Design method of buffer layer support for large deformation tunnel
By obtaining stress-strain relationship curves and calculating energy absorption, suitable filling materials and thicknesses were selected, solving the instability problem of buffer layer support design for large deformation tunnels, achieving precise support effects, and improving the safety of tunnel operation.
Patent Information
- Application Number
- CN202111572047.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-21
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-12-21
AI Technical Summary
In existing technologies, the design of buffer layer support for large deformation tunnels relies on manual experience, resulting in unstable support effects and difficulty in providing accurate and effective data support, which affects the safety of secondary lining structures during tunnel operation.
By obtaining the stress-strain relationship curve of the buffer layer support of the target large deformation tunnel, candidate filling materials with a termination stress of less than the ultimate bearing capacity of the secondary lining structure in the pressure relief stage are screened out. Their energy absorption and thickness are calculated. Combined with the required pressure relief deformation, the appropriate filling material and thickness are determined to achieve accurate design.
It provides accurate and effective data support to ensure that the design of the buffer layer support for large deformation tunnels takes into account the specific schemes of pressure yield, pressure yield and energy absorption characteristics, thereby improving the safety of the secondary lining structure during the tunnel operation period.
Smart Images

Figure CN114329701B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of engineering, and in particular to a buffer layer support design method for a large deformation tunnel. Background Art
[0002] In recent years, the construction of transportation infrastructure in western my country has resulted in an increasing number of soft rock tunnels crossing high geostress areas. The deformation of the surrounding rock of high geostress soft rock tunnels is large and lasts for a long time, which not only easily leads to the destruction of the primary support structure during the construction period, but also causes cracking of the secondary lining structure during the operation period, affecting the safe operation of the tunnel.
[0003] In order to ensure the safety of the secondary lining structure during the operation period, a support technology of setting a high-compression buffer layer between the primary support and the secondary lining was proposed to absorb the deformation of the surrounding rock during the tunnel operation period.
[0004] In the process of researching the existing related technologies, the inventors found that the construction and design of the buffer layer support for large deformation tunnels still rely on manual experience. In subsequent engineering work, it was found that the support effect of the buffer layer support for large deformation tunnels constructed at that time was unstable and the effect was poor. Summary of the invention
[0005] The present application provides a design method for buffer layer support of large deformation tunnels, which is used to propose a specific structural scheme for buffer layer support of large deformation tunnels under the condition of considering yield pressure, yield amount and energy absorption characteristics, so as to provide accurate and effective data support for the design of buffer layer support of deformation tunnels.
[0006] In a first aspect, the present application provides a buffer layer support design method for a large deformation tunnel, the method comprising:
[0007] After determining the design task of the buffer layer support of the target large deformation tunnel, the ultimate bearing capacity of the secondary lining structure corresponding to the buffer layer support of the target large deformation tunnel is obtained;
[0008] Obtain the stress-strain relationship curve of the first candidate filling material for the target large deformation tunnel buffer layer support obtained through the confined compression test adapted for the target large deformation tunnel buffer layer support, and screen out the second candidate filling material whose termination stress in the yielding stage is less than the ultimate bearing capacity of the secondary lining structure. The stress-strain relationship curve includes an elastic stage, a yielding stage, and a compaction stage;
[0009] The sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage of the second candidate filling material is obtained, and the target candidate filling material with the maximum sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage is selected as the filling material for the buffer layer support of the target large deformation tunnel;
[0010] Obtain the required yield deformation of the buffer layer support of the target large deformation tunnel;
[0011] The thickness of the buffer layer support for the target large deformation tunnel is determined based on the required yielding deformation and the terminal strain of the yielding stage of the target candidate filling material.
[0012] In combination with the first aspect of the present application, in a first possible implementation of the first aspect of the present application, obtaining the ultimate bearing capacity of the secondary lining structure corresponding to the buffer layer support of the target large deformation tunnel includes:
[0013] The ultimate bearing capacity p of the secondary lining structure is calculated by the following formula s :
[0014]
[0015] in, is the design compressive strength of secondary lining concrete, t is the thickness of secondary lining, and R is the outer contour radius of secondary lining.
[0016] In combination with the first aspect of the present application, in a second possible implementation of the first aspect of the present application, obtaining the required yield deformation of the buffer layer support of the target large deformation tunnel includes:
[0017] The required yield deformation U is calculated by the following formula F :
[0018] U F =U M -U R
[0019] Among them, U M is the average value of the maximum deformation of the tunnel in the monitoring section before the secondary lining construction, U R Reserve deformation space for secondary lining.
[0020] In combination with the first aspect of the present application, in a third possible implementation of the first aspect of the present application, before obtaining a stress-strain relationship curve of a first candidate filling material for a target large deformation tunnel buffer layer support obtained through a confined compression test adapted for a target large deformation tunnel buffer layer support, the method further includes:
[0021] Conducting a confined compression test on the first candidate filling material;
[0022] During the test, the stress-strain curve of the first candidate filling material is monitored, and the stress-strain curve includes the elastic stage end stress σ y , elastic stage end strain ε y , the end stress of the yielding stageσ z and the end strain ε of the yield stage z .
[0023] In combination with the first aspect of the present application, in a fourth possible implementation of the first aspect of the present application, obtaining the sum of the energy absorption of the second candidate filling material in the elastic stage and the energy absorption of the second candidate filling material in the pressure-releasing stage includes:
[0024] The sum of the energy absorption in the elastic stage and the energy absorption in the yield stage of the second candidate filling material is calculated by the following formula:
[0025]
[0026] Among them, E E is the energy absorbed in the elastic stage, E Y In order to absorb energy in the compression stage, σ y is the elastic stage end stress, ε y is the end strain of the elastic stage, σ z is the end stress of the yield stage, ε z To terminate the strain in the yielding stage.
[0027] In combination with the first aspect of the present application, in a fifth possible implementation of the first aspect of the present application, the thickness of the buffer layer support of the target large deformation tunnel is determined according to the required yielding deformation amount and the yielding stage termination strain of the target candidate filling material, including:
[0028] Calculate the thickness using the following formula:
[0029]
[0030] Among them, U F is the required yield deformation, ε z To terminate the strain in the yielding stage.
[0031] In combination with the first aspect of the present application, in a sixth possible implementation manner of the first aspect of the present application, the method further includes:
[0032] Output the target candidate filling materials and thickness prompt information to provide data reference for the structural processing of the buffer layer support of the target large deformation tunnel.
[0033] In a second aspect, the present application provides a large deformation tunnel buffer layer support design device, the device comprising:
[0034] An acquisition unit is used to acquire the ultimate bearing capacity of the secondary lining structure corresponding to the buffer layer support of the target large deformation tunnel after determining the design task of the buffer layer support of the target large deformation tunnel;
[0035] The first screening unit is used to obtain the stress-strain relationship curve of the first candidate filling material of the target large deformation tunnel buffer layer support obtained through the side confinement compression test adapted to the target large deformation tunnel buffer layer support, and screen out the second candidate filling material whose termination stress of the yielding stage is less than the ultimate bearing capacity of the secondary lining structure, and the stress-strain relationship curve includes relationship curves of the elastic stage, the yielding stage and the compaction stage;
[0036] The second screening unit is used to obtain the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage of the second candidate filling material, and screen out the target candidate filling material whose sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage is the maximum as the filling material for the buffer layer support of the target large deformation tunnel;
[0037] The acquisition unit is also used to obtain the required yield deformation of the buffer layer support of the target large deformation tunnel;
[0038] The determination unit is used to determine the thickness of the buffer layer support of the target large deformation tunnel according to the required yielding deformation amount and the yielding stage termination strain of the target candidate filling material.
[0039] In conjunction with the second aspect of the present application, in a first possible implementation manner of the second aspect of the present application, the acquiring unit is specifically configured to:
[0040] The ultimate bearing capacity p of the secondary lining structure is calculated by the following formula s :
[0041]
[0042] in, is the design compressive strength of secondary lining concrete, t is the thickness of secondary lining, and R is the outer contour radius of secondary lining.
[0043] In conjunction with the second aspect of the present application, in a second possible implementation manner of the second aspect of the present application, the acquiring unit is specifically configured to:
[0044] The required yield deformation U is calculated by the following formula F :
[0045] U F =U M -U R
[0046] Among them, U M is the average value of the maximum deformation of the tunnel in the monitoring section before the secondary lining construction, U R Reserve deformation space for secondary lining.
[0047] In combination with the second aspect of the present application, in a third possible implementation manner of the second aspect of the present application, the device further includes a test unit, which is used to:
[0048] Conducting a confined compression test on the first candidate filling material;
[0049] During the test, the stress-strain curve of the first candidate filling material is monitored, and the stress-strain curve includes the elastic stage end stress σ y , elastic stage end strain ε y , the end stress of the yielding stageσ z and the end strain ε of the yield stage z .
[0050] In combination with the second aspect of the present application, in a fourth possible implementation manner of the second aspect of the present application, the second screening unit is used to:
[0051] The sum of the energy absorption in the elastic stage and the energy absorption in the yield stage of the second candidate filling material is calculated by the following formula:
[0052]
[0053] Among them, E E is the energy absorbed in the elastic stage, E Y In order to absorb energy in the compression stage, σ y is the elastic stage end stress, ε y is the end strain of the elastic stage, σ z is the end stress of the yield stage, ε z To terminate the strain in the yielding stage.
[0054] In conjunction with the second aspect of the present application, in a fifth possible implementation manner of the second aspect of the present application, the determining unit is specifically configured to:
[0055] Calculate the thickness using the following formula:
[0056]
[0057] Among them, U F is the required yield deformation, ε z To terminate the strain in the yielding stage.
[0058] In combination with the second aspect of the present application, in a sixth possible implementation manner of the second aspect of the present application, the device further includes an output unit, which is used to:
[0059] Output the target candidate filling materials and thickness prompt information to provide data reference for the structural processing of the buffer layer support of the target large deformation tunnel.
[0060] In the third aspect, the present application provides a large deformation tunnel buffer layer support design device, including a processor and a memory, wherein a computer program is stored in the memory, and when the processor calls the computer program in the memory, the method provided by the first aspect of the present application or any possible implementation method of the first aspect of the present application is executed.
[0061] In a fourth aspect, the present application provides a computer-readable storage medium, which stores multiple instructions, and the instructions are suitable for a processor to load to execute the method provided by the first aspect of the present application or any possible implementation of the first aspect of the present application.
[0062] From the above content, it can be concluded that the present application has the following beneficial effects:
[0063] With respect to the construction design of the target large deformation tunnel buffer layer support, the present application obtains the stress-strain relationship curve of the first candidate filling material for the target large deformation tunnel buffer layer support, and screens out the second candidate filling material whose termination stress in the yielding stage is less than the ultimate bearing capacity of the secondary lining structure of the target large deformation tunnel buffer layer support, then obtains the sum of the energy absorption in the elastic stage and the energy absorption in the yielding stage of the second candidate filling material, and screens out the target candidate filling material with the maximum value of the sum of the energy absorption in the elastic stage and the energy absorption in the yielding stage as the target large deformation tunnel buffer layer support. The filling material is then used to determine the thickness of the target large deformation tunnel buffer layer support according to the required yielding deformation of the target large deformation tunnel buffer layer support and the terminal strain of the yielding stage of the target candidate filling material. In this process, taking into account the yielding pressure (terminal stress of the yielding stage), the yielding amount (the required yielding deformation of the target large deformation tunnel buffer layer support) and the energy absorption characteristics (the sum of the energy absorption in the elastic stage and the energy absorption in the yielding stage), a specific design scheme for the large deformation tunnel buffer layer support is proposed, providing accurate and effective data support for the design of the deformation tunnel buffer layer support. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0065] Figure 1 A schematic diagram of a flow chart of a buffer layer support design method for a large deformation tunnel in this application;
[0066] Figure 2 A schematic diagram of a scenario for buffer layer support in this application;
[0067] Figure 3A curve schematic diagram of a stress-strain relationship curve of a candidate filling material for the buffer layer of the present application;
[0068] Figure 4 A schematic diagram of an example of a stress-strain relationship curve of a candidate filling material for an organic buffer layer of the present application;
[0069] Figure 5 A schematic diagram of an example of the energy absorption effect of candidate filling materials for the buffer layer of the present application;
[0070] Figure 6 A schematic diagram of a structure of a buffer layer support design device for a large deformation tunnel in this application;
[0071] Figure 7 A structural schematic diagram of the buffer layer support design equipment for large deformation tunnels in this application. DETAILED DESCRIPTION
[0072] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of this application.
[0073] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments described here can be implemented in an order other than that illustrated or described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or modules is not necessarily limited to those steps or modules clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products or devices. The naming or numbering of steps in this application does not mean that the steps in the method flow must be executed in the time / logical sequence indicated by the naming or numbering. The process steps that have been named or numbered can change the execution order according to the technical purpose to be achieved, as long as the same or similar technical effects can be achieved.
[0074] The division of modules in this application is a logical division. There may be other division methods when it is implemented in actual applications. For example, multiple modules can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection between modules can be electrical or other similar forms, which are not limited in this application. In addition, the modules or submodules described as separate components may or may not be physically separated, may or may not be physical modules, or may be distributed in multiple circuit modules, and some or all of the modules may be selected according to actual needs to achieve the purpose of the present application.
[0075] Before introducing the large deformation tunnel buffer layer support design method provided in this application (also known as the structural result processing method of the large deformation tunnel buffer layer support), the background content involved in this application is first introduced.
[0076] The large deformation tunnel buffer layer support design method, device and computer-readable storage medium provided in the present application can be applied to the large deformation tunnel buffer layer support design equipment, and is used to propose a specific structural scheme for the large deformation tunnel buffer layer support while considering the yield pressure, yield amount and energy absorption characteristics, so as to provide accurate and effective data support for the deformation tunnel buffer layer support design.
[0077] The execution subject of the large deformation tunnel buffer layer support design method mentioned in the present application can be a large deformation tunnel buffer layer support design device, or a server, physical host or user equipment (UE) and other different types of large deformation tunnel buffer layer support design equipment integrated with the large deformation tunnel buffer layer support design device. Among them, the large deformation tunnel buffer layer support design device can be implemented in hardware or software, and the UE can be a terminal device such as a smart phone, a tablet computer, a laptop computer, a desktop computer or a personal digital assistant (PDA), and the large deformation tunnel buffer layer support design device can be set in the form of a device cluster.
[0078] Next, the buffer layer support design method for a large deformation tunnel provided by this application is introduced.
[0079] First, see Figure 1 , Figure 1 A schematic flow chart of a buffer layer support design method for a large deformation tunnel provided by the present application is shown. The buffer layer support design method for a large deformation tunnel provided by the present application may specifically include the following steps S101 to S105:
[0080] Step S101, after determining the target large deformation tunnel buffer layer support design task, obtaining the secondary lining structure ultimate bearing capacity corresponding to the target large deformation tunnel buffer layer support;
[0081] It can be understood that, in practical applications, the construction design of the buffer layer support for a large deformation tunnel is triggered by the current target large deformation tunnel buffer layer support design task.
[0082] Buffer support, its structure in the tunnel, can refer to Figure 2 A schematic diagram of a scenario of buffer layer support of the present application is shown, which is located between the initial support and the secondary lining and is used to absorb the deformation of the surrounding rock and reduce the stress on the secondary lining.
[0083] This design task can be triggered manually by relevant staff or autonomously by the equipment. For example, if the system detects the emergence of new large deformation tunnel content, it can autonomously trigger the design of its buffer layer support.
[0084] With the triggering of the design task, the ultimate bearing capacity of the secondary lining structure of the buffer layer support of the target large deformation tunnel can be obtained first, providing specific and accurate data basis for the preliminary screening of subsequent candidate filling materials.
[0085] The so-called ultimate bearing capacity of the secondary lining structure can be understood as the bearing capacity of the secondary lining structure of the target large deformation tunnel under extreme conditions. The secondary lining structure is specifically a permanent support structure built with reinforced concrete and other materials along the periphery of the tunnel body to prevent deformation or collapse of the surrounding rock of the target large deformation tunnel.
[0086] Among them, the ultimate bearing capacity of the secondary lining structure of the buffer layer support of the target large deformation tunnel can be directly carried in the task data of the above-mentioned design task, that is, it can be predetermined data and can be directly called later.
[0087] Alternatively, the ultimate bearing capacity of the secondary lining structure of the buffer layer support of the target large deformation tunnel can also be obtained through real-time calculation to ensure that the data is accurate and up-to-date.
[0088] As a practical implementation method, in actual application, the ultimate bearing capacity of the secondary lining structure of the buffer layer support of the target large deformation tunnel is p s , can be calculated by the following formula:
[0089]
[0090] in, is the design compressive strength of secondary lining concrete, t is the thickness of secondary lining, and R is the outer contour radius of secondary lining.
[0091] It can be seen from this formula that, combined with the relevant data of the secondary lining, the ultimate bearing capacity of the secondary lining structure p s A specific and simple calculation scheme is provided.
[0092] Step S102, obtaining a stress-strain relationship curve of a first candidate filling material for a target large deformation tunnel buffer layer support obtained through a confined compression test adapted for a target large deformation tunnel buffer layer support, and screening out a second candidate filling material whose termination stress in a yielding stage is less than the ultimate bearing capacity of a secondary lining structure, wherein the stress-strain relationship curve includes an elastic stage, a yielding stage, and a compacting stage;
[0093] After obtaining the ultimate bearing capacity of the secondary lining structure of the buffer layer support of the target large deformation tunnel mentioned above, it can be used to screen the candidate filling materials here.
[0094] It can be understood that the buffer layer support of the large deformation tunnel uses filling materials to achieve its support effect, and what filling materials to use and what thickness of the filling materials are the goals targeted by this application.
[0095] For different large deformation tunnels, when designing the buffer layer support, the range of materials to be used can be pre-set, and the multiple types of filling materials specified therein are referred to as the first candidate filling materials in this application.
[0096] Specifically, regarding the material properties of the filling material, in practical applications, the present application screens the filling material based on its stress-strain relationship curve.
[0097] The stress-strain curve is obtained from the side confinement compression test of the buffer layer support adaptation of the target large deformation tunnel. The load-displacement curve can also be used. Figure 3 A schematic diagram of the stress-strain curve of the candidate filling material of the buffer layer of the present application is shown. The stress-strain curve is mainly divided into three parts: the elastic stage ( Figure 3 The second is the elastic stage ( Figure 3 The third is the compression stage ( Figure 3 These three stages correspond to the three main stages of large deformation tunnel buffer layer support in the actual engineering process, reflecting the corresponding relationship between stress and strain.
[0098] Here, σ represents stress and ε represents strain.
[0099] The stress-strain relationship curve of the candidate filling material may be directly carried in the task data of the above-mentioned design task, that is, it may be predetermined data and may be directly called later.
[0100] Alternatively, the stress-strain relationship curve of the candidate filling material may also be obtained through real-time calculation to ensure that the data is accurate and up-to-date.
[0101] As a practical implementation method, in actual applications, the stress-strain relationship curve of the first candidate filling material for the target large deformation tunnel buffer layer support can be obtained on site, thereby determining the accurate stress-strain relationship curve of the current candidate filling material on site.
[0102] As a specific implementation method, it can be:
[0103] Conducting a confined compression test on the first candidate filling material;
[0104] During the test, the stress-strain curve of the first candidate filling material is monitored, and the stress-strain curve includes the elastic stage end stress σ y , elastic stage end strain ε y , the end stress of the yielding stageσ z and the end strain ε of the yield stage z .
[0105] Among them, the lateral confinement compression test can be understood as a compression test of the candidate filling material under the lateral confinement conditions suitable for the target large deformation tunnel buffer layer support. It is used to restore the application environment of the target large deformation tunnel buffer layer support. When the lateral deformation of the sample of the candidate filling material is constrained, the axial stress is applied, the relationship between the pressure and the sample deformation is measured, and then the stress and strain are determined, and the stress-strain relationship curve is obtained.
[0106] This application believes that when the pressure release stage ends, the stress σ z ≥Ultimate bearing capacity of secondary lining structure p s When the pressure relief stage ends, the alternative filling material cannot be used because of the excessive pressure relief. z <Ultimate bearing capacity of secondary lining structure p s When the filling material meets the stress requirement of the buffer layer, it can be used as an alternative material, and the final adoptable filling material can be determined through subsequent re-screening.
[0107] Step S103, obtaining the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage of the second candidate filling material, and selecting the target candidate filling material with the maximum sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage as the filling material for the buffer layer support of the target large deformation tunnel;
[0108] It can be understood that the filling material can also reflect the energy absorption characteristics in the process of realizing the buffer layer support. Specifically, by quantifying the data through the energy absorption, it can be understood that in the process of providing the buffer layer support effect, the degree of energy absorbed from the surrounding rock can be absorbed, thereby achieving the buffering effect.
[0109] The present application believes that the energy absorption characteristics of the filling material are specifically reflected in the two stages mentioned above, namely the elastic stage and the pressure-yielding stage, which also corresponds to the actual application of buffer layer support in large deformation tunnels.
[0110] At this time, if only one filling material needs to be selected, the target candidate filling material with the maximum sum of the energy absorption in the elastic stage and the energy absorption in the compression stage can be selected as the filling material finally adopted.
[0111] The sum of the absorbed energy in the elastic stage and the absorbed energy in the pressure-releasing stage can be directly carried in the task data of the above-mentioned design task, that is, it can be predetermined data and can be directly called later.
[0112] Alternatively, the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-releasing stage may also be obtained through real-time calculation, so as to ensure that the data are accurate and latest data.
[0113] As another practical implementation, the sum of the energy absorption in the elastic phase and the energy absorption in the pressure-yielding phase of the second candidate filling material can be obtained by referring to the following content.
[0114] The sum of the energy absorption in the elastic stage and the energy absorption in the yield stage of the second candidate filling material is calculated by the following formula:
[0115]
[0116] Among them, E E is the energy absorbed in the elastic stage, E Y In order to absorb energy in the compression stage, σ y is the elastic stage end stress, ε y is the end strain of the elastic stage, σ z is the end stress of the yield stage, ε z To terminate the strain in the yielding stage.
[0117] It can be seen from the formula that the data of the stress-strain relationship curve at different positions involved in the above content are combined to provide a specific and simple calculation scheme for the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage.
[0118] Step S104, obtaining the required yield deformation of the buffer layer support of the target large deformation tunnel;
[0119] After determining the specific target filling material to be used, the thickness of the buffer layer to be achieved can also be determined, that is, the thickness of the target large deformation tunnel buffer layer support.
[0120] This application believes that the thickness is related to the required compressive deformation of the buffer layer support of the target large deformation tunnel. The required compressive deformation can be obtained by monitoring the deformation of the target large deformation tunnel. Therefore, the required compressive deformation of the buffer layer support of the target large deformation tunnel can be obtained, providing a data basis for subsequent thickness determination.
[0121] Similarly, the required compressive deformation of the buffer layer support of the target large deformation tunnel can be directly carried in the task data of the above-mentioned design task, that is, it can be predetermined data and can be directly called later.
[0122] Alternatively, the required yield deformation of the buffer layer support of the target large deformation tunnel can also be obtained through real-time calculation to ensure that the data is accurate and up-to-date.
[0123] As another practical implementation method, please refer to the following content.
[0124] The required yield deformation U is calculated by the following formula F :
[0125] U F =U M -U R
[0126] Among them, U M is the average value of the maximum deformation of the tunnel in the monitoring section before the secondary lining construction, U R Reserve deformation space for secondary lining.
[0127] It can be seen from this formula that, combined with the relevant data of the secondary lining, the required compression deformation U F A specific and simple calculation scheme is provided.
[0128] Step S105, obtaining the thickness of the target large deformation tunnel buffer layer support according to the required yielding deformation amount and the yielding stage termination strain of the target candidate filling material.
[0129] After determining the specific target candidate filling materials and the required compressive deformation of the target large deformation tunnel buffer layer support, we can combine the two and consider the material properties and the properties of the target large deformation tunnel buffer layer support itself to determine the applicable and suitable thickness.
[0130] As another practical implementation method, the thickness of the buffer layer support of the target large deformation tunnel can be calculated by the following formula:
[0131]
[0132] Among them, U F is the required yield deformation, ε z To terminate the strain in the yielding stage.
[0133] In this formula, a specific and simple calculation scheme is provided for the thickness of the buffer layer support of the target large deformation tunnel.
[0134] In this way, the filling material and the appropriate thickness selected for the buffer layer support of the target large deformation tunnel are determined. At this time, it can also be output for practical decision-making.
[0135] For example, prompt information of target candidate filling materials and thickness can be output to provide data reference for the structural processing of the buffer layer support of the target large deformation tunnel.
[0136] The specific output method of the prompt information, that is, the prompt method, can be executed according to a preset strategy, such as image display, voice, text message, email, etc., which is not specifically limited here.
[0137] As an example of the above content, a large deformation tunnel intends to select polyurethane and polyethylene materials as the filling materials of the buffer layer. Based on the above processing of this application, the selection of filling materials is carried out. The whole process is as follows:
[0138] (1) Carry out polyurethane (density 70~100kg / m 3 ) and polyethylene (density 90~135kg / m 3 ) was subjected to a confined compression test, the stress-strain relationship obtained is as follows Figure 4 An example schematic diagram of a stress-strain curve of a candidate filling material for the organic buffer layer of the present application is shown.
[0139] (2) The tunnel excavation radius is 6.5 m. The secondary lining is made of C30 concrete (design compressive strength 14.3 MPa) with a thickness of 50 cm. The ultimate bearing capacity of the secondary lining structure is calculated as p s for:
[0140]
[0141] (3) According to the stress-strain curve, the density is 70-80 kg / m 3 Polyurethane and density of 90~135kg / m 3 The polyethylene meets the yield stage end stress σ z (Let the pressure be less than the ultimate bearing capacity of the secondary lining structure p s demand.
[0142] (4) According to the stress-strain relationship, the energy absorption effect per unit volume of the buffer layer with different densities is calculated, such as Figure 5 An example schematic diagram of the energy absorption effect of the candidate filling materials for the buffer layer of the present application is shown. Figure 5 It can be seen that the density is 80kg / m 3 Polyurethane material has the best energy absorption effect and is selected as the filling material for the buffer layer.
[0143] (5) The average maximum deformation of the tunnel with large deformation is 354 mm, the reserved space for secondary lining is 300 mm, and the density is 80 kg / m 3 The yield strain of the polyurethane material is ε z is 0.55, and the calculated thickness of the buffer layer is 98 mm.
[0144] For the above content, in general, for the construction design of the buffer layer support of the target large deformation tunnel, this application obtains the stress-strain relationship curve of the first candidate filling material of the buffer layer support of the target large deformation tunnel, and screens out the second candidate filling material whose termination stress in the elastic stage is less than the ultimate bearing capacity of the secondary lining structure of the buffer layer support of this target large deformation tunnel, and then obtains the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage of the second candidate filling material, and screens out the target candidate filling material with the maximum value of the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage as the target large deformation tunnel The filling material of the buffer layer support is then determined according to the required yielding deformation of the buffer layer support of the target large deformation tunnel and the terminal strain of the yielding stage of the target candidate filling material. In this process, taking into account the yielding pressure (terminal stress of the yielding stage), the yielding amount (the required yielding deformation of the buffer layer support of the target large deformation tunnel this time) and the energy absorption characteristics (the sum of the energy absorption in the elastic stage and the energy absorption in the yielding stage), a specific construction scheme for the buffer layer support of the large deformation tunnel is proposed, providing accurate and effective data support for the deformation tunnel buffer layer support.
[0145] The above is an introduction to the buffer layer support design method for a large deformation tunnel provided by this application. In order to facilitate better implementation of the buffer layer support design method for a large deformation tunnel provided by this application, this application also provides a buffer layer support design device for a large deformation tunnel from the perspective of functional modules.
[0146] See also Figure 6 , Figure 6 This is a structural schematic diagram of a buffer layer support design device for a large deformation tunnel of the present application. In the present application, the buffer layer support design device 600 for a large deformation tunnel may specifically include the following structure:
[0147] An acquisition unit 601 is used to acquire the ultimate bearing capacity of the secondary lining structure corresponding to the buffer layer support of the target large deformation tunnel after determining the design task of the buffer layer support of the target large deformation tunnel;
[0148] The first screening unit 602 is used to obtain the stress-strain relationship curve of the first candidate filling material of the target large deformation tunnel buffer layer support obtained by the side confinement compression test adapted to the target large deformation tunnel buffer layer support, and screen out the second candidate filling material whose termination stress of the yielding stage is less than the ultimate bearing capacity of the secondary lining structure, and the stress-strain relationship curve includes relationship curves of the elastic stage, the yielding stage and the compaction stage;
[0149] The second screening unit 603 is used to obtain the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage of the second candidate filling material, and screen out the target candidate filling material with the maximum sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage as the filling material for the buffer layer support of the target large deformation tunnel;
[0150] The acquisition unit 601 is also used to acquire the required yield deformation of the buffer layer support of the target large deformation tunnel;
[0151] The determination unit 604 is used to determine the thickness of the target large deformation tunnel buffer layer support according to the required yielding deformation amount and the yielding stage termination strain of the target candidate filling material.
[0152] In an exemplary implementation, the acquiring unit 601 is specifically configured to:
[0153] The ultimate bearing capacity p of the secondary lining structure is calculated by the following formula s :
[0154]
[0155] in, is the design compressive strength of secondary lining concrete, t is the thickness of secondary lining, and R is the outer contour radius of secondary lining.
[0156] In yet another exemplary implementation, the acquiring unit 501 is specifically configured to:
[0157] The required yield deformation U is calculated by the following formula F :
[0158] U F =U M -U R
[0159] Among them, U M is the average value of the maximum deformation of the tunnel in the monitoring section before the secondary lining construction, U R Reserve deformation space for secondary lining.
[0160] In yet another exemplary implementation, the apparatus further includes a testing unit 605, configured to:
[0161] Conducting a confined compression test on the first candidate filling material;
[0162] During the test, the stress-strain curve of the first candidate filling material is monitored, and the stress-strain curve includes the elastic stage end stress σ y , elastic stage end strain ε y , the end stress of the yielding stageσ z and the end strain ε of the yield stage z .
[0163] In yet another exemplary implementation, the second screening unit 603 is configured to:
[0164] The sum of the energy absorption in the elastic stage and the energy absorption in the yield stage of the second candidate filling material is calculated by the following formula:
[0165]
[0166] Among them, E E is the energy absorbed in the elastic stage, E Y In order to absorb energy in the compression stage, σ y is the elastic stage end stress, ε y is the end strain of the elastic stage, σ z is the end stress of the yield stage, ε z To terminate the strain in the yielding stage.
[0167] In yet another exemplary implementation, the determining unit 604 is specifically configured to:
[0168] Calculate the thickness using the following formula:
[0169]
[0170] Among them, U F is the required yield deformation, ε z To terminate the strain in the yielding stage.
[0171] In yet another exemplary implementation, the apparatus further includes an output unit 606, configured to:
[0172] Output the target candidate filling materials and thickness prompt information to provide data reference for the structural processing of the buffer layer support of the target large deformation tunnel.
[0173] This application also provides a large deformation tunnel buffer layer support design and processing equipment from the perspective of hardware structure, see Figure 7 , Figure 7A schematic diagram of a structure of a buffer layer support design device for a large deformation tunnel of the present application is shown. Specifically, the buffer layer support design device for a large deformation tunnel of the present application may include a processor 701, a memory 702, and an input / output device 703. The processor 701 is used to execute a computer program stored in the memory 702 to implement the following Figure 1 The steps of the buffer layer support design method for a large deformation tunnel in the corresponding embodiment; or, the processor 701 is used to execute the computer program stored in the memory 702 to implement the following Figure 6 Corresponding to the functions of each unit in the embodiment, the memory 702 is used to store the processor 701 executing the above Figure 1 The computer program required for the buffer layer support design method for a large deformation tunnel in the corresponding embodiment.
[0174] Exemplarily, the computer program may be divided into one or more modules / units, one or more modules / units are stored in the memory 702, and executed by the processor 701 to complete the present application. One or more modules / units may be a series of computer program instruction segments capable of completing specific functions, and the instruction segments are used to describe the execution process of the computer program in the computer device.
[0175] The buffer layer support design device for a large deformation tunnel may include, but is not limited to, a processor 701, a memory 702, and an input-output device 703. Those skilled in the art will appreciate that the illustration is merely an example of the buffer layer support design device for a large deformation tunnel, and does not constitute a limitation on the buffer layer support design device for a large deformation tunnel, and may include more or fewer components than shown in the illustration, or a combination of certain components, or different components, for example, the buffer layer support design device for a large deformation tunnel may also include a network access device, a bus, etc., and the processor 701, the memory 702, the input-output device 703, etc. are connected via the bus.
[0176] The processor 701 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the large deformation tunnel buffer layer support design device, and uses various interfaces and lines to connect various parts of the entire device.
[0177] The memory 702 can be used to store computer programs and / or modules. The processor 701 implements various functions of the computer device by running or executing the computer programs and / or modules stored in the memory 702 and calling the data stored in the memory 702. The memory 702 can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function, etc.; the data storage area can store data created according to the use of the large deformation tunnel buffer layer support design device, etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0178] When the processor 701 is used to execute the computer program stored in the memory 702, the following functions can be implemented:
[0179] After determining the design task of the buffer layer support of the target large deformation tunnel, the ultimate bearing capacity of the secondary lining structure corresponding to the buffer layer support of the target large deformation tunnel is obtained;
[0180] Obtain the stress-strain relationship curve of the first candidate filling material for the target large deformation tunnel buffer layer support obtained through the confined compression test adapted for the target large deformation tunnel buffer layer support, and screen out the second candidate filling material whose termination stress in the yielding stage is less than the ultimate bearing capacity of the secondary lining structure. The stress-strain relationship curve includes an elastic stage, a yielding stage, and a compaction stage;
[0181] The sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage of the second candidate filling material is obtained, and the target candidate filling material with the maximum sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage is selected as the filling material for the buffer layer support of the target large deformation tunnel;
[0182] Obtain the required yield deformation of the buffer layer support of the target large deformation tunnel;
[0183] According to the required yielding deformation and the terminal strain of the yielding stage of the target candidate filling material, the thickness of the buffer layer support of the target large deformation tunnel is obtained.
[0184] Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working process of the large deformation tunnel buffer layer support design device, equipment and its corresponding units described above can refer to the following Figure 1 The description of the buffer layer support design method for a large deformation tunnel in the corresponding embodiment will not be repeated here in detail.
[0185] A person of ordinary skill in the art will appreciate that all or part of the steps in the various methods of the above embodiments may be completed by instructions, or by controlling related hardware through instructions. The instructions may be stored in a computer-readable storage medium and loaded and executed by a processor.
[0186] To this end, the present application provides a computer-readable storage medium, in which a plurality of instructions are stored, and the instructions can be loaded by a processor to execute the present application as follows: Figure 1 The steps of the buffer layer support design method for a large deformation tunnel in the corresponding embodiment, the specific operation can be referred to as follows Figure 1 The description of the buffer layer support design method for a large deformation tunnel in the corresponding embodiment will not be repeated here.
[0187] The computer-readable storage medium may include: a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.
[0188] Due to the instructions stored in the computer-readable storage medium, the present application can be executed. Figure 1 The steps of the buffer layer support design method for a large deformation tunnel in the corresponding embodiment, therefore, the present application can be implemented as follows Figure 1 The beneficial effects that can be achieved by the buffer layer support design method for a large deformation tunnel in the corresponding embodiment are detailed in the previous description and will not be repeated here.
[0189] The above is a detailed introduction to the large deformation tunnel buffer layer support design method, device, equipment and computer-readable storage medium provided by the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea; at the same time, for technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
Claims
1. A buffer layer support design method for a large deformation tunnel, characterized in that: The method comprises: After determining the target large deformation tunnel buffer layer support design task, obtaining the secondary lining structure ultimate bearing capacity corresponding to the target large deformation tunnel buffer layer support; Obtaining a stress-strain relationship curve of a first candidate filling material for the target large deformation tunnel buffer layer support obtained through a confined compression test adapted for the target large deformation tunnel buffer layer support, and screening out a second candidate filling material whose termination stress in the yielding stage is less than the ultimate bearing capacity of the secondary lining structure, wherein the stress-strain relationship curve includes an elastic stage, a yielding stage, and a compaction stage; Obtaining the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage of the second candidate filling material, and selecting the target candidate filling material whose sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage is the maximum as the filling material for the buffer layer support of the target large deformation tunnel; Obtaining the required yield deformation of the buffer layer support of the target large deformation tunnel; The thickness of the buffer layer support of the target large deformation tunnel is determined according to the required yielding deformation amount and the yielding stage termination strain of the target candidate filling material.
2. The method according to claim 1, characterized in that The obtaining of the ultimate bearing capacity of the secondary lining structure corresponding to the buffer layer support of the target large deformation tunnel includes: The ultimate bearing capacity p of the secondary lining structure is calculated by the following formula s : in, is the design compressive strength of secondary lining concrete, t is the thickness of secondary lining, and R is the outer contour radius of secondary lining.
3. The method according to claim 1, characterized in that The step of obtaining the required yield deformation of the buffer layer support of the target large deformation tunnel includes: The required yield deformation U is calculated by the following formula F : IN F =U M -IN R Among them, U M is the average value of the maximum deformation of the tunnel in the monitoring section before the secondary lining construction, U R Reserve deformation space for secondary lining.
4. The method according to claim 1, characterized in that: Before obtaining the stress-strain relationship curve of the first candidate filling material for the target large deformation tunnel buffer layer support obtained through the confined compression test adapted for the target large deformation tunnel buffer layer support, the method further includes: Conducting a confined compression test on the first candidate filling material; During the test, the stress-strain curve of the first candidate filling material is monitored, wherein the stress-strain curve includes the elastic stage end stress σ y , elastic stage end strain ε y , the end stress of the yielding stageσ z and the end strain ε of the yield stage z .
5. The method according to claim 1, characterized in that The step of obtaining the sum of the energy absorption in the elastic phase and the energy absorption in the pressure-yielding phase of the second candidate filling material comprises: The sum of the energy absorption in the elastic stage and the energy absorption in the yield stage of the second candidate filling material is calculated by the following formula: Among them, E E is the energy absorbed in the elastic stage, E Y is the energy absorbed during the pressure release stage, σ y is the elastic stage end stress, ε y is the end strain of the elastic stage, σ z is the end stress of the yield stage, ε z To terminate the strain in the yielding stage.
6. The method according to claim 1, characterized in that The step of determining the thickness of the target large deformation tunnel buffer layer support according to the required yielding deformation and the yielding stage termination strain of the target candidate filling material comprises: The thickness is calculated by the following formula: Among them, U F is the required yield deformation, ε z The strain is terminated for the yielding stage.
7. The method according to claim 1, characterized in that The method further comprises: Output the target candidate filling material and the prompt information of the thickness to provide data reference for the structural processing of the buffer layer support of the target large deformation tunnel.
8. A buffer layer support design device for a large deformation tunnel, characterized in that: The device comprises: An acquisition unit, configured to acquire the ultimate bearing capacity of the secondary lining structure corresponding to the target large deformation tunnel buffer layer support after determining the target large deformation tunnel buffer layer support design task; A first screening unit is used to obtain a stress-strain relationship curve of a first candidate filling material for the target large deformation tunnel buffer layer support obtained through a confined compression test adapted to the target large deformation tunnel buffer layer support, and screen out a second candidate filling material whose termination stress in the yielding stage is less than the ultimate bearing capacity of the secondary lining structure, wherein the stress-strain relationship curve includes relationship curves of an elastic stage, a yielding stage, and a compacting stage; A second screening unit is used to obtain the sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage of the second candidate filling material, and screen out the target candidate filling material whose sum of the energy absorption in the elastic stage and the energy absorption in the pressure-yielding stage is the maximum as the filling material for the buffer layer support of the target large deformation tunnel; The acquisition unit is further used to acquire the required yield deformation of the buffer layer support of the target large deformation tunnel; The determination unit is used to determine the thickness of the target large deformation tunnel buffer layer support according to the required yielding deformation amount and the yielding stage termination strain of the target candidate filling material.
9. A deformation tunnel buffer layer support design device, characterized in that: The method comprises a processor and a memory, wherein the memory stores a computer program, and the processor executes the method according to any one of claims 1 to 7 when calling the computer program in the memory.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor to execute the method according to any one of claims 1 to 7.
Citation Information
Cited By
Tunnel dynamic design method based on forepoling deformation
CN119962058A
Tunnel Dynamic Design Method Based on the Deformation of Advanced Support
CN119962058B