Gaming Machines
The gaming machine's lottery-based mode selection and timed automatic operations address player discomfort with manual operations, enhancing engagement and reducing wait times for performance initiation.
Patent Information
- Application Number
- JP2021156018
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-09-24
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-09-24
AI Technical Summary
Players in gaming machines, such as pachinko machines, often find the required operations in start operation request performances cumbersome, and those who opt for automatic modes have to wait excessively for the performance to start, reducing enjoyment.
A gaming machine with a lottery system that determines performance modes, allowing players to select between manual and automatic modes, and sets different automatic operation timings based on the operation time required for various controls, ensuring quicker performance initiation.
Enhances player engagement by allowing personalized operation preferences and reducing wait times for performance initiation, improving overall enjoyment.
Smart Images

Figure 0007577330000001 
Figure 0007577330000002 
Figure 0007577330000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a gaming machine having a presentation content that prompts a player to perform a predetermined operation and starts a specific presentation in response to the operation.
[0002] Some gaming machines, such as pachinko machines, sometimes execute a start operation request effect that prompts the player to operate an effect button or the like, and starts a specific effect as a result of the player's operation. Since the specific effect started by the start operation request effect is generally a preferred effect for the player, such a start operation request effect allows the player to experience a sense of accomplishment in having started a preferred effect by himself / herself.
[0003] Basically, the start operation request performance is configured so that the specific performance will not start unless the required operation is performed within the operation acceptance period. However, there are some players who find the operation in the start operation request performance cumbersome. Also, there are players who want to enjoy the specific performance even if they fail to perform the required operation in the start operation request performance. For this reason, a configuration has been proposed in which the start operation request performance has an automatic mode that, when a preset automatic operation timing is reached, assumes that the required operation has been performed even if it has not been performed, and starts the specific performance (for example, Patent Document 1). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2020-036854 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the above-mentioned automatic mode start operation request presentation, some players who find the operation troublesome can enjoy the specific presentation when the automatic operation timing arrives, even without performing the required operation. However, since many players wish to start the specific presentation by their own operation even in the automatic mode, in the conventional configuration, the automatic operation timing is set after a sufficient time has elapsed for the player to reliably perform the required operation. For this reason, a player who does not perform the required operation in the automatic mode must wait a relatively long time for the specific presentation to start each time the start operation request presentation is performed in the automatic mode, which makes it difficult for the player to enjoy the presentation.
[0006] The present invention has been made in consideration of the above-mentioned current situation, and has as its object to provide a gaming machine which can improve the entertainment value of the presentation of the start operation request in the automatic mode, as compared with the conventional configuration. [Means for solving the problem]
[0007] The present invention comprises a lottery means for holding a lottery when a predetermined condition is satisfied, a presentation mode selection means for selecting a presentation mode based on the result of the lottery, a presentation control means for controlling a presentation in the presentation mode selected by the presentation mode selection means, and a presentation operation mode setting means which can be set to a manual mode or an automatic mode, the presentation modes selected by the presentation mode selection means include a start operation request presentation which prompts a player to perform a specific presentation start operation and, when the specific presentation start operation is performed, starts a specific presentation in response to the specific presentation start operation, and when the start operation request presentation is executed, if the presentation control means is set to the manual mode, the start operation request presentation is executed when the specific presentation start operation is performed within a predetermined operation acceptance period. When the specific performance is started, the specific performance is started, and if the automatic mode is set when the start operation request performance is executed, the specific performance can be started when the automatic operation timing set in the operation acceptance period arrives, even if the specific performance start operation has not been performed.The start operation request performance includes a first start operation request performance in which a predetermined number of operations of a first operation means is the specific performance start operation, and a second start operation request performance in which the predetermined number of operations of a second operation means is the specific performance start operation, and the automatic operation timing is set to different timings in the first start operation request performance and the second start operation request performance.
[0008] Generally, the time required to operate the operating means varies depending on the arrangement and operation method, and therefore in this configuration, for the first start operation request presentation and the second start operation request presentation, whichever takes a relatively short time to operate the operating means, the automatic operation timing is set earlier, and for the presentation which takes a relatively long time to operate the operating means, the automatic operation timing is set relatively later.In this way, in either the automatic mode of the first start operation request presentation or the second start operation request presentation, it is possible to ensure that the player has time to perform the specific presentation start operation before the automatic operation timing, while shortening as much as possible the time that a player who does not wish to perform the specific presentation start operation has to wait for the start of the specific presentation, thereby improving the interest of the start operation request presentation.
[0009] In the present invention, it is proposed that the presentation operation mode setting means is capable of selectively setting the manual mode and the automatic mode by the player's operation. In this configuration, a player who wants to feel a strong sense of accomplishment through the start operation request presentation can select the manual mode, and a player who finds the operation in the start operation request presentation troublesome can select the automatic mode, so that the start operation request presentation can be provided according to the player's preference.
[0010] In addition, in the present invention, it is proposed that the performance mode selection means selects the first start operation request performance at a different frequency from the second start operation request performance. In such a configuration, it is assumed that the player is accustomed to the specific performance start operation for the first start operation request performance or the second start operation request performance, whichever is selected more frequently, and the time required for the specific performance start operation is relatively short. Therefore, in such a configuration, if the automatic operation timing is set relatively early for the first start operation request performance or the second start operation request performance, whichever is selected more frequently, it is possible to appropriately shorten the time a player who does not intend to perform the specific performance start operation waits for the start of the specific performance while ensuring the time to perform the specific performance start operation before the automatic operation timing. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a front view of a pachinko machine 1 according to an embodiment of the present invention. [Diagram 2] 1 is a front view of the game board 2 of the pachinko machine 1. FIG. [Diagram 3] 2 is a block diagram showing the electrical configuration of the pachinko machine 1. FIG. [Figure 4] 1 is a diagram explaining some of the game specifications. [Diagram 5] 4 is a flowchart showing an outline of a main routine. [Figure 6] A flowchart showing the start winning processing. [Figure 7] 1 is a flowchart showing the correct / incorrect determination process. [Figure 8] 2 is a flowchart showing the correct / incorrect determination process. [Figure 9] 3 is a flowchart showing the correctness determination process. [Figure 10] 4 is a flowchart showing the correct / incorrect determination process. [Figure 11] 1 is a flowchart showing a jackpot game process. [Figure 12] 2 is a flowchart showing the jackpot game processing. [Figure 13] 3 is a flowchart showing the jackpot game processing. [Figure 14] These are examples of the display of the effect display screen 6a during a pseudo-special effect, where (A) is an example of the display while the special effect patterns 101a to 101c are changing, (B) is an example of the display during a reach effect (during a normal reach effect), and (C) is an example of the display while the special effect patterns 101a to 101c are displayed in a confirmed stopped state. [Figure 15] These are examples of the display screen 6a during pseudo-special effects, where (A) is an example of the display during a normal reach effect, (B) is an example of the display during a super reach effect, and (C) is an example of the display during a premium reach effect. [Figure 16] These are examples of the display screen 6a during a pseudo-special effect, where (A) is an example of the display during a normal reach effect, (B) is an example of the display during a first start operation request effect, and (C) is an example of the display during a super reach effect. [Figure 17] These are examples of the display screen 6a during a pseudo-special effect, where (A) is an example of the display during a normal reach effect, (B) is an example of the display during a second start operation request effect, and (C) is an example of the display during a premium reach effect. [Figure 18] This is a timing chart showing the execution mode of a start operation request performance in manual mode, where (A) shows the case where a specific performance start operation is performed during the operation acceptance period, and (B) shows the case where a specific performance start operation is not performed during the operation acceptance period. [Figure 19] This is a timing chart showing the execution mode of the first start operation request effect in automatic mode, where (A) shows the case where the effect button 67 is operated by the automatic operation timing, and (B) shows the case where the effect button 67 is not operated by the automatic operation timing. [Figure 20] This is a timing chart showing the execution mode of the second start operation request effect in automatic mode, where (A) shows the case where the effect lever 70 is operated by the automatic operation timing, and (B) shows the case where the effect lever 70 is not operated by the automatic operation timing. [Figure 21] 13A and 13B are examples of setting screen displays, in which (A) shows an example of a main setting screen display, and (B) shows an example of a setting screen display for setting manual mode and automatic mode. [Figure 22] 13 is a flowchart showing a pseudo special effect control process. [Diagram 23] 13 is a flowchart showing a start operation request presentation process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] The embodiments of the present invention will be described with reference to the drawings. Note that the embodiments of the present invention are not limited to the following embodiments, and various forms may be adopted as long as they fall within the technical scope of the present invention. In addition, the following examples and other examples may be appropriately combined.
[0013] [Configuration Description] (1) Overall structure As shown in Fig. 1, the pachinko machine 1 of this embodiment has a structure in which each component is held by an outer frame 51 that forms a vertically long fixed outer shell holding frame. An inner frame (not shown) is attached to the outer frame 51 via hinges 53 provided on the upper and lower left sides of the outer frame 51 so as to be openable and closable relative to the outer frame 51, and a front frame (glass frame) 52 is attached to the front of the inner frame so as to be openable and closable relative to the inner frame. A glass plate 61 is detachably attached to the front frame 52. A game board 2 (Fig. 2) attached to the inner frame is disposed on the inner side (rear side) of the glass plate 61.
[0014] Speakers 66 are provided on the upper left and right sides of the front frame 52, and game sounds and alarm sounds emitted from the speakers 66 enhance the entertainment value of the game and alert the player. In addition, a plurality of frame side decorative lamps 65 that emit light according to the game state are provided on the front frame 52, and the light emission enhances the entertainment value of the game. In addition, a performance lever 70 that can be pulled down is provided in the upper center of the front frame 52. Furthermore, an upper tray 55 and a lower tray 63 are integrally provided on the lower part of the front frame 52, and a launch handle 64 is provided to the right of the lower tray 63. This launch handle 64 is rotated clockwise by the player to operate a launch device (not shown) and launch the game balls supplied from the upper tray 55 toward the game area 3 of the game board 2.
[0015] Prize balls and loan balls are dispensed to the upper tray 55. The lower tray 63 is configured to receive prize balls that have spilled over from the upper tray 55, and is equipped with a ball removal lever (not shown) that ejects game balls from the lower tray 63. When the player operates this ball removal lever, the game balls stored in the lower tray 63 can be transferred to a separate box (dollar box).
[0016] The pachinko machine 1 of this embodiment is a so-called CR machine, and is provided adjacent to a prepaid card unit (CR unit) 56 that reads and writes prepaid cards. The pachinko machine 1 is provided with a settlement display device 94 (see FIG. 3) that has a loan button 57, a settlement button 58, and a balance display device 59. In addition, in the center of the upper tray 55, there are provided a performance button 67, a jog dial 68, and a decision switch 69 that can be operated by the player.
[0017] 2 is a front view of the game board 2 of the pachinko machine 1. On the game board 2, a substantially circular game area 3 in which game balls flow down is defined by guide rails 2a and 2b, and a large number of game nails (not shown) are planted in the game area 3. A center case 5 is disposed in the center of the game area 3, and a performance pattern display device 6 is disposed in the center of the center case 5. The performance pattern display device 6 is an LCD equipped with a performance display screen 6a on the front side, and is disposed so that the performance display screen 6a can be seen from the front of the pachinko machine 1. The center case 5 is also provided with a warp entrance, a warp passage, a stage, etc. (not shown).
[0018] A first starting opening 11 is disposed directly below the center case 5, and a normal symbol operation gate 17 and a second starting opening 12 are disposed vertically to the right of the center case 5. The first starting opening 11 is configured so that game balls flowing down the game area 3 can always enter, while the second starting opening 12 is configured with a normal electric device 13 equipped with an openable wing piece, and game balls flowing down the game area 3 can only enter when the wing piece is open. The normal symbol operation gate 17 is also configured so that game balls can always pass through.
[0019] Furthermore, a large prize opening 14 is disposed at the lower right of the center case 5 (below the normal electric device 13). The large prize opening 14 is composed of a special electric device 15, and the special electric device 15 has an opening / closing piece that is adapted to be shifted between an upright position for closing the large prize opening 14 and a tilted position for tilting forward from the upright position to open the large prize opening 14. By shifting the opening / closing piece to the upright position, the large prize opening 14 is in a closed state in which game balls cannot enter the large prize opening 14, and by shifting the opening / closing piece to the tilted position, the large prize opening 14 is in an open state in which game balls can enter the large prize opening 14. The special electric device 15 has a large prize opening solenoid 14b (see FIG. 3) that shifts the opening / closing piece to the open / close position, and the large prize opening solenoid 14b can be driven and controlled to shift the large prize opening 14 between the closed state and the open state.
[0020] In addition, four general winning holes 31 are provided to the left of the first starting hole 11. These general winning holes 31 are configured to allow game balls to enter at all times. Furthermore, an outlet 16 is provided at the most downstream portion of the game area 3, and if a game ball shot into the game area 3 does not enter any of the winning holes or the starting hole, the game ball will enter the outlet 16.
[0021] At the lower right of the game board 2, there are disposed a normal symbol display device 7 capable of variably displaying normal symbols, a first special symbol display device 9 capable of variably displaying a first special symbol, and a second special symbol display device 10 capable of variably displaying a second special symbol. The normal symbol display device 7 is made up of multiple LEDs, and the first special symbol display device 9 and the second special symbol display device 10 are made up of 7-segment displays. At the lower right of the game board 2, there are disposed a normal symbol reserved number display device 8, a first special symbol reserved number display device 18, and a second special symbol reserved number display device 19, each made up of multiple LEDs.
[0022] 3 is a block diagram showing the electrical wiring of the pachinko machine 1. This block diagram does not show relay boards or power boards that simply relay signals. Although detailed illustrations are omitted, the main control device 80, payout control device 81, performance symbol control device 82, and sub-integrated control device 83 all have a CPU, ROM, RAM, input ports, output ports, etc. The CPU of each of these control devices starts the programs loaded in each ROM by an interrupt signal with a 2 ms cycle, and executes various controls.
[0023] Detection signals from the first start port switch 11a, which detects game balls that have entered the first start port 11, the second start port switch 12a, which detects game balls that have entered the second start port 12, the normal gate switch 17a, which detects game balls that have passed through the normal pattern activation gate 17, the count switch 14a, which counts game balls that have entered the special prize port 14, and each general prize port switch 31a, which respectively detects game balls that have entered the general prize port 31, are input to the main control device 80 via the game board relay terminal board 74.
[0024] The main control device 80 operates according to the program installed in its ROM, generates various commands related to the progress of the game based on the above detection signals, etc., and outputs the commands to the payout control device 81 and the sub-integrated control device 83. In addition, the main control device 80 controls the display of the first special symbol display device 9, the second special symbol display device 10, and the normal symbol display device 7 through the symbol display device relay terminal board 75, and controls the lighting of the first special symbol reserved number display device 18, the second special symbol reserved number display device 19, and the normal symbol reserved number display device 8. In addition, the main control device 80 is also connected to the large prize opening solenoid 14b and the normal electric role solenoid 13a through the game board relay terminal board 74. The main control device 80 controls the opening and closing of the large prize opening 14 by driving and controlling the large prize opening solenoid 14b, and controls the opening and closing of the second starting opening 12 by driving and controlling the normal electric role solenoid 13a. In addition, the main control device 80 outputs signals for managing the changes in symbols, jackpots, etc. to the hall computer 87 via the external connection terminal board 78.
[0025] The payout control device 81 is configured to be capable of two-way communication with the main control device 80, and drives the payout motor 90 to pay out prize balls in response to commands sent from the main control device 80. In this embodiment, a detection signal from a payout switch 91 for counting the game balls paid out as prize balls is input to the main control device 80 and the payout control device 81, and the counting of prize balls is performed by both.
[0026] Furthermore, signals from a full switch 92 and a ball out switch 93 are input to the payout control device 81. The full switch 92 detects that the lower tray 63 is full, and outputs a signal to the payout control device 81 upon detection. The ball out switch 93 detects that the amount of game balls stored in the ball tank (not shown) is low or that there is no game ball stored, and outputs a signal to the payout control device 81 upon detection. When the payout control device 81 inputs signals from the full switch 92 and the ball out switch 93, it stops driving the payout motor 90 and stops the payout operation of the prize balls. The full switch 92 and the ball out switch 93 are configured to continue outputting signals until the detected state is resolved, and the payout control device 81 resumes driving the payout motor 90 by stopping the input of the signal.
[0027] The payout control device 81 can communicate with the CR unit 56 via the CR unit terminal board 79, and drives the payout motor 90 in response to a payout command to pay out loaned balls. The CR unit terminal board 79 is also connected to the settlement display device 94 for two-way communication, and receives signals from a ball lending switch and a settlement switch provided on the settlement display device 94. The ball lending switch detects the operation of the lending button 57 and outputs a signal, and the settlement switch detects the operation of the settlement button 58 and outputs a signal. The payout control device 81 is also connected to the launch control device 84, and transmits a launch stop command to the launch control device 84 at a predetermined timing.
[0028] The launch control device 84 controls the launch motor 97 to launch the game balls into the game area 3. In addition to the payout control device 81 described above, the launch control device 84 receives a rotation amount signal from the launch handle 64, a touch signal from the touch switch 98, and a launch stop signal from the launch stop switch 99. The rotation amount signal is output when the player rotates the launch handle 64, the touch signal is output when the player touches the launch handle 64, and the launch stop signal is output when the player presses the launch stop switch 99. If the touch signal is not input, the launch control device 84 controls so as not to launch the game balls, and even when the launch stop signal is input, the launch control device 84 controls so as not to launch the game balls regardless of the operation of the launch handle 64.
[0029] The sub-integrated control device 83 receives data and commands sent from the main control device 80, sorts them into data for performance display control, sound control, and lamp control, sends the commands for performance display control to the performance pattern control device 82, and distributes the data for sound control and lamp control to each control part (functional parts as a sound control device and a lamp control device) contained in itself. Then, the functional part as a sound control device operates the sound LSI based on the data for sound control, thereby controlling the output of sound from the speaker 66, and the functional part as a lamp control device operates the lamp driver based on the data for lamp control, thereby controlling the emission of various LEDs and lamps 65.
[0030] Furthermore, switches that detect the operation of the effect button 67, jog dial 68, decision switch 69, effect lever 70, etc. are connected to the sub-integrated control device 83, and when each switch detects an operation by the player, the corresponding signal is input. Here, the effect button 67 is a general push button of a momentary action type, which outputs an OFF signal when not operated, and outputs an ON signal when pressed. Also, the effect lever 70 is a lever that is biased to an upper position by a spring and can be pulled down, which outputs an OFF signal when in the upper position, and outputs an ON signal when pulled down from the upper position.
[0031] The performance symbol control device 82 performs control based on data and commands sent from the sub-integrated control device 83 (those sent from the main control device 80 and those generated by the sub-integrated control device 83 based on input from the main control device 80 and input from the performance button 67, performance lever 70, etc.), and displays performance images such as special performance symbols on the screen of the performance symbol display device 6. The sub-integrated control device 83 and the main control device 80 are configured as a one-way communication circuit from the main control device 80 to the sub-integrated control device 83 via a performance relay terminal board, and the sub-integrated control device 83 and the performance symbol control device 82 are configured as a one-way communication circuit from the sub-integrated control device 83 to the performance symbol control device 82.
[0032] The power supply board (not shown) is configured as a DC power supply that generates a DC voltage from power supplied from an external AC power supply, and supplies power to each component of the pachinko machine 1 by operating a power switch provided on the power supply board. This power supply board is equipped with a backup power supply consisting of a capacitor and the like, and stores power in the backup power supply while power is being supplied from the AC power supply. As a result, during a power outage, power is supplied to the main control device 80 and the like (for example, the RAM of the main control device 80, etc.), and data in the RAM of the main control device 80 is retained for a certain period of time even after the power supply from the AC power supply is stopped. The backup power supply may be provided in the main control device 80, or in a device other than the power supply board. In this case, the power supply board outputs a supply signal to a device equipped with a backup power supply when power is being supplied from the AC power supply, and outputs a power outage signal to the device equipped with a backup power supply when the power supply is stopped.
[0033] [Explanation of operation] Next, the operation of the pachinko machine 1 of this embodiment will be described. When a game ball shot into the game area 3 enters the first start hole 11 (the first start hole switch 11a in FIG. 3 detects the game ball), the first special symbol starts to change on the first special symbol display device 9, and the random number extracted due to the ball entering the game is judged as a win or loss. Then, when a predetermined change time has elapsed from the start of the change, the first special symbol is stopped and displayed, and the result of this win or loss judgment is announced. Here, as described later, a first reserved memory is generated and stored by a random number extracted when a ball enters the first starting hole 11. Up to four first reserved memories can be stored, and the number of first reserved memories stored (hereinafter referred to as the first reserved memory number) is represented by the number of lights on the first special symbol reserved number display device 18. The hit / miss judgment and the change of the first special symbol are executed by consuming the first reserved memories stored in this manner. The first reserved memory number indicates the number of unconsumed first reserved memories that have not been consumed by the hit / miss judgment process described later.
[0034] On the other hand, when the game ball released into the game area 3 passes through the normal symbol activation gate 17 (the normal gate switch 17a in FIG. 3 detects the game ball), the normal symbol display device 7 starts to display the normal symbol in a variable manner, and the random number extracted due to the ball entering is judged as a win or loss. Then, if the normal symbol that stops a predetermined time after the start of the variation is in a predetermined winning state, the wing piece of the normal electric device 13 is driven, and the game ball can enter the second starting hole 12. Here, the wing piece of the normal electric device 13 opens once for 0.2 seconds in the non-opening extension mode described later with one hit of a normal symbol, and opens three times for 1 second in the open extension mode described later.
[0035] When a gaming ball enters the second start hole 12 (the second start hole switch 12a in FIG. 3 detects the gaming ball), the second special symbol starts to vary on the second special symbol display device 10, and the random number extracted due to the ball entering the hole is judged as a win or lose. Then, when a predetermined variation time has elapsed from the start of the variation, the second special symbol is stopped and displayed, and the result of this win or lose judgment is announced. Here, as described later, a second reserved memory is generated and stored by a random number extracted when a ball enters the second starting hole 12. Up to four second reserved memories can be stored, and the number of stored second reserved memories (hereinafter referred to as the second reserved memory number) is represented by the number of lights on the second special symbol reserved number display device 19. The hit / miss judgment and the change of the second special symbol are executed by consuming the second reserved memories thus stored. The second reserved memory number indicates the number of unconsumed second reserved memories that have not been consumed by the hit / miss judgment process described later. In this embodiment, the first special symbol and the second special symbol are prioritized for variation regardless of the order of balls entering the first start hole 11 and the second start hole 12. In other words, if there is an unconsumed second reserved memory (if the number of second reserved memories is 1 or more), the second reserved memory is consumed and the variation of the second special symbol begins regardless of whether there is an unconsumed first reserved memory. And, only when there is no unconsumed second reserved memory, the first reserved memory is consumed and the variation of the first special symbol begins.
[0036] During the variation of the first special symbol and the second special symbol, the special effect symbols 101a to 101c (see FIG. 14) vary in conjunction with the variation of each special symbol on the effect display screen 6a of the effect symbol display device 6, and a pseudo special effect is executed in which the special effect symbols 101a to 101c stop varying in conjunction with the stop display of each special symbol. In such a pseudo special effect, the special effect symbols 101a to 101c are displayed in a stopped state in such a manner that the result of the hit / miss judgment indicated by the stop display state of each special symbol can be notified. In other words, the pseudo special effect on the effect symbol display device 6 allows the player to know the variation of each special symbol and the result of the hit / miss judgment (jackpot, time-saving hit, or miss).
[0037] If the result of the hit / miss judgment executed by the consumption of the first reserved memory is a jackpot, the first special symbol is stopped in a predetermined jackpot symbol mode by the first special symbol display device 9, and the special performance symbol is displayed as a fixed stop in a jackpot symbol mode in the pseudo special performance. This confirms the jackpot. On the other hand, if the result of the hit / miss judgment executed by the consumption of the second reserved memory is a jackpot, the second special symbol is stopped in a predetermined jackpot symbol mode by the second special symbol display device 10, and the special performance symbol is displayed as a fixed stop in a jackpot symbol mode by the performance symbol display device 6. This confirms the jackpot.
[0038] When a jackpot is determined by the first special symbol and the second special symbol in this way, a jackpot game is executed to open the jackpot opening 14. In this jackpot game, an opening round to open the jackpot opening 14 is repeatedly executed a predetermined number of times with intervals.
[0039] The pachinko machine 1 of this embodiment is configured as a probability variation machine. That is, the game according to this configuration is roughly divided into a game in which the big prize opening 14 is closed and the big prize game in which the big prize opening 14 is opened. In the game in which the big prize opening 14 is closed, a normal probability state (hereinafter referred to as a normal game state) and a high probability state (hereinafter referred to as a probability variation game state) in which the probability of winning a special symbol is higher than that in the normal game state are set, and after the big prize game ends, the game moves to either the normal game state or the probability variation game state. Here, the probability variation game state is executed after the big prize game ends when the stop display mode of the special symbol indicating the big prize win is a predetermined probability variation pattern, and the normal game state is executed after the big prize game ends when the hit mode of each special symbol is a predetermined non-probability variation pattern.
[0040] In this embodiment, the winning probability of the special symbol (probability of the special symbol stopping in a jackpot mode) is different between a normal mode and a probability variable mode, and the normal mode is active in the normal game state, and the probability variable mode is active in the probability variable game state. Here, the winning probability of the special symbol in the normal mode is set to 1 / 300, and the winning probability of the special symbol in the probability variable mode is set to 1 / 30 (see FIG. 4). In the probability variation game state, the probability of winning the special symbol is set to the probability variation mode, and the average variation time of the special symbol and the normal symbol is shortened compared to the normal game state, and the opening time of the normal electric role is extended compared to the normal game state in an extended opening mode. On the other hand, in the normal game state, the normal mode and the non-opening extended mode are set. This probability variation game state ends when the special symbol becomes a jackpot or when the number of times the special symbol changes reaches a specified number of times (for example, 100 times).
[0041] Furthermore, if the result of the hit / miss judgment by the consumption of the first reserved memory is a hit for the time-saving, the first special symbol is stopped in a predetermined time-saving hit pattern, and the special performance symbol is displayed as a fixed stop in the pseudo special performance in a time-saving hit pattern. This confirms the hit for the time-saving. In this embodiment, the hit for the time-saving is set only in the hit / miss judgment when the first reserved memory is consumed in the normal mode, and the hit / miss judgment when the second reserved memory is consumed or the hit / miss judgment in the probability change mode does not result in a hit for the time-saving (see FIG. 4). When the first special symbol is confirmed as a hit for the time-saving, it is controlled to a time-saving state different from the normal game state and the probability change game state. In the time-saving state, as in the probability change game state, the average fluctuation time of the special symbol and the normal symbol is shortened compared to the normal game state, and the opening time of the normal electric role is extended compared to the normal game state, while the winning probability of the special symbol is the normal mode, as in the normal game state. The time-saving state ends when the special symbol becomes a jackpot or when the number of times the special symbol changes reaches a specified number of times (50 times).
[0042] In addition, when a game ball enters each of the starting holes 11 and 12, the big prize hole 14, and the general prize hole 31, a set number of prize balls are paid out for each entry. Specifically, as shown in Fig. 4, three prize balls are paid out for each entry into the first starting hole 11, five prize balls are paid out for each entry into the second starting hole 12, thirteen prize balls are paid out for each entry into the big prize hole 14, and five prize balls are paid out for each entry into the general prize hole 31.
[0043] [Control process explanation] Next, the processing of various programs executed by the main control device 80 will be described. (1) About the main routine A flow chart of the main routine is shown in Fig. 5. The main routine is composed of the main process from S10 to S80, and the residual process of S85 which is repeated as long as time permits within the time remaining after executing the main process, and is executed periodically by a hardware interrupt every 2 ms. When a hardware interrupt is executed by the microcomputer, it is first determined whether or not it is a normal interrupt (S10). This determination process is performed by determining whether or not a value in a predetermined area of the RAM as a memory is equal to a predetermined value, and is intended to determine whether or not normal processing may be executed when the processing executed by the microcomputer has shifted to the main process.
[0044] If a negative judgment is made in S10 (i.e., it is judged that the interrupt is not normal) (S10: No), the initial setting (S15) is executed, and the remaining process (S85) is started. In this initial setting, for example, a predetermined value is written to a predetermined area of the RAM, and each initial value is written to the working area of the RAM, such as setting the first and second special symbols as the initial symbols, and the like. On the other hand, if a positive judgment is made in S10 (i.e., it is judged to be a normal interrupt) (S10: Yes), the update process of the initial value random number (S20), the update process of the random number for determining a jackpot (S25), the update process of the random number for determining a first jackpot pattern (S30), the update process of the random number for determining a second jackpot pattern (S35), the update process of the random number for determining a time-saving hit pattern (S40), the update process of the random number for determining a win (S45), the update process of the random number for reaching a reach (S50), the update process of the random number for determining a fluctuation pattern (S55), the win confirmation process (S60), the win / lose determination process (S65), the special game process (S70), the fraud monitoring process (S75), the image output process, and other output processes (S80) are performed, and the update process of the initial value random number (S85) is looped within the remaining time until the next interrupt signal is input.
[0045] (2) About the start-up winning process Next, the start winning process executed by the main control device 80 will be described with reference to the flowchart of Fig. 6. This start winning process is one of the subroutines called in the winning confirmation process (S60) of the main routine described above. In the start winning process, in S100, it is determined whether or not the first start port switch 11a has detected a game ball. If the determination is negative (S100: No), the process proceeds to S120, and if the determination is positive (S100: Yes), the process proceeds to S105. In S105, it is determined whether or not the first reserved memory number has reached an upper limit (for example, 4). If the determination is positive (S105: Yes), the process proceeds to S120, and if the determination is negative (S105: No), the process proceeds to S110.
[0046] In S110, a first extraction random number reservation storage process is executed. In this first extraction random number reservation storage process, a first jackpot determination random number, a first jackpot pattern determination random number, a time-saving pattern determination random number, a reach determination random number, a variation pattern determination random number, etc. are extracted and stored as a first reservation memory, and a first reservation number counter indicating the first reservation memory number is incremented by 1, and a process required to light up the first special pattern reservation number display device 18 according to the information of the first reservation number counter is performed. After S110, the process proceeds to S120.
[0047] In S120, it is determined whether the second start switch 12a has detected a game ball. If the determination is negative (S120: No), the process proceeds to S140, and if the determination is positive (S120: Yes), the process proceeds to S125. In S125, it is determined whether the second reserved memory number has reached an upper limit (e.g., 4). If the determination is positive (S125: Yes), the process proceeds to S140, and if the determination is negative (S125: No), the process proceeds to S130.
[0048] In S130, the second extracted random number reserved storage process is executed. In this second extracted random number reserved storage process, the random number for determining the second big win, the random number for determining the second big win pattern, the random number for reaching the limit, the random number for determining the variation pattern, etc. are extracted and stored as the second reserved memory, and the second reserved number counter indicating the second reserved memory number is incremented by 1, and the necessary process is performed to light up the second special reserved number display device 19 according to the information of the second reserved number counter. After S130, the process proceeds to S140.
[0049] In S140, a start winning command transmission process is executed. In this start winning command transmission process, a start winning command including the first reserved memory information generated in S110 or the second reserved memory information generated in S130 is transmitted to the sub-integrated control device 83, and the start winning process is terminated. Note that if the first reserved memory and the second reserved memory have not been generated, the start winning command is not transmitted and the start winning process is terminated.
[0050] (3) Regarding the process of determining whether or not a person is a winner Next, the winning / losing determination process executed by the main control device 80 will be described with reference to the flowcharts of Figures 7 to 10. The winning / losing determination process is executed from the main routine described above.
[0051] In the winning / losing determination process, as shown in FIG. 7, it is determined whether or not the special electric role is in operation (i.e., the big win game is being executed) (S150). Then, if the result is a positive determination (S150: Yes), the winning / losing determination process is terminated, and if the result is a negative determination (S150: No), the process proceeds to S155. In S155, it is determined whether or not the first special symbol or the second special symbol is being displayed in a variable manner. Then, if the result is a positive determination (S155: Yes), the process proceeds to S280 in FIG. 9, and if the result is a negative determination (S155: No), the process proceeds to S160. In S160, it is determined whether or not the first special symbol or the second special symbol is being displayed in a fixed stop. Then, if the result is a positive determination (S160: Yes), the process proceeds to S300 in FIG. 10, and if the result is a negative determination (S160: No), the process proceeds to S165.
[0052] In S165, it is determined whether there is an unconsumed second reserved memory, and if the determination is positive (S165: Yes), the process proceeds to S170, and if the determination is negative (S165: No), the process proceeds to S175. In S170, the number of second reserved memories is decremented, and the oldest unconsumed second reserved memory (the unconsumed second reserved memory generated earliest) is selected, and the information (numeric data such as random numbers) stored in the second reserved memory is moved to a specified buffer for jackpot determination. In this way, the second reserved memory is consumed.
[0053] In S175, it is determined whether there is an unconsumed first reserved memory, and if the determination is positive (S175: Yes), the process proceeds to S180, and if the determination is negative (S175: No), the hit / miss determination process is terminated. In S180, the number of first reserved memories is decremented, and the oldest unconsumed first reserved memory (the first unconsumed first reserved memory generated first) is selected, and the information stored in that first reserved memory (numeric data such as random numbers) is moved to a specified buffer for jackpot determination. In this way, the first reserved memory is consumed. In the present embodiment, the second reserved memory is given priority over the first reserved memory in the judgment of whether the item is a winner or loser. Therefore, the first reserved memory is only judged to be winner if there is no unconsumed second reserved memory.
[0054] In S185, it is determined whether the probability variable flag is 1 or not, and if the determination is positive (S185: Yes), the process proceeds to S190, and if the determination is negative (S185: No), the process proceeds to S195. Here, the probability variable flag = 1 indicates the above-mentioned probability variable game state ("probability variable mode / open extension mode"), and the probability variable flag = 0 indicates the above-mentioned normal game state ("normal mode / non-open extension mode").
[0055] In S190, a winning / losing judgment table (probability change table) corresponding to the winning probability of the probability change mode is selected, and based on the selected probability change table, the random number for jackpot judgment moved to the buffer for jackpot judgment is judged to be a jackpot or not, and the reserved memory related to the random number for jackpot judgment is consumed. After processing this S190, proceed to S200 in FIG.
[0056] On the other hand, in S195, a winning / losing judgment table (normal table) corresponding to the winning probability in the normal mode is selected, and based on the selected normal table, the random number for jackpot judgment moved to the buffer for jackpot judgment is judged to be a jackpot or not, and the reserved memory related to the random number for jackpot judgment is consumed. Here, in this embodiment, when the first reserved memory is consumed, it is also judged whether the random number for jackpot judgment is a time-saving hit or not based on the selected normal table. After processing this S195, proceed to S200 in FIG. 8.
[0057] In S200 of FIG. 8, it is determined whether or not there is a big win based on the determination result of S190 or S195. If the determination is affirmative (S200: Yes), the process proceeds to S205, and if the determination is negative (S200: No), the process proceeds to S220. In S205, the jackpot symbol is determined based on the random number for determining the jackpot symbol related to the reserved memory that has been consumed. Then, the process proceeds to S210.
[0058] In the subsequent process of determining the fluctuation pattern in S210, the fluctuation time of the special symbol is determined based on the random numbers for determining the fluctuation pattern and the random numbers for determining the reach (the random numbers for determining the fluctuation pattern and the random numbers for determining the reach in the buffer for determining the jackpot, etc.) related to the pending memory that has been consumed, and the certain hit flag, and the fluctuation pattern of the special symbol is determined according to the fluctuation time. In more detail, the variation time of the selectable special symbols is predetermined according to the probability variation flag, and the variation time of the special symbols is determined according to the above-mentioned variation pattern determination random number and reach determination random number. That is, when the probability variation flag = 0 (normal game state), the mode is the non-open extension mode, so the variation time of the special symbols corresponding to the non-open extension mode can be selected, and the variation time of the special symbols is determined by the variation pattern determination random number and reach determination random number of the consumed reserved memory. On the other hand, when the probability variation flag = 1 (probability variation game state), the mode is the open extension mode that shortens the variation time of the special symbols, so the variation time of the special symbols corresponding to the open extension mode can be selected, and the variation time is determined by the variation pattern determination random number and reach determination random number. The reach determination random number is used to determine whether or not to execute various reach performances that have been determined in advance.
[0059] In the next S215, the number of rounds of the jackpot game, the opening pattern of the jackpot opening, the presentation time for the jackpot game, the interval time, and the presentation mode of the jackpot game, etc. are set, and the process proceeds to S250.
[0060] On the other hand, in S220 following the negative judgment of S200, it is judged whether or not the time-saving hit is based on the judgment result of S195. Here, in the case of a positive judgment (S220: Yes), it proceeds to S225, and in the case of a negative judgment (S220: No), it proceeds to S240. In this embodiment, as described above, it is judged whether or not the time-saving hit is only when the first reserved memory is consumed in normal mode, so when the second reserved memory is consumed or in the probability change mode, it is judged negative in S220 (proceeds to S240).
[0061] In S225, the winning symbol for the time-saving function is determined based on the random number for determining the winning symbol related to the reserved memory that has been consumed, and the process proceeds to S230. In S230, similarly to the above-mentioned S210, the special symbol variation time is determined based on the random numbers for reach judgment and variation pattern determination related to the consumed reserved memory and the probability variation flag, and the special symbol variation pattern is determined according to the variation time. After this S230, proceed to S235. In S235, the performance time related to the time-saving game and the performance mode of the time-saving game are set, and proceed to S250.
[0062] Furthermore, in S240 following the negative judgment of S220, similarly to the above-mentioned S210, the special symbol fluctuation time and fluctuation pattern are determined based on the random number for reach judgment and the random number for fluctuation pattern determination related to the consumed reserved memory and the probability variable flag, and prior to this, a process for determining a losing symbol is performed. After this S240, the process proceeds to S245, where a process for a losing symbol is performed. Then, the process proceeds to S250. In this embodiment, the process for determining a losing symbol is performed in S240, but it is not limited to this, and a configuration having a process for determining a losing symbol before S240 may be used.
[0063] In S250, a reserved number command indicating the first reserved memory number and the second reserved memory number after decrementing in S170 and S180, a command including information on the hit / miss judgment result (jackpot, time-saving hit, or miss) determined in S190 and S195, and a change start command including the big win game content, the change time of the special symbol, the stop mode of the special symbol, etc. determined in S205 are transmitted to the sub-integrated control device 83. This change start command includes information indicating whether the consumed reserved memory is the first reserved memory or the second reserved memory, information on whether various reach performances are executed, and information on the probability change flag. Furthermore, the first special symbol display device 9 or the second special symbol display device 10 is driven and controlled according to the consumed reserved memory to start changing the first special symbol or the second special symbol, and the hit / miss judgment process is terminated. When the sub-integrated control device 83 receives such a command, it stores the information indicated in the command (the first reserved memory number and the second reserved memory number, the variation time of the special symbol, the presence or absence of various reach effects, the result of the hit / miss judgment, the stopping mode of the special symbol, the content of the big win game, etc.) in a specified buffer. Then, the sub-integrated control device 83 transmits a command to the effect symbol control device 82 along with the variation start command, and the effect symbol control device 82 drives and controls the effect symbol display device 6 according to the received command to start the pseudo special effect on the effect display screen 6a.
[0064] 9, which follows the positive judgment of S155, judges whether the variation time of the special symbol has elapsed, and if the judgment is positive (S280: Yes), proceed to S285, and if the judgment is negative (S280: No), end the winning / losing judgment process. In S285, the display of the variation of the special symbol is ended, and the determined symbol of the special symbol (i.e., the big win symbol determined in S205, the time-saving winning symbol determined in S225, or the losing symbol determined in S240) is displayed, and a symbol determination command for determining and stopping the special performance symbol is transmitted to the sub-integrated control device 83, and the winning / losing judgment process is ended.
[0065] In addition, in S300 of FIG. 10 following the positive judgment of S160, it is judged whether the duration of the stop display of the special symbol has ended, and if the judgment is positive (S300: Yes), the process proceeds to S305, and if the judgment is negative (S300: No), the winning / losing judgment process is terminated. In S305, the stop display of the special symbol is terminated and the process proceeds to S310. In S310, the probability variable flag indicating that the game is in a probability variable game state is referenced, and if the probability variable flag = 1 (S310: Yes), the remaining number of winning / losing judgments that can be performed during the probability variable mode (remaining number of times of special symbol fluctuation) is referenced (S315). Then, if the remaining number of times of special symbol fluctuation = 0 (S315: Yes), the probability variable flag is cleared (S320) and the process proceeds to S345. On the other hand, if the judgment is negative in S315 (S315: No), the process proceeds to S345.
[0066] In the case of a negative judgment in the above S310 (S310: No), proceed to S330, refer to the time-saving flag indicating the time-saving state, and in the case of the time-saving flag = 1 (S330: Yes), refer to the remaining number of pass / fail judgments that can be performed in the time-saving state (remaining number of special chart changes) (S335). Then, in the case of the remaining number of special chart changes = 0 (S335: Yes), clear the time-saving flag (S340) and proceed to S345. On the other hand, in the case of a negative judgment in S335 (S335: No), proceed to S345. Also, in the case of a negative judgment in the above S330 (S330: No), proceed directly to S345.
[0067] In S345, it is determined whether the special symbol displayed as the fixed stop symbol is a symbol that will result in a jackpot, and if the determination is positive (S345: Yes), the process proceeds to S350, and if the determination is negative (S345: No), the process proceeds to S370. In S350, the probability variable flag and the time-saving flag are cleared. After that, by sequentially executing the condition device operation start process (S355), the role continuous operation device operation start process (S360), and the jackpot start performance process (S365), a command indicating the mode of the jackpot game and a command instructing the start of the jackpot game are sent to the sub-integrated control device 83 to start the jackpot game, and the process proceeds to S385.
[0068] On the other hand, in S370 following the negative judgment in S345, it is judged whether the special symbol displayed in the stopped state is a symbol that will be a time-saving hit, and if the judgment is positive (S370: Yes), the probability change flag is cleared and the time-saving flag is set (S375), and further, the remaining number of hit / fail judgments that can be performed in the time-saving state (remaining number of times the special symbol can be changed) is set to 50 (S380), and the process proceeds to S385. On the other hand, if the judgment is negative in S370 (S370: No), the process proceeds directly to S385.
[0069] In S385, the state designation command transmission process is executed, and the winning / losing judgment process is terminated. In the state designation command transmission process (S385) of this embodiment, when the probability variable flag or the time-saving flag is set or cleared, information indicating the start or end of the probability variable game state or the time-saving game state is transmitted to the sub-integrated control device 83.
[0070] (4) Jackpot game processing Next, the big win game process executed by the main control device 80 will be described with reference to the flowcharts of Figures 11 to 13. This big win game process is a process executed from the special game process (S70) of the main routine described above when a big win is determined by the win / loss determination process described above.
[0071] In the big win game process, as shown in Fig. 11, it is determined whether or not the accessory continuous operating device is in operation (i.e., whether or not a big win game is being played) (S500). If the determination is affirmative (S500: Yes), the process proceeds to S505, and if the determination is negative (S500: No), the big win game process is terminated.
[0072] In S505, it is determined whether or not the big prize opening 14 is open. If the determination is affirmative (S505: Yes), the process proceeds to S550 in FIG. 12, and if the determination is negative (S505: No), the process proceeds to S510.
[0073] In S510, it is determined whether or not it is during an interval between open rounds in the jackpot game. If the determination is positive (S510: Yes), the process proceeds to S570 in FIG. 12, and if the determination is negative (S510: No), the process proceeds to S515. In S515, it is determined whether or not the end presentation of the jackpot game is in progress. If the determination is positive (S515: Yes), the process proceeds to S600 in FIG. 13, and if the determination is negative (S515: No), the process proceeds to S520.
[0074] In S520, it is determined whether or not the start presentation time for the big win game has elapsed. If the determination is affirmative (S520: Yes), the process proceeds to S525, and if the determination is negative (S520: No), the big win game process ends.
[0075] In S525, a large prize opening process is executed to open the large prize opening 14. In this large prize opening process, the opening time (for example, 30 seconds) set in advance as the maximum opening time of the large prize opening 14 in the opening round is consumed in synchronization with the start of opening the large prize opening 14. After this large prize opening process, the large prize game process is terminated. Here, the consumption of the opening time is performed by a subtraction process of the opening timer. Specifically, the opening timer is preset with a counter value equivalent to the opening time (30 seconds), and a process of subtracting the counter value is executed each time the large prize game process is executed (each time the timer interrupt process is executed), and the opening time is considered to have elapsed when the counter value becomes 0. Of course, the measurement means for the opening time is not limited to the subtraction process of the opening timer, and other means can be used.
[0076] In S550 of FIG. 12 following the positive determination of S505, it is determined whether the number of game balls entering the big prize opening 14 has reached 10. If the determination is positive (S550: Yes), the process proceeds to S560, and if the determination is negative (S550: No), the process proceeds to S555. In S555, it is determined whether the opening time (30 seconds) has elapsed due to the expiration of the time of the opening timer described above. Here, if the determination is positive (S555: Yes), the process proceeds to S560, and if the determination is negative (S555: No), the big prize game processing is terminated. In S560, the big prize opening closing process is executed to close the big prize opening 14 (the opening round is terminated). In the following S565, the big prize interval process is executed to set an interval between each opening round of the big prize game, and the big prize game processing is terminated.
[0077] 12, which follows the positive determination of S510, determines whether the interval time for the big win game has elapsed. If the determination is positive (S570: Yes), the process proceeds to S575, and if the determination is negative (S570: No), the big win game process ends. In S575, it is determined whether the final round has ended, and if the determination is positive (S575: Yes), the process proceeds to S580, and if the determination is negative (S575: No), the process proceeds to S585. In S580, a jackpot end effect process is executed to perform an effect when the jackpot game ends. After S580, the jackpot game process ends. In S585, the large prize opening process is executed. In this process, the same process as S525 described above is executed, the large prize opening 14 is opened, and the opening time (30 seconds) is started.
[0078] In addition, in S600 of FIG. 13 following the positive judgment of S515, it is judged whether the time of the big win end performance has ended. In the case of a positive judgment (S600: Yes), the process proceeds to S605, and the S605 and S610 are executed in sequence, while in the case of a negative judgment (S600: No), the big win game processing is terminated. In S605 and S610, the role continuous operation device and the condition device are stopped, and the process proceeds to S615. In S615, it is judged whether or not to move to the high probability game state after the big win game. Here, in the case of a positive judgment (S615: Yes), the number of hit / miss judgments that can be executed during the high probability game state (the upper limit value of the number of times the special chart changes) is set (S620), and the high probability flag is set to 1 (S625). Then, the process proceeds to S640. On the other hand, in the case of a negative judgment in the S615 (S615: No), the process proceeds to S640.
[0079] In S640 and S645, a process of transmitting a jackpot end command to the sub-integrated control device 83 to end the performance related to the jackpot game and a state designation command transmission process are executed, and the jackpot game process is terminated. Here, in the state designation command transmission process (S645), information indicating the game state after the jackpot game (normal game state or probability variable game state) is transmitted to the sub-integrated control device 83.
[0080] [Description of the production] Next, the effects of the pachinko machine 1 of this embodiment will be described. (1) About the pseudo-special effects As described above, on the performance display screen 6a of the performance pattern display device 6, the three special performance patterns 101a to 101c (see Figure 14) are changed in conjunction with the change of each special pattern, and the three special performance patterns 101a to 101c are stopped in conjunction with the stopped display of each special pattern, and a pseudo-special performance is executed in which the win / loss judgment result indicated by the stopped pattern state of the special patterns is announced based on the pattern state of the special performance patterns 101a to 101c that are displayed as confirmed stopped.
[0081] FIG. 14 is a typical display example of the effect display screen 6a in the pseudo special effect, where FIG. 14(A) shows the special effect symbols 101a to 101c fluctuating (non-reach effect), FIG. 14(B) shows the reach effect (normal reach effect), and FIG. 14(C) shows the special effect symbols 101a to 101c being displayed as fixed and stopped. As shown in FIG. 14, three special effect symbols 101a to 101c are usually displayed side by side in the middle of the effect display screen 6a. Each of the special effect symbols 101a to 101c consists of nine types of symbols from "1" to "9", and when the pseudo special effect starts, each of the special effect symbols 101a to 101c fluctuates by being displayed in turn with the nine types of symbols, as shown in FIG. 14(A). Then, as shown in FIG. 14(C), at the end of the pseudo special effect, a fixed stop display is executed in which all the special effect symbols 101a-101c are statically displayed for a certain period of time or more. Then, the winning / losing judgment result is announced based on the combination of the stopped symbols of the three special effect symbols 101a-101c that are fixed and displayed. Here, a combination in which the three special effect symbols 101a-101c are the same stop symbol is a symbol pattern that indicates a big win, a combination in which the stopped symbols of the three special effect symbols 101a-101c are arranged in a predetermined order (such as a combination of "1", "2", and "3") is a symbol pattern that indicates a time-saving win, and other combinations are symbol patterns that indicate a loss. That is, FIG. 14(C) shows a case in which the special effect symbols 101a-101c are fixed and displayed in a symbol pattern that indicates a loss.
[0082] (2) Regarding reserved designs Also, as shown in FIG. 14, in the pseudo special performance, the first reserved pattern 111 indicating the above-mentioned first reserved memory number and the second reserved pattern 112 indicating the second reserved memory number are usually displayed on the performance display screen 6a. The first reserved pattern 111 is displayed in a first reserved pattern display area 131 provided in the lower left of the performance display screen 6a. The second reserved pattern 112 is displayed in a second reserved pattern display area 132 provided in the lower right of the performance display screen 6a. In the first reserved pattern display area 131, the first reserved patterns 111 in the same number as the first reserved memory number are displayed side by side from the right, and in the second reserved pattern display area 132, the second reserved patterns 112 in the same number as the second reserved memory number are displayed side by side from the left. That is, in the first reserved pattern display area 131, the first reserved pattern 111 is displayed right-justified every time the first reserved memory increases, while the first reserved pattern 111 in the rightmost position is removed and the remaining first reserved pattern 111 is moved one position to the right, shifting display is performed every time the first reserved memory is consumed. Similarly, in the second reserved pattern display area 132, the second reserved pattern 112 is displayed left-justified every time the second reserved memory 112 increases, while the second reserved pattern 112 in the rightmost position is removed and the remaining second reserved pattern 112 is moved one position to the left, shifting display is performed every time the second reserved memory 112 is consumed.
[0083] (3) Reach performance To explain the pseudo special effects in detail, the pseudo special effects are broadly divided into effects in which reach effects are executed and effects in which reach effects are not executed. FIG. 14(B) is a display example of a general effect display screen 6a in reach effects. In reach effects, as shown in FIG. 14(A)→FIG. 14(B), two of the three special effect symbols 101a-101c that have been fluctuating are stopped first at symbols that can be a symbol combination that indicates a big win. Then, while fluctuating the remaining one symbol for a relatively long time, effects are performed using images and sounds to stimulate the player's expectation of a big win, and then the last symbol is stopped and displayed as a fixed stop (see FIG. 14(C)). In addition, in the pseudo special effects that do not involve reach effects, the three special effect symbols 101a-101c stop fluctuating in succession from the state shown in FIG. 14(A) and are displayed as a fixed stop (see FIG. 14(C)). In the pseudo special performance in which the reach performance is executed, the expectation of a big win is set to be higher than in the pseudo special performance in which the reach performance is not executed.
[0084] The reach performance includes a normal reach performance, a super reach performance, and a premium reach performance. As shown in FIG. 15(A), the normal reach performance is a performance in which three special performance symbols 101a to 101c are displayed in a large size in the middle of the performance display screen 6a (normal display mode) in a variable manner. In contrast, as shown in FIG. 15(B) and 15(C), the super reach performance and the premium reach performance are a performance in which three special performance symbols 101a to 101c are displayed in a smaller size than normal in the upper right part of the performance display screen 6a (special display mode) in a variable manner, and performance images 121, 122 including a main character 120 and the like are displayed in a wide range of the performance display screen 6a. The super reach performance and the premium reach performance are executed as a type of performance that develops from the normal reach performance. That is, the reach performance is roughly divided into a performance that is displayed as a fixed stop as a normal reach performance, and a performance that develops into a super reach performance or a premium reach performance. The pseudo-special effects that develop into the Super Reach effect or the Premium Reach effect are set to have a higher expectation of a big win than the pseudo-special effects that do not develop into the Super Reach effect or the Premium Reach effect. Therefore, when the normal reach effect develops into the Super Reach effect or the Premium Reach effect, the player's emotions of expecting a big win are further heightened, and the feeling of excitement can be sustained during the Super Reach effect or the Premium Reach effect.
[0085] If the reach effect does not develop into a super reach effect or a premium reach effect, as shown in Figure 14(B) → Figure 14(C), the remaining special effect pattern 101b stops changing while the normal reach effect remains in place, and the special effect patterns 101a to 101c are displayed as fixed stop patterns in the jackpot pattern mode or the losing pattern mode (see Figure 14(C)).
[0086] (4) Super Reach Effects When the reach performance is accompanied by the super reach performance, the performance display screen 6a usually switches from the performance image for the normal reach performance to the performance image 121 for the super reach performance, as shown in Fig. 15(A)→Fig. 15(B). Specifically, the display of the special performance symbols 101a-101c switches to the special display mode, the special performance symbols 101a-101c are displayed in a reduced size in the upper right corner, the reserved symbols 111, 112 are hidden, and the performance image 121 including the main character 120 is displayed large on the performance display screen 6a.
[0087] As shown in Fig. 15(B), the effect image 121 for the super reach effect is a moving image in which the main character 120 of a karate practitioner tries to destroy a rock, and after the moving image of the main character 120 punching and kicking the rock is displayed for a predetermined time, either a success effect image in which the rock is successfully destroyed or a failure effect image in which the rock is unsuccessfully destroyed is displayed, and the super reach effect ends. If a success effect image is displayed here, a big win is confirmed, and after the super reach effect ends, the special effect symbols 101a to 101c are displayed in a fixed stop state in the normal display mode in a big win pattern mode that notifies a big win. In contrast, if a failure effect image is displayed at the end of the super reach effect, the special effect symbols 101a to 101c are displayed in a fixed stop state in the normal display mode in a loss pattern mode that notifies a loss, after the super reach effect ends (see Fig. 14(C)).
[0088] (5) Premium Reach Production When the reach effect is accompanied by the premium reach effect, the effect display screen 6a usually switches from the effect image for the normal reach effect to the effect image 122 for the premium reach effect, as shown in Fig. 15(A) → Fig. 15(C). Specifically, the display of the special effect symbols 101a to 101c switches to the special display mode, the special effect symbols 101a to 101c are displayed in a reduced size in the upper right part, the reserved symbols 111, 112 are hidden, and the effect image 122 including the main character 120 is displayed large on the effect display screen 6a.
[0089] As shown in Fig. 15(C), the performance image 122 of the premium reach performance is a moving image of the karate-ka's main character 120 fighting a rival character, and after the moving image of the main character 120 fighting is displayed for a predetermined time, either a success performance image of the main character 120 winning against the rival character or a failure performance image of the main character 120 losing is displayed, and the premium reach performance ends. If a success performance image is displayed, a big win is confirmed, and after the premium reach performance ends, the special performance symbols 101a to 101c are displayed in a fixed stop state in a big win pattern mode that notifies a big win in the normal display mode. In contrast, if a failure performance image is displayed at the end of the premium reach performance, the special performance symbols 101a to 101c are displayed in a fixed stop state in a loss pattern mode that notifies a loss in the normal display mode after the premium reach performance ends (see Fig. 14(C)).
[0090] The premium reach effect is common to the super reach effect in that it displays a moving image of the main character 120 and the like over a wide area of the effect display screen 6a, but the premium reach effect has a higher expectation of a jackpot than the super reach effect. Specifically, the super reach effect of this embodiment has an expectation of a jackpot of about 20%, whereas the premium reach effect has an expectation of a jackpot of about 80%. The premium reach effect is executed less frequently than the super reach effect because of the higher expectation of a jackpot.
[0091] [Explanation of main parts] Next, the main part of the present invention will be described. (1) Regarding the start operation request In this embodiment, in a pseudo-special effect that develops into a super reach effect or a premium reach effect, a start operation request effect may be executed. In a pseudo-special effect that develops into a super reach effect or a premium reach effect, the super reach effect or the premium reach effect is usually started at a predetermined timing, regardless of the player's operation. In contrast, when a start operation request effect is executed, the player is prompted to perform a predetermined specific effect start operation, and the super reach effect or the premium reach effect is started at the timing when the player performs the specific effect start operation.
[0092] (2) About manual mode and automatic mode The start operation request performance can be set to manual mode or automatic mode. In the start operation request performance when the manual mode is set, if a specific performance start operation is performed within the operation acceptance period, it develops into a super reach performance or a premium reach performance, and if a specific performance start operation is not performed during the operation acceptance period, it does not develop into a super reach performance or a premium reach performance, and the normal reach performance continues. That is, in the manual mode, a specific performance start operation is essential to start a super reach performance or a premium reach performance. On the other hand, in the start operation request performance when the automatic mode is set, if a specific performance start operation is not performed until the automatic operation timing set within the operation acceptance period, it is considered that a specific performance start operation was performed at the automatic operation timing, and a super reach performance or a premium reach performance is started immediately after the automatic operation timing. That is, in the automatic mode, a super reach performance or a premium reach performance is started even if the player does not perform a specific performance start operation.
[0093] (3) First start operation request performance and second start operation request performance The start operation request effect consists of a first start operation request effect in which a single operation of the effect button 67 is a specific effect start operation, and a second start operation request effect in which a single operation of the effect lever 70 is a specific effect start operation. Different effects are started in the first start operation request effect and the second start operation request effect. Specifically, in the first start operation request effect, a super reach effect is started in response to the operation of the effect button 67, and in the second start operation request effect, a premium reach effect is started in response to the operation of the effect lever 70.
[0094] (4) First start operation request In the pseudo special performance in which the first start operation request performance is executed, when the normal reach performance develops into the super reach performance, the first start operation request performance is executed. Specifically, as shown in FIG. 16(A)→FIG. 16(B), when the first start operation request performance starts, the display image on the performance display screen 6a is switched from the performance image for the normal reach performance to an operation request image 123 that prompts the operation of the performance button 67. Specifically, the display of the special performance symbols 101a-101c is switched to a special display mode, the special performance symbols 101a-101c are displayed in a reduced size in the upper right portion, the reserved symbols 111, 112 are hidden, and the operation request image 123 including the image 123a of the target operation means (performance button 67), the operation request message 123b, and the time gauge 123c is displayed. The time gauge 123c indicates an operation acceptance period during which the operation of the effect button 67 is valid, and the time gauge starts decreasing at the same time as the operation acceptance period starts, and is displayed so that the time gauge reaches zero when the operation acceptance period expires. In this embodiment, the operation acceptance period is set to 10 seconds.
[0095] In the first start operation request effect when the manual mode is set, if the effect button 67 is operated within the operation acceptance period, the operation triggers the start of the super reach effect, and as shown in FIG. 16(B)→FIG. 16(C), immediately after the operation, the display image on the effect display screen 6a switches from the operation request image 123 to the effect image 121 for the super reach effect. On the other hand, in the first start operation request effect when the manual mode is set, if the effect button 67 is not operated within the operation acceptance period, the super reach effect does not start and the normal reach effect is resumed. That is, as shown in FIG. 16(B)→FIG. 16(A), immediately after the operation acceptance period expires, the display image on the effect display screen 6a switches from the operation request image 123 to the effect image for the normal reach.
[0096] Fig. 18 is a timing chart showing the manner in which the first start operation request effect is executed when the manual mode is set. Fig. 18(A) shows a case in which the first start operation request effect is started at time T1, and the effect button 67 is pressed at time T2, before the expiration time T3 of the operation acceptance period. In such a case, the super reach effect is started immediately after the operation of the effect button 67. On the other hand, Fig. 18(B) shows a case in which the first start operation request effect is started at time T1, and the effect button 67 is not operated until the expiration time T3 of the operation acceptance period. In such a case, the normal reach effect is resumed immediately after the expiration time T3 of the operation acceptance period.
[0097] In the first start operation request performance when the automatic mode is set, the automatic operation timing is set when 6 seconds have elapsed since the start of the operation acceptance period. If the performance button 67 is operated between the start of the operation acceptance period and the automatic operation timing, the operation triggers the start of the super reach performance, and as shown in FIG. 16(B)→FIG. 16(C), immediately after the operation, the display image on the performance display screen 6a switches from the operation request image 123 to the performance image 121 for the super reach performance. On the other hand, in the first start operation request performance when the automatic mode is set, if the performance button 67 is not operated by the automatic operation timing, the automatic operation timing triggers the start of the super reach performance, and as shown in FIG. 16(B)→FIG. 16(C), immediately after the automatic operation timing, the display image on the performance display screen 6a switches from the operation request image 123 to the performance image 121 for the super reach performance.
[0098] Fig. 19 is a timing chart showing the manner in which the first start operation request effect is executed when the automatic mode is set. Fig. 19(A) shows a case in which the first start operation request effect is started at time T1, and the effect button 67 is pressed at time T2, prior to the automatic operation timing T3. In such a case, the super reach effect starts immediately after the effect button 67 is pressed. On the other hand, Fig. 19(B) shows a case in which the first start operation request effect is started at time T1, and the effect button 67 is not pressed until the automatic operation timing T3. In such a case, the super reach effect starts immediately after the automatic operation timing.
[0099] In this way, in the first start operation request presentation, the highly anticipated super reach presentation is started when the player operates the presentation button 67 as prompted, so the player can feel a sense of accomplishment in starting the highly anticipated super reach presentation by himself / herself. Also, in the first start operation request presentation when the automatic mode is set, even if the presentation button 67 is not operated, the super reach presentation is started when the automatic operation timing arrives. Therefore, when the automatic mode is set, even if the presentation button 67 is not operated, the super reach presentation can be enjoyed, and also, a player who finds the operation of the presentation button 67 troublesome can enjoy the super reach presentation by waiting until the automatic operation timing without operating the presentation button 67.
[0100] (5) Regarding the second start operation request In the pseudo special performance in which the second start operation request performance is executed, when the normal reach performance develops into the premium reach performance, the second start operation request performance is executed. Specifically, as shown in FIG. 17(A)→FIG. 17(B), when the second start operation request performance starts, the display image on the performance display screen 6a is switched from the performance image for the normal reach performance to an operation request image 124 that prompts the operation of the performance lever 70. Specifically, the display of the special performance symbols 101a-101c is switched to a special display mode, the special performance symbols 101a-101c are displayed in a reduced size in the upper right portion, the reserved symbols 111, 112 are hidden, and the operation request image 124 including the image 124a of the target operation means (performance lever 70), the operation request message 124b, and the time gauge 124c is displayed. The time gauge 124c indicates an operation acceptance period during which the operation of the effect lever 70 is valid, and the time gauge starts decreasing at the same time as the operation acceptance period starts, and is displayed so that the time gauge reaches zero when the operation acceptance period expires. In this embodiment, the operation acceptance period is set to 10 seconds, which is the same as the first start operation request effect.
[0101] In the second start operation request effect when the manual mode is set, if the effect lever 70 is operated within the operation acceptance period, the premium reach effect is started by the operation, and as shown in FIG. 17(B)→FIG. 17(C), immediately after the operation, the display image on the effect display screen 6a is switched from the operation request image 124 to the effect image 122 for the premium reach effect. On the other hand, in the second start operation request effect when the manual mode is set, if the effect lever 70 is not operated within the operation acceptance period, the premium reach effect is not started and the normal reach effect is resumed. That is, as shown in FIG. 17(B)→FIG. 17(A), immediately after the operation acceptance period expires, the display image on the effect display screen 6a is switched from the operation request image 124 to the effect image for the normal reach.
[0102] The timing chart in Fig. 18 will be used to explain the manner in which the second start operation request effect is executed when the manual mode is set. Fig. 18(A) shows a case in which the second start operation request effect is started at time T1, and the effect lever 70 is pressed at time T2, before the expiration time T3 of the operation acceptance period. In such a case, the premium reach effect is started immediately after the operation of the effect lever 70. On the other hand, Fig. 18(B) shows a case in which the second start operation request effect is started at time T1, and the effect lever 70 is not operated until the expiration time T3 of the operation acceptance period. In such a case, the normal reach effect is resumed immediately after the expiration time T3 of the operation acceptance period.
[0103] In the second start operation request performance when the automatic mode is set, the automatic operation timing is set when 8 seconds have elapsed since the start of the operation acceptance period. If the performance lever 70 is operated from the start of the operation acceptance period until the automatic operation timing, the premium reach performance is started by the operation, and as shown in FIG. 17(B)→FIG. 17(C), immediately after the operation, the display image on the performance display screen 6a is switched from the operation request image 124 to the performance image 122 for the premium reach performance. On the other hand, in the second start operation request performance when the automatic mode is set, if the performance lever 70 is not operated by the automatic operation timing, the premium reach performance is started by the automatic operation timing, and as shown in FIG. 17(B)→FIG. 17(C), immediately after the automatic operation timing, the display image on the performance display screen 6a is switched from the operation request image 124 to the performance image 122 for the premium reach performance.
[0104] Fig. 20 is a timing chart showing the execution mode of the second start operation request effect when the automatic mode is set. Fig. 20(A) shows a case where the second start operation request effect is started at time T1, and the effect lever 70 is pressed at time T2, before the automatic operation timing T3. In such a case, the premium reach effect is started immediately after T2, when the effect lever 70 is operated. On the other hand, Fig. 20(B) shows a case where the second start operation request effect is started at time T1, and the effect lever 70 is not operated until the automatic operation timing T3. In such a case, the premium reach effect is started immediately after the automatic operation timing T3.
[0105] In this way, in the second start operation request performance, the highly anticipated premium reach performance is started when the player operates the performance lever 70 as prompted, so the player can feel a sense of accomplishment that he or she has started the highly anticipated premium reach performance by themselves. Also, in the second start operation request performance when the automatic mode is set, even if the performance lever 70 is not operated, the premium reach performance is started when the automatic operation timing arrives. Therefore, when the automatic mode is set, even if the performance lever 70 is not operated, the premium reach performance can be enjoyed, and also, a player who finds the operation of the performance lever 70 troublesome can enjoy the premium reach performance by waiting until the automatic operation timing without operating the performance lever 70.
[0106] Here, in this embodiment, the automatic operation timing is set to different timings in the first start operation request presentation and the second start operation request presentation. Specifically, in the first start operation request presentation, the automatic operation timing is set 6 seconds after the start of the operation acceptance period (10 seconds), whereas in the second start operation request presentation, the automatic operation timing is set 8 seconds after the start of the operation acceptance period (10 seconds). This is to ensure that the player has time to operate the presentation button 67 or presentation lever 70 before the automatic operation timing, while shortening as much as possible the time that a player who does not intend to operate until the automatic operation timing waits for the start of a specific presentation. Specifically, the effect button 67, which is the target operating means for the first start operation request effect, is located near the hand (left hand) that operates the effect button 67 of the player, and since the pressing operation itself can be performed in a relatively short time, most players can operate the effect button 67 within 6 seconds after being prompted to operate it. For this reason, in the first start operation request effect, the automatic operation timing is set to 6 seconds after the start of the operation acceptance period, which is a relatively short time. In contrast, the effect lever 70, which is the target operating means of the second start operation request effect, is located on the upper part of the machine, away from the hand (left hand) that operates the effect lever 70 of the player. Also, the operation of gripping and pulling down the lever takes more time than the action of pressing a button. Furthermore, the second start operation request effect is performed less frequently than the first start operation request effect, and the player has fewer opportunities to operate the effect lever 70 than the opportunity to operate the effect button 67, so it is expected that the player will have difficulty operating the operation lever 70. For this reason, the automatic operation timing for the second start operation request effect is set to 8 seconds after the start of the operation acceptance period, which is longer than that for the first start operation request effect, so that many players can reliably operate the operation lever 70 by the automatic operation timing. In this manner, in this embodiment, for start operation request presentations which differ for the target operation means, the automatic operation timing is set in accordance with the characteristics of the target operation means, thereby ensuring time for the player to operate the presentation button 67 or presentation lever 70 before the automatic operation timing, while shortening as much as possible the time a player who does not intend to operate until the automatic operation timing waits for the start of a specific presentation, thereby improving the interest of the start operation request presentation in the automatic mode.
[0107] (6) Manual and automatic mode settings The manual mode and the automatic mode of the start operation request performance can be selectively set by the player's operation. Specifically, in this embodiment, the setting screen for the player to set various game settings includes a selection item of the manual mode and the automatic mode. FIG. 21 is an example of a setting screen displayed on the performance display screen 6a of the performance pattern display device 6. When the player operates the decision switch 69 before or during the game, the main setting screen shown in FIG. 21(A) is displayed. On the main setting screen, the model information and various setting items are displayed, and when the setting item is selected with the cursor by operating the jog dial 68 and the decision switch 69 is operated, the setting screen of each item is displayed. In this embodiment, when the "start operation request performance" is selected on the main setting screen, the setting screen shown in FIG. 21(B) is displayed, and on this setting screen, either the manual mode or the automatic mode can be selectively set by operating the jog dial 68 and the decision switch 69. This setting screen is controlled by the sub-integrated control device 83, and setting information such as the manual mode and the automatic mode is stored in the memory of the sub-integrated control device 83.
[0108] (7) Control of pseudo-special effects The control process related to the pseudo special effects will be explained in detail below. The control process related to the pseudo-special effects is mainly executed by the sub-integrated control device 83. Specifically, basic contents such as the execution time of the pseudo-special effects and the presence or absence of various reach effects are determined by the hit / miss judgment process (see FIG. 8) of the main control device 80, and are transmitted to the sub-integrated control device 83 by a fluctuation start command. Then, the sub-integrated control device 83 controls the display contents of the pseudo-special effects according to the fluctuation start command received from the main control device 80. That is, when the sub-integrated control device 83 receives the fluctuation start command, it determines a pseudo-special effect display pattern for displaying a series of pseudo-special effects from the start of fluctuation of the special effect pattern to the fixed stop display based on the information included in the fluctuation start command, and controls the display of the pseudo-special effects on the effect pattern display device 6 according to the pseudo-special effect display pattern.
[0109] In this embodiment, the display control of such pseudo special effects is performed by a pseudo special effect control process shown in Fig. 22. This pseudo special effect control process is a process that is periodically (for example, a timer interrupt process with a 2 ms period) executed by the sub-integrated control device 83.
[0110] 22, the pseudo special effect control process determines in S1000 whether or not a start winning command has been received from the main control device 80. If the determination is affirmative (S1000: Yes), the process proceeds to S1005, and if the determination is negative (S1000: No), the process proceeds to S1015.
[0111] In S1005, a reserved mode update process is executed, and the process proceeds to S1015. In this reserved mode update process, in addition to the reserved patterns displayed in the first reserved pattern display area 131 or the second reserved pattern display area 132, a display command for additionally displaying a new reserved pattern is transmitted to the performance pattern control device 82.
[0112] In S1015, it is determined whether or not a fluctuation start command has been received from the main control device 80. If the determination is affirmative (S1015: Yes), the process proceeds to S1020, and if the determination is negative (S1015: No), the process proceeds to S1035.
[0113] In S1020, the process of determining the pseudo special performance display pattern is performed. In this process, the information of the hit / miss judgment result, the information on the reach performance, the information on the change pattern, and the information on the change time, etc., included in the change start command are confirmed, and according to each of these pieces of information, a series of change modes from the start of the change of the special performance pattern to the end of the change and a mode of displaying the special performance pattern in a fixed stop are determined, and in the case of a reach performance, the performance mode of the reach performance is also determined.
[0114] Here, as described above, the reach performance includes a case where it can develop into a super reach performance, a case where it can develop into a premium performance, and a case where it cannot develop into either (only normal reach performance), and when a reach performance is performed, at least one of them is selected, and the performance mode of the selected reach performance is determined. Specifically, when the hit / miss judgment result is a miss, a performance with only normal reach performance is selected with a high probability, and when the hit / miss judgment result is a jackpot, a performance that develops into a super reach performance or premium reach performance is selected with a high probability. Therefore, the super reach performance and premium reach performance are reach performances with a high expectation that the special performance pattern is determined in a stopping mode indicating a jackpot, and the normal reach performance is a reach performance with a lower expectation than the super reach performance and premium reach performance.
[0115] In addition, when a reach effect that can develop into a super reach effect or a premium reach effect is selected in the process of S1020, the presence or absence of a start operation request effect is determined by lottery with a predetermined probability. Then, when it is determined that a start operation request effect is to be executed, the performance mode of the start operation request effect is determined. In other words, whether or not the start operation request effect can be executed and the execution mode are determined in S1020.
[0116] The pseudo-special effect display pattern is configured by a combination of the change mode and stop mode of the special effect symbols determined in S1020, the display mode of the reach effect, and the display mode of the start operation request effect. Basically, a series of display modes from the start to the end of the pseudo-special effect is finally determined in S1020. Note that, for the pseudo-special effect that executes the start operation request effect, the display mode changes according to the player's operation, so two pseudo-special effect display patterns are determined: the display mode when it develops into a super reach effect or a premium reach effect, and the display mode when it does not develop.
[0117] In the next S1025, a pseudo-special effect display process is executed. In this pseudo-special effect display process, a display command including information on the pseudo-special effect display pattern determined in the process of S1020 is sent to the effect pattern control device 82. By sending this display command, the sub-integrated control device 83 controls the display of a pseudo-special effect according to the pseudo-special effect display pattern on the effect pattern display device 6 via the effect pattern control device 82. When the effect pattern control device 82 receives the display command from the sub-integrated control device 83, it generates video data for displaying the pseudo-special effect display pattern according to the information on the pseudo-special effect display pattern included in the display command. That is, the effect pattern control device 82 has a large number of data used for generating the video data stored in advance, and selects a plurality of data necessary for configuring the pseudo-special effect display pattern based on the display command from the large number of data, and generates the video data by combining the selected plurality of data. Then, the effect pattern display device 6 is driven and controlled to play back this video data, thereby displaying the pseudo-special effect according to the pseudo-special effect display pattern determined in the pseudo-special effect display pattern determination process (S1020) on the effect display screen 6a. Note that, if the pseudo-special effect display pattern including the start operation request effect is determined in the pseudo-special effect display pattern determination process (S1020), in the process of S1025, the sub-integrated control device 83 transmits to the effect pattern control device 82 a display command including information on the pseudo-special effect display pattern when the effect does not develop into the super reach effect or the premium reach effect.
[0118] In S1030 following S1025, a reserved mode update process is executed, and the process proceeds to S1035. In this reserved mode update process, a reserved pattern display pattern is generated to remove the reserved patterns 111, 112 corresponding to the reserved memory to be consumed from the first reserved pattern display area 131 or the second reserved pattern display area 132, and a display command including information on the reserved pattern display pattern is sent to the performance pattern control device 82.
[0119] In S1035, it is determined whether or not a pseudo-special effect is being executed, and if the determination is affirmative (S1035: Yes), the process proceeds to S1040, and if the determination is negative (S1035: No), the process proceeds to S1050. In S1040, it is determined whether or not the pseudo-special effect being executed is one that executes a start operation request effect, and if the determination is affirmative (S1040: Yes), the process proceeds to S1045, and if the determination is negative (S1040: No), the process proceeds to S1050. In S1045, a start operation request effect process related to the control of the start operation request effect is executed, and the process proceeds to S1050. The start operation request effect process will be described later.
[0120] In S1050, it is determined whether or not a symbol determination command has been received from the main control device 80. If the determination is affirmative (S1050: Yes), the process proceeds to S1055, and if the determination is negative (S1050: No), the pseudo-special effect control process is terminated. In S1055, a pseudo-special effect end process is executed, and the pseudo-special effect control process is terminated. In this pseudo-special effect end process, a display command including information on the stop mode of the special effect symbol determined in the process of S1020 is sent to the effect symbol control device 82, and the special effect symbol is displayed as a determined stop on the effect display screen 6a, and the pseudo-special effect is terminated.
[0121] (8) Processing of start operation requests Next, the start operation request effect processing executed by the sub integrated control device 83 will be described with reference to the flowchart of Fig. 23. The start operation request effect processing is processing executed from the pseudo special effect control processing described above. In the start operation request performance process, in S1100, it is determined whether the operation reception flag is 1 or not, and if the determination is affirmative (S1100: Yes), the process proceeds to S1200, and if the determination is negative (S1100: No), the process proceeds to S1105. Here, the operation reception flag = 1 indicates that the operation reception period for the start operation request performance is in progress, and the operation reception flag = 0 indicates that the operation reception period for the start operation request performance is not in progress.
[0122] In S1105, it is determined whether the acceptance end flag is 1 or not, and if the determination is affirmative (S1105: Yes), the start operation request presentation process is terminated, and if the determination is negative (S1105: No), the process proceeds to S1110. Here, the acceptance end flag = 1 indicates that the start operation request presentation has ended, and the acceptance end flag = 0 indicates that the start operation request presentation has not yet ended.
[0123] In S1110, it is determined whether the reception start timer has finished measuring, and if the determination is affirmative (S1110: Yes), the process proceeds to S1115, and if the determination is negative (S1110: No), the start operation request performance process is terminated. The reception start timer is a timer that measures the time from the start of the pseudo special performance to the start of the start operation request performance.
[0124] In S1115, the operation acceptance flag is set to 1 (operation acceptance period is in progress). In the following S1120, the operation acceptance timer is set to 10 seconds to start measuring the operation acceptance period.
[0125] In S1125 following S1120, it is determined whether the automatic mode flag is 1 or not, and if the determination is affirmative (S1125: Yes), the process proceeds to S1130, and if the determination is negative (S1125: No), the start operation request presentation process is terminated. Here, the automatic mode flag = 1 indicates that the start operation request presentation is set to the automatic mode, and the automatic mode flag = 0 indicates that the start operation request presentation is set to the manual mode.
[0126] In S1130, it is determined whether the start operation request performance to be executed is the first start operation request performance, and if the determination is affirmative (S1130: Yes), the process proceeds to S1135, and if the determination is negative (second start operation request performance) (S1130: No), the process proceeds to S1140. Then, in S1135, the automatic operation timer is set to 6 seconds to measure the time until the automatic operation timing of the first start operation request performance, and the start operation request performance is terminated. On the other hand, in S1140, the automatic operation timer is set to 8 seconds to measure the time until the automatic operation timing of the second start operation request performance, and the start operation request performance is terminated.
[0127] In S1200, which follows the positive determination in S1100, it is determined whether or not the first start operation request performance is in progress, and if the determination is positive (S1200: Yes), the process proceeds to S1205, and if the determination is negative (the second start operation request performance is in progress) (S1200: No), the process proceeds to S1210. Then, in S1205, it is determined whether or not the output of the performance button 67 has been switched ON, and if the determination is positive (S1205: Yes), the process proceeds to S1225, and if the determination is negative (S1205: No), the process proceeds to S1215. Meanwhile, in S1210, it is determined whether or not the output of the performance lever 70 has been switched ON, and if the determination is positive (S1210: Yes), the process proceeds to S1225, and if the determination is negative (S1210: No), the process proceeds to S1215.
[0128] In S1215, it is determined whether or not the automatic mode flag is 1. If the determination is affirmative (S1215: Yes), the process proceeds to S1220, and if the determination is negative (S1215: No), the process proceeds to S1230.
[0129] In S1225, a display command including information on the pseudo display pattern related to the super reach effect or premium reach effect determined in the process of S1020 is sent to the effect symbol control device 82, and the process proceeds to S1235. By this process, an effect image related to the super reach effect or premium reach effect is displayed on the effect display screen 6a.
[0130] In S1230, it is determined whether the operation reception timer has finished measuring 10 seconds, and if the determination is positive (S1230: Yes), the process proceeds to S1235, and if the determination is negative (S1230: No), the start operation request presentation process is terminated.
[0131] In S1235, the operation reception flag is set to 0, and the process proceeds to S1240. In S1240, the reception end flag is set to 1, and the start operation request presentation process is terminated. The start operation request presentation ends with the processes of S1235 and S1240. Here, when the start operation request presentation is to be terminated after the process of S1225 is executed, the presentation symbol control device 82 starts a super reach presentation or a premium reach presentation according to the display command transmitted in S1225. On the other hand, when the start operation request presentation is to be terminated after a negative judgment in S1230, the normal reach presentation is resumed according to the display command transmitted in S1025 of the pseudo special presentation control process (see FIG. 22).
[0132] [Features of the embodiment] In this embodiment, the automatic operation timing is set relatively early in the first start operation request effect in which the target operation means (effect button 67) can be operated in a relatively short time, and the automatic operation timing is set relatively early in the second start operation request effect in which the target operation means (effect lever 70) takes a relatively long time to be operated. In this way, in this embodiment, by setting the automatic operation timing of the first start operation request effect and the second start operation request effect to different timings according to the respective target operation means, in the automatic mode of either start operation request effect, it is possible to secure time to operate the target operation means before the automatic operation timing, while shortening the time that a player who does not intend to perform a specific effect start operation waits for the start of the super reach effect or premium reach effect as much as possible, thereby improving the interest of the start operation request effect. In particular, in this embodiment, the frequency of execution of the super reach effect is higher than that of the premium reach effect, and the frequency of execution of the first start operation request effect is about 10 times that of the second start operation request effect. That is, in this embodiment, the number of opportunities to operate the effect button 67 is greater than the number of opportunities to operate the effect lever 70, and since the player is relatively accustomed to operating the effect button 67, the automatic operation timing can be set relatively early for the first start operation request effect, which is relatively frequently executed. In addition, in the present invention, it is proposed that the performance mode selection means selects the first start operation request performance at a different frequency from the second start operation request performance. In such a configuration, it is assumed that the player is accustomed to the specific performance start operation for the first start operation request performance or the second start operation request performance, whichever is selected more frequently, and the time required for the specific performance start operation is relatively short. Therefore, in such a configuration, if the automatic operation timing is set relatively early for the first start operation request performance or the second start operation request performance, whichever is selected more frequently, it is possible to appropriately shorten the time a player who does not intend to perform the specific performance start operation waits for the start of the specific performance while ensuring the time to perform the specific performance start operation before the automatic operation timing. In this embodiment, the player can selectively set the manual mode or the automatic mode by himself / herself via the setting screen. With this configuration, a player who wants to feel a strong sense of accomplishment by the start operation request presentation can select the manual mode, and a player who finds the operation in the start operation request presentation troublesome can select the automatic mode, so that the start operation request presentation can be provided according to the player's preference.
[0133] [Correspondence to claims] The correspondence between the terms used in the above embodiments and the terms described in the claims will be explained below. The pachinko machine 1 corresponds to an example of a gaming machine according to the present invention. The steps S110 and S130 of the start winning process correspond to an example of the lottery means according to the present invention. The win / loss determination process S210, S230, and S240, and the pseudo special effect process S1020 correspond to an example of the effect mode selection means according to the present invention. The pseudo special effect processing steps S1025 and S1045 correspond to an example of the effect control means according to the present invention. The sub integrated control device 83, the jog dial 68, and the decision switch 69 correspond to an example of the performance operation mode setting means according to the present invention. The super reach effect and the premium reach effect correspond to the specific effect according to the present invention. The effect button 67 corresponds to the first operating means according to the present invention. The effect lever 70 corresponds to the second operating means according to the present invention. A single operation of the effect button 67 corresponds to a specific effect start operation of the first start operation request effect according to the present invention. A single operation of the effect lever 70 corresponds to a specific effect start operation of the second start operation request effect according to the present invention.
[0134] Below, a variation of the above embodiment will be described.
[0135] Although the above embodiment is an application of the present invention to a pachinko machine, the present invention can also be applied to gaming machines such as reel-type gaming machines (slot machines).
[0136] In the above embodiment, the effect button 67 and the effect lever 70 correspond to the first and second operating means according to the present invention, respectively, but the first and second operating means according to the present invention are not limited to buttons and levers, and may be anything that can be operated by a player, such as a touch sensor, a jog dial, or a handle lever. In addition, the first and second operating means according to the present invention may be a combination of the same type of operating means, such as a button and a button, or a lever and a lever. In addition, the effect button 67 and the effect lever 70 in the above embodiment are used only for the purpose of effect, but the target operating means of the specific effect start operation according to the present invention may also be used in game operations.
[0137] In addition, although the start operation request effects in the above embodiment are only of two types, a first start operation request effect that prompts a single operation of the effect button 67, and a second start operation request effect that prompts a single operation of the effect lever 70, the present invention may also be provided with third and fourth start operation request effects that prompt other specific effect start operations, and for the third and fourth start operation request effects, the automatic operation timing may be set to the same timing as that of the first start operation request effect or the second start operation request effect.
[0138] In addition, in the above embodiment, the specific effect start operation was performed by operating the effect button 67 once for the first start operation request effect, and by operating the effect lever 70 once for the second start operation request effect, but the specific effect start operation according to the present invention may be performed by operating the effect button 67 or the effect lever 70 multiple times.
[0139] In the above embodiment, the automatic operation timing is set to 6 seconds after the start of the operation acceptance period in the first start operation request performance, and 8 seconds after the start of the operation acceptance period in the second start operation request performance. However, the automatic operation timing according to the present invention can be set according to the operation means targeted for the specific performance start operation, and can be changed within the scope of the present invention. If the automatic operation timing is set in the first half of the operation acceptance period, many players may fail to operate, so it is preferable to set it in the second half of the operation acceptance period. In addition, the automatic operation timing according to the present invention may be set in stages, such as "early", "normal", and "late". In this case, the automatic operation timing of the first start operation request performance and the second start operation request performance according to the present invention may be set to be different in at least one stage. In addition, the automatic operation timing according to the present invention may be set at the end of the operation acceptance period.
[0140] In the above embodiment, the operation acceptance period was fixed at 10 seconds, but the length of the operation acceptance period may be different between the first start operation request performance and the second start operation request performance.
[0141] In the above embodiment, the player can select the manual mode or the automatic mode of the start operation request performance from the setting screen. Instead of or in addition to this configuration, the manual mode or the automatic mode may be set according to the lottery result or the number of times the special symbol changes. The manual mode and the automatic mode may be set separately for the first start operation request performance and the second start operation request performance. In addition, when the start operation request performance in which the specific performance start operation is not performed is repeated a certain number of times in the manual mode, the automatic mode may be switched to. In this case, when only the performance button 67 is not operated, only the first start operation request performance may be switched to the automatic mode, and when only the performance lever 70 is not operated, only the second start operation request performance may be switched to the automatic mode. In addition, when the specific performance start operation is performed in the start operation request performance in the automatic mode, the manual mode may be switched to. In addition, when the specific performance start operation is a multiple operation of the target operation means, if the target operation means is operated at least once by the automatic operation timing, the specific performance may not be started even when the automatic operation timing is reached, and the operation may be accepted until the operation acceptance period expires. In this case, when the operation acceptance period expires, the specific performance may be started, or may not be executed.
[0142] In the first start operation request effect in the above embodiment, a super reach effect is started as a specific effect, and in the second start operation request effect, a premium reach effect is started as a specific effect, but the specific effects relating to the first start operation request effect and the second start operation request effect may be common. Also, even if the start operation request effect prompts the same specific effect start operation, if the specific effects to be started are different, the timing of the automatic operation may be made different for each of the different types of start operation effects.
[0143] In the above embodiment, during the start operation request performance, the operation request images 123, 124 are displayed on the performance display screen 6a of the performance pattern display device 6 to prompt the player to operate the performance button 67 or the performance lever 70, but the present invention is not limited to such a configuration, and may be configured to prompt the player to perform a specific performance start operation. Specifically, instead of or in addition to the configuration of the embodiment, a configuration may be used to prompt the player to perform a specific performance start operation by voice, or a configuration may be used in which the button or lever of the target operating means is lit or flashed. In the above embodiment, the time gauges 123c, 124c are displayed on the operation request images 123, 124 to indicate the remaining time of the operation acceptance period, but the operation acceptance period does not have to be clearly indicated to the player. In the automatic mode, the remaining time until the automatic operation timing may be clearly indicated on the performance display screen 6a.
[0144] In the above embodiment, the start operation request effect is executed during the pseudo special effect, but the start operation request effect according to the present invention is not limited to being executed during the pseudo special effect. For example, the start operation request effect may be executed during a big win game, and a specific effect that suggests or notifies the type of big win (such as a special big win) may be started when the player performs a specific effect start operation. [Explanation of symbols]
[0145] 1. Pachinko machines (amusement machines) 6. Display device for performance patterns 6a Production display screen 67 Production button (first operating means) 68 Jog dial 69 Decision switch 70 Production lever (second operating means) 80 Main Control Unit 82 Performance pattern control device 83 Sub-integrated control device 123,124 Operation request image 123a, 124a Images of target operation means 123b,124b Operation request message 123c,124c Time Gauge
Claims
[Claim 1] A lottery means for conducting a lottery when a predetermined condition is satisfied; A performance mode selection means for selecting a performance mode based on a result of the lottery; A performance control means for controlling the performance in the performance mode selected by the performance mode selection means; A performance operation mode setting means that can be set to a manual mode or an automatic mode; Equipped with The presentation mode selected by the presentation mode selection means includes: The game includes a start operation request effect that prompts the player to perform a specific performance start operation, and when the specific performance start operation is performed, starts a specific performance in response to the specific performance start operation, The performance control means includes: When the start operation request performance is executed, if the manual mode is set, when the specific performance start operation is performed within a predetermined operation acceptance period, the specific performance is started, When the start operation request performance is executed, if the automatic mode is set, when the automatic operation timing set in the operation acceptance period arrives, the specific performance can be started even if the specific performance start operation is not performed, The start operation request performance is A first start operation request effect in which a predetermined number of operations of a first operating means is set as the specific effect start operation; a second start operation request effect in which the predetermined number of operations of the second operation means is the specific effect start operation; Including, In the first start operation request performance and the second start operation request performance, are set at different times, The performance mode selection means is configured such that a frequency of selecting the first start operation request performance and a frequency of selecting the second start operation request performance are different, and the frequency of selecting the second start operation request performance is set to be lower than the frequency of selecting the first start operation request performance; The gaming machine is characterized in that the automatic operation timing is set so that the first start operation request presentation is earlier than the second start operation request presentation.
Citation Information
Patent Citations
Game machine
JP2018094094A
Game machine
JP2020036854A
Game machine
JP2021023651A
