An ecological slope protection and construction method technology, applied in water conservancy projects, sea area engineering, botanical equipment and methods, etc., can solve problems affecting the stability of the slope of the reservoir dam, disconnection, soil erosion of the slope structure, etc., to avoid Birds feed on seeds, reduce evaporation, reduce the effect of rainwater wash-off
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2022-01-11
Abstract
Description
technical field
[0001] The invention belongs to the technical field of reservoir slope protection construction, and in particular relates to an ecological slope protection construction method of concrete prefabricated blocks for reservoir engineering. Background technique
[0002] A dam is a water-retaining structure that intercepts the water flow of a river channel to raise the water level or regulate the flow. It can form a reservoir, raise the water level, adjust the runoff, and concentrate the water head. It is used for flood control, water supply, irrigation, hydroelectric power generation, and improvement of shipping. The slope formed on the side facing the water surface, generally in rainy days or strong vibrations, often occurs geological disasters such as landslides, collapses, swelling or spalling. In order to prevent the occurrence of the above geological disasters, slope treatment is required , while the protection structure of the existing traditional slope prot...
Examples
Embodiment Construction
[0029] The technical solutions of the present invention will be further specifically described below through examples.
[0030] A construction method for ecological slope protection of concrete prefabricated blocks in reservoir engineering;
[0031] The specific operation steps are as follows:
[0032] S1. Reservoir slope pretreatment: clean up the vegetation junction above the opening line of the dam slope, and clean up the width of 1.5m-2m (adjust the width according to the actual situation on site). Weeds, fallen leaves and dead branches, floating soil and pumice, etc. At the same time, potholes on the slope of the dam body are artificially filled and watered and tamped. Guarantee of deviations between them, reducing the difficulty of operation during the installation of concrete prefabricated blocks in the later stage;
[0033] S2. Set up water channels. After the slope of the dam body is leveled, it is necessary to set up cut-off drainage ditches at the junction of the ...