Communication method and device

By enabling eMTC terminals to use format-3 or format-3A control information in the Type 0 common search space, the method addresses the challenge of receiving emergency notifications with reduced power consumption and complexity, ensuring efficient emergency message delivery.

JP7578357B2Active Publication Date: 2024-11-06HUAWEI TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021557698
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-10-16
Filing Date
2019-11-21
Publication Date
2024-11-06
Estimated Expiration
2039-11-21

AI Technical Summary

Technical Problem

Existing eMTC terminal devices in the connected state cannot receive emergency message notifications due to their inability to monitor the Type 2 common search space, leading to increased power consumption and complexity when monitoring both Type 2 and user-specific search spaces.

Method used

Implementing a communication method that allows eMTC terminals to monitor both Type 0 common and user-specific search spaces using format-3 or format-3A control information in Type 0 common search space, reducing the need to monitor Type 2 search space and minimizing power consumption and complexity.

Benefits of technology

This approach reduces user power consumption and complexity by avoiding the need to monitor multiple search spaces, while maintaining the ability to receive emergency information without increasing control information overhead or spectral efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007578357000018
    Figure 0007578357000018
  • Figure 0007578357000019
    Figure 0007578357000019
  • Figure 0007578357000020
    Figure 0007578357000020
Patent Text Reader

Abstract

A communication method and device are used to solve a problem of the existing technology that complexity and power consumption are relatively high when an eMTC terminal device in a connected state receives an emergency message notification. The method includes: a first device determining first control information carrying first information used to indicate emergency information, where the first control information is format-3 control information, format-3A control information, format-6-0A control information, format-6-0B control information, format-6-1A control information, or format-6-1B control information. The first device transmits the first control information to a second device. Further, the first device transmits the emergency information to the second device. The method and device provided in the embodiments of the present application extend network coverage and may be applied to the Internet of Things (IoT), such as MTC, LTE-M, or M2M.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present application relates to the field of communication technologies, and in particular to communication methods and devices. [Background technology]

[0002] Currently, the fourth generation communication system, i.e., long term evolution-advanced (LTE-A) system, continues to provide wireless communication services to its user equipment (UE) in the short term (or long term). In particular, the enhanced machine type communication (eMTC) system and other evolved systems (e.g., further eMTC (FeMTC), further further eMTC (eFeMTC), additional MTC (AMTC)) are systems derived from LTE. The eMTC system and other evolved systems operate in the LTE system and in the LTE frequency band. To reduce power consumption and cost, the operating bandwidth of the eMTC terminal is generally relatively small and narrower than the operating bandwidth of the LTE system. For example, the operating bandwidth of the eMTC terminal may be one narrowband NB. One NB includes six consecutive physical resource blocks (PRBs), and one PRB includes 12 subcarriers (SCs). The battery life of an eMTC UE is expected to be relatively long, about 10 years, due to characteristics such as low power consumption and long sleep of the eMTC UE.

[0003] In order to reduce the power consumption and detection complexity of eMTC terminals, for eMTC terminals in a connected state, only the user-specific search space and the Type 0 common search space used to transmit power control information of a terminal group (UE group) can be detected.

[0004] In the existing technology, emergency information (e.g., earthquake and tsunami warning system (ETWS) information, commercial mobile alert service (CMAS) information, and information used to indicate system information modification) is carried in a system message. To reduce power consumption, an eMTC terminal device does not update the system message very frequently. Therefore, when there is an emergency message, the base station notifies the terminal device by using a paging message or direct indication information. However, the paging message or direct indication information is carried in the Type 2 common search space, and an eMTC terminal in a connected state does not monitor the search space. As a result, an eMTC terminal in a connected state cannot receive an emergency message notification.

[0005] In a possible solution, an eMTC terminal device in a connected state is enabled to monitor both the Type 2 search space and the user-specific search space, i.e., an eMTC terminal device in a connected state is enabled to receive paging messages or direct indication information. However, since the paging messages and the user-specific search space may be located in different narrowbands, the eMTC terminal device needs to monitor the two narrowbands simultaneously. As a result, the user complexity and the user power consumption are greatly increased. Summary of the Invention

[0006] The embodiments of the present application provide a communication method and device that solves the problems of the existing technology, that is, the relatively high complexity and power consumption when an eMTC terminal device in a connected state receives an emergency message notification.

[0007] According to a first aspect, an embodiment of the present application provides a communication method. The method includes: a first device determines first control information carrying first information used to indicate emergency information, and the first control information is format-3 control information, format-3A control information, format-6-0A control information, format-6-0B control information, format-6-1A control information, or format-6-1B control information. The first device transmits the first control information to a second device. Further, the first device transmits the emergency information to the second device.

[0008] In this embodiment of the present application, the first device may instruct the second device to receive emergency information by using Format-3, Format-3A, Format-6-0A, Format-6-0B, Format-6-1A, or Format-6-1B control information. The Format-3A control information and the Format-3A control information are group control information and are carried in the Type 0 common search space, and the Format-6-0A control information, the Format-6-0B control information, the Format-6-1A control information, and the Format-6-1B control information are user-specific control information. information and is carried in the user-specific search space. Therefore, the second device does not need to monitor the Type2 search space when receiving emergency information, which does not increase user complexity and reduces user power consumption.

[0009] Compared with the existing technology method of increasing bits in user-specific control information to indicate emergency information, the control information used in this embodiment of the present application in the above format does not need to indicate emergency information by increasing additional bits. Therefore, the increase in control information overhead can be avoided, the decrease in spectrum efficiency can be further avoided, and the increase in user power consumption can be avoided.

[0010] Furthermore, the format-3 control information and the format-3A control information are group control information, specifically, a first device such as a network device can send instruction information to multiple second devices such as terminal devices by using one control information, thereby avoiding waste of resources of the first device and reducing the power consumption of the first device.

[0011] In a possible design, the first control information is downlink control information.

[0012] In a possible design, the first control information is format-3 or format-3A control information, and K transmit power control command numbers (TPC) in the first control information are used to indicate the first information, where K is an integer equal to or greater than 1. The TPC command number may also be referred to as a TPC command, and each TPC command includes 2 bits. In the above design, the first information is indicated by using a TPC command of the format-3 control information or the format-3A control information, so that the first control information can indicate the first information without changing the number of bits. Thus, no additional bits need to be added to indicate the emergency information, and an increase in control information overhead can be avoided, a decrease in spectral efficiency can be avoided, and an increase in user power consumption can be avoided. Furthermore, the format-3 control information and the format-3A control information are group control information, and specifically, a first device, such as a network device, can transmit instruction information to multiple second devices, such as terminal devices, by using one control information, thereby avoiding waste of resources of the first device and reducing power consumption of the first device. Moreover, the format-3 control information and the format-3A control information are carried in the Type0 common search space. Therefore, the second device does not need to monitor the Type2 search space when receiving the emergency information, which does not increase user complexity and reduces user power consumption. Moreover, only slight changes are required to the existing protocol.

[0013] In the above design, the K TPC commands may not be assigned to any second device for transmitting transmit power control information and may be used to indicate the first information.

[0014] In a possible design, the first control information may alternatively include M TPC commands (or TPC command numbers), where the M TPC commands are used to indicate transmit power control commands of H second devices, where M and H are integers greater than or equal to 0.

[0015] In a possible design, the K TPC commands may be predefined, or the K TPC commands may be determined by the first device and configured for the second device using higher layer signaling.

[0016] In a possible design, the first control information is format-3 or format-3A control information, and Q bits other than the TPC command in the first control information are used to indicate the first information, where Q is an integer equal to or greater than 1. That is, the first control information includes Q bits and N TPC commands, and the Q bits are used to indicate the first information, and the N TPC commands are used to indicate (or carry) the transmit power control information of multiple second devices. In the above design, the format-3 control information and the format-3A control information are group control information, and specifically, a first device, such as a network device, can send instruction information to multiple second devices, such as terminal devices, by using one control information, thereby avoiding the waste of resources of the first device and reducing the power consumption of the first device. Furthermore, the format-3 control information and the format-3A control information are carried in a Type0 common search space. Therefore, the second device does not need to monitor the Type2 search space when receiving emergency information, which does not increase user complexity and reduces user power consumption. Furthermore, only slight changes to existing protocols are required.

[0017] In a possible design, the first control information is format-3 or format-3A control information, and the first control information includes Q bits, where the Q bits are used to indicate the first information, and Q is an integer equal to or greater than 1. In the above design, the first control information may be used to indicate only emergency information notification, but does not need to be used to indicate (or convey) transmission power control information.

[0018] In a possible design, before sending the first control information to the second device, the first device may determine second information used to indicate that the first control information includes the first information, and send the second information to the second device. According to the above design, after receiving the second information, the second device can obtain the first information from the first control information, thereby improving the accuracy of obtaining the emergency information notification.

[0019] In a possible design, the first control information may be format-6-1A or format-6-1B control information, and the first field of the first control information is used to indicate the first information when all bits of the resource block allocation field of the first control information are set to 1. In the above design, the format-6-1A control information and the format-6-1B control information are user-specific messages and are carried in a user-specific search space. Thus, the second device does not need to monitor the Type 2 search space when receiving the emergency information, thereby not increasing user complexity and reducing user power consumption. Furthermore, in the above design, the emergency information is indicated by using the redundancy status of the format-6-1A control information and the format-6-1B control information, thereby avoiding increasing control information overhead, reducing power consumption, and improving system resource utilization.

[0020] In a possible design, the first field may be a physical random access channel (PRACH) mask index field.

[0021] In a possible design, the first control information may be format-6-0B control information, and a second field of the first control information is used to indicate the first information when all bits of a modulation and coding scheme field of the first control information are set to 1; alternatively, the first control information may be format-6-0A control information, and a third field of the first control information is used to indicate the first information when all bits of a resource block allocation field of the first control information are set to 1. In the above design, the format-6-0A control information and the format-6-0B control information are user-specific messages and are carried in a user-specific search space. Thus, the second device does not need to monitor the Type 2 search space when receiving the emergency information, thereby not increasing user complexity and reducing user power consumption. Furthermore, in the above design, the emergency information is indicated by using a redundancy status of the format-6-0A control information and the format-6-0B control information, thereby avoiding increasing control information overhead, reducing power consumption, and improving system resource utilization.

[0022] In a possible design, a cyclic redundancy check (CRC) code of the first control information may be scrambled by a first scrambling code, where the first scrambling code may be a system information radio network temporary identifier (SI-RNTI).

[0023] In a possible design, when the CRC code of the first control information is scrambled by the second scrambling code, the first control information may only include emergency information notification, or the first control information may be used to indicate that the first information or the first control information includes emergency information, where the second scrambling code may be SI-RNTI.

[0024] In a possible design, the emergency information may include one or more of the following: ETWS information, CMAS information, and information used to indicate a system information change. The ETWS information, CMAS information, and information used to indicate a system information change may be an ETWS instruction or an ETWS notification, respectively. Indication or ETWS Notification ), CMAS instruction or CMAS notice (CMAS Indication or CMAS Notification ), and system information modification instruction or system information modification notice Indication or system information modification Notification )

[0025] According to a second aspect, an embodiment of the present application provides a communication method. The method includes: a second device receives first control information transmitted by a first device, the first control information carries first information used to indicate emergency information, the first control information being format-3 control information, format-3A control information, format-6-0A control information, format-6-0B control information, format-6-1A control information, or format-6-1B control information. The second device receives the emergency information based on the first information in the first control information.

[0026] In this embodiment of the present application, the first device may instruct the second device to receive emergency information by using format-3, format-3A, format-6-0A, format-6-0B, format-6-1A, or format-6-1B control information. The format-3A control information and the format-3A control information are group control information and are carried in Type0 common search space, and the format-6-0A control information, the format-6-0B control information, the format-6-1A control information, and the format-6-1B control information are user-specific messages and are carried in user-specific search space. Therefore, the second device does not need to monitor Type2 search space when receiving emergency information, which does not increase user complexity and reduces user power consumption.

[0027] Compared with the existing technology method of increasing bits in user-specific control information to indicate emergency information, the control information used in this embodiment of the present application in the above format does not need to indicate emergency information by increasing additional bits. Therefore, the increase in control information overhead can be avoided, the decrease in spectrum efficiency can be further avoided, and the increase in user power consumption can be avoided.

[0028] Furthermore, the format-3 control information and the format-3A control information are group control information, specifically, a first device such as a network device can send instruction information to multiple second devices such as terminal devices by using one control information, thereby avoiding waste of resources of the first device and reducing the power consumption of the first device.

[0029] In a possible design, the first control information is downlink control information.

[0030] In a possible design, the first control information may be format-3 or format-3A control information, and K TPC command numbers in the first control information are used to indicate the first information, where K is an integer equal to or greater than 1. The TPC command numbers may also be referred to as TPC commands, and each TPC command includes 2 bits. In the above design, the first information may be indicated by using the TPC command of the format-3 control information or the format-3A control information, so that the first control information can indicate the first information without changing the number of bits. Thus, no additional bits need to be added to indicate the emergency information, and an increase in control information overhead may be avoided, a decrease in spectral efficiency may be avoided, and an increase in user power consumption may be avoided. Furthermore, the format-3 control information and the format-3A control information are group control information, and specifically, a first device, such as a network device, may use one control information to transmit indication information to multiple second devices, such as terminal devices, thereby avoiding waste of resources of the first device and reducing power consumption of the first device. Moreover, the format-3 control information and the format-3A control information are carried in the Type0 common search space. Therefore, the second device does not need to monitor the Type2 search space when receiving the emergency information, which does not increase user complexity and reduces user power consumption. Moreover, only slight changes are required to the existing protocol.

[0031] In the above design, the K TPC commands may not be assigned to any second device for transmitting transmit power control information and may be used to indicate the first information.

[0032] In a possible design, the first control information may alternatively include M TPC commands (or TPC command numbers), where the M TPC commands are used to indicate transmit power control commands of H second devices, where M and H are integers greater than or equal to 0.

[0033] In a possible design, the K TPC commands may be predefined, or the K TPC commands may be determined by the second device by receiving higher layer signaling sent by the first device.

[0034] In a possible design, the first control information may be format-3 or format-3A control information, and Q bits other than the TPC command in the first control information are used to indicate the first information, where Q is an integer equal to or greater than 1. That is, the first control information includes Q bits and N TPC commands, and the Q bits are used to indicate the first information, and the N TPC commands are used to indicate (or carry) the transmit power control information of multiple second devices. In the above design, the format-3 control information and the format-3A control information are group control information, and specifically, a first device, such as a network device, can send instruction information to multiple second devices, such as terminal devices, by using one control information, thereby avoiding the waste of resources of the first device and reducing the power consumption of the first device. Furthermore, the format-3 control information and the format-3A control information are carried in a Type0 common search space. Therefore, the second device does not need to monitor the Type2 search space when receiving emergency information, which does not increase user complexity and reduces user power consumption. Furthermore, only slight changes to existing protocols are required.

[0035] In a possible design, the first control information is format-3 or format-3A control information, and the first control information includes Q bits, where the Q bits are used to indicate the first information, and Q is an integer equal to or greater than 1. In the above design, the first control information may be used to indicate only emergency information notification, but does not need to be used to indicate (or convey) transmission power control information.

[0036] In a possible design, before receiving the first control information sent by the first device, the second device may receive the second information sent by the first device, and the second information is used to indicate that the first control information includes the first information. According to the above design, after receiving the second information, the second device can obtain the first information from the first control information, thereby improving the accuracy of obtaining the emergency information notification.

[0037] In a possible design, the first control information may be format-6-1A or format-6-1B control information, and the first field of the first control information is used to indicate the first information when all bits of the resource block allocation field of the first control information are set to 1. In the above design, the format-6-1A control information and the format-6-1B control information are user-specific messages and are carried in a user-specific search space. Thus, the second device does not need to monitor the Type 2 search space when receiving the emergency information, thereby not increasing user complexity and reducing user power consumption. Furthermore, in the above design, the emergency information is indicated by using the redundancy status of the format-6-1A control information and the format-6-1B control information, thereby avoiding increasing control information overhead, reducing power consumption, and improving system resource utilization.

[0038] In a possible design, the first field may be a PRACH mask index field.

[0039] In a possible design, the first control information may be format-6-0B control information, and a second field of the first control information is used to indicate the first information when all bits of a modulation and coding scheme field of the first control information are set to 1; alternatively, the first control information may be format-6-0A control information, and a third field of the first control information is used to indicate the first information when all bits of a resource block allocation field of the first control information are set to 1. In the above design, the format-6-0A control information and the format-6-0B control information are user-specific messages and are carried in a user-specific search space. Thus, the second device does not need to monitor the Type 2 search space when receiving the emergency information, thereby not increasing user complexity and reducing user power consumption. Furthermore, in the above design, the emergency information is indicated by using a redundancy status of the format-6-0A control information and the format-6-0B control information, thereby avoiding increasing control information overhead, reducing power consumption, and improving system resource utilization.

[0040] In a possible design, the CRC code of the first control information may be scrambled by a first scrambling code, where the first scrambling code may be the SI-RNTI.

[0041] In a possible design, when the CRC code of the first control information is scrambled by the second scrambling code, the first control information may only include emergency information notification, or the first control information may be used to indicate that the first information or the first control information includes emergency information, where the second scrambling code may be SI-RNTI.

[0042] In a possible design, the emergency information may include one or more of the following: ETWS information, CMAS information, and information used to indicate a system information change. The ETWS information, CMAS information, and information used to indicate a system information change may be referred to as an ETWS notification or ETWS indication, a CMAS notification or CMAS indication, and a system information modification notification or system information modification indication, respectively.

[0043] According to a third aspect, the present application provides an apparatus. The apparatus may be a first device, a second device, or a chip. The apparatus comprises a function for implementing any embodiment of the first aspect or the second aspect. The function may be implemented by hardware, or may be implemented by hardware executing corresponding software. The hardware or software includes one or more modules corresponding to the above functions.

[0044] According to a fourth aspect, there is provided an apparatus. The apparatus includes a processor, a communication interface, and a memory. The communication interface is configured to transmit information and / or messages and / or data between the apparatus and other apparatuses. The memory is configured to store computer-executable instructions. When the apparatus is operated, the processor executes the computer-executable instructions stored in the memory such that the apparatus performs a communication method according to the first aspect or any possible design of the first aspect, or a communication method according to the second aspect or any possible design of the second aspect.

[0045] According to a fifth aspect, the present application further provides a system, the system comprising a first device according to any embodiment of the first aspect and a second device according to any embodiment of the second aspect.

[0046] According to a sixth aspect, the present application further provides a computer-readable storage medium storing instructions which, when executed on a computer, enable the computer to perform a method according to each of the above aspects.

[0047] According to a seventh aspect, the present application further provides a computer program product comprising instructions, which, when executed on a computer, enable the computer to carry out a method according to each of the above aspects. [Brief description of the drawings]

[0048] [Figure 1] 1 is a schematic architecture diagram of a communication system according to an embodiment of the present application; [Diagram 2] 1 is a simplified flowchart of a communication method according to an embodiment of the present application. [Diagram 3] 1 is a schematic structural diagram of a communication device according to an embodiment of the present application; [Figure 4] 1 is a schematic structural diagram of a communication device according to an embodiment of the present application; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0049] The following describes the embodiments of the present application in more detail with reference to the accompanying drawings.

[0050] The communication method provided in the present application may be applied to various communication systems. For example, the communication system may be an Internet of Things (IoT), a narrowband Internet of Things (NB-IoT), and a long term evolution (LTE) system, or may be a fifth generation (5G) communication system, a combined architecture of LTE and 5G, a new radio (NR) in 5G, a global system for mobile communications (GSM), a universal mobile telecommunications system (UMTS), a code division multiple access (CDMA) system, and new communication systems that will appear in future communication developments. The communication method provided in this embodiment of the present application allows one entity in the communication system to transmit control information used to schedule a transport block, transmit and receive the transport block, and another entity in the communication system to receive the control information used to schedule the transport block, and receive and transmit the transport block.

[0051] A terminal device in the present embodiment is a device that provides voice and / or data connectivity to a user, such as a portable device or a vehicle-mounted device with wireless connectivity. Alternatively, the terminal device may be another processing device connected to a wireless modem. The terminal device may communicate with one or more core networks via a radio access network (RAN). The terminal device may also be called a wireless terminal, a subscriber unit, a subscriber station, a mobile station, a mobile, a remote station, an access point, a remote terminal, an access terminal, a user terminal, a user agent, a user device, a user equipment, etc. The terminal device may be a mobile terminal, such as a mobile phone (also called a "cellular" phone), and a computer equipped with a mobile terminal. For example, the terminal device may be a portable, pocket-sized, handheld, computer-embedded, or vehicle-mounted mobile device that exchanges voice and / or data with a radio access network. For example, the terminal device may further be a device such as a personal communication service (PCS) telephone, a cordless telephone, a session initiation protocol (SIP) telephone, a wireless local loop (WLL) station, or a personal digital assistant (PDA).Common terminal devices include, for example, mobile phones, tablet computers, notebook computers, palmtop computers, mobile internet devices (MIDs), and wearable devices, for example, smart watches, smart bands, and pedometers, although embodiments of the present application are not limited thereto.

[0052] The network devices described in the embodiments of the present application may be configured to convert received over-the-air frames to and from internet protocol (IP) packets and act as routers between the terminal devices and the rest of the access network, where the rest of the access network may include an IP network, etc. The network devices may coordinate management of attributes of the air interface. For example, the network devices may be a base transceiver station (BTS) in global system for mobile communications (GSM) or code division multiple access (CDMA), a NodeB (NodeB) in wideband code division multiple access (WCDAM), an Evolved NodeB (NodeB) in LTE, a ... evolvedThe network device may be a 5G NodeB, eNB or eNodeB, a new radio controller (NR controller), a gNodeB (gNB) in a 5G system, a centralized network element (centralized unit), a new radio base station, a radio remote module, a micro base station, a relay station, a distributed network element (distributed unit), a transmission reception point (TRP) or a transmission point (TP), or any other radio access device. However, the embodiments of the present application are not limited thereto. The network device may cover one or more cells.

[0053] FIG. 1 illustrates a communication system according to an embodiment of the present application. The communication system includes a network device and six terminal devices, namely UE1 to UE6. In the communication system, UE1 to UE6 may transmit uplink data to the network device, and the network device may receive the uplink data transmitted by UE1 to UE6. In addition, UE4 to UE6 may also form a communication subsystem. The network device may transmit downlink information to UE1, UE2, UE3, and UE5, and UE5 may transmit downlink information to UE4 and UE6 based on device-to-device (D2D) technology. FIG. 1 is merely a schematic diagram, and does not particularly limit the type of the communication system, the number, types, etc. of devices included in the communication system.

[0054] The network architecture and service scenarios described in the embodiments of the present application are intended to more clearly describe the technical solutions in the embodiments of the present application, and do not constitute limitations on the technical solutions provided in the embodiments of the present application. Those skilled in the art may recognize that with the evolution of network architectures and the emergence of new service scenarios, the technical solutions provided in the embodiments of the present application can also be applied to similar technical problems.

[0055] In a communication system, a UE may be in three states: idle, inactive, and connected. A UE in the connected state may be dynamically scheduled by the base station to communicate with the base station and transmit data. A UE in the idle state may not be dynamically scheduled by the base station to transmit data. Initially, a UE in the idle state needs to perform random access and can transmit data only after an RRC connection is established, or add a small amount of uplink data to message 3 in the random access process. The inactive state may be regarded as an intermediate state between the two states. The UE and the core network maintain the context of radio resource control (RRC) messages in the connected state. Thus, compared with the idle state, the UE can enter the connected state faster. According to the current LTE protocol, the RRC configuration messages are not maintained and kept when the UE changes from the RRC connected state to the idle state, and the context of the RRC messages is maintained when the UE changes from the connected state to the inactive state.

[0056] Currently, the fourth generation communication system, i.e., long term evolution-advanced (LTE-A) system, continues to provide wireless communication services to its user equipment (UE) in the short term (or long term). In particular, the enhanced machine type communication (eMTC) system and other evolved systems (e.g., further eMTC (FeMTC), further further eMTC (eFeMTC), additional MTC (AMTC)) are systems derived from LTE. The eMTC system and other evolved systems operate in the LTE system and in the LTE frequency band. To reduce power consumption and cost, the operating bandwidth of the eMTC terminal is generally relatively small and narrower than the operating bandwidth of the LTE system. For example, the operating bandwidth of the eMTC terminal may be one narrowband NB. One NB includes six consecutive physical resource blocks (PRBs), and one PRB includes 12 subcarriers (SCs). The battery life of an eMTC UE is expected to be relatively long, about 10 years, due to characteristics such as low power consumption and long sleep of the eMTC UE.

[0057] In LTE, a terminal device obtains scheduling information by monitoring a control channel search space and then schedules data. The control channel search space in LTE can be divided into a user-specific search space and a common search space. The user-specific search space is set by each user, and each user is assigned a unique search space. The common search space is a search space monitored by a group of users or users in one cell. In general, messages transmitted in the common search space are common messages of the cell. To reduce terminal power consumption and detection complexity, for an eMTC terminal in a connected state, only the user-specific search space and the Type 0 common search space used to transmit power control information of a terminal group (UE group) need to be detected. However, emergency information (e.g., earthquake and tsunami warning system (ETWS) information, commercial mobile alert service (CMAS) information, and information used to indicate system information modification) are carried in system messages. In order to reduce power consumption, the eMTC terminal device does not update system messages very frequently. Therefore, when there is an emergency message, the base station needs to notify the terminal device to receive the emergency message. In the existing technology, the emergency information notification is in the paging message or direct instruction information, but the paging message or direct instruction information is in the Type 2 common search space, and the eMTC terminal in the connected state does not monitor the search space. Therefore, the eMTC terminal in the connected state cannot receive the emergency message notification. In this case, the eMTC terminal device can only fall back to the idle state to receive the paging message or direct instruction information in order to receive the emergency information notification, and then receives the emergency information. As a result, the delay is relatively long, and the power consumption of the terminal device increases.

[0058] A possible solution to this problem is that an eMTC terminal device in a connected state is enabled to monitor both the Type 2 search space and the user-specific search space, i.e., an eMTC terminal device in a connected state is enabled to receive paging messages or direct indication information. However, since the paging messages and the user-specific search space may be located in different narrowbands, an eMTC terminal device in a connected state needs to monitor two narrowbands simultaneously. As a result, user complexity and user power consumption are greatly increased. Moreover, if such a method is used, existing protocols need to be significantly modified.

[0059] Based thereon, the embodiments of the present application provide a communication method and device that solve the problem of the existing technology that the complexity and power consumption are relatively high when an eMTC terminal device in a connected state receives an emergency message notification. The method and the device are based on the same inventive concept. Since the problem-solving principles of the method and the device are similar, the implementations of the device and the method may be referenced to each other. The repeated parts will not be described again.

[0060] In the embodiments of the present application, "a plurality of" refers to two or more.

[0061] It should be understood that in the specification of this application, terms such as "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or ordering.

[0062] 2 is a schematic flow chart of a communication method according to the present application. The method may be applied to a terminal device in the communication system shown in FIG 1. The method includes the following steps:

[0063] S201: A first device determines first control information. The first control information carries first information, and the first information is used to indicate emergency information. The first control information is format-3 control information, format-3A control information, format-6-0A control information, format-6-0B control information, format-6-1A control information, or format-6-1B control information.

[0064] The emergency information may include one or more of the following: ETWS information, CMAS information, and information used to indicate system information changes.

[0065] In this embodiment of the present application, the ETWS information, the CMAS information, and the information used to indicate a system information change may be referred to as an ETWS notification or ETWS indication, a CMAS notification or CMAS indication, and a system information modification notification or system information modification indication, respectively.

[0066] For example, the first control information may be downlink control information in an LTE eMTC system or downlink control information in an NR system, which is not particularly limited in this application. For simplicity of description, an example in which the first control information is downlink control information (DCI) is used below.

[0067] In the exemplary description, when indicating emergency information, the first information may specifically indicate a type and / or notification of the emergency information.

[0068] Furthermore, if the first device determines that there is no emergency information, the first device may further indicate the absence of emergency information by using the first control information.

[0069] The first device may be a network device and the second device may be a terminal device. Alternatively, the first device may be a terminal device and the second device may be a network device. Alternatively, the first device may be another device having a transmitting capability and the second device may be another device having a receiving capability.

[0070] S202: The first device transmits first control information to the second device, and the second device receives the first control information accordingly.

[0071] S203: The first device transmits emergency information to the second device.

[0072] S204: The second device receives emergency information based on the first information in the first control information.

[0073] In this embodiment of the present application, the first device may instruct the second device to receive emergency information by using format-3, format-3A, format-6-0A, format-6-0B, format-6-1A, or format-6-1B control information. The format-3A control information and the format-3A control information are group control information and are carried in Type0 common search space, and the format-6-0A control information, the format-6-0B control information, the format-6-1A control information, and the format-6-1B control information are user-specific messages and are carried in user-specific search space. Therefore, the second device does not need to monitor Type2 search space when receiving emergency information, which does not increase user complexity and reduces user power consumption.

[0074] Compared with the existing technology method of increasing bits in user-specific control information to indicate emergency information, the control information used in this embodiment of the present application in the above format does not need to indicate emergency information by increasing additional bits. Therefore, the increase in control information overhead can be avoided, the decrease in spectrum efficiency can be further avoided, and the increase in user power consumption can be avoided.

[0075] Furthermore, the format-3 control information and the format-3A control information are group control information, specifically, a first device such as a network device can send instruction information to multiple second devices such as terminal devices by using one control information, thereby avoiding waste of resources of the first device and reducing the power consumption of the first device.

[0076] In the exemplary description, the first control information may be format-3 or format-3A control information, and K transmit power control command numbers (TPC command numbers) in the first control information are used to indicate the first information, where K is an integer equal to or greater than 1. The K TPC command numbers may not be assigned to any second device to transmit the transmit power control information and are used to indicate the first information.

[0077] Furthermore, 1st systemThe control information may alternatively include M TPC command numbers. The M TPC command numbers are used to indicate the transmit power control commands of the M second devices, or the M TPC command numbers are used to indicate the transmit power control commands of the H second devices, where M is an integer equal to or greater than 0 and H is an integer greater than M. That is, the first control information may include K+M TPC command numbers, where the K TPC command numbers are used to indicate the first information, and the remaining M TPC command numbers are still used to indicate the transmit power control commands. For example, one of the remaining M TPC command numbers may indicate the transmit power control command of one second device, or may indicate the transmit power control commands of multiple second devices.

[0078] The TPC command number may also be called a TOC command, and each TPC command contains 2 bits. For ease of description, the TPC command is used below.

[0079] The K TPC commands may be predefined. For example, the first device and the second device predefine the number, index, number, etc. of the K TPC commands. Alternatively, the K TPC commands are determined by the first device and configured for the second device by using higher layer signaling. For example, the first device may configure the number, index, number, etc. of the K TPC commands by using system information or by using higher layer signaling, such as radio resource control (RRC) signaling or media access control control element (MAC CE) signaling.

[0080] To specifically describe the case where the TPC command indicates the first information, an example in which K is equal to 1 is used below. One TPC command includes two bits. Therefore, the TPC command includes four value states, which are "00", "01", "10", and "11". Any two of the four value states may be selected to indicate the first information and the third information, respectively. For example, as shown in Table 1, 00 indicates the third information (without emergency information) and 01 indicates the first information (with emergency information). [Table 1]

[0081] Alternatively, any three of the four value states may be selected to indicate the first information and the third information, respectively. For example, as shown in Table 2, 00 indicates the third information (without emergency information), 01 indicates the first information (with emergency information) and the emergency information is an ETWS notification, and 10 indicates the first information (with emergency information) and the emergency information is a CMAS notification. [Table 2]

[0082] Alternatively, four value states may be used to indicate the first information and the third information, respectively. For example, as shown in Table 3-1, 00 indicates the third information (without emergency information), 01 indicates the first information (with emergency information) and the emergency information is an ETWS notification, 10 indicates the first information (with emergency information) and the emergency information is a CMAS notification, and 11 indicates the first information (with emergency information) and the emergency information is a system information change notification. [Table 3]

[0083] Alternatively, the first information and the third information may be indicated by using two bits. For example, one of the two bits is used to indicate an ETWS notification, and the remaining bit of the two bits is used to indicate a CMAS notification. 0 indicates that this type of emergency information does not exist, and 1 indicates that this type of emergency information exists. For example, as shown in Table 3-2, the CMAS notification is indicated by using the upper bit, ETW The notification is indicated by using the lower bits. In this case, as shown in Table 3-3, 00 indicates the third information (without emergency information, i.e., without ETWS notification or CMAS notification), 01 indicates the first information (with emergency information), which is an ETWS notification, 10 indicates the first information (with emergency information), which is a CAMS notification, and 11 indicates the first information (with emergency information), which is an ETWS notification and a CMAS notification. [Table 4] [Table 5]

[0084] An example where K=2 is used for explanation. Two TPC commands include 4 bits, and three of the four bits can be used to indicate the first information and the third information. For example, as shown in Table 3-4, the first bit (most significant bit) of the three bits is used to indicate ETWS notification, the second bit (middle significant bit) of the three bits is used to indicate CMAS notification, and the third bit (least significant bit) of the three bits is used to indicate system information change. 0 indicates that this type of emergency information does not exist, and 1 indicates that this type of emergency information exists. For example, as shown in Table 3-5, 000 indicates the third information (without emergency information), 010 indicates the first information (with emergency information), which is a CAMS notification, 100 indicates the first information (with emergency information), which is an ETWS notification, 110 indicates the first information (with emergency information), which is an ETWS notification and a CMAS notification, 111 indicates the first information (with emergency information), which is an ETWS notification, a CMAS notification, and a system information change notification, 001 indicates the first information (with emergency information), which is a system information change notification, 101 indicates the first information (with emergency information), which is an ETWS notification and a system information change notification, and 011 indicates the first information (with emergency information), which is a CMAS notification and a system information change notification. [Table 6] [Table 7]

[0085] It should be understood that Table 1 to Table 3-5 are merely illustrative examples, and do not particularly limit the type of emergency information indicated by the first information, the value state corresponding to the first information, the value state corresponding to the third information, etc. Furthermore, it should be understood that the specific meanings corresponding to different bits or different states in the above tables are not particularly limited. The contents are protected by the embodiments of the present application, provided that the number of bits included and the contents shown are the same as those of the method provided in the embodiments of the present application.

[0086] In another exemplary description, the first control information may be format-3 or format-3A control information, and Q bits other than the TPC command in the first control information are used to indicate the first information, where Q is an integer equal to or greater than 1. That is, the first control information includes Q bits and N TPC commands, where the Q bits are used to indicate the first information, and the N TPC commands are used to indicate (or transmit) the transmission power control information of a plurality of second devices. Alternatively, the first control information includes only Q bits. In this case, the first control information may be used to indicate an emergency information notification, but does not need to be used to indicate (or transmit) the transmission power control information.

[0087] For example, Q may be equal to 1, and this bit has two value states, which are "0" and "1". Thus, a value of 0 of the augmented bit Q may indicate the first information (with emergency information), and furthermore, a value of 1 of the bit Q may indicate the third information (without emergency information). Alternatively, when the value of the augmented bit is 1, the first information (with emergency information) may be indicated, and furthermore, when the value of the bit is 0, the third information (without emergency information) may be indicated.

[0088] As another example, Q may alternatively be equal to 2, and the two bits have four value states, which are "00", "01", "10", and "11". Thus, the first information and the third information may be indicated by using the two increased bits. For details of how to indicate the first information by using the two increased bits, please refer to the method of indicating the first information by using different value states of the TPC command as shown in Tables 1 to 3-1. The details will not be described again here. Alternatively, when the two bits indicate the first information and the third information, the two bits may specifically indicate two types of emergency information, respectively. For details of how to indicate the two types of emergency information by using the two bits, please refer to the method of indicating the two types of emergency information by using the two bits of the TPC command as shown in Tables 3-2 and 3-3. The details will not be described again here.

[0089] As another example, Q may alternatively be equal to 3. When the three bits indicate the first information and the third information, the three bits may specifically indicate three types of emergency information, respectively. Three For details on how to indicate the three types of emergency information, please refer to the method of indicating three types of emergency information by using three bits of the TPC command as shown in Table 3-4 and Table 3-5. The details will not be described again here.

[0090] In specific implementation, before sending the first control information to the second device, the first device may further determine second information used to indicate that the first control information includes the first information, and send the second information to the second device. Thus, after receiving the second information, the second device can obtain the first information from the first control information.

[0091] In yet another exemplary description, the first control information may alternatively be format-6-1A or format-6-1B control information, and a first field of the first control information may be used to indicate the first information when all bits of a resource block assignment field of the first control information are set to 1.

[0092] In a specific implementation, the first field may be a physical random access channel (PRACH) mask index field.

[0093] In an example, in a frequency division duplex (FDD) system, if the value of the first field is 13, 14, or 15, it may indicate that emergency information exists. Alternatively, any two value states may be selected from the value states 13, 14, and 15 of the first field to indicate two emergency information notifications, respectively, where the two emergency information notifications may be any two of ETWS notification, CMAS notification, and system information change notification. For example, 13 indicates ETWS notification, and 14 indicates CMAS notification. Alternatively, three value states 13, 14, and 15 of the first field may indicate three emergency information notifications, respectively, where the three emergency information notifications may be ETWS notification, CMAS notification, and system information change notification. For example, as shown in Table 4, 13 indicates ETWS notification, 14 indicates CAMS notification, and 15 indicates system information change notification.

[0094] In another example, in time division duplex, if the value of the first field is 7, 8, or 9, it indicates that emergency information exists. Alternatively, any two value states may be selected from the value states 7, 8, and 9 of the first field to respectively indicate two emergency information notifications, where the two emergency information notifications may be any two of ETWS notification, CMAS notification, and system information change notification. For example, 7 indicates ETWS notification, and 8 indicates CMAS notification. Alternatively, three value states 7, 8, and 9 of the first field may respectively indicate three emergency information notifications, where the three emergency information notifications may be ETWS notification, CMAS notification, and system information change notification. For example, as shown in Table 4, 7 indicates ETWS notification, 8 indicates CAMS notification, and 9 indicates system information change notification. [Table 8]

[0095] In another exemplary description, the first control information may be format-6-0B control information, and the second field of the first control information is used to indicate the first information when all bits of the MCS field of the first control information are set to 1.

[0096] In specific implementation, the second field may be any field other than the MCS field and the flag for distinguishing uplink and downlink (the flag for distinguishing between format 6-0B and format 6-1B) in the first control information.

[0097] In some embodiments, the second field may indicate the first information by using different states. Specifically, the second field may indicate the first information by using a first status, and the first status may include one or more states. If the first status includes one state, the state may indicate the first information (with emergency information). If the first status includes two states, the two states may indicate two types of emergency information notification, respectively. If the first status includes three states, the three states may indicate three types of emergency information notification, respectively. Each state of the first status may include at least one bit with a value of 1.

[0098] Second An example in which the field is a repetition number field is used below. The repetition number field may indicate the first information by using one value state. For example, when the value of the repetition number field is 111, the first information (with emergency information) is indicated. The repetition number field may alternatively indicate the first information by using two value states. For example, when the value of the repetition number field is 111, the first information (with emergency information) is indicated, and the emergency information is ETWS information, and when the value of the repetition number field is 110, the first information (with emergency information) is indicated, and the emergency information is CMAS information. The repetition number field may alternatively indicate the first information by using three value states. For example, when the value of the repetition number field is 111, the first information (with emergency information) is indicated, and the emergency information is ETWS information; when the value of the repetition number field is 110, the first information (with emergency information) is indicated, and the emergency information is CMAS information; when the value of the repetition number field is 100, the first information (with emergency information) is indicated, and the emergency information is system information change information. It should be noted that the above is merely an exemplary description, and specific limitations are as follows: SecondThat is, no restrictions are imposed on the type of field, the number of states included in the first status, the types of emergency information, the value states corresponding to each type of emergency information, etc.

[0099] In some other embodiments, the second field may indicate the first information by using different bits. For details of how to indicate the first information by using different bits of the second field, please refer to the method of indicating two types of emergency information by using different bits of the TPC command. For example, for details of how to indicate two types of emergency information by using two bits of the second field, respectively, please refer to the method of indicating two types of emergency information by using two bits of the TPC command as shown in Table 3-2 and Table 3-3. The details will not be described again here. By using three bits of the second field, Three For details on how to indicate the types of emergency information, please refer to the method of indicating three types of emergency information notification by using three bits of the TPC command as shown in Table 3-4 and Table 3-5. The details will not be described again here.

[0100] In yet another exemplary description, the first control information may be format-6-0A control information, and a third field of the first control information is used to indicate the first information when all bits of the resource block allocation field of the first control information are set to 1.

[0101] In specific implementation, the third field may be any field other than the resource block allocation field in the first control information and the flag for distinguishing uplink and downlink (flag for distinguishing format 6-0A / format 6-1A).

[0102] In some embodiments, the third field may indicate the first information by using different states. Specifically, the third field may indicate the first information by using a first status, and the first status may include one or more states. If the first status includes one state, the state may indicate the first information (with emergency information). If the first status includes two states, the two states may indicate two types of emergency information notification, respectively. If the first status includes three states, the three states may indicate three types of emergency information notification, respectively. Each state of the first status may include at least one bit with a value of 1.

[0103] An example in which the third field is a modulation and coding scheme (MCS) field is used below. The MCS field may indicate the first information by using one value state. For example, when the value of the MCS field is 111, the first information (with emergency information) is indicated. The MCS field may alternatively indicate the first information by using two value states. For example, when the value of the MCS field is 111, the first information (with emergency information) is indicated, and the emergency information is ETWS information, and when the value of the MCS field is 110, the first information (with emergency information) is indicated, and the emergency information is CMAS information. The MCS field may alternatively indicate the first information by using three value states. For example, when the value of the MCS field is 111, the first information (with emergency information) is indicated, and the emergency information is ETWS information; when the value of the MCS field is 110, the first information (with emergency information) is indicated, and the emergency information is CMAS information; when the value of the MCS field is 100, the first information (with emergency information) is indicated, and the emergency information is system information change information. It should be noted that the above is merely an exemplary description, and specific limitations include: ThirdThat is, no restrictions are imposed on the type of field, the number of states included in the first status, the types of emergency information, the value states corresponding to each type of emergency information, etc.

[0104] In some other embodiments, the third field may indicate the first information by using different bits. For details of how to indicate the first information by using different bits of the third field, please refer to the method of indicating two types of emergency information by using different bits of the TPC command. For example, for details of how to indicate two types of emergency information by using two bits of the third field, respectively, please refer to the method of indicating two types of emergency information by using two bits of the TPC command as shown in Table 3-2 and Table 3-3. The details will not be described again here. By using three bits of the third field, Three For details on how to indicate the types of emergency information, please refer to the method of indicating three types of emergency information notification by using three bits of the TPC command as shown in Table 3-4 and Table 3-5. The details will not be described again here.

[0105] In a possible implementation, in some of the described examples above, a cyclic redundancy check (CRC) code of the first control information may be scrambled by a first scrambling code, where the first scrambling code may be a system information radio network temporary identifier (SI-RNTI).

[0106] In an exemplary description, when the CRC code of the first control information is scrambled by a second scrambling code, the first control information may only include an emergency information notification, the first control information includes an emergency information notification, or the first control information is used to indicate or transmit the first information, where the second scrambling code may be SI-RNTI. Optionally, in this case, all remaining bits in the first control information are set to a first status. For example, all remaining bits are set to 1, or all remaining bits are set to 0. In this way, whether the DCI is correct can be further detected by using the first status, thereby reducing the false alarm probability.

[0107] In another exemplary description, when the CRC code of the first control information is scrambled by the SI-RNTI, the fourth field of the first control information may be used to indicate the first information, and the fourth field may be any field in the first control information.

[0108] Based on the same inventive concept as the method embodiment, the embodiment of the present application provides a communication device, the structure of which may be shown in FIG.

[0109] In a specific implementation, the apparatus is specifically configured to implement the functions of the first device in the embodiment of Fig. 2. The apparatus may be the first device itself, or may be a chip or chipset in the first device, or a part of a chip used to perform the functions of the related method. Specifically, the processing unit 301 is configured to determine first control information, the first control information carries first information, the first information is used to indicate emergency information, the first control information is format-3 control information, format-3A control information, format-6-0A control information, format-6-0B control information, format-6-1A control information, or format-6-1B control information. The transceiver unit 302 is configured to transmit the first control information determined by the processing unit 301 to the second device, and transmit the emergency information to the second device.

[0110] The emergency information may include one or more of the following: ETWS notification, CMAS notification, and system information change notification.

[0111] In an exemplary description, the first control information is format-3 or format-3A control information, and K TPC command numbers in the first control information may be used to indicate the first information, where K is an integer greater than or equal to 1.

[0112] The K TPC command numbers may be predefined, or the K TPC command numbers may be determined by the first device and configured for the second device using higher layer signaling.

[0113] In another exemplary description, the first control information is format-3 or format-3A control information, and Q bits other than the TPC command number in the first control information may be used to indicate the first information, where Q is an integer greater than or equal to 1.

[0114] In implementation, the processing unit 301 may be further configured to determine second information before the transceiver unit 302 transmits the first control information to the second device, and the second information is used to indicate that the first control information includes the first information. The transceiver unit 302 may be further configured to transmit the second information determined by the processing unit 301 to the second device.

[0115] In yet another exemplary description, the first control information is format-6-1A or format-6-1B control information, and a first field of the first control information may be used to indicate the first information when all bits of the resource block allocation field of the first control information are set to 1.

[0116] In yet another example embodiment, the first field may be a PRACH mask index field.

[0117] In yet another exemplary description, the first control information may be format-6-0B control information and a second field of the first control information may be used to indicate the first information if all bits of the modulation and coding scheme field of the first control information are set to 1; alternatively, the first control information may be format-6-0A control information and a third field of the first control information may be used to indicate the first information if all bits of the resource block allocation field of the first control information are set to 1.

[0118] In some embodiments, the CRC code of the first control information is scrambled by the SI-RNTI.

[0119] In another specific implementation, the apparatus is specifically configured to implement the functionality of the second device in the embodiment of Fig. 2. The apparatus may be the second device itself, or may be a chip or chipset in the second device, or a portion of a chip used to perform the functionality of the related method. Specifically, the transceiver unit 302 is configured to receive data, and the processing unit 301 is configured to control the transceiver unit 302 to receive first control information transmitted by the first device, the first control information carries first information, the first information is used to indicate emergency information, the first control information is format-3 control information, format-3A control information, format-6-0A control information, format-6-0B control information, format-6-1A control information, or format-6-1B control information, and to control the transceiver unit 302 to receive the emergency information based on the first information in the first control information.

[0120] The emergency information may include one or more of the following: ETWS notification, CMAS notification, and system information change notification.

[0121] In an exemplary description, the first control information is format-3 or format-3A control information, and K TPC command numbers in the first control information may be used to indicate the first information, where K is an integer greater than or equal to 1.

[0122] The K TPC command numbers may be predefined, or the K TPC command numbers may be determined by the second device by receiving higher layer signaling sent by the first device.

[0123] In yet another exemplary description, the first control information is format-3 or format-3A control information, and Q bits in the first control information may be used to indicate the first information, where Q is an integer greater than or equal to 1.

[0124] In implementation, the processing unit 301 may be further configured to control the transceiver unit 302 to receive second information transmitted by the first device before controlling the transceiver unit 302 to receive first control information transmitted by the first device, where the second information is used to indicate that the first control information includes the first information.

[0125] In yet another exemplary description, the first control information is format-6-1A or format-6-1B control information, and a first field of the first control information may be used to indicate the first information when all bits of the resource block allocation field of the first control information are set to 1.

[0126] Additionally, the first field may be a PRACH mask index field.

[0127] In other exemplary descriptions, the first control information may be format-6-0B control information and a second field of the first control information may be used to indicate the first information if all bits of the modulation and coding scheme field of the first control information are set to 1; alternatively, the first control information may be format-6-0A control information and a third field of the first control information may be used to indicate the first information if all bits of the resource block allocation field of the first control information are set to 1.

[0128] In some embodiments, the CRC code of the first control information is scrambled by the SI-RNTI.

[0129] The present application provides another communication method, which may be applied to a terminal device in the communication system shown in FIG. 。

[0130] In a communication system, one downlink control information (DCI) schedules one transport block (TB) or multiple transport blocks. When the DCI schedules one TB, the DCI also indicates one hybrid automatic retransmission request (HARQ) process number. For example, if a user equipment (UE) supports eight HARQ processes, the DCI indicates the HARQ process number used for the TB scheduled by the DCI, from 0 to 7, by using three bits. When the DCI schedules one TB, the DCI also indicates the data scheduled by the DCI. Ta , a newly transmitted TB or a retransmitted TB is It also indicates whether

[0131] To reduce DCI transmission overhead and save transmission resources, one DCI may be used to schedule multiple TBs. When one DCI schedules multiple transport blocks, the DCI may indicate multiple HARQ process numbers, where each HARQ process number corresponds to or is associated with the transmission of one transport block.

[0132] In order to further reduce overhead when one DCI schedules multiple transport blocks, it is necessary to restrict that the HARQ process numbers used for the multiple transport blocks are consecutive and the first HARQ process number among the multiple HARQ process numbers is constant. For example, if one DCI schedules N transport blocks and the HARQ process number of the first transport block among the N transport blocks is constant, e.g., always 0, the HARQ process numbers of the remaining N-1 transport blocks among the N transport blocks are 1, 2, ..., and N-1.

[0133] When DCI can schedule up to N transport blocks, N bits need to indicate new data indicator (NDI) information of each transport block in a bitmap manner. N bits also need to indicate whether the HARQ process number of each transport block is used in a bitmap manner. Therefore, a total of 2N bits are needed to indicate the number of scheduled transport blocks and the NDI information of each transport block. Therefore, there is a problem that the overhead is too large when the control channel indicates the number of transport blocks and the NDI information of each transport block.

[0134] 1. An information processing method comprising: receiving, by a terminal device, downlink control information from a network device, the downlink control information being capable of scheduling up to N transport blocks TB, where N is a positive integer; When the downlink control information includes a first field, the first field is divided into (N+2) bits b0, b1, . . . and b N+1 determining that the determining, by the terminal device, a number L of TBs scheduled by the downlink control information according to the first field, where L is a positive integer; 、 When L is greater than 1, the L TBs scheduled by the downlink control information include both newly transmitted TBs and retransmitted TBs; j consecutive bits b in the first field k , b k+1 , and b k+j-1 in which the bit state of only one bit is 1 and the bit states of the other j-1 bits are all 0, j is a positive integer, j=N+1-L, and k is a prespecified integer, k=0 or k=1+1; If k=0, then the bit b j The bit state of L consecutive bits b j+1 , b j+2 , and b N+1 carries new data indicator NDI information for the L TBs scheduled by the downlink control information, or if k=L+1, then bit b L The bit state of L consecutive bits b0, b1, . . . and b L-1 determining the number L, where L carries NDI information of the L TBs scheduled by the downlink control information; determining, by the terminal device, HARQ process numbers for each of the L TBs; transmitting or receiving, by the terminal device, the L TBs based on the determined HARQ process numbers of each of the L TBs and the NDI information of each of the L TBs; The method according to claim 1,

[0135] 2. L, a HARQ process number of a first TB among the L TBs, and the NDI information of each of the L TBs are determined based on a bit state of the first field and a correspondence between the number of TBs, the HARQ process number of the first TB, and the NDI information of the L TBs, and the first TB is one of the L TBs; The method of claim 1.

[0136] 3. Determining, by the terminal device, a HARQ process number for each of the L TBs, The terminal device uses bit b0 as the starting bit, and the HARQ process number of the first TB is i, and then bit b i is a first bit whose bit state is 1 among the (N+2) bits; and determine, by the terminal device, HARQ process numbers of other TBs other than the first TB among the L TBs based on a first association relationship between the HARQ process number of the first TB and the process numbers of the L HARQ processes, where the first TB is one of the L TBs, and the L HARQ processes are HARQ processes corresponding to the L TBs; or The terminal device sends bit b L+1 is used as the starting bit, and the HARQ process number of the first TB is iL-1. i is a first bit whose bit state is 1 among the (N+2) bits; and, by the terminal device, determine HARQ process numbers of other TBs other than the first TB among the L TBs based on a first association relationship between the HARQ process number of the first TB and the process numbers of the L HARQ processes, where the first TB is one of the L TBs, and the L HARQ processes are HARQ processes corresponding to the L TBs. having The method of claim 1.

[0137] 4. The terminal device calculates bit b using bit b0 as the starting bit, where j=m and L=N+1-m. m is the second bit among said (N+2) bits whose bit state is 1; or The terminal device determines whether a bit b N+1 as the starting bit, and for j=N+1-m and L=m, bit b m is the second bit in said (N+2) bits, going from right to left, whose bit state is 1. The method of claim 1 further comprising:

[0138] 5. The NDI information of each of the L TBs is divided into the L bits b j+1 , b j+2 , and b N+1 or The NDI information of each of the L TBs is represented by the L bits b0, b1, . . . and b L-1 Determined based on 5. The method according to claim 1, 3 or 4.

[0139] 6. determining by the terminal device whether the downlink control information includes the first field based on a first bit in the downlink control information, the first bit being 1 bit; determining, by the terminal device, that the downlink control information includes the first field if a bit state of the first bit is 1, where N is an integer greater than L; 6. The method of claim 1 , further comprising:

[0140] 7. Determining by the terminal device whether the downlink control information includes the first field based on a first bit in the downlink control information, the first bit being 1 bit; determining, by the terminal device, that the downlink control information does not include the first field if a bit state of the first bit is 0; determining, by the terminal device, that the downlink control information has a second bit, the second bit being 1 bit; determining, by the terminal device, if a bit state of the second bit is 1, that the downlink control information can schedule up to N TBs, where N is a positive integer greater than 1, and all TBs scheduled by the downlink control information are newly transmitted TBs or all TBs scheduled by the downlink control information are retransmitted TBs; determining, by the terminal device, when a bit state of the second bit is 1, that the downlink control information is capable of scheduling up to N TBs, where N is a positive integer greater than 1, and the downlink control information includes a second field and / or a third field, the second field being used to indicate HARQ process numbers and / or first identification information of the up to N TBs, and the third field being used to indicate a second identification information; or determining, by the terminal device, that the downlink control information can schedule only one TB when a bit state of the second bit is 0; Determining, by the terminal device, that the downlink control information can only schedule one or two TBs when the bit state of the second bit is 0, the downlink control information includes a fourth field and / or a fifth field, the fourth field is used to indicate a HARQ process number and / or NDI information, and the fifth field is used to indicate a redundancy version (RV); or determining, by the terminal device, that the downlink control information can only schedule a maximum of two TBs when the bit state of the second bit is 0, the downlink control information including a third field and / or a fourth field, the third field being used to indicate a HARQ process number and / or NDI information, and the fourth field being used to indicate a redundancy version (RV); 6. The method of claim 1 , further comprising:

[0141] 8. Determining by the terminal device whether the downlink control information includes the first field based on a first bit in the downlink control information, the first bit being 1 bit; determining, by the terminal device, that the downlink control information does not include the first field if a bit state of the first bit is 0; determining, by the terminal device, that the downlink control information has a second bit, the second bit being 1 bit; determining, by the terminal device, if a bit state of the second bit is 1, that the downlink control information can schedule up to N TBs, where N is a positive integer greater than 1, and all TBs scheduled by the downlink control information are newly transmitted TBs or all TBs scheduled by the downlink control information are retransmitted TBs; determining, by the terminal device, if a bit state of the second bit is 1, that the downlink control information is capable of scheduling up to N TBs, where N is a positive integer greater than 1, and the downlink control information includes a second field and / or a third field, where the second field is used to indicate HARQ process numbers and / or first identification information of the up to N TBs, and the third field is used to indicate a second identification information; and determining, by the terminal device, a number L of the TBs scheduled by the downlink control information based on the second field, where L is a positive integer and L≦N; or When a bit state of the second bit is 0, determining by the terminal device that the downlink control information further includes a third bit, the third bit is a 1 bit, and the bit state of the third bit is always 1; determining, by the terminal device, that the downlink control information can schedule only one or two TBs based on the third bit; 6. The method of claim 1 , further comprising:

[0142] 9. An information processing method comprising: determining, by the network device, a number L of transport blocks TB to be scheduled by downlink control information, where the downlink control information can schedule a maximum of N TBs, where N is a positive integer, and L is a positive integer; be said determining; and determining, by the network device, HARQ process numbers of the L TBs; determining, by the network device, new data indicator (NDI) information of the L TBs; and transmitting, by the network device, the downlink control information to a terminal device, the downlink control information being capable of scheduling both newly transmitted TBs and retransmitted TBs, the downlink control information including a first field, the first field including (N+2) bits b0, b1, . . . and b N+1 Including, j consecutive bits b in the first field k , b k+1 , and b k+j-1 in which the bit state of only one bit is 1 and the bit states of the other j-1 bits are all 0, j is a positive integer, j=N+1-L, and k is a prespecified integer, k=0 or k=1+1; If k=0, then the bit b j The bit state of L consecutive bits b j+1 , b j+2 , and b N+1 carries NDI information of the L TBs scheduled by the downlink control information, or if k=L+1, then bit b L The bit state of L consecutive bits b0, b1, . . . and b L-1 wherein the transmitting carries NDI information of the L TBs that are scheduled by the downlink control information; transmitting or receiving, by the network device, the L TBs based on the downlink control information; The method according to claim 1,

[0143] 10. The method further comprising: determining, by the network device, one or more bit states of the first field based on a correspondence between a bit state of the first field and L, a HARQ process number of a first TB of the L TBs, and NDI information of each of the L TBs; The first TB is one of the L TBs. The method of claim 9.

[0144] 11. If k=0, determine by the network device that the HARQ process number of the first TB is i, the first TB is the first TB among the L TBs, and the network device uses bit b0 as a start bit, and the network device uses bit b i The bit state of b0, b1, . . . and b j-1 b in i determining that the bit states of the other j-1 bits other than are all 0; or When k=L+1, the network device determines that the HARQ process number of the first TB is iL-1, the first TB is a first TB among the L TBs, and the network device determines that the HARQ process number of the first TB is iL-1. L+1 as a start bit, and by the network device, bit b i The bit state of b is 1, L+1 , b L+2 , , and b N+1 b in i Determine that the bit states of the other j-1 bits other than are all 0. 11. The method of claim 9 or 10, further comprising:

[0145] 12. If k=0, then the network device N+1-L determining that the bit state of When k=L+1, the network device selects a bit b L Determining that the bit state of is 1 The method of claim 9, further comprising:

[0146] 13. The network device indicates the NDI information of each of the L TBs by using L bits in a bitmap manner, and the L bits are represented by b j+1 , b j+2 , and b N+1 or The network device indicates the NDI information of each of the L TBs by using L bits in a bitmap manner, and the L bits are b0, b1, . . . and b L-1 That is 13. The method of claim 9, 11 or 12, further comprising:

[0147] 14. Determining, by the network device, that the downlink control information includes the first field when the network device determines that the downlink control information is capable of scheduling both the newly transmitted TB and the retransmitted TB; setting, by the network device, a bit state of a first bit in the downlink control information to 1; Further comprising: the first bit is 1 bit; 14. The method according to any one of claims 9 to 13.

[0148] 15. Determining, by the network device, that the downlink control information does not include the first field when the network device determines that all TBs that the downlink control information can schedule are likely to be only newly transmitted TBs, or when the network device determines that all TBs that the downlink control information can schedule are likely to be only retransmitted TBs; or determining, by the network device, that the downlink control information does not include the first field if the network device determines that the downlink control information includes a second field and / or a third field; and setting, by the network device, a bit state of a first bit in the downlink control information to 1, the first bit being a 1 bit; 14. The method of any one of claims 9 to 13, further comprising:

[0149] 16. Setting, by the network device, a bit state of a second bit in the downlink control information to 1 if the downlink control information schedules multiple newly transmitted TBs or multiple retransmitted TBs; setting, by the network device, a bit state of a second bit in the downlink control information to 1 if the downlink control information includes the second field and / or the third field; or setting, by the network device, a bit state of a second bit in the downlink control information to 0 if the downlink control information can schedule only one or two TBs; Further comprising: the second bit is 1 bit; The method of claim 15.

[0150] 17. When the downlink control information schedules multiple newly transmitted TBs or multiple retransmitted TBs, setting a bit state of a second bit in the downlink control information to 1 by the network device, and the second bit is a 1 bit; or If the downlink control information includes the second field and / or the third field, setting, by the network device, a bit state of a second bit in the downlink control information to 1, the second bit being a 1 bit; When the downlink control information can only schedule one or two TBs, determining, by the network device, that the downlink control information further has a third bit, the third bit being a 1 bit, and setting, by the network device, a bit state of the third bit to 0; The method of claim 15 further comprising:

[0151] 18. A processing module and a transceiver module, the transceiver module is configured to receive downlink control information from a network device, the downlink control information being capable of scheduling up to N transport blocks TB, where N is a positive integer; The processing module is configured to, if the downlink control information includes a first field, the first field is composed of (N+2) bits b0, b1, . . . and b N+1 Decided to include Determine a number L of TBs scheduled by the downlink control information according to the first field, where L is a positive integer. be , configured as When L is greater than 1, the L TBs scheduled by the downlink control information include both newly transmitted TBs and retransmitted TBs; j consecutive bits b in the first field k , b k+1 , and b k+j-1 in which the bit state of only one bit is 1 and the bit states of the other j-1 bits are all 0, j is a positive integer, j=N+1-L, and k is a prespecified integer, k=0 or k=1+1; If k=0, then the bit b j The bit state of L consecutive bits b j+1 , b j+2 , and b N+1carries new data indicator NDI information for the L TBs scheduled by the downlink control information, or if k=L+1, then bit b L The bit state of L consecutive bits b0, b1, . . . and b L-1 carries NDI information of the L TBs scheduled by the downlink control information; The processing module is configured to determine a HARQ process number for each of the L TBs; the transceiver module is configured to transmit or receive the L TBs based on the determined HARQ process number of each of the L TBs and the NDI information of each of the L TBs; Terminal device.

[0152] 19. L, the HARQ process number of a first TB among the L TBs, and the NDI information of each of the L TBs are determined based on the bit state of the first field and the correspondence between the number of TBs, the HARQ process number of the first TB, and the NDI information of the L TBs, and the first TB is one of the L TBs; A terminal device according to claim 18.

[0153] 20. The processing module comprises: Using bit b0 as the starting bit, the HARQ process number of the first TB is i, and bit b i is a first bit with a bit state of 1 among the (N+2) bits; and determine HARQ process numbers of other TBs other than the first TB among the L TBs based on a first association relationship between the HARQ process number of the first TB and the process numbers of the L HARQ processes, the first TB being one of the L TBs, and the L HARQ processes being HARQ processes corresponding to the L TBs; or Bit b L+1is used as the starting bit, and the HARQ process number of the first TB is iL-1. i is a first bit whose bit state is 1 among the (N+2) bits; and determine HARQ process numbers of other TBs other than the first TB among the L TBs based on a first association relationship between the HARQ process number of the first TB and the process numbers of the L HARQ processes, wherein the first TB is one of the L TBs, and the L HARQ processes are HARQ processes corresponding to the L TBs. It is configured as follows: A terminal device according to claim 18.

[0154] 21. The processing module uses bit b0 as the starting bit, and for j=m and L=N+1-m, calculates bit b m is the second bit among said (N+2) bits whose bit state is 1; or The processing module is N+1 as the starting bit, and for j=N+1-m and L=m, bit b m is configured to determine, from right to left, among the (N+2) bits, the second bit whose bit state is 1; A terminal device according to claim 18.

[0155] 22. The NDI information of each of the L TBs is divided into the L bits b j+1 , b j+2 , and b N+1 or The NDI information of each of the L TBs is represented by the L bits b0, b1, . . . and b L-1 Determined based on A terminal device according to claim 18, 20 or 21.

[0156] 23. The processing module comprises: determining whether the downlink control information includes the first field based on a first bit in the downlink control information, the first bit being 1 bit; determining that the downlink control information includes the first field if a bit state of the first bit is 1, where N is an integer greater than L; It is configured as follows: A terminal device according to any one of claims 18 to 22.

[0157] 24. The processing module comprises: Determine whether the downlink control information includes the first field based on a first bit in the downlink control information, and if the first bit is a 1 bit and a bit state of the first bit is 0, determine that the downlink control information does not include the first field; determining that the downlink control information has a second bit, the second bit being one bit; If the bit state of the second bit is 1, determining that the downlink control information can schedule up to N TBs, where N is a positive integer greater than 1, and all TBs scheduled by the downlink control information are newly transmitted TBs or all TBs scheduled by the downlink control information are retransmitted TBs; If a bit state of the second bit is 1, determining that the downlink control information can schedule up to N TBs, where N is a positive integer greater than 1, and the downlink control information includes a second field and / or a third field, the second field is used to indicate HARQ process numbers and / or first identification information of the up to N TBs, and the third field is used to indicate a second identification information; If the bit state of the second bit is 0, ,beforeThe downlink control information determines that only one or two TBs can be scheduled, and the downlink control information includes a fourth field and / or a fifth field, the fourth field is used to indicate a HARQ process number and / or an NDI information, and the fifth field is used to indicate a redundancy version (RV), or If the bit state of the second bit is 0, then determining that only one or two TBs can be scheduled. It is configured as follows: A terminal device according to any one of claims 18 to 22.

[0158] 25. The processing module comprises: determining whether the downlink control information includes the first field based on a first bit in the downlink control information, the first bit being 1 bit; determining that the downlink control information does not include the first field if a bit state of the first bit is 0; determining that the downlink control information comprises a second bit, the second bit being one bit; or If the bit state of the second bit is 1, determining that the downlink control information can schedule up to N TBs, where N is a positive integer greater than 1, and all TBs scheduled by the downlink control information are newly transmitted TBs or all TBs scheduled by the downlink control information are retransmitted TBs; When a bit state of the second bit is 0, determining that the downlink control information further includes a third bit, the third bit is a 1 bit, and a bit state of the third bit is always 1; determining, based on the third bit, that the downlink control information can schedule only one TB; It is configured as follows: A terminal device according to any one of claims 18 to 22.

[0159] 26. A processing module and a transceiver module, The processing module is configured to determine a number L of transport blocks TB scheduled by downlink control information, the downlink control information being capable of scheduling a maximum of N TBs, where N is a positive integer, and L is a positive integer. the law of nature, The processing module is configured to determine HARQ process numbers for the L TBs; the processing module is configured to determine new data indicator (NDI) information of the L TBs; The transceiver module is configured to transmit the downlink control information to a terminal device, the downlink control information being capable of scheduling both newly transmitted TBs and retransmitted TBs, the downlink control information including a first field, the first field including (N+2) bits b0, b1, . . . and b N+1 Including, j consecutive bits b in the first field k , b k+1 , and b k+j-1 in which the bit state of only one bit is 1 and the bit states of the other j-1 bits are all 0, j is a positive integer, j=N+1-L, and k is a prespecified integer, k=0 or k=1+1; If k=0, then the bit b j The bit state of L consecutive bits b j+1 , b j+2 , and b N+1 carries NDI information of the L TBs scheduled by the downlink control information, or if k=L+1, then bit b L The bit state of L consecutive bits b0, b1, . . . and bL-1 carries NDI information of the L TBs scheduled by the downlink control information; the transceiver module is configured to transmit or receive the L TBs based on the downlink control information; Network devices.

[0160] 27. The processing module is configured to determine one or more bit states of the first field based on a correspondence between a bit state of the first field and L, a HARQ process number of a first TB of the L TBs, and NDI information of each of the L TBs; The first TB is one of the L TBs. 27. The network device of claim 26.

[0161] 28. The processing module comprises: If k=0, determine that the HARQ process number of the first TB is i, the first TB is a first TB among the L TBs, use bit b0 as a start bit, and use bit b i The bit state of b0, b1, . . . and b j-1 b in i determine that the bit states of the other j-1 bits other than are all 0; or Determine that the HARQ process number of the first TB is iL-1 if k=L+1, the first TB is a first TB among the L TBs, and bit b L+1 as the starting bit, and bit b i The bit state of b is 1, L+1 , b L+2 , , and b N+1 b in i Determine that the bit states of the other j-1 bits other than are all 0. It is configured as follows: 28. A network device according to claim 26 or 27.

[0162] 29. The processing module comprises: If k=0, then the bit b N+1-L Determine that the bit state of is 1, or If k=L+1, then the bit b L Determine that the bit state of is 1 It is configured as follows: 27. The network device of claim 26.

[0163] 30. The processing module comprises: The NDI information of each of the L TBs is indicated by using L bits in a bitmap manner, and the L bits correspond to b j+1 , b j+2 , and b N+1 or The NDI information of each of the L TBs is indicated by using L bits in a bitmap manner, and the L bits are b0, b1, . . . and b L-1 is It is configured as follows: 30. A network device according to claim 26, 28 or 29.

[0164] 31. The processing module is configured to determine that the downlink control information includes the first field and set a bit state of a first bit in the downlink control information to 1 if the downlink control information determines that both the newly transmitted TB and the retransmitted TB can be scheduled; the first bit is 1 bit; A network device according to any one of claims 26 to 30.

[0165] 32. The processing module is configured to determine that the downlink control information does not include the first field and set a bit state of a first bit in the downlink control information to 1 when the downlink control information determines that all TBs that can be scheduled are likely to be newly transmitted TBs only, when the downlink control information determines that all TBs that can be scheduled are likely to be retransmitted TBs only, or when the downlink control information determines that the downlink control information includes a second field and / or a third field; the first bit is 1 bit; A network device according to any one of claims 26 to 30.

[0166] 33. The processing module comprises: setting a bit state of a second bit in the downlink control information to 1 if the downlink control information schedules newly transmitted TBs, if the downlink control information schedules retransmitted TBs, or if the downlink control information includes the second field and / or the third field; or If the downlink control information can only schedule one or two TBs, set a bit state of a second bit in the downlink control information to 0. It is configured as follows: the second bit is 1 bit; 33. The network device of claim 32.

[0167] 34. The processing module comprises: If the downlink control information schedules multiple newly transmitted TBs, if the downlink control information schedules multiple retransmitted TBs, or if the downlink control information includes the second field and / or the third field, setting a bit state of a second bit in the downlink control information to 1, and the second bit is a 1 bit, or If the downlink control information can only schedule one or two TBs, determine that the downlink control information further includes a third bit, and the third bit is a 1 bit, and set a bit state of the third bit to 0. It is configured as follows: 33. The network device of claim 32.

[0168] 35 The processing module comprises: setting a bit state of a second bit in the downlink control information to 1 if the downlink control information schedules multiple newly transmitted TBs or if the downlink control information schedules multiple retransmitted TBs; or If the downlink control information can schedule only one TB, set a bit state of a second bit in the downlink control information to 0. It is configured as follows: the second bit is 1 bit; 33. The network device of claim 32.

[0169] 36 If the bit state of the second bit is 1, the terminal device determines that the downlink control information is capable of scheduling up to N TBs, where N is a positive integer greater than 1, and the downlink control information includes a second field and / or a third field, the second field is used to indicate HARQ process numbers and / or first identification information of the up to N TBs, and the third field is used to indicate second identification information, and the method includes: and determining, by the terminal device, a number L of TBs scheduled by the downlink control information based on the second field, where L is a positive integer. be , and, determining, by the terminal device, HARQ process numbers of the L TBs scheduled by the downlink control information based on the second field, where the second field has 8 or 9 bits, and the HARQ process numbers of each of the L TBs are determined based on the second field in a bitmap manner; The terminal device receives the first identification information or The above Second Identification information determining NDI information for each of the L TBs based on transmitting or receiving, by the terminal device, the L TBs based on the determined HARQ process numbers of each of the L TBs and the NDI information of each of the L TBs; Further comprising The method of claim 7.

[0170] 37 The third field has one bit. The method of claim 7.

[0171] 38 The NDIs of the L TBs are the same, or The NDIs before the L TBs are the same; Claim 36 The method according to

[0172] 39 If the bit state of the second bit is 0, the terminal device determines that the downlink control information can only schedule one or two TBs, and the downlink control information includes a fourth field and / or a fifth field, the fourth field is used to indicate a HARQ process number and / or NDI information, and the fifth field is used to indicate a redundancy version (RV), and the method includes: and determining, by the terminal device, a number L of TBs scheduled by the downlink control information, where L is a positive integer. be , and, determining, by the terminal device, HARQ process numbers of the L TBs scheduled by the downlink control information according to the fourth field; determining, by the terminal device, NDI information of each of the L TBs based on the fourth field; transmitting or receiving, by the terminal device, the L TBs based on the determined HARQ process numbers of each of the L TBs and the NDI information of each of the L TBs; Further comprising The method of claim 7.

[0173] 40 determining information about the redundancy version based on the fifth field and / or the fourth field by the terminal device; It further has , Claim 7 or 39 The method according to

[0174] 41 the fourth field has 7 bits or 9 bits, and / or The fifth field has 2 bits. Claim 7, 39 or 40 The method according to

[0175] 42 If the bit state of the second bit is 1, the terminal device determines that the downlink control information is capable of scheduling up to N TBs, where N is a positive integer greater than 1, and the downlink control information includes a second field and / or a third field, the second field is used to indicate HARQ process numbers and / or first identification information of the up to N TBs, and the third field is used to indicate second identification information, and the method includes: and determining, by the terminal device, a number L of TBs scheduled by the downlink control information based on the second field, where L is a positive integer. be , and, determining, by the terminal device, HARQ process numbers of the L TBs scheduled by the downlink control information based on the second field, where the second field has 8 or 9 bits, and the HARQ process numbers of each of the L TBs are determined based on the second field in a bitmap manner; The terminal device receives the first identification information or The above Second Identification information determining NDI information for each of the L TBs based on transmitting or receiving, by the terminal device, the L TBs based on the determined HARQ process numbers of each of the L TBs and the NDI information of each of the L TBs; Further comprising The method of claim 7.

[0176] In an embodiment, the network device table The network device may determine scheduling information for one or more TBs based on the scheduling information. The scheduling information includes one or more of the following: a HARQ process number, new data indicator (NDI) information, and an RV. , Da Downlink control information is used to transmit scheduling information.

[0177] The terminal device may receive the downlink control information sent by the network device, and determine or parse the scheduling information according to Table 5. The terminal device receives or transmits data based on the determined scheduling information. In Table 5, b0 to b9 represent 10 bits or 10-bit numbers, N(i) represents the NDI information of the i-th TB, and H(i) represents whether the TB associated with the i-th HARQ process is scheduled. For example, H(i)=1 represents that the i-th HARQ process is scheduled, and H(i)=0 represents that the i-th HARQ process is not scheduled. Whether the HARQ process is scheduled can also be understood as whether the TB corresponding to the HARQ process number is scheduled. [Table 9-1] [Table 9-2]

[0178] The number L of transport blocks TB scheduled by the downlink control information may alternatively be the number L of hybrid automatic repeat request (HARQ) processes indicated by the downlink control information, i.e., TB is the HARQ process and It is in one-to-one correspondence.

[0179] It should be noted that the NDI information is the data scheduled by the downlink control information. Ta , a newly transmitted TB or a retransmitted TB is For example, the NDI information may include feedback information of each of the L TBs, and the feedback information of the TBs may also be referred to as TB acknowledgment information.

[0180] The base station determines the number of TBs scheduled by the DCI, and determines one or more of the HARQ process ID of each scheduled TB, the NDI of each TB, and the RV. If the base station determines to indicate the scheduling information in a first manner, the first bit is set to 1. In this case, the first field is included, and the first field includes 10 bits. Optionally, in the first manner, the multiple scheduled HARQ processes are consecutive and / or the NDI information is indicated by using the first field (or some bits in the first field) in a bitmap manner.

[0181] Alternatively, if the base station decides to indicate the scheduling information in a second manner, the first bit is 0 and the second bit is 1. Optionally, in this case, the downlink control information includes a second field and / or a third field. The second field is used to indicate HARQ process numbers and / or first identification information of up to N TBs, and the third field is used to indicate the second identification information. The second identifier or the first identifier is used to indicate newly transmitted or retransmitted information, or the second identifier or the first identifier is used to indicate NDI information. The second field includes 8 or 9 bits, and the HARQ process numbers of each of the L TBs are determined based on the second field in a bitmap manner.

[0182] Alternatively, if the base station determines that the number of TBs scheduled by the DCI is 1 or 2, the first bit is 0 and the second bit is 0. The downlink control information includes a fourth field and / or a fifth field, where the fourth field is used to indicate a HARQ process number and / or an NDI, and the fifth field is used to indicate a redundancy version (RV).

[0183] The user equipment receives downlink control information DCI sent by the base station. The user equipment determines one or more of the HARQ process number of each TB, the NDI of each TB, and the RV based on the DCI. If the first bit is 1, the scheduling information is determined in a first manner. If the base station determines to indicate the scheduling information in the first manner, the first bit is set to 1. In this case, the first field is included, and the first field includes 10 bits. Optionally, in the first manner, the multiple scheduled HARQ processes are consecutive and / or the NDI information is indicated by using the first field (or some bits in the first field) in a bitmap manner.

[0184] Alternatively, the user equipment determines the scheduling information in a second manner based on the first bit being 0 and the second bit being 1. Optionally, in this case, the downlink control information includes a second field and / or a third field. The second field is used to indicate HARQ process numbers and / or first identification information of up to N TBs, and the third field is used to indicate the second identification information. The second identifier or the first identifier is used to indicate newly transmitted or retransmitted information, or the second identifier or the first identifier is used to indicate NDI information. The second field includes 8 or 9 bits, and the HARQ process numbers of each of the L TBs are determined based on the second field in a bitmap manner.

[0185] Alternatively, the user equipment determines that the number of TBs scheduled by the DCI is 1 or 2 based on the first bit being 0 and the second bit being 0. The downlink control information includes a fourth field and / or a fifth field, where the fourth field is used to indicate a HARQ process number and / or an NDI, and the fifth field is used to indicate a redundancy version (RV).

[0186] The second device receives first information from the first device. For example, the first information is downlink control information (DCI). The first information includes first indication information and / or second indication information. The first indication information is used to indicate that the number of TBs being scheduled is a first set or a second set, and the first set is different from the second set (there is at least one quantity of TBs that belong to the second set but not to the first set), or the first indication information and / or the second indication information is used to indicate a manner of scheduling multiple TBs.

[0187] In the exemplary description, the number of TBs included in the first set is 1 and 2. That is, in this case, the first information indicates that the number of scheduled TBs is 1 or 2. The number of TBs included in the second set is {1, 2, 3, 4, 5, 6, 7, 8} or {3, 4, 5, 6, 7, 8}.

[0188] In the exemplary description, the first indication information includes a first field, and a bit x in the first field is used to indicate the first indication information. For example, when x=1, a first state (e.g., 1) of the first field is used to indicate that the number of scheduled TBs belongs to a first set, and a second state (e.g., 0) of the first field is used to indicate that the number of scheduled TBs belongs to a second set, or when x=2, a first state (e.g., 00) of the first field is used to indicate that the number of scheduled TBs belongs to the first set, and a second state (e.g., 01) of the first field is used to indicate that the number of scheduled TBs belongs to the second set.

[0189] In the exemplary description, the first indication information includes one or more fields, and a bit x in the first indication information is used to indicate that the number of scheduled TBs belongs to a first set or that one or more TBs are scheduled by using a first scheduling scheme. For example, in the first scheme, the one or more scheduled TBs are all newly transmitted TBs or retransmitted TBs. For example, in the first scheme, the HARQ processes associated with multiple scheduled TBs are consecutive or non-consecutive. That is, in this case, the HARQ process number is indicated in a bitmap manner by using the second field.

[0190] In the exemplary description, the first information includes first indication information and second indication information. The first indication information includes one or more fields, and the second indication information includes one or more fields. Bit x in the first indication information is used to indicate that one or more TBs are scheduled by using a second scheduling scheme, and the number of scheduled TBs belongs to a first set, or is used to indicate that one or more TBs are scheduled by using the first scheduling scheme or in the second scheme. For example, in the first scheme, the one or more scheduled TBs are all newly transmitted TBs or retransmitted TBs. For example, in the first scheme, HARQ processes associated with multiple scheduled TBs are indicated in a bitmap manner by using the second field. For example, in the second scheme, HARQ processes associated with multiple scheduled TBs are consecutive.

[0191] The above HARQ processes being consecutive may also be understood as the HARQ process number of one or more scheduled TBs being determined based on the initial HARQ process number and the number of scheduled TBs.

[0192] The signaling overhead can be effectively reduced by using other communication methods provided in this embodiment of the present application.

[0193] The present application further provides another communication method, which may be applied to a terminal device in the communication system shown in FIG. 。

[0194] The HARQ process number for each TB ranges from 0 to 7. The NDI for each TB has two values. If the DCI schedules one TB, there are 8 (which is the number of HARQ process ID values) x 2 (which is the number of possible NDI values) = 16 combinations. If the DCI schedules two TBs, there are 28 (which is the number of HARQ process ID combinations for the two TBs) x 4 (which is the number of possible NDI values ​​for the two TBs) = 112 combinations. Thus, there are a total of 16 + 112 = 128 combinations for scheduling one TB and two TBs. Thus, the DCI has 7 bits to indicate the HARQ processor ID and NDI for one transport block TB scheduled by that DCI, or to indicate the HARQ process ID or NDI for each of the two TBs scheduled by that DCI. If the DCI schedules one TB, the value of the HARQ process ID of the TB ranges from 0 to 7 and the new data indicator of the TB needs to be indicated in the DCI. If the DCI schedules two TBs, the value of the HARQ process ID of one TB (which may also be called the first TB) ranges from 0 to 7 and the value of the HARQ process ID of the other TB (which may also be called the second TB) ranges from 0 to 7, but the HARQ process ID of the first TB is different from the HARQ process ID of the second TB. The NDI of each of the two TBs needs to be indicated in the DCI.

[0195] One of the seven bits of the DCI is the NDI of the first TB. For example, the first TB is one of the N TBs scheduled by the DCI. N=1 or N=2. Three of the seven bits of the DCI indicate HARQ process ID1 with {0-7}, and the other three of the seven bits of the DCI indicate HARQ process ID2 with {0-7}. The value of HARQ process ID1 may be the same as the value of HARQ process ID2. Alternatively, the value of HARQ process ID1 may be different from the value of HARQ process ID2. The HARQ process number of one TB is HARQ process ID1, and the HARQ process number of the other TB is HARQ process ID2.

[0196] If the value of HARQ process ID1 is the same as the value of HARQ process ID2, it indicates that the DCI schedules one TB, and the HARQ process ID of the TB = HARQ process ID1 = HARQ process ID2. If the value of HARQ process ID1 is different from the value of HARQ process ID2, it indicates that the DCI schedules two TBs.

[0197] When the value of HARQ process ID1 is smaller than the value of HARQ process ID2, it indicates that the NDI of the other TBs than the first TB of the two TBs scheduled by the DCI is equal to 0. When the value of HARQ process ID1 is larger than the value of HARQ process ID2, it indicates that the NDI of the other TBs than the first TB of the two TBs scheduled by the DCI is equal to 1. For example, the first TB is the first TB of the two TBs scheduled by the DCI. When the value of HARQ process ID1 is smaller than the value of HARQ process ID2, it indicates that the NDI of the second TB scheduled by the DCI is equal to 0. When the value of HARQ process ID1 is larger than the value of HARQ process ID2, it indicates that the NDI of the second TB scheduled by the DCI is equal to 1. For example, in two scheduled TBs, the HARQ process ID of one TB is HARQ process ID1, and the HARQ process ID of the other TB is HARQ process ID2. For example, the first TB is one of two TBs scheduled by DCI, and the second TB is the other TB of the two scheduled TBs other than the first TB. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2. When the value of HARQ process ID1 is smaller than the value of HARQ process ID2, it indicates that the NDI of the second TB scheduled by DCI is equal to 0. When the value of HARQ process ID1 is larger than the value of HARQ process ID2, it indicates that the NDI of the second TB scheduled by DCI is equal to 1.

[0198] Alternatively, when the value of HARQ process ID1 is greater than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB of the two TBs scheduled by the DCI is equal to 0. When the value of HARQ process ID1 is less than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB of the two TBs scheduled by the DCI is equal to 1. For example, the first TB is the first TB of the two TBs scheduled by the DCI. When the value of HARQ process ID1 is greater than the value of HARQ process ID2, it indicates that the NDI of the second TB scheduled by the DCI is equal to 0. When the value of HARQ process ID1 is less than the value of HARQ process ID2, it indicates that the NDI of the second TB scheduled by the DCI is equal to 1. For example, the first TB is one of the two TBs scheduled by the DCI and the second TB is the other TB than the first TB of the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2. If the value of HARQ process ID1 is greater than the value of HARQ process ID2, it indicates that the NDI of the second TB scheduled by the DCI is equal to 0. If the value of HARQ process ID1 is less than the value of HARQ process ID2, it indicates that the NDI of the second TB scheduled by the DCI is equal to 1.

[0199] The base station determines the number of TBs scheduled by the DCI, the HARQ process ID of each scheduled TB, and the NDI of each scheduled TB. If the base station determines that the number of TBs scheduled by the DCI is equal to 1, the base station indicates the NDI of the TB by using 1 bit of the DCI, indicates HARQ process ID1 in the range {0 to 7} by using 3 bits of the DCI, and indicates HARQ process ID2 in the range {0 to 7} by using 3 bits of the DCI, where HARQ process ID1 is equal to HARQ process ID2.

[0200] When the base station determines that the number of TBs scheduled by the DCI is equal to 2, the base station indicates the NDI of the first TB by using one bit of the DCI, where the first TB is one of the two TBs scheduled by the DCI, and the second TB is the other TB other than the first TB among the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2. The base station indicates the HARQ process ID1 in the range {0 to 7} by using three bits of the DCI, and indicates the HARQ process ID2 in the range {0 to 7} by using three bits of the DCI, where the HARQ process ID1 is not equal to the HARQ process ID2. When the base station determines that the NDI of the second TB is equal to 0, the value of the HARQ process ID1 is smaller than the value of the HARQ process ID2. If the base station determines that the NDI of the second TB is equal to 1, the value of HARQ process ID1 is greater than the value of HARQ process ID2. Alternatively, if the base station determines that the NDI of the second TB is equal to 0, the value of HARQ process ID1 is greater than the value of HARQ process ID2. If the base station determines that the NDI of the second TB is equal to 1, the value of HARQ process ID1 is less than the value of HARQ process ID2.

[0201] The user equipment receives downlink control information DCI transmitted by the base station. Seven bits of the DCI indicate the number of TBs scheduled by the DCI. A HARQ process ID of each TB scheduled by the DCI is determined, and an NDI of each TB scheduled by the DCI is determined. One of the seven bits of the DCI is the NDI of the first TB. For example, the first TB is one of the N TBs scheduled by the DCI. N=1 or N=2. Three of the seven bits of the DCI indicate HARQ process ID1 with {0-7}, and the other three of the seven bits of the DCI indicate HARQ process ID2 with {0-7}. The value of HARQ process ID1 may be the same as the value of HARQ process ID2. Alternatively, the value of HARQ process ID1 may be different from the value of HARQ process ID2.

[0202] If the value of HARQ process ID1 is the same as the value of HARQ process ID2, the user equipment determines that the DCI schedules one TB, and the HARQ process ID of the TB=HARQ process ID1=HARQ process ID2. If the value of HARQ process ID1 is different from the value of HARQ process ID2, the user equipment determines that the DCI schedules two TBs. The first TB is one of the two TBs scheduled by the DCI, and the second TB is the other TB other than the first TB among the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2.

[0203] If the value of HARQ process ID1 is smaller than the value of HARQ process ID2, the user equipment determines that the NDI of the second TB scheduled by the DCI is equal to 0. If the value of HARQ process ID1 is larger than the value of HARQ process ID2, the user equipment determines that the NDI of the second other TB scheduled by the DCI is equal to 1.

[0204] Alternatively, when the value of HARQ process ID1 is greater than the value of HARQ process ID2, the user equipment determines that the NDI of the second TB scheduled by the DCI is equal to 0. When the value of HARQ process ID1 is less than the value of HARQ process ID2, the user equipment determines that the NDI of the second TB scheduled by the DCI is equal to 1.

[0205] Table 6 shows seven bits of the DCI.

Table 10

[0206] When the number of scheduled TBs is 1 or 2, the NDI and the HARQ process ID (HARQ process number) may be indicated as shown in Table 7.

Table 11

[0207] In Table 7, for one TB: HARQ process ID = HARQ process ID2, for two TBs: HARQ process ID1 ≠ HARQ process ID2, when HARQ process ID1 < HARQ process ID2, NDI = 0 for the second TB, when HARQ process ID1 > HARQ process ID2, NDI = 1 for the second TB.

[0208] The signaling overhead can be effectively reduced by using further other communication methods provided in this embodiment of the present application.

[0209] The present application further provides a communication method. The method may be applied to a terminal device in the communication system shown in FIG. 1 。

[0210] Each transport block ( transportThe HARQ values ​​for each TB range from 0 to N-1. The new data indicator (NDI) for each TB has two values. When the downlink control information (DCI) schedules one TB, there are N (the number of HARQ process ID values) x 2 (the number of possible NDI values) = 2N combinations. When the DCI schedules two TBs, there are C 2 / N (the number of HARQ process ID combinations for two TBs, where two HARQ processes are selected from N HARQ processes) x 4 (the number of possible NDI values ​​for two TBs) = 2 x C2 / N combinations. Thus, there are a total of 2N + 2 x C 2 / N combinations for scheduling one TB and two TBs. Thus, M1 = log2(2N + 2 x C 2 / N) bits are required for the DCI. Alternatively, 1 TB and 2 TB scheduling occupy a total of M2=2+2×log2(N) bits.

[0211] Optionally, log2(N) bits of DCI are used to indicate HARQ process ID1 (which may also be called the HARQ process corresponding to the first TB), and the other log2(N) bits of DCI are used to indicate HARQ process ID2 (which may also be called the HARQ process corresponding to another TB other than the first TB when two TBs are scheduled). When HARQ process ID1 is equal to HARQ process ID2, it indicates that one TB is scheduled, and when HARQ process ID1 is not equal to HARQ process ID2, it indicates that two TBs are scheduled. Here, HARQ process ID1 being equal to HARQ process ID2 means that the bit values ​​or states of HARQ process ID1 and HARQ process ID2 are the same, and HARQ process ID1 not being equal to HARQ process ID2 means that the bit values ​​or states of HARQ process ID1 and HARQ process ID2 are different.

[0212] Optionally, one bit of the DCI is used to indicate an NDI corresponding to HARQ process ID 1. Another bit of the DCI is used to indicate an NDI corresponding to HARQ process ID 2. Optionally, when the number of scheduled TBs is 1, the other bit used to indicate an NDI corresponding to HARQ process ID 2 is ignored or is not present or has the same value as the bit used to indicate an NDI corresponding to HARQ process ID 1.

[0213] For example, when N=8, 3 bits are used to indicate HARQ process ID1, the other 3 bits are used to indicate HARQ process ID2, 1 bit is used to indicate the NDI corresponding to HARQ process ID1, and the other bit is used to indicate the NDI corresponding to HARQ process ID2.

[0214] Optionally, one bit of DCI is used to indicate the NDI corresponding to HARQ process ID 1. When HARQ process ID 1 is not equal to HARQ process ID 2, i.e., two TBs are scheduled, if the value of HARQ process ID 1 is greater than the value of HARQ process ID 2, it indicates that the value of NDI corresponding to HARQ process ID 2 is the same as the value of NDI corresponding to HARQ process ID 1, or if the value of HARQ process ID 1 is less than the value of HARQ process ID 2, it indicates that the value of NDI corresponding to HARQ process ID 2 is different from the value of NDI corresponding to HARQ process ID 1.

[0215] Optionally, one bit of DCI is used to indicate the NDI corresponding to HARQ process ID 1. When HARQ process ID 1 is not equal to HARQ process ID 2, i.e., two TBs are scheduled, if the value of HARQ process ID 1 is greater than the value of HARQ process ID 2, it indicates that the value of NDI corresponding to HARQ process ID 2 is different from the value of NDI corresponding to HARQ process ID 1, or if the value of HARQ process ID 1 is less than the value of HARQ process ID 2, it indicates that the value of NDI corresponding to HARQ process ID 2 is the same as the value of NDI corresponding to HARQ process ID 1.

[0216] The base station determines the number of TBs scheduled by the DCI, the HARQ process ID of each scheduled TB, and the NDI of each scheduled TB. If the base station determines that the number of TBs scheduled by the DCI is equal to 1, the base station indicates the NDI of the TB by using 1 bit of the DCI, indicates HARQ process ID1 in the range {0 to N-1} by using log2(N) bits of the DCI, and indicates HARQ process ID2 in the range {0 to N-1} by using log2(N) bits of the DCI, where HARQ process ID1 is equal to HARQ process ID2.

[0217] When the base station determines that the number of TBs scheduled by the DCI is equal to 2, the base station indicates the NDI of the first TB by using one bit of the DCI, where the first TB is one of the two TBs scheduled by the DCI, and the second TB is the other TB other than the first TB among the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2. The base station indicates HARQ process ID1 in the range {0 to N-1} by using log2(N) bits of the DCI, and indicates HARQ process ID2 in the range {0 to N-1} by using log2(N) bits of the DCI, where HARQ process ID1 is not equal to HARQ process ID2. If the base station determines that the NDI of the second TB is the same as the NDI of the first TB, the value of HARQ process ID1 is smaller than the value of HARQ process ID2, or if the base station determines that the NDI of the second TB is different from the NDI of the first TB, the value of HARQ process ID1 is larger than the value of HARQ process ID2. Alternatively, if the base station determines that the NDI of the second TB is the same as the NDI of the first TB, the value of HARQ process ID1 is larger than the value of HARQ process ID2, or if the base station determines that the NDI of the second TB is different from the NDI of the first TB, the value of HARQ process ID1 is smaller than the value of HARQ process ID2.

[0218] A user equipment receives downlink control information DCI transmitted by a base station. M1 bits of the DCI indicate the number of TBs scheduled by the DCI. A HARQ process ID of each TB scheduled by the DCI is determined, and an NDI of each TB scheduled by the DCI is determined. One of the M1 bits of the DCI is the NDI of the first TB. For example, the first TB is one of the Q TBs scheduled by the DCI. Q=1 or Q=2. log2(N) of the M1 bits of the DCI indicate HARQ process ID1 in {0 to N-1}, and the other log2(N) of the M1 bits of the DCI indicate HARQ process ID2 in {0 to N-1}. The value of HARQ process ID1 may be the same as the value of HARQ process ID2. Alternatively, the value of HARQ process ID1 may be different from the value of HARQ process ID2.

[0219] If the value of HARQ process ID1 is the same as the value of HARQ process ID2, the user equipment determines that the DCI schedules one TB, and the HARQ process ID of the TB=HARQ process ID1=HARQ process ID2. If the value of HARQ process ID1 is different from the value of HARQ process ID2, the user equipment determines that the DCI schedules two TBs. The first TB is one of the two TBs scheduled by the DCI, and the second TB is the other TB other than the first TB among the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2.

[0220] Optionally, the DCI M1One of the bits indicates an NDI corresponding to the first TB (or HARQ process ID1), and the terminal device determines the NDI corresponding to the first TB (or HARQ process ID1) based on the bit. If the value of HARQ process ID1 is smaller than the value of HARQ process ID2, the user equipment determines the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI based on another bit of the M2 bits of the DCI.

[0221] Optionally, one of the M1 bits of the DCI indicates an NDI corresponding to the first TB (or HARQ process ID1), and the terminal device determines the NDI corresponding to the first TB (or HARQ process ID1) according to the bit. If the value of HARQ process ID1 is smaller than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is the same as the NDI corresponding to the first TB. If the value of HARQ process ID1 is larger than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is different from the NDI corresponding to the first TB (or HARQ process ID1).

[0222] Alternatively, if the value of HARQ process ID1 is smaller than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is different from the NDI corresponding to the first TB. If the value of HARQ process ID1 is larger than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is the same as the NDI corresponding to the first TB (or HARQ process ID1).

[0223] For example, if N=8 and M1=7, the DCI has 7 bits to indicate the HARQ processor ID and NDI for one transport block TB scheduled by the DCI, or to indicate the HARQ process ID or NDI for each of two TBs scheduled by the DCI. If the DCI schedules one TB, the value of the HARQ process ID of the TB ranges from 0 to 7, and the new data indicator of the TB needs to be indicated in the DCI. If the DCI schedules two TBs, the value of the HARQ process ID of one TB (also called the first TB) ranges from 0 to 7, the value of the HARQ process ID of the other TB (also called the second TB) ranges from 0 to 7, and is different from the value of the HARQ process of the previous TB, and the HARQ process ID of the first TB is different from the HARQ process ID of the second TB. The NDI of each of the two TBs needs to be indicated in the DCI.

[0224] One of the seven bits of the DCI is the NDI of the first TB. For example, the first TB is one of the Q TBs scheduled by the DCI. Q=1 or Q=2. Three of the seven bits of the DCI indicate HARQ process ID1 with {0-7}, and the other three of the seven bits of the DCI indicate HARQ process ID2 with {0-7}. The value of HARQ process ID1 may be the same as the value of HARQ process ID2. Alternatively, the value of HARQ process ID1 may be different from the value of HARQ process ID2. The HARQ process number of one TB is HARQ process ID1, and the HARQ process number of the other TB is HARQ process ID2.

[0225] If the value of HARQ process ID1 is the same as the value of HARQ process ID2, it indicates that the DCI schedules one TB, and the HARQ process ID of the TB = HARQ process ID1 = HARQ process ID2. If the value of HARQ process ID1 is different from the value of HARQ process ID2, it indicates that the DCI schedules two TBs.

[0226] One bit of DCI is used to indicate the NDI corresponding to HARQ process ID1 or the first TB. When the value of HARQ process ID1 is smaller than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB among the two TBs scheduled by DCI is the same as the NDI of the first TB, or the NDI of HARQ process ID2 is the same as the NDI of HARQ process ID1. When the value of HARQ process ID1 is larger than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB among the two TBs scheduled by DCI is different from the NDI of the first TB, or the NDI of HARQ process ID2 is different from the NDI of HARQ process ID1. For example, the first TB is the first TB among the two TBs scheduled by DCI.

[0227] Alternatively, one bit of DCI is used to indicate the NDI corresponding to HARQ process ID1 or the first TB. When the value of HARQ process ID1 is smaller than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB among the two TBs scheduled by DCI is different from the NDI of the first TB, or the NDI of HARQ process ID2 is different from the NDI of HARQ process ID1. When the value of HARQ process ID1 is larger than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB among the two TBs scheduled by DCI is the same as the NDI of the first TB, or the NDI of HARQ process ID2 is the same as the NDI of HARQ process ID1. For example, the first TB is the first TB among the two TBs scheduled by DCI.

[0228] The base station determines the number of TBs scheduled by the DCI, the HARQ process ID of each scheduled TB, and the NDI of each scheduled TB. If the base station determines that the number of TBs scheduled by the DCI is equal to 1, the base station indicates the NDI of the TB by using 1 bit of the DCI, indicates HARQ process ID1 in the range {0 to 7} by using 3 bits of the DCI, and indicates HARQ process ID2 in the range {0 to 7} by using 3 bits of the DCI, where HARQ process ID1 is equal to HARQ process ID2.

[0229] When the base station determines that the number of TBs scheduled by the DCI is equal to 2, the base station indicates the NDI of the first TB by using one bit of the DCI, where the first TB is one of the two TBs scheduled by the DCI, and the second TB is the other TB other than the first TB among the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2. The base station indicates HARQ process ID1 in the range {0 to 7} by using three bits of the DCI, and indicates HARQ process ID2 in the range {0 to 7} by using three bits of the DCI, where HARQ process ID1 is not equal to HARQ process ID2. If the base station determines that the NDI of the second TB is the same as the NDI of the first TB, the value of HARQ process ID1 is smaller than the value of HARQ process ID2, or if the base station determines that the NDI of the second TB is different from the NDI of the first TB, the value of HARQ process ID1 is larger than the value of HARQ process ID2. Alternatively, if the base station determines that the NDI of the second TB is the same as the NDI of the first TB, the value of HARQ process ID1 is larger than the value of HARQ process ID2, or if the base station determines that the NDI of the second TB is different from the NDI of the first TB, the value of HARQ process ID1 is smaller than the value of HARQ process ID2.

[0230] The user equipment receives downlink control information DCI transmitted by the base station. Seven bits of the DCI indicate the number of TBs scheduled by the DCI. A HARQ process ID of each TB scheduled by the DCI is determined, and an NDI of each TB scheduled by the DCI is determined. One of the seven bits of the DCI is the NDI of the first TB. For example, the first TB is one of the Q TBs scheduled by the DCI. Q=1 or Q=2. Three of the seven bits of the DCI indicate HARQ process ID1 with {0-7}, and the other three of the seven bits of the DCI indicate HARQ process ID2 with {0-7}. The value of HARQ process ID1 may be the same as the value of HARQ process ID2. Alternatively, the value of HARQ process ID1 may be different from the value of HARQ process ID2.

[0231] If the value of HARQ process ID1 is the same as the value of HARQ process ID2, the user equipment determines that the DCI schedules one TB, and the HARQ process ID of the TB=HARQ process ID1=HARQ process ID2. If the value of HARQ process ID1 is different from the value of HARQ process ID2, the user equipment determines that the DCI schedules two TBs. The first TB is one of the two TBs scheduled by the DCI, and the second TB is the other TB other than the first TB among the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2.

[0232] Optionally, one of the seven bits of the DCI indicates an NDI corresponding to the first TB (or HARQ process ID1), and the terminal device determines the NDI corresponding to the first TB (or HARQ process ID1) according to the bit. If the value of HARQ process ID1 is smaller than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is the same as the NDI corresponding to the first TB. If the value of HARQ process ID1 is larger than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is different from the NDI corresponding to the first TB (or HARQ process ID1).

[0233] Alternatively, if the value of HARQ process ID1 is smaller than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is different from the NDI corresponding to the first TB. If the value of HARQ process ID1 is larger than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is the same as the NDI corresponding to the first TB (or HARQ process ID1).

[0234] For example, if N=4 and M1=5, in the DCI, the M1 bit indicates the HARQ processor ID and NDI for one transport block TB scheduled by the DCI, or indicates the HARQ process ID or NDI for each of two TBs scheduled by the DCI. If the DCI schedules one TB, the value of the HARQ process ID of the TB ranges from 0 to 3, and the new data indicator of the TB needs to be indicated in the DCI. If the DCI schedules two TBs, the value of the HARQ process ID of one TB (which may be called the first TB) ranges from 0 to 3, and the value of the HARQ process ID of the other TB (which may be called the second TB) ranges from 0 to 3, and is different from the value of the HARQ process of the previous TB, but the HARQ process ID of the first TB is different from the HARQ process ID of the second TB. The NDI of each of the two TBs needs to be indicated in the DCI.

[0235] One of the five bits of the DCI is the NDI of the first TB. For example, the first TB is one of the Q TBs scheduled by the DCI. Q=1 or Q=2. Two of the five bits of the DCI indicate HARQ process ID1 with {0-3}, and the other two of the five bits of the DCI indicate HARQ process ID2 with {0-3}. The value of HARQ process ID1 may be the same as the value of HARQ process ID2. Alternatively, the value of HARQ process ID1 may be different from the value of HARQ process ID2. The HARQ process number of one TB is HARQ process ID1, and the HARQ process number of the other TB is HARQ process ID2.

[0236] If the value of HARQ process ID1 is the same as the value of HARQ process ID2, it indicates that the DCI schedules one TB, and the HARQ process ID of the TB = HARQ process ID1 = HARQ process ID2. If the value of HARQ process ID1 is different from the value of HARQ process ID2, it indicates that the DCI schedules two TBs.

[0237] One bit of DCI is used to indicate the NDI corresponding to HARQ process ID1 or the first TB. When the value of HARQ process ID1 is smaller than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB among the two TBs scheduled by DCI is the same as the NDI of the first TB, or the NDI of HARQ process ID2 is the same as the NDI of HARQ process ID1. When the value of HARQ process ID1 is larger than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB among the two TBs scheduled by DCI is different from the NDI of the first TB, or the NDI of HARQ process ID2 is different from the NDI of HARQ process ID1. For example, the first TB is the first TB among the two TBs scheduled by DCI.

[0238] Alternatively, one bit of DCI is used to indicate the NDI corresponding to HARQ process ID1 or the first TB. When the value of HARQ process ID1 is smaller than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB among the two TBs scheduled by DCI is different from the NDI of the first TB, or the NDI of HARQ process ID2 is different from the NDI of HARQ process ID1. When the value of HARQ process ID1 is larger than the value of HARQ process ID2, it indicates that the NDI of the other TB than the first TB among the two TBs scheduled by DCI is the same as the NDI of the first TB, or the NDI of HARQ process ID2 is the same as the NDI of HARQ process ID1. For example, the first TB is the first TB among the two TBs scheduled by DCI.

[0239] The base station determines the number of TBs scheduled by the DCI, the HARQ process ID of each scheduled TB, and the NDI of each scheduled TB. If the base station determines that the number of TBs scheduled by the DCI is equal to 1, the base station indicates the NDI of the TB by using 1 bit of the DCI, indicates HARQ process ID1 in the range {0 to 3} by using 2 bits of the DCI, and indicates HARQ process ID2 in the range {0 to 3} by using 3 bits of the DCI, where HARQ process ID1 is equal to HARQ process ID2.

[0240] When the base station determines that the number of TBs scheduled by the DCI is equal to 2, the base station indicates the NDI of the first TB by using one bit of the DCI, where the first TB is one of the two TBs scheduled by the DCI, and the second TB is the other TB other than the first TB among the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2. The base station indicates HARQ process ID1 in the range {0 to 3} by using two bits of the DCI, and indicates HARQ process ID2 in the range {0 to 3} by using two bits of the DCI, where HARQ process ID1 is not equal to HARQ process ID2. If the base station determines that the NDI of the second TB is the same as the NDI of the first TB, the value of HARQ process ID1 is smaller than the value of HARQ process ID2, or if the base station determines that the NDI of the second TB is different from the NDI of the first TB, the value of HARQ process ID1 is larger than the value of HARQ process ID2. Alternatively, if the base station determines that the NDI of the second TB is the same as the NDI of the first TB, the value of HARQ process ID1 is larger than the value of HARQ process ID2, or if the base station determines that the NDI of the second TB is different from the NDI of the first TB, the value of HARQ process ID1 is smaller than the value of HARQ process ID2.

[0241] The user equipment receives downlink control information DCI transmitted by the base station. Five bits of the DCI indicate the number of TBs scheduled by the DCI. A HARQ process ID of each TB scheduled by the DCI is determined, and an NDI of each TB scheduled by the DCI is determined. One of the five bits of the DCI is the NDI of the first TB. For example, the first TB is one of the Q TBs scheduled by the DCI. Q=1 or Q=2. Two of the five bits of the DCI indicate HARQ process ID1 with {0-3}, and the other two of the five bits of the DCI indicate HARQ process ID2 with {0-3}. The value of HARQ process ID1 may be the same as the value of HARQ process ID2. Alternatively, the value of HARQ process ID1 may be different from the value of HARQ process ID2.

[0242] If the value of HARQ process ID1 is the same as the value of HARQ process ID2, the user equipment determines that the DCI schedules one TB, and the HARQ process ID of the TB=HARQ process ID1=HARQ process ID2. If the value of HARQ process ID1 is different from the value of HARQ process ID2, the user equipment determines that the DCI schedules two TBs. The first TB is one of the two TBs scheduled by the DCI, and the second TB is the other TB other than the first TB among the two scheduled TBs. The HARQ process number of the first TB is HARQ process ID1, and the HARQ process number of the second TB is HARQ process ID2.

[0243] Optionally, one of the five bits of the DCI indicates an NDI corresponding to the first TB (or HARQ process ID1), and the terminal device determines the NDI corresponding to the first TB (or HARQ process ID1) according to the bit. If the value of HARQ process ID1 is smaller than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is the same as the NDI corresponding to the first TB. If the value of HARQ process ID1 is larger than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is different from the NDI corresponding to the first TB (or HARQ process ID1).

[0244] Alternatively, if the value of HARQ process ID1 is smaller than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is different from the NDI corresponding to the first TB. If the value of HARQ process ID1 is larger than the value of HARQ process ID2, the user equipment determines that the NDI corresponding to the second TB (i.e., HARQ process ID2) scheduled by the DCI is the same as the NDI corresponding to the first TB (or HARQ process ID1).

[0245] The above implementations may be combined with each other where there is no contradiction.

[0246] In the above implementations, the meaning of the same or different values ​​of NDI is the same as the meaning of the same or different NDI.

[0247] The signaling overhead can be effectively reduced by using yet another communication method provided in this embodiment of the present application.

[0248] Enhanced machine type communication (eMTC) systems and other evolved systems (e.g., Further eMTC, FeMTC; Further Further eMTC, eFeMTC; and Additional MTC, AMTC) are derived from LTE. In versions prior to Release 14, these systems were implemented (operating in in-band mode) and were actually developed. The battery life of MTC UEs is typically expected to be more than 10 years. However, new radio (NR) is about to be used commercially. Coexistence of NR and Long Term Evolution (LTE) becomes an important scenario. Furthermore, NR is likely to gradually replace LTE in future spectrum deployments. Given that deployed MTC UEs still have a relatively long battery life, MTC and NR systems are likely to appear simultaneously. Therefore, MTC systems operate in the NR frequency band, and how to avoid interference between MTC and NR systems is an important issue that needs to be considered. In the downlink, the LTE system includes a central DC subcarrier that is not counted in the resource block (RB), and the NR system does not include a central DC subcarrier, and the LTE channel grid and the NR channel grid may not be aligned, so the LTE and NR RBs are not aligned. In order to reduce the resources reserved on the NR side, subcarriers that are not aligned with LTE and NR are punctured in existing technologies. However, a problem that has not been solved in existing technologies is whether puncturing is performed at the edge of the frequency resource of °.

[0249] Based thereon, the present application provides a communication method, which may be applied to a terminal device in a communication system as shown in FIG. 。

[0250] In an embodiment, a terminal device receives first information, the first information being used to indicate a position and a number of subcarriers to puncture a first resource, the first resource including N RBs or M narrowbands, N being an integer equal to or greater than 1, and M being an integer equal to or greater than 1. For example, N=1 or M=1.

[0251] Optionally, the network device transmits first information, where the first information is used to indicate a position and a number of subcarriers to puncture the first resource, and the first resource includes N RBs or M narrowbands, where N is an integer equal to or greater than 1, and M is an integer equal to or greater than 1. For example, N=1 or M=1.

[0252] Optionally, the M or N narrowbands are configured by a network device. Specifically, the network device transmits second information, the second information is used to indicate M or N, and the terminal device receives the second information and determines M or N based on the second information.

[0253] Optionally, the terminal device receives third information sent by the network device, and the third information is used to indicate that the first resource is N RBs or M narrowbands. The terminal device determines that the first resource includes N RBs or M narrowbands based on the third information. That is, in this case, the third information indicates the granularity of the first resource, and the granularity may be a narrowband or an RB.

[0254] Optionally, N or M is predefined or determined based on the system bandwidth, for example, the system bandwidth is 1.4 MHz or 6 RBs, and N=6 or M=1.

[0255] For example, when the system bandwidth is 3 MHz or 15 RB, N=6 or M=1. Optionally, the terminal device determines whether a narrowband when the system bandwidth is 3 MHz is a narrowband numbered 0 or a narrowband numbered 1 based on the first information. Optionally, the network device transmits fourth information, and the terminal device receives the fourth information, and the fourth information is used to indicate M narrowband positions. The fourth information when the system bandwidth is 3 MHz is used to indicate whether a narrowband when the system bandwidth is 3 MHz is a narrowband numbered 0 or a narrowband numbered 1. In this case, the user equipment determines whether a narrowband when the system bandwidth is 3 MHz is a narrowband numbered 0 or a narrowband numbered 1 based on the fourth information.

[0256] For example, when the system bandwidth is 5 MHz or 25 RB, N=12 or M=2. Optionally, the terminal device determines based on the first information whether the two narrowbands when the system bandwidth is 5 MHz are narrowbands numbered 0 and 1 or narrowbands numbered 2 and 3. Optionally, the network device transmits fourth information, and the terminal device receives the fourth information, where the fourth information is used to indicate M narrowband positions. When the system bandwidth is 5 MHz, the fourth information is used to indicate whether the two narrowbands are narrowbands numbered 0 and 1 or narrowbands numbered 2 and 3. In this case, the user equipment determines based on the fourth information whether the two narrowbands when the system bandwidth is 5 MHz are narrowbands numbered 0 and 1 or narrowbands numbered 2 and 3.

[0257] For example, when the system bandwidth is 10 MHz or 50 RB, N=48 or M=8. Optionally, the terminal device determines based on the first information that the eight narrowbands when the system bandwidth is 10 MHz are narrowbands numbered 0, 1, 2, 3, 4, 5, 6, and 7. Optionally, the network device transmits fourth information, and the terminal device receives the fourth information, where the fourth information is used to indicate M narrowband positions. The fourth information is used to indicate that the eight narrowbands when the system bandwidth is 10 MHz are narrowbands numbered 0, 1, 2, 3, 4, 5, 6, and 7. In this case, the user equipment determines based on the fourth information that the eight narrowbands when the system bandwidth is 10 MHz are narrowbands numbered 0, 1, 2, 3, 4, 5, 6, and 7.

[0258] For example, when the system bandwidth is 15 MHz or 75 RB, N=36 or M=6. Optionally, the terminal device determines whether the six narrowbands when the system bandwidth is 15 MHz are narrowbands numbered 0, 1, 2, 3, 4, and 5 or narrowbands numbered 6, 7, 8, 9, 10, and 11 based on the first information. Optionally, the network device transmits fourth information, and the terminal device receives the fourth information, and the fourth information is used to indicate M narrowband positions. The fourth information is used to indicate whether the six narrowbands when the system bandwidth is 15 MHz are narrowbands numbered 0, 1, 2, 3, 4, and 5 or narrowbands numbered 6, 7, 8, 9, 10, and 11. In this case, the user equipment determines based on the fourth information whether the six narrowbands when the system bandwidth is 15 MHz are the narrowbands numbered 0, 1, 2, 3, 4, and 5 or the narrowbands numbered 6, 7, 8, 9, 10, and 11.

[0259] For example, when the system bandwidth is 20 MHz or 100 RB, N=96 or M=16. Optionally, the terminal device determines based on the first information that the 16 narrowbands when the system bandwidth is 20 MHz are narrowbands numbered 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, and 15. Optionally, the network device transmits fourth information, and the terminal device receives the fourth information, and the fourth information is used to indicate M narrowband positions. The fourth information is used to indicate that the 16 narrowbands when the system bandwidth is 20 MHz are narrowbands numbered 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, and 15. In this case, based on the fourth information, the user equipment determines that the 16 narrowbands when the system bandwidth is 20 MHz are narrowbands numbered 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, and 15.

[0260] The above implementations may be combined with each other where there is no contradiction.

[0261] In existing technology, one DCI is transmitted over multiple transport blocks ( transport For a user terminal in coverage extension B, up to four TBs can be scheduled. In the existing technology, 10 bits are used to indicate the NDI, HARQ process number, the number of scheduled TBs, and MCS. However, there is no corresponding method for describing and interpreting simply and clearly.

[0262] Based thereon, the present application provides a communication method, which may be applied to a terminal device in a communication system as shown in FIG. 。

[0263] 1. An information processing method comprising: receiving, by a terminal device, downlink control information from a network device, the downlink control information being capable of scheduling up to N transport blocks TB, where N is a positive integer, the downlink control information including first bits and second bits, the first bits having M bits, the second bits having P bits, where M and P are integers equal to or greater than 1; determining, by the terminal device, a number L of TBs scheduled by the downlink control information based on the second bit; determining, by the terminal device, at least one of a hybrid automatic repeat request (HARQ) process number corresponding to the L TBs and new data indicator (NDI) information of the L TBs according to the first bit; determining, by the terminal device, a modulation and demodulation scheme (MCS) based on the second bit and / or the first bit; transmitting information by the terminal device according to the number L of TBs to be scheduled, the HARQ process numbers corresponding to the L TBs, the NDIs corresponding to the L TBs, and the MCS; The method according to claim 1,

[0264] 2. Determining, by the terminal device, the number L of TBs scheduled by the downlink control information based on the second bit, determining, by the terminal device, the number L of TBs scheduled by the downlink control information based on a value obtained after performing a modulus operation on a first value V corresponding to the second bit with respect to 3; The method of claim 1.

[0265] 3. Regarding 3, the value obtained after performing a modulus operation on the first value V corresponding to the second bit is 0, and L=1 or 2; the value obtained after performing a modulus operation on the first value V corresponding to the second bit with respect to 3 is 1, L=3; and / or the value obtained after performing a modulus operation on the first value V corresponding to the second bit with respect to 3 is 2, and L=4; The method of claim 2.

[0266] 4. L=1 or 2, two bits in the first bit sequence are used to indicate a first HARQ process number, the other two bits in the first bit sequence are used to indicate a second HARQ process number, and the other bit in the first bit sequence is used to indicate an NDI corresponding to a first TB; L=1 if the first HARQ process number is equal to the second HARQ process number; When the first HARQ process number is greater than the second HARQ process number, L=2, and the HARQ process number corresponding to the second TB other than the first TB of the two TBs is the greater HARQ process number between the first HARQ process number and the second HARQ process number, and the NDI corresponding to the second TB is 0, and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number, or When the first HARQ process number is smaller than the second HARQ process number, L=2, and the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the larger HARQ process number between the first HARQ process number and the second HARQ process number, the NDI corresponding to the second TB is 1, and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number; 4. The method according to any one of claims 1 to 3.

[0267] 5. L=1 or 2, two bits in the first bit sequence are used to indicate a first HARQ process number, the other two bits in the first bit sequence are used to indicate a second HARQ process number, and the other bit in the first bit sequence is used to indicate an NDI corresponding to a first TB; L=1 if the first HARQ process number is equal to the second HARQ process number; When the first HARQ process number is greater than the second HARQ process number, L=2, and the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the greater HARQ process number between the first HARQ process number and the second HARQ process number, and the NDI corresponding to the second TB is 1, and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number, or When the first HARQ process number is smaller than the second HARQ process number, L=2, and the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the larger HARQ process number between the first HARQ process number and the second HARQ process number, the NDI corresponding to the second TB is 0, and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number; 4. The method according to any one of claims 1 to 3.

[0268] 6. If L=3, two bits in the first bit sequence are used to indicate a third HARQ process number, and the other three bits in the first bit sequence are used to indicate NDIs corresponding to the L TBs, and the third HARQ process number is a non-scheduled HARQ process number; and / or When L=4, four bits in the first bit are used to indicate NDIs corresponding to the L TBs; 6. The method according to any one of claims 1 to 5.

[0269] 7. When L=3, two bits in the first bit sequence are used to indicate HARQ process numbers corresponding to the L TBs, and the other three bits in the first bit sequence are used to indicate NDIs corresponding to the L TBs; and / or When L=4, four bits in the first bit are used to indicate NDIs corresponding to the L TBs; 6. The method according to any one of claims 1 to 5.

[0270] 8. Determining, by the terminal device, a modulation and demodulation scheme (MCS) based on the second bit and / or the first bit, determining, by the terminal device, an MCS index based on a value obtained after performing a truncation operation on a first value V corresponding to the second bit with respect to 3; or determining, by the terminal device, an MCS index based on a value obtained after performing a truncation operation on a first value V corresponding to a second bit with respect to 3, when L=1, 2 or 3; having 8. The method according to any one of claims 1 to 7.

[0271] 9. If L=4, one bit in the first bit is used to indicate that the MCS index is 10 or that the MCS index is determined based on the value obtained after performing a rounding operation on a first value V corresponding to the second bit to 3; 9. The method according to any one of claims 1 to 8.

[0272] 10. Determining, by the terminal device, a modulation and demodulation scheme (MCS) based on the second bit and / or the first bit, determining, by the terminal device, a first offset value based on a bit in the first bit sequence, the first offset value being an integer greater than or equal to 0; determining, by the terminal device, the MCS index based on the first offset value and a first value V corresponding to the second bit; having 9. The method according to any one of claims 1 to 8.

[0273] 11. N=4, and / or M=5 and P=5, 11. The method according to any one of claims 1 to 10.

[0274] 12. An information processing method comprising: sending downlink control information by a network device to a terminal device, the downlink control information being capable of scheduling up to N transport blocks TB, the downlink control information including first bits and second bits, the first bits having M bits and the second bits having P bits, where M and P are integers equal to or greater than 1; the second bit is used to indicate a number L of TBs scheduled by the downlink control information, where N and L are positive integers, 1≦L≦N; the first bit is used to indicate at least one of a hybrid automatic repeat request (HARQ) process number corresponding to the L TBs and new data indicator (NDI) information of the L TBs; and the second bit and / or the first bit is used to indicate a modulation and demodulation scheme (MCS). said transmitting; transmitting information by the network device according to the number L of TBs to be scheduled, the HARQ process numbers corresponding to the L TBs, the NDIs corresponding to the L TBs, and the MCS; The method according to claim 1,

[0275] 13. The first bit has one field and the second bit has one or more fields. The method of claim 12.

[0276] 14. The second bit indicates the number L of TBs scheduled by the downlink control information by using a value obtained after performing a modulus operation on a first value V corresponding to the second bit with respect to 3; 14. The method according to claim 12 or 13.

[0277] 15. L=1 or 2, and the value obtained after performing a modulus operation on the first value V corresponding to the second bit with respect to 3 is 0; and / or L=3, and the value obtained after performing a modulus operation on the first value V corresponding to the second bit with respect to 3 is 1; and / or L=4, and the value obtained after performing a modulus operation on the first value V corresponding to the second bit with respect to 3 is 2; 15. The method according to any one of claims 12 to 14.

[0278] 16. L=1 or 2, two bits in the first bit sequence are used to indicate a first HARQ process number, the other two bits in the first bit sequence are used to indicate a second HARQ process number, and the other bit in the first bit sequence is used to indicate an NDI corresponding to a first TB; If it is determined that L=1, the first HARQ process number is equal to the second HARQ process number; When it is determined that L=2, the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the larger one between the first HARQ process number and the second HARQ process number, or when the NDI corresponding to the second TB is 0, the first HARQ process number is larger than the second HARQ process number and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number, or When L=2, the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the larger HARQ process number between the first HARQ process number and the second HARQ process number, or when the NDI corresponding to the second TB is 1, the first HARQ process number is smaller than the second HARQ process number, and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number. 16. The method according to any one of claims 12 to 15.

[0279] 17. L=1 or 2, two bits in the first bit sequence are used to indicate a first HARQ process number, the other two bits in the first bit sequence are used to indicate a second HARQ process number, and the other bit in the first bit sequence is used to indicate an NDI corresponding to a first TB; If L=1, the first HARQ process number is equal to the second HARQ process number; When it is determined that L=2, the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the larger HARQ process number between the first HARQ process number and the second HARQ process number, or when the NDI corresponding to the second TB is 1, the first HARQ process number is larger than the second HARQ process number and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number, or When it is determined that L=2, the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the larger HARQ process number between the first HARQ process number and the second HARQ process number, or when the NDI corresponding to the second TB is 0, the first HARQ process number is smaller than the second HARQ process number, and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number. 16. The method according to any one of claims 12 to 15.

[0280] 18. If L=3, two bits in the first bit sequence are used to indicate a third HARQ process number, and the other three bits in the first bit sequence are used to indicate NDIs corresponding to the L TBs, and the third HARQ process number is a non-scheduled HARQ process number; and / or When L=4, four bits in the first bit are used to indicate NDIs corresponding to the L TBs; 18. The method according to any one of claims 12 to 17.

[0281] 19. When L=3, two bits in the first bit sequence are used to indicate HARQ process numbers corresponding to the L TBs, and the other three bits in the first bit sequence are used to indicate NDIs corresponding to the L TBs; and / or When L=4, four bits in the first bit are used to indicate NDIs corresponding to the L TBs; 18. The method according to any one of claims 12 to 17.

[0282] 20. The second bit and / or the first bit indicate an MCS index by using a value obtained after performing a truncation operation on a first value V corresponding to the second bit with respect to 3, or When L=1, 2 or 3, the second bit and / or the first bit indicate an MCS index by using a value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3. 20. The method according to any one of claims 12 to 19.

[0283] 21. If L=4, one bit in the first bit is used to indicate that the MCS index is 10 or that the MCS index is determined based on the value obtained after performing a rounding operation on a first value V corresponding to the second bit to 3; 21. The method according to any one of claims 12 to 20.

[0284] 22. N=4, and / or M=5 and P=5, 22. The method according to any one of claims 12 to 21.

[0285] A specific embodiment may be as follows.

[0286] A1: A network device sends downlink control information to a terminal device.

[0287] The downlink control information can schedule up to N TBs, and the downlink control information includes a first bit and a second bit. The first bit includes M bits, and the second bit includes P bits, where M and Pha1 are integers equal to or greater than 1. The second bit is used to indicate the number L of TBs scheduled by the downlink control information, where N and L are positive integers and 1≦L≦N. The first bit is used to indicate Hybrid Automatic Repeat Request (HARQ) process numbers corresponding to the L TBs and New Data Indicator (NDI) information of the L TBs. The second bit and / or the first bit are used to indicate a Modulation and Coding Scheme (MCS).

[0288] Before step A1, the network device may determine the number L of transport blocks TB scheduled by the downlink control information, hybrid automatic repeat request (HARQ) process numbers corresponding to the L TBs, new data indicator (NDI) information of the L TBs, and MCS.

[0289] A2: A terminal device receives downlink control information from a network device, where the downlink control information is capable of scheduling up to N transport blocks TB, where N is a positive integer, for example, N=4. The downlink control information includes a first bit and a second bit, where the first bit includes one or more fields, and the second bit includes one or more fields. For example, the first bit includes five bits, and the second bit includes five bits.

[0290] A3: The terminal device determines the number L of TBs (which may also be referred to as the number of HARQ processes) scheduled by the downlink control information based on the second bit, determines hybrid automatic repeat request HARQ process numbers corresponding to the L TBs (which may also be referred to as L HARQ processes) and new data indicator NDI information of the L TBs (which may also be referred to as L HARQ processes) based on the first bit, and determines a modulation and demodulation scheme (Modulation and Coding Scheme, MCS) or an MCS index based on the second bit.

[0291] A4: The network device and the terminal device transmit information according to the number L of scheduled TBs, the HARQ process numbers corresponding to the L TBs, the NDIs corresponding to the L TBs, and the MCS.

[0292] Here, the transmission of information performed by the terminal device can be understood as the reception of information. In this case, the transmission of information on the network device side can be understood as the transmission of information. Alternatively, the transmission of information performed by the terminal device can be understood as the transmission of information. In this case, the transmission of information performed by the network device can be understood as the reception of information.

[0293] For example, the information transmitted by the network device or the terminal device may be a PDSCH or a PUSCH.

[0294] Optionally, the second bit may indicate the number L of TBs scheduled by the downlink control information by using a value obtained after performing a modulo operation on the first value V corresponding to the second bit with respect to 3. Thus, the terminal device may determine the number of TBs scheduled by the downlink control information based on a value obtained after performing a modulo operation on the first value V corresponding to the second bit with respect to 3. Specifically, the number of scheduled TBs is determined based on a value obtained by performing a modulo operation on the first value V corresponding to the index indicated by all bits in the second bit with respect to 3 or the first value V corresponding to the state of all bits in the second bit with respect to 3. For example, v mode 3 indicates that the number of scheduled TBs (or the number of HARQ processes) is determined based on the remainder obtained after performing v / 3. For example, the value obtained after performing a modulo operation on the first value V corresponding to the second bit with respect to 3 is 0, and L=1 or L2. As another example, the value obtained after performing a modulo operation on the first value V corresponding to the second bit with respect to 3 is 1, and L=3. As another example, the value obtained after performing a modulo operation on the first value V corresponding to the second bit with respect to 3 is 2, and L=4. That is, after a modulo operation on the first value with respect to 3, there are three values ​​0, 1 and 2. The three values ​​correspond to the three values ​​of L: 1 (or 2), 3 and 4, respectively. In this embodiment of the present application, the correspondence between the three values ​​obtained after performing a modulo operation on the first value with respect to 3 and the three values ​​of L is not limited, provided that the values ​​obtained after performing a modulo operation on the first value V indicate the three values ​​of L, L={1 or 2}, L={3} and L={4}.

[0295] Optionally, L=1 or L2, two bits in the first bit sequence are used to indicate a first HARQ process number, the other two bits in the first bit sequence are used to indicate a second HARQ process number, and the other one bit in the first bit sequence is used to indicate an NDI corresponding to a first TB. In this case, since one or two TBs are scheduled, there is at least one TB.

[0296] Optionally, when the first HARQ process number is equal to the second HARQ process number, L=1; when the first HARQ process number is greater than the second HARQ process number, L=2; the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the greater HARQ process number between the first HARQ process number and the second HARQ process number; the NDI corresponding to the second TB is 1; and the HARQ process number corresponding to the first TB is the greater HARQ process number between the first HARQ process number and the second HARQ process number. or if the first HARQ process number is smaller than the second HARQ process number, L=2 and the HARQ process number corresponding to the second TB other than the first TB of the two TBs is the larger HARQ process number between the first HARQ process number and the second HARQ process number, the NDI corresponding to the second TB is 0, and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number.

[0297] Optionally, when the first HARQ process number is equal to the second HARQ process number, L=1; when the first HARQ process number is greater than the second HARQ process number, L=2; the HARQ process number corresponding to the second TB other than the first TB among the two TBs is the greater HARQ process number between the first HARQ process number and the second HARQ process number; the NDI corresponding to the second TB is 0; and the HARQ process number corresponding to the first TB is the greater HARQ process number between the first HARQ process number and the second HARQ process number. or if the first HARQ process number is smaller than the second HARQ process number, L=2 and the HARQ process number corresponding to the second TB other than the first TB of the two TBs is the larger HARQ process number between the first HARQ process number and the second HARQ process number, the NDI corresponding to the second TB is 1, and the HARQ process number corresponding to the first TB is the smaller HARQ process number between the first HARQ process number and the second HARQ process number.

[0298] Optionally, when L=3, two bits in the first bit are used to indicate the third HARQ process number, and the other three bits in the first bit are used to indicate the NDI corresponding to L TBs, and the third HARQ process number is a non-scheduled HARQ process number. In other words, there are four HARQ processes in total, and L=3, that is, three HARQ processes are scheduled. Therefore, the remaining one HARQ process is not scheduled. As a result, in this case, it is only known that the HARQ processes corresponding to the remaining three HARQ process numbers are scheduled by indicating the non-scheduled HARQ process number. In this way, the indication can be performed more satisfactorily, the coding complexity of the user terminal and the base station is reduced, and the power consumption is reduced.

[0299] Optionally, when L=4, four bits in the first bit are used to indicate the NDI corresponding to L TBs. In this case, there are a total of five bits in the first bit, and the first four bits or four bits in other positions may be selected to indicate the NDI.

[0300] Optionally, when L=3, two bits in the first bit are used to indicate HARQ process numbers corresponding to L TBs, and the other three bits in the first bit are used to indicate NDI corresponding to L TBs. In this case, the three scheduled HARQ processes are indicated by four HARQ processes, one with four possibilities. Thus, two bits are used for indication. For example, Table 8 may be used for indication. It should be noted that the content is within the scope of protection of the present application, provided that the three HARQ process numbers are indicated by using four bit states of two bits. This is not particularly limited. For example, the three scheduled HARQ process numbers are indicated by {012, 013, 023, 123} As shown in the figure. [Table 12]

[0301] It should be understood that Table 8 is merely an example description, and the correspondence between the states of the two bits in the first bit and the three scheduled HARQ process numbers is not particularly limited.

[0302] Optionally, the second bit and / or the first bit may indicate the MCS index by using a value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3. Thus, the terminal device determines the MCS index based on the value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3. That is, in this case, the truncation is performed on V with respect to 3, i.e., floor(V / 3), where floor(x) represents an integer less than or equal to x. The value obtained after the truncation is used to determine the MCS index.

[0303] Alternatively, when L=1, 2, or 3, the second bit and / or the first bit may indicate the MCS index by using a value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3. Thus, when L=1, 2, or 3, the terminal device determines the MCS index based on a value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3. That is, in this case, the truncation is performed on V with respect to 3, i.e., floor(V / 3), where floor(x) represents an integer equal to or greater than x. The value obtained after the truncation is used to determine the MCS index.

[0304] Optionally, when L=4, one bit in the first bit is used to indicate that the MCS index is 10 or that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3. For example, one bit other than the four NDI indication bits in the first bit is used to indicate that the MCS index is 10 or that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3. For example, if the bit is 0, it indicates that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3, and if the bit is 1, it indicates that the MCS index is 10.

[0305] Optionally, when L=4, one bit in the first bit is used to indicate a first offset value. The first offset value is an integer equal to or greater than 0, for example, 0 or 1. The MCS index is a first offset value and a first value corresponding to the second bit. V For example, the MCS index is determined based on a value obtained after performing a round-down operation on the sum of the first value V corresponding to the second bit and the first offset value with respect to 3. For example, one bit other than the four NDI indication bits in the first bit indicates that the first offset value is Z, where Z=0 or Z=1, and the MCS index is determined based on a value obtained after performing a round-down operation on V+Z with respect to 3, that is, the MCS index is determined based on floor(Z+V).

[0306] Table 9 is an example of a method, where bits B0 to B4 represent the first bit, and V is a number indicated by the five bits in the second bit, ranging from 0 to 31. M0 bits in the first field are used to indicate that the MCS index is 10, or that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the second bit with respect to 3. H0 represents the first HARQ process number; H1 represents the second HARQ process number, N0 represents the NDI corresponding to the first TB, and N1, N2, and N3 represent the NDIs corresponding to the second, third, and fourth TBs that are scheduled. Hx represents the non-scheduled HARQ process number, i.e., the three scheduled HARQ process numbers. Imcs represents the MCS index. [Table 13]

[0307] Table 10 is an example of a method, where bits B0 to B4 represent the first bit, V is a number indicated by the five bits in the second bit, ranging from 0 to 31, H0 represents the first HARQ process number, H1 represents the second HARQ process number, N0 represents the NDI corresponding to the first TB, and N1, N2, and N3 represent the NDIs corresponding to the second, third, and fourth TBs that are scheduled. Hx represents the non-scheduled HARQ process number, i.e., the three scheduled HARQ process numbers. Imcs represents the MCS index. [Table 14]

[0308] The following gives the definition of the i-th TB in this application. DCI indicates or schedules N HARQ processes, and the N HARQ process numbers are arranged in ascending order. It is assumed that the HARQ process numbers obtained after the N HARQ process numbers are sorted in ascending (or descending) order are M(0), M(1), ..., and M(N-1). The HARQ process number of the i-th TB is M(i-1), where i=1, ..., or N.

[0309] The implementations of the present application may be combined with each other where there is no contradiction.

[0310] In the implementation of this specification, the value corresponding to a bit may be the value indicated by that bit, or may be a decimal value obtained by converting the binary value of that bit. This is not particularly limited here.

[0311] By using the above communication method, instructions can be executed more flexibly, the coding complexity of the user terminal and the base station is reduced, and the power consumption is reduced.

[0312] The present application further provides another communication method for solving the following problem: In the existing technology, one DCI is transmitted over multiple transport blocks ( transport For a user terminal in coverage extension B, up to four TBs can be scheduled. In the existing technology, 10 bits are used to indicate NDI, HARQ process number, number of scheduled TBs, and MCS. However, there is no corresponding method for simple and clear description and interpretation. The method may be applied to a terminal device in the communication system shown in FIG. 1. The following describes the method from the first node side: 。

[0313] The first node sends downlink control information to the second node. The first node indicates the number of TBs scheduled by the downlink control information, the HARQ process number corresponding to each TB, the NDI of each TB, and the MCS index. There are 11 or 10 MCS indexes in total. The downlink control information includes a third bit and a fourth bit. The third bit includes 5 bits, and the fourth bit includes 5 bits. The value indicated by the third bit is used to indicate the MCS index and the number of TBs scheduled.

[0314] The value V indicated by the third bit is used to indicate the MCS index Imcs, where V = Imcs x 3. The value V indicated by the third bit is further used to determine the number of TBs that are scheduled. Alternatively, the value V indicated by the third bit and an offset value Z indicated by one bit in the fourth bit are used to indicate the MCS index Imcs, where V + Z = Imcs x 3. The value V indicated by the third bit is further used to determine the number of TBs that are scheduled.

[0315] For example, when the DCI schedules one TB or two TBs, the value V indicated by the third bit is a multiple of 3. One bit within the fourth bit is used to indicate the NDI corresponding to the first TB, the other two bits within the fourth bit are used to indicate the first HARQ process number (H0), and the remaining two bits within the fourth bit are used to indicate the second HARQ process number (H1). For example, H0 is indicated by {0, 1, 2, 3}. For example, H1 is indicated by {0, 1, 2, 3}. When the DCI schedules one TB, H0 = H1, and the HARQ process number of the TB is H0. When the DCI schedules two TBs, H0 ≠ H1, and the HARQ process numbers of the two TBs are H0 and H1. When the NDI of the second TB is equal to 0, H0 < H1, and when the NDI of the second TB is equal to 1, H0 > H1. Alternatively, when the second NDI is equal to 0, H0 > H1, and when the NDI of the second TB is equal to 1, H0 < H1.

[0316] For example, when the DCI schedules one TB or two TBs, the value V indicated by the third bit is equal to 3m, where m is 0 or a positive integer. One bit within the fourth bit is used to indicate the NDI corresponding to the first TB, the other two bits within the fourth bit are used to indicate the first HARQ process number (H0), and the remaining two bits within the fourth bit are used to indicate the second HARQ process number (H1). For example, H0 is indicated by {0, 1, 2, 3}. For example, H1 is indicated by {0, 1, 2, 3}. When the DCI schedules one TB, H0 = H1, and the HARQ process number of the TB is H0. When the NDI of the second TB is the same as the NDI of the first TB, H0 < H1, when the NDI of the second TB is equal to 0, H0 < H1, and when the NDI of the second TB is equal to 1, H0 > H1. Alternatively, when the second NDI is equal to 0, H0 > H1, and when the NDI of the second TB is equal to 1, H0 < H1.

[0317] For example, when the DCI schedules one TB or two TBs, the value V indicated by the third bit is equal to 3m + 1, where m is 0 or a positive integer. One bit within the fourth bit is used to indicate the NDI corresponding to the first TB, two bits within the fourth bit are used to indicate the first HARQ process number (H0), and the remaining two bits within the fourth bit are used to indicate the second HARQ process number (H1). For example, H0 is indicated by {0, 1, 2, 3}. For example, H1 is indicated by {0, 1, 2, 3}. When the DCI schedules one TB, H0 = H1, and the HARQ process number of the TB is H0. When the NDI of the second TB is equal to 0, H0 < H1, and when the NDI of the second TB is equal to 1, H0 > H1. Alternatively, when the second NDI is equal to 0, H0 > H1, and when the NDI of the second TB is equal to 1, H0 < H1.

[0318] For example, when the DCI schedules one TB or two TBs, the value V indicated by the third bit is equal to 3m + 2, where m is 0 or a positive integer. One bit within the fourth bit is used to indicate the NDI corresponding to the first TB, two bits within the fourth bit are used to indicate the first HARQ process number (H0), and the remaining two bits within the fourth bit are used to indicate the second HARQ process number (H1). For example, H0 is indicated by {0, 1, 2, 3}. For example, H1 is indicated by {0, 1, 2, 3}. When the DCI schedules one TB, H0 = H1, and the HARQ process number of the TB is H0. When the NDI of the second TB is equal to 0, H0 < H1, and when the NDI of the second TB is equal to 1, H0 > H1. Alternatively, when the second NDI is equal to 0, H0 > H1, and when the NDI of the second TB is equal to 1, H0 < H1.

[0319] For example, if the DCI schedules three TBs, the value V indicated by the third bit is equal to 3m+1, where m is 0 or a positive integer. Three bits in the fourth bit are used to indicate the NDIs of the three TBs, respectively. Two bits in the fourth bit indicate three HARQ process numbers H2 corresponding to the three TBs. For example, H2 is indicated as {012, 013, 023, 123}. Alternatively, two bits in the fourth bit indicate a non-scheduled HARQ process number H2 (where the value of H2 is 0, 1, 2, or 3). In this case, the HARQ process numbers corresponding to the three TBs are the remaining three process numbers other than H2 in {0, 1, 2, 3}.

[0320] For example, if the DCI schedules three TBs, the value V indicated by the third bit is equal to 3m, where m is 0 or a positive integer. Three bits in the fourth bit are used to indicate the NDIs of the three TBs, respectively. Two bits in the fourth bit indicate three HARQ process numbers H2 corresponding to the three TBs. For example, H2 is indicated as {012, 013, 023, 123}. Alternatively, two bits in the fourth bit indicate a non-scheduled HARQ process number H2 (where the value of H2 is 0, 1, 2, or 3). In this case, the HARQ process numbers corresponding to the three TBs are the remaining three process numbers other than H2 in {0, 1, 2, 3}.

[0321] For example, if the DCI schedules three TBs, the value V indicated by the third bit is equal to 3m+2, where m is 0 or a positive integer. Three bits in the fourth bit are used to indicate the NDIs of the three TBs, respectively. Two bits in the fourth bit indicate three HARQ process numbers H2 corresponding to the three TBs. For example, H2 is indicated as {012, 013, 023, 123}. Alternatively, two bits in the fourth bit indicate a non-scheduled HARQ process number H2 (where the value of H2 is 0, 1, 2, or 3). In this case, the HARQ process numbers corresponding to the three TBs are the remaining three process numbers other than H2 in {0, 1, 2, 3}.

[0322] For example, if the DCI schedules 4 TBs, the value V indicated by the third bit is equal to 3m, where m is 0 or an integer. The HARQ process numbers corresponding to the 4 TBs are 0, 1, 2, and 3. The four bits in the fourth bit are used to indicate the NDIs corresponding to the 4 TBs, respectively.

[0323] For example, if the DCI schedules 4 TBs, the value V indicated by the third bit is equal to 3m+1, where m is 0 or an integer. The HARQ process numbers corresponding to the 4 TBs are 0, 1, 2, and 3. The four bits in the fourth bit are used to indicate the NDIs corresponding to the 4 TBs, respectively.

[0324] For example, if the DCI schedules 4 TBs, the value V indicated by the third bit is equal to 3m+2, where m is 0 or an integer. The HARQ process numbers corresponding to the 4 TBs are 0, 1, 2, and 3. The four bits in the fourth bit are used to indicate the NDIs corresponding to the 4 TBs, respectively.

[0325] Optionally, when L=4, one bit in the fourth bit is used to indicate that the MCS index is 10 or that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the third bit by 3. For example, one bit other than the four NDI indication bits in the fourth bit is used to indicate that the MCS index is 10 or that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the third bit by 3. For example, if the bit is 0, it indicates that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the third bit by 3, and if the bit is 1, it indicates that the MCS index is 10.

[0326] Optionally, when L=4, one bit in the fourth bit is used to indicate a first offset value. The first offset value is an integer equal to or greater than 0, for example, 0 or 1. The MCS index is a combination of the first offset value and the first value corresponding to the third bit. V For example, the MCS index is determined based on a value obtained after performing a round-down operation on the sum of the first value V corresponding to the third bit and the first offset value Z with respect to 3. For example, one bit other than the four NDI indication bits in the fourth bit is used to indicate that the first offset value is Z, where Z=0 or Z=1, and the MCS index is determined based on a value obtained after performing a round-down operation on V+Z with respect to 3, that is, the MCS index is determined based on floor(Z+V).

[0327] For example, other indication information is described below. In the table below, Ni is the NDI of TBi or the (i+1)th TB, where the value of i is 0, 1, 2, or 3. For example, in the table below, V is the value indicated by the third bit, and floor is the rounding down operation. The fourth bit includes 4 bits, b0, b1, b2, and b3.

[0328] Table 11 is an example of a method, where bits B0 to B4 represent the fourth bit, V is a number indicated by the five bits in the third bit, ranging from 0 to 31, H0 represents the first HARQ process number, H1 represents the second HARQ process number, N0 represents the NDI corresponding to the first TB, and N1, N2, and N3 represent the NDIs corresponding to the second, third, and fourth TBs that are scheduled. Hx represents the non-scheduled HARQ process number, i.e., the three scheduled HARQ process numbers. Imcs represents the MCS index. [Table 15]

[0329] Table 12 is an example of a method, where bits B0 to B4 represent the fourth bit, and V is a number indicated by the five bits in the third field, ranging from 0 to 31. M0 bits in the first field are used to indicate that the MCS index is 10, or that the MCS index is determined based on a value obtained after performing a truncation operation on a first value V corresponding to the fourth bit with respect to 3. H0 represents the first HARQ process number; H1 represents the second HARQ process number, N0 represents the NDI corresponding to the first TB, and N1, N2, and N3 represent the NDIs corresponding to the second, third, and fourth TBs that are scheduled. Hx represents the non-scheduled HARQ process number, i.e., the three scheduled HARQ process numbers. Imcs represents the MCS index. [Table 16]

[0330] The following describes the method from the second node side. 。

[0331] The second node receives the downlink control information sent by the first node. The second node determines the number of scheduled TBs, the HARQ process number corresponding to each TB, the NDI of each TB, and the MCS index by using the received downlink control information. There are 11 or 10 MCS indexes in total. The downlink control information includes a third bit and a fourth bit. The third bit includes 5 bits, and the fourth bit includes 5 bits. The second node further determines the number of scheduled TBs based on the value indicated by the third bit.

[0332] The second node determines the MCS index Imcs based on the value V indicated by the third bit, where V=Imcs× 3 The second node further determines the number of scheduled TBs based on the value V indicated by the third bit. Alternatively, the value V indicated by the third bit and the offset value Z indicated by one bit in the fourth bit are used to indicate the MCS index Imcs, where V+Z=Imcs×3. The value V indicated by the third bit is further used to determine the number of scheduled TBs.

[0333] For example, when the value V indicated by the third bit is a multiple of 3, the DCI schedules one TB or two TBs. One bit in the fourth bit is used to indicate the NDI corresponding to the first TB, the other two bits in the fourth bit are used to indicate the first HARQ process number (H0), and the remaining two bits in the fourth bit are used to indicate the second HARQ process number (H1). For example, H0 is indicated by {0, 1, 2, 3}. For example, H1 is indicated by {0, 1, 2, 3}. When H0 = H1, the DCI schedules one TB, and the HARQ process number of the TB is H0. When H0 ≠ H1, the DCI schedules two TBs, and the HARQ process numbers of the two TBs are H0 and H1. When H0 < H1, the NDI of the second TB is equal to 0, and when H0 > H1, the NDI of the second TB is equal to 1. Alternatively, when H0 < H1, the NDI of the second TB is equal to 1, and when H0 > H1, the second NDI is equal to 0.

[0334] For example, assuming that m is 0 or a positive integer, when the value V indicated by the third bit is equal to 3m + 1, the DCI schedules one TB or two TBs. One bit in the fourth bit is used to indicate the NDI corresponding to the first TB, the other two bits in the fourth bit are used to indicate the first HARQ process number (H0), and the remaining two bits in the fourth bit are used to indicate the second HARQ process number (H1). For example, H0 is indicated by {0, 1, 2, 3}. For example, H1 is indicated by {0, 1, 2, 3}. When H0 = H1, the DCI schedules one TB, and the HARQ process number of the TB is H0. When H0 ≠ H1, the DCI schedules two TBs, and the HARQ process numbers of the two TBs are H0 and H1. When H0 < H1, the NDI of the second TB is equal to 0, and when H0 > H1, the NDI of the second TB is equal to 1. Alternatively, when H0 < H1, the NDI of the second TB is equal to 1, and when H0 > H1, the second NDI is equal to 0.

[0335] For example, assuming that m is 0 or a positive integer, when the value V indicated by the third bit is equal to 3m + 2, the DCI schedules one TB or two TBs. One bit within the fourth bit is used to indicate the NDI corresponding to the first TB, the other two bits within the fourth bit are used to indicate the first HARQ process number (H0), and the remaining two bits within the fourth bit are used to indicate the second HARQ process number (H1). For example, H0 is indicated by {0, 1, 2, 3}. For example, H1 is indicated by {0, 1, 2, 3}. When H0 = H1, the DCI schedules one TB, and the HARQ process number of the TB is H0. When H0 ≠ H1, the DCI schedules two TBs, and the HARQ process numbers of the two TBs are H0 and H1. When H0 < H1, the NDI of the second TB is equal to 0, and when H0 > H1, the NDI of the second TB is equal to 1. Alternatively, when H0 < H1, the NDI of the second TB is equal to 1, and when H0 > H1, the second NDI is equal to 0.

[0336] For example, assuming that m is 0 or a positive integer, when the value V indicated by the third bit is equal to 3m + 2, the DCI schedules three TBs. Three bits within the fourth bit are respectively used to indicate the NDI of the three TBs. Two bits within the fourth bit indicate the three HARQ process numbers H2 corresponding to the three TBs. For example, H2 is indicated by {012, 013, 023, 123}. Alternatively, two bits within the fourth bit indicate the NDI of the other two TBs other than the first TB among the three TBs, and two bits within the fourth bit indicate the HARQ process number H2 that has not been scheduled (where the value of H2 is 0, 1, 2, or 3). In this case, the HARQ process numbers corresponding to the three TBs are the remaining three process numbers other than H2 in {0, 1, 2, 3}.

[0337] For example, when the value V indicated by the third bit is equal to 3m+1, where m is 0 or a positive integer, the DCI schedules three TBs. Three bits in the fourth bit are used to indicate the NDI of the three TBs, respectively. Two bits in the fourth bit indicate three HARQ process numbers H2 corresponding to the three TBs. For example, H2 is indicated as {012, 013, 023, 123}. Alternatively, two bits in the fourth bit indicate the NDI of the other two TBs other than the first TB among the three TBs, and two bits in the fourth bit indicate the non-scheduled HARQ process number H2 (where the value of H2 is 0, 1, 2, or 3). In this case, the HARQ process numbers corresponding to the three TBs are the remaining three process numbers other than H2 in {0, 1, 2, 3}.

[0338] For example, when the value V indicated by the third bit is equal to 3m, where m is 0 or a positive integer, the DCI schedules three TBs. Three bits in the fourth bit are used to indicate the NDI of the three TBs, respectively. Two bits in the fourth bit indicate three HARQ process numbers H2 corresponding to the three TBs. For example, H2 is indicated as {012, 013, 023, 123}. Alternatively, two bits in the fourth bit indicate the NDI of the other two TBs other than the first TB among the three TBs, and two bits in the fourth bit indicate the non-scheduled HARQ process number H2 (where the value of H2 is 0, 1, 2, or 3). In this case, the HARQ process numbers corresponding to the three TBs are the remaining three process numbers other than H2 in {0, 1, 2, 3}.

[0339] For example, if the value V indicated by the third bit is equal to 3m, where m is 0 or an integer, the DCI schedules 4 TBs. The HARQ process numbers corresponding to the 4 TBs are 0, 1, 2, and 3. The four bits in the fourth bit are used to indicate the NDIs corresponding to the 4 TBs, respectively.

[0340] For example, if the value V indicated by the third bit is equal to 3m+1, where m is 0 or an integer, the DCI schedules 4 TBs. The HARQ process numbers corresponding to the 4 TBs are 0, 1, 2, and 3. The four bits in the fourth bit are used to indicate the NDIs corresponding to the 4 TBs, respectively.

[0341] For example, if the value V indicated by the third bit is equal to 3m+2, where m is 0 or an integer, the DCI schedules 4 TBs. The HARQ process numbers corresponding to the 4 TBs are 0, 1, 2, and 3. The four bits in the fourth bit are used to indicate the NDIs corresponding to the 4 TBs, respectively.

[0342] Optionally, when L=4, one bit in the fourth bit is used to indicate that the MCS index is 10 or that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the third bit by 3. For example, one bit other than the four NDI indication bits in the fourth bit is used to indicate that the MCS index is 10 or that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the third bit by 3. For example, if the bit is 0, it indicates that the MCS index is determined based on a value obtained after performing a truncation operation on the first value V corresponding to the third bit by 3, and if the bit is 1, it indicates that the MCS index is 10.

[0343] Optionally, when L=4, one bit in the fourth bit is used to indicate a first offset value. The first offset value is an integer equal to or greater than 0, for example, 0 or 1. The MCS index is a combination of the first offset value and the first value corresponding to the third bit. VIt is determined based on [specific conditions]. For example, the MCS index is determined based on the value obtained after performing a floor operation on the sum of the first value V corresponding to the third bit with respect to 3 and the first offset value Z. For example, one bit other than the four NDI indication bits within the fourth bit is used to indicate that the first offset value is Z, where Z = 0 or Z = 1, and the MCS index is determined based on the value obtained after performing a floor operation on V + Z with respect to 3, that is, the MCS index is determined based on floor(Z + V).

[0344] The value obtained after performing a remainder operation on the index indicated by the third bit with respect to 3 is 0, and the second node determines that the DCI schedules one TB or two TBs. The second node determines the NDI corresponding to the first TB based on one bit within the fourth bit, determines the first HARQ process number (H0) based on the other two bits within the fourth bit, and determines the second HARQ process number (H1) based on the other two bits within the fourth bit. When H0 = H1, the second node determines that the DCI schedules one TB, and the HARQ process number of the TB is H0. When H0 ≠ H1, the second node determines that the DCI schedules two TBs, and the HARQ process numbers of the two TBs are H0 and H1. When H0 < H1, the NDI of the second TB is equal to 0, and when H0 > H1, the NDI of the second TB is equal to 1. Alternatively, when H0 > H1, the NDI of the second TB is equal to 0, and when H0 < H1, the NDI of the second TB is equal to 1.

[0345] After performing a modulus operation on the index indicated by the third bit with respect to 3, the obtained value is 1, and the second node determines that the DCI schedules a TB of 3. The second node determines an NDI corresponding to the three TBs based on the three bits in the fourth bit. The second node determines a HARQ process number H2 corresponding to the three TBs based on the other two bits in the fourth bit. For example, H2 is indicated as {012, 013, 023, 123}. Alternatively, the second node determines an NDI of the other two TBs other than the first TB of the three TBs based on the two bits in the fourth bit. The second node determines a non-scheduled HARQ process number H2 (the value of H2 is 0, 1, 2, or 3) based on the other two bits in the fourth bit. In this case, the HARQ process numbers corresponding to the three TBs are the remaining three process numbers other than H2 in {0, 1, 2, 3}.

[0346] After performing a modulus operation on the index indicated by the third bit with respect to 3, the value obtained is 2, and the second node determines that the DCI schedules 4 TBs, and determines that the HARQ process numbers corresponding to the 4 TBs are 0, 1, 2, and 3. The second node determines the NDI corresponding to each TB based on the four bits in the fourth bit.

[0347] The following gives the definition of the i-th TB in this application. DCI indicates or schedules N HARQ processes, and the N HARQ process numbers are arranged in ascending order. It is assumed that the HARQ process numbers obtained after the N HARQ process numbers are sorted in ascending (descending) order are M(0), M(1),..., M(N-1). The HARQ process number of the i-th TB is M(i-1), where i=1,..., or N.

[0348] The implementations of the present application may be combined with each other where there is no contradiction.

[0349] In the implementation of this specification, the value corresponding to a bit may be the value indicated by that bit, or may be a decimal value obtained by converting the binary value of that bit. This is not particularly limited here.

[0350] By using the above communication method, instructions can be executed more flexibly, the coding complexity of the user terminal and the base station is reduced, and the power consumption is reduced.

[0351] The module division in the embodiment of the present application is merely an example and is a logical functional division. In actual implementation, other division manners may be used. Furthermore, the functional modules in the embodiment of the present application may be integrated into one processor, or may exist physically separately. Alternatively, two or more modules may be integrated into one module. The integrated module may be implemented in the form of hardware, or may be implemented in the form of a software functional module.

[0352] In the case where an integrated module may be implemented in the form of hardware, the communication device may be shown in Fig. 4, and the processing unit 301 may be a processor 402. The processor 402 may be a CPU, a digital processing module, etc. The transceiver unit 302 may be a communication interface 401. The communication interface 401 may be a transceiver, an interface circuit such as a transceiver circuit, a transceiver chip, etc. Communication Equipment The system further includes a memory 403 configured to store a program executed by the processor 402. The memory 403 may be a non-volatile memory such as a HDD or SSD, or a volatile memory such as a RAM, or any other medium that can carry or store desired program code in the form of instructions or data structures and that is accessible by a computer, including but not limited to such a medium.

[0353] The processor 402 is configured to execute program code stored in the memory 403, and is specifically configured to execute the operations of the processing unit 301. Details will not be described again here in this application.

[0354] The specific connection medium between the communication interface 401, the processor 402, and the memory 403 is not limited in this embodiment of the present application. In this embodiment of the present application, the memory 403, the processor 402, and the communication interface 401 are connected by using a bus 404 in FIG. 4. The bus is shown by using a thick line in FIG. 4. The connection manner between the other components is only an example for description and is not limited by the reference. The bus can be classified as an address bus, a data bus, a control bus, etc. For simplicity of presentation, only one thick line is used to represent a bus in FIG. 4, but this does not mean that there is only one bus or only one type of bus.

[0355] It should be understood by those skilled in the art that the embodiments of the present application may be provided as a method, a system, or a computer program product. Thus, the present application may use the form of a hardware-only embodiment, a software-only embodiment, or an embodiment that combines software and hardware. Furthermore, the present application may use the form of a computer program product embodied in one or more computer usable storage media (including, but not limited to, disk memory, CD-ROM, optical memory, etc.) that contain computer usable program code.

[0356] The present application is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present application. It should be understood that computer program instructions may be used to implement each process and / or each block in the flowcharts and / or block diagrams, and combinations of processes and / or blocks in the flowcharts and / or block diagrams. These computer program instructions may be provided to a processor of a general purpose computer, a special purpose computer, an embedded processor, or other programmable data processing device to generate a machine, whereby the instructions executed by the processor of the computer or other programmable data processing device generate an apparatus that implements the particular functionality of one or more processes in the flowcharts and / or one or more blocks in the block diagrams.

[0357] These computer program instructions may alternatively be stored in a computer-readable memory that can direct a computer or other programmable data processing device to operate in a particular manner, such that the instructions stored in the computer-readable memory generate an artifact that includes an instruction apparatus that implements a particular function in one or more processes in the flowcharts and / or in one or more blocks in the block diagrams.

[0358] These computer program instructions may alternatively be loaded into a computer or other programmable data processing device such that a sequence of operations and steps are executed on the computer or other programmable device, thereby generating a computer-implemented process. Thus, the instructions executed on the computer or other programmable device provide steps for implementing a particular function in one or more processes in the flowcharts and / or in one or more blocks in the block diagrams.

[0359] Obviously, those skilled in the art can make various modifications and variations to the embodiments of the present application without departing from the spirit and scope of the embodiments of the present application. The present application intends to cover these modifications and variations, provided that they fall within the scope of protection defined by the following claims and their equivalent technologies.

[0360] This application claims priority to International Patent Application No. PCT / CN2019 / 080645, filed on March 29, 2019, with the State Intellectual Property Office of the People's Republic of China, entitled "COMMUNICATION METHOD AND DEVICE", the entire contents of which are incorporated herein by reference. This application also claims priority to International Patent Application No. PCT / CN2019 / 111545, filed on October 16, 2019, with the State Intellectual Property Office of the People's Republic of China, entitled "COMMUNICATION METHOD AND DEVICE", a portion of which is incorporated herein by reference.

Claims

1. 1. A communication method comprising: determining, by a first device, first control information, where when a cyclic redundancy check (CRC) code of the first control information is scrambled by a system information radio network temporary identifier (SI-RNTI), the first control information carries first information used to indicate emergency information, the emergency information including one or more of the following: an Earthquake and Tsunami Warning System (ETWS) notification, a Commercial Mobile Alert Service (CMAS) notification, and a system information change notification; transmitting, by the first device, the first control information to a second device; transmitting the emergency information by the first device to the second device; having a first field of the first control information indicates the first information, and bits of other fields in the first control information except for the first field are set to 0; method.

2. 1. A communication method comprising: receiving, by a second device, first control information transmitted by the first device, wherein when a cyclic redundancy check (CRC) code of the first control information is scrambled by a system information radio network temporary identifier (SI-RNTI), the first control information carries first information used to indicate emergency information, the emergency information including one or more of the following: an earthquake and tsunami warning system (ETWS) notification, a commercial mobile alert service (CMAS) notification, and a system information change notification; receiving, by the second device, the emergency information based on the first information in the first control information; having a first field of the first control information indicates the first information, and bits of other fields in the first control information except for the first field are set to 0; method.

3. The first control information is downlink control information in an enhanced machine type communication (eMTC) system of Long Term Evolution (LTE), or downlink control information in a New Radio (NR) system; The method according to claim 1 or 2.

4. The search space corresponding to the first control information is not a Type 2 search space; 4. The method according to any one of claims 1 to 3.

5. The first control information is format-3 control information, format-3A control information, format-6-0A control information, format-6-0B control information, format-6-1A control information, or format-6-1B control information in an LTE eMTC system; 5. The method according to any one of claims 1 to 4.

6. The first control information is format-3 or format-3A control information, and K transmission power control commands (TPC commands) in the first control information are used to indicate the first information, where K is an integer equal to or greater than 1.

6. The method according to any one of claims 1 to 5.

7. The K TPC commands are predefined or the K TPC commands are determined by the first device and configured for the second device using higher layer signaling. The method according to claim 6.

8. The first control information is format-3 or format-3A control information, and Q bits other than the TPC command in the first control information are used to indicate the first information, where Q is an integer equal to or greater than 1.

6. The method according to any one of claims 1 to 5.

9. A communication device, comprising: The apparatus is adapted for use in a first device, a processing unit configured to determine first control information, the first control information carrying first information used to indicate emergency information when a Cyclic Redundancy Check (CRC) code of the first control information is scrambled by a System Information Radio Network Temporary Identifier (SI-RNTI), the emergency information including one or more of the following: an Earthquake and Tsunami Warning System (ETWS) notification, a Commercial Mobile Alert Service (CMAS) notification, and a System Information Change notification; a transceiver unit configured to transmit the first control information determined by the processing unit to a second device and to transmit the emergency information to the second device; having a first field of the first control information indicates the first information, and bits of other fields in the first control information except for the first field are set to 0; Communications equipment.

10. A communication device, comprising: The apparatus is applied to a second device; a transceiver unit configured to receive data; Processing unit and having The processing unit includes: Controlling the transceiver unit to receive first control information transmitted by a first device, wherein when a Cyclic Redundancy Check (CRC) code of the first control information is scrambled by a System Information Radio Network Temporary Identifier (SI-RNTI), the first control information carries first information used to indicate emergency information, the emergency information including one or more of the following: an Earthquake and Tsunami Warning System (ETWS) notification, a Commercially Available Mobile Alert Service (CMAS) notification, and a System Information Change notification; Controlling the transceiver unit to receive the emergency information based on the first information in the first control information. It is configured as follows: a first field of the first control information indicates the first information, and bits of other fields in the first control information except for the first field are set to 0; Communications equipment.

11. The first control information is downlink control information in an enhanced machine type communication (eMTC) system of Long Term Evolution (LTE), or downlink control information in a New Radio (NR) system; A communication device according to claim 9 or 10.

12. The search space corresponding to the first control information is not a Type 2 search space; A communication device according to any one of claims 9 to 11.

13. The first control information is format-3 control information, format-3A control information, format-6-0A control information, format-6-0B control information, format-6-1A control information, or format-6-1B control information in an LTE eMTC system; A communication device according to any one of claims 9 to 12.

14. The first control information is format-3 or format-3A control information, and K transmission power control commands (TPC commands) in the first control information are used to indicate the first information, where K is an integer equal to or greater than 1. A communication device according to any one of claims 9 to 13.

15. The K TPC commands are predefined or the K TPC commands are determined by the first device and configured for the second device using higher layer signaling.

15. The communication device of claim 14.

16. The first control information is format-3 or format-3A control information, and Q bits other than the TPC command in the first control information are used to indicate the first information, where Q is an integer equal to or greater than 1. A communication device according to any one of claims 9 to 13.

17. A communication device, comprising: The apparatus is adapted for use in a first device and has a processor and a memory storing a computer program; The computer program, when executed by the processor, causes the first device to perform the method of any one of claims 1 and 3 to 8. Device.

18. A communication device, comprising: The apparatus is adapted for use in a second device and has a processor and a memory storing a computer program; The computer program, when executed by the processor, causes the second device to perform a method according to any one of claims 2 to 8. Device.

19. The method according to any one of claims 1 to 8 may be implemented when read and executed by one or more processors, Computer program.

Citation Information

Patent Citations

  • Method and apparatus for notifying SI update, EAB update, and PWS message in a wireless communication system

    JP2018526898A

  • Group power control for a secondary cell

    US20180041997A1

  • Terminal device, base station device and method

    WO2016186044A1

  • User terminal, radio base station and radio communication method

    WO2017078023A1