A fast self-built sluice wall system containing gallbladder and its installation method and application

By adopting a fast self-built sluice wall system with gallbladder in the mine, and using expansion and curing materials and water to quickly form high-strength sluice walls, the problem that the existing technology cannot quickly and effectively prevent and effectively prevent and control underground water hazards and ensure rapid prevention and control and safety.

CN111255515BActive Publication Date: 2025-03-28王经明
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010198988.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-20
Publication Date
2025-03-28
Estimated Expiration
2040-03-20

AI Technical Summary

Technical Problem

The existing technology cannot quickly and effectively prevent mine flood disasters, causing threats to the lives and property safety of underground workers.

Method used

A quick self-built sluice wall system with gallbladder is adopted, which includes a bag body system, a filling system, a fixing system and an automatic control system. It is composed of high-strength textile outer bags, inflatable inner liner, a spray pipe and a water injection pipe. The expansion curing material and water are used to quickly form a high-strength sluice wall.

Benefits of technology

It realizes the rapid and automatic formation of high-strength sluice walls, which can quickly block outflows, prevent underground water damage, significantly reduce the risk of flooding, and provide good life and property safety guarantees.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111255515B_ABST
    Figure CN111255515B_ABST
Patent Text Reader

Abstract

The present invention provides a system for self-built sluice wall with a liner and a process method thereof, including an automatic control system, a bag system, a filling system and a fixing system. The automatic control system is an electronic control device system arranged on the side wall of the tunnel to control the automatic telescopic belt frame, the expansion of the sluice wall bag body and the filling of the sluice wall. The bag system includes a high-strength textile bag body, an expandable high-temperature resistant liner, a grouting pipe and a water injection pipe. The filling system is a system for injecting fillers into the bag body, which is composed of a high-pressure air duct, a high-pressure water pipe, a filler storage tank, a pressurized water injection pump, a grouting and water filling pipeline system. The fixing system is a device for fixing the bag body to the tunnel roof and preventing the bag body from swinging. The fixing system includes an anchor cable, a fixed joint, a pulling rope and a blocking column. The present invention can realize the rapid and automatic formation of a high-strength sluice wall, can effectively prevent the occurrence of water damage, and provide protection for the life and property safety of personnel in the mine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a mine water hazard rapid treatment technology, and in particular to a gall-containing rapid self-built sluice wall system and an installation method and application thereof. Background Art

[0002] The hydrogeological conditions of mines in my country are complex, and mine water inrush disasters occur frequently, such as water seepage from old empty space, water inrush from collapsed columns, water inrush from faults, and water intrusion from loose layers. Since there is no effective prevention method, these disasters often cause the death of underground workers or flooding of mines. For example, in early 2015, a water inrush from a hidden collapsed column on the bottom of the coal seam occurred at Fengfeng Wutongzhuang Coal Mine, with water flowing from 80m 3 / h, increased to 25000m after 36h 3 / h, causing the well to be flooded. There were also collapse columns that caused 32 deaths in Luotuoshan Coal Mine, 17 deaths in Fangezhuang Coal Mine, and flooding in five coal mines, including Xingtai Dongpang Coal Mine. The flooding time was between 3 and 30 hours. Heavy rain or flood inflow or infiltration often causes excessive water volume in the well, leading to disasters. For example, 186 deaths in Huayu Coal Mine and 4 deaths in Leping Yangou Coal Mine were caused by floods. Every year, coal mines in South China, North China, Northeast China, and Northwest my country suffer from heavy rain or flood disasters. Traditional concrete sluice wall water blocking cannot achieve the purpose of rapid water blocking because the construction speed is too slow to be built and shaped in time. Therefore, there is an urgent need for equipment and technology that can quickly block water to prevent the occurrence of such water disasters.

[0003] Sluice walls are a mature flood control technology in my country, but they are all artificially built after the disaster. The entire sluice wall construction project takes more than 96 hours, plus the 72 hours required for concrete solidification, the total time is 7 days and nights. In recent years, due to the application of chemical slurry, the sluice wall can be completed in 48 hours. However, when the water volume is large and the water volume continues to increase, the sluice wall is often not yet formed and the mine has been flooded. This kind of artificial sluice wall project can only be constructed after the water volume stabilizes, which can only be post-disaster isolation and cannot play a role in disaster prevention and relief. In order to solve this problem, some scholars in my country have invented the technology of rapid self-built sluice wall, but it uses a single-layer non-bladder bag body, which consumes a lot of materials and takes a long time to build, and cannot completely control underground water hazards. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a rapid self-built sluice wall system containing gallbladder in view of the deficiencies of the above-mentioned prior art. The system can realize the rapid and automatic formation of a high-strength sluice wall, effectively prevent the occurrence of water disasters, and provide protection for the life and property safety of personnel in mines.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a rapid self-built sluice wall system containing a bladder, characterized in that it includes a bag system, a filling system, a fixing system and an automatic control system.

[0006] The bag system consists of a high-strength textile outer bag, an expandable high-temperature resistant inner liner, a spraying pipe and a water injection pipe. The inner liner is arranged in the outer bag and a cavity interlayer is formed between the inner liner and the outer bag. The spraying pipe passes through the outer bag and is connected to the cavity interlayer, and the water injection pipe passes through the outer bag and is connected to the inner liner. The outer bag is a single-layer structure outer bag or a double-layer structure outer bag, and the outer bag is made of high-strength textile.

[0007] When the bag system is filled with the expanded and solidified organic-inorganic hybrid material and water, the solidified material and water will be in a static state, the expanded and solidified filling material will shrink due to cooling, and the initially formed sluice wall will leak. For the single-layer outer bag body, high-pressure water injection into the inner liner will continue at this time to cause the bag system to expand secondary to maintain the water blocking effect. On the other hand, for the double-layer outer bag body, the cavity interlayer in the bag system will continue to be grouting and filled to maintain the water blocking effect.

[0008] The filling system includes a primary filling system and a secondary filling system. The primary filling system includes a large filling storage tank, a first grouting pipeline and a water filling pipeline. The inlet of the large filling storage tank is connected to the air outlet of the existing high-pressure air duct underground, and the outlet of the large filling storage tank is connected to the grouting pipe through the first grouting pipeline. One end of the water filling pipeline is connected to the existing high-pressure water pipe underground, and the other end of the water filling pipeline is connected to the water injection pipe. A pressure pump is installed on the water filling pipeline, and a liquid mixer is installed on the first grouting pipeline. The secondary filling system includes a small filling storage tank and a second grouting pipeline. The filling The inlet of the small storage tank is connected with the outlet of the existing high-pressure air duct underground, and the outlet is connected to the cavity interlayer of the bag system through the second grouting pipeline. The second grouting pipeline is successively installed with a pressure pump and a liquid mixer. The large filling storage tank and the small filling storage tank both store two liquid materials A and B at the same time, that is, a large storage tank for material A, a large storage tank for material B, a small storage tank for material A and a small storage tank for material B. The A and B materials are mixed to become expanded and solidified fillers. Three-way automatic gate valves are installed at the outlets of the high-pressure air duct and the high-pressure water pipe; the secondary filling system is installed on the bag system of the double-layer outer bag.

[0009] Both the primary filling system and the secondary filling system utilize the existing high-pressure air duct as power to fill the mixed liquid material into the bag system through two material tanks placed on one side of the tunnel. The gas in the high-pressure air duct applies pressure on the top surface of the filling storage tank, driving the liquid to flow to the inlet at the bottom of the riser in the tank and enter the liquid mixer for mixing.

[0010] The fixing system includes an existing anchor rod or anchor cable located on the top plate of the tunnel underground, a pulling rope, a blocking column and a retractable belt rack installed at the rear of the bag body. The bag body system is connected to the anchor rod or anchor cable via a fixed joint directly above, and the front end of the bag body system is connected to the anchor rod or anchor cable via a pulling rope. The blocking column is vertically arranged at the rear end of the bag body system. The function of the pulling rope is to prevent the bag body system from shaking its head and getting entangled when water bursts into the tunnel. The function of the blocking column is to prevent the bag body system from swinging its tail and getting entangled when water bursts into the tunnel. The blocking column can be a hydraulic support or a high-angle blocking frame.

[0011] The automatic control system is an existing automatic control substation, which is installed on the side wall of the rear lane of the bag system. The automatic control system is connected to the retractable belt rack and the automatic gate valve, and can release the bag system by controlling the extension and retraction of the retractable belt rack, and control the opening and closing of the high-pressure air duct and the high-pressure water pipe by controlling each automatic gate valve.

[0012] The gallbladder-containing rapid self-built sluice wall system also includes a diversion system and a water pressure sensor arranged in the drainage groove of the bottom plate of the laneway behind the bag system. The diversion system includes a diversion water pipe fixed by concrete and half lying in the bottom plate and an automatic gate valve installed at the outlet of the diversion water pipe. The diversion water pipe made of metal water pipe is used to replace the drainage ditch of the bottom plate to discharge the surrounding rock water in the excavation process, avoid the sluice wall to block the drainage ditch tightly, or the malignant water inrush during the construction of the diversion sluice wall, and reduce the swing of the sluice wall. The diversion water pipe is built into an arc with concrete to avoid the problem of loose blocking caused by the intersection of the pipe and the bottom plate at a sharp angle. The diameter of the diversion water pipe is based on the principle of not affecting the extension and contraction of the belt frame, and the length of the diversion water pipe is preferably longer than the sluice wall by more than 0.5m. The water pressure sensor and the automatic gate valve on the diversion water pipe are both connected to the automatic control system.

[0013] Preferably, the outer bag is the main body of the sluice wall, which is the main body that constrains the shape of the sluice wall and blocks the water flow. The cross-sectional size of the outer bag is greater than 1.2 times the cross-sectional size of the tunnel.

[0014] Preferably, the inner liner is suspended in the outer bag by a connecting rope.

[0015] Preferably, the two ends of the outer bag can be fixed by sewing, gluing or tying, wherein when the tying method is used, it is fixed by a tying ring, and the tying ring is provided with a metal ring for pulling and fixing with an external rope.

[0016] Preferably, the liquid mixer is an impeller installed at both ends of a section of grouting pipeline.

[0017] Preferably, the two liquid materials A and B are non-toxic, odorless and non-corrosive. The expansion multiple of the two liquid materials A and B after mixing is about 10, and the initial expansion time is controllable from 15s to 300s, the expansion duration is less than 20s, and the compressive strength of the mixed material after expansion and curing is greater than 5MPa.

[0018] A method for installing a rapid self-built sluice wall system in a mine tunnel comprises the following steps:

[0019] Step 801, select a tunnel behind the transfer machine, and install the bag body on the top plate of the tunnel in the folding form required by the bag body system manual;

[0020] Step 802, installing a diversion system at the tunnel floor position corresponding to the bag system;

[0021] Step 803: Determine the length of the pulling rope according to the calculation method given in the manual, and fix the pulling rope to the hook of the anchor rod or anchor cable on the top plate in front of the bag body;

[0022] Step 804: Install the three-way automatic gate valve at the ends of the high-pressure air pipe and the high-pressure water pipe at the rear of the bag system;

[0023] Step 805, installing the blocking columns on both sides of the retractable belt rack;

[0024] Step 806, installing the automatic control system on the side wall of the lane behind the bag system;

[0025] Step 807, install the water pressure sensor in a special container at the drainage groove of the bottom plate at the rear of the bag body, and connect it to the automatic control system;

[0026] Step 808, install the filling material storage tank behind the bag system against the tunnel wall;

[0027] Step 809, sequentially connect the high-pressure air duct, the filling material storage tank, the first grouting pipeline and the spraying pipe, and sequentially connect the high-pressure water pipe, the water filling pipeline and the water injection pipe, wherein a liquid mixer is installed on the first grouting pipeline, and a pressure pump is installed on the water filling pipeline;

[0028] Step 810, connect the high-pressure air duct, the filling material storage tank, and the second grouting pipeline in sequence to the bag system in which the outer bag is a double-layer bag and the inner liner bag, and install a booster pump and a liquid mixer on the second grouting pipeline.

[0029] The order of the above steps 801-810 is not fixed and can be performed simultaneously. The arrangement height of the special container equipped with the water pressure sensor and the activation threshold of the sluice wall should be determined according to the hydrogeological conditions of the mine. The large and small material storage tanks are fixed on the tunnel floor or tunnel wall to prevent them from being knocked down by sudden water and losing their function. The large and small material storage tanks can be connected or separated.

[0030] The length of the pulling rope should be adjustable as needed, and the adjusted length should remain fixed. The tensile strength of the pulling rope should not be less than 20T. The tunnel for building the sluice wall should have good engineering geological conditions: good surrounding rock integrity, no cracks, no spalling or roof collapse, and no delamination of the roof. If the surrounding rock does not meet the above requirements, the surrounding rock should be treated with chemical grouting, and the sluice wall can be built only after it meets the standards.

[0031] A fast self-built sluice wall system containing gallbladder is applied to underground water blocking in a mine, and the water blocking method comprises the following steps:

[0032] Step 901: When a water disaster occurs, the water pressure sensor sends a signal to the automatic control system;

[0033] Step 902, the automatic control system controls the retractable belt frame to retract, so that the bag system automatically falls from the tunnel roof and unfolds;

[0034] Step 903: Open the valves of the high-pressure air pipe and the high-pressure water pipe;

[0035] Step 904: Liquids A and B in the filling material storage tank are mixed by a liquid mixer and then injected into the cavity interlayer in the bag system;

[0036] Step 905, the mixed liquid injected into the bag system expands and solidifies;

[0037] Step 906: The water in the high-pressure water pipe is injected into the inner tank through the water filling pipeline;

[0038] Step 907: the outer bag is filled and the pressurized filling system stops working, and the water in the lane is temporarily blocked;

[0039] Step 908, the automatic gate valve of the diversion system is closed;

[0040] Step 909, the bag system cools and shrinks, causing secondary water leakage in the tunnel;

[0041] Step 910: For the double-layer bag inner liner, the high-pressure air duct valve connected to the secondary filling system is opened, and the secondary filling system is operated to perform secondary grouting filling on the double-layer outer bag; for the single-layer outer bag, the pressure pump on the water filling pipeline is started to inject water into the inner liner for the second time;

[0042] Step 911, when the secondary grouting and secondary water filling of the bag system are completed, the water damage stops and the bag system completely blocks the tunnel.

[0043] Compared with the prior art, the present invention has the following advantages:

[0044] 1. The sluice wall in the present invention is self-built, and the filling materials are slurry and water, which is twice as fast as the earlier similar patented technology. Moreover, the filling materials are all located on site, eliminating the transportation time. The filling speed is the maximum flow of the high-pressure gas or water pipeline, and the filling time is less than 20 minutes. The construction speed is about 144 times faster than the traditional concrete sluice wall and 24 times faster than the sluice wall cast by chemical slurry, which can greatly reduce the risk of well flooding.

[0045] 2. The sluice wall constructed by the present invention has high strength and high water pressure resistance. The tensile strength of the sluice wall bag system is greater than 10MPa. Under the limit of 10 times expansion multiple, the ability of the filler to resist water pressure after expansion, solidification and hardening is greater than 3MPa. The bag strength is greater than the expansion pressure of the filler, and the bag will not burst, which is safe and reliable.

[0046] 3. The bag system of the present invention has strong rupture resistance, which can effectively avoid the hidden danger of leakage caused by the traditional bag system being easily punctured by sharp rocks protruding from the tunnel wall, broken metal mesh, and pointed ends of anchor rods or anchor cables after being subjected to the expansion pressure of the filler.

[0047] 4. The pipelines in the present invention are all connected by quick connectors on the three-way valve, and the system adopts a programmed construction plan. The pulling rope and the textile bag, the filling storage tank and the anchor head are all connected by a locked hook, so the construction is convenient and easy. The water gate wall determines whether a water disaster occurs through the water pressure data collected by the water pressure sensor, and can respond in time, which can provide good protection for the safety of life and property underground.

[0048] 5. The present invention designs a double-layer inner bag body and a single-layer inner bag body as the main body of the sluice wall, which can be filled with expansion curing materials and water at the same time. When a secondary leakage occurs after the initial filling of the sluice wall, a secondary filling is performed, eliminating the problem of cooling and shrinking leakage of the filler and continuously maintaining the sealing effect.

[0049] The present invention is further described in detail below with reference to the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 It is a structural schematic diagram of the present invention.

[0051] Figure 2 It is a schematic diagram of the structure of the double-layer bag liner bag body system during the filling process of the present invention.

[0052] Figure 3It is a schematic diagram of the structure after the double-layer bag liner bag system of the present invention is filled.

[0053] Figure 4 It is a structural schematic diagram of the single-layer bag liner bag body system during the filling process of the present invention.

[0054] Figure 5 It is a schematic diagram of the structure after the single-layer bag liner bag system of the present invention is filled.

[0055] Figure 6 It is a schematic diagram of the connection structure of the large A material storage tank, the small A material storage tank, the high-pressure air duct and the high-pressure water pipe in the present invention.

[0056] Figure 7 It is a schematic diagram of the arrangement of the blocking column and the retractable belt rack in the present invention.

[0057] Figure 8 It is a schematic diagram of the arrangement of the water pressure sensor in the present invention.

[0058] Fig. 9 It is a structural schematic diagram of the tying ring in the present invention.

[0059] Description of reference numerals:

[0060] 1—Outer bag; 2—Inner liner; 3—Water injection pipe;

[0061] 4—Shotcrete pipe; 5—A large material storage tank; 6—A small material storage tank;

[0062] 7—Large tank for B material storage; 8—Small tank for B material storage; 9—High-pressure air duct;

[0063] 10—high-pressure water pipe; 11—first grouting pipeline; 12—second grouting pipeline;

[0064] 13—blocking column; 14—retractable belt rack; 15—water filling pipeline;

[0065] 16—Mine water inrush; 17—Transfer machine; 18—Roof;

[0066] 19—expansion solidification filler; 20—water; 21—automatic gate valve;

[0067] 22—bottom plate; 23—drainage trough; 24—water pressure sensor;

[0068] 25—Automatic control system; 26—Metal ring; 27—Bundling ring. DETAILED DESCRIPTION

[0069] like Figure 1 As shown, the present invention includes a bag system, a filling system, a fixing system and an automatic control system.

[0070] like Figures 2 to 5 As shown, the bag system is composed of a high-strength textile outer bag 11, an expandable high-temperature resistant rubber inner bag 22, a spraying pipe 44 and a water injection pipe 3. The inner bag 2 is arranged in the outer bag 1 and a cavity interlayer is formed between the inner bag 2 and the outer bag 1. The spraying pipe 4 passes through the outer bag 1 to communicate with the cavity interlayer, and the water injection pipe passes through the outer bag 1 to communicate with the inner bag 2; the outer bag 1 is a single-layer structure outer bag or a double-layer structure outer bag, and the single-layer structure outer bag; the outer bag 1 is made of high-strength textile.

[0071] When the bag system is filled with the expanded and solidified organic-inorganic hybrid material and water, the solidified material and water will be in a static state, the expanded and solidified filling material will shrink due to cooling, and the initially formed sluice wall will leak. For the single-layer outer bag body, high-pressure water injection into the inner liner 2 is continued at this time to cause the bag system to expand secondary to maintain the water blocking effect. On the other hand, for the double-layer outer bag body, the cavity interlayer in the bag system is continued to be grouting filled to maintain the water blocking effect.

[0072] like Figure 6 As shown, the filling system includes a primary filling system and a secondary filling system. The primary filling system includes a large filling storage tank, a first grouting pipeline 11 and a water filling pipeline 15. The inlet of the large filling storage tank is connected to the air outlet of the existing high-pressure air duct 9 underground, and the outlet of the large filling storage tank is connected to the spraying pipe 4 through the first grouting pipeline 11. One end of the water filling pipeline 15 is connected to the existing high-pressure water pipe 10 underground, and the other end of the water filling pipeline 15 is connected to the water injection pipe. A pressure pump is installed on the water filling pipeline 15, and a liquid mixer is installed on the first grouting pipeline 11; the secondary filling system includes a small filling storage tank and a second grouting pipeline 12, the The inlet of the small filling storage tank is connected with the outlet of the existing high-pressure air duct 9 underground, and the outlet is connected to the cavity interlayer of the bag system through the second grouting pipeline 12. The second grouting pipeline 12 is successively installed with a pressure pump and a liquid mixer. The large filling storage tank and the small filling storage tank both store two liquid materials A and B at the same time, namely, the large A material storage tank 5, the B material storage tank 7, the A material storage tank 6 and the B material storage tank 8. The A and B materials are mixed to become expanded and solidified fillers 19. The outlets of the high-pressure air duct 9 and the high-pressure water pipe 10 are both installed with three-way automatic gate valves 21; the secondary filling system is installed on the bag system of the double-layer outer bag 1.

[0073] Both the primary filling system and the secondary filling system utilize the existing high-pressure air duct 9 as power to fill the mixed liquid material into the bag system through two material tanks placed on one side of the tunnel. The gas in the high-pressure air duct 9 applies pressure on the top surface of the filling material storage tank, driving the liquid to flow to the inlet at the bottom of the vertical pipe in the tank and enter the liquid mixer for mixing.

[0074] like Figure 7 As shown, the fixing system includes an existing anchor rod or anchor cable located on the tunnel roof 18 underground, a pulling rope, a blocking column 13 and a retractable belt rack 14 installed at the rear of the bag body. The bag body system is connected to the anchor rod or anchor cable through a fixed joint directly above, and the front end of the bag body system is connected to the anchor rod or anchor cable through a pulling rope. The blocking column 13 is vertically arranged at the rear end of the bag body system. The function of the pulling rope is to prevent the bag body system from shaking its head and getting entangled when water bursts into the tunnel. The function of the blocking column 13 is to prevent the bag body system from getting entangled due to the tail swinging when water bursts into the tunnel. The blocking column 13 can be a hydraulic support or a high-angle blocking frame.

[0075] The automatic control system is an existing automatic control substation, which is installed on the side wall of the rear lane of the bag system. The automatic control system is connected to the retractable belt rack 14 and each automatic gate valve 21. It can release the bag system by controlling the extension and retraction of the retractable belt rack 14, and control the opening and closing of the high-pressure air duct 9 and the high-pressure water pipe 10 by controlling each automatic gate valve 21.

[0076] like Figure 8 As shown, the gallbladder-containing rapid self-built sluice wall system also includes a diversion system and a water pressure sensor 24 arranged in the drainage groove 23 of the bottom plate 22 of the roadway behind the bag system. The diversion system includes a diversion water pipe fixed by concrete and half lying in the bottom plate 22 and an automatic gate valve 21 installed at the outlet of the diversion water pipe. The diversion water pipe made of metal water pipe is used to replace the drainage ditch of the bottom plate 22 to discharge the surrounding rock water in the excavation process, avoid the sluice wall to block the drainage ditch tightly, or the malignant water inrush during the construction of the diversion sluice wall, and reduce the swing of the sluice wall. The diversion water pipe is built into an arc with concrete to avoid the problem of poor blocking caused by the intersection of the pipe and the bottom plate 22 at an acute angle. The diameter of the diversion water pipe is based on the principle of not affecting the extension and contraction of the belt frame, and the length of the diversion water pipe is preferably longer than the sluice wall by more than 0.5m. The water pressure sensor 24 and the automatic gate valve 21 on the diversion water pipe are both connected to the automatic control system.

[0077] In this embodiment, the outer bag 1 is the main body of the sluice wall, which is the main body for constraining the shape of the sluice wall and blocking the water flow. The cross-sectional size of the outer bag 1 is greater than 1.2 times the cross-sectional size of the tunnel.

[0078] In this embodiment, the inner liner 2 is suspended in the outer bag 1 by a connecting rope.

[0079] In this embodiment, the two ends of the outer bag 1 can be fixed by sewing, gluing or tying. When the tying method is used, the two ends of the outer bag 1 are fixed by a tying ring 27, and the tying ring 27 is provided with a metal ring 26 for pulling and fixing with an external rope.

[0080] In this embodiment, the liquid mixer is an impeller installed at both ends of a section of grouting pipeline.

[0081] In this embodiment, the two liquid materials A and B are non-toxic, odorless, and non-corrosive. The expansion multiple of the two liquid materials A and B after mixing is about 10, and the initial expansion time is controllable from 15s to 300s, the expansion duration is less than 20s, and the compressive strength of the mixed material after expansion and curing is greater than 5MPa.

[0082] The installation method of the above-mentioned gallbladder-containing rapid self-built sluice wall system in a mine tunnel comprises the following steps:

[0083] Step 801, select a tunnel behind the transfer machine 17, and install the bag body on the top plate 18 of the tunnel according to the folding form required by the bag body system manual;

[0084] Step 802, installing a diversion system at the position of the tunnel floor 22 corresponding to the bag system;

[0085] Step 803, determine the length of the pulling rope according to the calculation method given in the manual, and fix the pulling rope to the hook of the anchor rod or anchor cable on the top plate 18 in front of the bag body;

[0086] Step 804: Install the three-way automatic gate valve 21 at the ends of the high-pressure air pipe 9 and the high-pressure water pipe 10 at the rear of the bag system;

[0087] Step 805, installing the blocking column 13 on both sides of the retractable belt frame 14;

[0088] Step 806, installing the automatic control system on the side wall of the lane behind the bag system;

[0089] Step 807, install the water pressure sensor 24 in a special container at the drainage groove 23 of the rear bottom plate 22 of the bag body, and connect it to the automatic control system;

[0090] Step 808, install the filling material storage tank behind the bag system against the tunnel wall;

[0091] Step 809, sequentially connect the high-pressure air duct 9, the filling material storage tank, the first grouting pipeline 11 and the spraying pipe 4, and sequentially connect the high-pressure water pipe 10, the water filling pipeline 15 and the water injection pipe, wherein a liquid mixer is installed on the first grouting pipeline 11, and a pressure pump is installed on the water filling pipeline 15;

[0092] Step 810, connect the high-pressure air duct 9, the filling material storage tank, and the second grouting pipeline 12 in sequence to the double-layer bag system of the outer bag 1, and install a booster pump and a liquid mixer on the second grouting pipeline 12.

[0093] In this embodiment, the order of the above steps 801-810 is not fixed and can be performed simultaneously. The arrangement height of the special container equipped with the water pressure sensor 24 and the activation threshold of the sluice wall should be determined according to the hydrogeological conditions of the mine. The large and small material storage tanks are fixed on the tunnel floor 22 or the tunnel wall to prevent them from being knocked down by sudden water and losing their functions. The large and small material storage tanks can be connected or separated.

[0094] In this embodiment, the length of the pulling rope should be adjustable as needed, and the adjusted length remains fixed. The tensile strength of the pulling rope is not less than 20T. The tunnel for building the sluice wall should have good engineering geological conditions: good surrounding rock integrity, no cracks, no spalling or roof collapse, and no delamination of the roof 18. If the surrounding rock does not meet the above requirements, the surrounding rock should be treated with chemical grouting, and the sluice wall can be built only after it meets the standards.

[0095] The above-mentioned gallbladder-containing rapid self-built sluice wall system is applied to underground water blocking in mines. The water blocking process includes the following steps:

[0096] Step 901: When a mine water inrush 16 occurs, the water pressure sensor 24 sends a signal to the automatic control system;

[0097] Step 902, the automatic control system controls the retractable belt frame 14 to retract, so that the bag system automatically falls from the tunnel roof 18 and unfolds;

[0098] Step 903, the valves of the high-pressure air pipe 9 and the high-pressure water pipe 10 are opened;

[0099] Step 904: Liquids A and B in the filling material storage tank are mixed by a liquid mixer and then injected into the cavity interlayer in the bag system;

[0100] Step 905, the mixed liquid injected into the bag system expands and solidifies;

[0101] Step 906: The water 20 in the high-pressure water pipe 10 is injected into the inner tank 2 through the water filling pipeline 15;

[0102] Step 907, the outer bag 1 is filled and the pressurized filling system stops working, and the water in the lane is temporarily blocked;

[0103] Step 908, the automatic gate valve 21 of the diversion system is closed;

[0104] Step 909, the bag system cools and shrinks, causing secondary water leakage in the tunnel;

[0105] Step 910: For the double-layer outer bag, the valve of the high-pressure air duct 9 connected to the secondary filling system is opened, and the secondary filling system is operated to perform secondary grouting filling on the double-layer bag inner liner 2; for the single-layer outer bag, the pressure pump on the water filling pipeline 15 is started to inject water 20 into the inner liner 2 for the second time;

[0106] Step 911, when the secondary grouting and secondary water filling of the bag system are completed, the water damage stops and the bag system completely blocks the tunnel.

[0107] The above is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent change made to the above embodiment according to the technical essence of the invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A rapid self-built sluice wall system containing gallbladders, characterized in that: It includes a bag system, a filling system, a fixing system and an automatic control system (25); The bag system is composed of an outer bag (1), an expandable inner liner (2), a spraying pipe (4) and a water injection pipe (3); the inner liner (2) is arranged in the outer bag (1) and a cavity sandwich is formed between the inner liner (2) and the outer bag (1); the spraying pipe (4) passes through the outer bag (1) and is connected to the cavity sandwich; the water injection pipe (3) passes through the outer bag (1) and is connected to the inner liner (2); the outer bag (1) is a single-layer structure outer bag or a double-layer structure outer bag; the outer bag (1) is made of high-strength textile fabric; The filling system comprises a primary filling system and a secondary filling system. The primary filling system comprises a filling material storage tank, a first grouting pipeline (11) and a water filling pipeline (15). The inlet of the filling material storage tank is connected to the air outlet of an existing high-pressure air pipe (9) underground. The outlet of the filling material storage tank is connected to the grouting pipe (4) through the first grouting pipeline (11). One end of the water filling pipeline (15) is connected to an existing high-pressure water pipe (10) underground. The other end of the water filling pipeline (15) is connected to the water injection pipe (3). A pressure pump is installed on the water filling pipeline (15). A liquid mixer is installed on the first grouting pipeline (11). The secondary filling system comprises A small filling material storage tank and a second grouting pipeline (12), wherein the inlet of the small filling material storage tank is connected to the air outlet of an existing high-pressure air duct (9) underground, and the outlet is connected to the cavity interlayer of the bag system through the second grouting pipeline (12), and a pressure pump and a liquid mixer are sequentially installed on the second grouting pipeline (12), and the large filling material storage tank and the small filling material storage tank both store two liquid materials A and B at the same time, and the A and B materials become expanded and solidified filling materials (19) after mixing, and the outlets of the high-pressure air duct (9) and the high-pressure water pipe (10) are both installed with three-way automatic gate valves (21); the secondary filling system is installed on the bag system of the double-layer outer bag (1); The fixing system comprises an existing anchor rod or anchor cable located on the tunnel roof (18) underground, a pulling rope, a blocking column (13) and a retractable belt rack (14) installed at the rear of the bag body. The upper part of the bag body system is connected to the anchor rod or anchor cable via a fixed joint, the front end of the bag body system is connected to the anchor rod or anchor cable via a pulling rope, the blocking column (13) is vertically arranged at the rear end of the bag body system, and the direction of the bag body system facing the water inrush is the front. The automatic control system (25) is an existing automatic control substation, and the automatic control system (25) is installed on the side wall of the rear lane of the bag system, and the automatic control system (25) is connected to the retractable belt rack (14) and the automatic gate valve (21); The gallbladder-containing rapid self-built sluice wall system also includes a diversion system and a water pressure sensor (24) arranged in a drainage ditch (23) of a tunnel bottom plate (22) behind the bag system. The diversion system includes a diversion water pipe fixed by concrete and semi-lying in the bottom plate (22) and an automatic gate valve (21) installed at the outlet of the diversion water pipe. The water pressure sensor (24) and the automatic gate valve (21) on the diversion water pipe are both connected to an automatic control system (25).

2. A gallbladder-containing rapid self-built sluice wall system according to claim 1, characterized in that: The cross-sectional dimension of the outer bag (1) is greater than 1.2 times the cross-sectional dimension of the tunnel.

3. A gallbladder-containing rapid self-built sluice wall system according to claim 1, characterized in that: The inner liner (2) is suspended inside the outer bag (1) via a connecting rope.

4. A gallbladder-containing rapid self-built sluice wall system according to claim 1, characterized in that: When the two ends of the outer bag (1) are fixed by bundling, the two ends of the outer bag (1) are sealed together and fixed by bundling rings (27), and the bundling rings (27) are provided with metal rings (26) for pulling and fixing with external ropes.

5. A gallbladder-containing rapid self-built sluice wall system according to claim 1, characterized in that: The liquid mixer is an impeller installed at both ends of a section of grouting pipeline.

6. A gallbladder-containing rapid self-built sluice wall system according to claim 1, characterized in that: A check valve is installed at the water injection port where the inner tank (2) is connected to the water injection pipe (3).

7. A gallbladder-containing rapid self-built sluice wall system according to claim 1, characterized in that: The two liquid materials A and B are non-toxic, odorless and non-corrosive. After mixing, the expansion multiple of the two liquid materials A and B is about 10, and the initial expansion time is controllable from 15s to 300s, the expansion duration is less than 20s, and the compressive strength of the mixed material after expansion and curing is greater than 5MPa.

8. A method for installing a rapid self-built sluice wall system in a mine tunnel, characterized in that: The following steps are involved: Step 801, select a tunnel behind the transfer machine, fold and shrink the bag system and install it on the top plate (18) of the tunnel; Step 802, installing a diversion system at the position of the tunnel floor (22) corresponding to the installed bag system; Step 803, fix the pulling rope to the hook of the anchor rod or anchor cable on the front top plate (18) of the bag body; Step 804: Install the three-way automatic gate valve (21) at the ends of the high-pressure air pipe (9) and the high-pressure water pipe (10) at the rear of the bag system; Step 805, installing the blocking columns (13) on both sides of the retractable belt frame (14); Step 806, installing the automatic control system (25) on the side wall of the lane behind the bag system; Step 807, install the water pressure sensor (24) in a special container at the drainage groove (23) of the rear bottom plate (22) of the bag body, and connect it to the automatic control system (25); Step 808, install the filling material storage tank behind the bag system against the tunnel wall; Step 809, sequentially connect the high-pressure air duct (9), the filling material storage tank, the first grouting pipeline (11) and the spraying pipe (4), and sequentially connect the high-pressure water pipe (10), the water filling pipeline (15) and the water injection pipe (3), wherein a liquid mixer is installed on the first grouting pipeline (11), and a pressure pump is installed on the water filling pipeline (15); Step 810, connect the high-pressure air duct (9), the filling material storage tank, and the second grouting pipeline (12) in sequence to the bag body system in which the outer bag (1) is a double-layer bag inner liner (2), and install a booster pump and a liquid mixer on the second grouting pipeline (12).

9. A rapid self-built sluice wall system containing gallbladder is applied to underground water blocking in mines, characterized in that The water plugging process includes the following steps: Step 901: When a flood occurs, the water pressure sensor (24) sends a signal to the automatic control system (25); Step 902, the automatic control system (25) controls the retractable belt frame (14) to retract, so that the bag system automatically falls from the tunnel roof (18) and unfolds; Step 903, the valves of the high-pressure air pipe (9) and the high-pressure water pipe (10) are opened; Step 904: Liquids A and B in the filling material storage tank are mixed by a liquid mixer and then injected into the cavity interlayer in the bag system; Step 905, the mixed liquid injected into the bag system expands and solidifies; Step 906: the water in the high-pressure water pipe (10) is injected into the inner tank (2) through the water filling pipeline (15); Step 907: the outer bag (1) is filled and the pressurized filling system stops working, and the water in the tunnel is temporarily blocked; Step 908, the automatic gate valve (21) of the diversion system is closed; Step 909, the bag system cools and shrinks, causing secondary water leakage in the tunnel; Step 910: For the double-layer outer bag body, the valve of the high-pressure air duct (9) connected to the secondary filling system is opened, and the secondary filling system is operated to perform secondary grouting filling on the double-layer outer bag body; for the single-layer outer bag body, the pressure pump on the water filling pipeline (15) is started to inject water into the inner liner (2) for the second time; Step 911, when the secondary grouting and secondary water filling of the bag system are completed, the water damage stops and the bag system completely blocks the tunnel.

Citation Information

Patent Citations

  • Quick self-built sluice wall system with container

    CN213574221U