A wind turbine generator set shaft alignment monitoring and adjustment device and monitoring and adjustment method
By using monitoring strain gauges and hydraulic cylinder systems in wind turbines, real-time monitoring and adjustment of the shaft alignment status of wind turbines are realized, which solves the problems of offset and shutdown during the shaft alignment adjustment process using traditional methods, and improves efficiency Adjust efficiency and stability.
Patent Information
- Application Number
- CN202210415345.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-04-20
AI Technical Summary
Existing wind turbines have deviations during the shaft alignment adjustment process, resulting in equipment distortion and wear and coupling deflection. Traditional adjustment methods require shutdown and lack the ability to adjust axis direction deviations.
A wind turbine shaft alignment monitoring and adjustment device is designed, which includes multiple monitoring strain gauges, adjustment devices, monitoring computers, hydraulic stations and electro-hydraulic proportional valves. Semiconductor strain gauges are used to monitor the shaft alignment status, and the shaft alignment status is monitored through hydraulic cylinders and supports. The leg system realizes real-time adjustment and does not require downtime.
It realizes real-time adjustment of the shaft alignment status of the wind turbine generator without stopping, reduces costs, improves adjustment efficiency, and improves the space utilization and stability of the alignment adjustment device.
Smart Images

Figure CN114790969B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of wind turbines, and in particular to a wind turbine shaft alignment monitoring and adjustment device and a monitoring and adjustment method. Background Art
[0002] During actual operation, due to the coupling system of the wind turbine generator set, there may be an offset between the generator input shaft connected to the output shaft of the generator speed increaser. If the shaft alignment state is not restored in time, the main shaft of the generator set equipment will be twisted and worn, and the deflection of the coupling will increase during operation. In order to improve the power generation efficiency of wind farms and meet power generation indicators, it is necessary to quickly and efficiently adjust the shaft alignment of wind turbines. Chinese Patent 202110959445.2 discloses an electronically controlled centering adjustment device and method for the shaft of a wind turbine generator set, which uses adjustment components arranged on the left and right sides of the wind turbine generator and uses hydraulic drive adjustment. Although the efficiency of the wind turbine shaft alignment adjustment is improved by using an automatic control method, the wind turbine generator set needs to be shut down during the adjustment process, and the adjustment time is relatively long. Chinese patent 202110959443.3 discloses a method for adjusting the alignment monitoring and adjustment device of the speed increaser high-speed shaft and the generator shaft, which uses a monitoring device installed at the wind turbine speed increaser and the generator main shaft to monitor the alignment of the wind turbine shaft, and uses a hydraulic adjustment device installed on the left and right sides of the bottom of the wind turbine to adjust it. This patented monitoring device cooperates with the adjustment device to adjust the wind turbine in real time. Although the real-time adjustment of the wind turbine shaft alignment is achieved, the adjustment device lacks freedom and cannot adjust the axial direction deviation of the wind turbine. Summary of the invention
[0003] Purpose of the invention: The purpose of the present invention is to provide a wind turbine shaft alignment monitoring and adjustment device and a monitoring and adjustment method, which can perform real-time alignment adjustment when the shaft of the generator set is offset, and there is no need to shut down the wind turbine during the adjustment process.
[0004] Technical solution: The wind turbine shaft alignment monitoring and adjustment device of the present invention comprises a monitoring device, an adjustment device, a monitoring computer, a hydraulic station and an electro-hydraulic proportional valve; the monitoring device comprises a plurality of monitoring strain gauges symmetrically arranged on the surface of a coupling, and the coupling connects the high-speed shaft of the speed increaser and the main shaft of the generator; the adjustment device comprises a static platform installed on the generator base, a dynamic platform installed under the wind turbine to support it, and a leg system connected between the static platform and the dynamic platform; the monitoring computer controls the electro-hydraulic proportional valve through an analog quantity acquisition module, and the electro-hydraulic proportional valve is connected to the hydraulic cylinder in the leg system; when the high-speed shaft of the speed increaser and the main shaft of the generator are offset, a plurality of monitoring strain gauges are deformed by force, and the resistance value changes accordingly, the voltage value of each monitoring strain gauge is collected and the data is fed back to the monitoring computer in real time, the monitoring computer determines the current state of the wind turbine shaft alignment, and controls the oil flow output by the hydraulic station to the electro-hydraulic proportional valve, and the electro-hydraulic proportional valve controls the extension and retraction of the hydraulic cylinder in the leg system, thereby adjusting the posture of the wind turbine and restoring the alignment state.
[0005] An absolute encoder is installed on the generator main shaft to obtain the position of the monitoring strain gauge when it rotates with the speed increaser high-speed shaft and the generator main shaft, so as to facilitate the adjustment device to perform centering adjustment.
[0006] The outrigger system includes a plurality of outriggers, each of which includes an upper Hooke's hinge, a connecting block, a hydraulic cylinder, a slewing bearing, a lower Hooke's hinge, a rope sensor, and a slide rail; the lower portion of the upper Hooke's hinge is sequentially connected to a connecting block, a hydraulic cylinder, a slewing bearing, and a lower Hooke's hinge; the upper flange of the upper Hooke's hinge is connected to a moving platform via bolts, and the upper flange of the lower Hooke's hinge is connected to a static platform via bolts; the rope sensor is installed on one side of the hydraulic cylinder to measure the displacement of the hydraulic cylinder piston rod, and the slide rail is installed on the other side of the hydraulic cylinder to limit the rotational freedom of the hydraulic cylinder piston rod.
[0007] The lower flange of the upper Hooke's hinge and the connecting block, the hydraulic cylinder and the slewing bearing, and the slewing bearing and the lower Hooke's hinge are all connected by at least two connecting plates. The Hooke's hinge, the slewing bearing, the connecting block, and the hydraulic cylinder are connected by the connecting plates, which enhances the interchangeability of the standard parts. The connecting plates are inexpensive and easy to process.
[0008] The electro-hydraulic proportional valve is respectively connected to the hydraulic cylinder on each leg in the outrigger system, and an ordinary reversing valve is arranged on the oil circuit of each leg; an electro-hydraulic proportional reversing valve is used to control the main oil circuit, and an ordinary reversing valve is used for the oil circuit of each leg, which effectively reduces the cost.
[0009] The supporting points of the legs on the static platform and the dynamic platform in the adjusting device are arranged in an isosceles triangle.
[0010] The present invention also includes a method for monitoring and adjusting the shaft alignment of a wind turbine generator set, comprising the following steps:
[0011] S1: Use the A / D acquisition module to collect the voltage signals U at points A1, A2, A3, and A4 A1 , U A2 , U A3 , U A4 , absolute encoder phase signal Among them, points A1, A2, A3, and A4 are the connection points between the A / D acquisition module and the power supply and voltage acquisition circuits of each monitoring strain gauge;
[0012] S2: Determine the voltage signal U A1 , U A2 , U A3 , U A4 Is it within the threshold? If the voltage signal U A1 , U A2 , U A3 , U A4 If it is within the threshold, the alignment is in good condition and no adjustment is required. The voltage values corresponding to the strain gauges on the output shaft of the speed increaser and the main shaft of the generator are recorded as the initial data.
[0013] S3: If the voltage signal U A1 , U A2 , U A3 , U A4 If it is not within the threshold, the wind turbine generator set shaft alignment state is offset. The offset form and direction between the speed increaser high-speed shaft and the wind turbine generator main shaft are determined based on the output voltage values of the absolute encoder, the speed increaser output shaft strain gauge, and the generator main shaft strain gauge.
[0014] S4: adjusting the position of the offset wind turbine using a wind turbine centering adjustment device according to the offset form and offset direction;
[0015] S5: After the initial adjustment, the voltage data collected by the strain gauge of the output shaft of the speed increaser and the strain gauge of the main shaft of the generator are compared with the initial data;
[0016] S6: If the comparison difference value is within the threshold, the adjustment is completed; if it exceeds the threshold, return to step S3 to continue adjustment.
[0017] In step S3, judging the offset form and direction between the speed increaser high-speed shaft and the wind turbine generator main shaft according to the output voltage values of the absolute encoder and the speed increaser output shaft strain gauge and the generator main shaft strain gauge specifically includes the following steps:
[0018] S3.1: If the voltage signal U A1 , U A2 Within the threshold, but U A3, U A4 If U is not within the threshold, the wind turbine shaft is not parallel to the X axis. A3 , U A4 is greater than the upper threshold, the offset direction is the negative direction of the X axis; if U A3 , U A4 is less than the lower limit of the threshold, the offset direction is the positive direction of the X axis; if the voltage signal U A1 , U A2 If the threshold is exceeded, proceed to the next step;
[0019] S3.2: If the voltage signal U A1 , U A2 If the threshold is exceeded and the amplitudes are basically equal and the signs are opposite, the wind turbine shaft is parallel misaligned in the Y-axis and Z-axis directions, and the parallel misalignment direction of the wind turbine shaft is the Y-axis. Direction and Z axis Direction; if the voltage signal U A1 , U A2 If the threshold is exceeded and the amplitudes are basically equal and the signs are the same, proceed to the next step;
[0020] S3.3: If the voltage signal U A1 , U A2 If the value exceeds the threshold and the amplitude is basically equal and the sign is the same, the wind turbine shaft is misaligned in the Y-axis and Z-axis directions, and the wind turbine shaft is angularly misaligned around the Y-axis. Direction and around the Z axis Directional angular misalignment.
[0021] In step S4, the posture adjustment of the offset wind turbine using the wind turbine centering adjustment device according to the offset form and offset direction specifically includes the following steps:
[0022] S4.1: The pull rope sensor collects the displacement of the piston rod of each leg, calculates the current length of each leg, and calculates the position of the dynamic platform of the wind turbine centering adjustment device at this time;
[0023] S4.2: Determine the final position and posture to be achieved by the moving platform adjustment movement according to the offset form and offset direction;
[0024] S4.3: Calculate the movement and extension amount required for the piston rod of each leg hydraulic cylinder to adjust the centering adjustment platform to the corresponding position;
[0025] S4.4: Control the movement and extension of the piston rod of the i-th leg of the centering adjustment device Δl i .
[0026] S4.5: Adjustment completed, return to the first step to continue monitoring the shaft alignment status of the wind turbine generator set
[0027] Step S4.2, determining the final position and posture to be achieved by the moving platform adjustment movement according to the offset form and offset direction, specifically:
[0028] If the X-axis is offset in the positive direction, the position B O′=[X c -ΔX0,Y c ,Z c ] T ,attitude If the X-axis is parallel to the negative direction and offset occurs, the position B O′=[X c +ΔX0,Y c ,Z c ] T ,attitude
[0029] If along the Y axis Direction deviation, when When B O′=[X c ,Y c -ΔY0,Z c ] T ,attitude when When B O′=[X c ,Y c +ΔY0,Z c ] T ,attitude when No adjustment required;
[0030] If along the Z axis Direction deviation, when When B O′=[X c ,Y c ,Z c -ΔZ0] T ,attitude when When B O′=[X c ,Y c ,Z c +ΔZ0] T ,attitude when No adjustment is required;
[0031] If the Y axis Direction rotation, when When B O′= B O, Posture when When B O′= B O, Posture when No adjustment is required;
[0032] If the Z axis Direction rotation, when When B O′= B O, Posture when When B O′= B O, Posture when No adjustment is required.
[0033] Beneficial effects: Compared with the prior art, the technical solution of the present invention has the following beneficial effects:
[0034] (1) When the shaft of the generator set is offset, it can be adjusted in real time without stopping the wind turbine generator set;
[0035] (2) Traditional monitoring methods use distance sensors, acoustic emission sensors, vibration sensors, etc. to monitor the shaft alignment status of wind turbines. The method of using sensors to monitor the shaft alignment status can only be effectively monitored when the shaft of the wind turbine is significantly offset. This solution uses semiconductor strain gauges as monitoring elements. Semiconductor strain gauges have the characteristics of large sensitivity coefficient, small mechanical hysteresis, large resistance range, and small lateral effect. They can quickly and accurately reflect the status of the monitored shaft. In addition, strain gauges are inexpensive and suitable for assembling a large number of wind turbines in various wind turbine farms, effectively controlling costs.
[0036] (3) Improve the traditional six-degree-of-freedom parallel platform structure so that the improved centering adjustment device occupies less space in the wind turbine cabin and provides more stable support for the rectangular base of the wind turbine; use a Hooke hinge and a slewing bearing to replace the ball hinge to ensure the same three degrees of freedom as the ball hinge and make up for the shortcoming of the ball hinge's insufficient constraint angle;
[0037] (4) The rotational position of the strain gauge can be known based on the absolute encoder, which facilitates the centering adjustment device to restore the centering state. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 This is an overall structural diagram of the wind turbine generator shaft alignment monitoring and adjustment device of the present invention;
[0039] Figure 2 It is a schematic diagram of the installation of the monitoring strain gauge and the coupling in the present invention;
[0040] Figure 3 It is a structural schematic diagram of the centering adjustment device in the present invention;
[0041] Figure 4 It is a cross-sectional view of a single leg in the leg system;
[0042] Figure 5 for Figure 4 A magnified view of the structure at center A;
[0043] Figure 6 for Figure 4 A magnified view of the structure at B in the middle;
[0044] Figure 7 It is a schematic diagram of the layout improvement of the outrigger system in the present invention;
[0045] Figure 8 It is a hydraulic system diagram of the centering adjustment device of the present invention;
[0046] Fig. 9 It is a block diagram of the hydraulic system control circuit in the present invention;
[0047] Fig.10 It is a schematic diagram of the hydraulic system control circuit;
[0048] Fig.11 A circuit diagram of a circuit for monitoring the power supply and voltage acquisition of a strain gauge in the present invention;
[0049] Fig.12 This is a schematic diagram of the structure of the monitoring strain gauge when the alignment is in good condition;
[0050] Fig.13 This is a schematic diagram of the structure of the parallel misalignment process strain gauge monitoring strain gauge;
[0051] Fig.14 Schematic diagram of the output voltage variation of the double-arm half-bridge circuit during the process of parallel misalignment;
[0052] Fig.15 Schematic diagram of the structure of the strain gauge for monitoring the angular misalignment process;
[0053] Fig.16 This is a schematic diagram of the output voltage variation of the double-arm half-bridge circuit during the angular misalignment process;
[0054] Fig.17 This is a flow chart of the alignment monitoring method;
[0055] Fig.18 The figure is a flow chart of the centering adjustment method. DETAILED DESCRIPTION
[0056] The technical solution of the present invention is described in detail below in conjunction with specific implementation methods and the accompanying drawings.
[0057] like Figure 1 As shown, the wind turbine generator shaft alignment monitoring and adjustment device of the present invention comprises a monitoring device 5, an adjustment device, an absolute encoder 7, a conductive slip ring 8, a monitoring computer 13, a hydraulic station 14 and an electro-hydraulic proportional valve 15. The wind turbine generator comprises a speed increaser 1, a speed increaser high-speed shaft 2, a brake disc 3, a coupling 4, a generator main shaft 6 and a wind turbine 12 connected in sequence from left to right. The coupling 4 connects the speed increaser high-speed shaft 2 and the generator main shaft 6. The monitoring device 5 comprises 6 monitoring strain gauges, which are divided into three groups and symmetrically arranged on the surface of the coupling 4. The absolute encoder 7 and the conductive slip ring 8 are installed on the generator main shaft 6, and the absolute encoder 7 is used to obtain the position of the monitoring strain gauge when it rotates with the speed increaser high-speed shaft 2 and the generator main shaft 6. The adjustment device comprises a static platform 9, a dynamic platform 10 and a leg system 11, wherein the static platform 9 is installed on the generator base, the dynamic platform 10 is installed under the wind turbine 12 to support it, and the leg system 11 is installed between the static platform 9 and the dynamic platform 10 to connect the two into an integral structure. The monitoring computer 13 and the hydraulic station 14 are installed above the generator base, the electro-hydraulic proportional valve 15 is installed above the static platform 9, and the monitoring device 5 transmits the monitored centering status data to the monitoring computer 13. The monitoring computer 13 controls the centering adjustment device according to the monitoring data to restore the centering state of the wind turbine shaft.
[0058] like Figure 2 As shown, a coordinate system is established with the axis direction of the main shaft of the wind turbine as the X-axis, an axis perpendicular to the X-axis and parallel to the ground as the Y-axis, and an axis perpendicular to the X-axis, Y-axis and the ground as the Z-axis. The monitoring device 5 is composed of a monitoring strain gauge I 21, a monitoring strain gauge II 22, a monitoring strain gauge III 23, a monitoring strain gauge IV 24, a monitoring strain gauge V 25, and a monitoring strain gauge VI 26. The monitoring strain gauge I 21 is installed at point A of the coupling 4, the monitoring strain gauge II 22 is installed at point B of the coupling 4, the monitoring strain gauge III 23 is installed at point C of the coupling 4, the monitoring strain gauge IV 24 is installed at point D of the coupling 4, the monitoring strain gauge V 25 is installed at point E of the coupling 4, and the monitoring strain gauge VI 26 is installed at point F of the coupling 4. The monitoring strain gauge I 21 and the monitoring strain gauge II 22, the monitoring strain gauge I 23 and the monitoring strain gauge II 24, the monitoring strain gauge V 25, and the monitoring strain gauge VI 26 are arranged symmetrically. The conductive slip ring 8 takes the positive direction of the Z axis as the zero position of the absolute encoder 7 and the counterclockwise direction is positive. The wires of all the monitoring strain gauges are led out through the conductive slip ring 8.
[0059] like Figures 3 to 6As shown, the adjustment device is composed of a static platform 9, a dynamic platform 10, and an outrigger system 11. The outrigger system 11 includes 6 outriggers, each of which is composed of an upper Hooke's hinge 16, a connecting block 17, a hydraulic cylinder 18, a slewing bearing 19, a lower Hooke's hinge 20, a pull rope sensor 37, a slide rail 38, and a connecting plate. The specific installation method is that the lower part of the upper Hook's hinge 16 is connected in sequence with the connecting block 17, the hydraulic cylinder 18, the slewing bearing 19, and the lower Hook's hinge 20; the upper flange of the upper Hook's hinge 16 is bolted to the moving platform 10 of the adjusting device, the lower flange of the upper Hook's hinge 16 is bolted to the connecting plate I 31, the connecting block 17 is bolted to the connecting plate II 32, and the connecting plate I 31 is bolted to the connecting plate II 32 to connect the upper Hook's hinge 16 to the connecting block 17; the connecting block 17 is connected to the piston rod of the hydraulic cylinder 18 through a thread; the bottom flange of the hydraulic cylinder 18 is bolted to the connecting plate III 33, the connecting plate IV 34 is bolted to the upper part of the slewing bearing 19, and the connecting plate III 33 is bolted to the connecting plate IV 34 to connect the hydraulic cylinder 18 to the upper part of the slewing bearing 19; the lower part of the slewing bearing 19 is connected to the connecting plate V 35, the upper flange of the lower Hook's hinge 20 is connected to the connecting plate VI 36, and the connecting plate V 35 is connected to the connecting plate VI The lower part of the slewing bearing 19 is connected to the upper flange of the lower Hook hinge 20 by bolt connection 36; the lower flange of the lower Hook hinge 20 is bolted to the static platform 9 of the adjusting device. The pull rope sensor 37 is installed on one side of the hydraulic cylinder 18 to measure the displacement of the piston rod in the hydraulic cylinder 18, and the slide rail 38 is installed on the other side of the hydraulic cylinder 18 to limit the rotational freedom of the piston rod of the hydraulic cylinder 18.
[0060] like Figure 7 As shown in the figure, it can be seen from the dotted circle in the figure that the support points of the legs of the static platform and the dynamic platform of the traditional six-degree-of-freedom platform are arranged in an equilateral triangle; it can be seen from the solid circle in the figure that the support points of the legs of the static platform 9 and the dynamic platform 10 of the improved centering adjustment device of this scheme are arranged in an isosceles triangle. The support points on each leg of the improved dynamic platform 10 are better adapted to the rectangular base of the wind turbine, and the space of the wind turbine cabin occupied by the static platform 9 is smaller.
[0061] like Figure 8As shown, the hydraulic system of the centering adjustment device is composed of a hydraulic station 14, an electro-hydraulic proportional valve 15, an electromagnetic reversing valve I 43, an electromagnetic reversing valve II 44, an electromagnetic reversing valve III 45, an electromagnetic reversing valve IV 46, an electromagnetic reversing valve V 47, an electromagnetic reversing valve VI 48, a hydraulic cylinder I 49, a hydraulic cylinder II 50, a hydraulic cylinder III 51, a hydraulic cylinder IV 52, a hydraulic cylinder V 53, and a hydraulic cylinder VI 54. The electro-hydraulic proportional valve 15 is respectively connected to the hydraulic cylinders on each leg in the leg system 11, and a common reversing valve is arranged on the oil distribution path of each leg. When the electro-hydraulic proportional valve 15 is in the right position, the electromagnetic reversing valve I 43 is in the left position, the hydraulic cylinder I 49 retracts, the electromagnetic reversing valve I 43 is in the right position, and the hydraulic cylinder I 49 extends; the electromagnetic reversing valve II 44 is in the left position, the hydraulic cylinder II 50 retracts, the electromagnetic reversing valve II 44 is in the right position, and the hydraulic cylinder II 50 extends; the electromagnetic reversing valve III 45 is in the left position, the hydraulic cylinder III51 retracts, the electromagnetic reversing valve III 45 is in the right position, and the hydraulic cylinder III 51 extends; the electromagnetic reversing valve IV 46 is in the left position, the hydraulic cylinder IV 52 retracts, the electromagnetic reversing valve IV 46 is in the right position, and the hydraulic cylinder IV 52 extends; the electromagnetic reversing valve V 47 is in the left position, the hydraulic cylinder V 53 retracts, the electromagnetic reversing valve V 47 is in the right position, and the hydraulic cylinder V 53 extends; the electromagnetic reversing valve VI 48 is in the left position, the hydraulic cylinder VI 54 retracts, the electromagnetic reversing valve VI 48 is in the right position and the hydraulic cylinder VI 54 extends.
[0062] like Fig. 9 As shown, the hydraulic system control circuit is composed of a monitoring computer 13, a hydraulic station 14, an electro-hydraulic proportional valve 15, an electromagnetic reversing valve, an analog output module 60, an analog acquisition module 61, a pull-wire sensor 37, and a relay module 65. The monitoring computer 13 controls the electro-hydraulic proportional valve 15 through the analog output module 60, controls the electromagnetic reversing valve through the relay module 65, and monitors the displacement of the piston rod of the hydraulic cylinder 18 through the pull-wire sensor 37, thereby achieving closed-loop control of each leg of the centering adjustment device.
[0063] like Fig.10 As shown, the monitoring computer 13 and the hydraulic station 14 are powered by 220V mains electricity, and the electro-hydraulic proportional valve 15, the electromagnetic reversing valve, the analog output module 60 and the analog acquisition module 61 are powered by a 24V power supply. The monitoring computer 13 communicates with the analog output module 60, the analog acquisition module 61 and the relay module 65 through the USB to 485 serial port, the pull rope sensor 37 outputs 4-20mA current to the analog acquisition module 61, the analog output module 60 outputs -10V to 10V voltage to control the electro-hydraulic proportional valve 15, and the relay module 65 outputs a switch quantity to control the electromagnetic reversing valve.
[0064] like Fig.11 As shown, (a) shows the power supply and voltage acquisition circuit of monitoring strain gauge I 21, monitoring strain gauge II 22, monitoring strain gauge V25, and monitoring strain gauge VI 26, and the strain gauge half-bridge method is used for measurement; (b) shows the power supply and acquisition circuit of monitoring strain gauge III 23 and monitoring strain gauge IV 24, and the strain gauge single-arm method is used for measurement. When the strain gauge produces mechanical deformation under the action of external force, that is, when the high-speed shaft of the wind turbine speed increaser and the main shaft of the wind turbine are offset, the resistance value will change accordingly. When the strain gauge is stretched by force, the resistance value increases; when the strain gauge is compressed by force, the resistance value decreases. The initial resistance values of monitoring strain gauge I 21, monitoring strain gauge II 22, monitoring strain gauge III 23, monitoring strain gauge IV 24, monitoring strain gauge V 25, and monitoring strain gauge VI 26 are R1, R2, R3, R4, R5, and R6, respectively, and satisfy the following relationship R1R8=R2R7, R5R 10 =R6R9, R3R 13 =R 11 R 12 、R4R 16 =R 14 R 15 .
[0065] like Fig.12 As shown in the figure, when the high-speed shaft of the wind turbine speed increaser and the main shaft of the wind turbine are in good alignment, the coupling transmits torque and generates torsional strain as the main shaft rotates, and all resistors are stretched and the resistance increases. However, in the double-arm half-bridge circuit, since the left and right resistors change the same, the voltage collected at points A1 and A2 remains unchanged; in the single-arm bridge circuit, since the resistance increases, the voltage collected at points A3 and A4 increases. The above voltage changes fluctuate within the threshold.
[0066] like Fig.13 As shown in the figure, when the high-speed shaft of the wind turbine speed increaser is parallel to the main shaft of the wind turbine, the monitoring strain gauge I 21 is stretched, the resistance value of R1 increases, the monitoring strain gauge II 22 is compressed, the resistance value of R2 decreases, and the voltage at the A1 port of the A / D acquisition module increases; the monitoring strain gauge V 25 is compressed, the resistance value of R5 decreases, the monitoring strain gauge VI 26 is stretched, the resistance value of R6 increases, and the voltage at the A2 port of the A / D acquisition module decreases. During the rotation of the generator shaft, the change law of the voltage collected by A1 and A2 is as follows: Fig.14 shown.
[0067] like Fig.14As shown, the voltage values collected by A1 and A2 change in a sinusoidal curve. During the operation of the wind turbine, the voltage value collected by A1 will have a peak point U1 at phase X1, and the phase X1 of the coupling 4 at this time can be obtained according to the absolute encoder 7; the voltage value collected by A1 will have a valley point L1 at phase X2, and the phase X2 of the coupling 4 at this time can be obtained according to the absolute encoder 7; the voltage value collected by A2 will have a valley point L2 at phase X1, and the phase X1 of the coupling 4 at this time can be obtained according to the absolute encoder 7; the voltage value collected by A2 will have a peak point U2 at phase X2, and the phase X2 of the coupling 4 at this time can be obtained according to the absolute encoder 7. It can be seen that the voltage values collected by points A1 and A2 are basically equal in value and opposite in sign, which means that parallel misalignment occurs in the shaft alignment of the wind turbine generator set, and the parallel misalignment offset direction is X1.
[0068] like Fig.15 As shown in the figure, when the high-speed shaft of the wind turbine speed increaser is misaligned with the main shaft of the wind turbine, the monitoring strain gauge I 21 is stretched, the resistance value of R1 increases, the monitoring strain gauge II 22 is compressed, the resistance value of R2 decreases, and the voltage at the A1 port of the A / D acquisition module increases; the monitoring strain gauge V 25 is stretched, the resistance value of R5 increases, the monitoring strain gauge VI 26 is compressed, the resistance value of R6 decreases, and the voltage at the A2 port of the A / D acquisition module increases. During the rotation of the generator shaft, the change rules of the voltages collected by A1 and A2 are as follows: Fig.16 shown.
[0069] like Fig.16 As shown, the voltage values collected by A1 and A2 change in a sinusoidal curve. During the operation of the wind turbine, the voltage value collected by A1 will have a peak point U3 at phase X3, and the phase X3 of the coupling 4 at this time can be obtained according to the absolute encoder 7; the voltage value collected by A1 will have a valley point L3 at phase X4, and the phase X4 of the coupling 4 at this time can be obtained according to the absolute encoder 7; the voltage value collected by A2 will have a peak point U3 at phase X3, and the phase X3 of the coupling 4 at this time can be obtained according to the absolute encoder 7; the voltage value collected by A2 will have a valley point L3 at phase X4, and the phase X4 of the coupling 4 at this time can be obtained according to the absolute encoder 7. It can be seen that the voltage values collected by points A1 and A2 are basically equal in value and have the same sign, which means that there is an angular misalignment in the shaft alignment of the wind turbine generator set, and the angular misalignment offset direction is X3.
[0070] When the high-speed shaft of the wind turbine speed increaser and the main shaft of the wind turbine are offset along the x-axis, all resistors are stretched or compressed at the same time, and the resistance values of all resistors increase or decrease at the same time. For the double-arm half-bridge circuit, since the left and right resistors change in the same way, the voltage collected at points A1 and A2 remains unchanged; for the single-arm bridge circuit, the resistance value increases or decreases, causing the voltage collected at points A3 and A4 to increase or decrease. Ultimately, the voltage at points A1 and A2 fluctuates within the threshold, and the voltage at points A3 and A4 exceeds the threshold range.
[0071] The present invention also includes a method for monitoring and adjusting the shaft alignment of a wind turbine generator set, comprising the following steps:
[0072] S1: Use the A / D acquisition module to collect the voltage signals U at points A1, A2, A3, and A4 A1 , U A2 , U A3 , U A4 , absolute encoder phase signal Among them, points A1, A2, A3, and A4 are the connection points between the A / D acquisition module and the power supply and voltage acquisition circuits of each monitoring strain gauge;
[0073] S2: Determine the voltage signal U A1 , U A2 , U A3 , U A4 Is it within the threshold? If the voltage signal U A1 , U A2 , U A3 , U A4 If it is within the threshold, the alignment is in good condition and no adjustment is required. The voltage values corresponding to the strain gauges on the output shaft of the speed increaser and the main shaft of the generator are recorded as the initial data.
[0074] S3: If the voltage signal U A1 , U A2 , U A3 , U A4 If it is not within the threshold, the wind turbine generator set shaft alignment state is offset. The offset form and direction between the speed increaser high-speed shaft and the wind turbine generator main shaft are determined based on the output voltage values of the absolute encoder, the speed increaser output shaft strain gauge, and the generator main shaft strain gauge.
[0075] S4: adjusting the position of the offset wind turbine using a wind turbine centering adjustment device according to the offset form and offset direction;
[0076] S5: After the initial adjustment, the voltage data collected by the strain gauge of the output shaft of the speed increaser and the strain gauge of the main shaft of the generator are compared with the initial data;
[0077] S6: If the comparison difference value is within the threshold, the adjustment is completed; if it exceeds the threshold, return to step S3 to continue adjustment.
[0078] like Fig.17 As shown, the specific process of the centering monitoring method in the above monitoring and adjustment method is:
[0079] The first step is to use the A / D acquisition module to collect the voltage signals U at points A1, A2, A3, and A4. A1 , U A2 , U A3 , U A4 , absolute encoder phase signal
[0080] The second step is to determine the voltage signal U A1 , U A2 , U A3 , U A4 Is it within the threshold? If the voltage signal U A1 , U A2 , U A3 , U A4 If the wind turbine shaft alignment is within the threshold, the wind turbine shaft alignment is in good condition, and the system returns to the first step to continue collecting the voltage signals at points A1, A2, A3, and A4. If the voltage signal U A1 , U A2 , U A3 , U A4 If the threshold is exceeded, the wind turbine shaft alignment is poor, and the next step is performed;
[0081] Step 3: If the voltage signal U A1 , U A2 Within the threshold, but U A3 , U A4 If the threshold is exceeded, the wind turbine shaft will be misaligned in the X-axis direction. A3 , U A4 is greater than the upper threshold, the offset direction is the negative direction of the X axis; if U A3 , U A4 If the voltage signal U A1 , U A2 If it exceeds the threshold, proceed to the next step;
[0082] Step 4: If the voltage signal U A1 , U A2 If the threshold is exceeded and the amplitudes are basically equal and the signs are opposite, the wind turbine shaft is parallel misaligned in the Y-axis and Z-axis directions, and the parallel misalignment direction of the wind turbine shaft is the Y-axis. Direction and Z axis Direction. If the voltage signal U A1 , U A2If the threshold is exceeded and the amplitudes are basically equal and the signs are the same, proceed to the next step;
[0083] Step 5: If the voltage signals UA1 and UA2 exceed the threshold and have substantially equal amplitudes and the same signs, the wind turbine generator set axis is misaligned in the Y-axis and Z-axis directions, and the wind turbine generator set axis is angularly misaligned around the Y-axis. Direction and around the Z axis Directional angular misalignment.
[0084] like Fig.18 As shown, the process of the centering adjustment method in the above monitoring and adjustment method is:
[0085] The first step is to determine the wind turbine shaft alignment status based on the real-time monitoring of the alignment monitoring device. If the wind turbine shaft alignment status is good, no adjustment is required. If the wind turbine shaft alignment status is poor, proceed to the next step;
[0086] In the second step, the pull rope sensor collects the displacement of the piston rod of each leg and calculates the current length l of each leg. ic = l 1c ,l 2c ,l 3c ,l 4c ,l 5c ,l 6c , and the Newton-Raphson iteration method is used to calculate the dynamic platform posture of the wind turbine generator set centering adjustment device at this time:
[0087]
[0088] In the formula, g ki is the coordinate of the support point on the ith leg of the centering adjustment platform in the static coordinate system, b ki The coordinates of the lower support point of the ith leg of the centering adjustment platform moving platform in the static coordinate system;
[0089] Squaring both sides of the above equation gives a nonlinear system of equations with six unknowns:
[0090] fi(Q)=(g xi -b xi ) 2 +(g yi -b yi ) 2 +(g zi -b zi ) 2 -(l ic ) 2 =0
[0091] Where, Q = (q1, q2, q3, q4, q5, q6);
[0092]
[0093]
[0094] In the formula,
[0095]
[0096] Put the above formula in the initial value (q 10 ,q 20 ,q 30 ,q 40 ,q 50 ,q 60 ) and take out the linear part to get:
[0097]
[0098] Let Δq i =q i -q i0 have to:
[0099]
[0100] The above formula is regarded as Δq i (i=1,2,3,4,5,6) is the system of equations with unknown coefficients, where the coefficient matrix is as follows:
[0101]
[0102] If |J|≠0, the change in posture parameter Δq can be solved i (i=1,2,3,4,5,6). Let the initial pose parameter Q0=[q 10 ,q 20 ,q 30 ,q 40 ,q 50 ,q 60 ] T , Q1=Q0+[Δq1,Δq2,Δq3,Δq4,Δq5,Δq6] T , the equations are as follows:
[0103]
[0104] Where f i (Q1) = f i (q 11 ,q 21 ,q 31 ,q 41 ,q 51 ,q 61 );
[0105] From this we can solve for Δq i =(q i -q i1 )(i=1,2,3,4,5,6),
[0106] Let: Q2=Q1+[Δq1,Δq2,Δq3,Δq4,Δq5,Δq6],
[0107] Iteration formula J(Q n+1 -Q n )=-f(Q n ),
[0108] Until max(Δq1, Δq2, Δq3, Δq4, Δq5, Δq6) < threshold, then Q n =[x c ,y c ,z c ,α c ,β c ,γ c ] is the solution, and the position of the moving platform at this time is B O=[X c ,Y c ,Z c ] T ,attitude
[0109] According to the pull rope sensor, we know that the length of each leg is l 1c , l 2c , l 3c , l 4c , l 5c , l 6c ;
[0110] The third step is to determine the wind turbine shaft offset form and offset direction according to the monitoring method;
[0111] If the X-axis is offset in the positive direction, the position B O′=[X c -ΔX0,Y c ,Z c ] T ,attitude If the X-axis is parallel to the negative direction and offset occurs, the position B O′=[X c +ΔX0,Y c ,Z c ] T ,attitude
[0112] If along the Y axis Direction deviation, when WhenB O′=[X c ,Y c -ΔY0,Z c ] T ,attitude when When B O′=[X c ,Y c +ΔY0,Z c ] T ,attitude when No adjustment required;
[0113] If along the Z axis Direction deviation, when When B O′=[X c ,Y c ,Z c -ΔZ0] T ,attitude when When B O′=[X c ,Y c ,Z c +ΔZ0] T ,attitude when No adjustment is required;
[0114] If the Y axis Direction rotation, when When B O′= B O, Posture when When B O′= B O, Posture when No adjustment is required;
[0115] If the Z axis Direction rotation, when When B O′= B O, Posture when When B O′= B O, Posture when No adjustment is required;
[0116] When the position of the moving platform needs to be adjusted by ΔX0, ΔY0, ΔZ0, and the posture needs to be adjusted by β0, γ0, proceed to the next step, and use the centering adjustment device to reversely solve and calculate the extension amount that each leg needs to adjust;
[0117] The fourth step is to calculate the movement and extension amount required for the piston rod of each leg hydraulic cylinder to adjust the centering adjustment platform to the corresponding position;
[0118] First, the position and attitude matrix of the third step platform are imported into the formula
[0119]
[0120]
[0121]
[0122] In the formula, cβ represents cosβ, sα represents sinα, and so on;
[0123] B l i =A i ′- B B i0
[0124] In the formula, A i ′ is the coordinate of the connection point of the moving platform in the coordinate system of the static platform, B B i0 is the coordinate of the static platform connection point in the static platform coordinate system; (i=1,2,3,4,5,6).
[0125] The length of each leg at this time is:
[0126]
[0127] The extension and retraction of each leg hydraulic cylinder is:
[0128] Δl i = l i -l ic
[0129] In the formula, l ic = l 1c ,l 2c ,l 3c ,l 4c ,l 5c ,l 6c .
[0130] Step 5: Control the movement and extension of the piston rod of the i-th leg of the centering adjustment device Δl i ;
[0131] Step 6. After adjustment, return to step 1 to continue monitoring the shaft alignment status of the wind turbine generator set.
Claims
1. A method for monitoring and adjusting the shaft alignment of a wind turbine generator set, characterized in that: The invention is applied to a shaft alignment monitoring and adjusting device for a wind turbine generator set, the shaft alignment monitoring and adjusting device for a wind turbine generator set comprises a monitoring device (5), an adjusting device, a monitoring computer (13), a hydraulic station (14) and an electro-hydraulic proportional valve (15); the monitoring device (5) comprises a plurality of monitoring strain gauges symmetrically arranged on the surface of a coupling (4); the coupling (4) connects a speed increasing box high-speed shaft (2) and a generator main shaft (6); The regulating device comprises a static platform (9) installed on a generator base and a dynamic platform (10) installed below a wind turbine (12) to support the wind turbine (12), wherein the static platform (9) and the dynamic platform (10) are connected via a leg system (11); The monitoring computer (13) controls the electro-hydraulic proportional valve (15) through an analog output module, and the electro-hydraulic proportional valve (15) is connected to the hydraulic cylinder in the outrigger system (11); When the speed increaser high-speed shaft (2) and the generator main shaft (6) are offset, multiple monitoring strain gauges are deformed by force, and the resistance value changes accordingly. The voltage value of each monitoring strain gauge is collected and the data is fed back to the monitoring computer (13) in real time. The monitoring computer (13) determines the alignment state of the wind turbine shaft at this time, and controls the oil flow output by the hydraulic station (14) to the electro-hydraulic proportional valve (15). The electro-hydraulic proportional valve (15) controls the extension and retraction of the hydraulic cylinder in the outrigger system (11), thereby adjusting the posture of the wind turbine (12) and restoring the alignment state. An absolute encoder (7) is installed on the generator main shaft (6) to obtain the position of the monitoring strain gauge when it rotates with the speed increaser high-speed shaft (2) and the generator main shaft (6); The outrigger system (11) comprises a plurality of outriggers, each of which comprises an upper Hooke's hinge (16), a connecting block (17), a hydraulic cylinder (18), a slewing bearing (19), a lower Hooke's hinge (20), a pull rope sensor (37), and a slide rail (38); The lower part of the upper Hooke's hinge (16) is connected in sequence to a connecting block (17), a hydraulic cylinder (18), a slewing bearing (19), and a lower Hooke's hinge (20); the upper flange of the upper Hooke's hinge (16) is connected to the moving platform (10) by bolts, and the upper flange of the lower Hooke's hinge (20) is connected to the static platform (9) by bolts; The pull rope sensor (37) is installed on one side of the hydraulic cylinder (18) to measure the displacement of the piston rod of the hydraulic cylinder (18), and the slide rail (38) is installed on the other side of the hydraulic cylinder (18) to limit the rotational freedom of the piston rod of the hydraulic cylinder (18); The wind turbine generator set shaft alignment monitoring and adjustment method comprises the following steps: S1: Use the A / D acquisition module to collect the voltage signals U at points A1, A2, A3, and A4 A1 , U A2 , U A3 , U A4 , absolute encoder phase signal Among them, points A1, A2, A3, and A4 are the connection points between the A / D acquisition module and the power supply and voltage acquisition circuits of each monitoring strain gauge; S2: Determine the voltage signal U A1 , U A2 , U A3 , U A4 Is it within the threshold? If the voltage signal U A1 , U A2 , U A3 , U A4 If it is within the threshold, the alignment is in good condition and no adjustment is required. The voltage values corresponding to the strain gauges on the output shaft of the speed increaser and the main shaft of the generator are recorded as the initial data. S3: If the voltage signal U A1 , U A2 , U A3 , U A4 If it is not within the threshold, the wind turbine generator set shaft alignment state is offset. The offset form and direction between the speed increaser high-speed shaft and the wind turbine generator main shaft are determined based on the output voltage values of the absolute encoder, the speed increaser output shaft strain gauge, and the generator main shaft strain gauge. S4: adjusting the position of the offset wind turbine using an adjustment device according to the offset form and offset direction; S5: After the initial adjustment, the voltage data collected by the strain gauge of the output shaft of the speed increaser and the strain gauge of the main shaft of the generator are compared with the initial data; S6: If the comparison difference value is within the threshold, the adjustment is completed; if it exceeds the threshold, return to step S3 to continue adjustment; In step S4, the posture adjustment of the offset wind turbine using the adjustment device according to the offset form and offset direction specifically includes the following steps: S4.1: The pull rope sensor collects the displacement of the piston rod of each leg, calculates the current length of each leg, and calculates the position and posture of the dynamic platform of the adjustment device at this time; S4.2: Determine the final position and posture to be achieved by the moving platform adjustment movement according to the offset form and offset direction; S4.3: Calculate the movement and extension amount required for the piston rod of each leg hydraulic cylinder to adjust the centering adjustment platform to the corresponding position; S4.4: Control and adjust the movement and extension of the piston rod of the i-th leg of the device Δl i ; S4.5: After adjustment, return to the first step to continue monitoring the shaft alignment status of the wind turbine generator set; Step S4.2, determining the final position and posture to be achieved by the moving platform adjustment movement according to the offset form and offset direction, specifically: If the X-axis is offset in the positive direction, the position B O′=[X c -ΔX0,Y c ,Z c ] T ,attitude If the X-axis is parallel to the negative direction and offset occurs, the position B O′=[X c +ΔX0,Y c ,Z c ] T ,attitude If along the Y axis Direction deviation, when When B O′=[X c ,Y c -ΔY0,Z c ] T ,attitude when When B O′=[X c ,Y c +ΔY0,Z c ] T ,attitude when No adjustment required; If along the Z axis Direction deviation, when When B O′=[X c ,Y c ,Z c -ΔZ0] T ,attitude when When B O′=[X c ,Y c ,Z c +ΔZ0] T ,attitude when No adjustment is required; If the Y axis Direction rotation, when When B O′= B O, Posture when When B O′= B O, Posture when No adjustment is required; If the Z axis Direction rotation, when When B O= B O, Posture when When B O′= B O, Posture when No adjustment is required.
2. The method for monitoring and adjusting the shaft alignment of a wind turbine generator set according to claim 1, characterized in that: The lower flange of the upper Hooke's hinge (16) and the connecting block (17), the hydraulic cylinder (18) and the slewing bearing (19), and the slewing bearing (19) and the lower Hooke's hinge (20) are all connected via at least two connecting plates.
3. The method for monitoring and adjusting the shaft alignment of a wind turbine generator set according to claim 1 is characterized in that: The electro-hydraulic proportional valve (15) is respectively connected to the hydraulic cylinder on each leg in the leg system (11), and a common reversing valve is arranged on the oil distribution path of each leg.
4. The method for monitoring and adjusting the shaft alignment of a wind turbine generator set according to claim 1, characterized in that: The supporting points of the legs on the static platform (9) and the dynamic platform (10) in the adjusting device are arranged in an isosceles triangle.
5. The method for monitoring and adjusting the shaft alignment of a wind turbine generator set according to claim 1, characterized in that: In step S3, judging the offset form and direction between the speed increaser high-speed shaft and the wind turbine generator main shaft according to the output voltage values of the absolute encoder and the speed increaser output shaft strain gauge and the generator main shaft strain gauge specifically includes the following steps: S3.1: If the voltage signal U A1 , U A2 Within the threshold, but U A3 , U A4 If U is not within the threshold, the wind turbine shaft is not parallel to the X axis. A3 , U A4 is greater than the upper threshold, the offset direction is the negative direction of the X axis; if U A3 , U A4 is less than the lower threshold, the offset direction is the positive direction of the X axis; if the voltage signal U A1 , U A2 If it exceeds the threshold, proceed to the next step; S3.2: If the voltage signal U A1 , U A2 If the threshold is exceeded and the amplitudes are basically equal and the signs are opposite, the wind turbine shaft is parallel misaligned in the Y-axis and Z-axis directions, and the parallel misalignment direction of the wind turbine shaft is the Y-axis. Direction and Z axis Direction; if the voltage signal U A1 , U A2 If the threshold is exceeded and the amplitudes are basically equal and the signs are the same, proceed to the next step; S3.3: If the voltage signal U A1 , U A2 If the value exceeds the threshold and the amplitude is basically equal and the sign is the same, the wind turbine shaft is misaligned in the Y-axis and Z-axis directions, and the wind turbine shaft is angularly misaligned around the Y-axis. Direction and around the Z axis Directional angular misalignment.
Citation Information
Patent Citations
Electric control centering adjusting device and method for shaft of wind generating set
CN113541385A
Wind turbine generator system shafting centering monitoring device and monitoring method
CN111441918A
Monitoring device for shaft centering of wind driven generator and correction method
CN112229347A
Centering monitoring and adjusting device and method for high-speed shaft of speed-increasing box and generator shaft
CN113638845A
Alignment monitoring system and method for shaft of wind driven generator
CN114109741A
Cited By
Device and method for monitoring centering state of wind power coupler
CN122191022A