Integrated operation and maintenance method, system, equipment and medium
Through smart contracts and blockchain technology, automated operation and maintenance in an internal and external network isolation environment is achieved, and the problem that existing technology cannot achieve full automated detection is solved, the operation and maintenance efficiency and security are improved, and the business of special enterprises is met. need.
Patent Information
- Application Number
- CN202411079135.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-29
AI Technical Summary
In order to meet the isolation of internal and external networks of the enterprise, the existing operation and maintenance platform cannot achieve fully automated inspection, especially under the requirements of diversity inspection, which leads to long maintenance cycles and cumbersome processes, and cannot meet the business needs of special enterprises.
Adopt integrated operation and maintenance methods to realize code scanning, automated testing and automated deployment through smart contracts, combine blockchain technology to ensure the security and integrity of the code, meet the acceptance requirements of different guarantee systems, and achieve continuous integration and continuous delivery.
It realizes automated operation and maintenance under an internal and external network isolation environment, ensures safe transmission and storage of codes, improves operation and maintenance efficiency and security, and meets the diverse detection needs of special enterprises.
Smart Images

Figure CN119046949A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent operation and maintenance technology, and in particular to integrated operation and maintenance methods, systems, equipment and media. Background Art
[0002] The current operation and maintenance platform is usually combined with the construction of an external technology platform. In the network environment of mass enterprises, the defect is that daily operation and maintenance are restricted by the suppliers of external technology platforms. As the IT (Internet Technology) architecture managed by the enterprise continues to expand, the number of business systems and development systems continues to grow, and it faces problems such as long maintenance cycles and cumbersome processes.
[0003] However, in the network environment of special enterprises that require internal and external network isolation and a high confidentiality security factor, many functions require approval of network permissions. At the same time, there are also data transmission restrictions, which cause many inconveniences. Therefore, the operation and maintenance platform combined with the construction of an external technical platform is not suitable for such special enterprises. In addition, since different business projects and security systems of some special enterprises will correspond to different testing requirements, the continuous integration function of the current operation and maintenance platform is affected by network permissions and cannot achieve complete "automation" under diverse testing requirements, resulting in the inability to meet the business needs of these special enterprises.
[0004] Therefore, how to achieve complete "automation" under the requirements of diversity detection while meeting the enterprise's needs for internal and external network isolation is an urgent problem that needs to be solved. Summary of the invention
[0005] The present invention provides an integrated operation and maintenance method to solve the technical problem of achieving complete "automation" under the requirements of diversity detection while meeting the enterprise's needs for internal and external network isolation.
[0006] In order to solve the above technical problems, an embodiment of the present invention provides an integrated operation and maintenance method, which includes:
[0007] Obtaining the project type, the level of the security protection system, and the acceptance requirements corresponding to the project type and the level of the security protection system pre-configured in the first smart contract;
[0008] Get the code from the code repository, scan the code, and output the code scanning results;
[0009] If the code scanning result contains security vulnerabilities, determining whether the risk level and quantity of the security vulnerabilities meet the acceptance requirements;
[0010] If the code scan does not contain the security vulnerability or the risk level and number of the security vulnerability meet the acceptance requirements, then obtain new code that updates the code according to the code scan result, automatically trigger continuous integration, perform automated testing on the integrated code, and output test results;
[0011] If the test result is that the test passes, the test result is transmitted to the corresponding second smart contract in the form of data, triggering the second smart contract to perform indicator verification, and outputting a report on the result of this indicator verification;
[0012] Determine whether the indicator verification result report meets the preset verification conditions;
[0013] If yes, the corresponding third smart contract is automatically matched according to the verification result and automatic deployment is performed;
[0014] If the test result is that the test fails or the indicator verification fails the verification condition, the fourth smart contract is triggered, the execution ends the process, and an abnormal information alarm is issued at the same time.
[0015] Furthermore, if the test result is a passed test, the test result is transmitted to the corresponding second smart contract in the form of data, triggering the second smart contract to perform indicator verification, and outputting the indicator verification result report includes:
[0016] Check whether there is any business process blocking;
[0017] If not, verify whether the test results of the project type include basic functions. If the level of the security protection system is a level 2 security protection system, verify the encrypted transmission, encrypted storage and integrity of the user data, external data interaction data and basic business data of the operation and maintenance platform. If the level of the security protection system is a level 3 security protection system, verify the encrypted transmission, encrypted storage and integrity of all data of the operation and maintenance platform, verify the safety function compliance rate, and after completing the verification, output the indicator verification result report;
[0018] If there is a business process blockage, the fourth smart contract will be triggered to execute the end process and issue an abnormal information alarm reminder.
[0019] Furthermore, the specific steps of verifying whether there is a business process blocking situation include:
[0020] Determine whether each test case involved in the automated test is in an unfinished state;
[0021] If so, there is a business process blocking situation.
[0022] Furthermore, the specific steps of determining whether the indicator verification passes the verification condition include:
[0023] Obtain indicator verification result report;
[0024] If the project type is a unified construction project and the level of the security protection system is a Level 2 security protection system, then determine whether the test results meet at least three basic functions including system management, system review and system audit, determine whether the operation and maintenance platform user data, external data interaction data, and basic business data are encrypted transmission, encrypted storage and complete, and determine whether the security function compliance rate is above 85%; if all are met, trigger the third smart contract and execute automated deployment;
[0025] If the project type is a unified construction project, and the level of the security protection system is a level 3 security protection system, then determine whether the test case satisfies the requirement that there is no business process blocking, determine whether the test result satisfies the requirement that at least three basic functions of system management, system review and system audit are included, determine whether all data of the operation and maintenance platform are encrypted for transmission, encrypted for storage and complete, and determine whether the security function compliance rate is above 95%; if all of them are satisfied, trigger the third smart contract and execute automated deployment;
[0026] If the project type is a self-built project, and the level of the security protection system is a Level 2 security protection system, then determine whether the test case satisfies the requirement that there is no business process blocking, or that there is a business process blocking and includes an abnormal information alarm reminder function, determine whether the test result satisfies at least three basic functions including system management, system review and system audit, determine whether the user data of the operation and maintenance platform, external data interaction data, and basic business data are encrypted transmission, encrypted storage and complete, and determine whether the security function compliance rate is above 80%; if all are satisfied, trigger the third smart contract and execute automated deployment;
[0027] If the project type is a self-built project, and the level of the security protection system is a level 3 security protection system, then it is determined whether the test case satisfies the requirement that there is no business process blocking, or satisfies the requirement that there is a business process blocking and includes an abnormal information alarm reminder function; it is determined whether the test result satisfies the requirement that at least three basic functions, namely system management, system review and system audit, are included; it is determined whether all data on the operation and maintenance platform are encrypted for transmission, encrypted for storage and complete; and it is determined whether the security function compliance rate is above 90%; if all are satisfied, the third smart contract is triggered and automated deployment is performed.
[0028] Furthermore, the specific steps of determining whether the risk level and quantity of the security vulnerabilities meet the acceptance requirements include:
[0029] obtaining the acceptance requirements;
[0030] If the project type is an integrated construction project, and the level of the security protection system is a level 2 security protection system, then determine whether the security vulnerability exists in the code scanning result. If so, determine whether the risk level of the security vulnerability includes medium-risk vulnerabilities and / or high-risk vulnerabilities. If there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, then determine whether the number of low-risk vulnerabilities is less than N, where N1 is a natural number. If so, perform automated testing. If there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to N, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder at the same time.
[0031] If the project type is an integrated construction project, and the level of the security protection system is a level 3 security protection system, then determine whether the security vulnerability exists in the code scanning result, and if so, determine whether the risk level of the security vulnerability includes medium-risk vulnerabilities and / or high-risk vulnerabilities. If there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, then determine whether the number of low-risk vulnerabilities is less than M, where M is a natural number and M is less than N. If so, perform automated testing. If there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to M, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder at the same time;
[0032] If the project type is a self-built project, and the level of the security protection system is a level 2 security protection system, then determine whether the security vulnerability exists in the code scanning result. If so, determine whether the risk level of the security vulnerability is a high-risk vulnerability. If there is no high-risk vulnerability, determine whether the security vulnerability is a medium-risk vulnerability. If so, determine whether the number of medium-risk vulnerabilities is less than Q, where Q is a natural number, and determine whether the number of low-risk vulnerabilities is less than P, where P is a natural number and P is greater than Q. If so, perform automated testing. If there is a high-risk vulnerability or the number of medium-risk vulnerabilities is greater than or equal to Q or the number of low-risk vulnerabilities is greater than or equal to P, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder at the same time;
[0033] If the project type is a self-built project and the level of the security protection system is a level 3 security protection system, then determine whether the security vulnerability exists in the code scanning result; if so, determine whether the risk level of the security vulnerability includes medium-risk vulnerabilities and / or high-risk vulnerabilities; if there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, then determine whether the number of low-risk vulnerabilities is less than R, where R is a natural number and R is less than P; if so, perform automated testing; if there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to R, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder.
[0034] Furthermore, the specific steps of obtaining new code that updates the code according to the code scanning result, automatically triggering continuous integration, performing automated testing on the integrated code, and outputting the test results include:
[0035] Receiving new code that updates the security vulnerability or the original code that does not meet the acceptance requirements;
[0036] Automatically trigger the build process to compile and run tests on the integrated code;
[0037] Execute unit tests;
[0038] Check code quality;
[0039] Execute automated tests to ensure that the basic functionality of the code works properly and output test results.
[0040] Furthermore, the code and the new code are uploaded to the code repository based on the code tamper-proof technology of the blockchain, triggering the fifth smart contract to perform hash calculation on the code and the new code and store the hash value on the blockchain.
[0041] The embodiment of the present invention also provides an integrated operation and maintenance system, the system comprising:
[0042] A first acquisition module is used to acquire the project type and the level of the security protection system pre-configured in the first smart contract, and the acceptance requirements corresponding to the project type and the level of the security protection system, wherein the project type includes an integrated project and a self-built project, and the level of the security protection system includes a level 2 security protection system and a level 3 security protection system;
[0043] A code scanning module is used to obtain code from a code repository, scan the code, and output the code scanning result;
[0044] A first judgment module, configured to judge whether the risk level and quantity of the security vulnerabilities meet the acceptance requirements if the code scanning result contains security vulnerabilities;
[0045] A first execution module is used to obtain new code that updates the code according to the code scanning result if the code scanning does not contain the security vulnerability or the risk level and number of the security vulnerability meet the acceptance requirements, and automatically trigger continuous integration, perform automated testing on the integrated code, and output the test results;
[0046] A second execution module is used to transmit the test result in the form of data to the corresponding second smart contract if the test result is a pass, trigger the second smart contract to execute the indicator verification, and output the indicator verification result report;
[0047] A second judgment module is used to judge whether the indicator verification result report meets the preset verification conditions;
[0048] The third execution module is used to automatically match the corresponding third smart contract according to the verification result and perform automatic deployment if yes;
[0049] The fourth execution module is used to trigger the fourth smart contract if the test result is that the test fails or the indicator verification fails the verification condition, execute the end process, and issue an abnormal information alarm reminder.
[0050] An embodiment of the present invention further provides a computer device, including:
[0051] one or more processors;
[0052] A storage device for storing one or more programs;
[0053] When the one or more programs are executed by the one or more processors, the one or more processors are enabled to implement any of the above methods.
[0054] An embodiment of the present invention further provides a computer-readable storage medium storing a computer program, which implements any of the above-mentioned methods when executed by a processor.
[0055] Beneficial effects of the embodiments of the present invention:
[0056] At the environmental application level, the present invention adopts an integrated operation and maintenance platform to meet the needs of special enterprises for internal and external network isolation. The integrated operation and maintenance platform has established continuous integration and continuous delivery functions. Through the second smart contract, automated testing can be achieved in the process of continuous integration, thereby realizing intelligent operation and maintenance. At the same time, the third smart contract is used to realize automated deployment after the test passes. And all codes are uploaded to the code warehouse through the blockchain, the hash value of the code is stored on the blockchain, and the consensus mechanism of the blockchain is used for verification, which can ensure that the code will not be maliciously tampered with during transmission, storage and use. In the process of continuous integration, due to the anti-tampering technology of the blockchain, code storage and transmission can be made safer and more reliable, realizing the real "project closure", which is of great significance to protecting the security, reliability and maintainability of software projects.
[0057] At the business satisfaction level, since the business of special enterprises includes integrated projects and self-built projects, different project types have different acceptance requirements in combination with different security levels. Different projects of the present invention refer to their own project characteristics, and the corresponding conditions will be triggered in the code scanning and overall testing links of the entire continuous integration. The smart contract determines the subsequent direction of the current project in the entire continuous integration process, realizing complete "automation". BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 is a flow chart of an embodiment of the present invention;
[0059] Figure 2 is a flowchart of a specific implementation of step 40 of the present invention;
[0060] Figure 3 is a flow chart of a specific implementation of step 50 of the present invention;
[0061] Figure 4 is a flow chart of a specific implementation of step 60 of the present invention;
[0062] Figure 5 is a flow chart of a specific implementation of step 30 of the present invention;
[0063] Figure 6 is a schematic block diagram of an example computer device of an embodiment of the present invention.
[0064] The reference numerals of the drawings in the specification are as follows:
[0065] 600, computer device; 601, computing unit; 602, ROM; 603, RAM; 604, bus; 605, I / O interface; 606, input unit; 607, output unit; 608, storage unit; 609, communication unit. DETAILED DESCRIPTION
[0066] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0067] Embodiment 1
[0068] Please refer to Figure 1 and Figure 2 , is an integrated operation and maintenance method provided by an embodiment of the present invention, the method comprising:
[0069] S10. Obtain the project type, the level of the security protection system, and the acceptance requirements corresponding to the project type and the level of the security protection system pre-configured in the first smart contract.
[0070] Specifically, project types include integrated projects and self-built projects. The levels of security protection systems include level 2 security protection systems and level 3 security protection systems. Therefore, there are four corresponding acceptance requirements. The first type is the acceptance requirements for integrated projects and level 2 security protection systems. The second type is the acceptance requirements for integrated projects and level 3 security protection systems. The third type is the acceptance requirements for self-built projects and level 2 security protection systems. The fourth type is the acceptance requirements for self-built projects and level 3 security protection systems.
[0071] The project type and the level of the security protection system in this embodiment are set in advance by R&D personnel according to business needs. Therefore, when the first smart contract obtains the specific project type and the level of the security protection system, it automatically matches the corresponding acceptance requirements.
[0072] S20. Obtain code from the code repository, scan the code, and output the code scanning result.
[0073] In this embodiment, the R&D personnel store the code in the code repository to ensure the confidentiality, tamper-proofing and integrity of the code, and the code is uploaded based on blockchain technology.
[0074] The code scanning of this embodiment specifically refers to checking the correctness of the program by analyzing or checking the syntax, structure, process, interface, etc. of the source program without running the code under test, and finding out the errors and defects hidden in the code, such as: parameter mismatch, ambiguous nested statements, erroneous recursion, illegal calculations, possible null pointer references, security vulnerabilities, etc.
[0075] Specifically, this method is applied on the operation and maintenance platform, requests code from the code repository, downloads the code locally, uses the built-in code analyzer to analyze the code and generate important information about the code quality, such as code complexity, code duplication, code test coverage, etc. The collected data can be stored in its built-in system database for subsequent use. If a security vulnerability is scanned, the severity of the vulnerability is judged according to the known security vulnerabilities, the corresponding risk level is divided, and the number of security vulnerabilities is recorded. Usually, this severity information can be obtained from the data feed of the vulnerability management tool vendor.
[0076] Preferably, you can also use its built-in report generator to generate various data visualization charts, reports and warnings and present them to users. Users can share opinions and suggestions through the feedback function to improve the quality of the code. If the errors and defects hidden in the code are not found, they also need to be fed back to the users.
[0077] S30. If the code scanning result contains security vulnerabilities, determine whether the risk level and number of the security vulnerabilities meet the acceptance requirements.
[0078] Based on step S10, the first smart contract makes a judgment based on a specific acceptance requirement that matches. For example, in the first case, the verification requirement configuration condition must be met: the number of low-risk vulnerabilities is less than 10, and there are no medium- and high-risk vulnerabilities. Based on the verification requirements, the security vulnerabilities scanned in step S20 are obtained, the corresponding risk level is found, and it is determined whether there are no medium- and high-risk vulnerabilities. If so, the process is terminated and an abnormal information alarm is issued. If not, it is determined whether the data of the risk vulnerabilities meets the requirements. If not, the fourth smart contract is triggered, the process is terminated, and an abnormal information alarm is issued. If it meets the requirements, step S40 is executed.
[0079] In the second case, the verification requirement configuration conditions must be met: the number of low-risk vulnerabilities is less than 5, and there are no medium- and high-risk vulnerabilities.
[0080] In the third case, the verification requirements must be met: there are low-risk vulnerabilities, the number of medium-risk vulnerabilities is less than 5, and there are no high-risk vulnerabilities.
[0081] In the fourth case, the verification requirement configuration conditions must be met: the number of low-risk vulnerabilities is less than 10, and there are no medium- and high-risk vulnerabilities.
[0082] S40. If the code scan does not contain security vulnerabilities or the risk level and number of security vulnerabilities meet the acceptance requirements, new code is obtained to update the code according to the code scan results, and continuous integration is automatically triggered to perform automated testing on the integrated code and output the test results.
[0083] Specifically, S41, receiving new code that updates the original code that targets the security vulnerability or does not meet the acceptance requirement.
[0084] S42. Automatically trigger the build process to compile and run tests on the integrated code.
[0085] S43. Perform unit testing to ensure that the basic functionality of the code works properly.
[0086] S44. Check code quality, perform code static analysis, code style check, etc. to ensure code quality.
[0087] S45. Perform automated testing to ensure that the basic functions of the code operate normally and output the test results.
[0088] If errors and defects hidden in the code are found in step S20, these errors and defects are updated to form new code, and the new code is also uploaded to the code repository.
[0089] More specifically, the code and new code are uploaded to the code repository based on the code anti-tampering technology of the blockchain, triggering the fifth smart contract to perform hash calculation on the original code and the new code and store the hash value on the blockchain. Before the new code is uploaded to the code repository, the hash calculation and hash value verification process is automatically performed to verify the original code. When the integrity of the code needs to be verified, the hash value of the code can be recalculated. If the stored hash value is consistent with the recalculated hash value, the new code is successfully uploaded and the code version is replaced. If it is inconsistent, the code is automatically rolled back. Preferably, before the code is changed or deployed, the hash calculation and verification process is automatically performed, which can improve the integrity and security of the code and avoid unsafe operations such as code tampering during the collaborative development process.
[0090] After the first smart contract detects that the new code has been submitted to the code repository, it pulls the new code from the code repository and automatically triggers the build process, unit testing, and code quality checks to ensure that there are no problems with the final integrated code. Automated testing and automated deployment are the process of continuous delivery. Before the integrated code is deployed to the test environment, various automated tests are performed, including integration testing, end-to-end testing, etc.
[0091] Specifically, automated testing includes checking the completion status of test cases, basic function construction projects, setting status of abnormal alarm reminders, data encryption transmission, encryption storage, integrity and security function compliance rate, etc.
[0092] S50. If the test result is that the test passes, the test result is transmitted to the corresponding second smart contract in the form of data, triggering the second smart contract to execute indicator verification, and outputting the indicator verification result report.
[0093] Specifically, the test passing means that the integrated code has no errors and defects. If the automated test passes, the second smart contract will be automatically triggered. If it fails, the fourth smart contract will be automatically triggered. By triggering different smart contracts to control different process directions, it is convenient to handle complex confidentiality business.
[0094] S60, judging whether the indicator verification passes the verification condition.
[0095] S70. If yes, automatically match the corresponding third smart contract according to the verification result and perform automatic deployment.
[0096] Specifically, the deployment includes test environment deployment and production environment deployment. The code after automated testing can be deployed to the test environment, which can be reviewed by the quality team, or constraints can be set in the third smart contract for judgment and evaluation. The code that has passed the review can be deployed to the production environment using automated tools to ensure the reliability and consistency of the deployment. Preferably, the application performance, logs, etc. are monitored in the production environment to provide real-time feedback, and a rollback mechanism is set. If there is a problem with the deployment, it will automatically roll back to the last stable version.
[0097] S80. If the test result is that the test fails or the indicator verification fails the verification condition, the fourth smart contract is triggered, the execution ends the process, and an abnormal information alarm is issued at the same time.
[0098] The abnormal information alarm reminder in this embodiment can be sent through a preset station letter, mailbox, or text message to remind you.
[0099] At the environmental application level, since some special enterprises need to meet the requirements of internal and external network isolation network environment and high confidentiality requirements, the existing technology is to use external technology platforms for integration, which leads to the need for configuration approval of network permissions, and there are also data transmission restrictions, causing many inconveniences. The present invention adopts an integrated operation and maintenance platform to meet the needs of internal and external network isolation of special enterprises. The integrated operation and maintenance platform has established continuous integration and continuous delivery functions. Through the second smart contract, automated testing can be achieved in the process of continuous integration, thereby realizing intelligent operation and maintenance, and automated deployment is achieved after the test is passed through the third smart contract. And all codes are uploaded to the code warehouse through the blockchain, the hash value of the code is stored on the blockchain, and the consensus mechanism of the blockchain is used for verification, which can ensure that the code will not be maliciously tampered with during transmission, storage and use. In the process of continuous integration, due to the anti-tampering technology of the blockchain, code storage and transmission can be made safer and more reliable, and the real "project closure" is realized, which is of great significance to the security, reliability and maintainability of protecting software projects.
[0100] At the business satisfaction level, since the business of special enterprises includes integrated projects and self-built projects, different project types have different acceptance requirements in combination with different security levels. The continuous integration function of the existing technology cannot meet the requirements of diversity detection and achieve complete "automation". However, different projects of the present invention refer to their own project characteristics, and the code scanning and overall testing links of the entire continuous integration will trigger the corresponding conditional smart contract. The smart contract determines the subsequent direction of the current project in the entire continuous integration process, thereby achieving complete "automation".
[0101] Embodiment 2
[0102] Please refer to Figure 3 and Figure 4 Based on the first embodiment, the step S50 of the present invention specifically includes:
[0103] S51. Check whether there is a business process blocking situation; if not, execute step S53; if so, execute step S53.
[0104] Specifically, it is determined whether each test case involved in the automated test is in an unfinished state. If so, there is a business process blocking situation. If not, it may be in a passed state or a failed state. In the automated testing process, each test case has three states: the passed state means that the test indicators are met, the failed state means that the test indicators are not met, and the unfinished state means that there is a business process blocking situation.
[0105] S52. Verify whether the test results of the project type include basic functions. If the security system is a Level 2 security system, verify the encrypted transmission, encrypted storage, and integrity of the user data, external data interaction data, and basic business data of the operation and maintenance platform. If the security system is a Level 3 security system, verify the encrypted transmission, encrypted storage, and integrity of all data on the operation and maintenance platform. Verify the compliance rate of security functions. After completing the above verification, output the indicator verification result report.
[0106] This embodiment does not limit the order of the above verification items. The second smart contract can be verified synchronously through parallel instructions, or can be verified one by one through sequential instructions.
[0107] S53. If there is a business process blocking situation, the fourth smart contract is triggered to execute the end process and issue an abnormal information alarm reminder.
[0108] Furthermore, the specific steps of step S60 of the present invention include:
[0109] S61. Obtain an indicator verification result report.
[0110] S62. If the project type is an integrated construction project and the level of the security protection system is a Level 2 security protection system, determine whether the test results meet at least the three basic functions of system management, system review and system audit, determine whether the user data of the operation and maintenance platform, external data interaction data, and basic business data are encrypted transmission, encrypted storage and complete, and determine whether the security function compliance rate is above 85%; if all are met, trigger the third smart contract and execute automated deployment.
[0111] Specifically, during the above verification process, if any item does not meet the verification conditions, the process will be terminated and an abnormal alarm will be issued.
[0112] S63. If the project type is a unified construction project and the level of the security protection system is a level 3 security protection system, determine whether the test case satisfies the requirement that there is no business process blocking, determine whether the test results meet the requirement of at least including the three basic functions of system management, system review and system audit, determine whether all data on the operation and maintenance platform are encrypted for transmission, encrypted for storage and complete, and determine whether the security function compliance rate is above 95%; if all of them are satisfied, trigger the third smart contract and execute automated deployment;
[0113] S64. If the project type is a self-built project and the level of the security protection system is a Level 2 security protection system, then determine whether the test case satisfies the requirement that there is no business process blocking, or that there is a business process blocking and includes an abnormal information alarm reminder function, determine whether the test results meet at least the three basic functions of system management, system review and system audit, determine whether the user data of the operation and maintenance platform, external data interaction data, and basic business data are encrypted transmission, encrypted storage and complete, and determine whether the security function compliance rate is above 80%; if all are satisfied, trigger the third smart contract and execute automatic deployment;
[0114] S65. If the project type is a self-built project and the level of the security protection system is a level 3 security protection system, then determine whether the test case satisfies the requirement that there is no business process blocking, or that there is a business process blocking and includes an abnormal information alarm reminder function; determine whether the test results meet the requirement of at least including three basic functions: system management, system review and system audit; determine whether it meets the requirement of verifying whether all data on the operation and maintenance platform are encrypted for transmission, encrypted for storage and complete; and determine whether the security function compliance rate is above 90%; if all are met, trigger the third smart contract and execute automated deployment.
[0115] Based on step S30, this embodiment has screened and determined the project type that needs to be verified and the level and acceptance requirements of the security protection system. Therefore, according to the indicator verification result report of the indicator verification in step S50, the second smart contract can be judged and compared according to the preset verification conditions. If the verification conditions are met, the third smart contract is automatically matched and automatically deployed.
[0116] Embodiment 3
[0117] Please refer to Figure 5 Based on the first and second embodiments, the specific steps of step S30 of the present invention include:
[0118] S31. Obtain acceptance requirements.
[0119] S32. If the project type is an integrated construction project and the level of the security protection system is a level 2 security protection system, determine whether there are security vulnerabilities in the code scanning results. If so, determine whether the risk level of the security vulnerabilities includes medium-risk vulnerabilities and / or high-risk vulnerabilities. If there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, determine whether the number of low-risk vulnerabilities is less than N, where N1 is a natural number, and N in this embodiment is 10. If so, perform automated testing. If there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to 10, trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder.
[0120] S33. If the project type is an integrated construction project and the level of the security protection system is a level 3 security protection system, determine whether there are security vulnerabilities in the code scanning results. If so, determine whether the risk level of the security vulnerabilities includes medium-risk vulnerabilities and / or high-risk vulnerabilities. If there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, determine whether the number of low-risk vulnerabilities is less than M, where M is a natural number and M is less than N. In this embodiment, M is 5. If so, perform automated testing. If there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to 5, trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder.
[0121] S34. If the project type is a self-built project and the level of the security protection system is a level 2 security protection system, then determine whether there are security vulnerabilities in the code scanning results. If so, determine whether the risk level of the security vulnerability is a high-risk vulnerability. If there is no high-risk vulnerability, then determine whether the security vulnerability is a medium-risk vulnerability. If so, then determine whether the number of medium-risk vulnerabilities is less than Q, where Q is a natural number. Determine whether the number of low-risk vulnerabilities is less than P, where P is a natural number and P is greater than Q. In this embodiment, Q is 5 and P is several. There is no limit on the number of P. In other embodiments, P can be 20, 30, etc. If so, perform automated testing. If there are high-risk vulnerabilities or the number of medium-risk vulnerabilities is greater than or equal to 5 or the number of low-risk vulnerabilities is greater than or equal to P, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder at the same time.
[0122] S35. If the project type is a self-built project and the level of the security protection system is a level 3 security protection system, determine whether there are security vulnerabilities in the code scanning results. If so, determine whether the risk level of the security vulnerabilities includes medium-risk vulnerabilities and / or high-risk vulnerabilities. If there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, determine whether the number of low-risk vulnerabilities is less than R, where R is a natural number and R is less than P. In this embodiment, R is 10. If so, perform automated testing. If there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to 10, trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder.
[0123] Specifically, medium-risk vulnerabilities and / or high-risk vulnerabilities include medium-risk vulnerabilities, high-risk vulnerabilities, and medium-risk vulnerabilities and high-risk vulnerabilities. Step S32 is the first case described in step S30. When one of the scanned security vulnerabilities is determined to be a medium-risk vulnerability or a high-risk vulnerability, or when multiple security vulnerabilities are determined to be medium-risk vulnerabilities or high-risk vulnerabilities, or when medium-risk and high-risk vulnerabilities exist at the same time, the fourth smart contract is triggered and the process ends. Step S33 is the second case described in step S30, step S34 is the third case described in step S30, and step S35 is the fourth case described in step S30.
[0124] Embodiment 4
[0125] The embodiment of the present invention also provides an integrated operation and maintenance system, which includes:
[0126] The first acquisition module is used to obtain the project type and the level of the security protection system pre-configured in the first smart contract, as well as the acceptance requirements corresponding to the project type and the level of the security protection system, wherein the project type includes an integrated project and a self-built project, and the level of the security protection system includes a level 2 security protection system and a level 3 security protection system;
[0127] The code scanning module is used to obtain code from the code repository, scan the code, and output the code scanning results;
[0128] The first judgment module is used to judge whether the risk level and quantity of the security vulnerabilities meet the acceptance requirements if the code scanning results contain security vulnerabilities;
[0129] The first execution module is used to obtain new code that updates the code according to the code scanning result if the code scanning does not contain security vulnerabilities or the risk level and number of security vulnerabilities meet the acceptance requirements, and automatically trigger continuous integration, perform automated testing on the integrated code, and output the test results;
[0130] The second execution module is used to transmit the test result in the form of data to the corresponding second smart contract if the test result is a pass, trigger the second smart contract to execute the indicator verification, and output the indicator verification result report;
[0131] The second judgment module is used to judge whether the indicator verification result report meets the preset verification conditions;
[0132] The third execution module is used to automatically match the corresponding third smart contract according to the verification result and perform automatic deployment if yes;
[0133] The fourth execution module is used to trigger the fourth smart contract if the test result is that the test fails or the indicator verification fails the verification condition, execute the end process, and issue an abnormal information alarm reminder.
[0134] The beneficial effects of the system of the embodiment of the present invention are equivalent to the beneficial effects of the above-mentioned integrated operation and maintenance method, and will not be described in detail here.
[0135] The system of this embodiment adopts the above method to meet the network requirements of special enterprises for internal and external network isolation. The code can be transmitted to the code warehouse through blockchain to realize information sharing. Different subsequent processes can also be triggered through multiple smart contracts to meet the requirements of internal and external network isolation and realize a safer and more confidential integrated operation and maintenance platform.
[0136] Embodiment 5
[0137] An embodiment of the present invention further provides a computer device, comprising:
[0138] one or more processors;
[0139] A storage device for storing one or more programs;
[0140] When one or more programs are executed by one or more processors, the one or more processors implement the above-mentioned integrated operation and maintenance method.
[0141] The beneficial effects of the computer device of the embodiment of the present invention are equivalent to the beneficial effects of the above-mentioned integrated operation and maintenance method, and will not be elaborated here.
[0142] An embodiment of the present invention further provides a storage medium on which a computer program is stored, and the program, when executed by a processor, implements the above-mentioned integrated operation and maintenance method.
[0143] The beneficial effects of the storage medium of the present invention are equivalent to the beneficial effects of the above-mentioned integrated operation and maintenance method, and will not be elaborated here.
[0144] Figure 6A schematic block diagram of an example computer device 600 that can be used to implement an embodiment of the present invention is shown. The computer device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The computer device can also represent various forms of mobile devices, such as personal digital assistants, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0145] like Figure 6 As shown, the computer device 600 includes a computing unit 601, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 602 or a computer program loaded from a storage unit 608 into a random access memory (RAM) 603. In the RAM 603, various programs and data required for the operation of the device can also be stored. The computing unit 601, the ROM 602, and the RAM 603 are connected to each other via a bus 604. An input / output (I / O) interface 605 is also connected to the bus 604.
[0146] A number of components in the computer device 600 are connected to the I / O interface 605, including: an input unit 606, such as a keyboard, a mouse, etc.; an output unit 607, such as various types of displays, speakers, etc.; a storage unit 608, such as a disk, an optical disk, etc.; and a communication unit 609, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 609 allows the computer device 600 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0147] The computing unit 601 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 601 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 601 performs the various methods and processes described above, such as the integrated operation and maintenance method. For example, in some embodiments, the integrated operation and maintenance method may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit 608. In some embodiments, part or all of the computer program may be loaded and / or installed on the computer device 600 via the ROM 602 and / or the communication unit 609. When the computer program is loaded into the RAM 603 and executed by the computing unit 601, one or more steps of the integrated operation and maintenance method described above may be performed. Alternatively, in other embodiments, the computing unit 601 may be configured to perform the integrated operation and maintenance method in any other appropriate manner (e.g., by means of firmware).
[0148] Various embodiments of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. Implemented in one or more computer programs, the one or more computer programs can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a dedicated or general programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0149] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0150] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0151] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0152] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0153] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.
[0154] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution disclosed in the present invention can be achieved, and this document does not limit this.
[0155] It should be understood that although the steps in the flowchart of the accompanying drawings are shown in sequence according to the instructions of the arrows, these steps are not necessarily performed in the order indicated by the arrows. Unless otherwise clearly stated in this document, the execution of these steps is not strictly limited in order and can be performed in other orders.
[0156] Moreover, at least part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The order of execution is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.
[0157] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.
Claims
1. An integrated operation and maintenance method, characterized in that: The method comprises: Obtaining the project type, the level of the security protection system, and the acceptance requirements corresponding to the project type and the level of the security protection system pre-configured in the first smart contract; Obtain code from a code repository, perform code scanning on the code, and output code scanning results; If the code scanning result contains security vulnerabilities, determining whether the risk level and quantity of the security vulnerabilities meet the acceptance requirements; If the code scan does not contain the security vulnerability or the risk level and number of the security vulnerability meet the acceptance requirements, then obtain new code that updates the code according to the code scan result, automatically trigger continuous integration, perform automated testing on the integrated code, and output test results; If the test result is that the test passes, the test result is transmitted to the corresponding second smart contract in the form of data, triggering the second smart contract to perform indicator verification, and outputting a report on the result of this indicator verification; Determine whether the indicator verification result report meets the preset verification conditions; If yes, the corresponding third smart contract is automatically matched according to the verification result and the automatic deployment is performed; If the test result is that the test fails or the indicator verification fails the verification condition, the fourth smart contract is triggered, the execution ends the process, and an abnormal information alarm is issued at the same time.
2. The integrated operation and maintenance method according to claim 1, characterized in that: If the test result is that the test passes, the test result is transmitted to the corresponding second smart contract in the form of data, triggering the second smart contract to perform indicator verification, and outputting the indicator verification result report. The specific steps include: Check whether there is any business process blocking; If not, verify whether the test results of the project type include basic functions. If the level of the security protection system is a level 2 security protection system, verify the encrypted transmission, encrypted storage and integrity of the user data, external data interaction data and basic business data of the operation and maintenance platform. If the level of the security protection system is a level 3 security protection system, verify the encrypted transmission, encrypted storage and integrity of all data of the operation and maintenance platform, verify the safety function compliance rate, and after completing the verification, output the indicator verification result report; If there is a business process blockage, the fourth smart contract will be triggered to execute the end process and issue an abnormal information alarm reminder.
3. The integrated operation and maintenance method according to claim 2, characterized in that: The specific steps of verifying whether there is a business process blocking situation include: Determine whether each test case involved in the automated test is in an unfinished state; If so, there is a business process blocking situation.
4. The integrated operation and maintenance method according to claim 3, characterized in that: The specific steps of determining whether the indicator verification passes the verification condition include: Obtain indicator verification result report; If the project type is a unified construction project and the level of the security protection system is a Level 2 security protection system, then determine whether the test results meet at least three basic functions including system management, system review and system audit, determine whether the operation and maintenance platform user data, external data interaction data, and basic business data are encrypted transmission, encrypted storage and complete, and determine whether the security function compliance rate is above 85%; if all are met, trigger the third smart contract and execute automated deployment; If the project type is a unified construction project, and the level of the security protection system is a level 3 security protection system, then determine whether the test case satisfies the requirement that there is no business process blocking, determine whether the test result satisfies the requirement that at least three basic functions of system management, system review and system audit are included, determine whether all data of the operation and maintenance platform are encrypted for transmission, encrypted for storage and complete, and determine whether the security function compliance rate is above 95%; if all of them are satisfied, trigger the third smart contract and execute automated deployment; If the project type is a self-built project, and the level of the security protection system is a Level 2 security protection system, then determine whether the test case satisfies the requirement that there is no business process blocking, or that there is a business process blocking and includes an abnormal information alarm reminder function, determine whether the test result satisfies at least three basic functions including system management, system review and system audit, determine whether the user data of the operation and maintenance platform, external data interaction data, and basic business data are encrypted transmission, encrypted storage and complete, and determine whether the security function compliance rate is above 80%; if all are satisfied, trigger the third smart contract and execute automated deployment; If the project type is a self-built project, and the level of the security protection system is a level 3 security protection system, then it is determined whether the test case satisfies the requirement that there is no business process blocking, or satisfies the requirement that there is a business process blocking and includes an abnormal information alarm reminder function; it is determined whether the test result satisfies the requirement that at least three basic functions, namely system management, system review and system audit, are included; it is determined whether all data on the operation and maintenance platform are encrypted for transmission, encrypted for storage and complete; and it is determined whether the security function compliance rate is above 90%; if all are satisfied, the third smart contract is triggered and automated deployment is performed.
5. The integrated operation and maintenance method according to claim 1, characterized in that: The specific steps of determining whether the risk level and quantity of the security vulnerabilities meet the acceptance requirements include: obtaining the acceptance requirements; If the project type is an integrated construction project, and the level of the security protection system is a level 2 security protection system, then determine whether the security vulnerability exists in the code scanning result. If so, determine whether the risk level of the security vulnerability includes medium-risk vulnerabilities and / or high-risk vulnerabilities. If there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, then determine whether the number of low-risk vulnerabilities is less than N, where N1 is a natural number. If so, perform automated testing. If there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to N, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder at the same time. If the project type is an integrated construction project, and the level of the security protection system is a level 3 security protection system, then determine whether the security vulnerability exists in the code scanning result, and if so, determine whether the risk level of the security vulnerability includes medium-risk vulnerabilities and / or high-risk vulnerabilities. If there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, then determine whether the number of low-risk vulnerabilities is less than M, where M is a natural number and M is less than N. If so, perform automated testing. If there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to M, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder at the same time; If the project type is a self-built project, and the level of the security protection system is a level 2 security protection system, then determine whether the security vulnerability exists in the code scanning result. If so, determine whether the risk level of the security vulnerability is a high-risk vulnerability. If there is no high-risk vulnerability, determine whether the security vulnerability is a medium-risk vulnerability. If so, determine whether the number of medium-risk vulnerabilities is less than Q, where Q is a natural number, and determine whether the number of low-risk vulnerabilities is less than P, where P is a natural number and P is greater than Q. If so, perform automated testing. If there is a high-risk vulnerability or the number of medium-risk vulnerabilities is greater than or equal to Q or the number of low-risk vulnerabilities is greater than or equal to P, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder at the same time; If the project type is a self-built project and the level of the security protection system is a level 3 security protection system, then determine whether the security vulnerability exists in the code scanning result; if so, determine whether the risk level of the security vulnerability includes medium-risk vulnerabilities and / or high-risk vulnerabilities; if there are no medium-risk vulnerabilities and / or high-risk vulnerabilities, then determine whether the number of low-risk vulnerabilities is less than R, where R is a natural number and R is less than P; if so, perform automated testing; if there are medium-risk vulnerabilities and / or high-risk vulnerabilities or the number of low-risk vulnerabilities is greater than or equal to R, then trigger the fourth smart contract, execute the end process, and issue an abnormal information alarm reminder.
6. The integrated operation and maintenance method according to claim 1, characterized in that: The specific steps of obtaining new code that updates the code according to the code scanning result, automatically triggering continuous integration, performing automated testing on the integrated code, and outputting the test result include: Receiving new code that updates the security vulnerability or the original code that does not meet the acceptance requirements; Automatically trigger the build process to compile and run tests on the integrated code; Execute unit tests; Check code quality; Execute automated tests to ensure that the basic functionality of the code works properly and output test results.
7. The integrated operation and maintenance method according to claim 1, characterized in that: The code and the new code are uploaded to the code repository based on the code tamper-proof technology of the blockchain, triggering the fifth smart contract to perform hash calculation on the code and the new code and store the hash value on the blockchain.
8. Integrated operation and maintenance system, characterized by: The system comprises: A first acquisition module is used to acquire the project type and the level of the security protection system pre-configured in the first smart contract, and the acceptance requirements corresponding to the project type and the level of the security protection system, wherein the project type includes an integrated project and a self-built project, and the level of the security protection system includes a level 2 security protection system and a level 3 security protection system; A code scanning module is used to obtain code from a code repository, scan the code, and output the code scanning result; A first judgment module, configured to judge whether the risk level and quantity of the security vulnerabilities meet the acceptance requirements if the code scanning result contains security vulnerabilities; A first execution module is used to obtain new code that updates the code according to the code scanning result if the code scanning does not contain the security vulnerability or the risk level and number of the security vulnerability meet the acceptance requirements, and automatically trigger continuous integration, perform automated testing on the integrated code, and output the test results; A second execution module is used to transmit the test result in the form of data to the corresponding second smart contract if the test result is a pass, trigger the second smart contract to execute the indicator verification, and output the indicator verification result report; A second judgment module is used to judge whether the indicator verification result report meets the preset verification conditions; The third execution module is used to automatically match the corresponding third smart contract according to the verification result and perform automatic deployment if yes; The fourth execution module is used to trigger the fourth smart contract if the test result is that the test fails or the indicator verification fails the verification condition, execute the end process, and issue an abnormal information alarm reminder.
9. A computer device, characterized in that: include: one or more processors; A storage device for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors are enabled to implement the method according to any one of claims 1 to 7.
10. A computer-readable storage medium storing a computer program, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Cited By
Network security level protection risk analysis system
CN120320970A
A network security level protection risk analysis system
CN120320970B
Code auditing system based on block chain
CN121211463A
Blockchain-based code audit system
CN121211463B
