Downstream tunnel length extremum method used for open-type ventilation system for extra-long highway tunnel
A road tunnel, open ventilation technology, applied in mine/tunnel ventilation, earthwork drilling, safety devices, etc., can solve problems such as the unformed method of extreme length of downstream tunnels, high ventilation costs for extra-long tunnels, and urban planning constraints.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2018-12-21
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of tunnel disaster prevention and mitigation, and in particular relates to a downstream tunnel length extreme value method for an open ventilation system of an extra-long highway tunnel. Background technique
[0002] Highway tunnels are long and narrow spaces that are semi-submerged or shallowly buried. The treatment of pollutants such as smoke and dust generated by cars driving in tunnels has always been an important issue of concern to the industry. Generally, mechanical ventilation is used to dilute pollutants such as smoke and CO, and the dirty air is discharged to the environment outside the tunnel, and it belongs to the direct current system scheme. The ventilation system of long-distance or extra-long-distance road tunnels must cooperate with ventilation shafts to meet the wind demand for diluting pollutants in the tunnel. The ventilation of extra-long highway tunnels specifically involves the optimi...
Examples
Embodiment Construction
[0081] The present invention will be further described below in conjunction with the accompanying drawings.
[0082] Such as figure 1 and figure 2 As shown, the open ventilation system of the extra-long highway tunnel applicable to the present invention includes a circulating air duct 5 arranged in the tunnel bypass tunnel and parallel to the tunnel, and the upstream tunnel 2 is between the tunnel entrance 1 and the air induction section B of the circulating air duct 5 The downstream tunnel 8 is between the ejection section E of the circulating air duct 5 and the tunnel exit 9, and the circulating air duct 5 communicates with the tunnel through the air induction section B and the ejection section E at both ends of the circulating air duct 5, and the upstream tunnel 2 and the downstream tunnel 8 There is a tunnel short road 14 between them; a dust collector is provided in the circulating air duct 5; the air induction section B of the circulating air duct 5 communicates with t...