A pest prediction method, device, equipment and storage medium

By using weather forecast data and prediction models to accurately predict the occurrence time and scope of crop pests, it solves the problem of manual field patrols relying on experience, improves the accuracy and consistency of pest predictions, and reduces the cost and workload of plant protection operations.

CN113962476BActive Publication Date: 2024-10-18GUANGZHOU XAIRCRAFT TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202111322776.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-09
Publication Date
2024-10-18
Estimated Expiration
2041-11-09

AI Technical Summary

Technical Problem

In the existing technology, the manual field patrol method relies heavily on experience in predicting crop pests, resulting in subjective differences among different workers and unsatisfactory prediction results.

Method used

By obtaining meteorological forecast data in the target area, the trained prediction model is used to determine the pest prediction time and membrane position information, providing more accurate pest prediction results and reducing the impact of subjective differences.

Benefits of technology

It improves the accuracy and consistency of pest prediction, reduces the cost and workload of plant protection operations caused by frequent manual field patrols, and improves the efficiency and effectiveness of prevention and control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113962476B_ABST
    Figure CN113962476B_ABST
Patent Text Reader

Abstract

The embodiments of the present application disclose a pest prediction method, device, equipment and storage medium. The technical solution provided by the embodiments of the present application predicts the pest prediction time and the pest prediction amount within the set prediction period using a first prediction model according to the weather forecast data within the set prediction period, and predicts the pest film position information within the set prediction period using a second prediction model according to the predicted pest prediction amount, outputs the pest prediction result based on the predicted pest prediction time and pest film position information, accurately predicts the pest prediction time and pest film position information through weather forecast data, provides a more accurate reference basis for crop pest control, and reduces the situation where the pest prediction effect is not ideal due to subjective differences among different staff members.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the technical field of crop prevention and control, and in particular to a pest prediction method, device, equipment and storage medium. Background Art

[0002] During the planting process of crops, pests such as aphids will occur, and it is necessary to prevent and control pests in the crop planting area in a timely manner. Traditional crop protection is generally carried out through the whole field prevention method. The time and frequency of the whole field prevention are determined according to the pest situation and the selected prevention and control indicators.

[0003] At present, the monitoring of crop pests is mainly done manually, that is, by manually patrolling the fields to record the pest situation in the field, and predicting the pest situation in the target area to determine the timing of field-wide defense. However, the manual patrol method relies heavily on manual experience, and there are large subjective differences among different workers, resulting in unsatisfactory pest prediction results. Summary of the invention

[0004] The embodiments of the present application provide a pest prediction method, device, equipment and storage medium to solve the technical problems in the prior art that the manual field patrol method relies heavily on manual experience, there are large subjective differences among different workers, and the pest prediction effect is not ideal. The embodiments of the present application accurately predict the pest prediction time and pest film position information through meteorological forecast data, providing a more accurate reference basis for crop pest control.

[0005] In a first aspect, an embodiment of the present application provides a pest prediction method, comprising:

[0006] Obtain weather forecast data for the target area within the set forecast period;

[0007] Using the trained first prediction model, determining the pest prediction time and the pest prediction amount according to the weather forecast data, wherein the first prediction model can output the pest prediction time and the pest prediction amount based on the input of the weather forecast data;

[0008] Using the trained second prediction model, the pest film position information is determined according to the weather forecast data and the pest prediction amount, and the second prediction model can output the pest film position information based on the input of the weather forecast data and the pest prediction amount;

[0009] The pest prediction result is obtained based on the pest prediction time and the pest film position information.

[0010] In a second aspect, an embodiment of the present application provides an insect pest prediction device, including a weather acquisition module, a first prediction module, a second prediction module and a result analysis module, wherein:

[0011] The weather acquisition module is used to obtain weather forecast data for the target area within a set forecast period;

[0012] The first prediction module is used to determine the pest prediction time and the pest prediction amount according to the weather forecast data using the trained first prediction model, and the first prediction model can output the pest prediction time and the pest prediction amount based on the input of the weather forecast data;

[0013] The second prediction module is used to determine the pest film position information according to the weather forecast data and the pest prediction amount by using the trained second prediction model, and the second prediction model can output the pest film position information based on the input of the weather forecast data and the pest prediction amount;

[0014] The result analysis module is used to obtain the pest prediction result based on the pest prediction time and the pest film position information.

[0015] In a third aspect, an embodiment of the present application provides an insect pest prediction device, including: a memory and one or more processors;

[0016] The memory is used to store one or more programs;

[0017] When the one or more programs are executed by the one or more processors, the one or more processors implement the pest prediction method as described in the first aspect.

[0018] In a fourth aspect, an embodiment of the present application provides a storage medium comprising computer executable instructions, which, when executed by a computer processor, are used to execute the pest prediction method as described in the first aspect.

[0019] The embodiment of the present application uses a first prediction model to predict the pest prediction time and the pest prediction amount within the set prediction period according to the meteorological forecast data within the set prediction period, and uses a second prediction model to predict the pest film position information within the set prediction period according to the predicted pest prediction amount, outputs the pest prediction result based on the predicted pest prediction time and pest film position information, accurately predicts the pest prediction time and pest film position information through meteorological forecast data, provides a more accurate reference basis for the pest control of crops, and reduces the situation where the pest prediction effect is unsatisfactory due to subjective differences among different staff members. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 is a flow chart of a pest prediction method provided in an embodiment of the present application;

[0021] Figure 2is a flow chart of another pest prediction method provided in an embodiment of the present application;

[0022] Figure 3 is a flow chart of another pest prediction method provided in an embodiment of the present application;

[0023] Figure 4 is a schematic diagram of the structure of an insect pest prediction device provided in an embodiment of the present application;

[0024] Figure 5 It is a structural schematic diagram of an insect pest prediction device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical scheme and advantages of the present application clearer, the specific embodiments of the present application are further described in detail below in conjunction with the accompanying drawings. It is understood that the specific embodiments described herein are only used to explain the present application, rather than to limit the present application. It should also be noted that, for the convenience of description, only the part related to the present application but not all the contents are shown in the accompanying drawings. Before discussing the exemplary embodiments in more detail, it should be mentioned that some exemplary embodiments are described as processes or methods depicted as flow charts. Although the flow chart describes each operation (or step) as a sequential process, many of the operations therein can be implemented in parallel, concurrently or simultaneously. In addition, the order of each operation can be rearranged. The process can be terminated when its operation is completed, but it can also have additional steps not included in the accompanying drawings. The process can correspond to a method, a function, a procedure, a subroutine, a subprogram, etc.

[0026] Figure 1 A flowchart of a pest prediction method provided in an embodiment of the present application is given. The pest prediction method provided in an embodiment of the present application can be executed by a pest prediction device, which can be implemented by hardware and / or software and integrated in a pest prediction device.

[0027] The following description takes the pest prediction method executed by the pest prediction device as an example. Figure 1 , the pest prediction method includes:

[0028] S101: Obtaining weather forecast data for a target area within a set forecast period.

[0029] The weather forecast data provided in this embodiment includes one or more combinations of different weather types such as temperature forecast data, humidity forecast data, and precipitation forecast data of the target area (e.g., drip-irrigated cotton fields) within a set forecast period. The weather forecast data can be obtained from the weather station website corresponding to the target area according to the set forecast period. The weather forecast data provided in this embodiment will be input into the trained first forecast model and the second forecast model as a forecast base for analysis and processing.

[0030] In one embodiment, a meteorological monitoring device may be set up in the target plot. The meteorological monitoring device may predict future meteorological forecast data based on the recorded meteorological data and transmit the meteorological forecast data to a server. The server may analyze the pest situation using the meteorological forecast data.

[0031] S102: Determine the pest prediction time and pest prediction amount according to the weather forecast data using the trained first prediction model. The first prediction model can output the pest prediction time and pest prediction amount based on the input of the weather forecast data.

[0032] The first prediction model provided in this embodiment is used to analyze and process the input weather forecast data and output the corresponding predicted pest time and predicted pest amount. The first prediction model is trained based on the collected meteorological indicator sample data, pest occurrence time and pest occurrence amount sample data. Specifically, the first prediction model is trained with the meteorological indicator sample data as input and the pest occurrence time and pest occurrence amount sample data as output until the accuracy of the first prediction model reaches the set accuracy requirement.

[0033] Exemplarily, the weather forecast data is input into the first prediction model, and the first prediction model analyzes and processes the weather forecast data and outputs the corresponding pest prediction time and pest prediction amount. The pest prediction time corresponds to the pest prediction amount one by one, and the pest prediction time can be a plurality of continuous times within the time length corresponding to the set prediction period. For example, the prediction period is set to 15 days, and each day of the next 15 days is used as a pest prediction time. The first prediction model analyzes and processes the weather forecast data corresponding to the next 15 days, and outputs the pest prediction amount corresponding to each day in the next 15 days. The pest prediction time can also be a set pest node time, such as the first appearance of pests and the peak period of winged insect migration, and different pest node times correspond to a pest prediction amount. By predicting the first appearance of pests and the peak period of winged insect migration, drones can be arranged in advance to spray pesticides to prevent pests from harming crop plants on a large scale or affecting crop plant yields. The pest prediction time can be understood as the predicted time of pest occurrence, such as the first appearance of pests, the peak period of winged insect migration, or the predicted insect quantity for each day of the set prediction period. The pest prediction quantity can be understood as the predicted occurrence quantity of pests corresponding to the pest prediction time.

[0034] S103: using the trained second prediction model, determine the pest film position information according to the weather forecast data and the pest prediction amount, and the second prediction model can output the pest film position information based on the input of the weather forecast data and the pest prediction amount.

[0035] The second prediction model provided in this embodiment is used to analyze and process the input weather forecast data and the predicted amount of insect pests and output the corresponding insect pest film position information, wherein the insect pest film position information is used to represent the diffusion distance of the pest (from the ridge or planting boundary), wherein the film position is the position of the film covering the crop, for example, in the planting of cotton, in order to protect the cotton, the film is covered on the cotton planting position. The second prediction model is trained based on the collected meteorological indicator sample data, the insect pest occurrence sample data and the insect pest film position sample data. Specifically, the second prediction model is trained with the meteorological indicator sample data and the insect pest occurrence sample data as input and the insect pest film position sample data as output until the accuracy of the second prediction model reaches the set accuracy requirement. In one embodiment, the diffusion distance can be represented by the film position farthest from the ridge or the planting area boundary among the film positions to which the corresponding pests diffuse.

[0036] Exemplarily, the weather forecast data and the insect pest prediction amount output by the first prediction model in the above steps are input into the second prediction model, and the second prediction model analyzes and processes the weather forecast data and the insect pest prediction amount and outputs the corresponding insect pest film position information. Wherein the insect pest film position information can be the diffusion distance corresponding to a plurality of continuous times within the time length corresponding to the set prediction period. For example, the prediction period is set to 15 days, and the second prediction model analyzes and processes according to the weather forecast data and the insect pest prediction amount corresponding to the next 15 days, and outputs the diffusion distance corresponding to each day in the next 15 days. In addition, the insect pest film position information can also be the diffusion distance corresponding to the set insect pest node time (such as the first appearance period of pests and the peak period of winged insect migration, etc.), or the longest diffusion distance within the set prediction period.

[0037] S104: Obtaining an insect pest prediction result based on the insect pest prediction time and the insect pest film position information.

[0038] After obtaining the pest prediction time and pest film position information within the set prediction period, the pest prediction results are generated based on the pest prediction time and pest film position information, and the pest prediction results are displayed. According to the pest prediction results, managers can intuitively observe the pest film position information corresponding to different pest prediction times within the set prediction period, understand the spread time and range of farmland pests within the set prediction period, and take preventive measures before the pests break out.

[0039] It can be understood that this plan predicts the pest forecast time and pest film position information based on meteorological forecast data, provides preventive treatment basis for farmland pest protection, and conducts preventive treatment in the corresponding area before the pest breaks out in the whole field. It replaces the general plant protection of the whole field after the pest breaks out in the whole field with regionalized and targeted early pest protection, reduces the plant protection operation area, reduces the damage to crops and the suppression of the natural enemy population of pests due to frequent general protection of the whole field, is conducive to establishing an ecological protection barrier, and conducts plant protection operations more reasonably and protects the farmland ecology.

[0040] In the above, based on the meteorological forecast data within the set prediction period, the first prediction model is used to predict the pest prediction time and the pest prediction amount within the set prediction period, and based on the predicted pest prediction amount, the second prediction model is used to predict the pest film position information within the set prediction period, and the pest prediction result is output based on the predicted pest prediction time and pest film position information. The pest prediction time and pest film position information are accurately predicted through meteorological forecast data, providing a more accurate reference basis for the pest control of crops, and reducing the situation where the pest prediction effect is unsatisfactory due to subjective differences among different staff members.

[0041] Based on the above embodiments, Figure 2A flowchart of another pest prediction method provided in an embodiment of the present application is given, which is a specific implementation of the above pest prediction method. Figure 2 , the pest prediction method includes:

[0042] S201: Obtain weather forecast data for a target area within a set forecast period.

[0043] S202: using the trained first prediction model, determining the insect pest prediction time and the predicted amount of winged insect pests and the predicted amount of wingless insect pests according to the meteorological forecast data.

[0044] The predicted amount of insect pests provided in this embodiment includes the predicted amount of winged insect pests and the predicted amount of wingless insect pests, wherein the predicted amount of winged insect pests can be understood as the occurrence amount of winged pests (for example, winged aphids on the protection belt of cotton fields, wherein winged aphids have the ability to migrate and harm plants), and the predicted amount of wingless insect pests can be understood as the occurrence amount of wingless pests (for example, wingless aphids on the protection belt of cotton fields).

[0045] Wherein, the first prediction model is trained based on meteorological index sample data, pest occurrence time and pest occurrence amount sample data, wherein the pest occurrence amount sample data includes winged pest occurrence amount sample data and wingless pest occurrence amount sample data, and correspondingly, the pest occurrence time includes winged pest prediction time and wingless pest prediction time. That is, when training the first prediction model, the meteorological index sample data is used as input, the winged pest prediction time and wingless pest prediction time and the corresponding winged pest occurrence amount sample data and wingless pest occurrence amount sample data are used as output, and the first prediction model is trained. After the meteorological forecast data is input into the first prediction model, the first prediction model will output the winged pest prediction amount and the corresponding winged pest prediction time, as well as the wingless pest prediction amount and the corresponding wingless pest prediction time.

[0046] S203: Using the trained second prediction model, determine the film position information of winged insect pests and the film position information of wingless insect pests according to the weather forecast data and the predicted insect pest amount.

[0047] The pest film position information provided in this embodiment includes winged pest film position information and wingless pest film position information, wherein the winged pest film position information indicates the diffusion distance of winged pests in the corresponding winged pest prediction time, and the wingless pest film position information indicates the diffusion distance of wingless pests in the corresponding wingless pest prediction time.

[0048] The second prediction model provided in this embodiment is trained based on meteorological indicator sample data, pest occurrence sample data and pest film location sample data, wherein the pest occurrence sample data includes winged pest occurrence sample data and wingless pest occurrence sample data, and correspondingly, the pest film location sample data includes winged pest film location sample data and wingless pest film location sample data.

[0049] Specifically, when training the second prediction model, the collected meteorological index sample data is used as input, and the winged insect pest occurrence sample data and the wingless insect pest occurrence sample data as well as the winged insect pest film position sample data and the wingless insect pest film position sample data are used as output to train the second prediction model. After the meteorological forecast data and the winged insect pest prediction amount and the wingless insect pest prediction amount output by the first prediction model are input into the second prediction model, the second prediction model will output the corresponding winged insect pest film position information and wingless insect pest film position information.

[0050] The winged insect pest film position information and wingless insect pest film position information output by the second prediction model can be the winged insect pest film position information and wingless insect pest film position information corresponding to multiple consecutive time periods within the time length corresponding to the set prediction period, or can be the maximum winged insect pest film position information and wingless insect pest film position information within the set prediction period.

[0051] S204: Determine maximum film position information from the film position information of the winged insect pests and the film position information of the wingless insect pests.

[0052] Specifically, the winged insect pest film position information and the wingless insect pest film position information output by the second prediction model are compared, and the largest insect pest film position information among the winged insect pest film position information and the wingless insect pest film position information is determined as the maximum film position information. It can be understood that the maximum film position information reflects the farthest film position to which various insect forms (winged and wingless) of pests spread in the target area during the corresponding pest prediction time.

[0053] S205: Obtaining an insect pest prediction result based on the insect pest prediction time and the maximum film position information.

[0054] After obtaining the pest prediction time and maximum film position information within the set prediction period, the pest prediction results are generated based on the pest prediction time and maximum film position information, and the pest prediction results are displayed. According to the pest prediction results, managers can intuitively observe the maximum film position information corresponding to different pest prediction times within the set prediction period, and understand the maximum diffusion range of various insect pests within the set prediction period.

[0055] In one possible embodiment, after obtaining the maximum film position information, the predicted area of ​​pest occurrence can be calculated based on the film spacing, film width, and film length between the films on the target area, so that managers can plan the area of ​​land to be controlled by drones based on the predicted area of ​​pest occurrence, or generate a plant protection prescription map corresponding to the predicted area of ​​pest occurrence.

[0056] S206: When the predicted pest amount reaches a set pest amount threshold and / or the pest film position information reaches a set film position threshold, a pest warning is issued and / or a plant protection prevention plan is determined from a plant protection library according to the pest prediction result. The plant protection library records plant protection prevention plans corresponding to different pest prediction results.

[0057] After obtaining the predicted amount of pests and / or the maximum film position information, pest warning or plant protection prevention scheme can be determined according to the predicted amount of pests and / or the maximum film position information. The plant protection prevention scheme can be a quantitative plant protection drug scheme corresponding to different pest prediction results.

[0058] Specifically, the predicted pest amount is compared with the set pest amount threshold. When the predicted pest amount reaches the set pest amount threshold, an early warning of the pest occurrence is issued to remind the management personnel to prevent the pests in time; or when the predicted pest amount reaches the set pest amount threshold, a plant protection prevention plan is determined from the plant protection library according to the pest prediction results. The management personnel can carry out plant protection according to the decision suggestions of the plant protection prevention plan and control the pest amount in advance. The plant protection library provided in this embodiment records the plant protection prevention plans corresponding to different pest prediction results. The corresponding plant protection prevention plan under the current pest prediction result can be determined according to the correspondence between the pest prediction results and the plant protection prevention plans. Among them, the set film position threshold can be a threshold set by the user or a threshold set by the system default. The user can set the prevention or warning threshold by setting the set film position threshold, and can set the reminder or warning timing according to different pest types or prevention and control efforts, so as to carry out plant protection prevention more flexibly.

[0059] In addition, the maximum diffusion distance corresponding to the maximum film position information can be compared with the diffusion distance threshold corresponding to the set film position threshold. If the maximum diffusion distance reaches the diffusion distance threshold, an insect pest film position warning is issued to remind management personnel to prevent insect pests in time.

[0060] Or when the predicted amount of insect pests reaches the set insect amount threshold and / or when the maximum diffusion distance reaches the diffusion distance threshold, a plant protection prevention plan is determined from the plant protection library according to the insect pest prediction results, and the management personnel can perform plant protection according to the decision suggestions of the plant protection prevention plan, control the insect amount in advance, and / or perform plant protection for the area corresponding to the maximum film position information. The plant protection library provided in this embodiment records the plant protection prevention plans corresponding to different insect pest prediction results, and the corresponding plant protection prevention plan under the current insect pest prediction result can be determined according to the correspondence between the insect pest prediction results and the plant protection prevention plans. Among them, setting the insect amount threshold and / or setting the film position threshold can be a threshold set by the user, or it can be a threshold set by the system default. The user can set the control or warning threshold by setting the insect amount threshold and / or setting the film position threshold, and can set the timing of reminders or warnings according to different pest types or control efforts, so as to perform plant protection control more flexibly.

[0061] In the above, the first prediction model is used to predict the predicted time and predicted amount of pests in the set prediction period according to the weather forecast data in the set prediction period, and the second prediction model is used to predict the film position information of pests in the set prediction period according to the predicted predicted amount of pests, and the pest prediction result is output based on the predicted predicted time and film position information of pests, and the pest prediction time and film position information of pests are accurately predicted by weather forecast data, so as to provide a more accurate reference basis for the pest control of crops and reduce the situation where the pest prediction effect is not ideal due to the subjective differences of different staff members. At the same time, the maximum film position information is output based on the comparison of the film position information of pests corresponding to two different insect states, winged pests and wingless pests, so as to more accurately determine the predicted value of the film position of pests farthest from the boundary of the planting area, so as to ensure that the plant protection operation area can cover the diffusion range of pests in various insect states, and more reasonably arrange the film position range for plant protection. When the maximum film position information reaches the set film position threshold, an early warning of pests is issued to remind management personnel to take preventive measures against pests in a timely manner, or a plant protection prevention plan is output based on the pest prediction results to provide guidance for plant protection. At the same time, due to the limited accuracy of weather forecasts themselves, a standardized evaluation technology basis is provided through the prediction model to accurately and objectively predict the pest prediction time, pest prediction amount and pest film position information, reduce the subjective difference caused by manual field inspections, and effectively reduce the frequency and content of manual field inspections (including the area of ​​land that needs to be inspected), reduce the cost and workload of plant protection, and improve the work efficiency and quality of plant protection.

[0062] In a possible embodiment, after obtaining the pest prediction result, the pest prediction result can be corrected according to subsequent actual meteorological data. Based on this, the pest prediction method provided by this solution also includes:

[0063] S207: Correcting the insect pest prediction result according to the actual meteorological data of the target area and the corresponding meteorological forecast data.

[0064] Specifically, the actual meteorological data of the target area is obtained, and the actual meteorological data is compared with the meteorological forecast data of the same day as the actual meteorological data in the set prediction period, and the pest prediction result is corrected according to the comparison result.

[0065] It is understandable that the actual meteorological data reflects the actual meteorological conditions of the target area on that day. The actual meteorological data can be obtained from the meteorological site website corresponding to the target area, or collected or monitored by IoT devices (such as agricultural meteorological stations) arranged at the edge of the field or in the field, or monitored by monitoring the actual meteorological conditions of the day. The actual meteorological data includes one or more combinations of different meteorological types such as real-time temperature data, real-time humidity data, and real-time precipitation data.

[0066] In a specific implementation, correcting the pest prediction result includes steps S2071-S2072:

[0067] S2071: Correcting the weather forecast data according to the actual weather data of the target area.

[0068] S2072: Based on the corrected weather forecast data, the predicted pest time, the predicted pest amount and the pest film position information are updated to correct the pest prediction result.

[0069] Specifically, the actual meteorological data of the target area is obtained, and the meteorological forecast data (at the same time) corresponding to the actual meteorological data in the meteorological forecast data within the set forecast period is replaced by the actual meteorological data to correct the meteorological forecast data, which is equivalent to correcting the forecast base. It is understandable that on a certain day within the set forecast period, the corrected meteorological forecast data includes the actual meteorological data before that day and the meteorological forecast data on that day and thereafter.

[0070] For example, for the effective accumulated temperature as a calculation index of the temperature in the meteorological data, the effective accumulated temperature in the set prediction period will be calculated every day based on the previous actual temperature data and the forecast temperature data of the day and later, that is, the effective accumulated temperature will be corrected every day. For example, based on the meteorological forecast data of the next few days (for example, 7 days), the short-term pest prediction results are predicted. The full-period accumulated temperature value of the pest is the accumulated actual value of the effective accumulated temperature every day during the entire pest (such as aphid) occurrence period (3 to 4 months). It needs to be accurately calculated based on the historical true value (actual meteorological data) + the meteorological forecast value of the next few days (meteorological forecast data). At the same time, every day, the actual meteorological data of that day is imported, and the subsequent prediction base (meteorological forecast data) is corrected to obtain an effective accumulated temperature that is closer to the actual value in the set prediction period.

[0071] Furthermore, after correcting the subsequent weather forecast data, the corrected weather forecast data is input into the first prediction model to obtain updated pest prediction time and pest prediction amount, and the corrected weather forecast data and updated pest prediction amount are input into the second prediction model to obtain corrected pest film position prediction information, and the pest prediction result is updated based on the updated pest prediction time and pest film position information. The weather forecast data is corrected by the actual weather data of each day, so as to realize the gradual correction of the pest prediction result, reduce the error between the pest prediction result and the actual pest result, and provide a more accurate reference basis for the pest control of crops.

[0072] In a possible embodiment, after obtaining the pest film position information, the area for plant protection and control can be determined according to the pest film position information. Based on this, the pest prediction method provided by this solution also includes:

[0073] S208: Determine the area to be operated according to the insect pest film position information.

[0074] S209: Generate a work task corresponding to the area to be worked on.

[0075] S210: Sending the operation task to a drone, so that the drone performs a spraying operation on the area to be operated.

[0076] Specifically, after determining the pest film position information, when it is necessary to determine the operation area for pest control (for example, the predicted amount of pests is reached), the area to be operated can be determined according to the pest film position information, for example, the area enclosed from the ridge (or the film position closest to the ridge) to the film position corresponding to the pest film position information is used as the area to be operated. Furthermore, a corresponding operation task is generated according to the area to be operated, and the operation task is sent to a drone that can spray drugs. The drone sprays the area to be operated according to the operation task, so as to carry out targeted area prevention in the area to be operated, and there is no need to wait until the pest breaks out in the whole field before carrying out general prevention of the whole field. The area to be operated can be understood as the predicted spread range of pests. This scheme controls pests by spraying pesticides in the area to be operated. By accurately determining the area to be operated according to the pest film position information, the spraying area is clear, and there is no need to spray pesticides in the whole field. It is only necessary to spray pesticides in the area to be operated, thereby reducing the workload of plant protection and improving work efficiency.

[0077] Based on the above embodiments, Figure 3 A flowchart of another pest prediction method provided in an embodiment of the present application is given, which is a specific implementation of the above pest prediction method. Figure 3 , the pest prediction method includes:

[0078] S301: Filtering the meteorological indicator sample data according to the correlation between the meteorological indicator sample data of different meteorological type combinations and the pest occurrence time, pest occurrence amount sample data and pest film position sample data.

[0079] The meteorological indicator sample data can be obtained through meteorological monitoring equipment such as agricultural meteorological stations installed in the target area, wherein the meteorological types contained in the meteorological indicator sample data include a combination of one or more of temperature, humidity and precipitation.

[0080] Among them, temperature can be used as a calculation indicator of temperature through effective accumulated temperature. It needs to be explained that effective accumulated temperature can be understood as the cumulative value of the temperature above the development starting point required for the monitored pests to complete a certain development stage, and the calculation of effective accumulated temperature uses the starting point temperature and upper limit temperature of different types of pests at different development stages as the effective accumulated temperature screening conditions, that is, the pests can develop normally only when the daily average temperature is between the starting point temperature and the upper limit temperature. The effective accumulated temperature can be determined based on the following formula:

[0081]

[0082] Among them, K is the effective accumulated temperature (degrees per day), n is the number of days in the set prediction cycle (days), is the daily average temperature (℃), and To is the growth and development starting point temperature (℃) of the pest to be monitored at the corresponding development stage. It can be understood that different types of pests and different development stages have different corresponding growth and development starting points. For example, for cotton black aphids and cotton aphids in the seedling stage, the corresponding daily growth accumulated temperatures are calculated based on 6.05℃~25℃ and 5℃~34.9℃ as the effective accumulated temperature conditions, that is, the corresponding growth and development starting points are 6.05℃ and 5℃ respectively.

[0083] Exemplarily, the prediction period is set as the collection period, and meteorological indicator sample data, pest occurrence time, pest occurrence amount sample data, and pest film position sample data are collected by manual or intelligent equipment collection, and the meteorological indicator sample data are screened according to the correlation between the meteorological indicator sample data of different meteorological type combinations and the pest occurrence time, pest occurrence amount sample data, and pest film position sample data, so as to screen out the meteorological type combination corresponding to the meteorological indicator sample data with the highest correlation between the pest occurrence time, pest occurrence amount sample data, and pest film position sample data. The meteorological indicator sample data of different meteorological type combinations can be any one of effective accumulated temperature, daily average humidity, and daily rainfall, or a combination of any two, or a combination of three of effective accumulated temperature, daily average humidity, and daily rainfall, wherein the meteorological indicator sample data is not limited to the three types of effective accumulated temperature, daily average humidity, and daily rainfall, and the type of meteorological indicator sample data can be determined according to the design of the IoT device that collects actual meteorological data.

[0084] The pest occurrence time (including the predicted time for winged pests and the predicted time for wingless pests) can be multiple consecutive times within the time length corresponding to the collection period, or it can be the pest node time in the collection period, such as the first appearance of pests and the peak migration period of winged insects. The pest occurrence sample data can be understood as the occurrence of pests corresponding to each pest occurrence time in the collection period (including winged pest occurrence sample data and wingless pest occurrence sample data), which can be expressed in terms of the number of pests per hundred plants, the number of pests per unit area, etc. The pest film position sample data (including winged pest film position sample data and wingless pest film position sample data) can be understood as the pest diffusion distance corresponding to each pest occurrence time in the collection period.

[0085] Further, the meteorological index input into the first prediction model is based on the first correlation between the meteorological index of different meteorological types and the time of occurrence of pests and / or the amount of occurrence of pests, and the meteorological index with the highest correlation with the time of occurrence of pests and / or the amount of occurrence of pests is screened out from the meteorological index of different meteorological types. Correspondingly, the meteorological index input into the second prediction model is based on the second correlation between the meteorological index of different meteorological types and the amount of occurrence of pests and / or film position information, and the meteorological index with the highest correlation with the amount of occurrence of pests and / or film position information is screened out from the meteorological index of different meteorological types. Based on this, screening the meteorological index sample data specifically includes steps S3011-S3012:

[0086] S3011: Based on the first correlation between the meteorological indicator sample data of different meteorological type combinations and the pest occurrence time and / or pest occurrence amount sample data, the first meteorological sample data having the highest correlation with the pest occurrence time and / or pest occurrence amount sample data is screened out from the meteorological indicator sample data.

[0087] S3012: Based on the second correlation between the meteorological indicator sample data of different meteorological type combinations and the pest occurrence sample data and / or the pest film location sample data, the second meteorological sample data having the highest correlation with the pest occurrence sample data and / or the pest film location sample data is screened out from the meteorological indicator sample data.

[0088] The first correlation and the second correlation provided in this embodiment are calculated based on the principal component analysis algorithm or the stepwise regression analysis algorithm. Specifically, based on the principal component analysis algorithm or the stepwise regression analysis algorithm, the first correlation between the meteorological indicator sample data of each meteorological type combination and the sample data of the pest occurrence time and / or the pest occurrence amount is calculated, and the first meteorological sample data with the highest correlation (highest sensitivity) with respect to the pest occurrence time and / or the pest occurrence amount sample data is screened out from the meteorological indicator sample data of different meteorological type combinations. Further, based on the principal component analysis algorithm or the stepwise regression analysis algorithm, the second correlation between the meteorological indicator sample data of each meteorological type combination and the sample data of the pest occurrence amount and / or the pest film position is calculated, and the second meteorological sample data with the highest correlation (highest sensitivity) with respect to the sample data of the pest occurrence amount and / or the pest film position sample data is screened out from the meteorological indicator sample data of different meteorological type combinations.

[0089] For example, assuming that the meteorological indicator sample data for different meteorological type combinations are: temperature, humidity, precipitation, temperature + humidity, temperature + precipitation, humidity + precipitation and temperature + humidity + precipitation, providing 7 different meteorological type combinations, calculate the first correlation and the second correlation corresponding to the meteorological indicator sample data for these 7 different meteorological type combinations respectively, and among the meteorological indicator sample data corresponding to the 7 different meteorological type combinations, select the meteorological indicator sample data with the highest first correlation as the first meteorological sample data, and among the meteorological indicator sample data corresponding to the 7 different meteorological type combinations, select the meteorological indicator sample data with the highest second correlation as the second meteorological sample data.

[0090] S302: Based on the screened meteorological indicator sample data, pest occurrence time, pest occurrence amount sample data and pest film position sample data, train a first prediction model and a second prediction model.

[0091] After the most relevant meteorological index sample data are screened out, the first prediction model and the second prediction model are trained using the screened meteorological index sample data, pest occurrence time, pest occurrence amount sample data, and pest film position sample data. Specifically, the training of the first prediction model and the second prediction model includes steps S3021-S3022:

[0092] S3021: Training a first prediction model based on the first meteorological sample data, pest occurrence time and pest occurrence amount sample data.

[0093] S3022: Training a second prediction model based on the second meteorological sample data, the pest occurrence sample data and the pest film location sample data.

[0094] Specifically, the first meteorological sample data is used as input, and the sample data of pest occurrence time and pest occurrence amount are used as output, and the first prediction model constructed based on the neural learning network is trained to obtain a first prediction model with higher accuracy in fitting the pest occurrence time and pest occurrence amount changes based on meteorological data.

[0095] In one possible embodiment, when the meteorological forecast data is subsequently input into the first prediction model, the meteorological forecast data can be preprocessed according to the meteorological type combination corresponding to the first meteorological sample data (including the calculation of the effective accumulated temperature of different types of pests within a set prediction period), so that the meteorological type combination of the meteorological forecast data is consistent with the meteorological type combination corresponding to the first meteorological sample data, and the preprocessed meteorological forecast data is then input into the first prediction model to obtain a more accurate pest prediction time and pest prediction amount.

[0096] Furthermore, the second meteorological sample data and the pest occurrence sample data are used as input, and the pest film position sample data is used as output, and the second prediction model constructed based on the neural learning network is trained to obtain a second prediction model that has a higher accuracy in fitting the pest film position changes based on the meteorological data and the pest occurrence.

[0097] S303: Obtain weather forecast data for the target area within a set prediction period.

[0098] The meteorological forecast data provided in this embodiment includes meteorological index data, the meteorological index data input into the first prediction model is obtained by screening the correlation between the meteorological index data of different meteorological type combinations and the time of occurrence of pests and / or the amount of occurrence of pests, and the meteorological index data input into the second prediction model is obtained by screening the correlation between the meteorological index data of different meteorological type combinations and the amount of occurrence of pests and / or the information of the location of pest membranes. The correlation between the meteorological index data of different meteorological type combinations and the time of occurrence of pests and / or the amount of occurrence of pests (consistent with the first correlation), and the correlation between the meteorological index data of different meteorological type combinations and the amount of occurrence of pests and / or the information of the location of pest membranes (consistent with the second correlation) are determined and recorded during the training process of the first prediction model and the second prediction model.

[0099] For example, after collecting the weather forecast data of the target area within the set prediction period, the weather indicator data of the weather type combination with the highest correlation is screened out according to the correlation between the weather indicator data and the time and / or the amount of pest occurrence, and the weather indicator data can be input into the first prediction model to obtain a more accurate pest prediction time and pest prediction amount. Further, according to the correlation between the weather indicator data and the amount of pest occurrence and / or the information on the location of pest film, the weather indicator data of the weather type combination with the highest correlation is screened out, and the weather indicator data can be input into the second prediction model to obtain more accurate information on the location of pest film.

[0100] S304: Determine the pest prediction time and pest prediction amount according to the weather forecast data using the trained first prediction model. The first prediction model can output the pest prediction time and pest prediction amount based on the input of the weather forecast data.

[0101] S305: Using the trained second prediction model, determine the pest film position information according to the weather forecast data and the pest prediction amount. The second prediction model can output the pest film position information based on the input of the weather forecast data and the pest prediction amount.

[0102] S306: Obtaining an insect pest prediction result based on the insect pest prediction time and the insect pest film position information.

[0103] In the above, according to the meteorological forecast data within the set prediction period, the first prediction model is used to predict the predicted time and predicted amount of pests within the set prediction period, and according to the predicted predicted amount of pests, the second prediction model is used to predict the information of the film position of pests within the set prediction period, and the predicted predicted time and film position of pests are output based on the predicted predicted time and film position of pests. The predicted time and film position of pests are accurately predicted through meteorological forecast data, providing a more accurate reference basis for the pest control of crops, and reducing the situation where the pest prediction effect is not ideal due to the subjective differences of different staff. At the same time, the meteorological indicator sample data is screened according to the correlation between the meteorological indicator sample data of different meteorological type combinations and the pest occurrence time, the pest occurrence amount sample data and the pest film position sample data, and then the first prediction model and the second prediction model are trained based on the screened meteorological indicator sample data to improve the prediction accuracy of the first prediction model and the second prediction model, so as to achieve accurate prediction of the pest prediction time, the pest prediction amount and the film position of pests. Whether the user needs to carry out prevention and control depends mainly on whether the predicted amount of insect pests reaches the default or user-set insect quantity threshold. The main function of the prediction model is to predict the change of insect quantity based on the screened sensitive meteorological indicators (meteorological indicator data). The prediction model can accurately predict the specific date (pest prediction time) when the predicted amount of insect pests reaches the set insect quantity threshold and the occurrence position of film (film position information), and provide targeted prevention guidance for plant protection and control, reduce the number of general prevention in the whole field, and effectively achieve cost savings and environmental protection efficiency.

[0104] Figure 4 A schematic diagram of the structure of an insect pest prediction device provided in an embodiment of the present application is given. Figure 4 The pest prediction device includes a meteorological acquisition module 41, a first prediction module 42, a second prediction module 43 and a result analysis module 44.

[0105] Among them, the meteorological acquisition module 41 is used to obtain the meteorological forecast data of the target area within the set prediction period; the first prediction module 42 is used to use the trained first prediction model to determine the pest prediction time and the pest prediction amount according to the meteorological forecast data, and the first prediction model can output the pest prediction time and the pest prediction amount based on the input of the meteorological forecast data; the second prediction module 43 is used to use the trained second prediction model to determine the pest film position information according to the meteorological forecast data and the pest prediction amount, and the second prediction model can output the pest film position information based on the input of the meteorological forecast data and the pest prediction amount; the result analysis module 44 is used to obtain the pest prediction result based on the pest prediction time and the pest film position information.

[0106] In the above, based on the meteorological forecast data within the set prediction period, the first prediction model is used to predict the pest prediction time and the pest prediction amount within the set prediction period, and based on the predicted pest prediction amount, the second prediction model is used to predict the pest film position information within the set prediction period, and the pest prediction result is output based on the predicted pest prediction time and pest film position information. The pest prediction time and pest film position information are accurately predicted through meteorological forecast data, providing a more accurate reference basis for the pest control of crops, and reducing the situation where the pest prediction effect is unsatisfactory due to subjective differences among different staff members.

[0107] The embodiment of the present application also provides a pest prediction device, which can be integrated with the pest prediction device provided in the embodiment of the present application. Figure 5 Schematic diagram of the structure of an insect pest prediction device provided in an embodiment of the present application. Figure 5 The pest prediction device includes: an input device 53, an output device 54, a memory 52 and one or more processors 51; the memory 52 is used to store one or more programs; when the one or more programs are executed by the one or more processors 51, the one or more processors 51 implement the pest prediction method provided in the above embodiment. The input device 53, the output device 54, the memory 52 and the processor 51 can be connected by a bus or other means. Figure 5 The example of connecting through bus is taken in the following.

[0108] The memory 52, as a computing device readable storage medium, can be used to store software programs, computer executable programs and modules, such as program instructions / modules corresponding to the pest prediction method described in any embodiment of the present application (for example, the weather acquisition module 41, the first prediction module 42, the second prediction module 43 and the result analysis module 44 in the pest prediction device). The memory 52 may mainly include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application required for at least one function; the storage data area may store data created according to the use of the device, etc. In addition, the memory 52 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices. In some instances, the memory 52 may further include a memory remotely arranged relative to the processor 51, and these remote memories may be connected to the device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network and a combination thereof.

[0109] The input device 53 may be used to receive input digital or character information and generate key signal input related to user settings and function control of the device. The output device 54 may include a display device such as a display screen.

[0110] The processor 51 executes the software programs, instructions and modules stored in the memory 52 to perform various functional applications and data processing of the device, that is, to implement the above-mentioned pest prediction method.

[0111] The pest prediction device, equipment and computer provided above can be used to execute the pest prediction method provided in any of the above embodiments, and have corresponding functions and beneficial effects.

[0112] The embodiment of the present application also provides a storage medium containing computer executable instructions, wherein the computer executable instructions are used to execute the pest prediction method provided in the above embodiment when executed by a computer processor, and the pest prediction method comprises: obtaining weather forecast data of a target area within a set prediction period;

[0113] Using the trained first prediction model, the pest prediction time and the pest prediction amount are determined according to the meteorological forecast data, and the first prediction model can output the pest prediction time and the pest prediction amount based on the input of the meteorological forecast data; using the trained second prediction model, the pest film position information is determined according to the meteorological forecast data and the pest prediction amount, and the second prediction model can output the pest film position information based on the input of the meteorological forecast data and the pest prediction amount; the pest prediction result is obtained based on the pest prediction time and the pest film position information.

[0114] Storage medium - any of various types of memory devices or storage devices. The term "storage medium" is intended to include: installation media, such as CD-ROM, floppy disk or tape device; computer system memory or random access memory, such as DRAM, DDR RAM, SRAM, EDO RAM, Rambus RAM, etc.; non-volatile memory, such as flash memory, magnetic media (such as hard disk or optical storage); registers or other similar types of memory elements, etc. Storage media may also include other types of memory or combinations thereof. In addition, the storage medium may be located in the first computer system in which the program is executed, or may be located in a different second computer system, which is connected to the first computer system via a network (such as the Internet). The second computer system can provide program instructions to the first computer for execution. The term "storage medium" may include two or more storage media that may reside in different locations (for example, in different computer systems connected by a network). The storage medium may store program instructions (for example, embodied as a computer program) that can be executed by one or more processors.

[0115] Of course, the storage medium containing computer executable instructions provided in the embodiment of the present application is not limited to the pest prediction method described above, and the computer executable instructions can also execute related operations in the pest prediction method provided in any embodiment of the present application.

[0116] The pest prediction devices, equipment and storage media provided in the above embodiments can execute the pest prediction method provided in any embodiment of the present application. For technical details not described in detail in the above embodiments, please refer to the pest prediction method provided in any embodiment of the present application.

[0117] The above are only preferred embodiments of the present application and the technical principles used. The present application is not limited to the specific embodiments described herein, and various obvious changes, readjustments and substitutions that can be made by those skilled in the art will not deviate from the scope of protection of the present application. Therefore, although the present application is described in more detail through the above embodiments, the present application is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present application, and the scope of the present application is determined by the scope of the claims.

Claims

1. A pest prediction method, characterized in that: include: Obtain weather forecast data for the target area within the set forecast period; Using the trained first prediction model, determining the pest prediction time and the pest prediction amount according to the weather forecast data, wherein the first prediction model can output the pest prediction time and the pest prediction amount based on the input of the weather forecast data; Using the trained second prediction model, the pest film position information is determined according to the weather forecast data and the pest prediction amount, and the second prediction model can output the pest film position information based on the input of the weather forecast data and the pest prediction amount, and the pest film position information is used to indicate the diffusion distance of the pests; The pest prediction result is obtained based on the pest prediction time and the pest film position information.

2. The pest prediction method according to claim 1, characterized in that: The predicted amount of insect pests includes the predicted amount of winged insect pests and the predicted amount of wingless insect pests, and the insect pest film position information includes the film position information of winged insect pests and the film position information of wingless insect pests; The obtaining of the pest prediction result based on the pest prediction time and the pest film position information includes: Determine the maximum film position information from the film position information of the winged insect pests and the film position information of the wingless insect pests; The pest prediction result is obtained based on the pest prediction time and the maximum film position information.

3. The pest prediction method according to claim 1, characterized in that: The meteorological forecast data includes meteorological index data. The meteorological index data input into the first prediction model is obtained by screening the correlation between the meteorological index data of different meteorological type combinations and the time of pest occurrence and / or the amount of pest occurrence. The meteorological index data input into the second prediction model is obtained by screening the correlation between the meteorological index data of different meteorological type combinations and the amount of pest occurrence and / or pest film position information.

4. The pest prediction method according to claim 3, characterized in that: The meteorological index input into the first prediction model is the meteorological index with the highest correlation with the occurrence time of pests and / or the occurrence amount of pests among the meteorological indexes of different meteorological types; The meteorological index input into the second prediction model is the meteorological index with the highest correlation with the occurrence amount of insect pests and / or film position information among the meteorological indexes of different meteorological type combinations.

5. The pest prediction method according to claim 3, characterized in that: The correlation is calculated based on a principal component analysis algorithm or a stepwise regression analysis algorithm.

6. The pest prediction method according to claim 1, characterized in that: The method further comprises: When the predicted pest amount reaches a set pest amount threshold and / or the pest film position information reaches a set film position threshold, a pest warning is issued and / or a plant protection prevention plan is determined from the plant protection library based on the pest prediction result. The plant protection library records plant protection prevention plans corresponding to different pest prediction results.

7. The pest prediction method according to claim 1, characterized in that: The method further comprises: Determine the area to be operated according to the insect pest film position information; Generate a work task corresponding to the area to be worked on; The operation task is sent to the drone, so that the drone performs spraying operation on the area to be operated.

8. The pest prediction method according to claim 1, characterized in that: The method further comprises: The pest prediction result is corrected according to the actual meteorological data of the target area and the corresponding meteorological forecast data.

9. The pest prediction method according to claim 8, characterized in that: The correcting of the pest prediction result according to the actual meteorological data of the target area and the corresponding meteorological forecast data includes: Correcting the weather forecast data according to the actual weather data of the target area; The pest prediction time, the pest prediction amount and the pest film position information are updated based on the corrected weather forecast data to correct the pest prediction result.

10. A pest prediction device, characterized in that: It includes a weather acquisition module, a first prediction module, a second prediction module and a result analysis module, wherein: The weather acquisition module is used to obtain weather forecast data for the target area within a set forecast period; The first prediction module is used to determine the pest prediction time and the pest prediction amount according to the weather forecast data using the trained first prediction model, and the first prediction model can output the pest prediction time and the pest prediction amount based on the input of the weather forecast data; The second prediction module is used to determine the pest film position information according to the weather forecast data and the pest prediction amount by using the trained second prediction model. The second prediction model can output the pest film position information based on the input of the weather forecast data and the pest prediction amount. The pest film position information is used to indicate the diffusion distance of the pests. The result analysis module is used to obtain the pest prediction result based on the pest prediction time and the pest film position information.

11. A pest prediction device, characterized in that: include: memory and one or more processors; The memory is used to store one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the pest prediction method according to any one of claims 1 to 9.

12. A storage medium containing computer executable instructions, characterized in that: The computer executable instructions are used to execute the pest prediction method according to any one of claims 1 to 9 when executed by a computer processor.

Citation Information

Patent Citations

  • Method and device for determining activity time period of pests and method for determining pesticide applying time

    CN109197273A

  • Tea lesser leafhopper pest early warning method and system based on meteorological data

    CN112949917A

  • Crop disease and pest early warning method, system, device and storage medium

    CN113705875A