Adjusting method and device for drilling track of horizontal well
By establishing a horizontal well geological steering model and conducting azimuth resistivity boundary detection while drilling, and adjusting the drilling trajectory in conjunction with seismic profiles, the problem of trajectory adjustment after the formation of the formation in traditional geological steering technology has been solved, thereby improving the drilling success rate of the target formation and reducing the risk.
Patent Information
- Application Number
- CN202411740971.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2026-05-29
AI Technical Summary
Traditional geological steering technology in horizontal well drilling suffers from shallow instrument detection depth and insufficient azimuth sensitivity, resulting in the trajectory only being able to be adjusted after the formation has been exposed, causing leakage in the horizontal section of the reservoir and making it difficult to achieve proactive optimization and adjustment and improve the drilling rate of the target formation.
By comparing the formations of the standard well and the well to be drilled, a geological steering model for the horizontal well is established. By comparing the resistivity and gamma curves while drilling, the trajectory is adjusted in real time using the azimuth resistivity boundary detection curve while drilling, and pre-adjustment is carried out in combination with seismic profiles to optimize the drilling trajectory.
It enables real-time trajectory adjustment during drilling, improving the target formation encounter rate and reducing drilling risks, while also reducing the uncertainty of trajectory adjustment.