Environmental load estimation device, environmental load estimation system, and environmental load estimation method

The environmental load estimation device addresses the challenge of inaccurate CO2 emission calculations by categorizing data attributes and selecting appropriate estimation methods, resulting in improved real-time accuracy and effective emission reduction strategies.

WO2024203174A1PCT designated stage expired Publication Date: 2024-10-03HITACHI LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/009095
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-24
Filing Date
2024-03-08
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Current environmental load estimation methods lack real-time accuracy and consistency in data quality, making it difficult to accurately calculate and visualize CO2 emissions from transportation, which hinders the effectiveness of promoting sustainable practices and efficient operations in public transportation.

Method used

An environmental load estimation device that combines data from business systems, open data sources, and travel route collection devices, using a method that categorizes data attributes as continuous, causal, or independent to select appropriate estimation methods and calculation formulas, ensuring data consistency and accuracy for precise CO2 emission calculations.

Benefits of technology

This approach enhances the real-time accuracy and reliability of environmental load estimation, enabling more informed decision-making for reducing emissions and promoting sustainable transportation practices by providing detailed and accurate CO2 emission data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024009095_03102024_PF_FP_ABST
    Figure JP2024009095_03102024_PF_FP_ABST
Patent Text Reader

Abstract

The purpose of the present invention is to, in an environmental load estimation device for estimating an environmental load by combining calculation formulae and data having different accuracies, assign an estimation accuracy to data that is the result of estimating the environmental load so that the application side can determine whether or not the data can be used. For this purpose, an environmental load estimation device according to the present disclosure is provided with: a data acquisition unit capable of acquiring data from each of a business system device, an open data provision device, and a travel route collection device; a detailed environmental load estimation unit that estimates a detailed environmental load per person by substituting input data, including the data acquired by the data acquisition unit and data retained by the environmental load estimation device, into an estimation method that matches the input data; and a route environmental load estimation unit that estimates the route environmental load of a user by combining the detailed environmental load and information about the user's travel route.
Need to check novelty before this filing date? Find Prior Art

Description

Environmental load estimation device, environmental load estimation system, and environmental load estimation method

[0001] The present invention relates to an environmental load estimation device, an environmental load estimation system, and an environmental load estimation method.

[0002] In recent years, from the perspective of achieving the Sustainable Development Goals (SDGs), 2 In particular, transportation has a significant impact on the environment, contributing to air pollution and global warming, so reducing CO2 emissions from travel is a major social goal. 2 Reducing emissions has become an important issue. Public transport such as trains and buses emit less CO2 per unit of transport volume (passenger-kilometer basis) than private cars. 2 Because of its low emissions, individual users can use public transport and reduce CO2 emissions from travel. 2 It is important to reduce CO2 emissions. The system detects the means of transportation (train, bus, car, walking, etc.) from communication information acquired from each user's smartphone, estimates the energy consumption related to operation, and calculates the CO2 emissions per person for the section and train traveled by each user. 2 If the amount of emission reductions could be visualized, it would be possible to encourage modal shifts among individual users and to transition to a sustainable social structure. Furthermore, by providing such user trends to public transport operators (hereafter referred to as "operators"), operators would be able to utilize this trend data to operate their businesses more efficiently, bringing us one step closer to realizing an environmentally friendly society.

[0003] In addition, CO2 emissions from employee commuting, which is one item of supply chain emissions, 2 To calculate emissions, the CO2 emissions per unit of transportation volume determined for each mode of transportation (private car, airplane, bus, train, etc.) 2 Emissions (CO2 required to transport one person 1 km) 2 It is generally calculated by multiplying the amount of carbon dioxide emitted by the fuel by the distance traveled.

[0004] However, even with the same means of transportation, the environmental impact varies depending on the vehicle's performance. For example, in the case of private cars, electric vehicles have a lower CO2 emissions than gasoline-powered vehicles. 2 It is generally known that railways have low CO emissions. 2 New trains that can reduce NOx emissions have a lower environmental impact than conventional trains, and the environmental impact per person varies depending on the number of passengers. Utilizing the various data held by railway operators makes it possible to calculate environmental impact in more detail, but the format and accuracy of the data provided by each operator often differs. Furthermore, even when using the same calculation formula to calculate environmental impact values, the type, format, and accuracy of the data required often differs depending on the calculation formula, making it difficult to determine the accuracy of the environmental impact value.

[0005] As a system for maintaining interest in contributing to the SDGs, Patent Document 1 describes a system that includes: "a movement detection unit that detects when a user starts a movement from a movement start location and when the user finishes the movement at a movement end location; a movement content determination unit that determines the movement content including the movement start location, the movement end location, and information on the means of transportation and records the determined movement content in a movement history recording unit; a first CO2 per person related to the movement using a passenger transportation service" 2 Emissions and the second CO per person assuming that a commonly used passenger car travels from the start point to the end point of the trip. 2 An environmental load calculation unit that calculates the amount of CO emissions and a first CO 2 Second CO emissions 2 The document discloses an SDGs contribution point system that includes an SDGs application having a point calculation unit that calculates and records the points to be awarded to users according to the amount of reduction in emissions.

[0006] JP 2023-18710 A

[0007] In Patent Document 1, the CO2 per person is calculated by dividing it by the number of passengers, taking into consideration the type of train car, type of express or express, weight of the car, information on the power generation means, weather, etc. 2The method takes into account factors such as emissions. However, in Patent Document 1, basic information is set and fixed in advance as a reference value, and data from operators such as railway operators cannot be reflected in real time, so there is room for improvement in the calculated results. Therefore, the present disclosure aims to provide an environmental load estimation device, an environmental load estimation system, and an environmental load estimation method that utilize operator data to improve the real-time performance and accuracy of data related to environmental load estimation.

[0008] To solve the above-mentioned problems, one representative environmental load estimation device of the present invention is an environmental load estimation device that estimates environmental loads by combining and processing multiple pieces of information. The environmental load estimation device includes a data acquisition unit that can acquire data from a business system device, an open data provision device, and a travel route collection device. The environmental load estimation device also includes a detailed environmental load estimation unit that estimates detailed environmental loads per person by substituting input data, including the data acquired by the data acquisition unit and data held by the environmental load estimation device, into an estimation method consistent with the input data, and a route environmental load estimation unit that combines the detailed environmental loads with information on the user's travel route to estimate the user's route environmental load.

[0009] According to the present disclosure, it is possible to provide an environmental load estimation device, an environmental load estimation system, and an environmental load estimation method that utilize data from businesses to improve the real-time performance and accuracy of data related to environmental load estimation. Problems, configurations, and effects other than those described above will become clear from the description of the following embodiments of the invention.

[0010] FIG. 1 is a diagram illustrating an example of a hardware configuration according to an embodiment of the present disclosure. FIG. 2 is a diagram illustrating an example of a configuration of an environmental load estimation device according to an embodiment of the present disclosure. FIG. 3 is a schematic diagram illustrating an example of an estimation method for estimating environmental loads. FIG. 4 is a schematic diagram illustrating continuous attributes. FIG. 5 is a schematic diagram illustrating causal attributes. FIG. 6 is a schematic diagram illustrating independent attributes. FIG. 7 is a flowchart illustrating a main flow of environmental load estimation. FIG. 8 is a flowchart illustrating detailed environmental load estimation. FIG. 9 is a flowchart illustrating environmental load estimation for each train. FIG. 10 is a flowchart illustrating an estimation method when data attributes are continuous attributes. FIG. 11 is a flowchart illustrating an estimation method when data attributes are causal attributes. FIG. 12 is a flowchart illustrating an estimation method when data attributes are independent attributes. FIG. 13 is a diagram illustrating example data to be substituted into a calculation formula for the estimation method. FIG. 14 is a diagram illustrating data for estimating the number of passengers. FIG. 15 is a diagram illustrating data for estimating the environmental load for each train. FIG. 16 is a diagram illustrating data for estimating the environmental load for each train. FIG. 17 is a diagram illustrating data for estimating the environmental load for each train. FIG. 18 is a diagram illustrating an example of output of individual environmental load values. FIG. 19 is a flowchart of a method for estimating the environmental load of a route. FIG. 20 is a diagram illustrating an example of data acquiring passenger behavior routes and transportation routes. FIG. 21 is a diagram illustrating an example of a travel route broken down into fragments. FIG. 22 is a diagram illustrating an example of data integrating information on passenger routes and trains used. FIG. 23 is a diagram illustrating an example of integrating the environmental load for each fragment. FIG. 24 is a diagram illustrating an example of visualizing the environmental load in a heat map format. FIG. 25 is a diagram illustrating an example of visualizing the environmental load in a timetable diagram format. FIG. 26 is a diagram illustrating an example of visualizing the environmental load estimate in the format of a route search or travel history display. FIG. 27 is a diagram illustrating an example of how the environmental load estimate is used.

[0011] Hereinafter, embodiments of the present invention will be described with reference to the drawings. However, the present invention is not limited to these embodiments. In addition, in the description of the drawings, identical parts are denoted by the same reference numerals. When there are multiple components having the same or similar functions, they may be described by using the same reference numerals with different subscripts. Furthermore, when it is not necessary to distinguish between these multiple components, the subscripts may be omitted. The position, size, shape, range, etc. of each component shown in the drawings may not represent the actual position, size, shape, range, etc., in order to facilitate understanding of the invention. Therefore, the present invention is not necessarily limited to the position, size, shape, range, etc. disclosed in the drawings.

[0012] Furthermore, although terms such as "first," "second," and "third" may be used to describe various elements or components in this disclosure, these elements or components should not be limited by these terms. These terms are used only to distinguish one element or component from another. Thus, a first element or component discussed below could also be referred to as a second element or component without departing from the teachings of the inventive concept.

[0013] Furthermore, in this disclosure, "data accuracy" refers to the accuracy of data such as input values ​​and output values ​​used in this disclosure. However, the method of expressing data accuracy is not limited to percentage accuracy or significant figures, which are commonly used indicators of accuracy. In this disclosure, "data accuracy" refers to indicators that express data characteristics, such as the presence or absence of data, whether the value is a predicted value or an actual value, the frequency of data acquisition, and the unit of measurement. In other words, it refers to the "usability level" or "effectiveness" for determining whether the data can be used. In particular, the accuracy of data regarding the total environmental impact value of output values ​​in this disclosure is sometimes referred to as "estimated accuracy information." The estimated accuracy information may be in the form of a number (e.g., a percentage), or the actual formula and data used and their accuracy may be used as estimated accuracy information.

[0014] In this disclosure, the unit by which environmental load can be estimated is referred to as the “environmental load estimation category.” Furthermore, in this disclosure, “consistency” between input data and an estimation method or calculation formula means that the quality and accuracy of the input data are consistent with the quality and accuracy assumed by the estimation method or calculation formula, and that the estimation method or calculation formula can calculate an estimated value with the accuracy intended by the estimation method or calculation formula, in other words, that the estimation method or calculation formula is “effective.”

[0015] Furthermore, in this disclosure, "data attributes" are of the following three types: A: Continuing attribute Data with attributes where the content and accuracy of the data do not change for each estimated category of environmental load, and where the data of the previous estimated category can continue to be used. B: Causal attribute Data with attributes where the content and accuracy of the data may change for each estimated category of environmental load, but the content of the change has a causal relationship with the data of the previous estimated category, and where there is little change in the accuracy of the data. C: Independent attribute Data with attributes where the content and accuracy of the data often change for each estimated category of environmental load, and the content of the change has no causal relationship with the data of the previous estimated category and is independent of the previous estimated category, and therefore where there is a high possibility that the accuracy of the data is also changing.

[0016] <Hardware Configuration Example> First, with reference to FIG. 1 , an example hardware configuration for implementing an embodiment of the present disclosure will be described. The hardware configuration example according to the embodiment of the present disclosure can be configured with any appropriate computing system. The main components of the hardware that make up the environmental load estimation system are a business system device 30, an open data providing device 40, a travel path collection device 50, and an application server 60, which can be connected to the environmental load estimation device 10 via a network 20. The environmental load estimation device 10 includes a storage device 101, a memory 110, a CPU 120, a UI device 130, and a communication device 140. These components can be interconnected via a bus 150.

[0017] The storage device 101 can be configured with an appropriate non-volatile storage element such as an SSD (Solid State Drive) or a hard disk drive, and can store the program 102 and data 103. The memory 110 can be configured with a volatile storage element such as a RAM. The CPU 120 may include one or more CPUs, or may be a single CPU system. The CPU 120 executes the program 102 stored in the storage device 101 by, for example, reading it into the memory 110, and performs overall control of the device itself as well as various judgments, calculations, and control processes.

[0018] UI devices 130 may include user output devices such as a video display, speakers, television, etc., and user I / O devices such as user input devices such as a keyboard, mouse, keypad, touchpad, trackball, buttons, light pen, or other pointing device.

[0019] The network 20 is a path that allows connection and communication between the business system device 30, the open data providing device 40, the travel path collection device 50, and the application server 60 via the communication device 140 of the environmental load estimation device 10. Note that there may be a plurality of business system devices 30, open data providing devices 40, travel path collection devices 50, and application servers 60, as long as they are able to connect and communicate with the environmental load estimation device 10 via the necessary network 20. Furthermore, data and the like contained in the business system device 30, the open data providing device 40, and the travel path collection device 50 will be described later.

[0020] Individual users can receive the environmental load estimation results via the application server 60 using a desktop computer, a portable computer, a laptop computer, a tablet computer, a pocket computer, a telephone, a smartphone, or any other suitable electronic device. Businesses can also receive the environmental load estimation results via the application server 60. The application server 60 can provide smartphone apps for individual users, apps for use in travel expense settlement for general businesses, apps for use in automating business operations within businesses, and the like. Furthermore, the environmental load estimation results do not necessarily have to be received via the application server 60. They may also be received via another route via the network 20.

[0021] <Environmental Load Estimation Device> Next, the configuration of the environmental load estimation device 10 will be described with reference to FIG. 2 . FIG. 2 is a diagram illustrating an example of the configuration of the environmental load estimation device according to an embodiment of the present disclosure. As described above, the environmental load estimation device 10 is connected to various external devices and servers via a network 20. The environmental load estimation device 10 includes a data acquisition unit 201 that acquires various data, a detailed environmental load estimation unit 203 that estimates a detailed environmental load from the various data, a route environmental load estimation unit 205 that estimates a route environmental load, and a data distribution unit 207 that distributes estimation results, etc. The environmental load estimation device 10 also stores the various data acquired by the data acquisition unit, and includes basic data 211, statistical data 213, plan data 215, measurement data 217, estimation method patterns 220, detailed environmental loads 230, and route environmental loads 240 as information necessary for the detailed environmental load estimation unit 203 and the route environmental load estimation unit 205 to perform processing. Examples of data stored in the basic data 211, statistical data 213, plan data 215, and measurement data 217 will be described in detail later.

[0022] The data acquisition in the environmental load estimation device 10 may be a pull type in which the environmental load estimation device 10 acquires data by sending a request to the business system device 30, the open data providing device 40, the travel path collection device 50, etc., or a push type in which data transmitted from the business system device 30, the open data providing device 40, the travel path collection device 50, etc. The data acquisition source may be an external device such as the business system device 30, the open data providing device 40, the travel path collection device 50, etc., or may be a storage medium within the environmental load estimation device 10.

[0023] Furthermore, the timing of data acquisition may be either at regular intervals or at any timing, such as when the data is generated. Data to be used at each stage of detailed environmental load estimation and route environmental load estimation may be acquired each time. Data distribution may also be a push type where the environmental load estimation device itself issues the data, or a pull type where data is distributed upon receiving a request from the data distribution destination. Here, the data distribution destination is assumed to be an external device, but it is desirable that the distributed data be stored temporarily or permanently in a storage medium within the environmental load estimation device 10. Furthermore, the timing of data distribution may be either at regular intervals or at any timing, such as when a request is made by an application.

[0024] <Estimation Method> Next, the types of environmental loads and the estimation method thereof will be described with reference to Fig. 3. Fig. 3 is a schematic diagram illustrating an example of an estimation method for estimating the environmental load. The environmental load includes power consumption, CO 2 There are various indicators, such as emissions, and greenhouse gas emissions such as chlorofluorocarbons, methane, and NOx. There are also many methods and algorithms for calculating these values. For example, Figure 3 shows that there are multiple estimation methods (estimation methods 1 and 2) for data (data d) that is to be estimated as output. Estimation method 1 estimates data d as output using calculation formulas X and Y, while estimation method 2 estimates data d as output using calculation formula Z.

[0025] In estimation method 1, the calculation formula X used first requires data a that meets a specific accuracy requirement, which becomes the input to calculation formula X. The accuracy of data a is determined by calculation formula X, and if data a that meets this accuracy requirement does not exist, it is difficult to calculate a highly accurate estimate even when estimation method 1 is adopted. In estimation method 1, data b calculated by calculation formula X is the output of calculation formula X and becomes the input to the next calculation formula Y. Calculation formula Y calculates data d using data b and data c as inputs. Here again, the accuracy of the data required as input to calculation formula Y is determined by calculation formula Y, and if data b and data c do not meet this accuracy requirement, it is difficult for estimation method 1 to derive an accurate estimate. In other words, it is difficult to derive an accurate estimate unless the input data is substituted into an estimation method consistent with that data.

[0026] On the other hand, there may be an estimation method other than estimation method 1, called estimation method 2. In estimation method 2, data d is estimated as output using only calculation formula Z. The accuracy of the data required as input to calculation formula Z is determined by calculation formula Z, and if data e does not satisfy this accuracy requirement, estimation method 2 cannot be adopted.

[0027] The accuracy of data d estimated by estimation method 1 and estimation method 2 may differ. However, as described above, by determining the accuracy of the input data required by the calculation formula used in each estimation method and evaluating the accuracy of various data, it is possible to rationally select an estimation method and estimate the environmental load that is optimal for the purpose.

[0028] In other words, there is a wide variety of available data and calculation formulas. When estimating environmental impacts by combining data and calculation formulas with different accuracies, the party estimating the environmental impact, for example, the application server, needs to evaluate the accuracy of the data so that it can determine whether the data can be used. In the example of Figure 3, the accuracy of the available data is estimated and stored, and the application server determines whether to select Estimation Method 1 or Estimation Method 2, thereby obtaining the necessary data d. For this reason, in the present disclosure, the accuracy of the data required for each calculation formula is determined, and the accuracy of the data is determined depending on the type of data. An accurate estimate is derived by substituting this data into a consistent estimation method or calculation formula. More specifically, the accuracy of the data is used to determine whether the data obtained for each estimation method or calculation formula can be used.

[0029] If the method of calculating an estimated value by substituting such data into a calculation formula is applied to, for example, calculating the environmental impact of public transportation travel, it becomes possible to estimate environmental impact data in detail. As a result, when calculating supply chain emissions, businesses can use apps and other tools to more accurately calculate emissions caused by employee travel. Furthermore, by allowing individual users, such as consumers, to accurately understand the environmental impact of their own actions, it is expected that this will promote modal shift and contribute to raising environmental awareness.

[0030] <Switching of Data Attributes and Estimation Methods> Next, with reference to Figures 4 to 6, the classification of data attributes and the switching of estimation methods employed in the present disclosure will be described. In the present disclosure, data attributes are classified into three types, enabling efficient selection of estimation methods and calculation formulas. Figures 4 to 6 explain the switching of environmental load estimation methods using a vehicle traveling on a railway line as an example, but the present disclosure is not limited to the environmental load of railway vehicles traveling between stations. For example, the present disclosure can also be applied to calculating the environmental load resulting from the use of various facilities at stations, and can also be applied to any situation where calculation of the environmental load of route buses or other vehicles is required.

[0031] Figures 4 to 6 show models for estimating the amount of electric power, an index of the environmental impact when a train travels between stations X and Y, and the amount of electric power, an index of the environmental impact when a train travels between stations Y and Z after arriving at station Y. Generally, when estimating the amount of electric power, the amount of electric power is estimated for each station between the time the train departs from one station and the time the train stops at the next station. In other words, data for estimating the environmental impact for each station is collected, and the data is substituted into a calculation formula to calculate the environmental impact for each station. Specifically, data for estimating the amount of electric power includes, for example, the type of vehicle, delay time, and run curve (a graph showing the change in speed at each point as the train's position changes, with the horizontal axis representing the running position and the vertical axis representing the speed). The environmental impact varies depending on the type of vehicle, and the subsequent run curve also varies depending on the delay time, which affects the run curve and thus the calculation of the environmental impact. The amount of electric power required for running the vehicle changes depending on the run curve, which in turn changes the environmental load. In other words, to estimate environmental load, it is necessary to collect data for each estimation category of environmental load, assess the accuracy of the collected data, and select a calculation formula that is appropriate for the circumstances under which the data was obtained. In other words, an estimation method must be selected for each estimation category, and a decision process must be made to switch estimation methods for each station (each estimation category). However, by classifying the attributes of the data to be substituted into the calculation formula into A: continuous attributes, B: causal attributes, and C: independent attributes, it is possible to reduce the number of decisions to switch estimation methods and reduce the calculation load on the environmental load estimation device.

[0032] (Example of Continuing Attributes) First, referring to FIG. 4 , continuous attributes will be described using an example of vehicle model data 400. In FIG. 4 , the vehicle model data 400 enclosed by a solid line is a continuous attribute, while the other data enclosed by a dotted line is a non-continuing attribute. In FIG. 4 , the vehicle model data 400 basically remains unchanged from the time the same train departs from the starting station until it arrives at the destination. Therefore, the content and accuracy of the data are always constant and do not change depending on the course of operation along the way. In other words, for data with such continuous attributes, the accuracy of the data is confirmed at the starting station (first environmental impact estimation category). If that accuracy meets the accuracy required by the calculation formula, the accuracy of the data is reconfirmed between intermediate stations (later environmental impact estimation categories), and there is no need to review the selection method. Specifically, if model data cannot be obtained at the starting station, an estimation method including a calculation formula requiring model identification cannot be adopted, and an estimation method including a calculation formula not requiring model identification must be changed. The estimation method adopted at the starting station continues until the train arrives at the destination, and there is no need to determine whether to switch the estimation method between stations along the way.

[0033] (Example of Causal Attributes) Next, referring to FIG. 5 , causal attributes will be described using an example of delay data 500, 501, and 502. In FIG. 5 , delay data 500, 501, and 502 surrounded by solid lines are causal attributes, and other data surrounded by dotted lines are attributes other than causal attributes. In FIG. 5 , delay data 500, 501, and 502 generally change in relation to the delay time between the previous stations (previous environmental load estimation category). In other words, except in the event of an accident or the like, the delay time between the previous stations tends to gradually increase or decrease. For this reason, for data with causal attributes, the estimation method used between the previous stations may be continued and used for the next station (next environmental load estimation category), or the estimation method may be changed depending on the accuracy of the delay data. Specifically, if the estimation method was changed due to insufficient accuracy in delay data 500 between stations X and Y, and the accuracy of delay data 501 has been restored in the next station interval (between stations Y and Z), the estimation method may be returned to that of the previous station interval (between stations before station X); or, if accuracy has not been restored in delay data 502, the estimation method used in the previous station interval (between stations X and Y) will continue to be used.

[0034] (Example of Independent Attributes) Next, referring to FIG. 6 , independent attributes will be described using the example of run curves 600 and 601. In FIG. 6 , the run curves 600 and 601 surrounded by solid lines are independent attributes, and the other data surrounded by dotted lines are attributes other than independent attributes. In FIG. 6 , the run curve 601 between stations Y and Z (the estimation section to be estimated) is generally unrelated to the run curve 600 between the previous station (between stations X and Y) (the previous environmental load estimation section). For this reason, for data with independent attributes, the estimation method may constantly be changed between stations due to changes in the accuracy of the data. Specifically, even if the estimation method is changed because the accuracy of the run curve 600 between the previous station (between stations X and Y) is insufficient due to temporary data loss, the accuracy of the run curve 601 between the next station (between stations Y and Z) is likely to be sufficient. For this reason, it is necessary to basically determine the accuracy of the run curve between each station and determine whether to switch the estimation method between each station.

[0035] By categorizing the methods for determining whether to switch estimation methods according to the characteristics of the data in this way, it is possible to reduce the number of times the estimation method determination process is performed for each estimation category, thereby reducing the calculation load on the environmental load estimation device. Taking such measures is particularly effective when estimating environmental loads in real time.

[0036] <Main Flow> Next, the flow of environmental load estimation according to the present disclosure will be described with reference to Fig. 7. Fig. 7 is a flowchart showing the main flow for environmental load estimation. The environmental load estimation according to the present disclosure is composed of two steps: step 700, "estimation of detailed environmental load," and step 750, "estimation of environmental load of utilization route."

[0037] In the following description, environmental load estimation will be described using railroad train travel as an example, but the present disclosure is not limited to this and can be applied to various forms of travel, such as buses and private cars. In the case of private cars, detailed environmental load estimation can be performed based on the vehicle type, probe data (data obtained from various sensors equipped on the traveling vehicle), information on the roads traveled, and the like. Furthermore, the environmental load related to railroad trains can be estimated not only for each station but also for each station or each facility within a station. Naturally, when applied to buses, it can be applied to various situations, such as for each bus vehicle or each stop.

[0038] Details of the detailed environmental load estimation in this disclosure will be described later. Detailed environmental load estimation is an estimation process for estimating the environmental load per passenger from the start to the end of a service such as public transportation. In other words, it is a process for generating data related to the environmental load analyzed for each transportation service. Meanwhile, the environmental load estimation of the route of use in step 750 is an estimation process for estimating the environmental load for each user based on the route of the user using the transportation service. Details of the environmental load estimation of the route of use will also be described later. Estimating the environmental load of the route of use requires obtaining travel route information for each user.

[0039] The estimation of environmental load may be based on predicted values ​​or on actual values. The accuracy of the estimated value is higher when it is based on actual values, but the flow of calculating the estimated value is the same. For example, when a user searches for a route, the environmental load estimation data based on predicted values ​​can be used to encourage the user (passenger) to change their behavior by showing the estimated environmental load value for the route in the search results. On the other hand, for example, the environmental load estimation data based on actual values ​​can be used to award eco points according to the user's contribution to reducing the environmental load based on their travel history, or to allow a company to calculate CO2 emissions in the supply chain. 2 It can be used when calculating emissions, etc.

[0040] <Estimation of detailed environmental impact> Next, referring to FIG. 8, the power consumption and CO 2This section explains the estimation of detailed environmental loads, such as emissions, as an example. FIG. 8 is a flowchart illustrating in detail the details of the estimation of detailed environmental loads in step 700 shown in FIG. 7. The estimation of detailed environmental loads in FIG. 8 consists of three steps: step 801, "estimating environmental load for each train," step 802, "estimating environmental load per passenger," and step 803, "adding estimation accuracy information and storing as detailed environmental load." First, in step 801, "estimating environmental load for each train," the environmental load for each station on the route of each train is estimated. The estimation of environmental load for each train will be described in detail later. Next, in step 802, "estimating environmental load per passenger," the environmental load for each train is divided by the data on the number of passengers on each train between stations to estimate the general environmental load per passenger. In other words, the output of step 801 is apportioned by the number of passengers.

[0041] The estimation of the number of passengers will be described in detail later with reference to FIG. 14 . When this method is applied to freight trains rather than passenger trains, the allocation may be based on the unit mass of cargo rather than the number of passengers. Then, in step 803, “assigning estimation accuracy information and storing as detailed environmental load,” the calculated estimated value is assigned the accuracy of the data and stored as the detailed environmental load. Specifically, “estimated accuracy information” is assigned to the total environmental load value, which is the final output, based on the accuracy of the calculation formula and the accuracy of the data used in step 801 “estimating the environmental load for each train” and step 802 “estimating the environmental load per passenger” (e.g., whether data is available, whether it is actual or predicted, real-time performance, acquisition frequency, measurement unit, etc.). The estimated accuracy information may be in the form of a numerical value (e.g., percentage), or the actual formula and data used and their accuracy may be assigned as accuracy information.

[0042] In this way, by providing estimation accuracy information for detailed environmental impact estimates, applications that use this data can select data that best suits their purpose. Furthermore, being able to estimate environmental impact data for public transportation trips in detail makes it possible to utilize environmental impact data in a variety of applications. For example, when a business calculates supply chain emissions, it can more accurately calculate emissions from employee travel. Furthermore, allowing consumers to accurately understand the environmental impact of their own actions is expected to contribute to raising environmental awareness.

[0043] <Estimation of environmental load for each train> Next, "Estimation of environmental load for each train" in step 801 of Fig. 8 will be described with reference to Fig. 9. Fig. 9 is a flowchart explaining the flow of estimating environmental load for each train, classified by data attribute. (Step 901) First, in step 901, the train and section to be subject to environmental load estimation are specified.

[0044] (Step 902) Next, from step 902, the following steps 903 to 909 are repeated for the trains and sections for which environmental loads are to be estimated, in the order in which the trains run. Note that the order of repetition does not necessarily have to be limited to the order between stations or the order in which the trains run in the target section. It is also possible to repeat the process in the order of stations or trains that are used most frequently, or stations or trains for which there is a high need to estimate the environmental load.

[0045] (Step 903) Next, candidates for the estimation method for estimating the environmental load are set in step 903. As the estimation method, various existing estimation methods can be adopted.

[0046] (Step 904) Next, in step 904, the attributes of the data to be substituted into the calculation formula of the candidate estimation method are classified into continuous attributes (A), causal attributes (B), and independent attributes (C), and the processes of steps 905 to 908 are performed based on each attribute.

[0047] (Step 905) Step 905 is a process for determining an estimation method when the data has a continuous attribute. In step 905, an estimation method that can be adopted is determined based on the data obtained between the first stations, and this estimation method is applied to all target sections. In other words, it is determined that the estimation method decided in the first iteration will continue to be used in the second and subsequent iterations. This eliminates the need to determine the estimation method for data with a continuous attribute during the iteration flow in the target section, making it possible to reduce the calculation load for environmental impact estimation. Details of the estimation method to be adopted will be described later.

[0048] (Steps 906 and 907) Step 906 is a process for determining an estimation method when the data has causal attributes. In step 906, an applicable estimation method is determined based on the data acquired between certain stations. For the next interval between stations, in step 907, the estimation method adopted between the previous interval between stations is adopted as a candidate estimation method. It is determined whether the acquired data has an accuracy that is applicable to the estimation method adopted between the previous interval between stations. If applicable, the environmental impact is estimated using the calculation formula of the estimation method adopted between the previous interval between stations. This makes it possible to narrow down the candidate estimation methods to be adopted for data with causal attributes to the estimation method adopted between the previous interval between stations, thereby reducing the computational load of environmental impact estimation in determining the estimation method. In other words, for data with causal attributes, it is considered that the accuracy of the data rarely changes significantly between the previous interval between stations and the next interval, so there is a high probability that the estimation method adopted between the previous interval between stations is applicable. Therefore, by designating the previously adopted estimation method as a candidate estimation method for the next interval, the computational load can be reduced. However, if the accuracy of the data changes and the previous estimation method is no longer applicable, a different estimation method must be selected. The estimation method to be employed will be described in detail later.

[0049] (Step 908) Step 908 is a process for determining an estimation method when the data has independent attributes. When the data has independent attributes, the probability that the data obtained between one station will be applicable to the next station is low. Therefore, basically, an applicable estimation method is determined based on the data obtained for all stations, and the environmental load is estimated based on that estimation method.

[0050] In addition, in steps 905, 906, and 908, if one estimation method includes multiple calculation formulas or multiple data attributes, the accuracy of the data is taken into account for each calculation formula to determine whether the data can be used, i.e., whether it can be substituted. Details of the estimation method to be adopted will be described later.

[0051] (Step 909) Next, in step 909, the environmental load is calculated based on the estimation method described above, and the result is recorded.

[0052] (Step 910) Next, in step 910, steps 903 to 909 are repeated until the estimation of the environmental load between stations in the target section and for the target train is completed, and when the estimation is completed, the process proceeds to end.

[0053] In other words, the method for estimating environmental loads disclosed herein is a method for estimating environmental loads by repeating the following first to fourth steps for each estimation category: (1) a first step of setting candidate estimation methods for each estimation category of environmental loads; (2) a second step of verifying the consistency between the accuracy of the data required by the calculation formula and the accuracy of the acquired data for the calculation formula used in the estimation method set in the first step and the data used in the calculation formula; (3) a third step of estimating environmental loads using the estimation method if the accuracy of the data required by the calculation formula and the accuracy of the acquired data match in the second step; and (4) a fourth step of searching for an estimation method in which the accuracy of the data required by the calculation formula and the accuracy of the acquired data match in the second step if the accuracy of the data required by the calculation formula and the accuracy of the acquired data match.

[0054] Furthermore, the environmental load estimation method of the present disclosure may include the following requirements: (5) When the data used in the calculation formula is data with a continuous attribute, the estimation method adopted in the first estimation category is set as the candidate estimation method to be set in the first step from the first estimation category onwards. (6) When the data used in the calculation formula is data with a causal attribute, the estimation method adopted in the previous estimation category is set as the candidate estimation method to be set in the first step from the first estimation category onwards.

[0055] <Details of Estimation Method in Case of Continuing Attribute> Next, details of the estimation method in case the attribute of data is a continuing attribute will be described with reference to Fig. 10. Fig. 10 is a flowchart of the estimation method in case the attribute of data is a continuing attribute, which was outlined in Fig. 9. Steps 902, 909, and 910 already explained in Fig. 9 are the same as in Fig. 9, and therefore their explanation will be omitted.

[0056] (Steps 1002 and 1060) After the environmental load estimation category has been determined, the first step is to determine whether or not this is the initial estimation category. If the answer is YES, the process proceeds to step 1010. If the answer is NO, the process proceeds to step 1060, where the estimation method p to be adopted for this category is determined to be the estimation method P1 adopted the initial time. In other words, if the data attribute is a continuous attribute, once the estimation method is determined for the initial estimation category, the same estimation method as the initial estimation method can be adopted for the second and subsequent estimation categories. This makes it possible to omit calculations for determining the estimation method for the second and subsequent estimation categories, thereby reducing the calculation load and enabling environmental load estimation.

[0057] (Step 1010 and Step 1020) If it is determined in step 1002 that this is the first estimation section, an initial value is set to the candidate of estimation method p in step 1010. That is, the estimation method is set to, for example, P 0 Then, the process proceeds to step 1020. In step 1020, the estimation method P set in the previous step 1010 is 0 Obtain the data you need.

[0058] (Step 1030) Next, in step 1030, the accuracy of the data acquired in step 1020 is checked, and the acquired data is evaluated according to the estimation method P. 0 If it is not available, the process proceeds to step 1040, and if it is available, the process proceeds to step 1050.

[0059] (Step 1040) Next, if it is determined in step 1030 that the acquired data cannot be used, the estimation method is changed in step 1040. For example, if the estimation method is changed to the previously set P 0 The process returns to step 1020, where the data required for the changed estimation method Px is acquired, and again in step 1030, it is determined whether the new estimation method Px can be used based on the accuracy of the data. In other words, the routine is repeated until a combination of an estimation method and data that can be used for the new estimation method is found. Note that, when changing the estimation method in step 1040, an estimation method that does not require data accuracy may be prepared as the estimation method to be finally selected, so that the routine from step 1020 to step 1040 does not become an infinite routine, or an upper limit may be set on the number of times the routine is repeated, and when the upper limit is reached, a separate process may be performed.

[0060] (Steps 1050 and 1060) Next, if it is determined in step 1030 that the acquired data can be used, the estimation method is determined to be, for example, P1 in step 1050, and the determined estimation method P1 is stored in memory so that it will be used from the second time onwards.

[0061] <Details of Estimation Method in Case of Causal Attribute> Next, details of the estimation method in case the data attribute is a causal attribute will be described with reference to Fig. 11. Fig. 11 is a flowchart of the estimation method in case the data attribute is a causal attribute, which was outlined in Fig. 9. Steps 902, 909, and 910 already described in Fig. 9, and steps 1010, 1020, 1030, and 1040 already described in Fig. 10 are the same as those in Figs. 9 and 10, and therefore their description will be omitted or simplified.

[0062] (Steps 1002 and 1010 onwards) After the section for which environmental load estimation is to be performed is determined, the first step is to determine whether or not this is the first estimation section, as in the case of a continuous attribute. If the answer is Yes, the initial value of the estimation method is set in step 1010, as in the case of a continuous attribute. Next, the estimation method for the first time (between the first station) is determined in steps 1020 to 1160, and calculations are performed and the output results are recorded in step 909. Note that in the case of the first time, n = 1 in step 1150, so p = P1.

[0063] (Step 1102) If this is not the first time, the process proceeds from step 1002 to step 1102, and the previously adopted estimation method is set as the candidate estimation method. In other words, p = P1, which is the estimation method adopted between the first and second stations, is provisionally set. In the case of data with causal attributes, there is a high possibility that data with the same accuracy as that adopted previously can be obtained, and therefore there is a high possibility that the previously used estimation method can be adopted. Therefore, by initially setting the previously adopted estimation method, it is possible to significantly reduce the calculation load for determining the estimation method.

[0064] <Details of Estimation Method in Case of Independent Attributes> Next, details of the estimation method in case of independent attributes of data will be described with reference to Fig. 12. Fig. 12 is a flowchart of the estimation method in case of independent attributes of data, which has been outlined in Fig. 9. Steps 902, 909, and 910 already described in Fig. 9, and steps 1010, 1020, 1030, and 1040 already described in Fig. 10, are the same as those in Figs. 9 and 10, and therefore their description will be omitted or simplified.

[0065] If the data attribute is an independent attribute, it is considered that the accuracy of the data is less affected by the accuracy of the data between previous stations, and therefore, regardless of which station interval it is, it is highly necessary to search for an estimation method from the initial value, acquire data, and determine the estimation method to be applied to that station interval. For this reason, if the attribute is independent, the initial value of the estimation method is set in step 1010, data is acquired in step 1020, and it is determined in step 1030 whether the data can be used. If the data cannot be used, the estimation method is changed in step 1040, data is acquired again, and the process returns to step 1020 to acquire data necessary for the changed estimation method Px, and it is again determined in step 1030 based on the accuracy of the data whether the data can be used for that estimation method.

[0066] In other words, the routine is repeated until a combination of an estimation method and data that can be used for that estimation method is found. In changing the estimation method in step 1040, an estimation method that does not require data accuracy may be prepared as the estimation method to be finally selected so that the routine from step 1020 to step 1040 does not become an infinite routine, or an upper limit may be set on the number of times the routine is repeated so that a separate process is performed when the upper limit is reached, as in the case of continuous attributes and causal attributes.

[0067] (Step 1050) If the estimation method to be adopted can be determined in step 1050, calculation is performed and the output results are recorded in step 909, similar to the case of continuous attributes and causal attributes. However, in the case of independent attributes, the estimation method between the stations will not be used later, so it is not necessarily necessary to record the estimation method as was done in step 1060 for continuous attributes and step 1160 for causal attributes.

[0068] In addition, when data of different attributes, A: continuous attribute, B: causal attribute, and C: independent attribute, needs to be substituted into one calculation formula, it is sufficient to determine which attribute is to be applied preferentially and set candidate estimation methods assuming that it is the calculation formula of the prioritized attribute. Specifically, the following (1) to (3) can be determined. (1) If the calculation formula contains data of A: continuous attribute, the process shown in FIG. 10 is performed for A: continuous attribute. (2) If the calculation formula does not contain data of A: continuous attribute but contains B: causal attribute, the process shown in FIG. 11 is performed for B: causal attribute. (3) Only if the calculation formula contains only data of C: independent attribute, the process shown in FIG. 12 is performed for C: independent attribute.

[0069] (Example of Data for Estimating Environmental Load for Each Train) Next, with reference to Fig. 13, an example of data to be substituted (input) into the calculation formula of the estimation method when estimating the environmental load for each train will be described. Fig. 13 shows an example of data to be substituted into the calculation formula of the estimation method when estimating the environmental load for each train in step 801 described in Fig. 8. Fig. 13 shows an example of data for estimating the environmental load for each passenger train, but when estimating the environmental load of other public transportation systems, facilities, equipment, etc., various data can be used depending on the object of measurement.

[0070] Column 1310 in Figure 13 classifies data types into data related to business systems provided by transportation service providers and generally available open data provided by non-providers. The estimation method for estimating the environmental impact of each train can be achieved by substituting the above-mentioned data into a calculation formula, and publicly known data and calculation formulas can be used. Note that the information in columns 1320 to 1370 will vary depending on the system and provider that creates the data, and the information in Figure 13 is merely an example.

[0071] For example, the amount of electricity required to operate a train can be calculated from the amount of electricity used to run the train in the power management system, and CO2 emissions can be calculated from the supplier of that electricity and the supplier's energy procurement route. 2 It becomes possible to estimate the environmental load as the amount of emissions. Many existing calculation formulas can be used to estimate the environmental load. In this disclosure, when adopting a calculation formula, the accuracy of the data required for each calculation formula is determined in advance, and accuracy information including the presence or absence of data and the timing (frequency) of data acquisition is attached to the acquired data. Therefore, it becomes possible to accurately estimate the environmental load using a calculation formula suitable for the acquired data.

[0072] <Estimating the Number of Passengers> Next, with reference to FIG. 14 , data for estimating the number of passengers required to estimate the environmental impact per passenger shown in FIG. 8 will be described. The number of train passengers can be estimated by appropriately combining data such as those illustrated in FIG. 14 . The data arrangement in FIG. 14 differs only in that the planning data 1360 in FIG. 13 has been replaced with sales data 1450. Therefore, descriptions of items that are the same as those in FIG. 13 will be omitted. The sales data 1450 in FIG. 14 is sales-related data generated in advance. For example, the number of passengers on a train can be directly estimated from camera footage from a surveillance camera system. Furthermore, the beacon system in the system name refers to a system in which small transmitters (beacons) are installed at stations and bus stops. When a user's smartphone receives a Bluetooth (registered trademark) signal from the beacon, a boarding record is stored on the smartphone. Using such a system, it is also possible to estimate the number of passengers on a train or other vehicle from communication information between the beacon and the smartphone. In the present disclosure, accuracy information including the presence or absence of data and the timing (frequency) of data acquisition is attached to the data described in Fig. 14 as well, similar to the data exemplified in Fig. 13. This makes it possible to accurately estimate the number of people using a calculation formula suitable for the acquired data.

[0073] (Data Input Example) Next, with reference to Figures 15, 16, and 17, an example of data input for estimating the "environmental load per train" described with reference to Figure 13 will be described. Figure 15 shows two examples of estimation methods. Pattern ID 1510 indicates an ID for identifying the estimation method. Input data 1520 indicates the data output by each estimation method. In the example of Figure 15, both estimation methods estimate the amount of power. Calculation formula ID 1540 indicates the calculation formula used by each estimation method. In the example of Figure 15, the estimation method with pattern ID 1 uses two calculation formulas, F1 and F2, while the estimation method with pattern ID 2 uses only one calculation formula, F3. Furthermore, accuracy 1550 indicates the accuracy of the amount of power output. Note that the accuracy of the output value may be defined numerically (e.g., %) or as high, medium, low, etc. It may also be an acquisition frequency (e.g., in seconds, minutes, etc.) or a measurement unit (e.g., millimeters, kilometers, etc.). The usage conditions 1560 indicate conditions for using the corresponding estimation method pattern. The usage conditions 1560 may be defined by a numerical value (for example, a delay time of X minutes or less), or may be based on a location or time, or may be determined by a data value.

[0074] FIG. 16 shows an example of a definition of data attributes. Data ID 1610 indicates, by data name, an ID for identifying the type of parameter to be substituted into the calculation formula. Data ID 1610 indicates only the data name and does not include the value or accuracy of the data. Furthermore, classification 1620 defines the "data attributes" described using FIG. 9 and other figures. By defining "data attributes" for each data ID 1610 in this way, it is possible to efficiently determine an estimation method equipped with an appropriate calculation formula using the data classification when estimating the "environmental impact per train" described using FIG. 9 and other figures. Note that data for which "data attributes" are not defined is all considered to have "independent attributes."

[0075] FIG. 17 shows an example of a definition of a calculation formula. Calculation formula ID 1710 indicates an ID for identifying the calculation formula. Content 1720 stores specific algorithms, processing flows, mathematical expressions, and the like as the calculation formula itself. Input data 1730 and output data 1740 specify the types of input and output data. Precision 1750 stores the precision of output data 1740 when the corresponding calculation formula is used. Usage conditions 1760 store the conditions for using the corresponding calculation formula. Therefore, in the example of FIG. 17 , two calculation formulas, F2 and F3, are used to calculate the amount of power as output data. Each requires different input data, and the precision of the output data also differs.

[0076] As is clear from the above explanation, Figure 15 is a combination of the contents of Figures 16 and 17 for each estimation method, and Figure 15 makes it possible to provide estimation accuracy information for the data on "environmental load per train."

[0077] Next, referring to Fig. 18, an example of output when "adding estimation accuracy information and storing as detailed environmental load" described in step 803 of Fig. 8 will be described. Fig. 18 shows the "environmental load for each train" output in Fig. 15, which is divided by the number of passengers for each "environmental load estimation category", and is displayed as an individual environmental load value 1870. In Fig. 18, the environmental load index 1810 is calculated using the amount of electricity, CO 2The table shows indicators of environmental load, such as emissions. The train number 1820, estimated section start point 1830, and estimated section end point 1840 are information that specifies the estimated environmental load category. The estimated section start point 1830 and estimated section end point 1840 may be kilometers (a value indicating the distance from the starting point in kilometers) instead of station names. Furthermore, by comparing the train number 1820, estimated section start point 1830, and estimated section end point 1840 with the timetable, time information can also be obtained. The total environmental load value 1850 is the environmental load value for the corresponding train and section, i.e., the environmental load estimation category. The number of passengers 1860 is the number of passengers in the corresponding estimated environmental load category, and the individual environmental load value 1870 is the value obtained by dividing the total environmental load value 1850 by the number of passengers 1860, and is the environmental load value per person. Furthermore, the estimation method 1880 indicates which estimation method (calculation formula, data) was used, and the accuracy 1890 indicates estimation accuracy information.

[0078] Next, the estimation of the environmental load of a utilization route will be described with reference to Fig. 19. Fig. 19 is a flowchart for explaining in detail the estimation of the environmental load of a utilization route in step 750 shown in Fig. 7.

[0079] (Step 1910) In step 1910, the user's (sometimes referred to as passenger) activity route and transportation route can be acquired by various known methods. Examples of data for acquiring the passenger's transportation route will be described later.

[0080] (Step 1920) In step 1920, the train to be used is identified based on the passenger's transportation route. For example, if a boarding certificate is obtained by holding a smartphone over a communication terminal in the train, or if information such as location and travel speed obtained from the smartphone's GPS is linked to a timetable (planned timetable or actual timetable), it is possible to estimate which train is available to board based on the time of passing through the ticket gate.

[0081] (Step 1930) In step 1930, the passenger's route is decomposed into estimated segments of environmental load (hereinafter also referred to as "fragments"). Specific examples of decomposition into estimated segments will be described later.

[0082] (Steps 1940, 1941, 1943, and 1945) From step 1940 onward, an environmental load is estimated for each estimation segment generated in step 1930. First, in step 1941, the presence or absence of a detailed environmental load is confirmed for each fragment, and if detailed environmental load data exists, the detailed environmental load is acquired in step 1943. In step 1943, the detailed environmental load stored in step 803 described in FIG. 8 is used. If it is determined in step 1941 that a detailed environmental load cannot be obtained, the process proceeds to step 1945, where an approximate environmental load is estimated. Here, the approximate environmental load is calculated based on a general CO per unit transport volume. 2 This value is estimated using a known method such as multiplying the amount of emissions by the distance traveled.

[0083] (Step 1950) In step 1950, the estimated values ​​of each fragment are integrated. An example of the integrated estimated value will be described later.

[0084] <Route Data> Next, with reference to FIG. 20 , an example of data acquired in step 1910 of FIG. 19 for passenger routes and transportation routes will be described. In FIG. 20 , system type 2010 indicates the type of system from which the data is obtained, and mainly includes business systems provided by operators and systems / devices that handle location information of users' smartphones. In FIG. 20 , representative systems included in these systems are indicated as system names 2020, and the types of data are indicated as data names 2030. Note that the information in columns 2020 to 2070 varies depending on the system and operator that creates the data, and the information in FIG. 20 is merely an example. The "position (GPS, etc.), time, and mode of transportation" in the location travel app of the travel route collection device can estimate the position and mode of transportation (walking, bicycle, car, bus, train, etc.) at each time based on data such as position, time, travel speed, acceleration, and vibration that can be acquired from the smartphone's GPS or acceleration sensor. Furthermore, based on the connection success / failure information between the user's smartphone and the server, for example, if GPS cannot be obtained, it can be determined that the user is likely to be using the subway. By comparing this information with timetable and train location data from operation management systems held by railway operators, it becomes possible to detect the railway the user is using and identify the train they are riding with a high degree of accuracy.

[0085] Furthermore, data acquisition timing 2040 indicates the timing and frequency of acquisition of each piece of data. Scheduled data 2050, forecasted data 2060, and actual data 2070 indicate the type of calculation basis for data related to the accuracy of each piece of data. Scheduled data is based on information scheduled in advance, and indicates data with a certain degree of accuracy. Forecasted data is information predicted from past analysis, etc., and indicates low accuracy. Furthermore, actual data indicates information acquired as travel results from the current day to the next day onwards.

[0086] <Decomposition into Fragments> Next, an example of decomposing a travel route into fragments will be described with reference to Fig. 21. As shown in Fig. 21, when traveling from point A to point B, the route between station W and station Z can be decomposed into fragments 2100 from station W to station X, station X to station Y, and station Y to station Z.

[0087] <Passenger Route> Next, with reference to FIG. 22 , an example of data integrating information on the passenger's route acquired in step 1910 of FIG. 19 and the train information identified in step 1920 will be described. In FIG. 22 , a passenger ID 2210 is an ID for identifying each passenger, and a route sequence 2215 indicates the order of the route taken by the passenger. A travel section start point 2220 and a travel section end point 2225 indicate the start and end points of each fragment when the passenger's travel route is broken down into fragments. A travel time start point 2230 and a travel time end point 2235 also indicate the start and end times of travel for each fragment. A means of transportation 2240 indicates the means of transportation used for each fragment. The data from the passenger ID 2210 to the means of transportation 2240 is data assigned in step 1910 of FIG. 19 . A train number 2245 is information identifying the train to be used and is data assigned in step 1920 of FIG. 19 .

[0088] <Route Environmental Load> Next, an example of the results of calculating the route environmental load will be described with reference to FIG. 23 . FIG. 23 shows an example in which a travel route is broken down into fragments and the environmental loads for each fragment are integrated. The passenger ID 2310, route sequence 2315, travel section start point 2325, travel section end point 2340, travel time start point 2325, travel time end point 2340, and transportation mode 2345 correspond to the passenger ID 2210, route sequence 2215, travel section start point 2220, travel section end point 2225, travel time start point 2230, travel time end point 2235, and transportation mode 2240 in FIG. 22 , respectively. The fragment 2320 is the number assigned to the fragment described in FIG. 21 . The environmental load index 2350, individual environmental load value 2355, estimation method 2360, and accuracy 2365 are data assigned in steps 1943 and 1945 of FIG. 19 . In this case, even if the approximate environmental load is estimated by step 1945 in Fig. 19, it is desirable to record the estimation method 2360 and accuracy 2365. In the example showing the route environmental load in Fig. 23, the route environmental load is shown for each fragment, but depending on the purpose of use, it may be shown for each means of transportation (walking, railroad, private car, etc.) or some fragments may be integrated. Furthermore, it is possible to convert the environmental load index 2350 to the same environmental load index (for example, converting the amount of electricity into CO 2 may be estimated as a total value (converted into emissions).

[0089] <Display Pattern> Next, examples of displaying the results of environmental load estimation will be described with reference to Figs. 24 to 27. Figs. 24 and 25 are examples showing the results of environmental load estimation for each train, for the latter case. Fig. 24 is an example of visualizing the environmental load in a heat map format, showing the environmental load value per passenger, with the background color being darker as the environmental load increases. Fig. 25 is an example of displaying the environmental load estimation values ​​in the form of a train timetable. The vertical axis of the graph indicates the distance between stations, and the horizontal axis indicates time. The larger the environmental load value per passenger, the thicker the line, making it easy to see at a glance which trains have the highest environmental loads at which times of the day.

[0090] Next, Fig. 26 shows the estimated environmental impact for each travel section in the form of a route search or travel history display for passengers. 2 The amount of CO emissions is 0g, and the CO 2 The amount of CO emitted is 100g, while the amount of CO emitted in the travel section 2630 by car from station X to point B is 100g. 2 It can be seen at a glance that the discharge amount is 500g.

[0091] Next, referring to FIG. 27, the estimated environmental load per passenger (power consumption, CO 2 Next, a utilization example of the environmental load (emissions) will be described. FIG. 27 shows assumed users 2710 categorized into individual passengers, users, businesses, and general companies. Furthermore, timing of provision value 2720 is shown categorized into before and after. Here, before refers to, for example, a case where the environmental load is predicted before a train starts operation and information on estimated environmental load values ​​is distributed to users using an app or the like using that information. When distributing information beforehand, the real-time nature of the information and data provided is considered valuable. On the other hand, after refers to, for example, a case where the actual environmental load is estimated after a train starts operation and an app using that information is distributed to users. When distributing information after the fact, the accuracy of the information and data provided is considered valuable. The column for use 2730 shows specific examples of use, and value provided 2740 exemplifies the value that can be provided to society that is expected for each use.

[0092] Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and various modifications are possible without departing from the spirit and scope of the present invention. For example, in the above-described example of estimating environmental load, a case where a user travels from a starting point to a destination by foot, train, or automobile was described. However, it goes without saying that the environmental load estimation to which the present disclosure is applicable is not limited to these modes of travel and can be applied to any activity that generates environmental load. For example, even if a large amount of travel is not involved, if an environmental load is generated due to the use of equipment within a single building or human behavior, applying the estimation device or system disclosed herein to such environmental load can accurately estimate the environmental load and reduce the environmental load.

[0093] DESCRIPTION OF SYMBOLS 10: Environmental load estimation device 20: Network 30: Business system device 40: Open data provision device 50: Travel route collection device 60: Application server 101: Storage device 102: Program 103: Data 110: Memory 120: CPU 130: UI device 140: Communication device 150: Bus 201: Data acquisition unit 203: Detailed environmental load estimation unit 205: Route environmental load estimation unit 207: Data distribution unit 211: Basic data 213: Statistical data 215: Planning data 217: Measurement data 220: Estimation method pattern 230: Detailed environmental load 240: Route environmental load

Claims

1. An environmental load estimation device that estimates environmental load by combining and processing a plurality of pieces of information, comprising: a data acquisition unit capable of acquiring data from each of a business system device, an open data providing device, and a travel route collection device; a detailed environmental load estimation unit that estimates detailed environmental load per person by substituting input data including the data acquired by the data acquisition unit and data held by the environmental load estimation device into an estimation method consistent with the input data; and a route environmental load estimation unit that combines the detailed environmental load with information on the user's travel route to estimate the route environmental load of the user.

2. The environmental load estimation device according to claim 1, characterized in that the estimation method is defined by a combination of one or more calculation formulas and the input data, and the detailed environmental load estimation unit assigns estimation accuracy information to the detailed environmental load value it calculates.

3. The environmental load estimation device according to claim 2, characterized in that, when selecting the estimation method for each estimation category of environmental load for a travel route, the detailed environmental load estimation unit changes a method for determining whether or not the estimation method can be used depending on whether the input data used in the estimation method has a continuous attribute, a causal attribute, or an independent attribute.

4. An environmental load estimation system in which an environmental load estimation device that estimates environmental load by combining and processing a plurality of pieces of information, a business system device, an open data providing device, and a travel route collection device are connected via a network, wherein the environmental load estimation device comprises: a data acquisition unit capable of acquiring data from the business system device, the open data providing device, and the travel route collection device; a detailed environmental load estimation unit that estimates detailed environmental load per person by substituting input data including the data acquired by the data acquisition unit and data held by the environmental load estimation device into an estimation method consistent with the input data; and a route environmental load estimation unit that combines the detailed environmental load with information on the user's travel route to estimate the route environmental load of the user.

5. An environmental load estimation device according to claim 1, wherein the detailed environmental load estimation unit comprises a first step of setting candidate estimation methods for each estimation category of environmental load; a second step of verifying the consistency between the accuracy of the data required by the calculation formula and the accuracy of the acquired data for a calculation formula used in the estimation method set in the first step and data used in the calculation formula; a third step of estimating the environmental load using the estimation method if the accuracy of the data required by the calculation formula and the accuracy of the acquired data are consistent in the second step; and a fourth step of searching for an estimation method in which the accuracy of the data required by the calculation formula and the accuracy of the acquired data are consistent in the second step, and estimating the environmental load using the estimation method found if the accuracy of the data required by the calculation formula and the accuracy of the acquired data do not match, and 6. The environmental load estimation method according to claim 5, wherein in the second step, the detailed environmental load estimation unit sets the estimation method adopted in the first estimation section as the candidate estimation method to be set in the first step from the first estimation section onwards, if the data used in the calculation formula is data with a continuous attribute, and sets the estimation method adopted in the previous estimation section as the candidate estimation method to be set in the first step from the first estimation section onwards, if the data used in the calculation formula is data with a causal attribute.

Citation Information

Patent Citations

  • Navigation apparatus

    JP2011141272A

  • Navigation system, route search server, terminal device, and route guidance method

    JP2013040958A

  • Data conversion system, data conversion apparatus and data conversion method

    JP2014232464A

  • Power consumption predicting device

    JP2022129116A

  • Sustainable development goal contribution point system

    JP2023018710A