Formwork set, formwork structure, and formwork construction method

JP7878663B1Active Publication Date: 2026-06-23SHINKO CO LTD +1

Patent Information

Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
SHINKO CO LTD
Filing Date
2025-06-04
Publication Date
2026-06-23

AI Technical Summary

Benefits of technology

【0014】 本発明の型枠補助具、型枠セット、型枠構造、及び型枠施工方法によれば、型枠補助具に穿設された貫通孔に固定棒を挿通することにより型枠を固定化するので、簡易的で安定して型枠を固定化することができる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007878663000001_ABST
    Figure 0007878663000001_ABST
Patent Text Reader

Abstract

The present invention provides a formwork support tool, formwork set, formwork structure, and formwork construction method that can easily and stably fix formwork in place. [Solution] A formwork support tool for assisting the construction of formwork using a panel having multiple protrusions that extend to both ends, wherein the tool is installed so as to abut both ends of the panel and has through holes drilled at predetermined intervals through which fixing rods installed substantially parallel to the protrusions are inserted.
Need to check novelty before this filing date? Find Prior Art

Claims

1. A formwork set comprising a panel having multiple protrusions extending to both ends, and a formwork support tool for assisting in the construction of formwork using the panel, The aforementioned formwork auxiliary device The panel has at least a bottom surface that abuts against either end of the panel, A formwork set characterized in that through holes for fixing rods, which are installed substantially parallel to the protrusions of the panel, are drilled in the bottom surface at intervals set according to the spacing of the protrusions.

2. The formwork set according to claim 1, wherein the through holes are drilled at intervals that allow the panels to be installed such that the fixing rods face only one side of the panels.

3. The formwork auxiliary device is The formwork set according to claim 1, further having two sides connected to the bottom surface and extending parallel to the longitudinal direction.

4. The formwork set according to claim 1, wherein the height of the panel is 1.5 m or less.

5. A formwork structure formed using the formwork auxiliary tool and the panel, and the fixing rod, which are included in the formwork set according to any one of claims 1 to 4, The formwork support is in contact with each of the ends of the panel, A formwork structure characterized in that the fixing rod is inserted through the through holes of the two formwork support devices and is further embedded in the ground.

6. The formwork support is in contact with the panel in a manner that allows it to be detachably attached. The formwork structure according to claim 5, wherein the fixing rod is inserted through the through hole in a manner that allows it to be detachably attached to the formwork auxiliary device.

7. A formwork construction method that uses a panel having multiple protrusions extending to both ends, The formwork construction method uses a first formwork auxiliary tool having at least a bottom surface that contacts either end of the panel used, and having first through holes drilled at predetermined intervals in the bottom surface, and a second formwork auxiliary tool having second through holes drilled at the same intervals as the first through holes, The first formwork support is placed on the ground in a placement step, Insertion step of inserting a fixing rod having a predetermined length through the first through hole and embedding it in the ground, The erection step involves bringing one end of the panel into contact with the first formwork support and erecting the panel, A formwork construction method characterized by comprising a contact step of inserting the fixing rod through the second through hole and bringing the second formwork auxiliary device into contact with the other end of the panel.

8. A formwork construction method that uses a panel having multiple protrusions extending to both ends, The formwork construction method uses a first formwork auxiliary tool having at least a bottom surface that contacts either end of the panel used, and having first through holes drilled at predetermined intervals in the bottom surface, and a second formwork auxiliary tool having second through holes drilled at the same intervals as the first through holes, A preparatory step of joining the first formwork support to one end of the panel and the second formwork support to the other end of the panel, Installation step of erecting the panel to which the first formwork support and the second formwork support are joined, such that the first formwork support or the second formwork support is in contact with the ground, A formwork construction method characterized by comprising a fixing step of inserting a fixing rod having a predetermined length through the first through hole and the second through hole, and further burying it in the ground.

9. The formwork construction method according to claim 7 or 8, wherein the panel is erected such that the fixing rod faces only one side of the panel.

10. The formwork construction method according to claim 7 or 8, wherein the first formwork auxiliary and / or the second formwork auxiliary are joined to the panel using fastening components.