Comprehensive smart energy system configuration optimization method and device considering station building investment

By using energy station equipment type selection model and genetic algorithm in an integrated smart energy system, the equipment selection and capacity planning are optimized, and the problem of neglecting station investment in the existing technology is solved, and the optimal design and system investment of energy stations are achieved. Accuracy improves design efficiency and economicality.

CN113902167BActive Publication Date: 2024-11-19SHANDONG ELECTRIC POWER ENG CONSULTING INST CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202111043053.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-07
Publication Date
2024-11-19
Estimated Expiration
2041-09-07

AI Technical Summary

Technical Problem

The existing comprehensive smart energy system configuration optimization method ignores the investment estimation of energy stations, resulting in deviations in optimization results, which are difficult to meet the requirements of accuracy and timeliness, and are inefficient in design efficiency and are seriously wasted resources.

Method used

Using a method based on the energy station equipment type selection model, combined with internal electrical, thermal and cold power balance constraints, the equipment selection and capacity planning are optimized through genetic algorithms, and the system's full life cycle cost, pollutant emissions and comprehensive energy efficiency ratio are calculated to ensure that The best choice for investment in station buildings.

Benefits of technology

The optimal area design of energy stations is achieved, and the overall investment is accurately calculated, which improves the economic and comprehensiveness of planning and design, significantly reduces workload and improves design efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113902167B_ABST
    Figure CN113902167B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of energy system configuration optimization, and provides a comprehensive intelligent energy system configuration optimization method and device taking into account station building investment. The method includes obtaining basic project data, equipment data and civil engineering data; based on the energy station equipment type selection model, and under the operation constraints of each energy model and the power balance constraints of electricity, heat and cold power in the comprehensive intelligent energy system, the equipment selection, capacity planning scheme, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the comprehensive intelligent energy system are obtained; the objective function of the energy station equipment type selection model is to take into account the station building investment and take the lowest total cost of the system throughout the life cycle, the lowest annual pollutant emissions and the highest comprehensive energy efficiency ratio.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of energy system configuration optimization, and in particular, relates to a comprehensive intelligent energy system configuration optimization method and device taking station building investment into account. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] Affected by complex factors such as the mutual coupling of multiple energy sources, random fluctuations in energy and load, and the participation of multiple subjects, the planning and design process of the integrated smart energy system currently relies heavily on manpower, which is prone to problems such as repeated planning, single design schemes, and incomplete evaluation. Not only is the planning and design efficiency low, but it also causes a large amount of human resources waste, and it is difficult to meet the requirements of cost calculation accuracy and project timeliness. Therefore, a reliable, accurate and effective planning and design method is needed.

[0004] The existing integrated smart energy system configuration optimization methods often only focus on the selection of system equipment capacity, and ignore the investment estimation of energy station buildings. This part of investment usually accounts for a large proportion of the total project investment and has a significant impact on the optimization results. Therefore, the inventors found that for integrated smart energy systems that require the construction of energy station buildings, the existing integrated smart energy system configuration optimization methods only consider equipment optimization and cannot obtain the optimal optimization results, and large deviations will occur in actual applications. Summary of the invention

[0005] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides a comprehensive smart energy system configuration optimization method and device taking into account the station building investment, which takes into account the station building investment and can achieve the purpose of more accurate optimization and selection of the comprehensive smart energy system configuration.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] A first aspect of the present invention provides a comprehensive smart energy system configuration optimization method taking into account station building investment, comprising:

[0008] Obtain project basic data, equipment data and civil engineering data;

[0009] Based on the energy station equipment type selection model, and under the operation constraints of each energy model and the power balance constraints of electricity, heat and cold in the integrated smart energy system, the equipment selection, capacity planning scheme, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the integrated smart energy system are obtained;

[0010] Among them, the objective function of the energy station equipment type selection model is to take into account the station building investment and to minimize the total cost of the system over its entire life cycle, minimize the annual pollutant emissions, and maximize the comprehensive energy efficiency ratio.

[0011] A second aspect of the present invention provides a comprehensive smart energy system configuration optimization device taking into account station building investment, which includes:

[0012] Data acquisition module, which is used to obtain project basic data, equipment data and civil engineering data;

[0013] The optimization configuration module is used to select the model based on the energy station equipment type, and obtain the equipment selection, capacity planning scheme, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the integrated smart energy system under the operation constraints of each energy model and the balance constraints of electricity, heat and cold power in the integrated smart energy system;

[0014] Among them, the objective function of the energy station equipment type selection model is to take into account the station building investment and to minimize the total cost of the system over its entire life cycle, minimize the annual pollutant emissions, and maximize the comprehensive energy efficiency ratio.

[0015] A third aspect of the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps in the above-mentioned method for optimizing the configuration of an integrated smart energy system taking into account the investment in a power station.

[0016] The fourth aspect of the present invention provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps in the comprehensive smart energy system configuration optimization method taking into account station building investment as described above are implemented.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] The present invention takes into account the calculation of the energy station building investment, uses genetic algorithms to obtain the optimal area of ​​the energy station, provides a basis for the design of the energy station, and can also more accurately obtain the accurate overall investment of the comprehensive intelligent energy system. The economic indicators are more comprehensive and have practical guiding significance.

[0019] The integrated smart energy system configuration optimization method of the present invention realizes the coordinated optimization of various energy forms, solves the problems of single design scheme, unreasonable system configuration structure, incomplete evaluation, etc. in the integrated smart energy system planning process, significantly reduces the workload of planning and design personnel, and improves the planning and design efficiency, which is of great significance for computer-aided integrated smart energy system planning and design.

[0020] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0022] Figure 1 It is a flowchart of a method for optimizing configuration of an integrated smart energy system according to an embodiment of the present invention;

[0023] Figure 2 It is a schematic diagram of the energy station building investment calculation process according to an embodiment of the present invention. DETAILED DESCRIPTION

[0024] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0025] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0026] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0027] Embodiment 1

[0028] like Figure 1 As shown, this embodiment provides a comprehensive smart energy system configuration optimization method taking into account station building investment, which specifically includes the following steps:

[0029] Step 1: Obtain project basic data, equipment data and civil engineering data.

[0030] The basic project data include project area, building type, typical daily, cold, hot and hot water hourly loads, available resource quantities and resource prices of the project.

[0031] The amount of available resources for a project includes the amount of sunlight, wind power, electricity, gas, geothermal energy, water, etc. at the project location.

[0032] Resource prices include local electricity prices, gas prices, water prices and other resource prices.

[0033] The equipment data includes the investment cost per unit capacity, maintenance cost and efficiency of each type of equipment and the electrical, cooling and heating output limits of each unit of equipment.

[0034] The civil engineering data is used for the investment calculation of the energy station building, including the unit volume cost of the energy station's interior and exterior walls, reinforced concrete columns and beams, waterproofing, insulation, foundation, etc.

[0035] Step 2: Based on the energy station equipment type selection model, and under the operation constraints of each energy model and the power balance constraints of electricity, heat and cold in the integrated smart energy system, the equipment selection, capacity planning scheme, output of each type of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the integrated smart energy system are obtained;

[0036] Among them, the objective function of the energy station equipment type selection model is to take into account the station building investment and to minimize the total cost of the system over its entire life cycle, minimize the annual pollutant emissions, and maximize the comprehensive energy efficiency ratio.

[0037] Among them, the total system investment cost of the energy station investment is the sum of the total investment of the project, annual maintenance costs, annual fuel costs and annual electricity purchase costs. The total investment of the project is composed of the station building investment, the equipment investment in the station building and other costs except the station building and equipment investment.

[0038] Specifically, the total system investment cost of the economic target-energy station investment is f:

[0039]

[0040] The total cost of the whole life cycle is the lowest within M years, C inv , C om,y , C fuel,y , C grid,y They are the total investment of the project, annual maintenance costs, annual fuel costs, and annual electricity purchase costs.

[0041] The total cost of the whole life cycle is the lowest within M years, C inv , C om,y , C fuel,y , C grid,y They are the total investment of the project, annual maintenance cost, annual fuel cost, and annual electricity purchase cost, among which:

[0042] C inv =C inv,sta +C inv,equ +C inv,oth

[0043] In the formula, C inv,sta is the station building investment, which is calculated by the station building investment module; C inv,equis the equipment investment in the station building, which is obtained from the equipment capacity and unit capacity investment of each equipment, that is, k is the type of equipment; C inv,oth C is the other cost except the station building and equipment investment, which is obtained by multiplying the station building and equipment investment by the proportional factor L, that is, C inv,oth =(C inv,sta +C inv,equ )×L.

[0044]

[0045] Where N t is the total number of time periods in a year, which is 8760 hours; is the operation and maintenance cost of the unit load of equipment i, E i,t is the load of equipment i in the tth period. For distributed power sources such as gas internal combustion engines, wind power generation and photovoltaic cells, E i,t is the actual electrical power (kW) they run in period t; for heating / cooling equipment such as gas boilers, heat pumps, chillers, and lithium bromide absorption refrigeration units, E i,t is the heat / cooling power they provide in period t; for energy storage devices such as heat storage tanks and cold storage tanks, E i,t is the power they store / release during time period t.

[0046]

[0047] In the formula, is the fuel heat in period t, is the fuel price in the tth period. For the gas-using equipment in the system, the output energy can be converted into the corresponding gas volume according to the relationship between the output energy and the gas volume.

[0048]

[0049] In the formula, is the amount of electricity purchased from the grid by the system in period t, is the electricity price for purchasing electricity in period t.

[0050] Environmental protection target - annual pollutant emissions are Po:

[0051]

[0052] In the formula, is the natural gas heat consumed by the system in period t, β gas is the amount of pollutants emitted from burning natural gas; is the amount of electricity purchased from the grid by the system in period t, β grid It is the pollutant emissions from coal-fired power generation.

[0053] Comprehensive energy efficiency ratio target-the comprehensive energy efficiency ratio is PER:

[0054]

[0055] In the formula, E i is the power generation of the i-th power generation equipment, is the heating capacity of the jth heating equipment, is the cooling capacity of the kth refrigeration equipment, Q tot is the total energy of primary energy consumed.

[0056] In specific implementations, the operating constraints of each energy model include equipment installation capacity constraints, equipment output constraints, and power constraints for interaction with the large power grid.

[0057] Constraints:

[0058] 1) Equipment installation capacity constraints

[0059]

[0060] In the formula, The maximum installation capacity of each equipment is limited by objective conditions, such as working capital, floor space, etc.

[0061] 2) Equipment output constraints

[0062] For non-energy storage devices, their load output Q in period t i,t Should be smaller than the installed capacity of the device

[0063]

[0064] For wind power generation and photovoltaic cells, considering the randomness and volatility of their output, the capacity factor F is introduced to represent the ratio of the annual average output power of wind power generation and photovoltaic cells to the rated power:

[0065]

[0066] The output power of wind power and photovoltaic cells is:

[0067]

[0068] 3) Interaction power constraints with the large power grid

[0069]

[0070] In the formula, It is the upper limit of the interaction power between the system and the large power grid.

[0071] 4) Power balance constraints

[0072]

[0073] Where P G is the collection of power generation units; P L It is the collection of electrical equipment in the system; Ereq t is the power load demand on the user side in the tth period;

[0074] 5) Thermal energy balance constraints

[0075]

[0076] In the formula, H O is the collection of heat-generating equipment; H L Hreq is the collection of heat-using devices in the system; d,t is the heat load demand of the user side at the tth period, including heating load demand and hot water load demand;

[0077] 6) Cold energy balance constraint

[0078]

[0079] In the formula, C O A collection of refrigeration equipment; C L Creq is the collection of cooling equipment in the system; t is the cooling load demand of the user side in the tth period;

[0080] like Figure 2 As shown, in the investment calculation process, in addition to the investment in various types of equipment, the investment in the energy station building is also taken into account. The area of ​​the energy station building is related to the area occupied by the equipment. The specific method is as follows:

[0081] Obtain the model and quantity information of different equipment in the energy station through equipment type selection and equipment capacity planning.

[0082] Get the length, width, height and other dimension data of each device.

[0083] According to the relevant standards and specifications, find out the dimensions that need to be reserved in front, behind and adjacent to the equipment, and correct the length, width and height data.

[0084] Genetic algorithms are used to optimize equipment layout and obtain the optimal layout plan.

[0085] Among them, the use of genetic algorithms to optimize equipment layout belongs to the existing technology and will not be repeated here.

[0086] Add supporting areas such as energy station corridors, electrical rooms, and instrumentation and control rooms to the calculation results.

[0087] Based on the civil engineering data, the total investment cost of the energy station building is obtained.

[0088] By solving the above planning model, we can obtain the equipment selection, capacity planning scheme, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the comprehensive smart energy system; among which, the energy station investment includes the total system investment cost and annual operating cost of the energy station investment.

[0089] The comprehensive smart energy system configuration optimization method taking into account station building investment in this embodiment selects a combination of equipment types that can meet the load demand based on user load demand, energy prices and local resource endowment, obtains a better combination through calculation and comparison, optimizes the calculation equipment capacity configuration and the required energy station building investment, compares the total cost, pollutant emissions and system energy efficiency indicators, and achieves the goals of optimal economy, minimum pollutant emissions and maximum energy efficiency.

[0090] Embodiment 2

[0091] This embodiment provides a comprehensive smart energy system configuration optimization device taking into account station building investment, which specifically includes the following modules:

[0092] Data acquisition module, which is used to obtain project basic data, equipment data and civil engineering data;

[0093] The optimization configuration module is used to select the model based on the energy station equipment type, and obtain the equipment selection, capacity planning scheme, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the integrated smart energy system under the operation constraints of each energy model and the balance constraints of electricity, heat and cold power in the integrated smart energy system;

[0094] Among them, the objective function of the energy station equipment type selection model is to take into account the station building investment and to minimize the total cost of the system over its entire life cycle, minimize the annual pollutant emissions, and maximize the comprehensive energy efficiency ratio.

[0095] It should be noted here that each module in this embodiment corresponds to each step in Example 1 one by one, and the specific implementation process is the same, which will not be repeated here.

[0096] Embodiment 3

[0097] This embodiment provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps in the above-mentioned method for optimizing the configuration of an integrated smart energy system taking into account the investment in a power station building.

[0098] The storage medium may be a magnetic disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM).

[0099] Embodiment 4

[0100] This embodiment provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps in the above-mentioned method for optimizing the configuration of an integrated smart energy system taking into account the investment in a power station are implemented.

[0101] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of hardware embodiments, software embodiments, or embodiments combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage and optical storage, etc.) containing computer-usable program code.

[0102] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0103] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A comprehensive smart energy system configuration optimization method taking into account station building investment, characterized in that: include: Obtain project basic data, equipment data and civil engineering data; The civil engineering data is used for the calculation of the energy station building investment, including the unit volume cost; Based on the energy station equipment type selection model, and under the operation constraints of each energy model and the power balance constraints of electricity, heat and cold in the integrated smart energy system, the equipment selection, capacity planning scheme, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the integrated smart energy system are obtained; Among them, the objective function of the energy station equipment type selection model is to take into account the station building investment and take the lowest total cost of the system throughout the life cycle, the smallest annual pollutant emissions and the highest comprehensive energy efficiency ratio; the total investment cost of the energy station investment system is the sum of the total investment of the project, annual maintenance costs, annual fuel costs and annual electricity purchase costs. The total investment of the project consists of the station building investment, the equipment investment in the station building and other costs except the station building and equipment investment; Among them, the environmental protection target-annual pollutant emissions is Po : ; In the formula, is the natural gas heat consumed by the system in period t, is the amount of pollutants emitted from burning natural gas; is the amount of electricity purchased from the grid by the system in period t, is the pollutant emissions from coal-fired power generation; Comprehensive energy efficiency ratio target-comprehensive energy efficiency ratio is PER : ; In the formula, For the The power generation capacity of the power generation equipment, is the heating capacity of the jth heating equipment, is the cooling capacity of the kth refrigeration equipment, is the total energy of primary energy consumed; The operation constraints of each energy model include equipment installation capacity constraints, equipment output constraints, and large power grid interaction power constraints; In the investment calculation process, in addition to the investment in various types of equipment, the investment in the energy station building is also taken into account. The area of ​​the energy station building is related to the area occupied by the equipment. Specifically: through equipment type selection and equipment capacity planning, the model and quantity information of different equipment in the energy station are obtained, and the length, width and height size data of each equipment are obtained; according to relevant standards and specifications, the reserved dimensions in front, behind and adjacent to the equipment are found, and the length, width and height data are corrected; the genetic algorithm is used to optimize the equipment layout and obtain the optimal layout plan; the supporting area of ​​the energy station aisle, electrical room, and instrumentation room is added to the calculation results; according to the civil engineering data, the total investment cost of the energy station building is obtained; the above planning model is solved to obtain the equipment selection, capacity planning plan, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the comprehensive smart energy system; among them, the energy station investment situation includes the total system investment cost and annual operating cost of the energy station investment.

2. The method for optimizing the configuration of a comprehensive smart energy system taking into account station building investment as claimed in claim 1, characterized in that: The basic data of the project include project area, building type, typical daily hourly load of cooling, heating and hot water, available resource quantity and resource price of the project.

3. The method for optimizing the configuration of a comprehensive smart energy system taking into account station building investment as claimed in claim 1, characterized in that: The equipment data includes the investment cost per unit capacity, maintenance cost and efficiency of each type of equipment and the electrical, cooling and heating output limits of each unit of equipment.

4. A comprehensive intelligent energy system configuration optimization device taking into account station building investment, characterized in that: include: Data acquisition module, which is used to obtain project basic data, equipment data and civil engineering data; The civil engineering data is used for the calculation of the energy station building investment, including the unit volume cost; The optimization configuration module is used to select the model based on the energy station equipment type, and obtain the equipment selection, capacity planning scheme, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the integrated smart energy system under the operation constraints of each energy model and the balance constraints of electricity, heat and cold power in the integrated smart energy system; Among them, the objective function of the energy station equipment type selection model is to take into account the station building investment and take the lowest total cost of the system throughout the life cycle, the smallest annual pollutant emissions and the highest comprehensive energy efficiency ratio; the total investment cost of the energy station investment system is the sum of the total investment of the project, annual maintenance costs, annual fuel costs and annual electricity purchase costs. The total investment of the project consists of the station building investment, the equipment investment in the station building and other costs except the station building and equipment investment; Among them, the environmental protection target-annual pollutant emissions is Po : ; In the formula, is the natural gas heat consumed by the system in period t, is the amount of pollutants emitted from burning natural gas; is the amount of electricity purchased from the grid by the system in period t, is the pollutant emissions from coal-fired power generation; Comprehensive energy efficiency ratio target-comprehensive energy efficiency ratio is PER : ; In the formula, For the The power generation capacity of the power generation equipment, is the heating capacity of the jth heating equipment, is the cooling capacity of the kth refrigeration equipment, is the total energy of primary energy consumed; The operation constraints of each energy model include equipment installation capacity constraints, equipment output constraints, and large power grid interaction power constraints. In the investment calculation process, in addition to the investment in various types of equipment, the investment in energy station buildings is also taken into account. The area of ​​energy station buildings is related to the area occupied by equipment. Specifically: the model and quantity information of different equipment in the energy station are obtained through equipment type selection and equipment capacity planning, and the length, width and height dimension data of each equipment are obtained. According to relevant standards and specifications, the dimensions to be reserved in front, behind and adjacent to the equipment are found, and the length, width and height data are corrected. The genetic algorithm is used to optimize the equipment layout and obtain the optimal layout plan. The supporting areas of the energy station aisle, electrical room, and instrument and control room are added to the calculation results. According to the civil engineering data, the total investment cost of the energy station building is obtained. The above planning model is solved to obtain the equipment selection, capacity planning plan, output of various types of equipment, energy station investment, pollutant emissions and comprehensive energy efficiency ratio of the comprehensive smart energy system. Among them, the energy station investment situation includes the total system investment cost and annual operating cost of the energy station investment.

5. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps in the comprehensive smart energy system configuration optimization method taking into account station building investment as described in any one of claims 1-3 are implemented.

6. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps in the comprehensive smart energy system configuration optimization method taking into account station building investment as described in any one of claims 1-3 are implemented.

Citation Information

Patent Citations

  • Capacity optimization method for park-level integrated energy system based on investment constraints

    CN110086184A

  • Regional comprehensive energy system layout planning method considering topological characteristic of energy network

    CN110717226A

  • Method for establishing comprehensive energy planning and operation joint optimization model

    CN111899120A

  • Energy simulation and optimal scheduling method, system and equipment of integrated energy system

    CN112991087A

  • Park-level integrated energy system capacity optimization configuration method and system

    CN113033900A