Wharf foundation pit water stopping, reducing, draining and intercepting integrated system
By integrating the water-stop curtain, dewatering well, and drainage structure into an integrated foundation pit system, the problems of water stoppage, dewatering, drainage, and interception under complex hydrogeological conditions in wharf foundation pit construction were solved, achieving stable drying of the foundation pit and safe construction.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA RAILWAY GUANGZHOU ENG GRP CO LTD
- Filing Date
- 2026-04-08
- Publication Date
- 2026-06-30
AI Technical Summary
The construction of the wharf foundation pit faces complex hydrogeological conditions, especially the shallow groundwater level and high permeability. It is affected by dynamic hydraulic conditions such as tidal rise and fall, flood impact and wave climbing. In addition, the foundation pit is deep, large in area, and close to hydraulic structures, and the requirements for water control such as stopping, lowering, draining and intercepting are strict.
An integrated system consisting of a water-stop curtain, dewatering wells, drainage structures, and interception structures is adopted. The water-stop curtain blocks groundwater seepage, the dewatering wells actively drain groundwater, the drainage structure quickly discharges accumulated water, and the interception structure intercepts surface runoff, forming a three-dimensional prevention and control system.
This achieved the blocking of hydraulic connections between the inside and outside of the foundation pit and multi-level dewatering, ensuring the bottom of the pit is dry, enhancing foundation stability, reducing operation and maintenance costs, and improving construction safety and efficiency.