Method, apparatus and system for handover in a multi-connection network - Patents.com
The method addresses the challenge of flexible user plane channel sharing in multi-access networks by determining user type and adjusting splitting policies, enabling efficient handover and cost-effective network sharing in 5G and 4G networks.
Patent Information
- Application Number
- JP2022573466
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-05-29
- Filing Date
- 2021-05-07
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-05-07
AI Technical Summary
In multi-access networks with co-constructed and shared 5G and 4G networks, there is a challenge in flexibly controlling the degree of sharing of user plane channels during handover processes, as the deployment frequencies and coverage areas differ, leading to inconsistent user plane operations across operators.
A method and device for determining the type of user (shared or construction operator) and adjusting user plane splitting policies based on user type and resource occupancy, enabling flexible control of user plane channel sharing during handover, allowing for independent operation of 4G networks while sharing 5G networks.
Enables flexible control of user plane sharing in multi-access networks, reducing network construction costs by allowing shared 5G networks while maintaining independent operation of 4G networks, ensuring seamless handover and efficient resource utilization.
Smart Images

Figure 0007581381000001 
Figure 0007581381000002 
Figure 0007581381000003
Abstract
Description
[Technical field]
[0001] [CROSS REFERENCE TO RELATED APPLICATIONS] This disclosure is based on and claims priority to Chinese Patent Application No. 202010472373.4, filed on May 29, 2020, the disclosure of which is incorporated herein by reference in its entirety.
[0002] The present disclosure relates to the field of communication technology, and in particular to a handover method, a network device and a system in a multi-connection network. [Background technology]
[0003] With the rapid development of mobile Internet, users are gradually increasing their demands for network speed. In order to meet users' requirements for business rates, 5G (fifth generation) mobile networks are implemented and deployed. With the implementation of 5G networks, there are currently multiple mobile communication network standards, such as 5G mobile networks, 4G (fourth generation) mobile networks, and 3G (third generation) mobile networks. In a mobile network environment where mobile networks of different standards coexist, the multiple access technology enables a user terminal to aggregate the business rates of mobile networks of different standards to increase the transmission rate, thereby improving the user's business experience in the multiple access network.
[0004] In a multiple access network including a core network and an access network, the access network generally adopts a network architecture in which the control plane and the user plane are separated from each other. For example, in a 5G NSA (Non-Standalone) scenario, options 3, 4, 7 and 8 have been proposed for 3GPP (3rd Generation Partnership Project), in which a terminal can establish a connection with a 4G base station and a connection with a 5G base station at the same time (dual access). At present, the mainstream networking mode is option 3. Since the deployment frequency of 4G base stations is lower than that of 5G base stations, the coverage area of 4G base stations is larger than that of 5G base stations. Therefore, in option 3, in order to achieve the purpose of consolidating the performance of 4G and 5G networks, the 4G base station is responsible for transmitting control plane information, while the 5G base station and the 4G base station are both responsible for transmitting user plane data via dual access technology.
[0005] According to three specific implementation forms included in option 3, the user plane data of the terminal may be transmitted in three ways. As shown in FIG. 1, option 3 specifically includes option 3, option 3a, and option 3x, where the transmission of control plane information is indicated by a dotted arrow, and the transmission of user plane data is indicated by a solid arrow. In option 3, the user plane data of the terminal is split to a 5G base station via a 4G base station, and in option 3a, the user plane data of the terminal is split to a 4G base station and a 5G base station via a core network (EPC, Evolved Packet Core network), for example, the user plane data of the terminal is split to a 4G base station and a 5G base station via a Serving GateWay (SGW) in the EPC. In option 3x, the user plane data of the terminal is split to a 4G base station via a 5G base station. The protocol stacks of the 4G base station and the 5G base station include, for example, a Packet Data Convergence Protocol (PDCP) layer, a Radio Link Control (RLC) layer, a Media Access Control (MAC) layer, a Physical (PHY) layer, etc. Both the 4G base station and the 5G base station are connected to an EPC (Evolved Packet Core). The 4G base station is, for example, a Long Term Evolution (LTE) base station, and the 5G base station is, for example, a New Radio (NR) base station.
[0006] Currently, because the cost of building a 5G network is high, it is desired that multiple operators in different regions jointly build and share a 5G network in order to save the investment of the 5G network. Then, 5G users of various shared operators can use the 5G networks built by different operators. For example, in the network joint construction and sharing mode, the infrastructure of the 5G network may be set up by operator A in some cities, by operator B in other cities, and by operator C in further cities. In the NSA scenario, the 4G base station is generally the anchor of the 5G base station. Thus, the local construction operator shares the control plane of the 4G network with other operators, so that users of other shared operators can access the NSA network. When a terminal is moving within the boundary area of the joint construction and sharing network built by different operators, due to the change of the construction operator, the control plane channel of the 4G network of the terminal needs to be taken over, and the user plane channel also needs to be switched. Summary of the Invention
[0007] According to some embodiments of the present disclosure, a handover method in a multiple access network is provided, the method including: determining a type of a user of a terminal during a handover process of the terminal to a multiple access network of a construction operator, the type including a first type indicating that the user is a user of a shared operator or a second type indicating that the user is a user of the construction operator; determining a user plane split policy corresponding to the terminal according to the type of the user of the terminal; if the user plane split policy corresponding to the terminal is split disabled, switching the user plane channel of the terminal to a user plane channel of a first standard network of the construction operator; and if the user plane split policy corresponding to the terminal is split enabled, switching the user plane channel of the terminal to a user plane channel of the first standard network of the construction operator and a user plane channel of the second standard network.
[0008] In some embodiments, the step of determining a user plane split policy corresponding to the terminal according to a type of a user of the terminal includes: determining that the user plane split policy corresponding to the terminal is split-disabled if the type of the user of the terminal is a first type; and determining that the user plane split policy corresponding to the terminal is split-enabled if the type of the user of the terminal is a second type.
[0009] In some embodiments, determining a user plane splitting policy corresponding to the terminal according to a type of user of the terminal includes, when the networking mode includes splitting user plane data from base stations in the second standard network or splitting user plane data from base stations in the first standard network, determining a user plane splitting policy corresponding to the terminal according to a type of user of the terminal and an occupancy rate of user plane air interface resources provided by base stations in the second standard network and occupied by all terminals whose users are of the same type as the terminal.
[0010] In some embodiments, the step of determining a user plane split policy corresponding to the terminal according to the type of the user of the terminal and an occupancy rate of user plane air interface resources provided by base stations in the second standard network and occupied by all terminals belonging to users of a shared operator when the type of the user of the terminal is a first type includes the steps of: determining whether an occupancy rate of user plane air interface resources provided by base stations in the second standard network and occupied by all terminals belonging to users of a shared operator reaches a threshold when the occupancy rate reaches the threshold; determining that the user plane split policy corresponding to the terminal is split disabled when the occupancy rate does not reach the threshold; and determining that the user plane split policy corresponding to the terminal is split enabled when the occupancy rate is a second type.
[0011] In some embodiments, the method further includes, after determining the user plane split policy corresponding to the terminal, storing the user plane split policy corresponding to the terminal in association with an identity of the terminal.
[0012] In some embodiments, the step of storing the user plane split policy corresponding to the terminal in association with the terminal identification information includes a step of setting a split switch of a user plane channel of the second standard network corresponding to the terminal identification information to an off state when it is determined that the user plane split policy corresponding to the terminal is split-disabled, and a step of setting a split switch of a user plane channel of the second standard network corresponding to the terminal identification information to an on state when it is determined that the user plane split policy corresponding to the terminal is split-enabled.
[0013] In some embodiments, determining the type of the user of the terminal includes, in response to receiving control plane information of the terminal, obtaining identification information of the terminal from the control plane information or via an interface with a network device to which the terminal is connected before the terminal handover process, and determining the type of the user of the terminal according to the identification information of the terminal.
[0014] In some embodiments, determining a user type of the terminal during a handover process of the terminal to the multiple access network of the infrastructure operator includes, if an interface is established between the infrastructure operator's network device and a network device to which the terminal was connected before the terminal handover process, obtaining a Public Land Mobile Network (PLMN) number of the terminal via the interface and determining a user type of the terminal according to the PLMN number, or, if an interface is not established between the infrastructure operator's network device and a network device to which the terminal was connected before the terminal handover process, obtaining a PLMN number of the terminal via a Radio Resource Control (RRC) connection establishment process with the terminal and determining a user type of the terminal according to the PLMN number.
[0015] In some embodiments, the method further includes switching the terminal's control plane to a control plane channel of the construction operator's second standard network.
[0016] In some embodiments, if the networking mode includes splitting user plane data from a base station in the second standard network or splitting user plane data from a base station in the first standard network, the split switch is configured in a base station in the second standard network, and if the networking mode includes splitting user plane data from a core network of the second standard network, the split switch is configured in a core network device.
[0017] In some embodiments, the first standard network is a fifth generation mobile network and the second standard network is a fourth generation mobile network or a third generation mobile network.
[0018] According to yet another embodiment of the present disclosure, there is provided a network device in a multi-connection network, the network device comprising: a processor; and a memory coupled to the processor and storing instructions that, when executed by the processor, cause the processor to perform a handover method in a multi-connection network according to any one of the above embodiments.
[0019] According to yet another embodiment of the present disclosure, there is provided a non-transitory computer readable storage medium storing a computer program which, when executed by a processor, causes the processor to perform a method for handover in a multi-connection network according to any one of the above embodiments.
[0020] According to yet another embodiment of the present disclosure, there is provided a system in a multiple connection network, the system comprising: a network device in the multiple connection network according to any of the above embodiments; and a terminal that is taken over by a multiple connection network of a construction provider and configured to transmit user plane data via a user plane channel of a first standard network of the construction provider when a user plane split policy corresponding to the terminal is split-disabled, and to transmit user plane data via a user plane channel of the first standard network of the construction provider and a user plane channel of a second standard network of the construction provider when a user plane split policy corresponding to the terminal is split-enabled.
[0021] Other features and advantages of the present invention will become apparent from the following detailed description of illustrative embodiments of the present disclosure, which proceeds with reference to the accompanying drawings.
[0022] The accompanying drawings, which are included to provide a further understanding of the present disclosure and which are incorporated in and constitute a part of this specification, illustrate embodiments of the present invention and, together with the exemplary embodiments of the present application, serve to explain the disclosure but not to limit the present disclosure. [Brief description of the drawings]
[0023] [Figure 1] 1 is a schematic diagram of a dual connectivity mode of an NSA network according to some embodiments of the present disclosure. [Diagram 2] 4 is a schematic flow chart of a handover method in a multi-connection network according to some embodiments of the present disclosure. [Diagram 3] 4 is a schematic flow chart of a handover method in a multi-connection network according to another embodiment of the present disclosure; [Figure 4A] 1 is a schematic diagram illustrating a change in a dual connectivity (DC) bearer during a terminal handover process in an NSA dual connectivity network environment built by combining a 4G network and a 5G network according to some embodiments of the present disclosure. [Figure 4B] A schematic diagram showing the change of a dual connectivity (DC) bearer during a terminal handover process in an NSA dual connectivity network environment built by combining a 4G network and a 5G network according to another embodiment of the present disclosure. [Diagram 5] FIG. 2 is a schematic diagram of a network device in a multi-connection network according to some embodiments of the present disclosure. [Figure 6] FIG. 13 is a schematic configuration diagram of a network device in a multi-connection network according to another embodiment of the present disclosure. [Figure 7] FIG. 13 is a schematic configuration diagram of a network device in a multi-connection network according to yet another embodiment of the present disclosure. [Figure 8] FIG. 1 is a schematic diagram of a system in a multi-connection network according to some embodiments of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0024] Hereinafter, the technical solutions of each embodiment of the present disclosure will be described clearly and completely with reference to the drawings of each embodiment. Obviously, only some embodiments of the present disclosure are given herein, not all embodiments of the present disclosure. The following description of at least one exemplary embodiment is merely illustrative in nature, and is not intended as a limitation on the present invention, its application or use. All other embodiments obtained by those skilled in the art based on the embodiments of the present disclosure without creative efforts shall fall within the protection scope of the present disclosure.
[0025] The inventors have found that in the three specific implementations of option 3, both the 5G base station and the 4G base station are responsible for the transmission of user plane data via dual connectivity technology. Currently, due to the inconsistent progress of the construction of 4G networks of various operators, it is generally desired to operate the 4G user plane separately without sharing, or to flexibly control the degree to which the 4G user plane is shared with users of other operators. Based on the three specific implementations of option 3, in the handover process of the terminal in the boundary area between the co-construction network and the shared network, when the terminal is handed over to the network constructed by any operator, the user plane channel of the terminal needs to be switched to the 4G user plane channel and the 5G user plane channel of the operator. In this situation, it is still necessary for the 5G base station and the 4G base station to be responsible for the transmission of user plane data, which does not meet the needs of the operator. Generalizing to other multiple connectivity networks, in the handover process of the terminal in the boundary area between the co-construction network and the shared network, the user attributes of the terminal are different for different operators. In a situation where a terminal is handed over to a network of a construction operator, the construction operator may wish to flexibly control the degree of sharing the user plane of the second standard network with users of other shared operators while sharing the user plane of the first standard network with users of other shared operators. Therefore, the problem to be solved is how to realize the sharing of the user plane of the first standard network in the terminal handover process when the degree of sharing the user plane of the second standard network is controllable.
[0026] The technical problem that the present disclosure aims to solve is how to realize flexible control of the degree of sharing of the user plane of a second standard network based on requirements while enabling sharing of a first standard network during a terminal handover process.
[0027] The present disclosure provides a handover method in a multi-connection network, which is described below with reference to Figures 2 to 4B. The user plane channel and the control plane channel in the present disclosure are logical channels, and respectively refer to resources used to transmit user plane data and resources used to transmit control plane information.
[0028] 2 is a flowchart of a handover method in a multi-connection network according to some embodiments of the present disclosure. As shown in FIG. 2, the method of these embodiments includes steps S202 to S208.
[0029] In step S202, the infrastructure provider's network device determines the user type of the terminal during the handover process of the terminal to the infrastructure provider's multi-access network.
[0030] In the network co-construction and sharing mode, the constructor is an operator responsible for constructing a network in a certain area, and the sharing operator is another operator that shares part or all of the network with the constructor. The constructor's multi-connection network accessed by the terminal includes at least two standard networks, such as a first standard network and a second standard network, and the terminal is connected to each of the different standard networks. For example, the first standard network is a fifth generation mobile network, and the second standard network is a fourth generation mobile network or a third generation mobile network.
[0031] For example, when the networking mode includes splitting user plane data from a base station in a second standard network or splitting user plane data from a base station in a first standard network, the network equipment of the construction operator is a base station in the second standard network. When the networking mode includes splitting user plane data from a core network of the second standard network, the network equipment of the construction operator is a core network device. When the first standard network is a 5G network and the second standard network is a 4G network, the network equipment of the construction operator in the above three cases may correspond to specific network equipment in the option 3 scenario, the option 3x scenario and the option 3a scenario, respectively. The network equipment of the construction operator acts as a target network equipment in the handover process, and the terminal is handed over from the source network equipment to the network equipment of the construction operator. The network equipment (to which the terminal is connected) before and after the handover process may belong to the same operator or different operators, and this solution is applicable to both of these situations.
[0032] The type of the user of the terminal includes a first type indicating that the user is a shared operator user, or a second type indicating that the user is a user of the construction operator. In some embodiments, in response to receiving the control plane information of the terminal, the construction operator's network device obtains the terminal's identification information from the control plane information or via an interface with the network device to which the terminal is connected before the terminal's handover process, and then determines the type of the user of the terminal according to the terminal's identification information. For example, the control plane information includes information in a Radio Resource Control (RRC) connection establishment process between the construction operator's network device and the terminal, and the terminal's identification information includes the terminal's Public Land Mobile Network (PLMN) number. For example, the terminal's identification information includes an International Mobile Subscriber Identity (IMSI) including the PLMN number. The control plane information may also include signaling in another access procedure, such as an attach request, which is not limited to the illustrated example.
[0033] Since each operator has a different PLMN number, the operator attributes (user types) of users of different terminals can be identified based on the PLMN numbers. In some embodiments, if an interface is set up between the network device of the construction operator and the network device to which the terminal is connected before the terminal handover process, the network device of the construction operator obtains the PLMN number of the terminal through the interface and determines the user type of the terminal according to the PLMN number. The network devices of different operators may or may not have an interface between them. If such an interface exists, the network device to which the terminal is connected before the terminal handover process can send the PLMN number to the network device of the construction operator to which the terminal is connected after the terminal handover process through the interface.
[0034] In another embodiment, if no interface is set between the network device of the construction operator and the network device to which the terminal is connected before the handover process of the terminal, the network device of the construction operator obtains the PLMN number of the terminal from the signaling in the handover process. For example, if the network device of the construction operator is a base station of a second standard network, the network device of the construction operator obtains the PLMN number of the terminal through an RRC connection establishment process with the terminal, and determines the user type of the terminal according to the PLMN number. The PLMN number includes a Mobile Country Code (MCC) and a Mobile Network Code (MNC), and the operator network to which the user belongs can be determined based on the MNC. The handover process in the multiple access network includes a process of establishing an RRC connection between the terminal and the base station. For the handover process, reference can be made to the prior art, and will not be repeated here. In this solution, the PLMN number of the terminal is identified from the signaling in the handover process, thereby determining the user type of the terminal.
[0035] In step S204, the network device of the construction provider determines a user plane split policy corresponding to the terminal according to the type of the user of the terminal.
[0036] The user plane split policy may be a user-level setting, i.e., the user plane split policy is correspondingly set for each terminal user. The user plane split policy of the terminal may include split disable and split enable. Split disable means that the user plane data of the terminal is prohibited from being split to a network that is not shared with the terminal by the construction operator. Split enable means that the user plane data of the terminal is allowed to be split to all networks of the construction operator. In some embodiments, if the user of the terminal is a user of the shared operator, i.e., the type of the user is a first type, the construction operator's network device determines that the user plane split policy corresponding to the terminal is split disable, and if the user of the terminal is a user of the construction operator, i.e., the type of the user is a second type, the construction operator's network device determines that the user plane split policy corresponding to the terminal is split enable.
[0037] In another embodiment, the infrastructure operator can control the sharing degree of the user plane channel of a specific network (such as the second standard network) to the user of the sharing operator, and the sharing degree can be determined through negotiation between the infrastructure operator and the sharing operator. For example, the infrastructure operator can share the user plane air interface resource of the base station in the second standard network with the sharing operator at a certain ratio. Since the information of the user plane air interface resource is mainly obtained by the base station, when the networking mode includes dividing the user plane data from the base station in the second standard network or dividing the user plane data from the base station in the first standard network, the network device of the infrastructure operator determines the user plane division policy corresponding to the terminal according to the type of the user of the terminal and the occupancy rate of the user plane air interface resource provided by the base station in the second standard network and occupied by all terminals whose users are the same type as the terminal. For Option 3, Option 3a and Option 3x, the above-mentioned method is mainly applicable to Option 3 and Option 3x. The occupancy rate is the ratio of user plane air interface resources occupied by all terminals whose users are of the same type as the terminal to all user plane air interface resources provided by base stations in the second standard network.
[0038] Also, when the user of the terminal is a user of the construction operator, the construction operator's network device determines whether the occupancy rate of the user plane air interface resources provided by the base station in the second standard network and occupied by all terminals belonging to the user of the shared operator reaches a threshold, and when the occupancy rate reaches the threshold, determines that the user plane split policy corresponding to the terminal is split invalid, and when the occupancy rate does not reach the threshold, determines that the user plane split policy corresponding to the terminal is split valid. That is, when the user plane air interface resources of the base station in the second standard network occupied by the user of the shared operator connected to the base station in the second standard network reach a threshold, the terminal is set to split invalid after being handed over to the multiple access network. When the user of the terminal is a user of the construction operator, the construction operator's network device determines that the user plane split policy corresponding to the terminal is split valid. For example, the user plane air interface resources are user plane air interface channel resources or user plane air interface path resources.
[0039] In step S206, if the user plane split policy corresponding to the terminal is split disabled, the network device of the provider switches the user plane channel of the terminal to the user plane channel of the provider's first standard network.
[0040] In step S208, if the user plane split policy corresponding to the terminal is split enabled, the network device of the infrastructure provider switches the user plane channel of the terminal to the user plane channel of the first standard network and the user plane channel of the second standard network of the infrastructure provider.
[0041] In some embodiments, when the network device of the construction operator is a core network device, the core network device transmits the user plane split policy of the terminal to a base station in the second standard network (i.e., a base station in charge of the control plane). The base station in the second standard network assigns a user plane channel of the construction operator's first standard network to the terminal, or assigns a user plane channel of the construction operator's first standard network and a user plane channel of the second standard network to the terminal according to the user plane split policy. That is, the base station in the construction operator switches the user plane channel of the terminal to the user plane channel of the construction operator's first standard network, or switches the user plane channel of the terminal to the user plane channel of the construction operator's first standard network and a user plane channel of the second standard network according to the user plane split policy.
[0042] The user plane channel of the terminal may change the network standard before and after the handover process. For example, if the user of the terminal is a user of the construction operator, and the terminal located in the shared operator's network before the handover process moves to the construction operator's network in the boundary area between the joint construction network and the shared network, the terminal changes from originally using the user plane channel of the first standard network of the shared operator to using the user plane channel of the first standard network of the construction operator and the user plane channel of the second standard network after the handover process. If the user of the terminal is a user of the construction operator, and the terminal located in the shared operator's network before the handover process moves to the construction operator's network in the boundary area between the joint construction network and the shared network, the terminal changes from originally using the user plane channel of the first standard network of the shared operator and the user plane channel of the second standard network after the handover process to using only the user plane channel of the first standard network of the construction operator.
[0043] The procedure of determining the user plane split policy corresponding to the terminal according to the user type of the terminal and the occupancy rate of the user plane air interface resources provided by the base station in the second standard network and occupied by all terminals whose users are the same type as the terminal is similar to the above procedure, which may cause the change of the user plane split policy before and after the handover process of the terminal, thereby causing the change of the network standard of the user plane channel, and is not repeated here. Through the above process, the user-level switching control operation is performed based on the type of the user, and the flexible control of the sharing of the user plane of the first standard network and the sharing degree of the user plane of the second standard network can be achieved, so that the first standard network can be jointly constructed for sharing, and the second standard network can operate relatively independently, thereby realizing a network sharing manner.
[0044] In the above embodiment, the network device of the construction provider identifies whether the user of the terminal is a user of the construction provider or a user of the shared service provider during the handover process of the terminal to the multiple access network of the construction provider. The network device of the construction provider determines a user plane split policy corresponding to the terminal according to the type of the user of the terminal. If the user plane split policy corresponding to the terminal is split disabled, the network device of the construction provider switches the user plane channel of the terminal to the user plane channel of the first standard network of the construction provider. If the user plane split policy corresponding to the terminal is split enabled, the network device of the construction provider switches the user plane channel of the terminal to the user plane channel of the first standard network of the construction provider and the user plane channel of the second standard network.
[0045] When a terminal is handed over to the border area of a multiple connection co-construction shared network, the method of the above embodiment can achieve flexible control of the sharing degree of the user plane of the second standard network based on requirements while enabling the sharing of the first standard network. Flexible switching to the user plane channel of the second standard network can be realized based on different types of users of each terminal. The above method is applicable to NSA scenarios. When the first standard network is a 5G network and the second standard network is a 4G network, the sharing degree of the user plane of the 4G network can be flexibly controlled according to the type of user while enabling the sharing of the 5G network by all users after the handover. In this way, the goal of co-construction and sharing of the 5G network and the relatively independent operation of the 4G network can be achieved, which can ensure the implementation of 5G network co-construction and sharing, and can reduce the cost of 5G network construction.
[0046] In the process of a terminal accessing a multiple access network, the sharing of the user plane of the first standard network can be realized while flexibly controlling the sharing degree of the user plane of the second standard network. For example, during the process of a terminal accessing a multiple access network of a construction provider, the network device of the construction provider determines the type of the user of the terminal. The network device of the construction provider determines a user plane split policy corresponding to the terminal according to the type of the user of the terminal, and when the user plane split policy corresponding to the terminal is split invalid, assigns a user plane channel of the construction provider's first standard network to the terminal to transmit the user plane data of the terminal, and when the user plane split policy corresponding to the terminal is split valid, assigns a user plane channel of the construction provider's first standard network and a user plane channel of the second standard network to the terminal to transmit the user plane data of the terminal. The handover process can be referred to for the process of determining the user type of the terminal and determining the user plane split policy. Through the cooperation of the handover process and the access process, the sharing of the user plane of the first standard network can be realized while flexibly controlling the sharing degree of the user plane of the second standard network in the entire communication process.
[0047] A flowchart of a handover method in a multi-connection network according to another embodiment of the present disclosure is described below with reference to Figure 3. As shown in Figure 3, the method of these embodiments includes steps S302 to S316.
[0048] In step S302, in response to receiving the control plane information of the terminal, the network device of the construction provider obtains identification information of the terminal from the control plane information or via an interface with the network device to which the terminal was connected before the terminal handover process.
[0049] In step S304, the network device of the construction provider determines the type of the user of the terminal according to the identification information of the terminal.
[0050] The terminal identification information includes, for example, a PLMN number.
[0051] In step S306, the network device of the construction provider determines a user plane split policy corresponding to the terminal according to the type of the user of the terminal.
[0052] For details of this step, please refer to the above embodiment.
[0053] In step S308, the network device of the system provider stores the user plane split policy corresponding to the terminal in association with the identification information of the terminal.
[0054] The user plane split policy can be stored as an item of the terminal's attribute information in association with the terminal's identification information. For example, the user plane split policy can be expressed by a numerical value such as "1" for splitting enabled and "0" for splitting disabled. Here, the terminal identification information refers to information that can uniquely identify a terminal.
[0055] In some embodiments, a split switch may be provided corresponding to each terminal user. When the network device of the construction operator determines that the user plane split policy corresponding to the terminal is split-disabled, the split switch of the user plane channel of the second standard network corresponding to the terminal's identification information is set to an off state, and when the network device of the construction operator determines that the user plane split policy corresponding to the terminal is split-enabled, the split switch of the user plane channel of the second standard network corresponding to the terminal's identification information is set to an on state. The state of the split switch may be expressed by a numerical value, for example, "1" for an on state and "0" for an off state, but is not limited to the illustrated example. When the networking mode includes splitting user plane data from a base station in the second standard network or splitting user plane data from a base station in the first standard network, the split switch may be configured in the base station in the second standard network, and when the networking mode includes splitting user plane data from a core network of the second standard network, the split switch may be configured in the core network device.
[0056] In step S310, the network device of the system provider allocates a user plane channel to the terminal according to the user plane split policy corresponding to the terminal, that is, switches the user plane channel of the terminal according to the user plane split policy corresponding to the terminal.
[0057] A user plane channel can be assigned to the terminal according to the state of the split switch. When the networking mode includes splitting user plane data from a base station in the second standard network or splitting user plane data from a base station in the first standard network, the network device of the construction operator may be a base station in the second standard network (a base station in charge of the control plane). When the user plane split policy corresponding to the terminal is split disabled, the base station in the second standard network can assign a user plane channel of the first standard network to the terminal, i.e., switch the user plane channel of the terminal to the user plane channel of the first standard network. When the user plane split policy corresponding to the terminal is split enabled, the base station in the second standard network can assign a user plane channel of the first standard network and a user plane channel of the second standard network to the terminal, i.e., switch the user plane channel of the terminal to the user plane channel of the first standard network and a user plane channel of the second standard network. The process of assigning a user plane channel includes interactions between the base station in the second standard network and the base station in the first standard network. For this process, reference can be made to the prior art, and will not be repeated here.
[0058] When the networking mode includes splitting user plane data from a core network of the second standard network, the network device of the construction operator may be a core network device. The control device sends a user plane split policy corresponding to the terminal to a base station (base station in charge of the control plane) in the second standard network, and the base station in the second standard network allocates a user plane channel to the terminal according to the user plane split policy corresponding to the terminal.
[0059] In step S312, if the user plane split policy corresponding to the terminal is split disabled, the network device of the construction provider transmits user plane data via a user plane channel of the first standard network of the construction provider in response to receiving the user plane data from the terminal.
[0060] In step S314, if the user plane split policy corresponding to the terminal is split enabled, the network device of the construction provider transmits the user plane data via a user plane channel of the first standard network and a user plane channel of the second standard network of the construction provider in response to receiving the user plane data from the terminal.
[0061] In step S316, the network device of the provider switches the control plane of the terminal to the control plane channel of the provider's second standard network.
[0062] Step S316 and steps S302 to S314 are parallel steps. In response to receiving the control plane information from the terminal, the network device of the construction operator transmits the control plane information of the terminal through the control plane channel of the second standard network of the construction operator. The control plane information of all the terminals can be transmitted through the control plane channel of the second standard network. The coverage area of the second standard network is larger than the coverage area of the first standard network.
[0063] The solution of the above embodiment can be extended to a handover process of a terminal in multiple networks of different network standards. For example, the first standard network may be replaced by one or more shared networks, i.e., the terminals of all types of users can transmit user plane data via the user plane channels of the shared network before or after the handover process. The second standard network can be replaced by one or more networks with a controllable degree of sharing. For a terminal, in order to determine whether the terminal's user plane data can be transmitted via the network with a controllable degree of sharing after the handover process, it is required to determine the user plane split policy of this terminal according to the type of user of the terminal or according to the type of user of the terminal and the occupancy rate of the user plane air interface resources provided by the base station in the network with a controllable degree of sharing and occupied by all terminals whose users are of the same type as the terminal. For details of this scheme, reference can be made to the above embodiment, and will not be repeated here.
[0064] Taking an NSA dual connectivity network that supports networking modes option 3, option 3a and option 3x and is constructed by combining a 4G network and a 5G network as an example, a data transmission method in the dual connectivity network is described below with reference to Figures 4A and 4B.
[0065] As shown in FIG. 4A and FIG. 4B, both 4G base station and 5G base station are connected to EPC (Evolved Packet Core). The protocol stacks of 4G base station and 5G base station include, for example, PDCP layer, RLC layer, MAC layer, PHY layer, etc. The transmission of control plane information is indicated by dashed arrows, and the transmission of user plane data is indicated by solid arrows. Because the cost of building a 5G network is high, it is desired that the 5G network be jointly built and shared by multiple operators in different regions to save the investment of the 5G network. 5G users of various shared operators can use 5G networks built by different operators. Since each operator has a different PLMN number, for different users, the operator attributes can still be identified in the jointly built and shared 5G network. In the network joint construction and sharing mode, for each local network, the construction operator is responsible for the construction and operation of the 5G network in its area.
[0066] When a terminal accesses a shared multiple access network, the network device of the construction operator extracts the PLMN number of the terminal from the signaling in the access process and identifies whether the user of the terminal is a construction operator's user or a shared operator's user. The user plane split policy of the terminal can be directly determined according to the type of user. In option 3 and option 3x, the user plane split policy of the terminal can be provided by the construction operator's 4G base station and further determined according to the occupancy rate of the user plane air interface resources occupied by all terminals of the shared operator.
[0067] For example, for any user having a PLMN number of the construction operator, the split switch of the 4G user plane channel is set to the ON state, so that all 5G users of the construction operator can use the local 4G network and the local 5G network simultaneously. For any user of the construction operator, the split switch of the 4G user plane channel corresponding to the user is set to the ON state, so that the user plane channels of both the local 4G network and the local 5G network can be used by all 5G dual connectivity users of the construction operator. For a user of a shared operator, the split switch of the 4G user plane channel corresponding to this user is set to the OFF state, so that all 5G dual connectivity users of the shared operator are only allowed to use the user plane channel of the local 5G network and cannot use the user plane channel of the local 4G network.
[0068] Or in option 3 and option 3x, for a user of a shared operator, if the occupancy rate of the user plane air interface resources of the local 4G network occupied by the user of the shared operator reaches a threshold, the split switch of the 4G user plane channel corresponding to this user is set to an off state for subsequent access users of the shared operator, so that the user is only allowed to use the user plane channel of the local 5G network, and cannot use the user plane channel of the local 4G network. If the occupancy rate of the user plane air interface resources of the local 4G network occupied by the user of the shared operator does not reach a threshold, the split switch of the 4G user plane channel corresponding to the user of the shared operator can be set to an on state, so that the user of the shared operator is allowed to use the user plane channels of both the local 4G network and the local 5G network. Of course, all 5G dual-connection users of the shared operator can still use the control plane channel of the local 4G network to transmit control plane information and ensure the normal operation of the NSA network. Therefore, based on the above sharing solution, the goal of joint construction and sharing of 5G networks and relatively independent operation of 4G networks can be achieved.
[0069] When a terminal is in a boundary area between a co-constructed 5G network and a shared 5G network constructed by different operators, the 4G control plane channel for the terminal needs to be switched due to the change of the construction operator. In addition, the user plane channel sharing policy of the user will also change due to the change of the type of user to the operator. Based on the strategy of sharing the control plane and the flexible control of the degree of sharing the user plane channel, a control plane / user plane channel switching mechanism is designed in the scenario of moving through the boundary area between the co-constructed network and the shared network, mainly including the control plane switching mechanism, the recognition of the user's PLMN number, the adjustment of the user plane split policy, etc., to ensure the use of services by the user in the boundary area between the co-constructed network and the shared network. Hereinafter, the handover method in the multi-connection network will be described in detail with reference to FIG. 4A and FIG. 4B. FIG. 4A and FIG. 4B respectively show the channel switching process in the scenario of two types of users moving through the boundary area between the co-constructed network and the shared network.
[0070] As shown in FIG. 4A, for a terminal of a user of operator A, the terminal can use the control plane channel and user plane channel of the 4G network in the construction area of operator A, and can simultaneously use the user plane channel of the 5G NR constructed by operator A under the NSA operation mechanism. When the terminal moves from the area constructed by operator A to the area constructed by operator B, the control plane channel of the 4G network of operator A needs to be switched to the control plane channel of the 4G network constructed by operator B. In this case, the network device of operator B identifies the PLMN number of the terminal during the handover process of the terminal and knows that the user of the terminal is a user of the shared operator of operator B. The user plane split policy of the terminal can be directly determined according to the type of the user. In option 3 and option 3x, the user plane split policy of the terminal can be provided by the 4G base station of operator B and can be further determined according to the occupancy rate of the user plane air interface resources occupied by all terminals of the shared operator connected to the 4G base station of operator B.
[0071] For example, if the user plane split policy is split disabled, the network device of operator B may assign a control plane channel and a user plane channel to the terminal. The terminal can use the 4G control plane channel of operator B, but can only use the 5G user plane channel of operator B, i.e., cannot use the 4G user plane channel of operator B. From the perspective of the entire mobility management mechanism, the user of the terminal has completed the transition from a user of the construction operator to a user of the shared operator. The user plane split policy of the terminal can be a user-level setting that can be configured using a split switch. For example, if the user plane split policy for this terminal is split disabled, operator B can set the split switch of the 4G user plane channel corresponding to this terminal to an off state. In this way, this terminal can only use the 5G user plane channel of operator B, but cannot use the 4G user plane channel of operator B.
[0072] As shown in FIG. 4B, for a terminal of a user of operator B, the terminal is treated as a user of a shared operator in the area built by operator A, and is therefore allowed to use the 4G control plane channel of operator A, but can only use the 5G user plane channel of operator A. That is, the terminal is not allowed to use the 4G user plane channel of operator A. When the terminal moves from the area built by operator A to the area built by operator B, it needs to switch the 4G control plane channel of operator A to the control plane channel of the 4G network built by operator B. In this case, the network equipment of operator B identifies the PLMN number of the terminal during the handover process and knows that the user of the terminal is a user of operator B. Then, the network equipment of operator B assigns a control plane channel and a user plane channel to the terminal. The terminal can use the 4G control plane channel of operator B, and can simultaneously use the 4G user plane channel and the 5G user plane channel. From the perspective of the entire mobility management mechanism, the user has completed the transition from a user of a shared operator to a user of a built operator. The user plane split policy of the terminal can be a user-level setting that can be configured using a split switch. For example, for this terminal, operator B can set the split switch of the 4G user plane channel corresponding to this terminal to an on state, so that this terminal can use not only operator B's 5G user plane channel but also operator B's 4G user plane channel.
[0073] In option 3, for each terminal user, the state of the split switch of the 4G user plane channel can be set at the 4G base station side of the construction operator. For example, the state of the split switch of the 4G user plane channel can be set at the PDCP layer at the 4G base station side of the construction operator. In option 3a, for each terminal user, the state of the split switch of the 4G user plane channel can be set at the core network side of the construction operator. In option 3x, for each terminal user, the state of the split switch of the 4G user plane channel can be set at the 4G base station side of the construction operator. Operators A and B may correspond to different options, and the principle is the same as that in the above embodiment, and will not be repeated here.
[0074] This solution can also be extended to various shared multi-access networks. A 4G network link is equivalent to a connection channel with the best coverage in the multi-access network, and a 5G network link is equivalent to a shared channel in the multi-access network. A multi-access network can be extended from 4G and 5G network connections in an NSA network to multiple network connections of different network standards.
[0075] The present disclosure further provides a network device in a multi-connection network, which is described below with reference to FIG.
[0076] 5 is a block diagram of a network device in a multi-connection network according to some embodiments of the present disclosure. As shown in FIG. 5, the device 50 of these embodiments includes a user type determination module 510, a policy determination module 520, and a handover control module 530.
[0077] The user type determination module 510 is configured to determine a type of a user of the terminal during a handover process of the terminal to the multi-connection network of the construction operator, the type including a first type indicating that the user is a shared operator user or a second type indicating that the user is a construction operator user.
[0078] In some embodiments, the user type determination module 510 is configured to, in response to receiving control plane information of the terminal, obtain identification information of the terminal from the control plane information or via an interface with a network device to which the terminal is connected before the terminal handover process, and determine a type of user of the terminal according to the identification information of the terminal.
[0079] In some embodiments, the user type determination module 510 is configured to obtain a Public Land Mobile Network (PLMN) number of the terminal through the interface and determine a user type of the terminal according to the PLMN number when an interface is established between the network device of the construction operator and the network device to which the terminal is connected before the terminal handover process, or to obtain a PLMN number of the terminal through a Radio Resource Control (RRC) connection establishment process with the terminal and determine a user type of the terminal according to the PLMN number when an interface is not established between the network device of the construction operator and the network device to which the terminal is connected before the terminal handover process.
[0080] The policy determination module 520 is configured to determine a user plane split policy corresponding to the terminal according to a type of a user of the terminal.
[0081] In some embodiments, the policy determination module 520 is configured to determine that if a type of a user of the terminal is a first type, a user plane split policy corresponding to the terminal is split-disabled, and to determine that if a type of a user of the terminal is a second type, a user plane split policy corresponding to the terminal is split-enabled.
[0082] In some embodiments, the policy determination module 520 is configured to, when the networking mode includes splitting user plane data from a base station in the second standard network or splitting user plane data from a base station in the first standard network, determine a user plane splitting policy corresponding to the terminal according to a type of user of the terminal and an occupancy rate of user plane air interface resources provided by a base station in the second standard network and occupied by all terminals whose users are of the same type as the terminal.
[0083] In some embodiments, the policy determination module 520 is configured to determine whether an occupancy rate of user plane air interface resources provided by a base station in a second standard network and occupied by all terminals belonging to users of a shared operator reaches a threshold when the user type of the terminal is a first type, and determine that the user plane split policy corresponding to the terminal is split disabled if the occupancy rate reaches the threshold, and determine that the user plane split policy corresponding to the terminal is split enabled if the occupancy rate does not reach the threshold, and determine that the user plane split policy corresponding to the terminal is split enabled if the user type of the terminal is a second type.
[0084] The handover control module 530 is configured to switch the user plane channel of the terminal to the user plane channel of the first standard network of the construction provider when the user plane split policy corresponding to the terminal disables splitting, and to switch the user plane channel of the terminal to the user plane channel of the first standard network of the construction provider and the user plane channel of the second standard network when the user plane split policy corresponding to the terminal enables splitting.
[0085] In some embodiments, the policy determination module 520 is further configured to, after determining the user plane split policy corresponding to the terminal, store the user plane split policy corresponding to the terminal in association with the identification information of the terminal.
[0086] In some embodiments, the policy determination module 520 is further configured to set a split switch of a user plane channel of a second standard network corresponding to the terminal's identification information to an off state when it determines that the user plane split policy corresponding to the terminal is split disabled, and to set a split switch of a user plane channel of a second standard network corresponding to the terminal's identification information to an on state when it determines that the user plane split policy corresponding to the terminal is split enabled.
[0087] In some embodiments, the handover control module 530 is further configured to switch the terminal's control plane to a control plane channel of the builder's second standard network.
[0088] In some embodiments, if the networking mode includes splitting user plane data from a base station in the second standard network or splitting user plane data from a base station in the first standard network, the split switch is configured in a base station in the second standard network, and if the networking mode includes splitting user plane data from a core network device of the second standard network, the split switch is configured in a core network device.
[0089] In some embodiments, the first standard network is a fifth generation mobile network and the second standard network is a fourth generation mobile network or a third generation mobile network.
[0090] The network appliances in the multi-connection network in the embodiments of the present disclosure may be implemented by various computing devices or computer systems, and are described below with reference to FIGS.
[0091] 6 is a block diagram of a network device in a multi-connection network according to some embodiments of the present disclosure. As shown in FIG. 6, the network device 60 of this embodiment includes a memory 610 and a processor 620 coupled to the memory 610, and the processor 620 is configured to execute a data transmission method in a multi-connection network according to any one of the embodiments of the present disclosure based on instructions stored in the memory 610.
[0092] Here, the memory 610 may include, for example, a system memory, a non-volatile fixed storage medium, etc. The system memory stores, for example, an operating system, applications, a boot loader, databases, and other programs.
[0093] FIG. 7 is a configuration diagram of a network device in a multi-connection network according to another embodiment of the present disclosure. As shown in FIG. 7, the network device 70 of this embodiment includes a memory 710 and a processor 720, which are similar to the memory 610 and the processor 620, respectively. It may further include an input / output interface 730, a network interface 740, a storage interface 750, etc. These interfaces 730, 740, 750, the memory 710, and the processor 720 may be connected, for example, via a bus 760. Here, the input / output interface 730 provides a connection interface for input / output devices such as a display, a mouse, a keyboard, a touch screen, etc. The network interface 740 provides a connection interface for various networked devices, and can be connected, for example, to a database server or a cloud storage server. The storage interface 750 provides a connection interface with an external storage device such as an SD card or a USB flash disk.
[0094] The present disclosure further provides a system in a multi-connection network, which is described below with reference to FIG.
[0095] 8 is a block diagram of a system in a multiple access network according to some embodiments of the present disclosure. As shown in FIG. 8, the system 8 of this embodiment includes a network device 50 / 60 / 70 according to any one of the above embodiments, and a terminal 82 configured to be switched to a multiple access network of a construction company, and configured to transmit user plane data through a user plane channel of a first standard network of the construction company when a user plane split policy corresponding to the terminal 82 is split disabled, and transmit user plane data through a user plane channel of the first standard network of the construction company and a user plane channel of a second standard network of the construction company when a user plane split policy corresponding to the terminal 82 is split enabled.
[0096] It should be understood by those skilled in the art that the embodiments of the present disclosure may be provided as a method, a system, or a computer program product. Thus, the embodiments of the present disclosure may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment containing both hardware and software elements. Furthermore, the present disclosure may take the form of a computer program product embodied on one or more computer usable non-transitory storage media (including, but not limited to, disk storage devices, CD-ROMs, optical storage devices, etc.) having computer usable program code embodied therein.
[0097] The present disclosure will be described with reference to flowcharts and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the present disclosure. It should be understood that each process and / or each block in the flowcharts and / or block diagrams, and combinations of processes and / or blocks in the flowcharts and / or block diagrams, may be implemented by computer program instructions. The computer program instructions may be provided to a processor of a general purpose computer, a special purpose computer, an embedded processor, or other programmable data processing device that generates a machine such that the instructions are executed by a processor of a computer, or that generates means for implementing the functions specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0098] Computer program instructions may also be stored in a computer-readable storage device in which the instructions stored in the computer-readable storage device can instruct a computer or other programmable data processing apparatus to operate in a particular manner to produce a product having instruction means that implements the functions specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0099] These computer program instructions can also be loaded onto a computer or other programmable device to perform a series of operational steps on the computer or other programmable device to generate a computer-implemented process, such that the instructions, which execute on the computer or other programmable device, provide steps for implementing the functions specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0100] The above are only preferred embodiments of the present disclosure, and are not intended to limit the present disclosure. Any modifications, replacements, improvements, etc. within the spirit and principle of the present disclosure shall be included within the protection scope of the present disclosure.
Claims
1. A handover method in a multi-connection network, which is executed by a network device of a construction operator, comprising: determining a type of the user of the terminal during a handover process of the terminal to the multi-connection network of the construction operator, the type including a first type indicating that the user is a user of a shared operator and a second type indicating that the user is a user of the construction operator; determining a user plane split policy corresponding to the terminal according to the type of the user of the terminal; switching a user plane channel of the terminal to a user plane channel of a first standard network of the construction company when the user plane split policy corresponding to the terminal is split disabled, and switching the user plane channel of the terminal to the user plane channel of the first standard network of the construction company and a user plane channel of a second standard network when the user plane split policy corresponding to the terminal is split enabled; Switching the control plane of the terminal to a control plane channel of the second standard network of the construction operator; The method according to claim 1, further comprising:
2. Determining a user plane split policy corresponding to a terminal according to a user type of the terminal, determining that the user plane split policy corresponding to the terminal is split disabled if the type of the user of the terminal is the first type; determining that the user plane split policy corresponding to the terminal is split-enabled if the type of the user of the terminal is the second type; 2. The method of claim 1, comprising:
3. 2. The method according to claim 1, wherein, when a networking mode includes splitting user plane data from a base station in the second standard network or splitting user plane data from a base station in the first standard network, determining the user plane split policy corresponding to the terminal according to the type of the user of the terminal and an occupancy rate of user plane air interface resources provided by the base station in the second standard network and occupied by all terminals whose users are of the same type as the terminal.
4. Determining a user plane split policy corresponding to a terminal according to a user type of the terminal and an occupancy rate of user plane air interface resources provided by a base station in a second standard network and occupied by all terminals whose users are of the same type as the terminal, comprising: if the type of the user of the terminal is the first type, determining whether the occupancy rate of the user plane air interface resources provided by the base station in the second standard network and occupied by all terminals belonging to users of the shared operator reaches a threshold, and if the occupancy rate reaches the threshold, determining that the user plane split policy corresponding to the terminal is split disabled, and if the occupancy rate does not reach the threshold, determining that the user plane split policy corresponding to the terminal is split enabled; If the type of the user of the terminal is the second type, determining that the user plane split policy corresponding to the terminal is split enabled; 4. The method of claim 3, comprising:
5. 2. The method of claim 1 , further comprising: after determining the user plane split policy corresponding to the terminal, storing the user plane split policy corresponding to the terminal in association with an identity of the terminal.
6. The step of storing a user plane split policy corresponding to the terminal in association with the identification information of the terminal includes: When it is determined that the user plane split policy corresponding to the terminal is split invalid, setting a split switch of the user plane channel of the second standard network corresponding to the identification information of the terminal to an off state; When it is determined that the user plane split policy corresponding to the terminal is split enabled, setting the split switch of the user plane channel of the second standard network corresponding to the identification information of the terminal to an on state; 6. The method of claim 5, comprising:
7. The step of determining a type of user of the terminal comprises: in response to receiving control plane information of the terminal, obtaining an identification of the terminal from the control plane information or via an interface with a network device to which the terminal was connected prior to the handover process of the terminal; determining the type of the user of the terminal according to the identification information of the terminal; 6. The method according to claim 1 or 5, comprising:
8. The step of determining a type of user of the terminal during a process of handing over the terminal to the multi-access network of the construction operator includes: If an interface is set between the network device of the construction company and a network device to which the terminal was connected before the handover process of the terminal, obtaining a Public Land Mobile Network (PLMN) number of the terminal through the interface and determining the type of the user of the terminal according to the PLMN number; If the interface is not set between the network device of the construction provider and the network device to which the terminal is connected before the handover process of the terminal, obtaining the PLMN number of the terminal through a Radio Resource Control (RRC) connection establishment process with the terminal, and determining the type of the user of the terminal according to the PLMN number; 2. The method of claim 1, comprising:
9. 7. The method of claim 6, wherein the split switch is configured in the base station in the second standard network if the networking mode includes splitting user plane data from a base station in the second standard network or splitting user plane data from a base station in the first standard network, and the split switch is configured in a core network device if the networking mode includes splitting user plane data from a core network device of the second standard network.
10. 10. The method according to any one of claims 1 to 9, wherein the first standard network is a fifth generation mobile network and the second standard network is a fourth generation mobile network or a third generation mobile network.
11. A network device in a multiple access network, comprising: a user type determination module configured to determine a type of a user of the terminal during a handover process of the terminal to the multi-connection network of a construction operator, the type including a first type indicating that the user is a user of a shared operator and a second type indicating that the user is a user of the construction operator; a policy determination module configured to determine a user plane split policy corresponding to the terminal according to the type of the user of the terminal; a handover control module configured to switch a user plane channel of the terminal to a user plane channel of a first standard network of the construction company when the user plane split policy corresponding to the terminal is split disabled, and to switch the user plane channel of the terminal to the user plane channel of the first standard network of the construction company and a user plane channel of a second standard network when the user plane split policy corresponding to the terminal is split enabled; Equipped with A network device, characterized in that the handover control module is configured to switch a control plane of the terminal to a control plane channel of the second standard network of the construction provider.
12. A network device in a multiple access network, comprising: A processor; a memory coupled to said processor and storing instructions which, when executed by said processor, cause said processor to perform the method of any one of claims 1 to 10; A network device comprising:
13. A non-transitory computer readable storage medium storing a computer program which, when executed by a processor, causes the processor to perform the steps of the method according to any one of claims 1 to 10.
14. 1. A system in a multiple access network, comprising: A network device according to claim 11 or 12; a terminal configured to be taken over by the multiple access network of a construction company, the terminal being configured to transmit user plane data via a user plane channel of a first standard network of the construction company when a user plane split policy corresponding to the terminal indicates that splitting is disabled, and to transmit the user plane data via the user plane channel of the first standard network of the construction company and a user plane channel of a second standard network of the construction company when the user plane split policy corresponding to the terminal indicates that splitting is enabled; A system comprising:
Citation Information
Patent Citations
Network expansion method and access network equipment
CN107734511A
Improving cell access procedure
WO2019193237A1
