Core catcher support frame (embodiments)

The truss-cantilever design with a water cooling circuit in MLDs addresses the structural integrity issues by providing effective convective cooling and thermal protection, ensuring the reliability and safety of the nuclear power plant during severe accidents.

WO2024237812A1PCT designated stage expired Publication Date: 2024-11-21JOINT CO ATOMENERGOPROEKT
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/RU2023/000406
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-15
Filing Date
2023-12-27
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

Existing melt localization devices (MLDs) face challenges in maintaining structural integrity during severe accidents, as the cantilever truss fails to withstand beyond design thermal loads, leading to potential damage and radiation exposure due to the inability to effectively cool the core melt and manage thermal radiation.

Method used

The implementation of a truss-cantilever design with a load-bearing frame and a water cooling circuit, comprising a collector, branch pipes, and spray devices, which redistributes cooling water to ensure effective convective cooling and thermal protection of the console truss and guide plate, preventing overheating and maintaining structural integrity under extreme conditions.

Benefits of technology

The solution enhances the reliability of MLDs by providing continuous cooling and thermal protection, reducing the impact of thermal radiation and aerosol release, thereby ensuring the structural integrity and safety of the nuclear power plant during severe accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure RU2023000406_21112024_PF_FP_ABST
    Figure RU2023000406_21112024_PF_FP_ABST
Patent Text Reader

Abstract

The invention relates to core catchers with a melt receiving and distributing vessel, and more particularly to mechanisms for maintaining the structural integrity of a core catcher in the event of a severe accident. The technical result of the claimed invention consists in improving the reliability of a core catcher by means of a water coolant loop that is formed by installing in the support frame a water collector, to which are linked water feed connecting pipes connected to water feed pipes, wherein butted into said connecting pipes from below are distributing connecting pipes with spraying devices on the ends thereof. In one embodiment, the support frame can have two water collectors installed therein.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] TRUST-CONSOLE OF THE MELT LOCALIZATION DEVICE (OPTIONS)

[0002] Field of technology •

[0003] An invention for melt localization devices (hereinafter referred to as MLD) equipped with a vessel for receiving and distributing the melt, in particular, for mechanisms that ensure the integrity of the MLD structure is maintained during severe accidents.

[0004] The greatest radiation hazard is posed by accidents involving core meltdown, which can occur with multiple failures of core cooling systems.

[0005] In such accidents, the melt of the active zone - corium, melting the internal structures of the reactor and the reactor vessel, flows beyond its limits, and due to the residual heat remaining in it, can damage the integrity of the sealed shell of the nuclear power plant - the last barrier to the release of radioactive products into the environment.

[0006] To avoid this, it is necessary to localize the active zone melt (corium) leaking from the reactor vessel and ensure its continuous cooling until complete crystallization. This function is performed by a melt localization device, which prevents damage to the sealed shell of the NPP and thereby protects the population and the environment from radiation exposure during severe accidents at nuclear reactors.

[0007] Known designs of the molten core catcher intended for localization and cooling of the melt, as a rule, contain the following main elements: a guide device installed on a special support element - a cantilever truss, a housing with a filler made of sacrificial materials. In addition, various communication systems (sensors of control and measuring instruments, corium irrigation channels, steam removal channels, etc.) are connected to the molten core catcher, ensuring the functioning of the molten core catcher in severe accident conditions. The cantilever truss protects the housing, internal communications of the molten core catcher from destruction by the corium and serves as a support for the guide plate, which transmits static and dynamic effects to the cantilever truss secured in the reactor shaft. The cantilever truss also ensures the operability of the guide plate in the event of its destruction.

[0008] Prior art

[0009] A cantilever truss [1, 2, 3, 4] of the CCR is known, containing parallel and radial force ribs, external, middle and internal shells, an upper force plate and a lower force plate, forming internal and external sectors in which cover pipes are made, providing for the connection of control and measuring instrument (CMI) sensors, corium irrigation channels (a collector with distribution pipelines), providing for the supply of cooling water from external sources, which enters through the cantilever truss from above onto the corium, channels for the removal of steam, providing for the removal of steam from the sub-reactor room of the concrete shaft into the containment zone at the stage of corium cooling in the CCR body, channels for the supply of air, providing for the supply of air for cooling the guide plate during normal operation.

[0010] The disadvantage of the cantilever truss is that it cannot withstand the design thermal load that occurs when there is no cooling of the free surface of the core melt (melt mirror) inside the reactor core catcher housing. For the supporting elements of the cantilever truss and the elements of the cantilever truss fastening in the reactor shaft, these effects are especially destructive during prolonged exposure of the cantilever truss to high temperatures.

[0011] Disclosure of the invention The technical result of the claimed invention consists in increasing the reliability of the melt localization device.

[0012] The tasks that the claimed invention is aimed at solving are the following: ensuring, in the event of beyond design basis accidents, the supply of water to the space inside the molten core catcher housing to reduce the temperature of the steam-gas mixture and ensure convective cooling of the molten core catcher equipment located above the melt mirror; ensuring, in the event of beyond design basis accidents, the supply of water to the surface of the melt to reduce the impact of thermal radiation from the melt mirror on the molten core catcher equipment located above and to stop the release of aerosols.

[0013] The stated problem is solved by implementing the following variants of the invention.

[0014] Option 1.

[0015] In accordance with the first variant, the truss-cantilever of the melt localization device, containing a load-bearing frame, consisting of parallel and radial load-bearing ribs (1), (2), outer, middle and inner shells (3), (4), (5), an upper load-bearing plate (6) and a lower load-bearing plate (7), forming outer parallel first, second, third and fourth sectors (8), (9), (10), (11), inner parallel first, second, third and fourth sectors (12), (13), (14), (15) and radial sectors (16) located between them in such a way that the parallel first outer and first inner sectors (8), (12) lie on the same Cartesian axis with the parallel third outer and third inner sectors (10), (14) and are perpendicular to the axis on which the parallel second outer and second inner sectors (9), (13) lie, as well as the parallel fourth outer and fourth inner sectors (11), (15), according to the invention additionally comprises a collector (17) of Fig.1, passing from the radial ribs of the outer radial sectors (16a), (166), adjacent to the first parallel outer sector (8), through the outer parallel second, third and fourth sectors (9), (10), (11), as well as the outer radial sectors (16), the first and second branches (18a), (186) of Fig. 1, passing through the outer power shell (3) and intended for connecting the collector (17) with the pipelines (19), the distance from the first branch pipe (18a) to one end of the collector (17) is less than the distance from the second branch pipe (186) to the other end of the said collector (17), the dispensing branches (20) of Fig. 2, Fig. 3, connected from below to the collector (17) and passing from it through the middle power shell (4), the spray devices (21) of Fig. 2, Fig.3 located in some internal radial sectors and connected to the distributing pipes (20), wherein the external parallel first sector (8) and the internal parallel first sector (12) are empty, and the remaining external and internal parallel and radial sectors are filled with protective concrete (22).

[0016] Additionally, in the truss-console, according to the invention, on the outer side of the outer power shell (3) support legs (23) with anchor ribs (24) are installed, which makes it possible to increase the reliability of fastening the truss-console to the reactor shaft.

[0017] In accordance with the first variant, an essential feature of the claimed invention is the use in the truss-console of a collector (17) with pipes (18), (20), pipelines (19), spray devices (21) connected to it, which makes it possible to form a single water cooling circuit, which, due to the hydrostatic supply of cooling water from external systems, ensures its redistribution within a single collector (17), regardless of the difference in the flow rates of cooling water in each of the pipes (18), ensures effective water, steam-water and steam-gas cooling. 1truss-console, guide plate, thermal protection of the housing flange and melt mirror during the process of localization of the melt in the casing of the melt control rod, preventing overheating of the truss-console and guide plate, ensuring their strength and resistance to external influences under conditions of direct exposure to thermal radiation from the melt mirror and improving the outflow of heat from the hot areas of the power frame and protective concrete of the truss-console during long-term heating.

[0018] In addition, if the water supply valves fail, the water cooling circuit formed by the manifold (17) of Fig. 1 with the pipes (18) of Fig. 1, (20) of Fig. 2 connected to it, the pipelines (19) of Fig. 1, the spray devices (21) of Fig. 1, allows for effective water cooling of the melt mirror with water supplied from the pipes (18) to the manifold (17), through which the water is redistributed to the pipes (20) of Fig. 2, Fig. 3, from which, through the spray devices (21) of Fig. 2, Fig. 3, it directly or indirectly enters the steam-gas medium located above the melt mirror.

[0019] In addition, the water cooling circuit formed by the manifold (17) with the pipes (18), (20), pipelines (19), and spray devices (21) connected to it ensures a reduction and equalization of the temperature of the truss-console, the guide plate, and the flange of the CCLR body, a reduction in the temperature of the slag cap and crust located on the surface of the melt, a reduction in the temperature of the steam-gas environment located above the surface of the melt, which leads to cooling of the bottom of the nuclear reactor body and the surrounding elements of the reactor shaft equipment.

[0020] In addition, the water cooling circuit formed by the manifold (17) with the pipes (18), (20), pipelines (19), and spray devices (21) connected to it provides additional cooling of the cantilever truss due to heat flows through the elements of the cantilever truss and through the protective concrete to the elements forming the said circuit. Option 2.

[0021] According to the second variant, the truss-cantilever of the melt localization device, containing a load-bearing frame consisting of parallel and radial load-bearing ribs (1), (2), outer, middle and inner shells (3), (4), (5), an upper load-bearing plate (6) and a lower load-bearing plate (7), forming outer parallel first, second, third and fourth sectors (8), (9), (10), (11), inner parallel first, second, third and fourth sectors (12), (13), (14), (15) and radial sectors (16) located between them in such a way that the parallel first outer and first inner sectors (8), (12) lie on the same Cartesian axis with the parallel third outer and third inner sectors (10), (14) and are perpendicular to the axis on which the parallel second outer and second inner sectors (9), (13) lie, as well as the parallel fourth outer and fourth inner sectors (I), (15), according to the invention, additionally comprises first collector (17a) Fig. 4,passing from the radial edge of the outer radial sector (16a) adjacent to the first parallel outer sector (8), through the outer second parallel sector (9), to the radial edge of the outer radial sector (16b) adjacent to the third parallel outer sector (10), the first branch pipe (18a) of Fig. 5, passing through the outer power shell (3) and intended for connection with the first pipeline (19a) of Fig. 5 in such a way that the distance from the first branch pipe (18a) to one end of the first manifold (17a) is less than the distance to its other end, the second manifold (176) of Fig. 4, passing from the radial rib of the outer radial sector (166), adjacent to the first parallel outer sector (8), through the outer fourth parallel sector (11), to the radial rib of the outer radial sector (16g), adjacent to the third parallel outer sector (10), the second branch pipe (186) of Fig. 5,passing through the outer power shell (3) and intended for connection with the second pipeline (196) Fig. 5 in such a way that the distance from the second branch pipe (186) to one end of the second collector (176) is less than the distance to its other end, the dispensing branches (20) Fig. 2, Fig. 3, connected from below to the first and second collectors (17a), (176) and passing from them through the middle power shell (4), the spray devices (21) Fig. 2, Fig. 3, located in some internal radial sectors and connected to the dispensing branches (20), the external parallel first and third sectors (8), (10), the internal parallel first and third sectors (12), (14) are made empty, and the remaining external and internal parallel and radial sectors are filled with protective concrete (22).,

[0022] Additionally, in the truss-console, according to the invention, on the outer side of the outer power shell (3) support legs (23) with anchor ribs (24) are installed, which makes it possible to increase the reliability of fastening the truss-console to the reactor shaft.

[0023] According to the second variant, an essential feature of the claimed invention is the use in the cantilever truss of the first collector (17a) of Fig. 4 with the first branch pipe (18a) of Fig. 5, connected to the first pipeline (19a) of Fig. 5 in such a way that the distance from the first branch pipe (18a) to one end of the first collector (17a) is less than the distance to its other end, and the use of the second collector (176) of Fig. 4 with the second branch pipe (186) of Fig. 5, connected to the second pipeline (196) of Fig. 5 in such a way that the distance from the second branch pipe (186) to one end of the second collector (176) is less than the distance to its other end. The first (17a) and second (176) independent collectors are connected to the branches (20) of Fig. 2, Fig. 3, with spray devices (21) of Fig. 2, Fig.3, which allows to form two independent water cooling circuits, which, due to the hydrostatic supply of cooling water from external systems, provide independent from each other effective water, steam-water and steam-gas cooling of the truss-console, guide plate, thermal protection of the housing flange and the melt mirror during the process of localization of the melt in the molten core catcher housing, preventing overheating of the truss-console and guide plate, ensuring their strength and resistance to external influences under conditions of direct exposure to thermal radiation from the melt mirror and improving the outflow of heat from the hot areas of the power frame and protective concrete of the truss-console during long-term heating.

[0024] In addition, if the water supply valves fail, the water cooling circuit formed by the manifolds (17a) and (176) of Fig. 5 with the pipes (18a), (186) of Fig. 5 connected thereto and the pipes (20) of Fig. 2, Fig. 3, the pipelines (19a), (196) of Fig. 5, the spray devices (21) of Fig. 2, Fig. 3, makes it possible to ensure effective water cooling of the melt mirror with water supplied from the pipes (18a), (186) to the manifolds (17a), (176), through which the water is redistributed to the pipes (20), from which, through the spray devices (21), it directly or indirectly enters the steam-gas medium located above the melt mirror.

[0025] In addition, the water cooling circuit formed by means of collectors (17a), (176) with pipes (18a), (186), (20) connected to them, pipelines (19a), (196), spray devices (21), ensures a decrease and equalization of the temperature of the truss-console, the guide plate and the flange of the molten core catcher body, a decrease in the temperature of the slag cap and crust located on the surface of the melt, a decrease in the temperature of the steam-gas medium located above the surface of the melt, which leads to cooling of the bottom of the nuclear reactor body and the surrounding elements of the reactor shaft equipment.

[0026] In addition, the water cooling circuit formed by collectors (17a), (176) with pipes (18a), (186), (20), pipelines (19a), (196), and spray devices (21) connected to it provides additional cooling of the cantilever truss due to heat flows through the elements of the cantilever truss and through the protective concrete to the elements that form the said circuit.

[0027] Brief description of the drawings

[0028] Fig. 1 shows a melt localization device with a cantilever truss, made in accordance with the claimed invention.

[0029] Fig. 2a shows a cantilever truss (without the upper force plate) of a melt localization device with elements of a water cooling circuit, made in accordance with the claimed invention.

[0030] Fig. 26 shows a part of the cantilever truss with an upper load plate.

[0031] Fig. 3 shows a sectional view of a part of a cantilever truss (without the upper load plate), made in accordance with the claimed invention.

[0032] Fig. 4 shows a top view of a cantilever truss with two collectors.

[0033] Fig. 5a shows a part of a cantilever truss with two collectors with a place for installing one of the pipes in the first collector.

[0034] Fig. 56 shows a part of a cantilever truss with two collectors with a place for installing one of the pipes into the second collector.

[0035] Fig. 6 shows a general view of the melt localization device.

[0036] Embodiments of the invention

[0037] As shown in Fig. 1-6, the melt localization device comprises a guide plate (25) installed under the body (26) of the nuclear reactor and supported by a cantilever truss (27). Under the cantilever truss (27) a body (28) of the LMCR with a filler (29) for receiving and distributing the melt is installed. In the upper part of the body (28) of the LMCR a flange (30) is made, provided with thermal protection (31). The filler (29) consists of several cassettes (32) installed on top of each other, each of which contains one central and several peripheral openings (33). In the area between the upper cassette (32) and the flange (30) of the body (28) of the LMCR along the perimeter of the body (28) of the LMCR water supply valves (34) are located. The cantilever truss (27) contains a power frame, which consists of radial power ribs (2) (Fig. 2, 3), parallel power ribs (1), an outer power shell (3), an inner power shell (4), a middle power shell (5), an upper power plate (6) (Fig. 1), and a lower power plate (7).A water cooling circuit is formed inside the console truss (27), consisting of a manifold (17) (Fig. 2) with pipes (18), (20), pipelines (19), and spray devices (21) connected to it. Support legs (23) (Fig. 4) with anchor ribs (24) are installed on the outside of the outer power shell (16).

[0038] The truss-console of the melt localization device operates as follows.

[0039] As a result of direct interaction with the active zone melt and under the influence of thermal radiation from the melt mirror, a temperature gradient is established inside the truss-console (27), which leads to heat flows through the elements of the power frame of the truss-console (27). Improvement of heat outflow from hot areas of the power frame and protective concrete (22) during long-term heating is ensured by means of a water cooling circuit formed from a manifold (17) with pipes (18), (20), pipelines (19), spray devices (21) connected to it, which performs its functions in the following modes: mode 1 - in case of beyond design basis accidents in case of failure to open the water supply valves (34), but after completion of the following processes: cessation of the flow of core melt from the vessel (26) of the nuclear reactor into the filler (29), dissolution of the main mass of the filler (29) in the melt, completion of the inversion of the oxide and metallic components of the melt in the vessel (28) of the core catcher;mode 2 - in case of beyond design basis accidents after opening of water supply valves (34) at the stage of core melt cooling in the molten core catcher housing (28) in the mode of convective heat and mass transfer of steam and droplet medium between the reactor shaft (35) and the internal volume of the molten core catcher housing (28) under conditions of the cooling water level in the reactor shaft (35) being below the level of the water supply valves (34); mode 3 - in case of beyond design basis accidents after opening of water supply valves (34) at the stage of core melt cooling in the molten core catcher housing (28) in the mode of cooling water flow from the reactor shaft (35) into the internal volume of the molten core catcher housing (28) under conditions of the cooling water level in the reactor shaft (35) being above the level of the water supply valves (34).

[0040] In mode 1, under conditions of a beyond design basis accident, with failure to open the water supply valves (34), but after the cessation of the flow of core melt from the reactor vessel (26) into the filler (29), dissolution of the bulk of the filler (29) in the melt, completion of the inversion of the oxide and metallic components of the melt in the reactor catcher vessel (28), the following processes occur. After the formation of the melt mirror in the reactor catcher vessel (28), radiant heat flows begin to exert a thermal effect on the equipment of the nuclear reactor core melt localization and cooling system. Radiant heat flows from the melt mirror heat the thermal protection (31) of the flange (30) of the reactor catcher vessel (28) and the cantilever truss (27). The steam-gas medium located above the melt mirror heats up and rises upward to the bottom of the reactor vessel (26).Heating of the steam-gas medium occurs not only from the melt mirror, but also from the thermal protection (31) of the flange (30) of the casing (28) of the core catcher, the truss-console (27) and the guide plate (25). The heat released by the core melt increases the speed of convective flows of the steam-gas mixture between the guide plate (25), the casing (26) of the nuclear reactor. Under the action of convective heat flows, the lower force plate (7) of the truss-console (27) is heated and heat exchange processes in the spray devices (21) increase. The steam-gas mixture, heating up in the spray devices (21), enters the collector (17) of Fig. 1, Fig. 5 through the distribution pipes (20). The pipes (18) of Fig. 1, Fig. 5 connected to the water collector (17) are connected to the water collector (17).5 are cut off from external water supply systems, therefore the steam-gas mixture, circulating in the collector (17) and distribution pipes (20), equalizes its temperature in accordance with the temperature of the walls of the collector (17) and distribution pipes (20), which transfer heat through a layer of protective concrete (22) to the lower force plate (7), cooled by water or a steam-water mixture circulating in the shaft (35) of the reactor.

[0041] During the first supply of water from external systems to the branch pipes (18), water mixes with steam, resulting in rapid condensation of steam and a sharp drop in local pressure inside the branch pipe (18). Steam from the collector (17) begins to flow into the branch pipe (18), increasing the pressure in it, which leads to a decrease in the flow rate of water entering the branch pipe (18), up to a temporary cessation of flow.

[0042] From the branch pipe (18), the cooling water begins to flow into the collector (17) filled with a steam-gas mixture. Moving along the collector (17), the water flow condenses the steam and accelerates, forming a shock wave front. Two fronts, moving from one point in the collector (17) in opposite directions towards each other, will meet on the opposite side of the said collector (17). The result of the meeting is a hydraulic hammer in accordance with the interference pattern of the interaction. A more complex pattern is observed with the simultaneous flow of water into the collector (17) from two or more branch pipes (18). The following measures are taken to reduce the amplitude of self-oscillations and reduce their destructive force: in variant 1 of Fig. 1, the collector (17) is made open, which eliminates a direct head-on collision of shock waves moving towards each other and softens the subsequent head-on collision of reflected shock waves moving in the opposite direction; in variant 2 of Fig.4, 5 collectors (17a), (176) are made open, which excludes a direct head-on collision of shock waves moving towards each other and softens the subsequent head-on collision of reflected shock waves moving in the opposite direction; in variant 1 of Fig. 1, pipes (18a), (186) are cut asymmetrically into the collector (17), relative to the location of its end walls, which are made up of radial ribs of the outer radial sectors (16a), (166), in such a way that the distance from one end wall to the first pipe (18a) is not equal to the distance from the other end wall to the second pipe (186). Thus, for each of the receiving pipes (18a) and (186), the distance to the end walls of the collector (17) will be different. This allows for a spatial displacement of the maximum impact effects relative to the position of the pipes (18a) and (186); in variant 2 of Fig.4, 5 branch pipes (18a), (186) are cut asymmetrically into the collectors (17a), (176) relative to the location of the end walls of the collectors (17a), (176), which are the radial ribs of the outer radial sectors (16a), (166), (16b), (16d), in such a way that the distance from one end wall to the first branch pipe (18a) is not equal to the distance from it to the other end wall, and the distance from one end wall to the second branch pipe (186) is not equal to the distance from it to the other end wall. Thus, for each of the receiving branch pipes (18a) and (186), the distance to the end walls of the collectors (17a), (176) will be different.This makes it possible to ensure a spatial displacement of the maximum shock effects relative to the position of the branch pipe (18a) in the collector (17a) and relative to the position of the branch pipe (186) in the collector (176); inside the truss-console (27), the elements (17), (18), (20), (21), forming the water cooling circuit, are filled with protective concrete (22) on the outside, ensuring their integrity during hydraulic shocks and vibrations; in variant 1 of Fig. 1, the dispensing branches (20) are cut into the collector (17) from below, which reduces the flow of the steam-gas mixture into the collector (17) during the movement of shock waves and ensures the removal of water through the dispensing branches (20), which leads to a weakening of the shock condensation waves and the damping or significant weakening of the self-oscillations of the cooling water inside the collector (17). in variant 2 of Fig.4, 5 dispensing pipes (20) are cut into the bottom of the collectors (17a), (176), which reduces the flow of steam-gas mixture into the collectors (17a), (176) during the movement of shock waves and ensures the removal of water through the dispensing pipes (20), which leads to the weakening of shock condensation waves and the damping or significant weakening of self-oscillations of the cooling water inside the collector (17).

[0043] From the manifold (17) in variant 1 and from the manifolds (17a), (176) in variant 2, the cooling water enters the dispensing pipes (20), located radially with approximately the same azimuthal step. The initial supply of cooling water is accompanied by boiling and temporary blocking of the water flow in the dispensing pipes (20), but as the walls of the dispensing pipes (20) cool and the steam-gas mixture located inside the dispensing pipes (20) cools, the cooling water flow stabilizes and becomes stable.

[0044] From the branch pipes (20), first the steam-water mixture, and then the water, begin to flow into the spray devices (21), in which, due to hydrodynamic swirls, the cooling water is sprayed and its drop-jet gravity-free (gravitational) movement downwards occurs. The flow of cooling water from the water cooling circuit formed from the manifold (17) in variant 1 and from the manifolds (17a), (176) in variant 2 with connected branch pipes (18), distributing branch pipes (20), pipelines (19), spray devices (21), onto the melt mirror is accompanied by steam-water cooling of the slag cap and a thin crust on the melt surface. The incoming water from the formed water cooling circuit quickly reduces the temperature of the steam-gas medium above the melt mirror. The water-cooled crust above the melt mirror is stabilized.The temperature of the thermal protection (31) of the flange (30) of the casing (28) of the CCLR, the temperature of the cantilever truss (27) and the guide plate (25) gradually decreases and is established close to the temperature of saturated steam. During this period, a water level appears on the crust of the melt. The mass of the boiling water becomes less than the mass of the water entering from the water cooling circuit into the inner space of the casing (28) of the CCLR. This process ends with the formation of a water level inside the casing (28) of the CCLR. Saturated steam from the casing (28) of the CCLR rises upward and, having reached the inner space limited by the inner load shell (5) of the cantilever truss (27), moves in two ways: the first way - inside the casing (26) of the nuclear reactor and then into the sealed shell outside the shaft (35) of the reactor; the second way - along the outer surface of the casing (26) of the nuclear reactor outside the shaft (35) of the reactor into the sealed shell.

[0045] Having reached a sealed volume, the steam-gas mixture expands and cools.

[0046] In mode 2, under conditions of a beyond design basis accident after opening the water supply valves (34) at the stage of core melt cooling in the reactor core catcher vessel (28) in the mode of convective heat and mass transfer of the steam-droplet medium between the reactor shaft (35) and the internal volume of the reactor core catcher vessel (28), under conditions of the cooling water level in the reactor shaft (35) being below the level of the water supply valves (34), the following processes occur. When the water supply valves (34) are triggered to open under conditions of a low water level in the reactor shaft (35), the cooling of the outer surface of the reactor core catcher vessel (28) may be disrupted, leading to its overheating. To eliminate this phenomenon, it is necessary to increase the cooling water level in the reactor shaft (35).For this purpose, cooling water from internal sources or from the outside of the sealed shell, for example, from fire engines, is fed through pipes (18) to the manifold (17) in variant 1 and to the manifolds (17a), (176) in variant 2, from where it enters the body (28) of the nuclear reactor catcher through the distributing pipes (20) and spray devices (21). The temperature inside the body (28) of the nuclear reactor catcher is stabilized, saturated steam from the body (28) of the nuclear reactor catcher rises upward and, having reached the internal space limited by the internal power shell (5) of the truss-console, moves in two ways: the first way - inside the body (26) of the nuclear reactor and then into the sealed shell outside the shaft (35) of the reactor; the second way - along the outer surface of the body (26) of the nuclear reactor outside the shaft (35) of the reactor into the sealed shell.

[0047] As the melt mirror cools, the water level inside the casing (28) of the CLR gradually increases and reaches the water supply valves (34) located in the casing (28) of the CLR. Through the previously opened water supply valves (34), the cooling water flows into the shaft (35) of the reactor, increasing the water level in it. This process continues until the water levels in the shaft (35) of the reactor and inside the casing (28) of the CLR are equalized.

[0048] In mode 3, under conditions of a beyond design basis accident, after opening the water supply valves (34) at the stage of core melt cooling in the molten core catcher vessel (28), in the mode of cooling water supply from the reactor shaft (35) to the internal volume of the molten core catcher vessel (28), under conditions of the position of the cooling water level in the reactor shaft (35) above the level of the water supply valves (34), the following processes occur. Steam-water cooling of the slag cap and thin crust on the surface of the melt begins. Water supplied from the water supply valves (34) quickly reduces the temperature of the steam-gas environment above the melt mirror. The water-cooled crust above the melt mirror is stabilized. The temperature of the thermal protection (31) of the flange (30) of the molten core catcher vessel (29), the temperature of the truss-console (27) and the guide plate (25) gradually decreases and is established close to the saturated steam temperature. During this period, a water level appears on the melt crust.The mass of boiling water becomes less than the mass of water coming from the reactor shaft (35) through the open water supply valves (34) into the inner space of the reactor core catcher body (28). This process ends with the equalization of the water levels in the reactor shaft (35) and inside the reactor core catcher body (28).

[0049] Saturated steam from the casing (28) of the nuclear reactor core extractor rises upward and, having reached the internal space limited by the internal power shell (5) of the cantilever truss, moves in two ways: the first way - inside the casing (26) of the nuclear reactor and then into the hermetic shell outside the shaft (35) of the reactor; the second way - along the outer surface of the casing (26) of the nuclear reactor outside the shaft (35) of the reactor into the hermetic shell.

[0050] During intensive steam formation at the initial stage of cooling the surface of the melt after the valves (34) for supplying water inside the body (28) of the CCR are activated, an increase in pressure occurs relative to the pressure of saturated steam in the shaft (35) of the reactor, generated by boiling water around the outer surface of the body (28) of the CCR.

[0051] The reactor shaft (35) and the internal volume of the reactor core body (28) form a hydraulic circuit connected by hydraulic channels in the reactor core body (28).

[0052] The hydraulic circuit "reactor shaft (35) - internal volume of the casing (28) of the UL" has a negative feedback, leading to the attenuation of pressure fluctuations during rapid steam formation on the surface of the melt inside the casing (28) of the UL. Such a hydraulic circuit operates as follows. As soon as the pressure in the internal space of the casing (28) of the UL becomes greater than the pressure in the shaft (35) of the reactor, then the flow of water from the shaft (35) of the reactor through the valves (34) for supplying water to the internal space of the casing (28) of the UL stops or becomes negative: water is squeezed out by increased pressure from the casing (28) of the UL into the shaft (35) of the reactor. The formation of steam on the surface of the melt decreases, and the steam enters the sealed shell outside the reactor shaft (35) through channels located inside the nuclear reactor vessel (26) and along the outer surface of the nuclear reactor vessel (26), equalizing the pressure inside and outside the reactor vessel (28).The rate of pressure equalization is determined by the rate of steam evacuation through the channels inside the nuclear reactor vessel (26) and along the outer surface of the nuclear reactor vessel (26) into the sealed shell. If the evacuation of steam from the inner space of the vessel (28) of the LLRC is significantly hampered in these directions, then the pressure of saturated steam inside the vessel (28) of the LLRC will increase. Draining water from the vessel (28) of the LLRC will lead to a decrease in steam formation above the surface of the melt, which will lead to a decrease in pressure in the hydraulic circuit "reactor shaft (35) - inner volume of the vessel (28) of the LLRC".After equalizing the pressure in the reactor shaft (35) and inside the casing (28) of the UL, the water level inside the casing (28) of the UL begins to rise again - water begins to flow from the reactor shaft (35) into the casing (28) of the UL, inside which the process of steam formation begins with an increase in pressure, this leads to the fact that the processes in the hydraulic circuit "reactor shaft (35) - internal volume of the casing (28) of the UL" can be repeated cyclically several times until the cooling of the melt surface inside the casing (28) of the UL is completed.

[0053] The supply of cooling water from the water cooling circuit into the reactor core catcher housing (28) somewhat accelerates the cooling of the melt localization device equipment located above the melt crust, but does not change the fundamental picture. Additional water increases the volume of water above the melt crust, but this additional volume is redistributed according to the law of equalizing vessels through the flow sections of the opened water supply valves (34) between the reactor core catcher shaft (35) and the internal volume of the reactor core catcher housing (28). Consequently, the water level in the reactor core catcher housing (28), taking into account the return of condensate from the sealed shell, will gradually increase: as water enters the reactor core catcher housing (28) from the water cooling circuit and vaporization decreases both above the melt crust and along the outer surface of the reactor core catcher housing (28) in the reactor core catcher shaft (35); as residual energy releases decrease and the melt cools overall.

[0054] This process can be somewhat changed by the absence of condensate return to the reactor shaft (35) from the sealed volume, which is possible in the absence of heat transfer from the sealed volume to the environment, but, in principle, the absence of returned condensate from the sealed volume cannot affect the process of melt cooling during 24 hours of water entering the reactor core catcher housing (28) from the water cooling circuit, unless the sealed shell is depressurized with a subsequent pressure drop to atmospheric. But even under these conditions, when water is supplied from the water cooling circuit into the reactor core catcher housing (28), the stability of melt cooling, both from the outer surface of the reactor core catcher housing (28) and from the melt crust, will be ensured, provided that at least one water supply valve (34) is triggered to open and the condition of equalizing the water levels in the reactor shaft (35) and inside the reactor core catcher housing (28) is met.

[0055] The elements of the power frame of the cantilever truss (27), namely, parallel power ribs (1), radial power ribs (2), outer, middle and inner power shells (3), (4), (5), as well as the upper and lower power plates (6), (7) can be made of grade 09G2S steel.

[0056] The diameter of the inner power shell (5) is 5.1 m. The diameter of the middle power shell (4) is 5.9 m.

[0057] The diameter of the outer power shell (3) is 9.2 m.

[0058] The height of the cantilever truss (27) is 2 m.

[0059] Thus, the use of a melt localization device in the console truss of the collector (17) in variant 1 and collectors (17a), (176) in variant 2 with connected pipes (18), distributing pipes (20), pipelines (19), spray devices (21), forming a water cooling circuit, makes it possible to increase the reliability of the melt localization device by ensuring, in the event of beyond design basis accidents, the supply of water to the space inside the molten core catcher housing to reduce the temperature of the steam-gas mixture and ensure convective cooling of the equipment.

[0060] The CLR located above the melt mirror, as well as ensuring, in the event of beyond design basis accidents, the supply of water to the surface of the melt to reduce the impact of thermal radiation from the melt mirror on the CLR equipment located above and to stop the release of aerosols.

[0061] Sources of information:

[0062] 1. Russian Federation Patent No. 2576517, IPC G21C 9 / 016, priority dated 16.12.2014;

[0063] 2. Russian Federation Patent No. 2576516, IPC G21C 9 / 016, priority dated 16.12.2014;

[0064] 3. Russian Federation Patent No. 2575878, IPC G21C 9 / 016, priority dated 16.12.2014;

[0065] 4. Melt localization device for NPPs with WWER-1200, I.A. Sidorov, 7th Scientific and Technical Complex “Ensuring Safety of NPPs with WWER”, OKB “GIDROPRESS”, Russia, May 17-20, 2011;

[0066] 5. Russian Federation Patent No. 2742583, IPC G21C 9 / 016, priority dated 18.03.2020.

Claims

Invention formula 1. A truss-console of a melt localization device, containing a load-bearing frame consisting of parallel and radial load-bearing ribs (1), (2), outer, middle and inner shells (3), (4), (5), an upper load-bearing plate (6) and a lower load-bearing plate (7), forming outer parallel first, second, third and fourth sectors (8), (9), (10), (11), inner parallel first, second, third and fourth sectors (12), (13), (14), (15) and radial sectors (16) located between them in such a way that the parallel first outer and first inner sectors (8), (12) lie on the same Cartesian axis with the parallel third outer and third inner sectors (10), (14) and are perpendicular to the axis on which the parallel second outer and second inner sectors (9), (13) lie, as well as the parallel fourth outer and fourth inner sectors (I), (15), characterized in that it additionally contains collector (17) passing from the radial ribs of the outer radial sectors (16a), (166),adjacent to the first parallel outer sector (8), through the outer parallel second, third and fourth sectors (9), (10), (11), as well as the outer radial sectors (16), the first and second branch pipes (18a), (186) passing through the outer power shell (3) and intended for connecting the collector (17) with the pipelines (19), the distance from the first branch pipe (18a) to one end of the collector (17) is less than the distance from the second branch pipe (186) to the other end of the said collector (17), dispensing branch pipes (20) connected from below to the collector (17) and passing from it through the middle power shell (4), spraying devices (21) located in some of the inner radial sectors and connected to the dispensing branch pipes (20), wherein the outer parallel first sector (8) and the inner parallel first sector (12) are made empty, and the remaining outer and inner parallel and radial sectors are filled with protective concrete (22)., 2. A truss-console of a melt localization device, containing a load-bearing frame consisting of parallel and radial load-bearing ribs (1), (2), outer, middle and inner shells (3), (4), (5), an upper load-bearing plate (6) and a lower load-bearing plate (7), forming outer parallel first, second, third and fourth sectors (8), (9), (10), (11), inner parallel first, second, third and fourth sectors (12), (13), (14), (15) and radial sectors (16) located between them in such a way that the parallel first outer and first inner sectors (8), (12) lie on the same Cartesian axis with the parallel third outer and third inner sectors (10), (14) and are perpendicular to the axis on which the parallel second outer and second inner sectors (9), (13) lie, as well as the parallel fourth outer and fourth inner sectors (11), (15), characterized in that it additionally contains the first collector (17a) extending from the radial edge of the outer radial sector (16a),adjacent to the first parallel outer sector (8), through the outer second parallel sector (9), to the radial edge of the outer radial sector (16b), adjacent to the third parallel outer sector (10), the first branch pipe (18a), passing through the outer power shell (3) and intended for connection with the first pipeline (19a) in such a way that the distance from the first branch pipe (18a) to one end of the first collector (17a) is less than the distance to its other end, the second collector (176), passing from the radial edge of the outer radial sector (166), adjacent to the first parallel outer sector (8), through the outer fourth parallel sector (I), to the radial edge of the outer radial sector (16g), adjacent to the third parallel outer sector (10), the second branch pipe (186), passing through the outer power shell (3) and intended for connection with the second pipeline (196) in such a way such that the distance from the second branch pipe (186), to one end of the second collector (176) the distance to its other end is shorter, distributing pipes (20) connected from below with the first and second collectors (17a), (176) and passing from them through the middle power shell (4), spraying devices (21) located in some internal radial sectors and connected to distributing pipes (20), external parallel first and third sectors (8), (10), internal parallel first and third sectors - (12), (14) are made empty, and the remaining external and internal parallel and radial sectors are filled with protective concrete (22).

3. A truss-console of a melt localization device according to paragraph 1, characterized in that support legs (23) with anchor ribs (24) are installed on the outer side of the outer load-bearing shell (3).

Citation Information

Patent Citations

  • Core molten material cooling device

    JP6664021B2

  • Nuclear reactor core melt localization and cooling system

    RU2736544C1

  • Nuclear reactor core melt localization and cooling system

    RU2742583C1

  • Truss-console of the melt localization device

    RU2771264C1

  • Method for manufacturing a truss-console of a melt localization device

    RU2777423C1