A kind of universal side form for preparing prefabricated shear wall components

A shear wall and prefabricated technology, applied in the direction of molds, etc., can solve the problems of side molds that cannot be reused and high production costs, and achieve the effects of reducing work difficulty, improving production efficiency, and saving production costs

CN106493837BInactive Publication Date: 2018-12-07XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
8 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Publication Date
2018-12-07
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention provides a general side form for preparing assembled shear wall components, comprising a lower form and an upper form that cover each other, the lower form includes four lower form units with the same structure, one of the lower form units The detachable connection is realized through connecting plates and bolts; the structure of the upper side formwork unit is the same as that of the lower side formwork unit; the lower side formwork unit is equipped with a concealed column reinforcement fixing plate, a concealed beam reinforcement fixing plate and a stirrup baffle. The size of the universal side formwork of the present invention can be adjusted within a certain range, so that it can be applied to the production of prefabricated shear wall components of different sizes, and the side formwork can be reused, reducing the consumption of steel in the production process of prefabricated components , greatly saving production costs, but also improving the production efficiency of prefabricated components. The general side formwork is divided into upper and lower parts, and the hidden beam and concealed column reinforcement plate are fixed on the side formwork by bolts, which greatly improves the efficiency of the on-site reinforcement workers in binding steel bars.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the field of construction engineering and relates to a prefabricated shear wall component, in particular to a general side form for preparing the prefabricated shear wall component. Background technique

[0002] The prefabricated building is a building that is assembled by dismantling the structural components of the building in advance and transporting them to the site through reliable connections after they are prefabricated in the factory. This kind of building is characterized by fast construction speed, less restricted by climatic conditions, labor saving, and improved building quality. The prefabricated shear wall structure is currently the most widely used prefabricated building in my country.

[0003] With the advancement of urbanization, about 4 billion m of new buildings are built every year in the world. 2 of residential buildings, and my country's annual new building area ranks first in the world. There is a large...

Examples

Embodiment

[0048] Such as Figure 1 to Figure 14 As shown, the present embodiment provides a general-purpose side form for preparing a prefabricated shear wall member, including a lower side form 1 and an upper side form 2 that are covered together, and the lower side form 1 includes four structurally identical The lower side mold unit, the lower side mold unit is divided into top lower side mold unit 1-1, bottom lower side mold unit 1-2 and a pair of side lower side mold units 1-3, 1-4; wherein a pair of side lower side mold units 1-3, 1-4 are arranged in parallel, the top lower mold unit 1-1 and the bottom lower mold unit 1-2 are arranged in parallel; the top lower mold unit 1-1, the bottom lower mold unit 1-2 and a pair of side lower mold units The detachable connection between 1-3 and 1-4 is realized through connecting plate 3 and bolts;

[0049] Each of the lower side mold units includes a pair of half side mold units 1-5, and the half side mold unit 1-5 is processed with a fixed con...