UCI bit design method and apparatus

By configuring the usage status of indicating the CG transmission timing in UCI, the problem of large bit overhead of UCI is solved, and efficient utilization and accurate indication of resources are achieved.

WO2024230723A1PCT designated stage expired Publication Date: 2024-11-14HUAWEI TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/091668
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-11
Filing Date
2024-05-08
Publication Date
2024-11-14

AI Technical Summary

Technical Problem

In wireless communication networks, UCI's bit overhead is large, resulting in wasting resources for CG transmission timing during the configuration authorization period. How to effectively reduce the indication overhead of UCI is an urgent problem to be solved.

Method used

By obtaining the first configuration information, it is used to configure the range of the first indication information, which is the timing of partial CG transmission within the CG period period, indicates the timing of CG transmission used and/or not used, and send the information to The base station avoids waste of CG transmission timing resources during the CG period period, and at the same time reduces the bit overhead of the first indication information. The configuration information may be included in the DCI carried by the PDCCH, MAC CE or RRC signaling, and the indication information may be included in the UCI, indicating the usage status of the CG transmission timing through time bias and bitmap.

Benefits of technology

It effectively reduces the bit overhead of UCI, avoids resource waste during the CG cycle period, and realizes accurate indication of the CG transmission timing, improving resource utilization efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024091668_14112024_PF_FP_ABST
    Figure CN2024091668_14112024_PF_FP_ABST
Patent Text Reader

Abstract

A UCI bit design method: configuring a scope of a UCI bit to be part of CG transmission opportunities within a CG cycle period by means of configuration information, and indicating a CG transmission opportunity used and / or not used among the part of CG transmission opportunities by means of a UCI bit, so that UCI bit overhead is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

A UCI bit design method and device Technical Field

[0001] The present application relates to the field of communication technology, and in particular to a method and device for designing uplink control information (UCI) bits. Background Art

[0002] In wireless communication networks, extended reality (XR) technology offers advantages such as multi-perspective and strong interactivity, providing users with a brand-new visual experience and possessing enormous application value and commercial potential. XR encompasses technologies such as virtual reality (VR), augmented reality (AR), and mixed reality (MR), and is widely applicable in fields such as entertainment, gaming, healthcare, advertising, industry, online education, and engineering.

[0003] Configured grants (CGs) are suitable for the transmission of periodic services such as XR services. Uplink control information (UCI) can be used to indicate which CG transmission opportunities are used and / or not used within the CG period, thereby reducing the waste of CG transmission opportunity resources. Because UCI is sensitive to bit overhead, reducing UCI indication overhead is an urgent issue.

[0004] Summary of the Invention

[0005] In the first aspect, an embodiment of the present application provides a communication method, which can be executed by a terminal, or by a module applied to the terminal (such as a processor, chip, or chip system, etc.), and can also be implemented by a logical node, logical module or software that can realize all or part of the terminal functions. The method includes: obtaining first configuration information, the above-mentioned first configuration information is used to configure the scope of application of the first indication information, the scope of application of the above-mentioned first indication information is part of the CG transmission opportunities within the configured grant (CG) cycle period, and the first indication information is used to indicate the CG transmission opportunities used and / or not used in the above-mentioned part of the CG transmission opportunities. Send the above-mentioned first indication information.

[0006] Through the above method, the first configuration information for configuring the scope of application of the first indication information is obtained, and the scope of application of the first indication information is some CG transmission opportunities within the CG cycle. At this time, the first indication information is used to indicate the CG transmission opportunities used and / or not used in some CG transmission opportunities. While avoiding the waste of CG transmission opportunity resources within the CG cycle period, it can effectively reduce the bit overhead of the first indication information.

[0007] In combination with the first aspect, in certain embodiments of the first aspect, the first configuration information may be included in downlink control information (DCI) carried by a physical downlink control channel (PDCCH), may be carried by a media access control layer control element (MAC CE), or may be carried by radio resource control layer (RRC) signaling. The first indication information may be included in uplink control information (UCI) carried by the CG transmission opportunity used, for example, the first indication information may be included in UCI carried by all or part of the CG transmission opportunities used.

[0008] In conjunction with the first aspect, in certain embodiments of the first aspect, the first configuration information configures a time offset, the partial CG transmission opportunity is within a first time period, and the start time of the first time period is related to the time offset. The above embodiment determines the first time period by the time offset, and determines the scope of the first indication information by the first time period, thereby effectively reducing the bit overhead of the first indication information.

[0009] In combination with the first aspect, in certain embodiments of the first aspect, the starting time of the first time period is after the sending time of the first indication information, the interval between the starting time of the first time period and the sending time of the first indication information is equal to the time offset, and the end time of the first time period is the end time of the CG cycle period or the end time of the last CG transmission opportunity in the CG cycle period. The above embodiment determines the scope of the first indication information through the first time period, which can effectively reduce the bit overhead of the first indication information.

[0010] In conjunction with the first aspect, in certain embodiments of the first aspect, the aforementioned portion of the CG transmission opportunities may be within the aforementioned first time period. If the start time of the aforementioned first time period is included in a CG transmission opportunity within the aforementioned CG cycle time period, the aforementioned portion of the CG transmission opportunities within the first time period may not include the aforementioned CG transmission opportunity. The aforementioned embodiment determines the scope of the first indication information through the first time period, thereby effectively reducing the bit overhead of the first indication information.

[0011] In combination with the first aspect, in certain embodiments of the first aspect, the above-mentioned partial CG transmission opportunities may also be within the second time period, the starting time of the above-mentioned second time period is the sending time of the above-mentioned first indication information, and the end time of the above-mentioned second time period is the end time of the above-mentioned CG cycle period or the end time of the last CG transmission opportunity within the CG cycle period. The above-mentioned partial CG transmission opportunities within the above-mentioned second time period may include CG transmission opportunities containing the above-mentioned first indication information, or may not include CG transmission opportunities containing the first indication information, which is not limited in this application. In this way, the number of bits of the first indication information changes dynamically according to the sending time of the first indication information, which can flexibly and effectively reduce the bit overhead of the first indication information.

[0012] In conjunction with the first aspect, in certain embodiments of the first aspect, the number of bits of the first indication information is N1, where N1 is a positive integer, and the number of the partial CG transmission opportunities is M1, where M1 is an integer greater than or equal to N1. Optionally, M1 is an integer multiple of N1. In this way, the number of bits of the first indication information is less than or equal to the number of the partial CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0013] In combination with the first aspect, in certain embodiments of the first aspect, M1 is an integer multiple of N1, and M1=N1, and the above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings through a bitmap, and one bit in the above-mentioned bitmap corresponds to one CG transmission timing in the part of CG transmission timings, and when the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. In this way, the use and / or non-use of one CG transmission timing in the part of CG transmission timings can be indicated by one bit in the first indication information, thereby achieving the beneficial effect of fully and accurately indicating the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings.

[0014] In combination with the first aspect, in certain embodiments of the first aspect, M1 is an integer multiple of N1, and M1=k*N1, where k is an integer greater than 1. The above-mentioned first indication information indicates the CG transmission opportunities used and / or not used in the above-mentioned partial CG transmission opportunities through a bitmap, and one bit in the above-mentioned bitmap corresponds to k CG transmission opportunities in the partial CG transmission opportunities. When the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. In this way, the bit overhead of the first indication information can be further reduced.

[0015] In combination with the first aspect, in certain embodiments of the first aspect, the first configuration information configures the number of bits N2 of the first indication information, where N2 is a positive integer. One bit in the N2 bits of the first indication information indicates whether one or more CG transmission opportunities in the above-mentioned partial CG transmission opportunities are used or not used. For example, each bit in the N2 bits of the above-mentioned first indication information respectively indicates whether one or more CG transmission opportunities in the above-mentioned partial CG transmission opportunities are used or not used. In this way, the base station can configure the number of bits of the first indication information through the first configuration information based on its ability to process the first indication information and its ability to schedule the unused CG transmission opportunities indicated by the first indication information for use by other terminals, thereby completing the configuration of the number of bits of the first indication information without sending the above-mentioned capabilities of the base station itself, and effectively avoiding the exposure of the base station capability information.

[0016] In combination with the first aspect, in certain embodiments of the first aspect, the aforementioned partial CG transmission opportunities are the last M2 CG transmission opportunities within the aforementioned CG cycle period, where M2 is an integer greater than or equal to N2. Optionally, M2 is an integer multiple of N2. In the above embodiment, the number of bits of the first indication information is less than or equal to the number of the partial CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0017] In combination with the first aspect, in certain embodiments of the first aspect, M2 is an integer multiple of N2, and M2=N2, and the above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings through a bitmap, and one bit in the above-mentioned bitmap corresponds to one CG transmission timing in the part of CG transmission timings, and when the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. In this way, the use and / or non-use of one CG transmission timing in the part of CG transmission timings can be indicated by one bit in the first indication information, thereby achieving the beneficial effect of fully and accurately indicating the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings.

[0018] In combination with the first aspect, in certain embodiments of the first aspect, M2 is an integer multiple of N2, and M2=k*N2, where k is an integer greater than 1. The above-mentioned first indication information indicates the CG transmission opportunities used and / or not used in the above-mentioned partial CG transmission opportunities through a bitmap, and one bit in the above-mentioned bitmap corresponds to k CG transmission opportunities in the partial CG transmission opportunities. When the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. In this way, the bit overhead of the first indication information can be further reduced.

[0019] In the second aspect, an embodiment of the present application provides a communication method, which can be executed by a wireless access network device, or by a module (such as a processor, chip, or chip system, etc.) applied to the wireless access network device, or by a logical node, logical module or software that can realize all or part of the functions of the wireless access network device. The method includes: sending a first configuration information, the first configuration information is used to configure the scope of application of the first indication information, and the scope of application of the first indication information is part of the CG transmission opportunities within the CG cycle period. Obtain the first indication information, the first indication information is used to indicate the CG transmission opportunities used and / or not used in the above-mentioned part of the CG transmission opportunities.

[0020] Through the above method, the first configuration information for configuring the scope of application of the first indication information is obtained, and the scope of application of the first indication information is some CG transmission opportunities within the CG cycle. At this time, the first indication information is used to indicate the CG transmission opportunities used and / or not used in some CG transmission opportunities. While avoiding the waste of CG transmission opportunity resources within the CG cycle period, it can effectively reduce the bit overhead of the first indication information.

[0021] In conjunction with the second aspect, in certain embodiments of the second aspect, the first configuration information may be included in DCI carried by the PDCCH, may be carried by a MAC CE, or may be carried by RRC signaling. The first indication information may be included in UCI carried by the used CG transmission opportunity, for example, the first indication information may be included in UCI carried by all or part of the CG transmission opportunities in the used CG transmission opportunity.

[0022] In conjunction with the second aspect, in certain embodiments of the second aspect, the first configuration information configures a time offset, the partial CG transmission opportunity is within a first time period, and the start time of the first time period is related to the time offset. The above embodiment determines the first time period by the time offset, and determines the scope of the first indication information by the first time period, thereby effectively reducing the bit overhead of the first indication information.

[0023] In combination with the second aspect, in certain embodiments of the second aspect, the starting time of the first time period is after the sending time of the first indication information, the interval between the starting time of the first time period and the sending time of the first indication information is equal to the time offset, and the end time of the first time period is the end time of the CG cycle period or the end time of the last CG transmission opportunity in the CG cycle period. The above embodiment determines the scope of the first indication information through the first time period, which can effectively reduce the bit overhead of the first indication information.

[0024] In conjunction with the second aspect, in certain embodiments of the second aspect, the aforementioned partial CG transmission opportunities may be within the aforementioned first time period. If the start time of the aforementioned first time period is included in a CG transmission opportunity within the aforementioned CG cycle time period, the aforementioned partial CG transmission opportunities within the first time period may not include the aforementioned CG transmission opportunity. The aforementioned embodiment determines the scope of the first indication information through the first time period, thereby effectively reducing the bit overhead of the first indication information.

[0025] In combination with the second aspect, in certain embodiments of the second aspect, the above-mentioned partial CG transmission opportunities may also be within the second time period, the starting time of the above-mentioned second time period is the sending time of the above-mentioned first indication information, and the end time of the above-mentioned second time period is the end time of the above-mentioned CG cycle time period or the end time of the last CG transmission opportunity within the CG cycle time period. The above-mentioned partial CG transmission opportunities within the above-mentioned second time period may include CG transmission opportunities containing the above-mentioned first indication information, or may not include CG transmission opportunities containing the first indication information, which is not limited in this application. In this way, the number of bits of the first indication information changes dynamically according to the sending time of the first indication information, which can flexibly and effectively reduce the bit overhead of the first indication information.

[0026] In conjunction with the second aspect, in certain embodiments of the second aspect, the number of bits of the first indication information is N1, where N1 is a positive integer, and the number of the partial CG transmission opportunities is M1, where M1 is an integer greater than or equal to N1. Optionally, M1 is an integer multiple of N1. In this way, the number of bits of the first indication information is less than or equal to the number of the partial CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0027] In combination with the second aspect, in certain embodiments of the second aspect, M1 is an integer multiple of N1, and M1=N1, and the above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings through a bitmap, and one bit in the above-mentioned bitmap corresponds to one CG transmission timing in the part of CG transmission timings, and when the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. In this way, the use and / or non-use of one CG transmission timing in the part of CG transmission timings can be indicated by one bit in the first indication information, thereby achieving the beneficial effect of fully and accurately indicating the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings.

[0028] In combination with the second aspect, in certain embodiments of the second aspect, M1 is an integer multiple of N1, and M1=k*N1, where k is an integer greater than 1. The above-mentioned first indication information indicates the CG transmission opportunities used and / or not used in the above-mentioned partial CG transmission opportunities through a bitmap, and one bit in the above-mentioned bitmap corresponds to k CG transmission opportunities in the partial CG transmission opportunities. When the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. In this way, the bit overhead of the first indication information can be further reduced.

[0029] In combination with the second aspect, in certain embodiments of the second aspect, the first configuration information configures the number of bits N2 of the first indication information, where N2 is a positive integer. One bit in the N2 bits of the first indication information indicates whether one or more CG transmission opportunities in the above-mentioned partial CG transmission opportunities are used or not used. For example, each bit in the N2 bits of the first indication information respectively indicates whether one or more CG transmission opportunities in the above-mentioned partial CG transmission opportunities are used or not used. In this way, the base station can configure the number of bits of the first indication information through the first configuration information based on its ability to process the first indication information and its ability to schedule the unused CG transmission opportunities indicated by the first indication information for use by other terminals, thereby completing the configuration of the number of bits of the first indication information without sending the above-mentioned capabilities of the base station itself, and effectively avoiding the exposure of the base station capability information.

[0030] In conjunction with the second aspect, in certain embodiments of the second aspect, the aforementioned partial CG transmission opportunities are the last M2 CG transmission opportunities within the aforementioned CG cycle period, where M2 is an integer greater than or equal to N2. Optionally, M2 is an integer multiple of N2. In the above embodiment, the number of bits of the first indication information is less than or equal to the number of the partial CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0031] In combination with the second aspect, in certain embodiments of the second aspect, M2 is an integer multiple of N2, and M2=N2, and the above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings through a bitmap, and one bit in the above-mentioned bitmap corresponds to one CG transmission timing in the part of CG transmission timings, and when the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. In this way, the use and / or non-use of one CG transmission timing in the part of CG transmission timings can be indicated by one bit in the first indication information, thereby achieving the beneficial effect of fully and accurately indicating the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings.

[0032] In combination with the second aspect, in certain embodiments of the second aspect, M2 is an integer multiple of N2, and M2=k*N2, where k is an integer greater than 1. The above-mentioned first indication information indicates the CG transmission opportunities used and / or not used in the above-mentioned partial CG transmission opportunities through a bitmap, and one bit in the above-mentioned bitmap corresponds to k CG transmission opportunities in the partial CG transmission opportunities. When the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. In this way, the bit overhead of the first indication information can be further reduced.

[0033] In a third aspect, an embodiment of the present application provides a device that can implement the method of the first aspect or any possible implementation of the first aspect. The device includes corresponding units or modules for executing the above-mentioned method. The units or modules included in the device can be implemented in software and / or hardware. The device can be, for example, a terminal, or a chip, chip system, or processor that supports the terminal to implement the above-mentioned method. It can also be a logical node, logic module, or software that can implement all or part of the terminal functions.

[0034] In a fourth aspect, embodiments of the present application provide a device that can implement the method of the second aspect or any possible implementation of the second aspect. The device includes corresponding units or modules for executing the above-mentioned method. The units or modules included in the device can be implemented in software and / or hardware. The device can be, for example, a wireless access network device, or a chip, chip system, or processor that supports the wireless access network device to implement the above-mentioned method. It can also be a logical node, logical module, or software that can implement all or part of the functions of the wireless access network device.

[0035] In a fifth aspect, an embodiment of the present application provides a device comprising: a processor coupled to a memory, the memory being used to store instructions, and when the instructions are executed by the processor, the device implements the method in the above-mentioned first aspect, or any possible implementation of the first aspect.

[0036] In a sixth aspect, an embodiment of the present application provides a device comprising: a processor coupled to a memory, the memory being used to store instructions, and when the instructions are executed by the processor, the device implements the method in the above-mentioned second aspect, or any possible implementation of the second aspect.

[0037] In a seventh aspect, an embodiment of the present application provides a computer-readable storage medium having instructions stored thereon, which, when executed, enables a computer to execute the method in the above-mentioned first aspect or any possible implementation of the first aspect.

[0038] In an eighth aspect, an embodiment of the present application provides a computer-readable storage medium having instructions stored thereon, which, when executed, enables a computer to execute the method in the above-mentioned second aspect or any possible implementation of the second aspect.

[0039] In a ninth aspect, an embodiment of the present application provides a computer program product, which includes a computer program code. When the computer program code runs on a computer, it enables the computer to execute the method of the above-mentioned first aspect or any possible implementation method of the first aspect.

[0040] In a tenth aspect, an embodiment of the present application provides a computer program product, which includes a computer program code. When the computer program code runs on a computer, it enables the computer to execute the method of the above-mentioned second aspect or any possible implementation of the second aspect.

[0041] In the eleventh aspect, an embodiment of the present application provides a chip, comprising: a processor, the processor being coupled to a memory, the memory being used to store instructions, and when the instructions are executed by the processor, the chip implements the method of the above-mentioned first aspect, the second aspect, any possible implementation of the first aspect, or any possible implementation of the second aspect.

[0042] In the twelfth aspect, an embodiment of the present application provides a communication system, including: the device of the third aspect mentioned above and the device of the fourth aspect mentioned above.

[0043] In the thirteenth aspect, an embodiment of the present application provides a communication system, including: the device of the fifth aspect mentioned above and the device of the sixth aspect mentioned above.

[0044] It can be understood that for the beneficial effects of the features corresponding to the first and second aspects in the third to thirteenth aspects, please refer to the relevant descriptions in the first and second aspects and no repetition will be given. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] FIG1 is a schematic diagram of a communication system used in an embodiment of the present application;

[0046] Figures 2 to 5 show schematic diagrams of several system frameworks applicable to embodiments of the present application;

[0047] Figure 6 is a schematic diagram of video frame arrival;

[0048] Figure 7 is a schematic diagram of CG;

[0049] FIG8 is a schematic diagram of configuring multiple CG transmission opportunities within a CG cycle period;

[0050] FIG9 is a schematic diagram showing the CG transmission opportunities used and not used within the UCI indication CG cycle period;

[0051] Figures 10 and 11 are schematic diagrams showing the CG transmission opportunities used and not used within the CG cycle period indicated by the UCI bitmap;

[0052] FIG12 is a schematic diagram of a communication method provided in an embodiment of the present application;

[0053] 13-14 are schematic diagrams showing the first indication information provided in an embodiment of the present application indicating the CG transmission opportunities used and not used in the first time period;

[0054] 15-16 are schematic diagrams showing the first indication information indicating the CG transmission opportunities used and not used in the second time period according to an embodiment of the present application;

[0055] FIG17 is a schematic diagram showing the first indication information provided in an embodiment of the present application indicating the CG transmission opportunities used and not used within the CG cycle period;

[0056] FIG18 is a schematic diagram of the structure of a terminal provided in an embodiment of the present application;

[0057] 19-20 are schematic diagrams of the device provided in the embodiments of the present application. DETAILED DESCRIPTION

[0058] Figure 1 is a schematic diagram of the architecture of the communication system used in the embodiments of the present application. As shown in Figure 1, the communication system 10 includes a radio access network (RAN) 100 and a core network (CN) 130. Optionally, the communication system 10 may also include the Internet 140. The RAN 100 may include at least one RAN node (such as 110a and 110b in Figure 1, collectively referred to as 110) and at least one terminal (such as 120a-120j in Figure 1, collectively referred to as 120). The RAN 100 may also include other RAN nodes, such as wireless relay equipment and / or wireless backhaul equipment (not shown in Figure 1). The terminal 120 is connected to the RAN node 110 wirelessly. The RAN node 110 is connected to the core network 130 wirelessly or wiredly. The core network equipment in the core network 130 and the RAN node 110 in the RAN 100 can be separate, distinct physical devices, or they can be a single physical device integrating core network logical functions and radio access network logical functions, or a single device integrating some core network logical functions and some radio access network logical functions. Terminals and RAN nodes can be connected to each other via wired or wireless means. Figure 1 is merely a schematic diagram; the communication system may also include other network devices, such as relay equipment and backhaul equipment, which are not shown in Figure 1.

[0059] The methods and devices provided in the embodiments of the present application can be used in various communication systems, such as fourth generation (4G) communication systems, 4.5G communication systems, 5G communication systems, 5.5G communication systems, 6G communication systems, systems integrating multiple communication systems, or future evolved communication systems. For example, long term evolution (LTE) systems, new radio (NR) systems, open access networks (open RAN, O-RAN or ORAN) systems, cloud radio access networks (CRAN) systems, wireless-fidelity (WiFi) systems, and communication systems related to the third generation partnership project (3GPP), as well as other such communication systems, can also be communication systems integrating two or more of the above systems.

[0060] RAN nodes can also be expressed in different ways, such as radio access network devices. Unless otherwise specified in this application, radio access network devices are used for expression. Radio access network devices (sometimes also referred to as network devices in this application) can be base stations, evolved NodeBs (eNodeBs), transmission reception points (TRPs), next generation NodeBs (gNBs) in 5G mobile communication systems, next generation base stations in 6G mobile communication systems, base stations in future mobile communication systems, or access nodes in WiFi systems, etc.; they can also be modules or units that complete part of the functions of a base station, for example, they can be centralized units (CUs) or distributed units (DUs). Radio access network devices can be macro base stations (such as 110a in Figure 1), micro base stations or indoor stations (such as 110b in Figure 1), relay nodes or donor nodes, etc., or wireless controllers in CRAN scenarios. Optionally, radio access network devices can also be servers, wearable devices, vehicles or vehicle-mounted devices, etc. For example, the access network device in vehicle to everything (V2X) technology may be a road side unit (RSU). It is understood that all or part of the functions of the wireless access network device in this application may also be implemented by software functions running on hardware, or by virtualization functions instantiated on a platform (e.g., a cloud platform). The wireless access network device in this application may also be a logical node, logical module, or software that can implement all or part of the functions of the wireless access network device.

[0061] In another possible scenario, multiple radio access network devices collaborate to assist the terminal in achieving wireless access, and different radio access network devices respectively implement part of the functions of the base station. For example, the radio access network device can be a centralized unit (CU), a distributed unit (DU), a CU-control plane (CP), a CU-user plane (UP), or a radio unit (RU). The CU and DU can be set separately, or they can be included in the same network element, such as a baseband unit (BBU). The RU can be included in a radio frequency device or radio frequency unit, such as a remote radio unit (RRU), an active antenna unit (AAU), or a remote radio head (RRH).

[0062] In different systems, CU (or CU-CP and CU-UP), DU or RU may also have different names, but those skilled in the art can understand their meanings. For example, in the ORAN system, CU may also be called O-CU (Open CU), DU may also be called O-DU, CU-CP may also be called O-CU-CP, CU-UP may also be called O-CU-UP, and RU may also be called O-RU. For the convenience of description, this application uses CU, CU-CP, CU-UP, DU and RU as examples for description. Any unit of CU (or CU-CP, CU-UP), DU and RU in this application may be implemented by a software module, a hardware module, or a combination of a software module and a hardware module. The embodiments of this application do not limit the specific technology and specific device form adopted by the wireless access network device. For the convenience of description, the following description takes the base station as an example of the wireless access network device.

[0063] A terminal may also be referred to as a terminal device, user equipment (UE), mobile station, mobile terminal, etc. Terminals can be widely used in various scenarios, such as device-to-device (D2D), vehicle-to-everything (V2X) communication, machine-type communication (MTC), Internet of Things (IoT), virtual reality, augmented reality, industrial control, autonomous driving, telemedicine, smart grid, smart furniture, smart office, smart wearable, smart transportation, smart city, etc. A terminal can be a mobile phone, tablet computer, computer with wireless transceiver function, wearable device, vehicle, drone, helicopter, airplane, ship, robot, robotic arm, smart home device, etc. The embodiments of this application do not limit the specific technology and specific device form adopted by the terminal.

[0064] The terminal in this application may also be a VR terminal, an AR terminal, or an MR terminal. VR terminals, AR terminals, and MR terminals may all be referred to as XR terminals. An XR terminal may be, for example, a head-mounted device (such as a helmet or glasses), an all-in-one machine, a TV, a monitor, a car, a vehicle-mounted device, a tablet or a smart screen, etc. The XR terminal can present XR data to the user, and the user can experience a variety of XR services by wearing or using the XR terminal. The XR terminal can access the network wirelessly or wired, for example, through WiFi, 5G or other systems.

[0065] Base stations and terminals can be fixed or mobile. They can be deployed on land, indoors or outdoors, handheld or vehicle-mounted; on water; or in the air on aircraft, balloons, and satellites. The embodiments of this application do not limit the application scenarios of base stations and terminals.

[0066] The roles of base stations and terminals can be relative. For example, the aircraft or drone 120i in Figure 1 can be configured as a mobile base station. To terminals 120j accessing the wireless access network 100 via 120i, terminal 120i is a base station. However, to base station 110a, 120i is a terminal, meaning that communication between 110a and 120i occurs via a wireless air interface protocol. Of course, communication between 110a and 120i can also occur via a base station-to-base station interface protocol. In this case, 120i is also a base station relative to 110a. Therefore, base stations and terminals can be collectively referred to as communication devices. 110a and 110b in Figure 1 can be referred to as communication devices with base station functionality, while 120a-120j in Figure 1 can be referred to as communication devices with terminal functionality.

[0067] Communication between base stations and terminals, between base stations, and between terminals can be carried out through authorized spectrum, unauthorized spectrum, or both; communication can be carried out through spectrum below 6 gigahertz (GHz), spectrum above 6 GHz, or spectrum below 6 GHz and spectrum above 6 GHz. The embodiments of the present application do not limit the spectrum resources used for wireless communication.

[0068] In the embodiments of the present application, the functions of the base station may also be performed by a module (such as a chip) in the base station, or by a control subsystem that includes the base station function. The control subsystem that includes the base station function here can be a control center in the application scenarios of the above-mentioned terminals such as smart grid, industrial control, intelligent transportation, and smart city. The functions of the terminal may also be performed by a module (such as a chip or a modem) in the terminal, or by a device that includes the terminal function.

[0069] In this application, a base station sends a downlink signal or downlink information to a terminal, and the downlink information is carried on a downlink channel; a terminal sends an uplink signal or uplink information to a base station, and the uplink information is carried on an uplink channel; a terminal sends a sidelink signal or sidelink information to another terminal, and the sidelink information is carried on a sidelink channel. The information can be either control information or data information.

[0070] XR technology offers advantages such as multi-perspective and strong interactivity, providing users with a completely new experience and possessing enormous application value and commercial potential. XR encompasses technologies such as VR, AR, and MR, and can be widely applied in a wide range of fields, including entertainment, gaming, healthcare, advertising, industry, online education, and engineering. VR technology primarily involves rendering visual and audio scenes to closely simulate the visual and audio stimulation of the real world. In VR, users typically wear an XR device (such as a head-mounted device) to simulate visual and / or auditory sensations. VR technology can also track user movements, allowing for timely updates to the simulated visual and / or auditory content. AR technology primarily involves providing additional visual and / or auditory information or artificially generated content within the user's perceived real environment. The user's understanding of the real environment can be direct (e.g., without sensing, processing, or rendering) or indirect (e.g., transmitted through sensors and other means), with further augmentation. MR technology involves inserting virtual elements into a physical scene, aiming to provide users with an immersive experience where these elements appear to be part of the real scene.

[0071] The embodiments provided in this application are applicable to a variety of different scenarios. Figures 2 to 5 show schematic diagrams of several system frameworks applicable to the embodiments of this application.

[0072] FIG2 shows a schematic diagram of a scenario applicable to an embodiment of the present application. FIG2 illustrates a system 200, which includes a server 210, a core network and an access network 220 (which may be referred to as a transmission network 220, such as an LTE, 5G, or 6G network), and a terminal 230. The server 210 may be used to encode, decode, and render XR source data, the transmission network 220 may be used to transmit XR data, and the terminal 230 may provide users with a diverse XR experience by processing XR data. It is understood that other devices may be included between the transmission network 220 and the terminal 230, such as other terminals (such as mobile phones, laptops, or vehicle-mounted terminals) and / or network devices (such as relay devices, integrated access backhaul (IAB) devices, WiFi routers, or WiFi access points). The terminal 230 obtains XR data from the transmission network 220 with the help of other terminals and / or network devices.

[0073] Figure 3 shows another schematic diagram of a scenario to which an embodiment of the present application is applicable. Figure 3 illustrates a system 300, comprising a terminal 320 and other terminals 310. Other terminals 310 are terminals other than terminal 320. Other terminals 310 can transmit XR data to terminal 320. For example, other terminals 310 can project XR data to terminal 320. For another example, other terminals 310 and terminal 320 are vehicle-mounted terminals, and XR data can be exchanged between vehicle-mounted terminals. It can be understood that other terminals 310 can also be connected to a transmission network (such as LTE, 5G or 6G network) to obtain XR data from the transmission network, or send data to the transmission network.

[0074] Figure 4 shows another scenario diagram applicable to an embodiment of the present application. Figure 4 illustrates a system 400, including a terminal 430, a WiFi router or a WiFi access point 420 (which may be referred to as a WiFi device 420), and other terminals 410. Other terminals 410 are terminals other than terminal 430. Other terminals 410 can transmit XR data to terminal 430 with the help of WiFi device 420. For example, other terminal 410 is a mobile phone device, WiFi device 420 is a WiFi router, a WiFi access point or a set-top box, and terminal 430 is a TV device, a smart screen device or an electronic tablet device. The mobile phone device can project XR data to the TV device, smart screen device or electronic tablet device through the WiFi router, WiFi access point or set-top box to present it to the user.

[0075] FIG5 shows another schematic diagram of a scenario applicable to an embodiment of the present application. FIG5 illustrates a system 500, comprising a server 510, a fixed network 520, a WiFi router or a WiFi access point 530 (which may be referred to as a WiFi device 530), and a terminal 540. The server 510 may be used to encode, decode, and render XR source data, and transmit XR data to the terminal 540 with the help of the fixed network 520 and the WiFi device 530. For example, the fixed network 520 is an operator network, and the WiFi device 530 is a WiFi router, a WiFi access point, or a set-top box. The server 510 transmits or projects XR data to the terminal 540 with the help of the operator network 520 and the WiFi device 530.

[0076] It can be understood that Figures 2 to 5 only provide illustrations of several scenarios to which the embodiments of the present application can be applied, and do not limit the applicable scenarios of the embodiments of the present application.

[0077] The technical solution of this application is described below with reference to the accompanying drawings.

[0078] For XR transmission services and video transmission services, service data usually arrives periodically based on the frame rate. As shown in Figure 6, for a video with a frame rate of 60 frames per second (FPS), ideally, a picture frame arrives every 16.67 milliseconds (ms) (which can also be expressed as a frame period of 16.67ms). The amount of data arriving in the picture frame may vary (the higher the height of the arrow in the figure, the larger the data amount; the lower the height of the arrow, the smaller the data amount). Common frame rates for video frames are 30, 60, 90, or 120 FPS, corresponding to frame periods of 33.33, 16.67, 11.11, or 8.33ms, respectively.

[0079] XR and video transmission services typically transmit large amounts of data. For example, a 4K video frame is approximately 30-100 kilobits (Kb). Furthermore, the sizes of different video frames often vary, and due to varying compression rates and frame types, the size of each video frame can vary significantly.

[0080] Different XR services typically have different business models. Changes in VR scene content display are generally triggered by posture or position (motion). VR services primarily upload position and posture information, with low data volumes, typically only tens of kilobits per second (Kbps). Unlike VR, changes in AR scene content display are triggered by changes in the gaze focus target and the spatial relationship between position and gaze point (motion). The content uploaded by AR services includes the visual information required for perception (including depth). Therefore, AR services primarily transmit clear and stable images or video streams, with large data volumes. These streams may also include extracted environmental feature information. Generally, the required uplink rate for a basic interactive AR experience is approximately 2 Mbps, while advanced experiences require 10-20 Mbps. Compared to VR services, AR services require higher uplink transmission rates and present greater challenges.

[0081] Configured grant (CG) (also called configured scheduling (CS)) is suitable for periodic service transmission. CG means that during the transmission process, the CG transmission opportunity is allocated through the radio resource control layer (RRC) signaling or downlink control information (DCI), and then the above-mentioned scheduling resources can be used periodically for data transmission. The above-mentioned CG transmission opportunity can also be expressed in different ways, such as configured grant physical uplink shared channel (CG PUSCH), PUSCH or CG opportunity. Unless otherwise specified in this application, the CG transmission opportunity is used for expression.

[0082] For example, as shown in FIG7 , during uplink transmission, CG allocates CG transmission opportunities through RRC signaling or DCI, and then periodically uses the above-mentioned CG transmission opportunities for data transmission.

[0083] CG includes two types, of which Type 1 configures the relevant parameters of CG transmission through RRC signaling, such as the CG period, the time domain and frequency domain resources of CG, etc., and activates the corresponding CG resources through RRC signaling. Type 2 configures the relevant parameters of CG transmission through RRC signaling, such as the CG period, and allocates and activates the corresponding CG resources through DCI. Under normal circumstances, only one CG transmission opportunity can be configured within a CG period, which can also be understood as only one transport block (TB) can be transmitted within a CG period. For XR transmission services with large dynamic changes in the amount of transmitted data and a large amount of transmitted data, configuring one CG transmission opportunity within a CG period may not complete the data transmission. In response to the above problem, a method of configuring multiple CG transmission opportunities within a CG period can be adopted to solve it. For example, as shown in Figure 8, three CG transmission opportunities are configured within a CG period, and rectangles of different colors in the figure are different CG transmission opportunities. It can be understood that the embodiment of the present application does not limit the size relationship of the multiple CG transmission opportunities within the above-mentioned CG period.

[0084] For configuring multiple CG transmission opportunities within a CG cycle period, the transmission resources included in the above multiple CG transmission opportunities are the CG transmission resources within the CG cycle period. If the size of the CG transmission resources is smaller than the size of the XR transmission frame, it is necessary to dynamically schedule other transmission resources to transmit the remaining XR transmission frame data, which will introduce additional delays and thus affect the transmission performance. In order to avoid the above delays, the CG transmission resources within a CG cycle period can be configured to be larger, but this will result in waste of transmission resources when the XR transmission frame is small. The problem of waste of transmission resources can be solved by sending UCI. For example, the above UCI can be called XR uplink control information (extended reality uplink control information, XR-UCI), or unused transmission occasion uplink control information (unused transmission occasion uplink control information, UTO-UCI). This application does not limit its name. The above UCI is used to indicate the CG transmission opportunities used and / or not used within the CG cycle period. The above UCI can be carried on the above used CG transmission opportunities. For example, the UCI can be carried on all CG transmission opportunities or part of the CG transmission opportunities in the used CG transmission opportunities. After the base station receives the UCI sent by the terminal, it can schedule the unused CG transmission opportunities indicated by the above UCI to other terminals for use, thereby avoiding waste of transmission resources. For example, as shown in Figure 9, four CG transmission opportunities are configured in a CG cycle period: CG transmission opportunities 0-3. In the figure, a solid line on the rectangular border indicates that the CG transmission opportunity represented by the rectangle is used, and a dotted line on the rectangular border indicates that the CG transmission opportunity represented by the rectangle is not used. The UCI is carried on the used CG transmission opportunities: CG transmission opportunity 0 and CG transmission opportunity 1. The UCI carried on CG transmission opportunity 0 or CG transmission opportunity 1 is used to indicate the two CG transmission opportunities used in the above CG cycle period: CG transmission opportunity 0 and CG transmission opportunity 1, and the two unused CG transmission opportunities: CG transmission opportunity 2 and CG transmission opportunity 3. After receiving the UCI, the base station can schedule CG transmission opportunity 2 and CG transmission opportunity 3 to other terminals for use.

[0085] In a possible implementation of the UCI, the UCI indicates the CG transmission opportunities used and / or not used within the CG cycle period through a bitmap, wherein one bit in the bitmap corresponds to one CG transmission opportunity, and when the bit is 1, it indicates that the CG transmission opportunity corresponding to the bit is used, and when the bit is 0, it indicates that the CG transmission opportunity corresponding to the bit is not used. Alternatively, when the bit is 0, it indicates that the CG transmission opportunity corresponding to the bit is used, and when the bit is 1, it indicates that the CG transmission opportunity corresponding to the bit is not used. For example, as shown in Figure 10, 8 CG transmission opportunities are configured in a CG cycle period: CG transmission opportunities 0-7. In the figure, a solid line bordered rectangle indicates that the CG transmission opportunity represented by the rectangle is used, and a dotted line bordered rectangle indicates that the CG transmission opportunity represented by the rectangle is not used. The UCI is carried on the used CG transmission opportunities: CG transmission opportunities 0-5, wherein the UCI carried on CG transmission opportunity 0, CG transmission opportunity 1, CG transmission opportunity 2, CG transmission opportunity 3, CG transmission opportunity 4 or CG transmission opportunity 5 indicates the used and unused CG transmission opportunities in CG transmission opportunities 0-7 through a bitmap of [1 1 1 1 1 1 0 0]. A bit in the bitmap, such as "1" or "0", corresponds to a used or unused CG transmission opportunity. The UCI is used to indicate that the CG transmission opportunities used in the above-mentioned CG cycle period are CG transmission opportunities 0-5, and the CG transmission opportunities not used in the CG cycle period are CG transmission opportunities 6 and CG transmission opportunities 7.

[0086] In another possible implementation of the UCI, the UCI indicates the CG transmission opportunities used and / or not used within the CG cycle period through a bitmap, wherein one bit in the bitmap corresponds to multiple CG transmission opportunities, and when the bit is 1, it indicates that the multiple CG transmission opportunities corresponding to the bit are used, and when the bit is 0, it indicates that the multiple CG transmission opportunities corresponding to the bit are not used. Alternatively, when the bit is 0, it indicates that the multiple CG transmission opportunities corresponding to the bit are used, and when the bit is 1, it indicates that the multiple CG transmission opportunities corresponding to the bit are not used. For example, as shown in Figure 11, 8 CG transmission opportunities are configured in a CG cycle period: CG transmission opportunities 0-7. In the figure, a solid line border of a rectangle indicates that the CG transmission opportunity represented by the rectangle is used, and a dotted line border of a rectangle indicates that the CG transmission opportunity represented by the rectangle is not used. The UCI is carried on the used CG transmission opportunities: CG transmission opportunities 0-5, wherein the UCI carried on CG transmission opportunity 0, CG transmission opportunity 1, CG transmission opportunity 2, CG transmission opportunity 3, CG transmission opportunity 4 or CG transmission opportunity 5 indicates the used and unused CG transmission opportunities in CG transmission opportunities 0-7 through a bitmap of [1 1 1 0]. A bit in the bitmap, such as "1" or "0", corresponds to two used or unused CG transmission opportunities. The UCI is used to indicate that the CG transmission opportunities used in the above-mentioned CG cycle period are CG transmission opportunities 0-5, and the CG transmission opportunities not used in the CG cycle period are CG transmission opportunities 6 and CG transmission opportunity 7.

[0087] The UCI can be sent by the terminal to the base station. After receiving the UCI, the base station needs to process the UCI to obtain information about the CG transmission opportunities used and / or not used within the CG cycle period. The base station can then schedule the unused CG transmission opportunities indicated by the UCI to other terminals through RRC signaling or DCI. UCI is sensitive to bit overhead, so reducing the UCI indication overhead is an urgent issue.

[0088] The present application provides a UCI bit design method, which configures the scope of UCI to enable the UCI to indicate the CG transmission timing used and / or not used within the scope of UCI, thereby achieving the beneficial effect of reducing the UCI bit overhead.

[0089] Figure 12 is an interactive diagram of a communication method 1200 provided in an embodiment of the present application. In Figure 12, a wireless access network device and a terminal are used as examples to illustrate the method, but the present application does not limit the execution subject of the interactive diagram. For example, the wireless access network device in Figure 12 can also be a module (such as a chip, a chip system, or a processor) applied to the wireless access network device, or a logical node, a logical module, or software that can implement all or part of the functions of the wireless access network device; the terminal in Figure 12 can also be a module (such as a chip, a chip system, or a processor) applied to the terminal to implement the method, or a logical node, a logical module, or software that can implement all or part of the terminal functions. As shown in Figure 12, the method 1200 of this embodiment may include part 1210 and part 1220.

[0090] Part 1210: The wireless access network device sends first configuration information to the terminal. Accordingly, the terminal obtains the first configuration information. The first configuration information is used to configure the scope of application of the first indication information. The scope of the first indication information is part of the CG transmission opportunities within the CG cycle period. The first indication information is used to indicate the CG transmission opportunities used and / or not used in the part of the CG transmission opportunities. The first configuration information can be included in the DCI carried by the physical downlink control channel (PDCCH), or carried by the media access control layer control element (MAC CE), or carried by RRC signaling.

[0091] Part 1220: The terminal sends the first indication information to the wireless access network device, and accordingly, the wireless access network device obtains the first indication information. The above-mentioned first indication information may be included in the UCI carried by the above-mentioned CG transmission opportunity, for example, the first indication information may be included in the UCI carried by all or part of the CG transmission opportunities in the used CG transmission opportunity. The first indication information may indicate the CG transmission opportunities used and / or not used in the above-mentioned part of the CG transmission opportunities through a bitmap, and one bit in the above-mentioned bitmap corresponds to one or more CG transmission opportunities in the part of the CG transmission opportunities, and when the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned one or more CG transmission opportunities are used and not used, respectively. Alternatively, when the above-mentioned one bit is "0" and "1", it indicates that the above-mentioned one or more CG transmission opportunities are used and not used, respectively.

[0092] In method 1200, the terminal obtains first configuration information for configuring the scope of application of the first indication information, and the scope of application of the first indication information is some CG transmission opportunities within the CG cycle period. At this time, the first indication information is used to indicate the CG transmission opportunities used and / or not used in some CG transmission opportunities. While avoiding the waste of CG transmission opportunity resources within the CG cycle period, it can effectively reduce the bit overhead of the first indication information.

[0093] In this application, "sending information to... (radio access network device)" can be understood as the destination of the information being the radio access network device. This can include sending information to the radio access network device directly or indirectly. "Receiving information... from (radio access network device)" can be understood as the source of the information being the radio access network device, which can include receiving information from the radio access network device directly or indirectly. The information may undergo necessary processing between the source and destination of the information, such as format changes, but the destination can understand the valid information from the source. Similar expressions in this application can be understood similarly and will not be repeated here.

[0094] In one possible implementation of the first configuration information, the first configuration information configures a time offset, the partial CG transmission opportunity is within a first time period, and the start time of the first time period is related to the time offset. This implementation effectively reduces the bit overhead of the first indication information by determining the first time period through the time offset and determining the scope of the first indication information through the first time period.

[0095] In a possible implementation of the above-mentioned time offset, the time offset can be the sum of the processing delay and the scheduling delay, the above-mentioned processing delay is the delay for the base station to process the above-mentioned first indication information to obtain the CG transmission opportunity information used and / or not used in the above-mentioned part of the CG transmission opportunities, and the above-mentioned scheduling delay is the delay for the base station to schedule the unused CG transmission opportunities in the part of the CG transmission opportunities indicated by the first indication information to other terminals through RRC signaling or DCI. The above-mentioned time offset can be in ms, slot, symbol (symbol) or CG PUSCH as granularity. Through the above-mentioned implementation, it is possible to combine the base station processing and scheduling capabilities, while reducing the bit overhead of the first indication information, effectively avoid the waste of transmission resources.

[0096] In another possible implementation of the above-mentioned time offset, the time offset may also be related to the transmission data volume distribution information, and the above-mentioned transmission data volume distribution information may be reported to the base station by the terminal through MAC-CE, user assistance information (UE assistance information, UAI) or UCI, or may be obtained through the measurement or perception of the base station itself. The above-mentioned transmission data volume distribution information may be the minimum value of the transmission data volume, and the CG transmission timing corresponding to the above-mentioned minimum value of the transmission data volume is the CG transmission timing used. The base station configures the above-mentioned time offset through the above-mentioned CG transmission timing used, and the time offset may be in ms, slot, symbol (symbol) or CG PUSCH as granularity. In this way, the base station can determine the CG transmission timing to be used according to the minimum value of the transmission data volume, and avoid the first indication information from indicating the CG transmission timing to be used by the time offset, while the first indication information fully indicates the CG transmission timing used and / or not used within the CG cycle period, and effectively reduces the bit overhead of the first indication information.

[0097] In another possible implementation of the above-mentioned time offset, the time offset may also be the sum of the above-mentioned processing delay and the above-mentioned scheduling delay, or may be related to the above-mentioned transmission data volume distribution information. If the number of CG transmission opportunities contained in the above-mentioned first time period determined by the sum of the processing delay and the scheduling delay is greater than the number of CG transmission opportunities corresponding to the above-mentioned minimum value of the transmission data volume, then the time offset may be the sum of the processing delay and the scheduling delay. If the number of CG transmission opportunities contained in the above-mentioned first time period determined by the sum of the processing delay and the scheduling delay is less than the number of CG transmission opportunities corresponding to the above-mentioned minimum value of the transmission data volume, then the time offset may be related to the transmission data volume distribution information. Alternatively, if the number of CG transmission opportunities contained in the above-mentioned first time period determined by the sum of the processing delay and the scheduling delay is less than the number of CG transmission opportunities corresponding to the above-mentioned minimum value of the amount of transmitted data, then the time offset may be the sum of the processing delay and the scheduling delay. If the number of CG transmission opportunities contained in the above-mentioned first time period determined by the sum of the processing delay and the scheduling delay is greater than the number of CG transmission opportunities corresponding to the above-mentioned minimum value of the amount of transmitted data, then the time offset may be related to the transmission data amount distribution information, and the time offset may be in ms, slot, symbol or CG PUSCH granularity. The above-mentioned embodiment can effectively reduce the bit overhead of the first indication information while the first indication information fully indicates the CG transmission opportunities used and / or not used in the CG cycle period, and can also effectively avoid the waste of transmission resources.

[0098] In a possible implementation of the first time period, the starting time of the first time period is after the sending time of the first indication information, the interval between the starting time of the first time period and the sending time of the first indication information is equal to the time offset, and the end time of the first time period is the end time of the CG cycle period or the end time of the last CG transmission opportunity in the CG cycle period. The above implementation method determines the scope of the first indication information through the first time period, which can effectively reduce the bit overhead of the first indication information.

[0099] In a possible implementation of the above-mentioned partial CG transmission opportunity, the partial CG transmission opportunity may be within the above-mentioned first time period. For example, as shown in FIG13 , 7 CG transmission opportunities are configured within the CG period of 20 ms: CG transmission opportunities 0-6, wherein CG transmission opportunities 0-6 are sent at 0, 2.5, 5, 7.5, 10, 12.5 and 15 ms respectively, wherein a rectangle with a solid border represents a used CG transmission opportunity, and a rectangle with a dotted border represents an unused CG transmission opportunity, and the first indication information is contained in the UCI carried by the used CG transmission opportunity: CG transmission opportunity 0-4, wherein the first indication information contained in the UCI carried by CG transmission opportunity 0 (the black rectangle in the figure is UCI) is sent at 0 ms, the time offset configured by the first configuration information is 8 ms, the start time of the first time period is 8 ms, and the end time is 20 ms. The CG transmission opportunities within the first time period are CG transmission opportunities 4-6, and the first indication information is transmitted via bitmap=[1 0 0] indicates that CG transmission opportunity 4 is used, and CG transmission opportunity 5 and CG transmission opportunity 6 are not used; the first indication information contained in the UCI carried by CG transmission opportunity 1 (the black rectangle in the figure is UCI) is sent at 2.5ms, the time offset configured by the first configuration information is 8ms, the start time of the first time period is 10.5ms, and the end time is 20ms. The CG transmission opportunities in the first time period are CG transmission opportunity 5 and CG transmission opportunity 6, and the first indication information indicates through bitmap=[0 0] that CG transmission opportunity 5 and CG transmission opportunity 6 are not used; the indication of the first indication information contained in the UCI carried by CG transmission opportunity 2, 3 or 4 (the black rectangle in the figure is UCI) is similar and will not be repeated here.

[0100] If the starting time of the above-mentioned first time period is included in a CG transmission opportunity within the above-mentioned CG cycle time period, the part of CG transmission opportunities within the first time period may not include the above-mentioned one CG transmission opportunity. For example, as shown in Figure 14, 7 CG transmission opportunities are configured within the CG cycle period of 20ms: CG transmission opportunities 0-6, where CG transmission opportunities 0-6 are sent at 0, 2.5, 5, 7.5, 10, 12.5 and 15ms respectively, where a rectangle with a solid border represents a used CG transmission opportunity, and a rectangle with a dotted border represents an unused CG transmission opportunity, and the first indication information is included in the UCI carried by the used CG transmission opportunity: CG transmission opportunity 0-4, where the first indication information included in the UCI carried by CG transmission opportunity 0 (the black rectangle in the figure is UCI) is sent at 0ms, the time offset configured by the first configuration information is 8ms, the start time of the first period is 8ms, and the end time is 20ms, and the above-mentioned start time is included in CG transmission opportunity 3, the CG transmission opportunities in the first period are CG transmission opportunities 4-6, and the first indication information indicates through bitmap = [1 0 0] that CG transmission opportunity 4 is used, and CG transmission opportunity 5 and CG transmission opportunity 6 are not used. The above implementation method determines the scope of the first indication information by using the first time period, which can effectively reduce the bit overhead of the first indication information.

[0101] In another possible implementation of the above-mentioned partial CG transmission opportunity, the partial CG transmission opportunity may also be within the second time period, the starting time of the above-mentioned second time period is the sending time of the first indication information, and the end time of the second time period is the end time of the above-mentioned CG cycle period or the end time of the last CG transmission opportunity within the CG cycle period. The above-mentioned partial CG transmission opportunity within the above-mentioned second time period may include the CG transmission opportunity containing the above-mentioned first indication information, or may not include the CG transmission opportunity containing the first indication information, and this application does not limit it.

[0102] For example, as shown in FIG15 , seven CG transmission opportunities are configured within a CG period of 20 ms: CG transmission opportunities 0-6, wherein CG transmission opportunities 0-6 are sent at 0, 2.5, 5, 7.5, 10, 12.5, and 15 ms, respectively. A rectangle with a solid border represents a used CG transmission opportunity, and a rectangle with a dotted border represents an unused CG transmission opportunity. The first indication information is included in the UCI carried by the used CG transmission opportunity: CG transmission opportunity 0-4, wherein the first indication information contained in the UCI carried by CG transmission opportunity 4 (the black rectangle in the figure is the UCI) is sent at 10 ms. The start time of the second period is 10 ms, and the end time is 20 ms. The CG transmission opportunities in the second period are CG transmission opportunities 4-6. The first indication information is transmitted via bitmap=[1 0 0] indicates that CG transmission opportunity 4 is used, and CG transmission opportunity 5 and CG transmission opportunity 6 are not used; the first indication information contained in the UCI carried by CG transmission opportunity 3 (the black rectangle in the figure is UCI) is sent at 7.5ms, the start time of the second time period is 7.5ms, and the end time is 20ms. The CG transmission opportunities in the second time period are CG transmission opportunities 3-6, and the first indication information indicates through bitmap=[1 1 0 0] that CG transmission opportunity 3 and CG transmission opportunity 4 are used, and CG transmission opportunity 5 and CG transmission opportunity 6 are not used; the indication of the first indication information contained in the UCI carried by CG transmission opportunity 0, 1 or 2 (the black rectangle in the figure is UCI) is similar and will not be repeated here.

[0103] For another example, as shown in FIG16 , seven CG transmission opportunities are configured within a CG period of 20 ms: CG transmission opportunities 0-6, wherein CG transmission opportunities 0-6 are sent at 0, 2.5, 5, 7.5, 10, 12.5 and 15 ms, respectively. A rectangle with a solid border represents a used CG transmission opportunity, and a rectangle with a dotted border represents an unused CG transmission opportunity. The first indication information is included in the UCI carried by the used CG transmission opportunity: CG transmission opportunity 0-4, wherein the first indication information contained in the UCI carried by CG transmission opportunity 2 (the black rectangle in the figure is UCI) is sent at 5 ms, the start time of the second period is 5 ms, and the end time is 20 ms. The CG transmission opportunity in the second period is CG transmission opportunity 2-6, and the first indication information is transmitted via bitmap=[1 1 1 0 0] indicates that CG transmission opportunities 2-4 are used, and CG transmission opportunities 5 and CG transmission opportunities 6 are not used; the first indication information contained in the UCI carried by CG transmission opportunity 1 (the black rectangle in the figure is UCI) is sent at 2.5ms, the start time of the second time period is 2.5ms, and the end time is 20ms. The CG transmission opportunities in the second time period are CG transmission opportunities 1-6, and the first indication information indicates that CG transmission opportunities 1-4 are used through bitmap=[1 1 1 1 0 0], and CG transmission opportunities 5 and CG transmission opportunities 6 are not used; the indication of the first indication information contained in the UCI carried by CG transmission opportunities 0, 3 or 4 (the black rectangle in the figure is UCI) is similar and will not be repeated here. In the above embodiment, the number of bits of the first indication information changes dynamically according to the sending time of the first indication information, which can flexibly and effectively reduce the bit overhead of the first indication information.

[0104] In another possible implementation of the above-mentioned partial CG transmission opportunities, the partial CG transmission opportunities may also be all CG transmission opportunities within the above-mentioned CG cycle period, or all CG transmission opportunities within the above-mentioned CG cycle period except the CG transmission opportunities containing the first indication information. For example, as shown in FIG17 , seven CG transmission opportunities are configured within a CG cycle period of 20 ms: CG transmission opportunities 0-6, where CG transmission opportunities 0-6 are sent at 0, 2.5, 5, 7.5, 10, 12.5, and 15 ms, respectively. A rectangle with a solid border represents a used CG transmission opportunity, and a rectangle with a dotted border represents an unused CG transmission opportunity. The first indication information is contained in the UCI carried by the used CG transmission opportunities: CG transmission opportunities 0-4. The first indication information contained in the UCI carried by CG transmission opportunity 0, CG transmission opportunity 1, CG transmission opportunity 2, CG transmission opportunity 3, or CG transmission opportunity 4 (the black rectangle in the figure is the UCI) indicates through bitmap = [1 1 1 1 1 0 0] that CG transmission opportunities 0-4 are used, and CG transmission opportunity 5 and CG transmission opportunity are not used. The above-mentioned implementation method can achieve the beneficial effect of the first indication information fully indicating the CG transmission opportunities used and / or not used in the CG transmission opportunities within the CG cycle period.

[0105] In one possible implementation of the first indication information, the number of bits of the first indication information is N1, where N1 is a positive integer, and the number of the partial CG transmission opportunities is M1, where M1 is an integer greater than or equal to N1. Optionally, M1 is an integer multiple of N1. In the above implementation, the number of bits of the first indication information is less than or equal to the number of the partial CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0106] In a possible implementation manner in which M1 is an integer multiple of N1, M1=N1, and the above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings through a bitmap, and one bit in the above-mentioned bitmap corresponds to one CG transmission timing in the part of CG transmission timings, and when the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. Through the above-mentioned implementation manner, the use and / or non-use of one CG transmission timing in the part of CG transmission timings can be indicated by one bit in the first indication information, thereby achieving the beneficial effect of fully and accurately indicating the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings.

[0107] In another possible implementation where M1 is an integer multiple of N1, M1=k*N1, where k is an integer greater than 1. The above-mentioned first indication information indicates the CG transmission opportunities used and / or not used in the above-mentioned part of CG transmission opportunities through a bitmap, and one bit in the above-mentioned bitmap corresponds to k CG transmission opportunities in the part of CG transmission opportunities. When the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. Through the above-mentioned implementation, the bit overhead of the first indication information can be further reduced.

[0108] In another possible implementation of the first indication information, the number of bits of the first indication information is N1, where N1 is a positive integer, and the number of the partial CG transmission opportunities is M1, where M1 is an integer greater than N1. Optionally, M1 is not an integer multiple of N1. In the above implementation, the number of bits of the first indication information is less than the number of the partial CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0109] In a possible implementation manner in which M1 is not an integer multiple of N1. The above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timing through a bitmap, the last bit in the above-mentioned bitmap corresponds to M1-(N1-1)*(ceil(M1 / N1)) CG transmission timings in the part of CG transmission timing, one of the other bits in the bitmap except the above-mentioned last bit corresponds to ceil(M1 / N1) CG transmission timings in the part of CG transmission timing, when a bit in the above-mentioned bitmap is "1" and "0", it indicates that the CG transmission timing corresponding to the above-mentioned bit is used and not used, respectively, or when a bit in the bitmap is "0" and "1", it indicates that the CG transmission timing corresponding to the above-mentioned bit is used and not used, respectively, and ceil(.) is rounded up. For example, the number of partial CG transmission opportunities M1=10, the number of first indication information bits N1=3, and the first indication information indicates the used and unused CG transmission opportunities among the 10 CG transmission opportunities through bitmap=[1 1 0]. The first, second, and third bits in the above bitmap are used to indicate 4 used transmission opportunities, 4 used transmission opportunities, and 2 unused transmission opportunities among the above 10 CG transmission opportunities, respectively. Through the above implementation, the bit overhead of the first indication information can be further reduced.

[0110] In another possible implementation where M1 is not an integer multiple of N1. The above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of the CG transmission timing through a bitmap, one of the first M1 mod N1 bits in the above-mentioned bitmap corresponds to the ceil(M1 / N1) CG transmission timings in the part of the CG transmission timing, and one of the other bits in the bitmap except the above-mentioned first M1 mod N1 bits corresponds to the floor(M1 / N1) CG transmission timings in the part of the CG transmission timing. When a bit in the above-mentioned bitmap is "1" and "0", it indicates that the CG transmission timing corresponding to the above-mentioned bit is used and not used, respectively, or, when a bit in the bitmap is "0" and "1", it indicates that the CG transmission timing corresponding to the above-mentioned bit is used and not used, respectively, ceil(.) is rounded up, floor(.) is rounded down, and mod is the remainder. For example, the number of partial CG transmission opportunities M1=10, the number of first indication information bits N1=3, the first indication information indicates the used and unused CG transmission opportunities among the 10 CG transmission opportunities through bitmap=[1 1 0], and the first, second, and third bits in the above bitmap are used to indicate 4 used transmission opportunities, 3 used transmission opportunities, and 3 unused transmission opportunities among the above 10 CG transmission opportunities, respectively. Through the above implementation, the bit overhead of the first indication information can be further reduced.

[0111] In another possible implementation of the first configuration information, the first configuration information configures the number of bits N2 of the above-mentioned first indication information, where N2 is a positive integer. One bit in the N2 bits of the first indication information indicates whether one or more CG transmission opportunities in the above-mentioned partial CG transmission opportunities are used or not used. For example, each bit in the N2 bits of the above-mentioned first indication information respectively indicates whether one or more CG transmission opportunities in the above-mentioned partial CG transmission opportunities are used or not used. Through the above-mentioned implementation, the base station can configure the number of bits of the first indication information through the first configuration information based on its ability to process the first indication information and its ability to schedule the unused CG transmission opportunities indicated by the first indication information for use by other terminals, thereby completing the configuration of the number of bits of the first indication information without sending the above-mentioned capabilities of the base station itself, and effectively avoiding the exposure of the base station capability information.

[0112] In a possible implementation of the partial CG transmission opportunities, the partial CG transmission opportunities are the last M2 CG transmission opportunities within the CG cycle period, where M2 is an integer greater than or equal to N2. In the above implementation, the number of bits of the first indication information is less than or equal to the number of the partial CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0113] In a possible implementation of the first indication information, optionally, M2 is an integer multiple of N2. In the above implementation, the number of bits of the first indication information is less than or equal to the number of the CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0114] In a possible implementation manner in which M2 is an integer multiple of N2, M2=N2, the above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings through a bitmap, and one bit in the above-mentioned bitmap corresponds to one CG transmission timing in the part of CG transmission timings, and when the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned one CG transmission timing is used and not used, respectively. Through the above-mentioned implementation manner, the use and / or non-use of one CG transmission timing in the part of CG transmission timings can be indicated by one bit in the first indication information, thereby achieving the beneficial effect of fully and accurately indicating the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timings.

[0115] In another possible implementation where M2 is an integer multiple of N2, M2=k*N2, where k is an integer greater than 1. The above-mentioned first indication information indicates the CG transmission opportunities used and / or not used in the above-mentioned part of CG transmission opportunities through a bitmap, and one bit in the above-mentioned bitmap corresponds to k CG transmission opportunities in the part of CG transmission opportunities. When the above-mentioned one bit is "1" and "0", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. Alternatively, when the one bit is "0" and "1", it indicates that the above-mentioned k CG transmission opportunities are used and not used, respectively. Through the above-mentioned implementation, the bit overhead of the first indication information can be further reduced.

[0116] In another possible implementation of the first indication information, optionally, M2 is not an integer multiple of N2. In the above implementation, the number of bits of the first indication information is less than the number of the CG transmission opportunities, which can further reduce the bit overhead of the first indication information.

[0117] In a possible implementation manner in which M2 is not an integer multiple of N2. The above-mentioned first indication information indicates the CG transmission timing used and / or not used in the above-mentioned part of CG transmission timing through a bitmap, the last bit in the above-mentioned bitmap corresponds to M2-(N2-1)*(ceil(M2 / N2)) CG transmission timings in the part of CG transmission timing, one of the other bits in the bitmap except the above-mentioned last bit corresponds to ceil(M2 / N2) CG transmission timings in the part of CG transmission timing, when a bit in the above-mentioned bitmap is "1" and "0", it indicates that the CG transmission timing corresponding to the above-mentioned bit is used and not used, respectively, or when a bit in the bitmap is "0" and "1", it indicates that the CG transmission timing corresponding to the above-mentioned bit is used and not used, respectively, and ceil(.) is rounded up. For example, the number of partial CG transmission opportunities M2=10, the number of first indication information bits N2=3, and the first indication information indicates the used and unused CG transmission opportunities among the 10 CG transmission opportunities through bitmap=[1 1 0]. The first, second, and third bits in the above bitmap are used to indicate 4 used transmission opportunities, 4 used transmission opportunities, and 2 unused transmission opportunities among the above 10 CG transmission opportunities, respectively. Through the above implementation, the bit overhead of the first indication information can be further reduced.

[0118] In another possible implementation where M2 is not an integer multiple of N2, the above first indication information indicates, through a bitmap, the CG transmission opportunities used and / or not used in the above partial CG transmission opportunities. One bit in the first (M2 mod N2) bits of the bitmap corresponds to ceil(M2 / N2) CG transmission opportunities in the partial CG transmission opportunities, and one bit in the other bits of the bitmap except the first (M2 mod N2) bits corresponds to floor(M2 / N2) CG transmission opportunities in the partial CG transmission opportunities. When one bit in the bitmap is "1" and "0", it indicates that the CG transmission opportunity corresponding to the one bit is used and not used respectively, or when one bit in the bitmap is "0" and "1", it indicates that the CG transmission opportunity corresponding to the one bit is used and not used respectively. ceil(.) is the ceiling function, floor(.) is the floor function, and mod is the modulo operation. For example, the number of partial CG transmission opportunities M2 = 10, the number of bits of the first indication information N2 = 3, and the first indication information indicates, through a bitmap = [1 1 0], the CG transmission opportunities used and not used in 10 CG transmission opportunities. The first, second, and third bits in the bitmap are used to indicate 4 used transmission opportunities, 3 used transmission opportunities, and 3 unused transmission opportunities in the 10 CG transmission opportunities respectively. Through the above implementation, the bit overhead of the first indication information can be further reduced.

[0119] In another possible implementation of the first configuration information, the first configuration information may further configure the time offset and the number of bits of the first indication information. Among them, the number of CG transmission opportunities included in the first time period determined according to the time offset is M3, and the number of bits of the first indication information is N3. If M3 < N3, the first indication information is used to indicate the CG transmission opportunities used and / or not used in the last M3 CG transmission opportunities in the CG cycle period. If M3 > N3, the first indication information is used to indicate the CG transmission opportunities used and / or not used in the last N3 CG transmission opportunities in the CG cycle period. Alternatively, if M3 < N3, the first indication information is used to indicate the CG transmission opportunities used and / or not used in the last N3 CG transmission opportunities in the CG cycle period. If M3 > N3, the first indication information is used to indicate the CG transmission opportunities used and / or not used in the last M3 CG transmission opportunities in the CG cycle period. The above implementation realizes the beneficial effect of effectively reducing the bit overhead of the first indication information in combination with the base station processing capability.

[0120] It can be understood that the embodiments of the present application are not limited to XR transmission services and video transmission services, and other services (such as periodic services) can also be applied equally.

[0121] Corresponding to the method provided in the above method embodiment, the present application embodiment also provides a corresponding device, including a module for executing the corresponding module of the above embodiment. The module can be software, hardware, or a combination of software and hardware.

[0122] Figure 18 provides a schematic diagram of the structure of a terminal. The terminal can be applied to the scenarios shown in Figures 1, 2, 3, 4 or 5. The terminal or the modules in the terminal can execute the aforementioned method 1200 and various possible implementation methods. For ease of explanation, Figure 18 only shows the main modules of the terminal. As shown in Figure 18, the terminal 1800 includes a processor, a memory, a control circuit, an antenna, and input and output devices. The processor is mainly used to process communication protocols and communication data, as well as to control the entire terminal, execute software programs, and process software program data. The memory is mainly used to store software programs and data. The radio frequency circuit is mainly used to convert baseband signals into radio frequency signals and process radio frequency signals. The antenna is mainly used to transmit and receive radio frequency signals in the form of electromagnetic waves. Input and output devices, such as a touch screen, a display screen, a keyboard, etc., are mainly used to receive data input by the user and output data to the user.

[0123] When the terminal is powered on, the processor reads the software program from the storage unit, parses and executes the instructions of the software program, and processes the data of the software program. When data needs to be sent wirelessly, the processor performs baseband processing on the data to be sent and outputs the baseband signal to the RF circuit. The RF circuit processes the baseband signal to obtain an RF signal and transmits the RF signal to the outside in the form of electromagnetic waves via the antenna. When data is sent to the terminal, the RF circuit receives the RF signal via the antenna, which is further converted into a baseband signal and output to the processor. The processor converts the baseband signal into data and processes the data.

[0124] For ease of explanation, FIG18 shows only one memory and processor. In an actual terminal, there may be multiple processors and memories. The memory may also be referred to as a storage medium or storage device, etc., which is not limited in the present embodiment.

[0125] As an optional implementation, the processor may include a baseband processor and a central processing unit (CPU). The baseband processor is primarily responsible for processing communication protocols and communication data, while the CPU is primarily responsible for controlling the entire terminal device, executing software programs, and processing data from software programs. The processor in Figure 18 integrates the functions of both the baseband processor and the CPU. Those skilled in the art will appreciate that the baseband processor and the CPU may also be independent processors interconnected via a bus or other technology. Those skilled in the art will appreciate that a terminal may include multiple baseband processors to accommodate different network standards, multiple CPUs to enhance its processing capabilities, and that the various modules of the terminal may be connected via various buses. The baseband processor may also be referred to as a baseband processing circuit or a baseband processing chip. The CPU may also be referred to as a central processing circuit or a central processing chip. The functionality for processing communication protocols and communication data may be built into the processor or stored as a software program in a storage unit, with the processor executing the software program to implement the baseband processing functionality.

[0126] In one example, the antenna and control circuitry with transceiver functions can be considered the transceiver unit 1811 of terminal 1800, and the processor with processing functions can be considered the processing unit 1812 of terminal 1800. As shown in Figure 18, terminal 1800 includes a transceiver unit 1811 and a processing unit 1812. The transceiver unit may also be referred to as a transceiver, a transceiver, a transceiver device, etc. Optionally, the device used to implement the receiving function in the transceiver unit 1811 may be considered a receiving unit, and the device used to implement the transmitting function in the transceiver unit 1811 may be considered a transmitting unit, i.e., the transceiver unit 1811 includes a receiving unit and a transmitting unit. For example, the receiving unit may also be referred to as a receiver, a receiver, a receiving circuit, etc., and the transmitting unit may be referred to as a transmitter, a transmitter, or a transmitting circuit, etc. Optionally, the receiving unit and the transmitting unit may be a single integrated unit or multiple independent units. The receiving unit and the transmitting unit may be located in a single geographic location or dispersed across multiple geographic locations. As shown in Figure 19, another embodiment of the present application provides an apparatus 1900. The apparatus may be a terminal or a module (e.g., an integrated circuit, a chip, etc.) applied to a terminal. Alternatively, the apparatus may be a radio access network device or a module (e.g., an integrated circuit, a chip, etc.) applied to a radio access network device, or a logical node, a logical module, or software that can implement all or part of the functions of the radio access network device. The apparatus may also be another communication module. For example, the apparatus 1900 may implement the functions of the radio access network device in method 1200 and various possible implementations, or the apparatus 1900 may implement the functions of the terminal in method 1200 and various possible implementations. The apparatus 1900 may include: an interface module 1901 (or referred to as an interface unit) and a processing module 1902 (or referred to as a processing unit), and may also include a storage module 1903 (or referred to as a storage unit).

[0127] In one possible design, one or more modules in FIG19 may be implemented by one or more processors, or by one or more processors and memories, or by one or more processors and transceivers, or by one or more processors, memories, and transceivers, although this is not limited in the present embodiment. The processors, memories, and transceivers may be provided separately or integrated.

[0128] The device has the function of implementing the terminal described in the embodiment of the present application. For example, the device includes a module or unit or means corresponding to the steps involved in the terminal described in the embodiment of the present application. The function or unit or means can be implemented by software, or by hardware, or by hardware executing the corresponding software implementation, or by a combination of software and hardware. For details, please refer to the corresponding description in the aforementioned corresponding method embodiment. Alternatively, the device has the function of implementing the wireless access network device described in the embodiment of the present application. For example, the device includes a module or unit or means corresponding to the steps involved in the wireless access network device described in the embodiment of the present application. The function or unit or means can be implemented by software, or by hardware, or by hardware executing the corresponding software implementation, or by a combination of software and hardware. For details, please refer to the corresponding description in the aforementioned corresponding method embodiment.

[0129] In one possible design, the device 1900 includes: an interface module 1901 and a processing module 1902. The device 1900 can be, for example, a terminal, or a module applied to the terminal (such as a processor, a chip, or a chip system, etc.), or a logical node, a logical module or software that can realize all or part of the terminal functions. The processing module 1902 is used to obtain the first configuration information, and the above-mentioned first configuration information is used to configure the scope of application of the first indication information. The scope of application of the above-mentioned first indication information is part of the CG transmission opportunities within the CG cycle period, and the first indication information is used to indicate the CG transmission opportunities used and / or not used in the above-mentioned part of the CG transmission opportunities. The interface module 1901 is used to send the above-mentioned first indication information.

[0130] In a possible implementation of the device 1900, the first configuration information configures a time offset, the partial CG transmission opportunity is within a first time period, and the start time of the first time period is related to the time offset.

[0131] In a possible implementation of the device 1900, the starting time of the above-mentioned first time period is after the sending time of the above-mentioned first indication information, the interval between the starting time of the first time period and the sending time of the first indication information is equal to the above-mentioned time offset, and the end time of the above-mentioned first time period is the end time of the above-mentioned CG cycle period or the end time of the last CG transmission opportunity in the CG cycle period.

[0132] In a possible implementation of the device 1900, the number of bits of the above-mentioned first indication information is N1, N1 is a positive integer, and the number of the above-mentioned partial CG transmission opportunities is M1, M1 is an integer greater than or equal to N1.

[0133] In one possible implementation of the apparatus 1900 , M1 is an integer multiple of N1.

[0134] In a possible implementation manner of the apparatus 1900, the first configuration information configures the number of bits N2 of the first indication information, where N2 is a positive integer.

[0135] In a possible implementation of the device 1900, the above-mentioned partial CG transmission opportunities are the last M2 CG transmission opportunities in the above-mentioned CG cycle period, and M2 is an integer greater than or equal to N2.

[0136] In one possible implementation of the apparatus 1900 , M2 is an integer multiple of N2.

[0137] In one possible design, the device 1900 includes: an interface module 1901 and a processing module 1902. The device 1900 can be, for example, a wireless access network device, or a module (such as a processor, a chip, or a chip system, etc.) applied to the wireless access network device, or a logical node, a logical module or software that can realize all or part of the functions of the wireless access network device. The interface module 1901 is used to send the first configuration information, and the above-mentioned first configuration information is used to configure the scope of application of the first indication information, and the scope of application of the above-mentioned first indication information is part of the CG transmission opportunities within the CG cycle period. The processing module 1902 is used to obtain the above-mentioned first indication information, and the first indication information is used to indicate the CG transmission opportunities used and / or not used in the above-mentioned part of the CG transmission opportunities.

[0138] In a possible implementation of the device 1900, the first configuration information configures a time offset, the partial CG transmission opportunity is within a first time period, and the start time of the first time period is related to the time offset.

[0139] In a possible implementation of the device 1900, the starting time of the above-mentioned first time period is after the sending time of the above-mentioned first indication information, the interval between the starting time of the first time period and the sending time of the first indication information is equal to the above-mentioned time offset, and the end time of the above-mentioned first time period is the end time of the above-mentioned CG cycle period or the end time of the last CG transmission opportunity in the CG cycle period.

[0140] In a possible implementation of the device 1900, the number of bits of the above-mentioned first indication information is N1, N1 is a positive integer, and the number of the above-mentioned partial CG transmission opportunities is M1, M1 is an integer greater than or equal to N1.

[0141] In one possible implementation of the apparatus 1900 , M1 is an integer multiple of N1.

[0142] In a possible implementation manner of the apparatus 1900, the first configuration information configures the number of bits N2 of the first indication information, where N2 is a positive integer.

[0143] In a possible implementation of the device 1900, the above-mentioned partial CG transmission opportunities are the last M2 CG transmission opportunities in the above-mentioned CG cycle period, and M2 is an integer greater than or equal to N2.

[0144] In one possible implementation of the apparatus 1900 , M2 is an integer multiple of N2.

[0145] It is understandable that the beneficial effects corresponding to the above-mentioned device 1900 and various possible implementations can be referred to the description in the aforementioned method embodiment or invention content, and will not be repeated here.

[0146] Optionally, the apparatus 1900 may further include a storage module 1903 for storing data or instructions (also referred to as code or program). The other modules may interact or couple with the storage module to implement the corresponding methods or functions. For example, the processing module 1902 may read the data or instructions in the storage module 1903 to enable the apparatus 1900 to implement the method in the above embodiment.

[0147] In one example, the module in the above-mentioned device can be one or more integrated circuits configured to implement the above method, such as: one or more application specific integrated circuits (ASICs), or one or more digital singnal processors (DSPs), or one or more field programmable gate arrays (FPGAs), or a combination of at least two of these integrated circuit forms. For another example, when the module in the device can be implemented in the form of a processing element scheduler, the processing element can be a general-purpose processor, such as a central processing unit (CPU) or other processor that can call a program. For another example, these units can be integrated together and implemented in the form of a system-on-a-chip (SOC).

[0148] Referring to Figure 20, a schematic diagram of a device provided in an embodiment of the present application is provided, which can be used to implement the above-mentioned method 1200 and various possible implementation methods. As shown in Figure 20, the device includes: a processor 2010 and an interface 2030, and the processor 2010 is coupled to the interface 2030. The interface 2030 is used to communicate with other modules or devices. The interface 2030 can be a transceiver or an input / output interface. The interface 2030 can be, for example, an interface circuit. Optionally, the device also includes a memory 2020 for storing instructions executed by the processor 2010 or storing input data required by the processor 2010 to execute instructions or storing data generated after the processor 2010 executes instructions.

[0149] The above method 1200 and various possible implementations can be implemented by the processor 2010 calling a program or instruction stored in the memory 2020. The memory 2020 can be inside the device or outside the device, and this application does not limit this.

[0150] Optionally, the functions / implementation processes of the interface module 1901 and the processing module 1902 in FIG19 may be implemented by the processor 2010 in the apparatus shown in FIG20. Alternatively, the functions / implementation processes of the processing module 1902 in FIG19 may be implemented by the processor 2010 in the apparatus shown in FIG20, and the functions / implementation processes of the interface module 1901 in FIG19 may be implemented by the interface 2030 in the apparatus shown in FIG20. Exemplarily, the functions / implementation processes of the interface module 1901 may be implemented by the processor calling program instructions in the memory to drive the interface 2030.

[0151] When the above-mentioned device is a chip applied to a terminal, the chip of the terminal implements the functions of the terminal in the above-mentioned method embodiment. The chip receives information from other modules in the terminal (such as a radio frequency module or antenna), and the information is from other terminals or wireless access network devices; or the chip sends information to other modules in the terminal (such as a radio frequency module or antenna), and the information is sent by the terminal to other terminals or wireless access network devices.

[0152] When the above-mentioned device is a chip applied to a wireless access network device, the chip implements the functions of the wireless access network device in the above-mentioned method embodiments. The chip receives information from other modules (such as a radio frequency module or antenna) in the wireless access network device, where the information comes from other wireless access network devices or terminals; or the chip sends information to other modules (such as a radio frequency module or antenna) in the wireless access network device, where the information comes from the wireless access network device to other wireless access network devices or terminals.

[0153] Those skilled in the art will understand that the various numerical numbers such as the first and second involved in this application are only for the convenience of description and are not used to limit the scope of the embodiments of the present application, and also indicate the order of precedence. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one" refers to one or more. At least two refers to two or more. "At least one", "any one" or similar expressions refer to any combination of these items, including any combination of single items (individuals) or plural items (individuals). For example, at least one item (individual, kind) of a, b, or c can represent: a, b, c, ab, ac, bc or abc, where a, b, c can be single or multiple. "Multiple" refers to two or more, and other quantifiers are similar.

[0154] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0155] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When software is used for implementation, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from a website, computer, server or data center to another website, computer, server or data center via a wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) method. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrations. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive (SSD)).

[0156] The steps of the method described in the embodiments of the present application can be directly embedded in hardware, a software unit executed by a processor, or a combination of the two. The software unit can be stored in a random access memory (RAM), a flash memory, a read-only memory (ROM), a register, a hard disk, a removable disk, or other storage media in any form in the art. Exemplarily, the storage medium can be connected to the processor so that the processor can read information from the storage medium and can write information to the storage medium. Alternatively, the storage medium can also be integrated into the processor. The processor and the storage medium can be arranged in an ASIC.

[0157] The present application also provides a computer-readable medium having a computer program stored thereon, which implements the functions of any of the above method embodiments when executed by a computer.

[0158] The present application also provides a computer program product that implements the functions of any of the above-mentioned method embodiments when executed by a computer. The same or similar parts between the various embodiments in this application can refer to each other. In the various embodiments in this application, and the various implementation methods / implementation methods / implementation methods in each embodiment, if there is no special explanation and logical conflict, the terms and / or descriptions between different embodiments and the various implementation methods / implementation methods / implementation methods in each embodiment are consistent and can be referenced to each other. The technical features in different embodiments and the various implementation methods / implementation methods / implementation methods in each embodiment can be combined to form new embodiments, implementation methods, implementation methods, or implementation methods according to their inherent logical relationships. The above-described implementation methods of the present application do not constitute a limitation on the scope of protection of this application.

[0159] The above is only a specific implementation method of the present application, but the scope of protection of the present application is not limited thereto. Any technician familiar with this technical field can easily think of changes or replacements within the technical scope disclosed in this application, which should be covered by the scope of protection of the present application.

Claims

1. A communication method, It is characterized in that include: Obtaining first configuration information, where the first configuration information is used to configure a scope of action of first indication information, where the scope of action of the first indication information is to configure some CG transmission opportunities within an authorized CG cycle period, and the first indication information is used to indicate CG transmission opportunities used and / or not used within the some CG transmission opportunities; Send the first indication information.

2. The method according to claim 1, It is characterized in that The first configuration information configures a time offset, the partial CG transmission opportunity is within a first time period, and the start time of the first time period is related to the time offset.

3. The method according to claim 2, It is characterized in that The starting time of the first time period is after the sending time of the first indication information, the interval between the starting time of the first time period and the sending time of the first indication information is equal to the time offset, and the end time of the first time period is the end time of the CG cycle time period or the end time of the last CG transmission opportunity in the CG cycle time period.

4. The method according to claim 2 or 3, It is characterized in that The number of bits of the first indication information is N1, where N1 is a positive integer, and the number of partial CG transmission opportunities is M1, where M1 is an integer greater than or equal to N1.

5. The method according to claim 4, It is characterized in that M1 is an integer multiple of N1.

6. The method according to claim 1, It is characterized in that The first configuration information configures the number of bits N2 of the first indication information, where N2 is a positive integer.

7. The method according to claim 6, It is characterized in that The partial CG transmission opportunities are the last M2 CG transmission opportunities in the CG cycle period, where M2 is an integer greater than or equal to N2.

8. The method according to claim 7, It is characterized in that M2 is an integer multiple of N2.

9. The method according to any one of claims 1 to 8, It is characterized in that The partial CG transmission opportunities are subsequent CG transmission opportunities except the CG transmission opportunity for sending the first indication information.

10. A communication method, It is characterized in that include: Sending first configuration information, where the first configuration information is used to configure the scope of action of the first indication information, where the scope of action of the first indication information is to configure some CG transmission opportunities within the authorized CG cycle period; Obtain the first indication information, where the first indication information is used to indicate the CG transmission timings used and / or not used in the partial CG transmission timings.

11. The method according to claim 10, It is characterized in that The first configuration information configures a time offset, the partial CG transmission opportunity is within a first time period, and the start time of the first time period is related to the time offset.

12. The method according to claim 11, It is characterized in that The starting time of the first time period is after the sending time of the first indication information, the interval between the starting time of the first time period and the sending time of the first indication information is equal to the time offset, and the end time of the first time period is the end time of the CG cycle time period or the end time of the last CG transmission opportunity in the CG cycle time period.

13. The method according to claim 11 or 12, It is characterized in that The number of bits of the first indication information is N1, where N1 is a positive integer, and the number of partial CG transmission opportunities is M1, where M1 is an integer greater than or equal to N1.

14. The method according to claim 13, It is characterized in that M1 is an integer multiple of N1.

15. The method according to claim 10, It is characterized in that The first configuration information configures the number of bits N2 of the first indication information, where N2 is a positive integer.

16. The method according to claim 15, It is characterized in that The partial CG transmission opportunities are the last M2 CG transmission opportunities in the CG cycle period, where M2 is an integer greater than or equal to N2.

17. The method according to claim 16, It is characterized in that M2 is an integer multiple of N2.

18. The method according to any one of claims 10 to 17, It is characterized in that The partial CG transmission opportunities are subsequent CG transmission opportunities except the CG transmission opportunities for obtaining the first indication information.

19. A communication device, It is characterized in that include: A processor, wherein the processor is coupled to a memory, wherein the memory is used to store programs or instructions, and when the programs or instructions are executed by the processor, the device executes the method according to any one of claims 1 to 9.

20. A communication device, It is characterized in that include: A processor, wherein the processor is coupled to a memory, wherein the memory is used to store programs or instructions, and when the programs or instructions are executed by the processor, the device executes the method according to any one of claims 10 to 18.

21. A computer-readable storage medium having stored thereon instructions, It is characterized in that When the instructions are executed, the method according to any one of claims 1 to 9 is executed, or the method according to any one of claims 10 to 18 is executed.

22. A computer program product, It is characterized in that The method comprises a computer program code, and when the computer program code is executed, the method according to any one of claims 1 to 9 is implemented, or the method according to any one of claims 10 to 18 is implemented.

Citation Information

Patent Citations

  • Method and device for determining transmission resources

    CN111770577A

  • Cancellation of transmission occasions

    US20210337586A1

  • Skipping semi persistent scheduling (SPS) or configured grant physical uplink shared channel (CG pusch) occasions

    US20220248446A1