, the application server 60. The reservation request for the BDT includes, for example, identification information (such as an address) of the application server 60 which is the transmission source, identification information of the UE 21 which is the transmission destination, the amount of data to be transmitted, and information specifying the execution time period during which the transmission is performed.
[0097] Furthermore, the reservation request receiving unit 101 receives location information of the UE 21 from the UE 21. Note that the location information may be information indicating the location of the UE 21 specified by, for example, latitude and longitude.
[0098] In step S22, the cell inquiry unit 102 acquires location information of the UE 21 via the reservation request receiving unit 101, and refers to the location cell table 121 to identify the cell 42 of the base station 41 to which the UE 21 at the location identified by the location information is connected.
[0099] At this time, for example, as described with reference to Fig. 3, the cell reference unit 102 searches the location cell table 121 by the location information of the UE 21 described as "geomesh" to identify candidates of the cell described in "cellList". As a result, the first cell information is output.
[0100] In step S23, the value of a variable i, which is used as a number assigned to each of the cells identified in step S22, is set to 1.
[0101] In step S24, the transmission schedule generating unit 103 executes a transmission schedule generating process for the i-th cell. This determines whether or not the BDT corresponding to the reservation request can complete the transmission within the execution time slot specified in the reservation request. If it is determined that the transmission can be completed within the execution time slot, for example, the transmission schedule described with reference to FIG. 5 is generated.
[0102] In step S25, the influence calculation unit 104 executes an influence calculation process for the i-th cell, thereby determining whether the i-th cell satisfies the lower limit requirement of the throughput when the BDT of the reservation request received in step S21 is executed.
[0103] In step S26, the reservation adequacy determining unit 105 stores the reservation adequacy of the i-th cell. The reservation adequacy may be indicated by, for example, a first flag and a second flag obtained as a result of the processing in steps S24 and S25.
[0104] In step S27, it is determined whether the value of the variable i has reached the upper limit (Max).
[0105] For example, if the number of cells identified in step S22 is 2, then the upper limit is 2. If it is determined in step S27 that the value of variable i has not yet reached the upper limit (Max), then in step S29 the value of variable i is incremented by 1. Thereafter, the processes in steps S24 to S27 are repeatedly executed.
[0106] If it is determined in step S27 that the value of the variable i has reached the upper limit, the process advances to step S28.
[0107] In step S28, the reservation acceptance / rejection determination unit 105 executes a reservation acceptance / rejection determination process to determine whether to accept or reject the reservation request received in step S21. The result is notified to the UE 21 and the application server 60.
[0108] In this manner, the reservation request acceptance process is carried out.
[0109] (Flow of transmission schedule generation process) Next, a detailed flow of the transmission schedule generation process in step S24 in Fig. 7 will be described. Fig. 8 is a flowchart illustrating an example of the transmission schedule generation process.
[0110] In step S41, the transmission schedule generating unit 103 specifies a first throughput.
[0111] At this time, the transmission schedule generating unit 103 specifies the transmission start time based on, for example, information indicating the execution time slot included in the reservation request. Also, the transmission schedule generating unit 103 refers to the cell / time slot-specific throughput table 122 to specify a first throughput, which is a predicted throughput for a time slot after the cell transmission start time specified by the information supplied from the cell referencing unit 102.
[0112] In step S42, the transmission schedule generating unit 103 determines whether or not the transmission of the BDT will be completed within the execution time period of the reservation request.
[0113] At this time, the transmission schedule generating unit 103 identifies the transmission completion time when transmission of data of the capacity included in the reservation request is started at the transmission start time, and determines whether the transmission of the BDT will be completed within the execution time period of the reservation request.
[0114] If it is determined in step S42 that the job will be completed within the execution time slot, the process proceeds to step S43.
[0115] In step S43, the transmission schedule generating unit 103 generates a transmission schedule. At this time, for example, for the i-th cell, a transmission schedule as shown in Fig. 5 is generated.
[0116] In step S43, the transmission schedule generating unit 103 sets a first flag, which indicates whether or not the transmission in the execution time slot can be completed, to ON.
[0117] On the other hand, if it is determined in step S42 that the processing will not be completed within the execution time slot, the process proceeds to step S45. In step S45, the transmission schedule generating unit 103 sets the first flag to OFF.
[0118] In this manner, the transmission schedule generation process is performed.
[0119] (Flow of impact calculation process) Next, a detailed flow of the influence calculation process in step S25 in Fig. 7 will be described. Fig. 9 is a flowchart illustrating an example of the influence calculation process.
[0120] In step S61, the influence calculation unit 104 determines whether or not the first flag is set to ON. If it is determined in step S61 that the first flag is set to ON, the process proceeds to step S62.
[0121] In step S62, the influence calculation unit 104 calculates the second throughput for the i-th cell.
[0122] At this time, the impact calculation unit 104 calculates the amount of throughput degradation caused by executing the BDT of the reservation request in the i-th cell, for example, by referring to the transmission schedule generated in step S43 in Fig. 8. Then, the impact calculation unit 104 calculates the second throughput in the time slot of the i-th cell by subtracting the amount of degradation calculated corresponding to the number of BDTs executed in the time slot from the first throughput stored in the cell / time slot throughput table 122.
[0123] The effect calculation unit 104 calculates the second throughput at each time (for example, every minute) from the transmission start time to the transmission completion time of the transmission schedule created based on the reservation request.
[0124] In step S63, the influence calculation unit 104 determines whether the second throughput calculated in step S62 is equal to or greater than a threshold value. If it is determined in step S63 that the second throughput is equal to or greater than the threshold value, the process proceeds to step S64.
[0125] In step S64, the influence calculation unit 104 sets a second flag, which indicates suitability of the second lower limit requirement for the throughput, to ON.
[0126] On the other hand, if it is determined in step S63 that the difference is less than the threshold value, the process of step S66 is executed, and the influence calculation unit 104 sets the second flag to OFF.
[0127] Furthermore, if it is determined in step S61 that the first flag is not on, the processes in steps S61 to S65 are skipped.
[0128] In this manner, the effect calculation process is performed.
[0129] (Flow of reservation availability decision process) Next, a detailed flow of the reservation acceptance / rejection determination process in step S26 of Fig. 7 will be described. Fig. 10 is a flowchart illustrating an example of the reservation acceptance / rejection determination process.
[0130] In step S81, the reservation acceptance / rejection determination unit 105 determines whether the second flag is set to ON in all the cells. If it is determined in step S81 that the second flag is set to ON in all the cells, the process proceeds to step S82.
[0131] In step S82, it is determined whether the customer agrees to the reservation details. For example, the reservation request details received in step S21 in Fig. 7 are sent again to the customer to determine whether a response indicating agreement has been received. Note that the process of step S82 may not be executed.
[0132] If it is determined in step S82 that the reservation contents are agreed to, the process proceeds to step S83. On the other hand, if it is determined in step S82 that the reservation contents are not agreed to, the reservation acceptance / rejection determination process ends.
[0133] In step S83, the reservation acceptance / rejection decision unit 105 accepts the reservation request received in step S21.
[0134] In step S84, the reservation permission determination unit 105 writes information included in the accepted reservation request into the reservation table 123. At this time, the reservation permission determination unit 105 writes reservation information including identification information of the cell specified by the information supplied from the cell reference unit 102 and information included in the accepted reservation request into the reservation table 123.
[0135] On the other hand, if it is determined in step S81 that the second flag is not set to ON in any cell, the process proceeds to step S85. In step S85, the reservation acceptance / rejection determination unit 105 rejects the reservation request received in step S21.
[0136] In step S86, the reservation acceptance / rejection decision unit 105 notifies the UE 21 and the application server 60 of the decision to accept or reject the reservation request.
[0137] In this manner, the reservation admissibility determination process is executed. In the example of Fig. 10, for example, in all of the cells identified in step S22, if the BDT of the transmission schedule can complete transmission within the execution time slot specified in the reservation request, and the second throughput is equal to or greater than the threshold in all of those cells, the reservation admissibility determination unit 105 accepts the reservation request.
[0138] (Another example of reservation availability decision processing) On the other hand, if the transmission can be completed in the specified execution time slot in any of the cells identified in step S22 and the second throughput is equal to or greater than the threshold, the reservation request may be accepted. In this case, the detailed flow of the reservation acceptance / rejection decision process in step S26 in Fig. 7 is as shown in Fig. 11. Fig. 11 is a flowchart for explaining another example of the reservation acceptance / rejection decision process.
[0139] In step S101, the reservation acceptance / rejection determination unit 105 determines whether or not the second flag is set to ON in any cell. If it is determined in step S101 that the second flag is set to ON in any cell, the process proceeds to step S102.
[0140] In step S102, it is determined whether the customer agrees to the reservation details. For example, the reservation request details received in step S21 in Fig. 7 are sent again to the customer to determine whether a response indicating agreement has been received. Note that the process in step S102 may not be executed.
[0141] If it is determined in step S102 that the reservation details are agreed to, the process proceeds to step S103. On the other hand, if it is determined in step S102 that the reservation details are not agreed to, the reservation acceptance / rejection determination process ends.
[0142] In step S103, the reservation acceptance / rejection decision unit 105 accepts the reservation request received in step S21 by specifying a cell.
[0143] In step S104, the reservation acceptance determination unit 105 writes information included in the accepted reservation request into the reservation table 123. At this time, the reservation acceptance determination unit 105 writes reservation information including identification information of a cell that satisfies the requirements and information included in the accepted reservation request into the reservation table 123.
[0144] On the other hand, if it is determined in step S101 that the second flag is not set to ON in any of the cells, the process proceeds to step S105. In step S105, the reservation acceptance / rejection determination unit 105 rejects the reservation request received in step S21.
[0145] In step S106, the reservation acceptance / rejection decision unit 105 notifies the UE 21 and the application server 60 of the decision to accept or reject the reservation request. When the decision to accept the reservation request is notified, information related to the specified cell is also notified. For example, when the decision to accept the reservation request is notified, the RFSP index corresponding to the specified cell, etc. may be notified.
[0146] The reservation availability determination process may be executed in this manner.
[0147] Next, a flow of reservation execution control processing by the reservation communication control device will be described with reference to FIG 12, which is a flowchart illustrating an example of the reservation execution control processing.
[0148] In step S121, the reservation execution start state confirmation unit 106 determines whether there is a reservation for which transmission will start within a predetermined time (for example, within one minute) and waits until it is determined that there is a reservation. At this time, for example, the reservation execution start state confirmation unit 106 refers to the reservation table 123 to obtain the transmission start time of each BDT.
[0149] If it is determined in step S121 that a reservation for starting transmission is made, the process proceeds to step S122.
[0150] In step S122, the reservation execution start state confirmation unit 106 identifies a cell to which the UE 21 specified in the reservation request for the BDT that starts transmission within a predetermined time is connected. At this time, the reservation execution start state confirmation unit 106 identifies the cell to which the UE 21 is currently connected by, for example, acquiring location information from the NEF of the core network 50, and generates second cell information including identification information of the identified cell.
[0151] In step S123, the executive control unit 107 judges whether or not the cell specified by the second cell information is different from the cell described in the reservation information for the BDT that starts transmission within the predetermined time. If it is judged that the cell specified by the second cell information is different from the cell described in the reservation information, the process of step S124 is executed.
[0152] 11, if the reservation request is granted by specifying a cell, in step S123, it is determined whether or not the cell specified by the second cell information is different from the cell specified in the reservation information. That is, in step S123, it is determined whether or not the cell specified by the second cell information is included in the cells determined by the transmission schedule generating unit 103 as being capable of completing the BDT of the reservation request within the execution time slot, and determined by the influence calculating unit 104 as having a second throughput equal to or greater than a threshold value.
[0153] In step S124, the executive control unit 107 stops transmitting the BDT.
[0154] On the other hand, if it is determined in step S123 that the cell to which the UE 21 is connected corresponds to any of the cells described (or specified) in the reservation information, the process proceeds to step S125.
[0155] In step S125, execution control unit 107 waits until it is determined that the transmission start time has arrived. If it is determined in step S125 that the transmission start time has arrived, execution control unit 107 executes the BDT in question in step S126.
[0156] In this manner, the reservation execution control process is carried out.
[0157] (Effects of the First Embodiment) In this manner, according to the present embodiment, the reservation request is accepted after confirming that the transmission of the BDT related to the reservation request can be completed within the execution time slot, thereby making it possible to avoid the occurrence of a violation of the SLA related to the BDT.
[0158] Furthermore, according to the present embodiment, even if a BDT related to a reservation request is executed, acceptance of the reservation request is determined by confirming that the cells related to the transmission of the BDT satisfy the lower limit requirement of the throughput, and therefore, deterioration of the KPI due to the execution of the BDT can be avoided.
[0159] <Second embodiment> In the first embodiment, an example has been described in which the cell reference unit 102 searches the location cell table 121 based on location information transmitted from the UE 21 to identify the cell to which the UE 21 is connected. However, for example, it is also possible to configure the reservation communication control device 80 by omitting the cell reference unit 102 and the location cell table 121.
[0160] (Another configuration example of the reservation communication control device) 13 is a block diagram showing another example of the functional configuration of the reservation communication control device 80. In the figure, the same reference numerals are used to denote functional blocks corresponding to those in the first embodiment.
[0161] 13, unlike the case of FIG. 2, the reservation communication control device 80 is not provided with the cell reference unit 102 and the location cell table 121. Also, in this example, the UE 21 transmits to the reservation request receiving unit 101 first cell information including identification information of the cell to which the UE 21 is connected together with or instead of the location information.
[0162] The other configuration in FIG. 13 is similar to that described above with reference to FIG. 2, and therefore detailed description thereof will be omitted.
[0163] In this case, the transmission schedule generating unit 103 refers to the first cell information transmitted from the UE 21 to generate the transmission schedule.
[0164] That is, the transmission schedule generating unit 103 refers to the cell / time slot-specific throughput table 122 to obtain a predicted throughput for a time slot after the transmission start time of the cell corresponding to the first cell information transmitted from the UE 21. In addition, the transmission schedule generating unit 103 specifies a transmission completion time when transmission of data of a capacity included in the reservation request is started at the transmission start time.
[0165] This simplifies the configuration of the reservation communication control device 80. In particular, it becomes unnecessary to investigate the electric field strength in order to generate the position cell table 121, and it is possible to reduce the cost of the reservation communication control device 80, for example.
[0166] <Other embodiments> In the above-described embodiment, an example was described in which the start time of the execution time period of the reservation request matches the transmission start time of the transmission schedule, but the start time of the execution time period and the transmission start time do not necessarily have to match.
[0167] For example, the transmission schedule generating unit 103 may specify a time period (eg, one minute) after the start time of the execution time slot as the transmission start time.
[0168] Alternatively, when the transmission schedule generating unit 103 generates a transmission schedule based on the most recently received reservation request, if the transmission completion time is sufficiently earlier than the end time of the execution time slot, the transmission start time may be delayed. In this way, the transmission schedule generating unit 103 may adjust the number of BDTs executed in the same time slot as small as possible, for example.
[0169] <Example of software implementation> The reservation communication control device 80 described above is a program for causing a computer to function, and can be realized by a program for causing a computer to function as the reservation communication control device 80. In this case, the reservation communication control device 80 includes a computer having at least one control device (e.g., a processor) and at least one storage device (e.g., a memory) as hardware for executing the above program. An example of such a computer is shown in FIG. 14.
[0170] The computer 500 includes at least one processor 501 and at least one memory 502. The memory 502 stores a program 520 for causing the computer 500 to operate as a reservation communication control device 80. In the computer 500, the processor 501 reads and executes the program 520 from the memory 502, thereby implementing each function of the reservation communication control device 80.
[0171] The processor 501 may be, for example, a CPU (Central Processing Unit), a GPU (Graphic Processing Unit), a DSP (Digital Signal Processor), an MPU (Micro Processing Unit), an FPU (Floating point number Processing Unit), a PPU (Physics Processing Unit), a microcontroller, or a combination of these.
[0172] As the memory 502, for example, a flash memory, a hard disk drive (HDD), a solid state drive (SSD), or a combination of these can be used.
[0173] The computer 500 may further include a RAM (Random Access Memory) for expanding the program 520 during execution and for temporarily storing various data. The computer 500 may further include a communication interface for transmitting and receiving data to and from other devices. The computer 500 may further include an input / output interface for connecting input / output devices such as a keyboard, a mouse, a display, and a printer.
[0174] Furthermore, the program 520 for causing the computer 500 to operate as the reservation communication control device 80 can be recorded on a non-transitory tangible recording medium 530 that is readable by the computer 500. For example, a tape, a disk, a card, a semiconductor memory, or a programmable logic circuit can be used as such a recording medium 530. The computer 500 can obtain the program 520 via such a recording medium 530.
[0175] Furthermore, the program 520 for causing the computer 500 to operate as the reservation communication control device 80 can be transmitted via a transmission medium. For example, a communication network or a broadcast wave can be used as such a transmission medium. The computer 500 can also obtain the program 520 via such a transmission medium.
[0176] Also, some or all of the functions of the reservation communication control device 80 can be realized by logic circuits. For example, an integrated circuit in which a logic circuit that functions as each of the above control blocks is formed is also included in the scope of the present invention. In addition, the functions of each of the above control blocks can also be realized by, for example, a quantum computer.
[0177] According to each aspect of the present invention described above, by achieving the above-mentioned effects, it is possible to contribute to the achievement of Goal 9 of the Sustainable Development Goals (SDGs), "Build resilient infrastructure, promote inclusive and sustainable industrialization and innovation."
[0178] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention.
[0179] 〔summary〕 A reservation communication control device according to a first aspect of the present invention is a reservation communication control device that controls the reservation of a background data transmission (BDT) and the execution of the reservation, and includes a receiving unit that receives a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time zone; a first judgment unit that predicts a first throughput, which is the throughput of a cell identified by first cell information and to which the terminal device is connected during the execution time zone of the BDT of the reservation request, and judges whether the BDT of the reservation request can be completed by the cell during the execution time zone; a second judgment unit that predicts a second throughput obtained by subtracting the amount of throughput reduction caused by executing the BDT of the reservation request in the cell from the first throughput, and judges whether the second throughput of the cell is equal to or greater than a threshold; and a reservation acceptance / rejection determination unit that determines whether to accept or reject the reservation request based on the judgment result of the first judgment unit and the judgment result of the second judgment unit.
[0180] In a reservation communication control device according to aspect 2 of the present invention, in the above-mentioned aspect 1, the first determination unit predicts the first throughput based on the throughput of the cell in the execution time period predicted based on information related to past communications recorded by the core network, and the second determination unit predicts the second throughput by subtracting a reduction amount calculated corresponding to the number of BDTs executed in the execution time period from the first throughput.
[0181] A reservation communication control device according to aspect 3 of the present invention is, in aspect 1 or 2 above, characterized in that the receiving unit further receives location information of the terminal device, and further includes a location cell table that matches a location corresponding to the location information with a cell that can be connected at the location, and a cell identification unit that outputs the first cell information by referring to the location cell table, and the cell identification unit identifies one or more cells that can be connected at the location corresponding to the location information as cells to which the terminal device will be connected during the execution time period, and outputs the first cell information.
[0182] A reservation communication control device according to aspect 4 of the present invention is, in aspect 3 above, such that the reservation acceptance / rejection determination unit decides to accept the reservation request when the first judgment unit determines that the BDT of the reservation request can be completed within the execution time period for all of the cells included in the first cell information, and the second judgment unit determines that the second throughput is equal to or greater than a threshold value for all of the cells.
[0183] A reservation communication control device according to aspect 5 of the present invention, in aspect 3 above, is such that, when the first judgment unit judges that the BDT of the reservation request can be completed within the execution time period by one or more cells among the cells included in the first cell information, and the second judgment unit judges that the second throughput in the one or more cells is equal to or greater than a threshold value, the reservation acceptance / rejection determination unit specifies the one or more cells and decides to accept the reservation request.
[0184] A reservation communication control device according to a sixth aspect of the present invention is based on the first or second aspect above, wherein the receiving unit further receives the first cell information from the terminal device.
[0185] The reservation communication control device of aspect 7 of the present invention, in any of aspects 1 to 6 above, further comprises an execution start state confirmation unit that acquires from a core network second cell information that identifies a cell to which the terminal device is connected when starting execution of the BDT of the reservation request, and an execution control unit that aborts execution of the BDT of the reservation request when the cell identified by the second cell information is determined by the first judgment unit to be able to complete the BDT of the reservation request within the execution time zone and is not included in the cells determined by the second judgment unit to have the second throughput equal to or greater than a threshold.
[0186] A reservation communication control method according to an eighth aspect of the present invention is a reservation communication control method for reserving a background data transmission (BDT) and controlling the execution of the reservation, and includes the steps of receiving a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time zone, predicting a first throughput which is the throughput of a cell identified by first cell information and to which the terminal device is connected during the execution time zone of the BDT of the reservation request, and performing a first determination to determine whether the BDT of the reservation request can be completed by the cell during the execution time zone, predicting a second throughput which is obtained by subtracting from the first throughput the amount of throughput reduction due to the execution of the BDT of the reservation request in the cell, and performing a second determination to determine whether the second throughput of the cell is equal to or greater than a threshold, and deciding whether to accept or reject the reservation request based on the result of the first determination and the result of the second determination.
[0187] A program according to a ninth aspect of the present invention causes a computer to function as a reservation communication control device that controls the reservation of background data transmission (BDT) and the execution of the reservation, and includes a receiving unit that receives a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time zone, a first judgment unit that predicts a first throughput, which is the throughput of a cell identified by first cell information and to which the terminal device is connected during the execution time zone of the BDT of the reservation request, and determines whether the BDT of the reservation request can be completed by the cell during the execution time zone, a second judgment unit that predicts a second throughput obtained by subtracting the amount of throughput reduction caused by executing the BDT of the reservation request in the cell from the first throughput, and determines whether the second throughput of the cell is equal to or greater than a threshold, and a reservation acceptance / rejection determination unit that determines whether to accept or reject the reservation request based on the judgment result of the first judgment unit and the judgment result of the second judgment unit. [Explanation of symbols]
[0188] 21UE 41 Base station 42 Cells 50 Core Network 60 Application Server 80 Reservation communication control device 101 Reservation request receiving unit 102 Cell Inquiry Section 103 Transmission schedule generation unit 104 Impact Calculation Section 105 Reservation Acceptance Decision Department 106 Reservation execution start status confirmation section 107 Execution Control Unit 121 Position Cell Table 122 Cell / Time-of-day throughput table 123 Reserved Table
Claims
1. A reservation communication control device that controls a reservation of background data transmission (BDT) and execution of the reservation, A receiving unit that receives a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time period; a first determination unit that predicts a first throughput, which is a throughput of a cell identified by first cell information and to which the terminal device is connected during a time period during which the BDT of the reservation request is executed, and determines whether the BDT of the reservation request can be completed by the cell during the time period; a second determination unit that predicts a second throughput obtained by subtracting a decrease in throughput caused by executing BDT of the reservation request in the cell from the first throughput, and determines whether the second throughput of the cell is equal to or greater than a threshold; a reservation acceptance / rejection determination unit that determines whether to accept or reject the reservation request based on a determination result of the first determination unit and a determination result of the second determination unit. Reservation communication control device.
2. The first determination unit is predicting the first throughput based on a throughput of the cell in the execution time slot predicted based on information related to past communications recorded by the core network; The second determination unit is The second throughput is predicted by subtracting a decrease amount calculated corresponding to the number of BDTs executed in the execution time period from the first throughput. The reservation communication control device according to claim 1.
3. The receiving unit further receives location information of the terminal device, a position cell table that associates a position corresponding to the position information with a cell that can be connected to the position; a cell identification unit that outputs the first cell information by referring to the position cell table; The cell identification unit identifies one or more connectable cells at a position corresponding to the position information as cells to which the terminal device is connected during the execution time period, and outputs the first cell information. The reservation communication control device according to claim 1.
4. The reservation acceptance / rejection determination unit When the first determination unit determines that the BDT of the reservation request can be completed in the execution time slot by all of the cells included in the first cell information, and the second determination unit determines that the second throughput is equal to or greater than a threshold in all of the cells, acceptance of the reservation request is decided. The reservation communication control device according to claim 3.
5. The reservation acceptance / rejection determination unit When the first determination unit determines that the BDT of the reservation request can be completed in the execution time slot by one or more cells among the cells included in the first cell information, and the second determination unit determines that the second throughput is equal to or greater than a threshold in the one or more cells, the one or more cells are designated to determine acceptance of the reservation request. The reservation communication control device according to claim 3.
6. The receiving unit further receives the first cell information from the terminal device. The reservation communication control device according to claim 1.
7. An execution start state confirmation unit that acquires second cell information that identifies a cell to which the terminal device is connected when starting execution of the BDT of the reservation request from a core network; and an execution control unit that, when a cell specified by the second cell information is not included in a cell that is determined by the first determination unit to be able to complete the BDT of the reservation request in the execution time slot and is determined by the second determination unit to have the second throughput equal to or greater than a threshold, stops execution of the BDT of the reservation request. The reservation communication control device according to claim 1.
8. A reservation communication control method for a reservation communication control device that includes a receiving unit, a first determination unit, a second determination unit, and a reservation permission / non-permission determination unit, and controls a reservation for background data transmission (BDT) and execution of the reservation, comprising: A receiving unit receives a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time period; a first determination unit predicts a first throughput of a cell identified by first cell information, the first throughput being a throughput of a cell to which the terminal device is connected during a time slot during which the BDT of the reservation request is executed, and performs a first determination to determine whether the BDT of the reservation request can be completed by the cell during the time slot; a second determination unit predicts a second throughput by subtracting a reduction in throughput caused by performing BDT of the reservation request in the cell from the first throughput, and performs a second determination to determine whether the second throughput of the cell is equal to or greater than a threshold; A reservation acceptance / rejection determination unit determines whether to accept or reject the reservation request based on a result of the first determination and a result of the second determination. Reservation communication control method.
9. Computer, A reservation communication control device that controls a reservation of background data transmission (BDT) and execution of the reservation, A receiving unit that receives a reservation request for a BDT related to a terminal device connected to a core network, the reservation request specifying a data capacity and an execution time period; a first determination unit that predicts a first throughput, which is a throughput of a cell identified by first cell information and to which the terminal device is connected during a time period during which the BDT of the reservation request is executed, and determines whether the BDT of the reservation request can be completed by the cell during the time period; a second determination unit that predicts a second throughput obtained by subtracting a decrease in throughput caused by executing BDT of the reservation request in the cell from the first throughput, and determines whether the second throughput of the cell is equal to or greater than a threshold; and a reservation acceptance / rejection determination unit that determines whether to accept or reject the reservation request based on a determination result of the first determination unit and a determination result of the second determination unit. program.
Citation Information
Patent Citations
Access node, controller for an access node and method for improving a deployment of an access node
EP3367729A1
Communication control device, computer program, and communication control method
JP2021034764A
Method for updating background data transmission policy negotiated between application function and core network, policy control function, and application function - Patent Application Publication No. 20070122637
JP2022537714A
Power control in a wireless communication system
US20140342768A1
