A kind of refreshing shower gel preparation process
By using the design of a container and a packing mechanism in the shower gel preparation process, the continuous bottling of multiple shower gel bottles is achieved, which solves the problem of low bottling efficiency in the prior art and significantly improves the preparation efficiency.
Patent Information
- Application Number
- CN202210803020.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-07
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-07-07
AI Technical Summary
The existing shower gel preparation process can only bottle one bottle during filling, and multiple bottles cannot be loaded at the same time, resulting in low bottling efficiency and affecting the preparation efficiency.
Using a process including a container and a dispensing mechanism, the continuous uninterrupted bottling of multiple shower gel bottles is achieved through the design of a quantitative ring and a bottled bottle. The rotational connection between the quantitative chamber and the communication hole is used to realize the simultaneous bottling of the shower gel. .
It improves the bottling efficiency and can bottle multiple shower gel bottles at the same time, improving the overall preparation efficiency.
Smart Images

Figure CN115057018B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of shower gel preparation, in particular to a preparation process of a refreshing shower gel. Background Art
[0002] Shower gel, also known as bath liquid or shower gel, refers to a liquid cleanser used when taking a bath. It is a common cleaning product for modern people. Shower gel is a liquid cleansing skin care product made from surfactants and skin care as the main ingredients. It has a viscous liquid appearance and has the ability to cleanse and remove dirt from the skin. Shower gel can not only remove dirt from the body, but also leave a fragrance on the body, making it feel refreshed.
[0003] However, in the existing preparation process, when preparing shower gel for filling, generally only one shower gel bottle can be bottled, and multiple shower gel bottles cannot be bottled at the same time. The bottling efficiency is low, which affects the shower gel preparation efficiency. Summary of the invention
[0004] The invention aims to provide a preparation process of a refreshing shower gel, which can bottle a plurality of shower gel bottles at the same time and improve the bottling efficiency.
[0005] The purpose of the present invention is achieved through the following technical solutions:
[0006] A process for preparing a refreshing shower gel, the process comprising the following steps:
[0007] S1, stirring and mixing all the raw materials to obtain a shower gel;
[0008] S2. Add shower gel into the container;
[0009] S3, bottling a plurality of shower gel bottles simultaneously through a filling mechanism connected to the lower end of the filling barrel;
[0010] S4. Seal and package the bottled shower gel.
[0011] The containing barrel comprises a cylindrical wall with a base frame fixed at the lower end, and an upper cover installed at the upper end of the cylindrical wall and having an addition port. The filling mechanism comprises a plurality of bottling tubes fixed on the base frame, and a quantitative ring sealed and rotated on the outer side of the lower end of the cylindrical wall. The quantitative ring is provided with a plurality of quantitative cavities. As the quantitative ring rotates, the plurality of quantitative cavities are sequentially connected with each bottling tube. The inner side of the quantitative ring is provided with a plurality of connecting holes respectively connected with the plurality of quantitative cavities, and a plurality of long holes corresponding to the plurality of bottling tubes are arranged on the cylindrical wall. As the quantitative ring rotates, the plurality of connecting holes are sequentially connected with each long hole. After each connecting hole is separated from the long hole, its corresponding quantitative cavity is connected with the bottling tube. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the process of preparing a refreshing shower gel;
[0013] Figure 2 It is a schematic diagram of an embodiment of dispensing shower gel;
[0014] Figure 3 It is a schematic diagram of the structure of the container barrel;
[0015] Figure 4 It is a schematic diagram of the structure of the quantitative ring;
[0016] Figure 5 yes Figure 4 A schematic diagram of a local enlarged structure;
[0017] Figure 6 It is a schematic diagram of the structure of the piston rod;
[0018] Figure 7 is a schematic diagram of an embodiment of conveying a shower gel bottle;
[0019] Figure 8 It is a schematic diagram of the structure of the round frame;
[0020] Fig. 9 It is a schematic diagram of the structure of the push plate;
[0021] Fig.10 It is a schematic diagram of the structure of the curve conveyor;
[0022] Fig.11 It is a schematic diagram of the structure of the spiral plate;
[0023] Fig.12 It is a schematic diagram of an embodiment of transporting shower gel bottles after shower gel is packaged.
[0024] In the figure:
[0025] Cylinder wall 101; long hole 102; bottom frame 103; bottling tube 104; round tube seat 105; bump 106; roller frame 107; slip ring 108; screw 109;
[0026] Quantitative ring 201; quantitative cavity 202; communicating hole 203; lever 204;
[0027] Piston column 301; limiting frame 302; pulley 303; spring I 304; quantitative rod 305; spring II 306; limiting ring 307;
[0028] Vertical axis 401; circular plate 402; vertical column 403; circular frame 404; semicircular groove 405;
[0029] Square rod 501; push plate 502; slider 503; spring III 504;
[0030] Curve conveyor 601; guide plate 602;
[0031] Stirring shaft 701; Stirring plate 702; Spiral plate 703. DETAILED DESCRIPTION
[0032] like Figure 1 As shown: A process for preparing a refreshing shower gel, characterized in that the process comprises the following steps:
[0033] S1, stirring and mixing all the raw materials to obtain a shower gel;
[0034] S2. Add shower gel into the container;
[0035] S3, bottling a plurality of shower gel bottles simultaneously through a filling mechanism connected to the lower end of the filling barrel;
[0036] S4. Seal and package the bottled shower gel.
[0037] like Figure 2-5 As shown:
[0038] The container comprises a cylindrical wall 101 and a bottom frame 103. The bottom frame 103 is fixed to the lower end of the cylindrical wall 101, and an upper cover is installed on the upper end of the cylindrical wall 101. The upper cover is provided with an addition port.
[0039] The dispensing mechanism comprises a bottling tube 104, a quantitative ring 201, a quantitative cavity 202 and a connecting hole 203. The plurality of bottling tubes 104 are fixed on the base frame 103. The quantitative ring 201 is sealed and rotated on the outer side of the lower end of the cylindrical wall 101 and is sealed and rotated with the base frame 103. The plurality of quantitative cavities 202 are all arranged on the quantitative ring 201. As the quantitative ring 201 rotates, the plurality of quantitative cavities 202 are sequentially communicated with each of the bottling tubes 104. The plurality of connecting holes 203 are arranged on the inner side of the quantitative ring 201 and are respectively communicated with the plurality of quantitative cavities 202. The plurality of long holes 102 are arranged on the cylindrical wall 101. The plurality of long holes 102 correspond to the plurality of bottling tubes 104 respectively. As the quantitative ring 201 rotates, the plurality of connecting holes 203 are sequentially communicated with each of the long holes 102. After each connecting hole 203 is separated from the long hole 102, its corresponding quantitative cavity 202 is communicated with the bottling tube 104.
[0040] When in use, the shower gel is added into the container barrel composed of the base frame 103 and the cylindrical wall 101 through the adding port on the upper cover, and the quantitative ring 201 is driven by the motor installed on the base frame 103 to rotate the quantitative ring 201 on the cylindrical wall 101, so that the multiple connecting holes 203 on the quantitative ring 201 are connected with each long hole 102 in turn. When the long hole 102 is connected with the connecting hole 203, the shower gel in the container barrel will flow into the connecting hole 203 through the long hole 102, and finally flow into the quantitative cavity 202. The quantitative cavity 202 is filled with shower gel. As the quantitative ring 201 continues to rotate, the communicating hole 203 is separated from the long hole 102 and blocked by the cylindrical wall 101. At this time, the shower gel in the quantitative cavity 202 rotates on the bottom frame 103 along with the quantitative ring 201. When the quantitative ring 201 rotates to the bottling tube 104, the lower end of the quantitative cavity 202 is connected with the bottling tube 104, so that the shower gel in the quantitative cavity 202 flows into the bottling tube 104 and flows into the shower gel bottle at the lower end of the bottling tube 104, thereby completing the bottling of the shower gel.
[0041] As a result, as the quantitative ring 201 rotates, each quantitative cavity 202 is connected with the bottling tube 104 each time to complete one bottling, thereby achieving continuous and uninterrupted bottling operation and improving bottling efficiency. At the same time, through the provision of multiple bottling tubes 104 and multiple long holes 102, continuous and uninterrupted bottling operations can be carried out at multiple bottling tubes 104 at the same time, further improving bottling efficiency.
[0042] like Figure 4-6 As shown:
[0043] The piston column 301 slides in the quantitative chamber 202, the limit frame 302 is fixed to the upper end of the piston column 301 and is slidably connected to the quantitative ring 201, the spring I 304 is arranged between the limit frame 302 and the quantitative ring 201, and the multiple roller frames 107 are all fixed on the outside of the cylindrical wall 101, and the multiple roller frames 107 are respectively located directly above the multiple bottling tubes 104.
[0044] When the quantitative cavity 202 rotates to the bottling tube 104 with the quantitative ring 201, the limiting frame 302 connected to the piston column 301 in the quantitative cavity 202 contacts the roller frame 107 located above, and is guided and squeezed by the roller frame 107, so that the limiting frame 302 moves downward to squeeze the spring I 304, and at the same time drives the piston column 301 to slide down in the quantitative cavity 202, thereby quickly pushing the shower gel in the quantitative cavity 202 downward into the bottling tube 104, thereby improving the efficiency of the shower gel flowing into the bottling tube 104, and when the quantitative cavity 202 rotates through the bottling tube 104 with the quantitative ring 201, the limiting frame 302 is separated from the roller frame 107, and the elastic force of the spring I 304 pushes the limiting frame 302 to slide upward to the highest point, thereby restoring the piston column 301 to its original position, that is, the lower end of the piston column 301 is located above the connecting hole 203, so as to avoid affecting the shower gel from entering the quantitative cavity 202 through the connecting hole 203.
[0045] Further:
[0046] A pulley 303 is rotatably disposed on the limiting frame 302 .
[0047] By setting the pulley, the limiting frame 302 is in contact with the roller frame 107 through the pulley 303 , so that the limiting frame 302 can slide over the roller frame 107 .
[0048] Further:
[0049] The metering rod 305 slides in the piston column 301, the semicircular head is fixed on the upper end of the metering rod 305, the spring II 306 is arranged between the semicircular head and the upper end of the piston column 301, the limit rod slides on one of the roller frames 107, the slip ring 108 is fixed on the lower end of the limit rod, the screw 109 is threadedly connected to one of the roller frames 107, and the screw 109 is rotatably connected to the slip ring 108.
[0050] The elastic force of spring II 306 makes the semicircular head press upward on the slip ring 108, and by rotating the screw rod 109, the screw rod 109 is moved downward under the influence of the thread, and then drives the slip ring 108 to move downward, so that the slip ring 108 squeezes the semicircular head, so that the quantitative rod 305 moves downward and extends into the quantitative cavity 202, occupying the original space in the quantitative cavity 202, reducing the amount of shower gel filled in the quantitative cavity 202 each time, thereby achieving the adjustment of the amount of shower gel delivered by the quantitative cavity 202 to the bottling tube 104, so that the device can adapt to the filling of shower gel bottles of different volumes;
[0051] At the same time, the quantitative rod 305 slides in the piston column 301, which does not affect the downward movement of the piston column 301 to squeeze out the bath liquid.
[0052] Further:
[0053] The limiting ring 307 is fixed to the lower end of the quantitative rod 305 , and the lower end of the piston column 301 is provided with a groove that matches the limiting ring 307 .
[0054] The elastic force of spring II 306 pushes the quantitative rod 305 upward, so that the limiting ring 307 at the lower end of the quantitative rod 305 can slide into the groove at the lower end of the piston column 301, thereby keeping the lower end of the piston column 301 flat, so that when the piston column 301 slides down to squeeze the shower gel, the lower end of the piston column 301 can slide to the lower end of the quantitative chamber 202, thereby completely pushing the shower gel out of the quantitative chamber 202;
[0055] Moreover, when the piston column 301 descends with the limit frame 302 to squeeze the shower gel in the metering chamber 202, as the piston column 301 descends, the metering rod 305 is first kept stationary by the elastic force of the spring II 306 until the limit ring 307 slides into the groove at the lower end of the piston column 301. The limit ring 307 will squeeze as the piston column 301 descends, ensuring that the piston column 301 pushes out all the shower gel in the metering chamber 202.
[0056] like Figure 7-10 As shown:
[0057] A plurality of round tube seats 105 are fixed on the base frame 103 and correspond to the bottling tubes 104 respectively. The vertical axis 401 rotates in the round tube seats 105. The round frame 404 is fixed at the lower end of the vertical axis 401. A plurality of semicircular grooves 405 are evenly distributed on the outer side of the round frame 404. A turning conveyor 601 is provided at the lower end of the round frame 404.
[0058] The 601 turning conveyor is a 180-degree conveyor belt turning conveying equipment. You can refer to the 90-degree 180-degree belt turning conveyor 601 food automation conveying equipment provided by Ningjin County Shuangda Machinery Factory;
[0059] A batch of empty bottles are placed on one end of the conveyor belt. With the conveyor belt, all the empty bottles are driven to the round rack 404. Several of the empty bottles correspond to the semicircular grooves 405 on the round rack 404 and enter the semicircular grooves 405. With the intermittent rotation of the round rack 404, they are successively conveyed to the bottom of the bottling tube 104. During the interval, the shower gel flows into the empty bottle to complete the packaging. With the rotation of the round rack 404, the next empty bottle is conveyed to the bottom of the bottling tube 104 to continue filling. The bottles filled with shower gel are moved to the other side by the rotating round rack 404. With the movement of the conveyor belt, the bottles filled with shower gel will automatically slide out of the semicircular grooves 405 and move with the conveyor belt. The bottles filled with shower gel are collected at the other end of the conveyor belt.
[0060] Arc baffles are provided on both sides of the conveyor belt to prevent items from falling off the conveyor belt, and at the same time, the round frame 404 is filled between the two arc baffles to prevent empty bottles from not being conveyed through the round frame 404 and directly passing over the round frame 404, which affects the filling;
[0061] Thus, a conveying belt in a conveying direction is formed to cooperate with the intermittently rotating round frame 404 to automatically complete the conveying, filling and re-conveying of empty bottles.
[0062] Further:
[0063] The circular plate 402 is fixed on the upper end of the vertical shaft 401 , and a plurality of vertical posts 403 are fixed on the circular plate 402 and correspond to a plurality of semicircular grooves 405 , respectively. A plurality of shifting posts 204 are evenly fixed on the outer side of the quantitative ring 201 .
[0064] As the quantitative ring 201 rotates, multiple shifting posts 204 are inserted into the gaps between multiple vertical posts 403 in sequence, forming a shifting of the vertical posts 403, so that the vertical posts 403 drive the circular plate 402 to move intermittently, and then the circular frame 404 rotates intermittently, so that each time the circular frame 404 moves, a new empty bottle is carried to the bottom of the bottling tube 104 through a semicircular groove 405, and bottling is completed during the interval.
[0065] Further:
[0066] Guide plates 602 are provided on the arc baffles on both sides of the turning conveyor 601, so that the empty bottles are guided and concentrated by the two guide plates 602 while moving with the conveyor belt; thus, the empty bottles are arranged in sequence and enter the semicircular groove 405, avoiding the situation where the empty bottles fail to enter the semicircular groove 405.
[0067] Further:
[0068] The square rod 501 slides through the inner side of the semicircular groove 405, the push plate 502 is fixed on the outer side of the square rod 501, the slider 503 is fixed on the inner side of the square rod 501, the spring III 504 is arranged between the slider 503 and the semicircular groove 405, so that the push plate 502 is pressed against the inner wall of the semicircular groove 405, and the protrusion 106 is fixed on the round tube seat 105.
[0069] The push plate 502 is located inside the semicircular groove 405 under the influence of the elastic force of the spring III 504, and does not affect the empty bottle from entering the semicircular groove 405. At the same time, the push plate 502 rotates with the round frame 404 through the square rod 501. When it rotates to the protrusion 106, the protrusion 106 squeezes the slider 503, so that the slider 503 overcomes the elastic force of the spring III 504 and is driven by the square rod 501 to move the push plate 502 toward the opening direction of the semicircular groove 405, thereby pushing the bottle filled with shower gel in the semicircular groove 405 out of the semicircular groove 405, preventing the bottle filled with shower gel from continuing to rotate with the semicircular groove 405, affecting continuous filling.
[0070] like Fig.11 As shown:
[0071] A stirring shaft 701 rotates at the center of the bottom frame 103 , and a plurality of stirring plates 702 are fixed on the stirring shaft 701 . A spiral plate 703 is fixed outside the plurality of stirring plates 702 , and the outside of the spiral plate 703 contacts the inner wall of the cylindrical wall 101 .
[0072] The stirring motor installed on the bottom frame 103 drives the stirring shaft 701, so that the stirring shaft 701 drives the stirring plate 702 and the spiral plate 703 to rotate in the cylindrical wall 101, thereby stirring the shower gel in the cylindrical wall 101 and making the shower gel flow, thereby ensuring the quality of the shower gel;
[0073] The rotating spiral plate 703 will push the shower gel downward, causing the shower gel to move downward on the periphery of the cylindrical wall 101. As the shower gel gathers downward, it flows upward at the stirring plate 702 and is stirred by the stirring plate 702 to improve the stirring effect. At the same time, the spiral plate 703 pushes the shower gel downward, allowing the shower gel to flow out of the long hole 102 easily.
Claims
1. A process for preparing a refreshing shower gel, characterized in that: The process includes the following steps: S1, stirring and mixing all the raw materials to obtain a shower gel; S2. Add shower gel into the container; S3, bottling a plurality of shower gel bottles simultaneously through a filling mechanism connected to the lower end of the filling barrel; S4, sealing and packaging the bottled shower gel; The filling barrel comprises a cylindrical wall (101) with a bottom frame (103) fixed at the lower end, and an upper cover installed at the upper end of the cylindrical wall (101) and having a filling port. The filling mechanism comprises a plurality of bottling tubes (104) fixed on the bottom frame (103), and a quantitative ring (201) sealingly rotating on the outer side of the lower end of the cylindrical wall (101). The quantitative ring (201) is provided with a plurality of quantitative cavities (202). As the quantitative ring (201) rotates, the plurality of quantitative cavities (202) are sequentially connected with each bottling tube (104). The quantitative ring (201) is connected to the plurality of quantitative chambers (202), and the inner side of the quantitative ring (201) is provided with a plurality of communicating holes (203) respectively connected to the plurality of quantitative chambers (202), and a plurality of long holes (102) corresponding to the plurality of bottling tubes (104) are arranged on the cylindrical wall (101). As the quantitative ring (201) rotates, the plurality of communicating holes (203) are connected to each of the long holes (102) in sequence. After each communicating hole (203) is separated from the long hole (102), the corresponding quantitative chamber (202) is connected to the bottling tube (104); A piston column (301) slides in the quantitative cavity (202), a limiting frame (302) is fixed on the upper end of the piston column (301), a spring I (304) is provided between the limiting frame (302) and the quantitative ring (201), and a plurality of roller frames (107) are fixed on the cylindrical wall (101), and the plurality of roller frames (107) are respectively located directly above the plurality of bottling tubes (104); A pulley (303) is rotatably mounted on the limiting frame (302); A quantitative rod (305) slides inside the piston column (301), a semicircular head is provided at the upper end of the quantitative rod (305), a spring II (306) is provided between the semicircular head and the upper end of the piston column (301), a limit rod slides on one of the roller frames (107), a slip ring (108) is fixed at the lower end of the limit rod, a screw rod (109) is threadedly connected to one of the roller frames (107), and the screw rod (109) is rotatably connected to the slip ring (108); The lower end of the quantitative rod (305) is provided with a limiting ring (307), and the lower end of the piston column (301) is provided with a groove that matches the limiting ring (307); A plurality of circular tube seats (105) corresponding to the bottling tubes (104) are fixed on the bottom frame (103), a vertical shaft (401) is rotated inside the circular tube seat (105), a circular frame (404) is fixed at the lower end of the vertical shaft (401), semicircular grooves (405) are evenly distributed on the outer side of the circular frame (404), and a turning conveyor (601) is provided at the lower end of the circular frame (404); A circular plate (402) is fixed to the upper end of the vertical shaft (401), a plurality of vertical posts (403) corresponding to the plurality of semicircular grooves (405) are fixed to the circular plate (402), and a plurality of shifting posts (204) are evenly fixed to the outer side of the quantitative ring (201); A square rod (501) is slidably passed through the inner side of the semicircular groove (405), a push plate (502) is fixed on the outer side of the square rod (501), a slider (503) is fixed on the inner side of the square rod (501), a spring III (504) is provided between the slider (503) and the semicircular groove (405), so that the push plate (502) is pressed tightly against the inner wall of the semicircular groove (405), and a convex block (106) is fixed on the circular tube seat (105).
2. A process for preparing a refreshing shower gel according to claim 1, characterized in that: Guide plates (602) are provided on the arc baffles on both sides of the curved conveyor (601), so that the empty bottles are guided and concentrated by the two guide plates (602) while moving along with the conveyor belt.