Method for hoisting equipment of nuclear island main system
Through the lifting method of dual cranes, the installation process of the nuclear island main system equipment is simplified, the workload and technical requirements are reduced, the lifting efficiency is improved, and the problems of equipment lifting complexity and safety risks in the existing technology are solved.
Patent Information
- Application Number
- CN202111519857.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-13
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-12-13
AI Technical Summary
The lifting of the main system equipment of the nuclear island has problems such as complex design, large installation workload, high technical requirements, high construction safety and quality risks, and difficult to control the critical angle of flip.
The main crane is used to cooperate with the equipment head and the auxiliary crane is connected to the tail. The equipment is changed from the horizontal state to the vertical state through lifting and delivery actions, and the auxiliary crane is removed and the equipment is lifted to the installation position by the main crane.
The installation process is simplified, the workload and technical requirements are reduced, the lifting efficiency is improved, the construction safety risks are reduced, and the lifting process of the nuclear island owner system equipment is optimized.
Smart Images

Figure CN114148886B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of nuclear island equipment hoisting, and in particular to a nuclear island main system equipment hoisting method. Background Art
[0002] As my country's economy continues to grow steadily, heavy industry has entered a stage of rapid development, driving the continuous expansion of my country's hoisting industry. As of 2019, the national hoisting engineering industry has more than 100 super-large cranes with a lifting capacity of more than 650 tons, accounting for 20% of the global stock; the world's only three 4,000-ton crawler cranes, one 2,000-ton wheeled all-terrain crane, and one 6,400-ton hydraulic compound crane are all in my country.
[0003] The rapid development of the hoisting industry has created conditions for the use of new hoisting techniques for the hoisting of the main system equipment of the nuclear island in the construction of nuclear power projects. In order to actively promote advanced construction technology, the installation of the main system equipment SG, RPV, and PZR of the nuclear island is planned to adopt the open-top construction method. Among them, the three SGs, one of the key equipment in the main system equipment of the nuclear island, weigh 388t, with an upper diameter of 4870mm, a lower diameter of 3756mm, and an overall height of 22500mm. SG is heavy, long, and needs to be transported horizontally. It needs to be turned upright and hoisted into place, which makes hoisting difficult.
[0004] At present, the hoisting of SG requires the use of specially designed tooling, such as a tooling that uses a flip clamp in conjunction with a flip bracket or a J-shaped bracket. There are problems such as complex design and production, high requirements for the foundation treatment of the flip bracket, large workload for auxiliary installation, high requirements for installation technology, high risks in construction safety and quality, and difficulty in controlling the critical flip angle. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a method for hoisting nuclear island main system equipment which is simple to install and easy to operate.
[0006] The technical solution adopted by the present invention to solve the technical problem is: to provide a method for hoisting equipment of a nuclear island main system, comprising the following steps:
[0007] S1. When the main system equipment is in a horizontal position, connect the main crane to the head of the main system equipment and the auxiliary crane to the tail of the main system equipment;
[0008] S2, the main crane lifts the head of the main system equipment, and the auxiliary crane cooperates with the main crane until the main system equipment is turned from a horizontal state to an upright state;
[0009] S3. The connection between the auxiliary crane and the tail of the main system equipment is removed, and the main crane lifts the main system equipment to the installation position.
[0010] Preferably, in step S2, after the main crane lifts the head of the main system equipment, the auxiliary crane delivers the tail of the main system equipment toward the head of the main system equipment until the main system equipment is turned from a horizontal state to an upright state.
[0011] Preferably, in step S2, after the main crane lifts the head of the main system equipment, it delivers the head toward the tail of the main system equipment until the main system equipment is turned from a horizontal state to an upright state, and the auxiliary crane remains stationary.
[0012] Preferably, after step S1, the method further includes: the main crane and the auxiliary crane are lifted simultaneously to horizontally lift the main system equipment to a predetermined height so that there is a safe turning distance between the main system equipment and the ground.
[0013] Preferably, step S1 comprises:
[0014] S1.1. Install the first hanging member on the head of the main system equipment, and install the second hanging member on the tail of the main system equipment;
[0015] S1.2. Connect the main crane to the first hanging connection piece through a first hanging device, and connect the auxiliary crane to the second hanging connection piece through a second hanging device.
[0016] Preferably, the first hanging member comprises two tubular shaft type hanging ears, which are installed on opposite sides of the head of the main system equipment by hole matching.
[0017] Preferably, the first hanging member is a hanging cover plate, which can be detachably mounted on the head of the main system equipment.
[0018] Preferably, the second hanging member is a flip ring, which is clamped on the outer periphery of the tail of the main system equipment; the flip ring has one or two symmetrical hanging points.
[0019] Preferably, the second hanging member comprises two tubular shaft type hanging ears, which are installed on opposite sides of the tail of the main system equipment by hole matching.
[0020] Preferably, the first lifting device comprises a balance beam for connecting to the hook of the main crane, and two first hanging members connected to opposite ends of the balance beam and extending vertically downward;
[0021] In step S1.2, the ends of the two first hanging members away from the balance beam are connected to the first hanging member.
[0022] Preferably, the second sling comprises a sling rope; in step S1.2, the sling rope is connected to the second sling connector via a shackle.
[0023] Preferably, the second sling comprises a crossbeam connected to the auxiliary crane via a sling, and two second slings connected to opposite ends of the crossbeam and extending vertically downward;
[0024] In step S1.2, the ends of the two second hanging members away from the cross beam are connected to the second hanging connector.
[0025] The present invention provides another method for hoisting equipment of a nuclear island main system, comprising the following steps:
[0026] S1. When the main system equipment is in a horizontal position, connect the main crane to the head of the main system equipment and the auxiliary crane to the tail of the main system equipment;
[0027] S2, the main crane and the auxiliary crane are lifted simultaneously to lift the main system equipment to a predetermined height;
[0028] S3, the main crane remains stationary, and the auxiliary crane drops the hook to lower the tail of the main system equipment and simultaneously deliver it in the direction of the head until the main system equipment is turned from a horizontal state to an upright state;
[0029] S4. The connection between the auxiliary crane and the tail of the main system equipment is removed, and the main crane lifts the main system equipment to the installation position.
[0030] Preferably, step S1 comprises:
[0031] S1.1. Install the first hanging member on the head of the main system equipment, and install the second hanging member on the tail of the main system equipment;
[0032] S1.2. Connect the main crane to the first hanging connection piece through a first hanging device, and connect the auxiliary crane to the second hanging connection piece through a second hanging device.
[0033] Preferably, the first hanging member comprises two tubular shaft type hanging ears, which are installed on opposite sides of the head of the main system equipment by hole matching.
[0034] Preferably, the first hanging member is a hanging cover plate, which can be detachably mounted on the head of the main system equipment.
[0035] Preferably, the second hanging member is a flip ring, which is clamped on the outer periphery of the tail of the main system equipment; the flip ring has one or two symmetrical hanging points.
[0036] Preferably, the second hanging member comprises two tubular shaft type hanging ears, which are installed on opposite sides of the tail of the main system equipment by hole matching.
[0037] Preferably, the first lifting device comprises a balance beam for connecting to the hook of the main crane, and two first hanging members connected to opposite ends of the balance beam and extending vertically downward;
[0038] In step S1.2, the ends of the two first hanging members away from the balance beam are connected to the first hanging member.
[0039] Preferably, the second sling comprises a sling rope; in step S1.2, the sling rope is connected to the second sling connector via a shackle.
[0040] Preferably, the second sling comprises a crossbeam connected to the auxiliary crane via a sling, and two second slings connected to opposite ends of the crossbeam and extending vertically downward;
[0041] In step S1.2, the ends of the two second hanging members away from the cross beam are connected to the second hanging connector.
[0042] The method for hoisting the nuclear island main system equipment of the present invention realizes the hoisting of the main system equipment by cooperating with two cranes. The installation technology and requirements are simple, the installation workload is small, the operation is easy and the efficiency is improved. The method effectively solves the problems of the single-machine rotation method, such as the need for flip brackets, J-shaped brackets, etc., the large installation workload, high installation technology requirements, and high site layout requirements, and optimizes the nuclear island main system equipment hoisting process. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:
[0044] Figure 1 It is a schematic diagram of the hoisting process of a steam generator as the main system equipment in the present invention;
[0045] Figure 2 yes Figure 1 The schematic diagram of the hanging connection of the steam generator head is shown;
[0046] Figure 3 yes Figure 1 Another schematic diagram of the hanging connection of the tail of the steam generator is shown;
[0047] Figure 4 It is a schematic diagram of hoisting the main system equipment of the present invention as a pressure vessel. DETAILED DESCRIPTION
[0048] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.
[0049] The method for hoisting nuclear island main system equipment of the present invention is used to hoist nuclear island main system equipment such as steam generator (SG), pressure vessel (RPV), pressurizer (PZR), etc., so as to hoist them to corresponding installation positions in the nuclear island.
[0050] In some embodiments, the method for hoisting nuclear island main system equipment of the present invention comprises the following steps:
[0051] S1. When the main system equipment is in a horizontal position, connect the main crane to the head of the main system equipment and the auxiliary crane to the tail of the main system equipment.
[0052] Step S1 may specifically include:
[0053] S1.1. Install the first hanging member on the head of the main system equipment, and install the second hanging member on the tail of the main system equipment;
[0054] S1.2. Connect the main crane to the first lifting member through the first lifting device, and connect the auxiliary crane to the second lifting member through the second lifting device.
[0055] The connection between the first sling and the first sling connection is a movable connection, so that when the main crane lifts the first sling connection through the first sling, the first sling connection can rotate relative to the first sling. Similarly, the connection between the second sling and the second sling connection is movable, and the second sling connection can rotate relative to the second sling.
[0056] In order to ensure a safe turning distance between the main system equipment and the ground, the tail of the main system equipment and the second lifting member on it will not contact the ground during the subsequent lifting and turning of the head of the main system equipment. After the main crane and the auxiliary crane are connected to the head and tail of the main system equipment respectively, the main crane and the auxiliary crane are lifted at the same time to lift the main system equipment horizontally to a predetermined height. The predetermined height does not need to be too high, and can be determined according to the position of the second lifting member at the tail and its size.
[0057] S2. The main crane lifts the head of the main system equipment, and the auxiliary crane cooperates with the main crane until the main system equipment is turned from a horizontal state to an upright state (plumb state).
[0058] In this step, after the main crane lifts the head of the main system equipment, the auxiliary crane delivers the tail of the main system equipment to the direction of the head of the main system equipment. During the delivery process, the main system equipment gradually flips from a horizontal state to an upright state. The axis of the first lifting device and the main system equipment gradually changes from being relatively vertical to being parallel; the second lifting device gradually changes from being perpendicular to the axis of the main system equipment to being inclined relative to the axis of the main system equipment.
[0059] Alternatively, the main crane lifts the head of the main system equipment and then delivers the head to the tail of the main system equipment, while the auxiliary crane remains stationary. As the main crane continues to lift and change its amplitude, the main system equipment is rotated from a horizontal position to an upright position.
[0060] S3. Remove the connection between the auxiliary crane and the tail of the main system equipment, and the main crane will lift the main system equipment to the installation location.
[0061] Removing the connection between the auxiliary crane and the tail of the main system equipment includes: disconnecting the connection between the second lifting device and the second lifting member, placing the main system equipment upright on the positioning bracket by the main crane, making the second lifting member on the tail of the main system equipment cooperate with the positioning bracket, and finally removing the second lifting member on the tail of the main system equipment from the tail. After the second lifting member is separated from the tail of the main system equipment, the main crane lifts the main system equipment to the installation position through lifting, rotation, amplitude change and lowering.
[0062] For hoisting the main system equipment to the installation location, the operation can be as follows: hoist the main system equipment to above the top of the containment, enter from the open top of the containment and lower into the containment, after completing the hoisting of the required main system equipment, close the top cover of the containment on the top of the containment.
[0063] The main system device is in place at the installation position. Since the main system device is in place in an upright state, its head portion forms the top of the main system device, and its tail portion forms the bottom of the main system device.
[0064] In other embodiments, the method for hoisting nuclear island main system equipment of the present invention comprises the following steps:
[0065] S1. When the main system equipment is in a horizontal position, connect the main crane to the head of the main system equipment and the auxiliary crane to the tail of the main system equipment.
[0066] Step S1 may specifically include:
[0067] S1.1. Install the first hanging member on the head of the main system equipment, and install the second hanging member on the tail of the main system equipment;
[0068] S1.2. Connect the main crane to the first lifting member through the first lifting device, and connect the auxiliary crane to the second lifting member through the second lifting device.
[0069] The connection between the first sling and the first sling connection is a movable connection, so that when the main crane lifts the first sling connection through the first sling, the first sling connection can rotate relative to the first sling. Similarly, the connection between the second sling and the second sling connection is movable, and the second sling connection can rotate relative to the second sling.
[0070] S2. The main crane and the auxiliary crane are lifted simultaneously to lift the main system equipment to the predetermined height.
[0071] The predetermined height should meet the height requirement when the tail of the main system device is turned over relative to the head to stand upright. For example, the predetermined height can be equal to the overall height of the main device system when standing upright, or it can be increased or decreased based on the overall height of the main device system when standing upright.
[0072] S3. The main crane remains stationary, and the auxiliary crane drops the hook to lower the tail of the main system equipment and simultaneously deliver it in the direction of the head until the main system equipment is turned from a horizontal state to an upright state (plumb state).
[0073] When the auxiliary crane lowers the tail of the main system equipment, it slowly drops the hook and changes the amplitude to deliver it in the direction of the head of the main system equipment.
[0074] S4. Remove the connection between the auxiliary crane and the tail of the main system equipment, and the main crane will lift the main system equipment to the installation location.
[0075] Removing the connection between the auxiliary crane and the tail of the main system equipment includes: disconnecting the connection between the second lifting device and the second lifting member, placing the main system equipment upright on the positioning bracket by the main crane, making the second lifting member on the tail of the main system equipment cooperate with the positioning bracket, and finally removing the second lifting member on the tail of the main system equipment from the tail. After the second lifting member is separated from the tail of the main system equipment, the main crane lifts the main system equipment to the installation position through lifting, rotation, amplitude change and lowering.
[0076] For hoisting the main system equipment to the installation location, the operation can be as follows: hoist the main system equipment to above the top of the containment, enter from the open top of the containment and lower into the containment, after completing the hoisting of the required main system equipment, close the top cover of the containment on the top of the containment.
[0077] The main system device is in place at the installation position. Since the main system device is in place in an upright state, its head portion forms the top of the main system device, and its tail portion forms the bottom of the main system device.
[0078] refer to Figure 1 , 2 When the main system equipment is a SG (steam generator) 10, in a selective embodiment, the first hanging member includes two tubular shaft type lifting ears 20, and the second hanging member is a flip ring 30, which is usually formed by connecting two semicircular hoops.
[0079] The specific operations of step S1.1 are as follows:
[0080] Install two tubular shaft type lifting ears 20 on two symmetrical manholes at the head of the steam generator 10: insert the front end of the tubular shaft type lifting ear 20 into the manhole so that the tubular shaft type lifting ear 20 contacts the end face of the manhole, fix the tubular shaft type lifting ear in the threaded hole of the flange boss of the manhole with bolts, and tighten it according to the specified pre-tightening torque value.
[0081] The two semicircular hoops of the flip ring 30 are matched to the outer periphery of the tail of the steam generator 10, and the butt ends of the two semicircular hoops are connected and fastened with bolts; the bolts should be tightened alternately in a certain order. When the steam generator 10 is hoisted, the load is mainly borne by the friction between the flip ring and the steam generator 10. Therefore, in order to increase the friction, a rubber can be set between the contact surface of the flip ring 30 and the steam generator 10.
[0082] Correspondingly, the first sling 40 includes a balance beam 41 for connecting to the hook of the main crane, and two first slings 42 connected to opposite ends of the balance beam 41 and extending vertically downward; the first slings 42 can be a sling or a sling rod. The sling can preferably be a jointless rope loop. A conversion joint is set at the top of the balance beam 41, and the conversion joint is connected to the hook of the main crane through a rigging.
[0083] like Figure 1 As shown, in one embodiment of the second lifting device, it includes a lifting rope 50 connected to the hook of the auxiliary crane.
[0084] In step S1.2, the ends of the two first hanging members 42 away from the balance beam 41 are connected to the tubular lifting lugs 20. The end of each first hanging member 42 is sleeved on a tubular lifting lug 20 and can rotate relative to the tubular lifting lug 20.
[0085] For the lifting rope 50, a lifting point is arranged on the flip ring 30. When the steam generator 10 is in a horizontal state, the lifting point is located on the side of the steam generator 10 with the tail facing upward; the lifting point is connected to the lifting rope 50 through a shackle.
[0086] like Figure 3 As shown, in another embodiment of the second sling, the second sling includes a crossbeam 51 and two second slings 52 connected to opposite ends of the crossbeam 51 and pointing vertically downward. When two sling points are set on the flip ring 30; when the steam generator 10 is in a horizontal state, the two sling points are located on the two opposite sides of the rear of the steam generator 10; the crossbeam 51 is connected to the auxiliary crane through at least one set of sling ropes, and the end of each second sling 52 away from the crossbeam 51 is respectively connected to the sling point on each side of the rear of the steam generator 10, and the second sling 52 can rotate relative to the sling point. Each sling point can be formed by the combination of a sleeve and a positioning ring protruding from the flip ring 30. The center line of the sling point is parallel to the center line of the manhole of the steam generator 10, and the parallel tolerance is 0.6mm.
[0087] When the main system equipment is a SG (steam generator) 10, in another optional embodiment, the first hanging member includes two pipe-shaft type hanging ears, and the second hanging member also includes two pipe-shaft type hanging ears. When the first hanging member and the second hanging member are installed on the head and tail of the steam generator 10, the two pipe-shaft type hanging ears of the first hanging member are installed on the two symmetrical manholes of the head of the steam generator 10, and the two pipe-shaft type hanging ears of the second hanging member are installed on the two symmetrical hand holes of the tail of the steam generator 10. Figure 1 The installation of the tube shaft lifting eye 20 on the steam generator 10 is shown in FIG.
[0088] Correspondingly, the first sling and the second sling can both be composed of a balance beam, two slings connected at opposite ends of the balance beam and vertically downward, etc.; the slings can be ropes or rods. At the head of the SG, the first sling is connected to the main crane with its balance beam, and the end of the sling away from the balance beam is connected to the tubular lug of the first sling. At the tail of the SG, the second sling is connected to the auxiliary crane with its balance beam, and the end of the sling away from the balance beam is connected to the tubular lug of the second sling. The connection between the first sling and the second sling and the tubular lug can refer to the above Figure 2 Connection method shown.
[0089] For the above-mentioned implementation mode, when hoisting the SG, the hole structure on the head and tail of the SG is directly used for the detachable installation of the hanging parts (tubular axis type lifting ears), without the need to set up additional hanging points (such as welding lifting ears), thereby reducing the investment in parts and the like and improving efficiency.
[0090] When lifting the steam generator 10, any of the above two embodiments can be selected as needed: the main crane lifts the head of the steam generator 10, and the auxiliary crane delivers the tail of the steam generator 10 to the direction of the head until the steam generator 10 is turned from a horizontal state to a vertical state; or, the main crane lifts the head of the steam generator 10 and delivers it to the direction of the tail, and the auxiliary crane remains motionless until the steam generator 10 is turned from a horizontal state to a vertical state; or, the main crane and the auxiliary crane lift at the same time, lift the steam generator 10 to a predetermined height, the main crane remains motionless, and the auxiliary crane drops the hook to lower the tail of the steam generator 10 and deliver it to the direction of the head at the same time until the steam generator 10 is turned from a horizontal state to a vertical state. Finally, the steam generator 10 is hoisted into the containment for installation.
[0091] like Figure 4 As shown, when the main system equipment is a pressure vessel (RPV) 60, in a selective embodiment, the first hanging member is a hanging cover plate 70, which is detachably mounted on the head of the pressure vessel 60. The second hanging member is a flip ring 80, which is usually formed by connecting two semicircular hoops.
[0092] The specific operations of step S1.1 are as follows:
[0093] Install the lifting cover plate 70 on the head of the pressure vessel 60; fit the two semicircular hoops of the flip ring 80 to the outer periphery of the tail of the pressure vessel 60, and fasten the butt ends of the two semicircular hoops with bolts; the bolts should be tightened alternately in a certain order. When lifting the pressure vessel 60, the load is mainly borne by the friction between the flip ring 80 and the pressure vessel 60. Therefore, in order to increase the friction, a rubber can be set between the contact surface of the flip ring 80 and the pressure vessel 60.
[0094] The first sling 91 may include a sling rope, or include a balance beam, and two slings connected at opposite ends of the balance beam and extending vertically downward; the second sling 92 may include a sling rope, or include a balance beam, and two slings connected at opposite ends of the balance beam and extending vertically downward.
[0095] In step S1.2, when the first sling 91 includes a sling rope, a sling point is set on the sling cover plate 70, which is located on the central axis of the pressure vessel 60; the sling rope is connected between the main crane and the sling point. When the first sling 91 is composed of a balance beam and a sling, two symmetrical sling points are set on the sling cover plate 70, the balance beam is connected to the main crane through a sling rope, and the ends of the two slings away from the balance beam are respectively connected to the two sling points.
[0096] When the second sling 92 includes a lifting rope, a lifting point is set on the flip ring 80. When the pressure vessel 60 is in a horizontal state, the lifting point is located on the upward side of the tail of the pressure vessel 60; the lifting point is connected to the lifting rope through a shackle. When the second sling 92 is composed of a balance beam and a hanging piece, two lifting points are set on the flip ring 80; when the pressure vessel 60 is in a horizontal state, the two lifting points are located on the two opposite sides of the tail of the pressure vessel 60; the balance beam is connected to the auxiliary crane through a lifting rope, and the ends of the two hanging pieces away from the balance beam are respectively connected to the two lifting points.
[0097] When lifting the pressure vessel 60, any of the above two embodiments can be selected as needed: the main crane lifts the head of the pressure vessel 60, and the auxiliary crane delivers the tail of the pressure vessel 60 to the direction of the head until the pressure vessel 60 is turned from a horizontal state to a vertical state; or, the main crane lifts the head of the pressure vessel 60 and delivers it to the direction of the tail, and the auxiliary crane remains motionless until the pressure vessel 60 is turned from a horizontal state to a vertical state; or, the main crane and the auxiliary crane lift at the same time, lift the pressure vessel 60 to a predetermined height, the main crane remains motionless, and the auxiliary crane drops the hook to lower the tail of the pressure vessel 60 and deliver it to the direction of the head at the same time until the pressure vessel 60 is turned from a horizontal state to a vertical state. Finally, the pressure vessel 60 is hoisted into the containment for installation.
[0098] When the main system equipment is a pressure stabilizer, its hoisting method can refer to the hoisting of the above-mentioned steam generator and pressure vessel.
[0099] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for hoisting equipment of a nuclear island main system, characterized in that: The following steps are involved: S1. When the main system equipment is in a horizontal position, the first hanging member is installed on the two symmetrical manholes of the head of the main system equipment by hole matching, and the second hanging member is installed on the two symmetrical hand holes of the tail of the main system equipment by hole matching; the main crane is connected to the first hanging member by a first hanging device, and the auxiliary crane is connected to the second hanging member by a second hanging device; the first hanging member includes two tubular shaft lifting ears, and the second hanging member includes two tubular shaft lifting ears; S2, the main crane lifts the head of the main system equipment, and the auxiliary crane cooperates with the main crane until the main system equipment is turned from a horizontal state to an upright state; S3. The connection between the auxiliary crane and the tail of the main system equipment is removed, and the main crane lifts the main system equipment to the installation position.
2. The method for hoisting the nuclear island main system equipment according to claim 1, characterized in that: In step S2, after the main crane lifts the head of the main system equipment, the auxiliary crane delivers the tail of the main system equipment to the direction of the head of the main system equipment until the main system equipment is turned from a horizontal state to an upright state; or, After the main crane lifts the head of the main system equipment, it delivers the head toward the tail of the main system equipment until the main system equipment is turned from a horizontal state to an upright state, and the auxiliary crane remains stationary.
3. The method for hoisting nuclear island main system equipment according to claim 1, characterized in that: After step S1, the method further includes: the main crane and the auxiliary crane are lifted simultaneously to horizontally lift the main system equipment to a predetermined height so that there is a safe turning distance between the main system equipment and the ground.
4. The method for hoisting nuclear island main system equipment according to claim 1, characterized in that: The first lifting device includes a balance beam for connecting to the hook of the main crane, and two first hanging members connected to opposite ends of the balance beam and extending vertically downward; In step S1.2, the ends of the two first hanging members away from the balance beam are connected to the first hanging member.
5. The method for hoisting nuclear island main system equipment according to claim 1, characterized in that: The second sling comprises a sling rope; in step S1.2, the sling rope is connected to the second sling connector via a shackle; or, The second sling includes a crossbeam connected to the auxiliary crane through a sling rope, and two second slings connected to opposite ends of the crossbeam and extending vertically downward; in step S1.2, the ends of the two second slings away from the crossbeam are connected to the second sling connector.
6. A method for hoisting equipment of a nuclear island main system, characterized in that: The following steps are involved: S1. When the main system equipment is in a horizontal position, the first hanging member is installed on the two symmetrical manholes of the head of the main system equipment by hole matching, and the second hanging member is installed on the two symmetrical hand holes of the tail of the main system equipment by hole matching; the main crane is connected to the first hanging member by a first hanging device, and the auxiliary crane is connected to the second hanging member by a second hanging device; the first hanging member includes two tubular shaft lifting ears, and the second hanging member includes two tubular shaft lifting ears; S2, the main crane and the auxiliary crane are lifted simultaneously to lift the main system equipment to a predetermined height; S3, the main crane remains stationary, and the auxiliary crane drops the hook to lower the tail of the main system equipment and simultaneously deliver it in the direction of the head until the main system equipment is turned from a horizontal state to an upright state; S4. The connection between the auxiliary crane and the tail of the main system equipment is removed, and the main crane lifts the main system equipment to the installation position.
7. The method for hoisting nuclear island main system equipment according to claim 6, characterized in that: The first lifting device includes a balance beam for connecting to the hook of the main crane, and two first hanging members connected to opposite ends of the balance beam and extending vertically downward; In step S1.2, the ends of the two first hanging members away from the balance beam are connected to the first hanging member.
8. The method for hoisting nuclear island main system equipment according to claim 6, characterized in that: The second sling comprises a sling rope; in step S1.2, the sling rope is connected to the second sling connector via a shackle; or, The second sling includes a crossbeam connected to the auxiliary crane through a sling rope, and two second slings connected to opposite ends of the crossbeam and extending vertically downward; in step S1.2, the ends of the two second slings away from the crossbeam are connected to the second sling connector.