Automatic slag grabbing method, system, medium and device based on grid model evolution
Through grid model evolution and absolute value encoder measurement, the selection of slag grab points is optimized, and the problem of low automatic slag grab efficiency in scan-free scenarios is solved, and the full load rate and operating efficiency of grabs are improved.
Patent Information
- Application Number
- CN202110974747.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-24
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-08-24
AI Technical Summary
The prior art is difficult to automatically grab slag in no scanning scenarios, resulting in low slag grab efficiency, especially when there is water or steel slag in the slag pool, the full load rate of the grab is reduced and the driving operation efficiency is not high.
Using a method based on grid model evolution, the slag pool is divided into grids, the steel slag height is measured using an absolute encoder, the stacking evolution distance and average height are calculated, and the next slag grab point is judged to optimize the selection of slag grab point and realize automatic Catch scum.
In the scan-free scenario, automatic slag grab is achieved, which improves the full load rate of grabbing and driving operation efficiency, and improves the accuracy and particle size of steel slag shape modeling.
Smart Images

Figure CN113779716B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of grab bucket technology, and in particular to an automatic slag grab method, system, medium and device based on grid model evolution. Background Art
[0002] At present, the blast furnace slag of most domestic steel enterprises is quenched with high-pressure water. The quenched slag flows through the granulation tank and is discharged into the slag pool. Then part of the water is discharged through the bottom filter device, and then the driver operates the grab crane on the top of the slag pool to grab the slag.
[0003] However, the existing method of grabbing slag by driving a grab bucket, such as the 3D modeling method of slag based on radar scanning, performs 3D modeling and automatic slag grabbing on slag. When there is water in the slag pool, the actual height of the slag cannot be determined by installing scanning equipment such as radar or video recognition devices. Or when there is less slag in the slag pool, the grab bucket full load rate will be reduced when each rectangular unit is grabbed by the traversal method of this method, thereby reducing the operating efficiency of the driving.
[0004] Therefore, it is hoped that the problem of how to automatically grab the slag in a non-scanning scenario can be solved to improve the efficiency of grabbing the slag. Summary of the invention
[0005] In view of the shortcomings of the prior art described above, the purpose of the present invention is to provide an automatic slag grabbing method, system, medium and device based on grid model evolution, which is used to solve the problem in the prior art of how to automatically grab slag in a non-scanning scenario and improve the slag grabbing efficiency.
[0006] To achieve the above-mentioned purpose and other related purposes, the present invention provides an automatic slag grabbing method based on grid model evolution, comprising the following steps: dividing the slag pool according to a preset grid width d_y and grid length d_x to obtain a gridded slag pool, and calculating the accumulation evolution distance range_up based on a first distance calculation formula; taking the grid where the initial slag grabbing point (x, y) is located as the source grid, setting the grid covered by the grab bucket with the source grid as the center as an equal height grid, and obtaining the first height H of the remaining slag based on the absolute value encoder measurement, and setting the heights of the equal height grids to the first height H; performing accumulation evolution to obtain the outer grid height h; judging whether there is an area that has not undergone model evolution and can be covered by the grab bucket, if so, taking the center point of the area that has not undergone model evolution as the next slag grabbing point; if not, calculating the average height of each grid area in the grid range that can be covered by the grab bucket in turn, and taking the center point of the grid area with the largest average height as the next slag grabbing point.
[0007] In one embodiment of the present invention, the accumulation evolution distance range_up is calculated based on the first distance calculation formula, including: setting the initial grid height h_initial=0, obtaining the initial slag grab point (x, y), obtaining the static accumulation angle theta_up, and obtaining the grab bucket height Bucket_h; the accumulation evolution distance range_up is calculated based on the first distance calculation formula: , where [ ] indicates an integer.
[0008] In one embodiment of the present invention, the stacking evolution to obtain the outer grid height h includes: setting the grid distance between the outer grid and the outermost grid of the equal height grid to be d, recording the current height h_now of the outer grid; the outer grid height .
[0009] In one embodiment of the present invention, it further includes judging whether the average height is greater than a minimum height value H_limit. If so, the center point of the grid area with the maximum average height is used as the next slag grabbing point.
[0010] In one embodiment of the present invention, the first height H of the remaining slag is obtained by measuring based on an absolute encoder, including: a weighing sensor, an absolute encoder, a drum and a wire rope are arranged on a grab truck, the wire rope is wound on the drum, the upper end of the wire rope is connected to a weight sensor, the lower end of the wire rope is connected to a grab, and an absolute encoder for detecting height is installed on the drum. When the weight sensor detects a sudden change in the tension value of the wire rope after the grab is finished grabbing and is preparing to lift, the current absolute encoder value is used as the first height H of the remaining slag.
[0011] To achieve the above-mentioned purpose, the present invention also provides an automatic slag grabbing system based on grid model evolution, comprising: a division module, a contour calculation module, a stacking evolution module and a judgment module; the division module is used to divide the slag pool according to a preset grid width d_y and a grid length d_x to obtain a gridded slag pool, and calculate the stacking evolution distance range_up based on the first distance calculation formula; the contour calculation module is used to take the grid where the initial slag grabbing point (x, y) is located as the source grid, and set the grid covered by the grab bucket with the source grid as the center as the contour grid, and obtain the first height H of the remaining slag based on the absolute value encoder measurement, and set the height of the contour grid to the first height H; the stacking evolution module is used to perform stacking evolution to obtain the outer grid height h; the judgment module is used to determine whether there is an area that has not undergone model evolution and can be covered by the grab bucket. If so, the center point of the area that has not undergone model evolution is used as the next slag grabbing point; if not, the average height of each grid area is calculated in turn within the grid range that can be covered by the grab bucket, and the center point of the grid area with the largest average height is used as the next slag grabbing point.
[0012] In one embodiment of the present invention, the accumulation evolution distance range_up is calculated based on the first distance calculation formula, including: setting the initial grid height h_initial=0, obtaining the initial slag grab point (x, y), obtaining the static accumulation angle theta_up, and obtaining the grab bucket height Bucket_h; the accumulation evolution distance range_up is calculated based on the first distance calculation formula: , where [ ] indicates an integer.
[0013] In one embodiment of the present invention, a second judgment module is further included for judging whether the average height is greater than a minimum height value H_limit. If so, the center point of the grid area with the maximum average height is used as the next slag grabbing point.
[0014] To achieve the above objectives, the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements any of the above-mentioned automatic slag grabbing methods based on grid model evolution.
[0015] To achieve the above-mentioned purpose, the present invention also provides an automatic slag grabbing device based on grid model evolution, comprising: a processor and a memory; the memory is used to store a computer program; the processor is connected to the memory, and is used to execute the computer program stored in the memory, so that the automatic slag grabbing device based on grid model evolution can execute any of the above-mentioned automatic slag grabbing methods based on grid model evolution.
[0016] As described above, the automatic slag grabbing method, system, medium and device based on grid model evolution of the present invention have the following beneficial effects: they are used to realize automatic slag grabbing in non-scanning scenarios and optimize the grab bucket full load rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1a Shown is a flow chart of an automatic slag grabbing method based on mesh model evolution in one embodiment of the present invention;
[0018] Figure 1b A schematic diagram showing an automatic slag grabbing method based on mesh model evolution in one embodiment of the present invention
[0019] Figure 2 Shown is a schematic structural diagram of an automatic slag grabbing system based on grid model evolution in one embodiment of the present invention;
[0020] Figure 3 Shown is a schematic structural diagram of an automatic slag grabbing device based on grid model evolution in one embodiment of the present invention.
[0021] Component number description
[0022] 21 Divide modules 22 Elevation calculation module 23 Stack Evolution Module 24 Judgment module 31 processor 32 Memory DETAILED DESCRIPTION
[0023] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
[0024] It should be noted that the illustrations provided in the following embodiments are only used to illustrate the basic concept of the present invention in a schematic manner. Therefore, the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.
[0025] The automatic slag grabbing method, system, medium and device based on grid model evolution of the present invention are used to realize automatic slag grabbing in a non-scanning scenario and optimize the grab bucket full load rate.
[0026] like Figure 1a As shown, in one embodiment, the automatic slag grabbing method based on grid model evolution of the present invention comprises the following steps:
[0027] Step S11, dividing the slag pool into a gridded slag pool according to a preset grid width d_y and grid length d_x, and calculating the stacking evolution distance range_up based on the first distance calculation formula.
[0028] Specifically, the grab crane is provided with a grab, and the length direction of the grab is consistent with the length direction of the slag pool.
[0029] Specifically, the length of the grid along the length direction of the slag pool and the grab is denoted as d_x, the width of the grid along the width direction of the slag pool and the grab is denoted as d_y, and the initial height of the grid h_initial=0.
[0030] Specifically, the stacking evolution distance range_up is calculated based on the first distance calculation formula and includes:
[0031] Assume that the initial grid height h_initial = 0, obtain the initial slag grab point (x, y), obtain the static accumulation angle theta_up, and obtain the grab bucket height Bucket_h. The initial slag grab point (x, y) refers to the direction coordinates of the slag grab vehicle when the slag is grabbed for the first time in the slag pool, recorded as (x, y). The slag grab vehicle includes a large vehicle and a small vehicle. The static accumulation angle theta_up refers to the angle between the slope and the horizontal plane when the slag in the slag pool is stationary, recorded as theta_up, which can be obtained through experimental measurement.
[0032] The stacking evolution distance refers to the number of grids that can estimate the height based on the grab height and the static stacking angle, which is recorded as range_up. The stacking evolution distance range_up is calculated based on the following first distance calculation formula:
[0033] , where [ ] indicates an integer.
[0034] Step S12: taking the grid where the initial slag grabbing point (x, y) is located as the source grid, setting the grid covered by the grab bucket with the source grid as the center as the contour grid, obtaining the first height H of the remaining slag based on the absolute value encoder measurement, and setting the heights of the contour grids as the first height H.
[0035] Specifically, the grid covered by the grab bucket with the source grid as the center refers to the grid covered by the grab bucket with the source grid as the center. Figure 1b As shown, the letter A represents the source grid, and the letter B represents the grid covered by the grab bucket with the source grid as the center. The height of the source grid is the first height H, and the letter B represents the height of the grid covered by the grab bucket with the source grid as the center, which is also the first height H.
[0036] Step S13: Perform stacking evolution to obtain the outer grid height h.
[0037] Specifically, the stacking evolution means that for the outermost grid of the above-mentioned contour grid, the stacking evolution distance range_up is expanded outward one by one, and the grid distance between the evolved outer grid and the outermost grid of the contour grid is d, and the current height of the outer grid is recorded as h_now. The outer grid refers to the outer grid currently being referred to.
[0038] Specifically, the outer grid height h is obtained based on the first height calculation formula, including:
[0039] Let the grid distance between the outer grid and the outermost grid of the equal-height grid be d, and record the current height of the outer grid h_now.
[0040] Outer grid height The outer grid refers to the outer grid currently being referred to. The outermost grid of the contour grid refers to the outermost grid covered by the grab bucket with the source grid as the center. Figure 1b As shown in the figure, the outermost circle of the grid represented by the letter B is the outermost grid of the equal height grid, and the grid represented by the letter C is the outer grid. When it is the inner circle of the grid represented by the letter C, the grid distance d is 0, and when it is the outer circle of the grid represented by the letter C, the grid distance d is 1. The evolved grid is Figure 1b The inner layer of the grid marked as C, the height of the grid C adjacent to the grid B is substituted into the outer grid height of the original formula , then the height of the source grid is the first height H, which is 250, and it expands outwards one by one to the stacking evolution distance range_up of 2, the grid distance d between the outer grid evolved and the outermost grid of the equal height grid is 0, and the current height h_now of the outer grid is 0. Then h=max{250*(2-0) / 2,0}=250.
[0041] Step S14: determine whether there is an area that can be covered by the grab bucket and has not undergone model evolution. If so, take the center point of the area that has not undergone model evolution as the next slag grab point. If not, calculate the average height of each grid area in the grid range that can be covered by the grab bucket in turn, and take the center point of the grid area with the largest average height as the next slag grab point.
[0042] Specifically, the area that can be covered by the grab bucket and has not undergone model evolution refers to an area of the grid that does not belong to the source grid and the contour grid and has not undergone accumulation evolution.
[0043] Specifically, the center point of the area where model evolution has not been performed refers to the center point of the area where model evolution has not been performed and is covered by the grab bucket.
[0044] Specifically, when there is no area where model evolution has not been performed, the average height of each grid area in the grid range covered by the grab bucket is calculated by traversal. The center point of the grid area with the maximum average height is used as the next slag grab point. The average height refers to the average height of the grid covered by the grab bucket.
[0045] Specifically, it also includes judging whether the average height is greater than the minimum height H_limit. If it is, the center point of the grid area with the maximum average height is used as the next slag grab point. For a continuous grid area covering the length and width of the grab bucket, if its average height is greater than H_limit, the area can be grabbed.
[0046] Specifically, the method of obtaining the first height H of the remaining slag based on the absolute encoder includes: arranging a weighing sensor, an absolute encoder, a drum and a wire rope on the grab truck, the drum is wound with a wire rope, the upper end of the wire rope is connected to a weight sensor, the lower end of the wire rope is connected to a grab, and the drum is equipped with an absolute encoder for detecting the height. When the weight sensor detects a sudden change in the tension value of the wire rope when the grab is ready to lift after the grab is finished grabbing, the current absolute encoder value is used as the first height H of the remaining slag. In the non-scanning scenario, the present invention realizes automatic slag grabbing by estimating the height of the slag in the slag pool. Compared with the existing methods, the slag shape in the slag pool can be modeled and evolved with smaller granularity and higher precision, and a higher precision estimate can be obtained, so as to make a better selection of slag grabbing points, improve the full load rate of the grab bucket, and thus improve the driving operation efficiency.
[0047] like Figure 2 As shown, in one embodiment, the automatic slag grabbing system based on grid model evolution of the present invention includes a division module 21, a height calculation module 22, a stacking evolution module 23 and a judgment module 24.
[0048] The division module 21 is used to divide the slag pool into a gridded slag pool according to a preset grid width d_y and grid length d_x, and calculate the stacking evolution distance range_up based on the first distance calculation formula.
[0049] The height calculation module 22 is used to take the grid where the initial slag grab point (x, y) is located as the source grid, set the grid covered by the grab bucket with the source grid as the center as the height grid, obtain the first height H of the remaining slag based on the absolute value encoder measurement, and set the height of the height grid to the first height H.
[0050] The stacking evolution module 23 is used to perform stacking evolution to obtain the outer grid height h.
[0051] The judgment module 24 is used to judge whether there is an area that has not undergone model evolution and can be covered by the grab bucket. If so, the center point of the area that has not undergone model evolution is used as the next slag grabbing point; if not, the average height of each grid area in the grid range that can be covered by the grab bucket is calculated in turn, and the center point of the grid area with the largest average height is used as the next slag grabbing point.
[0052] Specifically, the method of calculating the accumulation evolution distance range_up based on the first distance calculation formula includes: setting the initial grid height h_initial=0, obtaining the initial slag grab point (x, y), obtaining the static accumulation angle theta_up, and obtaining the grab bucket height Bucket_h;
[0053] The stacking evolution distance range_up is calculated based on the first distance calculation formula: , where [ ] indicates an integer.
[0054] Specifically, it also includes a second judgment module for judging whether the average height is greater than the minimum height value H_limit. If it is greater, the center point of the grid area with the maximum average height is used as the next slag grabbing point.
[0055] Specifically, the stacking evolution to obtain the outer grid height h includes: setting the number of grids between the outer grid and the outermost grid of the equal height grid to d, recording the current height h_now of the outer grid; the outer grid height .
[0056] Specifically, the method for obtaining the first height H of the remaining slag based on the measurement of the absolute value encoder includes: arranging a weighing sensor, an absolute value encoder, a drum and a wire rope on the grab truck, the wire rope is wound on the drum, the upper end of the wire rope is connected to the weight sensor, the lower end of the wire rope is connected to the grab, and the drum is equipped with an absolute value encoder for detecting the height. When the weight sensor detects a sudden change in the tension value of the wire rope during the lifting process after the grab has finished grabbing, the current absolute value encoder value is used as the first height H of the remaining slag.
[0057] It should be noted that the structures and principles of the division module 21, the height calculation module 22, the accumulation evolution module 23 and the judgment module 24 correspond one to one with the steps in the above-mentioned automatic slag grabbing method based on grid model evolution, so they are not repeated here.
[0058] It should be noted that it should be understood that the division of the various modules of the above system is only a division of logical functions. In actual implementation, they can be fully or partially integrated into one physical entity, or they can be physically separated. And these modules can all be implemented in the form of software called by processing elements; they can also be all implemented in the form of hardware; some modules can also be implemented in the form of software called by processing elements, and some modules can be implemented in the form of hardware. For example, the x module can be a separately established processing element, or it can be integrated in a chip of the above device for implementation. In addition, it can also be stored in the memory of the above device in the form of program code, and called and executed by a processing element of the above device. The implementation of other modules is similar. In addition, these modules can be fully or partially integrated together, or they can be implemented independently. The processing element described here can be an integrated circuit with signal processing capabilities. In the implementation process, each step of the above method or each module above can be completed by an integrated logic circuit of hardware in the processor element or instructions in the form of software.
[0059] For example, the above modules may be one or more integrated circuits configured to implement the above methods, such as one or more application specific integrated circuits (ASIC), or one or more microprocessors (MPU), or one or more field programmable gate arrays (FPGA). For another example, when a module above is implemented in the form of a processing element scheduling program code, the processing element may be a general-purpose processor, such as a central processing unit (CPU) or other processor that can call program code. For another example, these modules may be integrated together and implemented in the form of a system-on-a-chip (SOC).
[0060] In one embodiment of the present invention, the present invention further includes a computer-readable storage medium on which a computer program is stored, and when the program is executed by a processor, any of the above-mentioned automatic slag grabbing methods based on grid model evolution is implemented.
[0061] Those skilled in the art can understand that all or part of the steps of implementing the above-mentioned method embodiments can be completed by hardware related to the computer program. The aforementioned computer program can be stored in a computer-readable storage medium. When the program is executed, the steps of the above-mentioned method embodiments are executed; and the aforementioned storage medium includes: ROM, RAM, magnetic disk or optical disk and other media that can store program codes.
[0062] like Figure 3 As shown, in one embodiment, the automatic slag grabbing device based on grid model evolution of the present invention includes: a processor 31 and a memory 32; the memory 32 is used to store computer programs; the processor 31 is connected to the memory 32, and is used to execute the computer program stored in the memory 32, so that the automatic slag grabbing device based on grid model evolution executes any of the automatic slag grabbing methods based on grid model evolution.
[0063] Specifically, the memory 32 includes: ROM, RAM, disk, USB flash drive, memory card or optical disk, etc., which can store program codes.
[0064] Preferably, the processor 31 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components.
[0065] In summary, the automatic slag grabbing method, system, medium and device based on the grid model evolution of the present invention are used to realize automatic slag grabbing in a non-scanning scenario and optimize the grab bucket full load rate. Therefore, the present invention effectively overcomes various shortcomings in the prior art and has high industrial utilization value.
[0066] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. An automatic slag grabbing method based on grid model evolution, characterized in that: The following steps are involved: The slag pool is divided according to the preset grid width d_y and grid length d_x to obtain a gridded slag pool, and the stacking evolution distance range_up is calculated based on the first distance calculation formula; The grid where the initial slag grab point (x, y) is located is taken as the source grid, and the grid covered by the grab bucket with the source grid as the center is set as the equal-height grid. The first height H of the remaining slag is obtained based on the absolute value encoder measurement, and the heights of the equal-height grids are all set as the first height H; Perform stacking evolution to obtain the outer grid height h; Determine whether there is an area that has not undergone model evolution and can be covered by the grab bucket. If so, use the center point of the area that has not undergone model evolution as the next slag grab point; If not, calculate the average height of each grid area in turn for the grid range that can be covered by the grab bucket, and take the center point of the grid area with the largest average height as the next slag grab point; The step of calculating the stacking evolution distance range_up based on the first distance calculation formula includes: Set the initial grid height h_initial=0, obtain the initial slag grab point (x, y), obtain the static accumulation angle theta_up, and obtain the grab bucket height Bucket_h; The stacking evolution distance range_up is calculated based on the first distance calculation formula: , where [ ] means taking an integer; The stacking evolution to obtain the outer grid height h includes: Let the grid distance between the outer grid and the outermost grid of the equal-height grid be d, and record the current height of the outer grid h_now; Outer grid height ; Among them, the accumulation evolution distance refers to the number of grids covered by the height of the slag accumulation gradually decreasing from the initial slag grabbing point to 0 after the grab grabs the slag each time; the remaining slag refers to the part of the slag in the slag pool that has not been grabbed in the current operation stage.
2. The automatic slag grabbing method based on grid model evolution according to claim 1 is characterized in that: The method also includes judging whether the average height is greater than a minimum height value H_limit. If so, the center point of the grid area with the maximum average height is used as the next slag grabbing point.
3. The automatic slag grabbing method based on grid model evolution according to claim 1 is characterized in that: The method of obtaining the first height H of the remaining slag by measuring based on the absolute value encoder comprises: A weighing sensor, an absolute value encoder, a drum and a wire rope are arranged on the grab truck. The wire rope is wound on the drum, the upper end of the wire rope is connected to the weight sensor, and the lower end of the wire rope is connected to the grab. An absolute value encoder for detecting height is installed on the drum. When the weight sensor detects a sudden change in the tension value of the wire rope when the grab is ready to lift after the grab has finished grabbing, the current absolute value encoder value is used as the first height H of the remaining slag.
4. An automatic slag grabbing system based on grid model evolution, characterized in that: include: Division module, height calculation module, accumulation evolution module and judgment module; The division module is used to divide the slag pool into a gridded slag pool according to a preset grid width d_y and grid length d_x, and calculate the stacking evolution distance range_up based on the first distance calculation formula; The height-contour calculation module is used to take the grid where the initial slag grab point (x, y) is located as the source grid, set the grid covered by the grab bucket with the source grid as the center as the height-contour grid, obtain the first height H of the remaining slag based on the absolute value encoder measurement, and set the heights of the height-contour grids as the first height H; The stacking evolution module is used to perform stacking evolution to obtain an outer grid height h; The judging module is used to judge whether there is an area that has not undergone model evolution and can be covered by the grab bucket. If so, the center point of the area that has not undergone model evolution is used as the next slag grab point; If not, calculate the average height of each grid area in turn for the grid range that can be covered by the grab bucket, and take the center point of the grid area with the largest average height as the next slag grab point; The step of calculating the stacking evolution distance range_up based on the first distance calculation formula includes: Set the initial grid height h_initial=0, obtain the initial slag grab point (x, y), obtain the static accumulation angle theta_up, and obtain the grab bucket height Bucket_h; The stacking evolution distance range_up is calculated based on the first distance calculation formula: , where [ ] means taking an integer; The stacking evolution to obtain the outer grid height h includes: Let the grid distance between the outer grid and the outermost grid of the equal-height grid be d, and record the current height of the outer grid h_now; Outer grid height ; Among them, the accumulation evolution distance refers to the number of grids covered by the height of the slag accumulation gradually decreasing from the initial slag grabbing point to 0 after the grab grabs the slag each time; the remaining slag refers to the part of the slag in the slag pool that has not been grabbed in the current operation stage.
5. The automatic slag grabbing system based on grid model evolution according to claim 4 is characterized in that: It also includes a second judgment module for judging whether the average height is greater than a minimum height value H_limit. If so, the center point of the grid area with the maximum average height is used as the next slag grabbing point.
6. A computer-readable storage medium having a computer program stored thereon, characterized in that: The computer program is executed by a processor to implement the automatic slag grabbing method based on grid model evolution as described in any one of claims 1 to 3.
7. An automatic slag grabbing device based on grid model evolution, characterized in that: include: Processor and memory; The memory is used to store computer programs; The processor is connected to the memory and is used to execute the computer program stored in the memory, so that the automatic slag grabbing device based on grid model evolution executes the automatic slag grabbing method based on grid model evolution described in any one of claims 1 to 3.
Citation Information
Patent Citations
Intelligent and fully-automatic stacker-reclaimer control device
CN106707956A
Dredging and measuring integrated sounding survey method for grab dredger
CN107816978A
Riprap throwing work supporting device and riprap throwing simulation work supporting device
JP2009024400A
BESO topology optimization method based on dynamic evolution rate and adaptive grid
JP6856286B1