System and method for removing dioxins from fly ash from garbage incineration in cement production line
By setting up fly ash degradation dioxin units in the cement clinker production line, the dioxin in the waste incineration fly ash is removed using cement kiln flue gas and specific temperatures, and the exhaust gas is re-entered into the kiln, which solves the problem of waste incineration fly ash. The problem of crust blockage caused by dioxin treatment has achieved the stability of cement production and the complete incineration of dioxin.
Patent Information
- Application Number
- CN202010426670.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-19
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-05-19
AI Technical Summary
The treatment of dioxins in waste incineration fly ash has problems that cause chloride volatilization during the coordinated disposal of cement kilns, causing crust blockage, affecting cement quality and normal production operation.
By setting up fly ash degradation dioxin units in the cement clinker production line, the dioxin in the fly ash is removed using cement kiln flue gas and specific temperatures, and the exhaust gas is re-entered into the kiln for disposal, to avoid the exhaust gas being re-synthesised dioxin, and to achieve the realization of the dioxin Totally burned.
Effectively remove dioxins from fly ash, avoiding crust blockage during cement production, ensuring cement quality and production continuity, and at the same time, there is no limit on the chloride ion content in fly ash.
Smart Images

Figure CN111473346B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of fly ash treatment, and in particular relates to a system and method for removing dioxins in fly ash from garbage incineration, which is connected in parallel with a cement clinker production line. Background Art
[0002] With the rapid growth of my country's economy, the emission of urban domestic waste in my country has also been increasing. Waste incineration power generation is an efficient treatment method with high harmlessness, large capacity reduction and maximum energy recovery. After purification, heavy metals and dioxins in the flue gas generated by the incineration of domestic waste are intercepted in the fly ash. The "National List of Hazardous Wastes" has stipulated that fly ash from waste incineration is a hazardous waste numbered HW18. my country's waste incineration is mainly based on fluidized bed and grate furnaces. The processing capacity of the two types of furnaces accounts for 1:2 of my country's domestic waste. The amount of fly ash produced by the fluidized bed incinerator is about 15-20% of the mass of the waste entering the furnace, and the amount of fly ash produced by the grate furnace is about 3-5% of the amount of waste entering the furnace. It is estimated that by the end of 2020, the total amount of waste incineration will reach 591,400 tons / day, and the annual amount of fly ash will be about 10 million tons.
[0003] "List of Hazardous Waste Exemption Management": The disposal of fly ash from the incineration of domestic waste meets the "Pollution Control Standards for Co-treatment of Solid Wastes in Cement Kilns" (GB30485-2013), and enters the cement kiln for co-treatment. The cement kiln co-treatment process is not managed as hazardous waste. Although the detoxification of fly ash can be effectively achieved by putting it into the high-temperature zone of the cement kiln, the chlorine content in fly ash is generally as high as 10%. When the cement kiln directly co-treatments it, chlorides are easy to volatilize in the kiln, return to the kiln tail smoke chamber, decomposition furnace and other parts with the flue gas, and gradually turn into solid as the temperature decreases. Chlorides circulate back and forth in the cement kiln system, constantly transforming between gas, liquid and solid phases, which can easily cause crusting and blockage. If appropriate measures are not taken, not only the quality of cement cannot be guaranteed, but cement production cannot operate normally. Summary of the invention
[0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide a system and method for removing dioxins from fly ash from garbage incineration in parallel with a cement clinker production line. By analyzing the available waste heat of the cement plant, the temperature and cement kiln flue gas suitable for removing dioxins from fly ash from garbage incineration are selected, and the purpose of degrading dioxins is achieved by controlling the reaction time and temperature. At the same time, in order to avoid the re-synthesis of dioxins by tail gas, the tail gas is re-entered into the kiln for disposal. The present invention utilizes the unique atmosphere and temperature of the cement production line to treat dioxins in fly ash in parallel. Compared with the coordinated treatment of fly ash by cement kilns, there is no restriction on the chloride ion content in the fly ash, and it will not cause crusting and blockage in the cement production process.
[0005] The present invention is realized in this way: a system for removing dioxins from fly ash from garbage incineration connected in parallel with a cement clinker production line comprises:
[0006] An atmosphere gas extraction point of a cement clinker production line, wherein the atmosphere gas extraction point of the cement clinker production line is used to extract cement kiln flue gas suitable for treating fly ash from the cement clinker production line;
[0007] A fly ash dioxin degradation unit, which is used to remove dioxins in fly ash. The air inlet end of the fly ash dioxin degradation unit is connected to the atmosphere air intake point of the cement clinker production line. A stirrer for stirring the fly ash is provided in the fly ash dioxin degradation unit;
[0008] A fly ash storage and unloading unit, wherein the fly ash storage and unloading unit is connected to a fly ash degradation dioxin unit, and the fly ash storage and unloading unit comprises a fly ash storage bin for storing fly ash supplied to the fly ash degradation dioxin unit, and a fly ash cooling bin for cooling fly ash from which dioxins have been removed by the fly ash degradation dioxin unit; the discharge end of the fly ash storage bin is connected to the feed end of the fly ash degradation dioxin unit, and the discharge end of the fly ash degradation dioxin unit is connected to the feed end of the fly ash cooling bin;
[0009] A gas delivery unit is used to deliver the cement kiln flue gas selected from the atmosphere gas intake point of the cement clinker production line to the fly ash dioxin degradation unit, and at the same time deliver the tail gas in the fly ash dioxin degradation unit to the cement kiln head for further treatment. The air inlet end of the gas delivery unit is connected to the air outlet end of the fly ash dioxin degradation unit, and the air outlet end of the gas delivery unit is connected to the cement kiln head.
[0010] In the above technical solution, preferably, the atmosphere gas intake point of the cement clinker production line is located at the outlet of the decomposition furnace and before entering the suspension preheater, or at the outlet of the fourth-stage preheater, or at the place where the tertiary air duct enters the decomposition furnace.
[0011] In the above technical solution, preferably, a cyclone separator is arranged between the fly ash dioxin degradation unit and the atmosphere gas intake point of the cement clinker production line, the air inlet end of the cyclone separator is connected to the atmosphere gas intake point of the cement clinker production line, the air outlet end of the cyclone separator is connected to the air inlet end of the fly ash dioxin degradation unit, and the discharge end of the cyclone separator is connected to the decomposition furnace of the cement clinker production line.
[0012] In the above technical solution, it is further preferred that a valve capable of adjusting the flue gas flow rate is installed on the pipe at the air inlet end of the cyclone separator.
[0013] In the above technical solution, preferably, a cyclone dust collector is provided between the fly ash degrading dioxin unit and the gas conveying unit, the air inlet end of the cyclone dust collector is connected to the air outlet end of the fly ash degrading dioxin unit, the air outlet end of the cyclone dust collector is connected to the air inlet end of the gas conveying unit, and the discharge end of the cyclone dust collector is connected to the feed end of the fly ash degrading dioxin unit.
[0014] In the above technical solution, preferably, the fly ash dioxin degradation unit includes a digestion bin, the air inlet end of the fly ash dioxin degradation unit is located at one side of the bottom of the digestion bin, the feed end and the air outlet end of the fly ash dioxin degradation unit are both located at the top of the digestion bin, the discharge end of the fly ash dioxin degradation unit is located at the bottom of the digestion bin, and the agitator is installed in the digestion bin.
[0015] In the above technical solution, it is further preferred that a vibration device is installed on the outer side of the bottom of the digestion chamber.
[0016] In the above technical solution, preferably, the gas delivery unit includes a fan, through which the cement kiln flue gas selected from the atmosphere gas intake point of the cement clinker production line is delivered to the fly ash dioxin degradation unit, and the tail gas after the dioxins are degraded in the fly ash dioxin degradation unit is delivered to the cement kiln head for further disposal.
[0017] The method for removing dioxins from waste incineration fly ash using the above system comprises the following steps:
[0018] (1) Select an atmosphere gas intake point and take the cement kiln flue gas from the atmosphere gas intake point;
[0019] (2) The gas transport unit transports the extracted cement kiln flue gas to the fly ash dioxin degradation unit, and at the same time transports the fly ash in the fly ash storage bin to the fly ash dioxin degradation unit;
[0020] (3) The fly ash is heated to 350°C to 450°C by introducing cement kiln flue gas into the fly ash dioxin degradation unit and kept at this temperature for 1 to 3 hours;
[0021] (4) The tail gas in the fly ash dioxin degradation unit is introduced into the cement kiln head through the gas transport unit for incineration and disposal. At the same time, the fly ash from which dioxins have been removed in the fly ash dioxin degradation unit is discharged to the fly ash cooling bin for cooling.
[0022] In the above technical solution, preferably, the cement kiln flue gas taken out in step (2) is first separated into gas and solid by a cyclone separator, and then the gas enters the fly ash dioxin degradation unit, and the separated solid is returned to the decomposition furnace of the cement clinker production line.
[0023] The advantages and positive effects of the present invention are:
[0024] 1. The present invention utilizes the unique atmosphere and temperature of the cement production line to treat dioxins in fly ash in parallel. Compared with the coordinated treatment of fly ash in cement kilns, it has no restrictions on the chloride ion content in fly ash and will not cause crusting and blockage of equipment in the cement production process.
[0025] 2. The present invention achieves the purpose of degrading dioxins by selecting a temperature and flue gas suitable for degrading dioxins in waste incineration fly ash and controlling the reaction time and temperature. At the same time, in order to avoid the re-synthesis of dioxins in tail gas, the tail gas is re-entered into the kiln for disposal, thereby completely incinerating the dioxins in the fly ash and the dioxins that may be re-synthesized in the tail gas. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 A flow chart of a system for removing dioxins from waste incineration fly ash connected in parallel to a cement kiln clinker production line provided in Example 1 of the present invention;
[0027] Figure 2 This is a flow chart of a system for removing dioxins from waste incineration fly ash, which is connected in parallel to a cement kiln clinker production line, provided in Example 2 of the present invention.
[0028] In the figure: 1. Cyclone separator; 2. Digestion chamber; 21. Agitator; 22. Vibration device; 3. Fly ash cooling chamber; 4. Cyclone dust collector; 5. Fan; 6. Decomposition furnace; 7. Cement kiln head; 8. Conveyor; 9. Valve. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0030] Embodiment 1:
[0031] See also Figure 1 The embodiment of the present invention provides a system for removing dioxins from waste incineration fly ash connected in parallel with a cement clinker production line, comprising:
[0032] The atmosphere gas intake point of the cement clinker production line is used to select cement kiln flue gas suitable for handling fly ash from the cement clinker production line; the atmosphere gas intake point of the cement clinker production line is located at the outlet of the decomposition furnace and before entering the suspension preheater, or at the outlet of the fourth-stage preheater, or at the entry of the tertiary air duct into the decomposition furnace.
[0033] A fly ash dioxin degradation unit is used to remove dioxins in fly ash. The fly ash dioxin degradation unit includes a digestion bin. An air inlet on one side of the bottom of the digestion bin is connected to an atmosphere gas intake point of a cement clinker production line. A valve capable of adjusting the flow rate of flue gas is installed on a pipeline between the atmosphere gas intake point of the cement clinker production line and the air inlet on the digestion bin. The flow rate of the selected flue gas is adjusted in real time according to demand. A stirrer for stirring fly ash is provided in the digestion bin. The air inlet on one side of the bottom and the stirrer allow the fly ash to be more fully mixed with the cement kiln flue gas to fully degrade the dioxins in the fly ash.
[0034] A fly ash storage and unloading unit, the fly ash storage and unloading unit includes a fly ash storage bin for storing and supplying fly ash for the fly ash degradation and dioxin unit, and a fly ash cooling bin for cooling the fly ash from which dioxins have been removed by the fly ash degradation and dioxin unit; the discharge end of the fly ash storage bin is connected to the top feed end of the digestion bin via a conveyor, and the bottom discharge end of the digestion bin is connected to the feed end of the fly ash cooling bin via a conveyor. In this embodiment, a vibration device is installed on the outer side of the bottom of the digestion bin, and the vibration device is more convenient for unloading the fly ash from which dioxins have been removed in the digestion bin and conveying it to the fly ash cooling bin for cooling. An agitator is also installed in the fly ash cooling bin, and the agitator is provided so that the fly ash from which dioxins have been removed can be cooled more quickly.
[0035] A gas delivery unit is used to deliver the cement kiln flue gas selected from the atmosphere gas intake point of the cement clinker production line to the fly ash dioxin degradation unit, and at the same time deliver the tail gas in the fly ash dioxin degradation unit to the cement kiln head for further treatment; the gas delivery unit includes a fan, through which the cement kiln flue gas selected from the atmosphere gas intake point of the cement clinker production line is delivered to the fly ash dioxin degradation unit to degrade the fly ash, and a cyclone dust collector is provided between the fan and the digestion bin, The air inlet end on one side of the top of the cyclone dust collector is connected to the air outlet end on the top of the digestion bin, the air outlet end on the top of the cyclone dust collector is connected to the air inlet end of the fan, the bottom discharge end of the cyclone dust collector is connected to the top feed end of the digestion bin, and the air outlet end of the fan is connected to the kiln head of the cement kiln; the tail gas in the fly ash degradation dioxin unit is first dedusted by the cyclone dust collector to prevent fly ash from being brought into the cement kiln, and then the tail gas is transported to the kiln head of the cement kiln by the fan for disposal to prevent the tail gas from synthesizing dioxins again.
[0036] In this embodiment, closed valves are provided on the pipeline near the atmosphere gas intake point of the cement clinker production line and on the pipeline connecting the fly ash dioxin degradation unit to the gas delivery unit.
[0037] In the embodiment of the present invention, the cement kiln flue gas selected from the atmosphere gas extraction point of the cement clinker production line is directly sent to the fly ash dioxin degradation unit without being treated, which reduces the investment in equipment on the one hand and avoids the waste of heat on the other hand.
[0038] Embodiment 2:
[0039] The difference from Example 1 is that please refer to Figure 1 In this embodiment, a cyclone separator is arranged between the fly ash dioxin degradation unit and the atmosphere gas intake point of the cement clinker production line. The air inlet end on one side of the top of the cyclone separator is connected to the atmosphere gas intake point of the cement clinker production line, the air outlet end on the top of the cyclone separator is connected to the air inlet end on one side of the bottom of the digestion bin, and the discharge end at the bottom of the cyclone separator is connected to the decomposition furnace of the cement clinker production line. At this time, the valve that can adjust the flue gas flow rate is located on the pipeline at the air inlet end of the cyclone separator.
[0040] In the embodiment of the present invention, the flue gas at the atmosphere gas extraction point of the cement clinker production line is first extracted by a cyclone separator and solid-gas separation is performed before entering the fly ash dioxin degradation unit. On the one hand, the power consumption required for flue gas extraction and transportation is reduced. On the other hand, the separated solids are returned to the cement kiln decomposition furnace to avoid a reduction in cement clinker production and an increase in solids in the fly ash cooling bin, thereby reducing the power consumption generated by stirring and transportation in the fly ash dioxin degradation unit.
[0041] Embodiment 3:
[0042] The method for removing dioxins from waste incineration fly ash using the system of Example 1 comprises the following steps:
[0043] (1) Select the atmosphere gas intake point at the outlet of the cement kiln decomposition furnace and before entering the suspension preheater to take the cement kiln flue gas;
[0044] (2) The taken-out cement kiln flue gas is directly sent to the digestion bin, and the fly ash in the fly ash storage bin is transported to the digestion bin through a conveyor;
[0045] (3) Heat the fly ash to 350°C through flue gas and keep it warm for 1.5 hours;
[0046] (4) The tail gas in the fly ash degradation dioxin unit is dedusted by a cyclone dust collector and then introduced into the cement kiln head through a fan for incineration. At the same time, the fly ash from which dioxins have been removed in the digestion bin is discharged to the fly ash cooling bin through a conveyor for cooling. It is stirred while cooling to obtain the finished product.
[0047] Embodiment 4:
[0048] The method for removing dioxins from waste incineration fly ash using the system of Example 1 comprises the following steps:
[0049] (1) Select the atmosphere gas intake point at the outlet of the cement kiln's fourth-stage preheater to take the cement kiln flue gas;
[0050] (2) The taken-out cement kiln flue gas is directly sent to the digestion bin, and the fly ash in the fly ash storage bin is transported to the digestion bin through a conveyor;
[0051] (3) Heat the fly ash to 400°C through flue gas and keep it at this temperature for 2 hours;
[0052] (4) The tail gas in the fly ash degradation dioxin unit is dedusted by a cyclone dust collector and then introduced into the cement kiln head through a fan for incineration. At the same time, the fly ash from which dioxins have been removed in the digestion bin is discharged to the fly ash cooling bin through a conveyor for cooling. It is stirred while cooling to obtain the finished product.
[0053] Embodiment 5:
[0054] The method for removing dioxins from waste incineration fly ash using the system of Example 1 comprises the following steps:
[0055] (1) Select the atmosphere gas intake point where the cement kiln tertiary air duct enters the decomposition furnace to take the cement kiln flue gas;
[0056] (2) The taken-out cement kiln flue gas is directly sent to the digestion bin, and the fly ash in the fly ash storage bin is transported to the digestion bin through a conveyor;
[0057] (3) Heat the fly ash to 450°C through flue gas and keep it warm for 1 hour;
[0058] (4) The tail gas in the fly ash degradation dioxin unit is dedusted by a cyclone dust collector and then introduced into the cement kiln head through a fan for incineration. At the same time, the fly ash from which dioxins have been removed in the digestion bin is discharged to the fly ash cooling bin through a conveyor for cooling. It is stirred while cooling to obtain the finished product.
[0059] Embodiment 6:
[0060] The method for removing dioxins from waste incineration fly ash using the system of Example 2 comprises the following steps:
[0061] (1) Select the atmosphere gas intake point at the outlet of the cement kiln decomposition furnace and before entering the suspension preheater to take the cement kiln flue gas;
[0062] (2) The flue gas from the cement kiln enters the cyclone separator through a pipeline for solid-gas separation. The separated solids are returned to the decomposition furnace, and the gas is introduced into the digestion bin. At the same time, the fly ash in the fly ash storage bin is transported to the digestion bin through a conveyor;
[0063] (3) heating the fly ash to 350°C by gas and keeping the temperature for 1.5 hours;
[0064] (4) The tail gas in the fly ash degradation dioxin unit is dedusted by a cyclone dust collector and then introduced into the cement kiln head through a fan for incineration. At the same time, the fly ash from which dioxins have been removed in the digestion bin is discharged to the fly ash cooling bin through a conveyor for cooling. It is stirred while cooling to obtain the finished product.
[0065] Embodiment 7:
[0066] The method for removing dioxins from waste incineration fly ash using the system of Example 2 comprises the following steps:
[0067] (1) Select the atmosphere gas intake point at the outlet of the cement kiln's fourth-stage preheater to take the cement kiln flue gas;
[0068] (2) The flue gas from the cement kiln enters the cyclone separator through a pipeline for solid-gas separation. The separated solids are returned to the decomposition furnace, and the gas is introduced into the digestion bin. At the same time, the fly ash in the fly ash storage bin is transported to the digestion bin through a conveyor;
[0069] (3) Heat the fly ash to 400°C through gas and keep it at this temperature for 2 hours;
[0070] (4) The tail gas in the fly ash degradation dioxin unit is dedusted by a cyclone dust collector and then introduced into the cement kiln head through a fan for incineration. At the same time, the fly ash from which dioxins have been removed in the digestion bin is discharged to the fly ash cooling bin through a conveyor for cooling. It is stirred while cooling to obtain the finished product.
[0071] Embodiment 8:
[0072] The method for removing dioxins from waste incineration fly ash using the system of Example 2 comprises the following steps:
[0073] (1) Select the atmosphere gas intake point where the cement kiln tertiary air duct enters the decomposition furnace to take the cement kiln flue gas;
[0074] (2) The flue gas from the cement kiln enters the cyclone separator through a pipeline for solid-gas separation. The separated solids are returned to the decomposition furnace, and the gas is introduced into the digestion bin. At the same time, the fly ash in the fly ash storage bin is transported to the digestion bin through a conveyor;
[0075] (3) heating the fly ash to 450°C by gas and keeping the temperature for 1 hour;
[0076] (4) The tail gas in the fly ash degradation dioxin unit is dedusted by a cyclone dust collector and then introduced into the cement kiln head through a fan for incineration. At the same time, the fly ash from which dioxins have been removed in the digestion bin is discharged to the fly ash cooling bin through a conveyor for cooling. It is stirred while cooling to obtain the finished product.
[0077] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents, and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A system for removing dioxins from fly ash from garbage incineration connected in parallel with a cement clinker production line, characterized in that: include: An atmosphere gas extraction point of a cement clinker production line, wherein the atmosphere gas extraction point of the cement clinker production line is used to extract cement kiln flue gas suitable for treating fly ash from the cement clinker production line; A fly ash dioxin degradation unit, which is used to remove dioxins in fly ash. The air inlet end of the fly ash dioxin degradation unit is connected to the atmosphere air intake point of the cement clinker production line. A stirrer for stirring the fly ash is provided in the fly ash dioxin degradation unit; A fly ash storage and unloading unit, wherein the fly ash storage and unloading unit is connected to a fly ash degradation dioxin unit, and the fly ash storage and unloading unit comprises a fly ash storage bin for storing fly ash supplied to the fly ash degradation dioxin unit, and a fly ash cooling bin for cooling fly ash from which dioxins have been removed by the fly ash degradation dioxin unit; the discharge end of the fly ash storage bin is connected to the feed end of the fly ash degradation dioxin unit, and the discharge end of the fly ash degradation dioxin unit is connected to the feed end of the fly ash cooling bin; A gas delivery unit, the gas delivery unit is used to deliver the cement kiln flue gas selected from the atmosphere gas extraction point of the cement clinker production line to the fly ash dioxin degradation unit, and at the same time deliver the tail gas after the dioxin degradation in the fly ash dioxin degradation unit to the cement kiln head for further disposal, the gas inlet end of the gas delivery unit is connected to the gas outlet end of the fly ash dioxin degradation unit, and the gas outlet end of the gas delivery unit is connected to the cement kiln head; The atmosphere gas extraction point of the cement clinker production line is located at the outlet of the decomposition furnace and before entering the suspension preheater, or at the outlet of the fourth-stage preheater, or at the place where the tertiary air duct enters the decomposition furnace; A cyclone separator is provided between the fly ash dioxin degradation unit and the atmosphere gas intake point of the cement clinker production line, the air inlet end of the cyclone separator is connected to the atmosphere gas intake point of the cement clinker production line, the air outlet end of the cyclone separator is connected to the air inlet end of the fly ash dioxin degradation unit, and the discharge end of the cyclone separator is connected to the decomposition furnace of the cement clinker production line; The fly ash dioxin degradation unit comprises a digestion bin, the air inlet end of the fly ash dioxin degradation unit is located at one side of the bottom of the digestion bin, the feed end and the air outlet end of the fly ash dioxin degradation unit are both located at the top of the digestion bin, the discharge end of the fly ash dioxin degradation unit is located at the bottom of the digestion bin, and the agitator is installed in the digestion bin; A vibration device is installed on the outer side of the bottom of the digestion bin.
2. The system for removing dioxins from fly ash from garbage incineration connected in parallel with a cement clinker production line according to claim 1, characterized in that: A valve capable of adjusting the flue gas flow rate is arranged on the pipeline at the air inlet end of the cyclone separator.
3. The system for removing dioxins from waste incineration fly ash connected in parallel with a cement clinker production line according to claim 1, characterized in that: A cyclone dust collector is provided between the fly ash dioxin degradation unit and the gas delivery unit. The air inlet end of the cyclone dust collector is connected to the air outlet end of the fly ash dioxin degradation unit, the air outlet end of the cyclone dust collector is connected to the air inlet end of the gas delivery unit, and the discharge end of the cyclone dust collector is connected to the feed end of the fly ash dioxin degradation unit.
4. The system for removing dioxins from fly ash from garbage incineration connected in parallel with a cement clinker production line according to claim 1, characterized in that: The gas delivery unit includes a blower.
5. A method for removing dioxins from waste incineration fly ash using a system according to claim 1, characterized in that: The steps include: (1) Select an atmosphere gas intake point and take the cement kiln flue gas from the atmosphere gas intake point; (2) The gas transport unit transports the extracted cement kiln flue gas to the fly ash dioxin degradation unit, and at the same time transports the fly ash in the fly ash storage bin to the fly ash dioxin degradation unit; (3) The fly ash is heated to 350°C to 450°C by introducing cement kiln flue gas into the fly ash dioxin degradation unit and kept at this temperature for 1 to 3 hours; (4) The tail gas in the fly ash dioxin degradation unit is introduced into the cement kiln head through the gas transport unit for incineration and disposal. At the same time, the fly ash from which dioxins have been removed in the fly ash dioxin degradation unit is discharged to the fly ash cooling bin for cooling.
6. The method for removing dioxins from waste incineration fly ash according to claim 5, characterized in that: In the step (2), the taken out cement kiln flue gas is first separated into gas and solid by a cyclone separator, and then the gas enters the fly ash dioxin degradation unit, while the separated solid is returned to the decomposition furnace of the cement clinker production line.
