Asphalt additive for cold repair of road surface
A technology of additive materials and cold patching asphalt, applied in building insulation materials, roads, roads, etc., can solve the problems of high price and not widely used, and achieve the effect of simple operation, scientific and novel concept, and good repair quality.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2008-05-07
- Estimated Expiration
- Not applicable · inactive patent
Abstract
Description
technical field
[0001] The invention relates to a road surface material in road and bridge engineering, in particular to a road surface cold-patch asphalt additive material. Background technique
[0002] With the continuous development of the transportation industry, the traffic volume is increasing day by day, and the resulting road surface damage is also accelerating. Repairing damaged pavement is an important part of pavement maintenance. In the past, most of the repair materials used hot-mix asphalt concrete. Due to the limitation of season and temperature, the damaged pavement could not be repaired in time at any time. As a result, the pavement cold patching material came into being. It broke through the constraints of hot-mix asphalt concrete due to construction conditions, and has been widely used in various domestic markets due to its simple operation, long-term storage, good repair quality, wide application, and environmental protection. It has been partially prom...
Examples
Embodiment 1
[0010] Put 30 kilograms of styrene-butadiene-styrene block copolymer, 20 kilograms of petroleum resin, 20 kilograms of terpene resin, 20 kilograms of mineral oil, and 800 kilograms of asphalt into a reactor with a stirring device, at a temperature of 170- Stir at high speed for 1-2 hours at 200°C, then cool down to about 150°C, add 5 kg of polyamide, 5 kg of N-cyclohexyl-N′-phenyl-p-phenylenediamine, 50 kg of styrene, 50 kg of diesel oil, and then Additive material for cold patch asphalt.
Embodiment 2
[0012] 22 kilograms of styrene-butadiene-styrene block copolymers, 22 kilograms of petroleum resins, 28 kilograms of terpene resins, 13 kilograms of mineral oils, and 730 kilograms of asphalt are put into a reactor with a stirring device, at a temperature of 170- Stir at high speed for 1-2 hours at 200°C, then cool down to about 150°C, add 6 kg of polyamide, 4 kg of N-cyclohexyl-N'-phenyl-p-phenylenediamine, 66 kg of styrene, 37 kg of diesel oil, and then Additive material for cold patch asphalt.
Embodiment 3
[0014] Put 25 kilograms of styrene-butadiene-styrene block copolymer, 14 kilograms of petroleum resin, 24 kilograms of terpene resin, 15 kilograms of mineral oil, and 760 kilograms of asphalt into a reactor with a stirring device. Stir at high speed for 1-2 hours at 200°C, then cool down to about 150°C, add 6 kg of polyamide, 4 kg of N-cyclohexyl-N'-phenyl-p-phenylenediamine, 33 kg of styrene, 40 kg of diesel oil, and then Additive material for cold patch asphalt.