By using cameras and power meters to gather data on people and electricity consumption, the control device estimates future power demand with enhanced accuracy, addressing the inefficiencies in predicting electricity demand in buildings.
Patent Information
- Application Number
- JP2022002632
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-01-11
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-01-11
AI Technical Summary
Existing technologies fail to accurately predict electricity demand in buildings by considering the flow of people, leading to inefficiencies in power load leveling.
A control device and method that utilizes cameras and power meters to collect data on the number of people in and heading towards a building, along with electricity consumption, to estimate future power demand using coefficients and machine learning.
Enhances the accuracy of predicting power demand by accounting for the flow of people, allowing for more precise energy management and improved load balancing.
Smart Images

Figure 0007593338000001 
Figure 0007593338000002 
Figure 0007593338000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a control device, a control method, and a program. [Background technology]
[0002] Conventionally, there is known a technology that promotes the leveling of the power load of devices in a building by considering the presence of people in the building. For example, Patent Document 1 discloses a technology that collects the operation status of electrical devices, determines whether residents are at home, predicts the time each dwelling will be at home based on the determined information, and allocates the time period when water heaters will heat up the water based on the predicted time. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2016-075453 A Summary of the Invention [Problem to be solved by the invention]
[0004] There was room for improvement in the technology for predicting electricity demand by taking into account the flow of people in a building.
[0005] An object of the present disclosure, made in consideration of the above circumstances, is to improve the technology for predicting electricity demand by taking into account the flow of people into a building. [Means for solving the problem]
[0006] A control device according to an embodiment of the present disclosure includes: acquire at least one of first information indicating the number of people in a target building during a specified time period, second information indicating the amount of electricity consumed by the target building during the specified time period, and third information indicating the number of people heading toward the target building during the specified time period; a control unit that estimates an amount of electricity demand of the building in a future target time period based on the first information, the second information, or the third information. Equipped with.
[0007] A control method according to an embodiment of the present disclosure includes: A computer-implemented control method, comprising: Obtaining at least one of first information indicating the number of people in a target building during a specified time period, second information indicating the amount of electricity consumed by the target building during the specified time period, and third information indicating the number of people heading toward the target building during the specified time period; estimating an amount of electricity demand for the building in a future target time period based on the first information, the second information, or the third information; Includes.
[0008] A program according to an embodiment of the present disclosure includes: On the computer, Obtaining at least one of first information indicating the number of people in a target building during a specified time period, second information indicating the amount of electricity consumed by the target building during the specified time period, and third information indicating the number of people heading toward the target building during the specified time period; estimating an amount of electricity demand for the building in a future target time period based on the first information, the second information, or the third information; The method executes an operation including: Effect of the Invention
[0009] According to one embodiment of the present disclosure, a technology for predicting power demand taking into account the flow of people into a building is improved. [Brief description of the drawings]
[0010] [Figure 1] 1 is a diagram illustrating a configuration of a system according to a first embodiment of the present disclosure. [Diagram 2] 5 is a flowchart showing an operation of the control device according to the first embodiment of the present disclosure. [Diagram 3] FIG. 11 is a diagram illustrating a configuration of a system according to a second embodiment of the present disclosure. [Figure 4]10 is a flowchart showing an operation of a control device according to a second embodiment of the present disclosure. [Diagram 5] FIG. 11 is a diagram illustrating a system configuration according to a third embodiment of the present disclosure. [Figure 6] 10 is a flowchart showing an operation of a control device according to a third embodiment of the present disclosure. [Figure 7] 11 is a diagram for explaining an example of the operation of a server that manages a CEMS. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] (First embodiment) Hereinafter, an embodiment of the present invention will be described.
[0012] An overview of a system 1 according to an embodiment of the present disclosure will be described with reference to Fig. 1. The system 1 includes a control device 20, a camera C1, a camera C2, and a power meter M. The control device 20, the camera C1, the camera C2, and the power meter M are communicatively connected to a network 60 including, for example, the Internet.
[0013] Network 60 includes the Internet, at least one WAN, at least one MAN, or a combination thereof. "WAN" is an abbreviation for wide area network. "MAN" is an abbreviation for metropolitan area network. Network 60 may include at least one wireless network, at least one optical network, or a combination thereof. The wireless network may be, for example, an ad-hoc network, a cellular network, a wireless LAN, a satellite communication network, or a terrestrial microwave network. "LAN" is an abbreviation for local area network.
[0014] The control device 20 is installed in a facility such as a data center. The control device 20 is, for example, a server belonging to a cloud computing system or other computing system.
[0015] Camera C1 is installed inside building B and can capture images of people inside the building. Camera C2 is installed on a road or the like around building B and can capture images of people or vehicles heading towards building B. The locations where cameras C1 and C2 are installed are not limited to these, and cameras C1 and C2 may be installed in any location. Cameras C1 and C2 are equipped with a communication unit and can transmit captured images to control device 20 via the communication unit and network 60.
[0016] The power meter M is, for example, a smart meter. The power meter M is, for example, but not limited to, installed inside the building B. The power meter M can measure the amount of power consumed in a predetermined period by any load device in the building B. The power meter M includes a communication unit, and can transmit information indicating the measured amount of consumed power to the control device 20 via the communication unit and the network 60.
[0017] In this embodiment, the system 1 is used for a CEMS (Community EMS). Among EMSs (Energy Management Systems), which are energy control systems that are part of a power grid, the CEMS that manages a specific area grasps the amount of power required in that area, issues instructions to reduce energy consumption for specific equipment, and determines the amount of power to be supplied from outside.
[0018] An example of a process flow of control by a server managing the CEMS will be described with reference to Fig. 7. The server may be the same device as the control device 20 according to this embodiment, or may be a different device.
[0019] First, in step S401, the server determines whether the sum of the PV utilization amount and the predicted power purchase amount is equal to or greater than the total demand for the day. The PV utilization amount may include the actual value of the amount of power used by photovoltaic power generation in the area at the time of step S401 and the amount of power expected to be produced by photovoltaic power generation in a future time period. The future time period may be a time period when the amount of power usage in the area reaches a peak, for example, a time period from 2:00 p.m. to 3:00 p.m. The server may obtain the PV utilization amount by transmitting information indicating the PV utilization amount from any photovoltaic power generation facility to the server. The predicted power sales amount refers to the amount of power that has been decided to be purchased from any power supplier up to the time of step S401, for example, on the previous day. The total demand for the day includes the amount of power consumed in the area at the time of step S401 and the amount of power expected to be demanded in a future time period.
[0020] If the sum of the PV utilization amount and the predicted power purchase amount is equal to or greater than the total demand for the day, the server proceeds to step S402, where the server determines to charge the power that is expected to be produced by photovoltaic power generation in a future time period. If the sum of the PV utilization amount and the predicted power purchase amount is less than the total demand for the day, the server proceeds to step S403.
[0021] In step S403, the server determines whether the total value of the PV utilization amount, the predicted amount of power purchase, and the demand reduction amount is equal to or greater than the total demand for the day. The demand reduction amount is the amount of power that can be reduced for load devices, etc. in the area in a future time period. If the total value of the PV utilization amount, the predicted amount of power purchase, and the demand reduction amount is equal to or greater than the total demand for the day, the server proceeds to step S404, where the server decides to reduce the amount of power usage for any load device in the area in a future time period. If the total value of the PV utilization amount, the predicted amount of power purchase, and the demand reduction amount is less than the total demand for the day, the server proceeds to step S405.
[0022] In step S405, the server judges whether the total value of the PV utilization amount, the predicted amount of power purchase, the amount of demand reduction, and the initial battery charge amount is equal to or greater than the total demand for the day. The initial battery charge amount refers to the amount of power charged in the batteries of facilities, etc. in the area. If the total value of the PV utilization amount, the predicted amount of power purchase, the amount of demand reduction, and the initial battery charge amount is equal to or greater than the total demand for the day, the server proceeds to step S406, where the server decides to discharge and use the power charged in the battery during the specified time period. If the total value of the PV utilization amount, the predicted amount of power purchase, the amount of demand reduction, and the initial battery charge amount is less than the total demand for the day, the server proceeds to step S407.
[0023] In step S407, the server judges whether the total value of the PV utilization amount, the predicted power purchase amount, the demand reduction amount, the initial battery charge amount, and the FC power generation amount is equal to or greater than the total demand for the day. The FC power generation amount refers to the amount of power that can be produced by operating the fuel cell generator. If the total value of the PV utilization amount, the predicted power purchase amount, the demand reduction amount, the initial battery charge amount, and the FC power generation amount is equal to or greater than the total demand for the day, the server's processing proceeds to step S408, where the server decides to operate the fuel cell generator. If the total value of the PV utilization amount, the predicted power purchase amount, the demand reduction amount, the initial battery charge amount, and the FC power generation amount is less than the total demand for the day, the server's processing proceeds to step S409, where the server decides to purchase power by paying, for example, an imbalance fee. The server's processing then ends.
[0024] In this way, the server performs control when there is a shortage of available power for the total demand of the day. This enables flexible energy management in the CEMS. Of the total demand of the day described above, a portion of the amount of power expected to be in demand in future time periods is the power demand of buildings in the target future time period according to this embodiment. This embodiment accurately estimates the power demand of each building in the area, improving the accuracy of forecasting the total demand of the day described above and enabling smooth control of the CEMS.
[0025] First, an overview of the present embodiment will be described, and details will be described later. The control device 20 acquires at least one of first information indicating the number of people in a target building B in a predetermined time period, second information indicating the amount of power consumed by the target building B in a predetermined time period, and third information indicating the number of people heading toward the target building B in a predetermined time period, and estimates the power demand of the building B in a future target time period based on the first information, the second information, or the third information.
[0026] In this embodiment, the target building B is an office building including a business office, and the number of people in building B refers to the number of people who come to work in the office building. Without being limited to this, building B may be a school, an event venue, a commercial facility, a public facility such as a hospital, etc. In this case, the number of people in building B refers to the number of people who come to building B and spend a certain amount of time there, and may include the number of students and teachers in a school, the number of event organizers and customers in an event venue, the number of store clerks and customers in a commercial facility, and the number of doctors and patients in a hospital.
[0027] In this embodiment, the predetermined time period is the morning time period, and more specifically, the time period from 9:00 am to 10:00 am. This time period is the time period after the time when people who come to building B start their work. The predetermined time period is not limited to this, and may be set arbitrarily. This makes it possible to estimate the power demand of building B at the time of morning, for example, when the predetermined time period is the morning time period.
[0028] The amount of power consumed in the target building B includes the amount of power consumed by at least one load device installed in the target building B. In this embodiment, the amount of power consumed in the target building B is the total value of the power consumed by each of the load devices. The load devices include lighting fixtures, air conditioning and heating devices, transportation devices such as elevators and escalators, and office equipment such as personal computers and copiers in the building B. In this embodiment, the amount of power consumed in the target building B is measured by a power meter M.
[0029] The power demand refers to the amount of power required in building B, and in this embodiment refers to the amount of power expected to be consumed by the load devices installed in building B. In this embodiment, the future target time period refers to the daytime period, and more specifically, the time period from 1:00 pm to 2:00 pm. This time period is the time period when the power demand for the entire building B reaches its peak. However, the specified time period is not limited to this and may be set arbitrarily.
[0030] In this way, according to this embodiment, it is possible to grasp the number of people already in building B and the number of people heading to building B, and to accurately predict the number of people in building B in a future target time period. Based on the number of people and the amount of power consumed in building B, it is possible to more accurately estimate the building's power demand in a future target time period. Therefore, it is possible to improve the technology for predicting power demand by taking into account the flow of people into a building.
[0031] Next, each component of the system 1 will be described in detail.
[0032] As shown in FIG. 1, the control device 20 includes a control unit 21, a storage unit 22, a communication unit 23, an input unit 24, and an output unit 25.
[0033] The control unit 21 includes one or more processors, one or more programmable circuits, one or more dedicated circuits, or a combination of these. The processor is, but is not limited to, a general-purpose processor such as a CPU or a GPU, or a dedicated processor specialized for a specific process. The dedicated circuit is, for example, but is not limited to, an ASIC. The control unit 21 controls the operation of the entire control device 20.
[0034] The storage unit 22 includes one or more memories. Each memory included in the storage unit 22 may function as, for example, a main storage device, an auxiliary storage device, or a cache memory. The storage unit 22 stores any information used in the operation of the control device 20. For example, the storage unit 22 may store a system program, an application program, a database, map information, and the like. The information stored in the storage unit 22 may be updatable with information acquired from the network 60 via the communication unit 23, for example.
[0035] The communication unit 23 includes one or more communication interfaces that connect to the network 60. The communication interface corresponds to, for example, a mobile communication standard, a wired LAN (Local Area Network) standard, or a wireless LAN standard, but is not limited to these, and may correspond to any communication standard.
[0036] The input unit 24 includes at least one input interface. The input interface is, for example, a physical key, a capacitive key, a pointing device, a touch screen integral with a display, or a microphone. The input unit 24 accepts an operation to input data used for the operation of the control device 20. The input unit 24 may be connected to the control device 20 as an external input device instead of being provided in the control device 20. As a connection method, any method such as USB, HDMI (registered trademark), or Bluetooth (registered trademark) can be used. "USB" is an abbreviation for Universal Serial Bus. "HDMI (registered trademark)" is an abbreviation for High-Definition Multimedia Interface.
[0037] The output unit 25 includes at least one output interface. The output interface is, for example, a display or a speaker. The display is, for example, an LCD or an organic EL display. "LCD" is an abbreviation for liquid crystal display. "EL" is an abbreviation for electro luminescence. The output unit 25 outputs data obtained by the operation of the control device 20. The output unit 25 may be connected to the control device 20 as an external output device instead of being provided in the control device 20. As a connection method, any method such as USB, HDMI (registered trademark), or Bluetooth (registered trademark) can be used.
[0038] The functions of the control device 20 are realized by executing a control program according to this embodiment on a processor corresponding to the control unit 21. That is, the functions of the control device 20 are realized by software. The control program causes a computer to execute the operations of the control device 20, thereby causing the computer to function as the control device 20. That is, the computer functions as the control device 20 by executing the operations of the control device 20 in accordance with the control program.
[0039] The program may be stored in a non-transitory computer-readable medium. Examples of the non-transitory computer-readable medium include a magnetic recording device, an optical disk, a magneto-optical recording medium, or a ROM. The program may be distributed, for example, by selling, transferring, or lending a portable medium such as a DVD or CD-ROM on which the program is stored. "DVD" is an abbreviation for digital versatile disc. "CD-ROM" is an abbreviation for compact disc read only memory. The program may be distributed by storing the program in the storage of a server and transferring the program from the server to another computer. The program may be provided as a program product.
[0040] A computer temporarily stores a program stored in a portable medium or transferred from a server in a main storage device. Then, the computer reads the program stored in the main storage device with a processor and executes processing according to the read program with the processor. The computer may read the program directly from a portable medium and execute processing according to the program. The computer may execute processing according to the received program each time a program is transferred from the server to the computer. Processing may be executed by a so-called ASP-type service that realizes functions only by execution instructions and result acquisition without transferring a program from the server to the computer. "ASP" is an abbreviation for application service provider. Programs include information used for processing by a computer and equivalent to a program. For example, data that is not a direct command to a computer but has the property of defining computer processing falls under " equivalent to a program.
[0041] A part or all of the functions of the control device 20 may be realized by a dedicated circuit corresponding to the control unit 21. In other words, a part or all of the functions of the control device 20 may be realized by hardware.
[0042] The operation of the control device 20 according to this embodiment will be described with reference to Fig. 2. This operation corresponds to a control method according to this embodiment. In the following, the control device 20 transmits and receives information to and from external devices via the communication unit 23 and the network 60. The coefficients calculated below may be generated by any machine learning.
[0043] In step S101, the control unit 21 of the control device 20 acquires first information indicating the number of people in the target building B in a given time period.
[0044] In this embodiment, the predetermined time period is the morning time period, which is around 9:00 a.m., when work begins at the business establishment serving as building B. The target building B may be set arbitrarily, and for example, a user of the control device 20 may be able to set all buildings within a predetermined area as the target building B via the input unit 24.
[0045] Any method may be adopted to acquire the first information. In this embodiment, the control unit 21 acquires the first information by analyzing images captured by a camera C1 installed in the target building B using any image analysis technology. For example, the control unit 21 analyzes images captured by a camera C1 installed in each room in the building B to determine the number of people in each room, and adds up the number of people to generate the first information as the number of people in the building B. The location where the camera C1 is installed is not limited to inside a room, and may be near a conveying device such as an elevator or escalator, or a facility where people move, such as a staircase.
[0046] Without being limited to this, the control unit 21 may obtain passage information indicating a record of passage through the entrance gate of building B, measure the number of people in building B based on the passage information, and obtain the measurement result as the first information. The entrance gate is a device that manages permission or prohibition of entry of people into building B and exit from building B. The entrance gate includes, for example, a reader unit such as a contactless or contact type IC card, a door unit for allowing people to enter or exit, a control unit for controlling each unit, and a communication unit. When a person passing through the entrance gate performs an action such as holding an IC card over the reader unit, the control unit of the entrance gate reads out the identification number recorded on the IC card and performs authentication. If it is determined as a result of the authentication that the person is allowed to pass, the control unit opens the door unit and allows the person to pass. The control unit can transmit the result of allowing passage through the entrance gate in this way to the control device 20 via the communication unit as passage information. The passage information may include, for example, the identification number of the person allowed to pass and the date and time of passing. The control unit 21 of the control device 20 obtains the passage information by receiving it via the communication unit 23. The control unit 21 may constantly receive the passage information from the entrance gate, or may receive it periodically. The control unit 21 measures the number of people in building B based on the received passage information. For example, the control unit 21 measures the number of people in building B by subtracting the total number of people permitted to exit building B from the total number of people permitted to enter building B up to a specified time period. The control unit 21 obtains the result of the measurement in this manner as the first information.
[0047] Any method may be adopted to obtain the information indicating the passage record, without being limited thereto. For example, the control unit 21 may obtain the information indicating the passage record by receiving it from an external device, such as a server device, installed in a security control room of the building B. In addition, when the building B is composed of a plurality of buildings, such as a school, the entrance gate may be provided in one place as a common gate for the plurality of buildings, or may be provided for each of the plurality of buildings. In this case, the control unit 21 may obtain the passage information from each entrance gate, and may obtain the total number of people permitted to pass through each entrance gate as the first information.
[0048] Without being limited thereto, the control unit 21 may determine whether the people working in building B are telecommuting, and if it is determined that they are telecommuting, count them as the number of people working at home, subtract the counted total value from a predetermined value, and acquire the result as the first information. The predetermined value may be the number of people when all the people working in building B come to work. The control unit 21 may determine that the people working in building B are telecommuting from attendance information described below. The control unit 21 may communicate with a terminal device held by the person working in building B, and determine that the person is telecommuting when the position of the terminal device is in a predetermined location, such as the house of the person working in building B, which has been registered in advance, for more than a predetermined time.
[0049] Without being limited thereto, the control unit 21 may acquire attendance information indicating the attendance status of people working in building B, measure the number of people in building B based on the attendance information, and acquire the measurement result as the first information. The attendance information includes the arrival date and time, departure date and time, etc. of people working in building B. Without being limited thereto, the attendance information may include the telecommuting schedule of the people working in building B, the department, the place where the work is performed such as the room in building B, etc. Attendance information may be generated, for example, by inputting it into an external attendance management device when the people working in building B arrive at or leave work. Inputting it into the attendance management device may be performed via a terminal device held by the people working in building B. Without being limited thereto, the attendance information may be registered in advance.
[0050] The control device 20 can acquire the attendance information by communicating with an external attendance management device and receiving the attendance information from the attendance management device. This is not limited to the above, and the control device 20 and the attendance management device may be the same device. The control unit 21 measures the number of people in building B based on the acquired attendance information. For example, the control unit 21 measures the number of people in building B by calculating the total number of people who have come to work at building B in a specified time period. The control unit 21 acquires the result of this measurement as the first information.
[0051] In step S102, the control unit 21 determines a coefficient based on the acquired first information. The control unit 21 may determine a coefficient with a higher value as the number of people in the building B increases. In this embodiment, the determined coefficient is assumed to be A1.
[0052] In step S103, the control unit 21 acquires second information indicating the amount of power consumed in the target building B in a predetermined time period.
[0053] Any method may be used to acquire the second information. In this embodiment, the control unit 21 acquires the second information by receiving information indicating the amount of power consumed by any load device in the building from the power meter M. The load device is, for example, a heating and cooling device. The control unit 21 may add up the amount of power consumed by each of the multiple load devices in building B measured by the power meter M to obtain the amount of power consumed in the target building B, and generate the second information.
[0054] In step S104, the control unit 21 determines a coefficient based on the acquired second information. The control unit 21 may determine a coefficient with a higher value as the value of the amount of power consumed in the target building increases. In this embodiment, the determined coefficient is assumed to be A2.
[0055] In step S105, the control unit 21 acquires third information indicating the number of people heading toward the target building B in a given time period.
[0056] Any method may be adopted to acquire the third information. In this embodiment, the control unit 21 acquires the third information by analyzing an image of a camera C2 installed on a road or the like around the target building B using any image analysis technology. For example, the control unit 21 analyzes an image taken by a camera C2 installed along a road leading to the building to determine the number of people heading toward the target building, and generates the third information as the number of people heading toward the target building by adding up the number of people. When a vehicle including a bus is included in the image taken by the camera C2, the control unit 21 may analyze the image to determine the number of people riding in the vehicle and generate the third information.
[0057] In step S106, the control unit 21 determines a coefficient based on the acquired third information. The control unit 21 may determine a coefficient with a higher value as the number of people heading toward the building increases. In this embodiment, the determined coefficient is assumed to be A3.
[0058] In step S107, the control unit 21 acquires event information indicating an event to be held in a future target time period in the building B. The event includes an exhibition, a presentation, a day when the entire building is closed, etc., to be held in the building B. Any method may be adopted to acquire the event information. The control unit 21 may acquire the event information by reading out the event information stored in the memory unit 22.
[0059] In step S108, the control unit 21 determines a coefficient based on the acquired event information. The coefficient may be a larger value as the number of people expected to come to the target building B for the event increases. The control unit 21 may determine the coefficient based on information indicating the number of people who visited the building B when the same event was held in the past. In this embodiment, the determined coefficient is assumed to be A4.
[0060] In step S109, the control unit 21 acquires schedule information indicating a schedule set for the day or time corresponding to the future target time period in building B. The schedule includes events scheduled in building B on the same day of the week or at the same time every day, and includes, for example, the start and end times of work that are set as a standard, the day of the week when it is recommended to leave work at the end time, the start and end times of a lunch break, and the like. Any method may be used to acquire the schedule information. The control unit 21 may acquire the schedule information by reading out the schedule information stored in the memory unit 22.
[0061] In step S110, the control unit 21 determines a coefficient based on the acquired schedule information. The coefficient may be a larger value as the number of people expected to be in the target building B on the day and time is larger. For example, in the target building B, the day of the week on which it is recommended to leave work at the end of business hours set as a standard is Wednesday, and the set future target time period is after the end of business hours on Wednesday. In this case, the coefficient may be a lower value than the coefficient set for the same target time period on another day of the week, or the coefficient set for the time period after the start of business hours and before the end of business hours on Wednesday. In this embodiment, the coefficient determined is A5.
[0062] In step S111, the control unit 21 acquires climate information indicating the climate at the location where building B is located. The climate includes the temperature, humidity, precipitation, wind volume, etc. at the location where building B is located. Any method may be adopted to acquire the climate information. For example, the control unit 21 may acquire the climate information by communicating with a thermometer / hygrometer provided in building B and receiving values measured by the thermometer / hygrometer. For example, the control unit 21 may acquire the climate information by communicating with an external device such as a server at a weather observation center and acquiring the climate information from the external device.
[0063] In step S112, the control unit 21 determines a coefficient based on the acquired climate information. The coefficient may be a larger value as the operation amount of the load device installed in the target building B, which is assumed in the climate, increases. For example, the farther the temperature indicated by the climate information is from the reference temperature, the greater the operation amount of the heating and cooling device, so a larger coefficient may be determined. The reference temperature is a temperature at which people in the building can survive without operating the heating and cooling device, for example, a temperature of 25 degrees Celsius. The reference temperature may be set arbitrarily. In this embodiment, the coefficient determined is A6.
[0064] In step S113, the control unit 21 calculates the power demand using a predetermined function. In this embodiment, the control unit 21 multiplies the coefficients A1 to A6 acquired in steps S102 to S112 by a predetermined value to calculate the power demand. The present invention is not limited to this, and any function may be adopted for calculating the power demand. For example, the control unit 21 may add up the values obtained by multiplying each of the coefficients A1 to A6 described above by a predetermined value to calculate the power demand. For example, the control unit 21 may set the predetermined value to a larger value as the difference between the number of people in the target building indicated by the first information and the number of people heading toward the target building indicated by the third information increases, and calculate the power demand. The function used to calculate the power demand may be calculated by machine learning. In this case, the control unit 21 may perform machine learning using the actual measurement value of the amount of power actually used in the time period in which the power demand was predicted in the past as teacher data.
[0065] In step S114, the control unit 21 stores the calculated power demand in the storage unit 22. The control unit 21 may store the power demand in association with each building B. This allows the control unit 21 to total up the power demand of any building B included in a predetermined area. Thereafter, the processing of the control unit 21 ends.
[0066] The control unit 21 transmits information indicating the power demand to a server that manages the CEMS, whereby the power demand calculated according to this embodiment is used as part or all of the total power demand for that day in steps S401, S403, S405, and S407 in Fig. 7. The control unit 21 may be able to notify the user via the output unit 25 of the power demand calculated for the target building B designated by the user.
[0067] As described above, the control device 20 of this embodiment is equipped with a control unit 21 that acquires at least one of first information indicating the number of people in the target building B during a specified time period, second information indicating the amount of electricity consumed by the target building B during a specified time period, and third information indicating the number of people heading towards the target building B during a specified time period, and estimates the electricity demand of building B during a future target time period based on the first information, the second information, or the third information.
[0068] According to this embodiment, the number of people already in building B and the number of people heading to building B can be grasped, and the number of people in the building in a future target time period can be accurately predicted. Since the operation amount of the load device is expected to increase in the future according to the number of people, the power demand of building B in a future target time period can be estimated with higher accuracy based on the number of people and the amount of power consumed in building B. Therefore, the technology for predicting power demand taking into account the flow of people into a building can be improved.
[0069] As described above, in the control device 20, the control unit 21 acquires passage information indicating the passage record of the entrance gate of building B, measures the number of people in building B based on the passage information, and acquires the measurement result as first information.
[0070] According to this embodiment, the control unit 21 can measure the number of people entering or exiting building B in real time. The control unit 21 predicts that the greater the measured number of people in building B, the greater the operation amount of the load device will be, and can reflect this in the prediction of the power demand. Furthermore, the control unit 21 can record the number of people who were in building B at the same time in the past and the predicted power demand in association with each other, and can improve the accuracy of the power demand prediction based on the record. Therefore, it is possible to improve the technology for predicting power demand by taking into account the flow of people into a building.
[0071] As described above, the control device 20 further includes a communication unit 23, and the control unit 21 communicates with a camera C1 installed in building B via the communication unit 23, measures the number of people in building B based on an image captured by the camera C1, and obtains the measurement result as the first information.
[0072] If the number of people in building B can be accurately measured by camera C1, the operation amount of the load device can be predicted. The control unit 21 can record the number of people in building B at the same time in the past in association with the predicted power demand, and can improve the accuracy of the power demand prediction based on the record. Therefore, it is possible to improve the technology for predicting the power demand by taking into account the flow of people into a building.
[0073] As described above, in the control device 20, the control unit 21 communicates with the camera C2 when it is installed on the road leading to the building B via the communication unit 23, measures the number of people heading towards the building B based on the image captured by the camera C2, and obtains the measurement result as the third information.
[0074] By analyzing the images from camera C2, the number of people approaching the building can be predicted more accurately and efficiently. If the number of people approaching the building is large, it is expected that the number of people in the building will be large in the target time period in the future, and the power demand in the building is expected to increase. Therefore, it is possible to improve the technology for predicting power demand by taking into account the flow of people into the building.
[0075] As described above, in the control device 20, the control unit 21 measures the number of people in building B based on whether the people working in building B are telecommuting, and obtains the measurement result as first information.
[0076] It is predicted that people who have decided to work from home are unlikely to come to the building during the target time period in the future. By using the number of people who work from home that is known in advance, it is possible to more efficiently predict the amount of electricity demand. Therefore, it is possible to improve the technology for predicting the amount of electricity demand by taking into account the flow of people into the building.
[0077] As described above, in the control device 20, the control unit 21 acquires attendance information indicating the attendance status of people working in building B, measures the number of people in building B based on the attendance information, and acquires the measurement result as first information.
[0078] According to this embodiment, the control unit 21 can grasp the number of people who have come to building B to work based on the attendance status, and can accurately measure the number of people in building B. By grasping the attendance status, the number of people who are likely to be involved in the change in the operation of the load device in a future target time period can be measured, instead of the number of people who are temporarily visiting building B, and the accuracy of the prediction of the power demand can be improved. Therefore, the technology for predicting the power demand taking into account the flow of people into a building can be improved.
[0079] As described above, in the control device 20, the control unit 21 further acquires climate information indicating the climate at the location where the building B is located, and estimates the power demand based on the climate information.
[0080] It is expected that the load devices in Building B will operate more efficiently as the climate moves away from a climate where people can live comfortably, and this will result in improved accuracy in predicting the amount of electricity demand. Therefore, it is possible to improve the technology for predicting the amount of electricity demand by taking into account the flow of people into a building.
[0081] Although the present invention has been described based on the drawings and examples, it should be noted that those skilled in the art may make various modifications and alterations based on the present disclosure. Therefore, it should be noted that these modifications and alterations are included in the scope of the present invention. For example, the functions included in each component or step can be rearranged so as not to be logically contradictory, and multiple components or steps can be combined into one or divided. For example, in the above-mentioned embodiment, an embodiment in which the configuration and operation of the control device 20 are distributed to multiple computers that can communicate with each other is also possible.
[0082] Second embodiment As a modified example of the present disclosure, the control unit 21 may communicate with a terminal device 30 carried by a person moving to building B, measure the number of people heading to building B based on terminal location information indicating the location of the terminal device 30, and obtain the measurement result as third information.
[0083] Fig. 3 is a schematic diagram of a system 2 according to this embodiment. As shown in Fig. 3, a control device 20 communicates with a terminal device 30 via a network 60, instead of the camera C2 of the first embodiment.
[0084] The terminal device 30 is carried by a person moving around the building as described below. The terminal device 30 is, for example, a mobile device such as a mobile phone, a smartphone, a wearable device, or a tablet, or a PC. "PC" is an abbreviation for personal computer. A "wearable device" is specifically a mobile device that can be worn on the body, such as a wristwatch type or an anklet type.
[0085] The control device 20, the camera C1, and the power meter M are similar to those in the first embodiment, and therefore the description thereof will be omitted.
[0086] The configuration of a terminal device 30 according to this embodiment will be described with reference to FIG.
[0087] The terminal device 30 includes a control unit 31, a storage unit 32, a communication unit 33, an input unit , an output unit 35, and a positioning unit .
[0088] The control unit 31 includes at least one processor, at least one dedicated circuit, or a combination of these. The processor is a general-purpose processor such as a CPU or a GPU, or a dedicated processor specialized for a specific process. The dedicated circuit is, for example, an FPGA or an ASIC. The control unit 31 executes processes related to the operation of the terminal device 30 while controlling each part of the terminal device 30.
[0089] The storage unit 32 includes at least one semiconductor memory, at least one magnetic memory, at least one optical memory, or a combination of at least two of these. The semiconductor memory is, for example, a RAM or a ROM. The RAM is, for example, an SRAM or a DRAM. The ROM is, for example, an EEPROM. The storage unit 32 functions as, for example, a main storage device, an auxiliary storage device, or a cache memory. The storage unit 32 stores information used in the operation of the terminal device 30 and information obtained by the operation of the terminal device 30.
[0090] The communication unit 33 includes at least one communication interface. The communication interface is, for example, an interface compatible with a mobile communication standard such as LTE, 4G standard, or 5G standard, an interface compatible with short-range wireless communication such as Bluetooth (registered trademark), or a LAN interface. "LTE" is an abbreviation for Long Term Evolution. "4G" is an abbreviation for 4th generation. "5G" is an abbreviation for 5th generation. The communication unit 33 receives information used in the operation of the terminal device 30, and transmits information obtained by the operation of the terminal device 30.
[0091] The input unit 34 includes at least one input interface. The input interface is, for example, a physical key, a capacitive key, a pointing device, a touch screen integral with a display, or a microphone. The input unit 34 accepts an operation to input information used for the operation of the terminal device 30. The input unit 34 may be connected to the terminal device 30 as an external input device instead of being provided in the terminal device 30. As a connection method, any method such as USB, HDMI (registered trademark), or Bluetooth (registered trademark) can be used.
[0092] The output unit 35 includes at least one output interface. The output interface is, for example, a display, a speaker, or a vibration motor. The display is, for example, an LCD or an organic EL display. The output unit 35 outputs information obtained by the operation of the terminal device 30. The output unit 35 may be connected to the terminal device 30 as an external output device instead of being provided in the terminal device 30. As a connection method, any method such as USB, HDMI (registered trademark), or Bluetooth (registered trademark) can be used.
[0093] The positioning unit 36 includes at least one GNSS receiver. "GNSS" is an abbreviation for global navigation satellite system. GNSS includes, for example, at least one of GPS, QZSS, GLONASS, and Galileo. "GPS" is an abbreviation for Global Positioning System. "QZSS" is an abbreviation for Quasi-Zenith Satellite System. QZSS satellites are called quasi-zenith satellites. "GLONASS" is an abbreviation for Global Navigation Satellite System. The positioning unit 36 measures the position of the terminal device 30.
[0094] The functions of the terminal device 30 are realized by executing a terminal program according to this embodiment on a processor corresponding to the control unit 31. That is, the functions of the terminal device 30 are realized by software. The terminal program causes a computer to execute the operations of the terminal device 30, thereby causing the computer to function as the terminal device 30. That is, the computer functions as the terminal device 30 by executing the operations of the terminal device 30 in accordance with the terminal program.
[0095] A part or all of the functions of the terminal device 30 may be realized by a dedicated circuit equivalent to the control unit 31. In other words, a part or all of the functions of the terminal device 30 may be realized by hardware.
[0096] The operation of the control unit 21 of the control device 20 of the system 2 will be described with reference to Fig. 4. This operation corresponds to the control method according to this embodiment.
[0097] Steps S201 to S204 in FIG. 4 are similar to steps S101 to S104 in FIG. 2 of the first embodiment, and therefore the description thereof will be omitted.
[0098] In step S105, the control unit 21 communicates with the terminal device 30 carried by the person moving to building B, measures the number of people heading to building B based on terminal location information indicating the location of the terminal device 30, and acquires the measurement result as the third information.
[0099] Specifically, the control unit 21 first identifies the terminal device 30 held by a person heading to building B, and communicates with the terminal device 30. Any method may be adopted to identify the terminal device 30 held by a person heading to building B. For example, the control unit 21 may acquire terminal location information indicating the locations of multiple terminal devices within a predetermined range from a building, and when the terminal location information indicates that the terminal device is moving to building B along a predetermined road toward building B, identify the terminal device as the terminal device 30 held by a person moving to building B.
[0100] For example, the control unit 21 may identify a terminal device whose destination is set to the target building B in a route guidance application as the terminal device 30 held by a person moving to building B. Without being limited thereto, the control unit 21 may identify a terminal device 30 held by a person registered in advance, such as a person working in building B, as the terminal device 30 held by a person moving to building B.
[0101] The control unit 21 calculates the moving speed and moving direction from the terminal position information indicating the position of the identified terminal device 30, and calculates the estimated time of arrival at building B. When the estimated time of arrival falls within a future target time period, the control unit 21 counts the number of people heading toward building B, and acquires the total counted value as the third information. In this way, the control unit 21 measures the number of people heading toward building B, and acquires the measurement result as the third information.
[0102] When a pre-registered terminal device held by a person working in building B is identified as terminal device 30 held by a person traveling to building B, control unit 21 may count people heading to building B when terminal device 30 moves along a predetermined route, and acquire the total counted value as the third information. The predetermined route may be pre-registered as a commuting route.
[0103] Steps S206 to S214 in FIG. 4 are similar to steps S106 to S114 in FIG. 2 of the first embodiment, and therefore the description thereof will be omitted.
[0104] According to this embodiment, the control unit 21 communicates with the terminal devices 30 of people who are definitely heading toward building B, and can predict with greater accuracy how much the number of people in building B will increase in a future target time period. This improves the accuracy of predicting the power demand of building B in a future target time period. This makes it possible to improve the technology for predicting the power demand by taking into account the flow of people into a building.
[0105] Third embodiment As a modified example of the present disclosure, the control unit 21 may communicate with a vehicle 40 moving to building B, measure the number of people heading to building B based on vehicle position information indicating the position of the vehicle 40, and obtain the measurement result as third information.
[0106] Fig. 5 is a schematic diagram of a system 3 according to this embodiment. As shown in Fig. 5, a control device 20 communicates with a vehicle 40 via a network 60, instead of the camera C2 of the first embodiment.
[0107] The vehicle 40 may be, for example, an automobile, but is not limited to this, and may be any vehicle. The automobile may be, for example, a gasoline automobile, an electric automobile, a hybrid automobile, a plug-in hybrid automobile, or a fuel cell automobile, but is not limited to these. The vehicle 40 may be driven by a driver, or may be automated at any level. The level of automation may be, for example, any of levels 1 to 5 in the level classification of the Society of Automotive Engineers (SAE). The vehicle 40 may be a dedicated vehicle for MaaS (Mobility as a Service). The vehicle 40 moves toward a building as described below.
[0108] The control device 20, the camera C1, and the power meter M are similar to those in the first embodiment, and therefore the description thereof will be omitted.
[0109] The configuration of a vehicle 40 according to this embodiment will be described with reference to FIG.
[0110] The vehicle 40 includes a control unit 41, a storage unit 42, a communication unit 43, an input unit 44, an output unit 45, and a positioning unit 46. The vehicle 40 further includes various sensors. The various sensors, the control unit 41, the storage unit 42, the communication unit 43, the input unit 44, the output unit 45, and the positioning unit 46 may be communicatively connected to an in-vehicle network such as a controller area network (CAN).
[0111] The control unit 41 includes one or more processors, one or more programmable circuits, one or more dedicated circuits, or a combination thereof. The processor is, for example, but is not limited to, a general-purpose processor such as a CPU or a GPU, or a dedicated processor specialized for a specific process. The programmable circuit is, for example, but is not limited to, an FPGA. The dedicated circuit is, for example, but is not limited to, an ASIC. The control unit 41 may include one or more ECUs (Electronic Control Units). The control unit 41 controls the operation of the entire vehicle 40 while controlling each part of the vehicle 40.
[0112] The storage unit 42 includes one or more memories. The memories are, for example, but not limited to, semiconductor memories, magnetic memories, or optical memories. Each memory included in the storage unit 42 may function as, for example, a main storage device, an auxiliary storage device, or a cache memory. The storage unit 42 stores any information used in the operation of the vehicle 40. For example, the storage unit 42 may store a system program, an application program, a database, and the like. The information stored in the storage unit 42 may be updatable with information acquired from the network 60 via the communication unit 43, for example.
[0113] The communication unit 43 includes at least one communication interface. The communication interface corresponds to, for example, a mobile communication standard, a mobile communication standard such as 4G or 5G, a wired LAN standard, or a wireless LAN standard, but is not limited to these and may correspond to any communication standard. For example, an in-vehicle communication device such as a DCM (Data Communication Module) may function as the communication unit 43. The communication unit 43 receives information used for the operation of the vehicle 40 and transmits information obtained by the operation of the vehicle 40.
[0114] The input unit 44 includes at least one input interface. The input interface is, for example, a physical key, a capacitive key, a pointing device, a touch screen integral with a display, or a microphone. The input unit 44 accepts an operation to input information used for the operation of the vehicle 40. The input unit 44 may be connected to the vehicle 40 as an external input device instead of being provided in the vehicle 40. As a connection method, any method such as USB, HDMI (registered trademark), or Bluetooth (registered trademark) can be used.
[0115] The output unit 45 includes at least one output interface. The output interface is, for example, a display or a speaker. The display is, for example, an LCD or an organic EL display. The output unit 45 outputs information obtained by the operation of the vehicle 40. The output unit 45 may be connected to the vehicle 40 as an external output device instead of being provided in the vehicle 40. As a connection method, any method such as USB, HDMI (registered trademark), or Bluetooth (registered trademark) can be used.
[0116] The positioning unit 46 includes at least one GNSS receiver. The GNSS includes at least one of GPS, QZSS, BeiDou, GLONASS, and Galileo, for example. The QZSS satellites are called quasi-zenith satellites. The positioning unit 46 measures the position of the vehicle 40.
[0117] The functions of vehicle 40 are realized by executing an arbitrary vehicle program in a processor serving as control unit 41. That is, the functions of vehicle 40 are realized by software. The vehicle program causes a computer to execute the operations of vehicle 40, thereby causing the computer to function as vehicle 40. That is, the computer functions as vehicle 40 by executing the operations of vehicle 40 in accordance with the vehicle program.
[0118] A part or all of the functions of the vehicle 40 may be realized by a programmable circuit or a dedicated circuit as the control unit 41. In other words, a part or all of the functions of the vehicle 40 may be realized by hardware.
[0119] The operation of the control unit 21 of the control device 20 of the system 3 will be described with reference to Fig. 6. This operation corresponds to the control method according to this embodiment.
[0120] Steps S301 to S304 in FIG. 6 are similar to steps S101 to S104 in FIG. 2 of the first embodiment, and therefore description thereof will be omitted.
[0121] In step S305, the control unit 21 communicates with the vehicle 40 moving to building B, measures the number of people heading to building B based on vehicle position information indicating the position of the vehicle 40, and acquires the measurement result as the third information.
[0122] Specifically, the control unit 21 first identifies the vehicle 40 moving to building B and communicates with the vehicle 40. Any method may be adopted to identify the vehicle 40 moving to building B. For example, the control unit 21 may acquire vehicle position information indicating the positions of multiple vehicles within a predetermined range from the building, and when the vehicle position information indicates that the vehicle is moving toward building B on a predetermined road toward building B, the control unit 21 may identify the vehicle as a vehicle 40 moving to building B.
[0123] For example, the control unit 21 may specify a vehicle whose destination is set to the target building B in a route guidance application as the vehicle 40 traveling to the building. Without being limited thereto, the control unit 21 may specify a pre-registered vehicle in which a person working in the building B rides as the vehicle 40 traveling to the building B.
[0124] The control unit 21 calculates the travel speed and travel direction from the vehicle position information indicating the identified position of the vehicle 40, and calculates the estimated arrival time at the building B. When the estimated arrival time is in a future target time zone, the control unit 21 acquires information indicating the number of people riding in the vehicle 40. The acquisition of the information indicating the number of people riding in the vehicle 40 may be performed by any method. For example, the control unit 21 may transmit a request to the vehicle 40 to transmit information indicating the number of people riding in the vehicle 40. In this case, in response to the request, the control unit 41 of the vehicle 40 detects the number of people riding in the vehicle 40 using any sensor such as a seat sensor of the vehicle 40, and transmits the detected number of people to the control device 20 as information indicating the number of people riding in the vehicle 40. The control unit 21 of the control device 20 may acquire the third information by receiving the information. Without being limited thereto, the control unit 21 identifies a camera installed on a road on which the vehicle 40 moves based on the vehicle position information, and communicates with the camera to receive an image of the moving vehicle 40 from the camera. The control unit 21 may analyze the image to detect the number of people riding in the vehicle 40, thereby acquiring the third information.
[0125] When a pre-registered vehicle in which a person working in building B rides is identified as vehicle 40 traveling to the building, control unit 21 may acquire, as the third information, the number of people pre-registered as riding in vehicle 40 when vehicle 40 travels along a predetermined route. The predetermined route may be pre-registered as a commuting route.
[0126] Steps S306 to S314 in FIG. 6 are similar to steps S106 to S114 in FIG. 2 of the first embodiment, and therefore description thereof will be omitted.
[0127] According to this embodiment, the control unit 21 can predict with greater accuracy the degree to which the number of people in building B will increase in the future target time period, taking into account people commuting to the building in vehicles 40. This improves the accuracy of predicting the power demand of building B in the future target time period. This makes it possible to improve the technology for predicting power demand by taking into account the flow of people into a building. [Explanation of symbols]
[0128] 1,2,3 System 20 Control device 21 Control section 22 Memory section 23 Communications Department 24 Input section 25 Output section 30 Terminal Equipment 31 Control Unit 32 Storage section 33 Communications Department 34 Input section 35 Output section 36 Positioning unit 40 vehicles 41 Control section 42 Storage section 43 Communications Department 44 Input section 45 Output section 46 Positioning unit 60 Network
Claims
1. Acquire information indicating the number of people heading toward a target building during a specified time period, A control device comprising a control unit that estimates an amount of electricity demand of the building in a future target time period based on the information, Further comprising a communication unit, A control device in which the control unit communicates with a vehicle moving toward the building via the communication unit, measures the number of people heading toward the building based on vehicle position information indicating the position of the vehicle, and acquires the measurement result as the information.
2. The control device according to claim 1 , The control unit communicates with a camera when installed on a road leading to the building via the communication unit, measures the number of people heading toward the building based on images captured by the camera, and acquires the measurement result as the information.
3. The control device according to claim 1 or 2, the control unit communicates with a terminal device carried by a person moving into the building via the communication unit, and measures the number of people moving toward the building based on terminal location information indicating a location of the terminal device; A control device that acquires the measurement results as the information.
4. A computer-implemented control method, comprising: Obtaining information indicating the number of people heading toward a target building during a given time period; estimating an amount of electricity demand for the building in a future time period of interest based on the information; The computer further includes a communication unit, The control method further includes communicating with a vehicle moving toward the building via the communication unit, measuring the number of people heading toward the building based on vehicle position information indicating the position of the vehicle, and acquiring the measurement result as the information.
5. 5. The control method according to claim 4, The control method further includes communicating with a camera installed on a road leading to the building via the communication unit, measuring the number of people heading toward the building based on images captured by the camera, and acquiring the measurement result as the information.
6. 6. The control method according to claim 4 or 5, The control method further includes communicating with a terminal device carried by a person moving into the building via the communication unit, measuring the number of people heading toward the building based on terminal location information indicating the location of the terminal device, and acquiring the measurement result as the information.
7. On the computer, Obtaining information indicating the number of people heading toward a target building during a given time period; and estimating an amount of electricity demand for the building in a future target time period based on the information, The computer further comprises a communication unit, A program that causes the computer to execute operations that further include communicating with a vehicle moving toward the building via the communication unit, measuring the number of people heading toward the building based on vehicle position information indicating the position of the vehicle, and acquiring the measurement results as the information.
Citation Information
Patent Citations
Energy consumption prediction system
JP2012190292A
Energy consumption analyzer
JP2013020307A
Power demand forecast device, method and system and power failure detection system
JP2013093934A
Motion estimation method and device
JP2016071801A
Water heater control device, water heater control system, water heater control method and program
JP2016075453A