Power rebalancing during maximum allowable exposure events

By adjusting the data channel transmission power in the wireless communication system during the RF exposure event, and using power rebalancing technology, the problem of poor communication quality under the RF exposure event is solved, and more stable communication is achieved.

CN115088313BActive Publication Date: 2024-11-19QUALCOMM INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202180014748.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2020-02-21
Filing Date
2021-01-27
Publication Date
2024-11-19
Estimated Expiration
2041-01-27

AI Technical Summary

Technical Problem

When a radio frequency exposure event occurs, it is difficult for the prior art to effectively adjust the data channel transmission power in the wireless communication system, resulting in unstable power changes and affecting communication quality.

Method used

By reducing the transmission power of the first beam used on the first data channel when the radio frequency exposure event occurs, and subsequently increasing the transmission power of the second beam used on the second data channel, while sending an RF exposure report to the base station, Achieve power rebalancing.

Benefits of technology

The transmission power change of the first data channel is effectively reduced, and the transmission power of the second data channel is increased, communication quality is improved, and the negative impact of radio frequency exposure events on communication is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115088313B_ABST
    Figure CN115088313B_ABST
Patent Text Reader

Abstract

The device receives at least one scheduling grant that schedules transmission on a first data channel and further schedules transmission on a second data channel. The device reduces the transmission power of transmissions on the first data channel using a first beam when a radio frequency (RF) exposure event occurs. The device increases the transmission power of transmissions on the second data channel using a second beam after the RF exposure event occurs. The device sends an RF exposure report associated with at least one of the first data channel or the first beam to a base station.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims the benefit of PCT International Application No. PCT / CN2020 / 076220, filed on February 21, 2020, entitled “POWER REBALANCING IN A MAXIMUMPERMISSIBLE EXPOSURE EVENT,” the disclosure of which is expressly incorporated herein by reference in its entirety. Technical Field

[0003] The present disclosure relates generally to communication systems, and more particularly to wireless communication systems. Background Art

[0004] Wireless communication systems are widely deployed to provide a variety of telecommunication services, such as telephony, video, data, messaging, and broadcasting. Typical wireless communication systems may employ multiple access technologies that can support communication with multiple users by sharing available system resources. Examples of such multiple access technologies include code division multiple access (CDMA) systems, time division multiple access (TDMA) systems, frequency division multiple access (FDMA) systems, orthogonal frequency division multiple access (OFDMA) systems, single carrier frequency division multiple access (SC FDMA) systems, and time division synchronous code division multiple access (TD-SCDMA) systems.

[0005] These multiple access technologies have been adopted in various telecommunication standards to provide a common protocol that enables different wireless devices to communicate at a city, country, region, and even global level. An example telecommunication standard is 5G New Radio (NR). 5G NR is part of the continuous mobile broadband evolution promulgated by the Third Generation Partnership Project (3GPP) to meet new requirements associated with latency, reliability, security, scalability (e.g., utilizing the Internet of Things (IoT)), and other requirements. 5G NR includes services associated with enhanced mobile broadband (eMBB), massive machine type communications (mMTC), and ultra-reliable low latency communications (URLLC). Some aspects of 5G NR can be based on the 4G Long Term Evolution (LTE) standard. 5G NR technology needs to be further improved. These improvements may also be applicable to other multiple access technologies and telecommunication standards that employ these technologies. Summary of the invention

[0006] A simplified overview of one or more aspects is presented below to provide a basic understanding of these aspects. This overview is not an extensive overview of all contemplated aspects, and is neither intended to identify key or important elements of all aspects, nor to delineate the scope of any or all aspects. Its sole purpose is to present some concepts of one or more aspects in a simplified form as a prelude to a more detailed description that is presented later.

[0007] In one aspect of the present disclosure, a method, a computer-readable medium, and an apparatus are provided. The apparatus may be a user equipment. The apparatus may receive at least one scheduling grant from a base station to schedule transmission on a first data channel and further schedule transmission on a second data channel, reduce the transmission power of transmission using a first beam on the first data channel when a radio frequency (RF) exposure event occurs, increase the transmission power of transmission using a second beam on the second data channel after the RF exposure event occurs, and send an RF exposure report associated with at least one of the first data channel or the first beam to the base station.

[0008] In some aspects, the transmit power of the first data channel may be decreased by a power delta, and the transmit power of the second data channel may be increased by the power delta.

[0009] In some aspects, the amount of power change may be the full transmit power for the first data channel.

[0010] In some aspects, uplink control information scheduled on a first data channel may be remapped to a second data channel.

[0011] In some aspects, uplink control information may be scheduled for uplink control information symbols for the first data channel, and the transmit power of the uplink control information symbols for the first data channel may not be reduced when the RF exposure event occurs.

[0012] In some aspects, the RF exposure report may be based on a reduction in transmit power for the first data channel.

[0013] In some aspects, the RF exposure report may be a medium access control control element (MAC-CE).

[0014] In some aspects, the RF exposure report may include an identifier of the power reduction amount for the first data channel and an identifier of the first beam.

[0015] In some aspects, the RF exposure report may include an identifier of the first data channel.

[0016] In some aspects, the RF exposure report may include an identifier of the amount of power increase for the second data channel.

[0017] In some aspects, the RF exposure report includes a request for a second beam to be paired with the new beam.

[0018] In some aspects, the RF exposure report is sent to the base station on a second data channel using a second beam.

[0019] In another aspect of the present disclosure, a method, a computer-readable medium, and an apparatus are provided. The apparatus may be a base station. The apparatus may send at least one scheduling grant to a user equipment (UE) that schedules transmission on a first data channel and further schedules transmission on a second data channel, receive a radio frequency (RF) exposure report associated with the transmission on the first data channel from the UE, the RF exposure report being received on the second data channel, and avoid scheduling another transmission on the first data channel in at least a portion of at least one time slot when the RF exposure report is received.

[0020] In some aspects, the RF exposure report may be a medium access control control element (MAC-CE).

[0021] In some aspects, the RF exposure report may include an identifier of the power reduction amount for the first data channel and an identifier of the first beam.

[0022] In some aspects, the RF exposure report may include an identifier of the first data channel.

[0023] In some aspects, the RF exposure report may include an identifier of the amount of power increase for the second data channel, and the apparatus may schedule the second data channel in a next time slot based on the amount of power increase for the second data channel.

[0024] In some aspects, the RF exposure report may include a request for a second beam to be paired with the new beam, and the apparatus may send a scheduling grant to the UE to schedule the first data channel for the third beam.

[0025] In some aspects, the UE may be scheduled to send uplink control information on the first data channel, and the apparatus may receive the uplink control information on the first data channel.

[0026] In some aspects, the UE is scheduled to send uplink control information on a first data channel, and the apparatus may receive the uplink control information on a second data channel.

[0027] To accomplish the foregoing and related ends, one or more aspects include the features hereinafter fully described and particularly pointed out in the claims. The following description and the accompanying drawings set forth in detail certain illustrative features of one or more aspects. However, these features are indicative of only a few of the various ways in which the principles of the various aspects may be employed, and this description is intended to include all such aspects and their equivalents. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 is a diagram illustrating an example of a wireless communication system and an access network.

[0029] Figure 2A, 2B , 2C, and 2D are diagrams illustrating examples of a first 5G / NR frame, a DL channel within a 5G / NR subframe, a second 5G / NR frame, and a UL channel within a 5G / NR subframe, respectively.

[0030] Figure 3 is a diagram illustrating an example of a base station and a user equipment (UE) in an access network.

[0031] Figure 4A is a diagram illustrating a base station and a UE communicating on a beam.

[0032] Figure 4B is a diagram illustrating the maximum permitted exposure (MPE) event for the uplink on a beam.

[0033] Figure 4C is a diagram illustrating a base station and a UE using a second beam to avoid an MPE event.

[0034] Figure 5 is a diagram illustrating a base station and a UE communicating using multi-panel transmission.

[0035] Figure 6 is a diagram illustrating multi-panel transmission using space division multiplexing.

[0036] Figure 7 is a communication flow diagram illustrating power rebalancing and MPE reporting in response to MPE events.

[0037] Figure 8 is a flow chart of a method of wireless communication.

[0038] Fig. 9 is a flow chart of a method of wireless communication.

[0039] Fig.10 is a diagram illustrating an example of a hardware implementation for an example apparatus.

[0040] Fig.11 is a diagram illustrating another example of a hardware implementation for another example apparatus. DETAILED DESCRIPTION

[0041] The detailed description set forth below in conjunction with the accompanying drawings is intended as a description of various configurations and is not intended to represent the only configuration in which the concepts described herein can be practiced. The detailed description includes specific details for the purpose of providing a thorough understanding of the various concepts. However, it is apparent to those skilled in the art that these concepts can be practiced without these specific details. In some cases, well-known structures and components are shown in block diagram form to avoid blurring these concepts.

[0042] Several aspects of telecommunication systems will now be presented with reference to various apparatus and methods. These apparatus and methods will be described in the following detailed description and illustrated in the accompanying drawings by various blocks, components, circuits, processes, algorithms, etc. (collectively referred to as "elements"). These elements may be implemented using electronic hardware, computer software, or any combination thereof. Whether such elements are implemented as hardware or software depends on the specific application and the design constraints imposed on the overall system.

[0043] For example, an element, or any part of an element, or any combination of elements can be implemented as a "processing system" including one or more processors. Examples of processors include microprocessors, microcontrollers, graphics processing units (GPUs), central processing units (CPUs), application processors, digital signal processors (DSPs), reduced instruction set computing (RISC) processors, systems on chip (SoCs), baseband processors, field programmable gate arrays (FPGAs), programmable logic devices (PLDs), state machines, gated logic, discrete hardware circuits, and other suitable hardware configured to perform various functions described throughout the present disclosure. One or more processors in a processing system can execute software. Whether it is software, firmware, middleware, microcode, hardware description language, or other, software should be broadly interpreted as representing instructions, instruction sets, codes, code segments, program codes, programs, subroutines, software components, applications, software applications, software packages, routines, subroutines, objects, executable files, execution threads, processes, functions, etc.

[0044] Therefore, in one or more example embodiments, the functions described can be implemented in hardware, software, or any combination thereof. If implemented in software, the functions can be stored on a computer-readable medium, or encoded as one or more instructions or codes on a computer-readable medium. Computer-readable media include computer storage media. The storage medium can be any available medium that can be accessed by a computer. As an example and not limitation, such a computer-readable medium can include a random access memory (RAM), a read-only memory (ROM), an electrically erasable programmable ROM (EEPROM), an optical disk storage, a magnetic disk storage, other magnetic storage devices, a combination of the aforementioned types of computer-readable media, or any other medium that can be used to store computer executable code in the form of instructions or data structures that can be accessed by a computer.

[0045] Figure 11 is a diagram illustrating an example of a wireless communication system and access network 100. The wireless communication system (also referred to as a wireless wide area network (WWAN)) includes a base station 102, a UE 104, an evolved packet core (EPC) 160, and another core network 190 (e.g., a 5G core (5GC)). The base station 102 may include a macro cell (a high-power cellular base station) and / or a small cell (a low-power cellular base station). A macro cell includes a base station. A small cell includes a femto cell, a pico cell, and a micro cell.

[0046] The base station 102 configured for 4G LTE (collectively referred to as the Evolved Universal Mobile Telecommunications System (UMTS) Terrestrial Radio Access Network (E-UTRAN)) can interface with the EPC 160 via a first backhaul link 132 (e.g., an S1 interface). The base station 102 configured for 5G NR (collectively referred to as the Next Generation RAN (NG-RAN)) can interface with the core network 190 via a second backhaul link 184. Among other functions, the base station 102 can perform one or more of the following functions: transmission of user data, radio channel encryption and decryption, integrity protection, header compression, mobility control functions (e.g., handover, dual connectivity), inter-cell interference coordination, connection establishment and release, load balancing, distribution for non-access stratum (NAS) messages, NAS node selection, synchronization, radio access network (RAN) sharing, multimedia broadcast multicast service (MBMS), subscriber and device tracking, RAN information management (RIM), paging, positioning, and delivery of warning messages. The base stations 102 may communicate with each other directly or indirectly (eg, through the EPC 160 or the core network 190) via a third backhaul link 134 (eg, an X2 interface). The third backhaul link 134 may be wired or wireless.

[0047] Base station 102 can communicate wirelessly with UE 104. Each of base stations 102 can provide communication coverage for a corresponding geographic coverage area 110. There may be overlapping geographic coverage areas 110. For example, a small cell 102' can have a coverage area 110' that overlaps with the coverage area 110 of one or more macro base stations 102. A network that includes both small cells and macro cells can be referred to as a heterogeneous network. A heterogeneous network can also include a home evolved node B (eNB) (HeNB), which can provide services to a restricted group called a closed subscriber group (CSG). The communication link 120 between base station 102 and UE 104 can include an uplink (UL) (also called a reverse link) transmission from UE 104 to base station 102 and / or a downlink (DL) (also called a forward link) transmission from base station 102 to UE 104. The communication link 120 can use multiple input multiple output (MIMO) antenna technology, including spatial multiplexing, beamforming, and / or transmit diversity. The communication link can be through one or more carriers. The base station 102 / UE 104 may use up to Y MHz (e.g., 5, 10, 15, 20, 100, 400, etc. MHz) of bandwidth per carrier allocated in a carrier aggregation for a total of up to Yx MHz (x component carriers) for transmission in each direction. The carriers may be adjacent to each other, or may not be adjacent to each other. The allocation of carriers may be asymmetric with respect to DL and UL (e.g., more or fewer carriers may be allocated for DL ​​compared to UL). The component carrier may include a primary component carrier and one or more secondary component carriers. The primary component carrier may be referred to as a primary cell (PCell), and the secondary component carrier may be referred to as a secondary cell (SCell).

[0048] Some UEs 104 may communicate with each other using a device-to-device (D2D) communication link 158. The D2D communication link 158 may use DL / UL WWAN spectrum. The D2D communication link 158 may use one or more sidelink channels, such as a physical sidelink broadcast channel (PSBCH), a physical sidelink discovery channel (PSDCH), a physical sidelink shared channel (PSSCH), and a physical sidelink control channel (PSCCH). The D2D communication may be through various wireless D2D communication systems, such as FlashLinQ, WiMedia, Bluetooth, ZigBee, Wi-Fi based on IEEE 802.11 standards, LTE, or NR.

[0049] The wireless communication system may also include a Wi-Fi access point (AP) 150 that communicates with a Wi-Fi station (STA) 152 in the 5 GHz unlicensed spectrum via a communication link 154. When communicating in the unlicensed spectrum, the STA 152 / AP 150 may perform a clear channel assessment (CCA) prior to communication to determine whether the channel is available.

[0050] The small cell 102' may operate in licensed and / or unlicensed spectrum. When operating in the unlicensed spectrum, the small cell 102' may employ NR and use the same 5 GHz unlicensed spectrum used by the Wi-Fi AP 150. The small cell 102' employing NR in the unlicensed spectrum may improve coverage and / or increase capacity of the access network.

[0051] Base station 102, whether a small cell 102' or a large cell (e.g., a macro base station), can include and / or be referred to as an eNB, a gNodeB (gNB), or another type of base station. Some base stations (such as gNB 180) can operate in traditional sub-6 GHz spectrum, millimeter wave (mmW) frequencies, and / or near mmW frequencies to communicate with UE 104. When gNB 180 operates at mmW or near mmW frequencies, gNB 180 can be referred to as a mmW base station. Extremely high frequency (EHF) is part of the RF in the electromagnetic spectrum. EHF ranges from 30 GHz to 300 GHz and has a wavelength between 1 mm and 10 mm. Radio waves in this band can be referred to as millimeter waves. Near mmW can extend down to frequencies of 3 GHz, with a wavelength of 100 mm. The super high frequency (SHF) band extends between 3 GHz and 30 GHz, which is also referred to as centimeter waves. Communications using mmW / near mmW radio frequency bands (e.g., 3 GHz to 300 GHz) have extremely high path losses and short distances. The mmW base station 180 may utilize beamforming 182 with the UE 104 to compensate for the extremely high path loss and short range. The base station 180 and the UE 104 may each include multiple antennas, such as antenna elements, antenna panels, and / or antenna arrays, to facilitate beamforming.

[0052] Base station 180 may transmit beamformed signals in one or more transmit directions 182' to UE 104. UE 104 may receive beamformed signals from base station 180 in one or more receive directions 182". UE 104 may also transmit beamformed signals to base station 180 in one or more transmit directions. Base station 180 may receive beamformed signals from UE 104 in one or more receive directions. Base station 180 / UE 104 may perform beam training to determine the best receive and transmit directions for each of base station 180 / UE 104. The transmit and receive directions of base station 180 may be the same, or may be different. The transmit and receive directions of UE 104 may be the same, or may be different.

[0053] The EPC 160 may include a mobility management entity (MME) 162, other MMEs 164, a serving gateway 166, a multimedia broadcast multicast service (MBMS) gateway 168, a broadcast multicast service center (BM-SC) 170, and a packet data network (PDN) gateway 172. The MME 162 may communicate with a home subscriber server (HSS) 174. The MME 162 is a control node that handles signaling between the UE 104 and the EPC 160. Typically, the MME 162 provides bearer and connection management. All user Internet Protocol (IP) packets are transmitted through the serving gateway 166, which itself is connected to the PDN gateway 172. The PDN gateway 172 provides UE IP address allocation and other functions. The PDN gateway 172 and the BM-SC 170 are connected to IP services 176. The IP services 176 may include the Internet, an intranet, an IP multimedia subsystem (IMS), a PS streaming service, and / or other IP services. The BM-SC 170 may provide functionality for MBMS user service provisioning and delivery. The BM-SC 170 may serve as an entry point for content provider MBMS transmissions, may be used to authorize and initiate MBMS bearer services within a public land mobile network (PLMN), and may be used to schedule MBMS transmissions. The MBMS Gateway 168 may be used to distribute MBMS services to base stations 102 belonging to a multicast broadcast single frequency network (MBSFN) area that broadcasts a specific service, and may be responsible for session management (start / stop) and collecting eMBMS-related billing information.

[0054] The core network 190 may include an access and mobility management function (AMF) 192, other AMFs 193, a session management function (SMF) 194, and a user plane function (UPF) 195. The AMF 192 may communicate with a unified data management (UDM) 196. The AMF 192 is a control node that handles signaling between the UE 104 and the core network 190. Typically, the AMF 192 provides QoS flow and session management. All user Internet Protocol (IP) packets are transmitted through the UPF 195. The UPF 195 provides UE IP address allocation and other functions. The UPF 195 is connected to an IP service 197. The IP service 197 may include the Internet, an intranet, an IP multimedia subsystem (IMS), a PS streaming service, and / or other IP services.

[0055] Base stations may include and / or be referred to as gNBs, Node Bs, eNBs, access points, base transceiver stations, radio base stations, radio transceivers, transceiver functions, basic service sets (BSSs), extended service sets (ESSs), transmit receive points (TRPs), or some other suitable terminology. Base stations 102 provide access points to EPC 160 or core network 190 for UEs 104. Examples of UEs 104 include cellular phones, smart phones, session initiation protocol (SIP) phones, laptops, personal digital assistants (PDAs), satellite radios, global positioning systems, multimedia devices, video devices, digital audio players (e.g., MP3 players), cameras, game consoles, tablets, smart devices, wearable devices, vehicles, electric meters, gas pumps, large or small kitchen appliances, healthcare devices, implants, sensors / actuators, displays, or any other similar functional devices. Some of UEs 104 may be referred to as IoT devices (e.g., parking meters, gas pumps, toasters, vehicles, heart monitors, etc.). UE 104 may also be referred to as a station, a mobile station, a subscriber station, a mobile unit, a subscriber unit, a wireless unit, a remote unit, a mobile device, a wireless device, a wireless communication device, a remote device, a mobile subscriber station, an access terminal, a mobile terminal, a wireless terminal, a remote terminal, a handset, a user agent, a mobile client, a client, or some other suitable terminology.

[0056] Reference again Figure 1 , in some aspects, the UE 104 may include an MPE power rebalancing component 198, which is configured to rebalance the transmit power applied to the PUSCH when the PUSCH is determined to be experiencing an MPE event. As described herein, an MPE event may be any radio frequency (RF) exposure event, including but not limited to an event in which the RF exposure is significantly less than any threshold defined by a committee, a standard, and / or other similar organizations. In some aspects, the base station 180 may include an MPE scheduling component 199, configured to receive an MPE report indicating that an MPE event has occurred on the PUSCH and change the scheduling of the PUSCH. As described herein, in some aspects, the MPE report may be any RF exposure report indicating that an RF exposure event has occurred on a data channel (e.g., PUSCH). Although the following description may focus on 5G NR, the concepts described herein may be applied to other similar fields, such as LTE, LTE-A, CDMA, GSM, and other wireless technologies.

[0057] Figure 2A FIG200 is a diagram illustrating an example of a first subframe within a 5G / NR frame structure. Figure 2B FIG230 is a diagram illustrating an example of DL channels within a 5G / NR subframe. Figure 2C Figure 250 illustrates an example of a second subframe within a 5G / NR frame structure. Figure 2D 280 is a diagram illustrating an example of UL channels within a 5G / NR subframe. The 5G / NR frame structure may be FDD, where for a particular set of subcarriers (carrier system bandwidth), subframes within that subcarrier set are dedicated to either DL or UL, or may be TDD, where for a particular set of subcarriers (carrier system bandwidth), subframes within that subcarrier set are dedicated to both DL and UL. Figure 2A , 2C In the example provided, it is assumed that the 5G / NR frame structure is TDD, subframe 4 is configured with slot format 28 (mainly DL), where D is DL, U is UL, and X is flexible between DL / UL, and subframe 3 is configured with slot format 34 (mainly UL). Although subframes 3 and 4 are shown with slot formats 34 and 28, respectively, any particular subframe can be configured with any of the various available slot formats 0-61. Slot formats 0 and 1 are DL and UL, respectively. Other slot formats 2-61 include a mixture of DL, UL and flexible symbols. The UE is configured with the slot format through the received slot format indicator (SFI) (dynamically through DL control information (DCI), or semi-statically / statically through radio resource control (RRC) signaling). Note that the description below also applies to the 5G / NR frame structure for TDD.

[0058] Other wireless communication technologies may have different frame structures and / or different channels. A frame (10ms) may be divided into 10 subframes (1ms) of equal size. Each subframe may include one or more time slots. A subframe may also include a microslot, which may include 7, 4, or 2 symbols. Depending on the time slot configuration, each time slot may contain 7 or 14 symbols. For time slot configuration 0, each time slot may include 14 symbols, and for time slot configuration 1, each time slot may include 7 symbols. The symbol on the DL may be a cyclic prefix (CP) OFDM (CP-OFDM) symbol. The symbol on the UL may be a CP-OFDM symbol (for high throughput scenarios) or a discrete Fourier transform (DFT) spread OFDM (DFT-s-OFDM) symbol (also known as a single carrier frequency division multiple access (SC-FDMA) symbol) (for power-constrained scenarios; limited to single stream transmission). The number of time slots within a subframe is based on the time slot configuration and parameter set (numerology). For slot configuration 0, different parameter sets μ from 0 to 5 allow 1, 2, 4, 8, 16 and 32 slots per subframe, respectively. For slot configuration 1, different parameter sets from 0 to 2 allow 2, 4 and 8 slots per subframe, respectively. Therefore, for slot configuration 0 and parameter set μ, there are 14 symbols / slot and 2μ slots / subframe. The subcarrier spacing and symbol length / duration are functions of the parameter set. The subcarrier spacing can be equal to 2 μ*15kHz, where μ is parameter set 0 to 5. Thus, parameter set μ=0 has a subcarrier spacing of 15kHz, and parameter set μ=5 has a subcarrier spacing of 480kHz. The symbol length / duration is inversely related to the subcarrier spacing. Figures 2A-2D An example is provided for slot configuration 0 with 14 symbols per slot, parameter set μ=2 and 4 slots per subframe. The slot duration is 0.25 ms, the subcarrier spacing is 60 kHz, and the symbol duration is approximately 16.67 μs.

[0059] A resource grid can be used to represent the frame structure. Each time slot includes a resource block (RB) (also called a physical RB (PRB)) extending over 12 consecutive subcarriers. The resource grid is divided into a number of resource elements (REs). The number of bits carried by each RE depends on the modulation scheme.

[0060] like Figure 2A As shown, some of the REs carry reference (pilot) signals (RS) of the UE. The RS may include a demodulation RS (DM-RS) (indicated as R for a specific configuration where 100x is the port number). x , but other DM-RS configurations are possible) and a channel state information reference signal (CSI-RS) for channel estimation at the UE. The RS may also include a beam measurement RS (BRS), a beam refinement RS (BRRS), and a phase tracking RS (PT-RS).

[0061] Figure 2B Examples of various DL channels within a subframe of a frame are illustrated. The physical downlink control channel (PDCCH) carries DCI within one or more control channel elements (CCEs), each CCE including nine RE groups (REGs), each REG including four consecutive REs in an OFDM symbol. The primary synchronization signal (PSS) may be within symbol 2 of a particular subframe of the frame. The UE 104 uses the PSS to determine the subframe / symbol timing and the physical layer identity. The secondary synchronization signal (SSS) may be within symbol 4 of a particular subframe of the frame. The UE uses the SSS to determine the physical layer cell identification group number and the radio frame timing. Based on the physical layer identity and the physical layer cell identity group number, the UE may determine the physical cell identifier (PvI). Based on the PCI, the UE may determine the location of the aforementioned DM-RS. The physical broadcast channel (PBCH) carrying the master information block (MIB) may be logically grouped using the PSS and SSS to form a synchronization signal (SS) / PBCH block. The MIB provides multiple RBs in the system bandwidth as well as a system frame number (SFN). The Physical Downlink Shared Channel (PDSCH) carries user data, broadcast system information such as System Information Blocks (SIBs) that are not transmitted through the PBCH, and paging messages.

[0062] like Figure 2CAs shown, some of the REs carry DM-RS for channel estimation at the base station (indicated as R for one specific configuration, but other DM-RS configurations are possible). The UE can send DM-RS for the physical uplink control channel (PUCCH) and DM-RS for the physical uplink shared channel (PUSCH). The PUSCH DM-RS can be sent in the first one or two symbols of the PUSCH. Depending on whether a short PUCCH or a long PUCCH is sent, and depending on the specific PUCCH format used, the PUCCH DM-RS can be sent in different configurations. The UE can send a sounding reference signal (SRS). The SRS can be sent in the last symbol of the subframe. The SRS can have a comb structure, and the UE can send the SRS on one of the combs. The SRS can be used by the base station for channel quality estimation to achieve frequency-dependent scheduling on the UL.

[0063] Figure 2D An example of various UL channels within a subframe of a frame is illustrated. The PUCCH may be positioned as indicated in a configuration. The PUCCH carries uplink control information (UCI), such as scheduling requests, channel quality indicator (CQI), precoding matrix indicator (PMI), rank indicator (RI), and HARQ ACK / NACK feedback. The PUSCH carries data and may additionally be used to carry a buffer status report (BSR), a power headroom report (PHR), and / or UCI.

[0064] Figure 33 is a block diagram of a base station 310 communicating with a UE 350 in an access network. In the DL, IP packets from the EPC 160 may be provided to a controller / processor 375. The controller / processor 375 implements layer 3 and layer 2 functions. Layer 3 includes a radio resource control (RRC) layer, and layer 2 includes a service data adaptation protocol (SDAP) layer, a packet data convergence protocol (PDCP) layer, a radio link control (RLC) layer, and a medium access control (MAC) layer. The controller / processor 375 provides RRC layer functions associated with broadcasting of system information (e.g., MIB, SIB), RRC connection control (e.g., RRC connection paging, RRC connection establishment, RRC connection modification, and RRC connection release), inter-radio access technology (RAT) mobility, and measurement configuration for UE measurement reporting; PDCP layer functions associated with header compression / decompression, security (encryption, decryption, integrity protection, integrity verification), and switching support functions; RLC layer functions associated with transmission of upper layer packet data units (PDUs), error correction through ARQ, concatenation, segmentation and reassembly of RLC service data units (SDUs), re-segmentation of RLC data PDUs, and reordering of RLC data PDUs; and MAC layer functions associated with mapping between logical channels and transport channels, multiplexing of MAC SDUs to transport blocks (TBs), demultiplexing of MAC SDUs from TBs, scheduling information reporting, error correction through HARQ, priority handling, and logical channel prioritization.

[0065] The transmit (TX) processor 316 and the receive (RX) processor 370 implement layer 1 functions associated with various signal processing functions. Layer 1 including the physical (PHY) layer may include error detection on the transmission channel, forward error correction (FEC) encoding / decoding of the transmission channel, interleaving, rate matching, mapping to the physical channel, modulation / demodulation of the physical channel, and MIMO antenna processing. The TX processor 316 handles the mapping to the signal constellation based on various modulation schemes (e.g., binary phase shift keying (BPSK), quadrature phase shift keying (QPSK), M-phase shift keying (M-PSK), M-quadrature amplitude modulation (M-QAM)). The coded and modulated symbols can then be split into parallel streams. Each stream can then be mapped to an OFDM subcarrier, multiplexed with a reference signal (e.g., pilot) in the time domain and / or frequency domain, and then combined together using an inverse fast Fourier transform (IFFT) to generate a physical channel carrying a time domain OFDM symbol stream. The OFDM stream is spatially precoded to generate multiple spatial streams. Channel estimates from a channel estimator 374 may be used to determine coding and modulation schemes, and for spatial processing. The channel estimates may be derived from a reference signal and / or channel condition feedback sent by the UE 350. Each spatial stream may then be provided to a different antenna 320 via a separate transmitter 318TX. Each transmitter 318TX may modulate an RF carrier with a corresponding spatial stream for transmission.

[0066] At the UE 350, each receiver 354RX receives a signal through its corresponding antenna 352. Each receiver 354RX recovers the information modulated onto the RF carrier and provides the information to a receive (RX) processor 356. The TX processor 368 and the RX processor 356 implement layer 1 functions associated with various signal processing functions. The RX processor 356 can perform spatial processing on the information to recover any spatial stream going to the UE 350. If multiple spatial streams go to the UE 350, they can be combined into a single OFDM symbol stream by the RX processor 356. Then, the RX processor 356 uses a fast Fourier transform (FFT) to convert the OFDM symbol stream from the time domain to the frequency domain. The frequency domain signal includes a separate OFDM symbol stream for each subcarrier of the OFDM signal. The symbols on each subcarrier and the reference signal are recovered and demodulated by determining the most likely signal constellation point sent by the base station 310. These soft decisions can be based on the channel estimates calculated by the channel estimator 358. The soft decisions are then decoded and deinterleaved to recover the data and control signals originally sent on the physical channel by base station 310. The data and control signals are then provided to controller / processor 359, which implements layer 3 and layer 2 functionality.

[0067] The controller / processor 359 may be associated with a memory 360 that stores program codes and data. The memory 360 may be referred to as a computer readable medium. In the UL, the controller / processor 359 provides demultiplexing between transport and logical channels, packet reassembly, decryption, header decompression, and control signal processing to recover IP packets from the EPC 160. The controller / processor 359 is also responsible for error detection using an ACK and / or NACK protocol to support HARQ operations.

[0068] Similar to the functions described in conjunction with the DL transmission of the base station 310, the controller / processor 359 provides RRC layer functions associated with system information (e.g., MIB, SIB) acquisition, RRC connection, and measurement reporting; PDCP layer functions associated with header compression / decompression, and security (encryption, decryption, integrity protection, integrity checking); RLC layer functions associated with transmission of upper layer PDUs, error correction through ARQ, concatenation, segmentation, and reassembly of RLC SDUs, resegmentation of RLC data PDUs, and reordering of RLC data PDUs; and MAC layer functions associated with mapping between logical channels and transport channels, multiplexing of MAC SDUs to TBs, demultiplexing of MAC SDUs from TBs, scheduling information reporting, error correction through HARQ, priority processing, and logical channel priority.

[0069] The TX processor 368 may select an appropriate coding and modulation scheme and facilitate spatial processing using channel estimates derived by the channel estimator 358 from a reference signal or feedback transmitted by the base station 310. The spatial streams generated by the TX processor 368 may be provided to different antennas 352 via separate transmitters 354TX. Each transmitter 354TX may modulate an RF carrier with a corresponding spatial stream for transmission.

[0070] At the base station 310, the UL transmission is processed in a manner similar to that described in conjunction with the receiver functionality at the UE 350. Each receiver 318RX receives a signal through its respective antenna 320. Each receiver 318RX recovers information modulated onto an RF carrier and provides the information to a RX processor 370.

[0071] The controller / processor 375 may be associated with a memory 376 that stores program codes and data. The memory 376 may be referred to as a computer readable medium. In the UL, the controller / processor 375 provides demultiplexing between transport and logical channels, packet reassembly, decryption, header decompression, control signal processing to recover IP packets from the UE 350. The IP packets from the controller / processor 375 may be provided to the EPC 160. The controller / processor 375 is also responsible for error detection using an ACK and / or NACK protocol to support HARQ operations.

[0072] At least one of the TX processor 368, the RX processor 356, and the controller / processor 359 may be configured to perform Figure 1 of 198 aspects.

[0073] At least one of the TX processor 316, the RX processor 370, and the controller / processor 375 may be configured to perform Figure 1 of 198 aspects.

[0074] Figure 4A 4 is a diagram 400 illustrating a base station 404 and a UE 402 communicating on a beam 410. The base station 404 may send a downlink signal 412 to the UE 402 on the beam 410. The UE 402 may send an uplink signal 414 to the base station 404 on the same beam 410.

[0075] Figure 4B 4 is a diagram 420 illustrating maximum permissible exposure (MPE) events for uplink 414 on beam 410. As described herein, an MPE event may be any radio frequency (RF) exposure event, including but not limited to an event where the RF exposure is significantly less than any threshold defined by a committee, standard, and / or other similar organization. To avoid harming a user, a UE may have an MPE. The MPE may define the maximum power for signals at some frequencies (e.g., RF frequencies) when the UE transmits signals in a direction close to a person's body of the UE. Figure 4B As shown, a human body 416 is present in beam 410 between UE 402 and base station 404. Base station 404 may still send downlink signal 412 to UE 402 on beam 410. However, uplink signal 414 may exceed the MPE for UE 402. Accordingly, an MPE event has occurred. If an MPE event occurs, UE 402 may not send uplink signal 414 on beam 410.

[0076] Figure 4C 4 is a diagram illustrating a base station 404 and a UE 402 using a second beam 460 to avoid an MPE event. The UE 402 and the base station 404 may communicate on both the beam 410 and the second beam 460. A human body is located in the path of the beam 410 between the UE 402 and the base station 404, resulting in an MPE event for the beam 410. Accordingly, the UE 402 may not transmit an uplink signal 414 on the beam 410. The human body is not in the path of the second beam 460. Accordingly, the transmission of the UE 402 on the second beam 460 may not result in an MPE event, and the UE 402 may transmit an uplink signal 464 to the base station 404 on the second beam 460.

[0077] Figure 5 5 is a diagram 500 illustrating a base station 504 and a UE 502 communicating using multi-panel transmission. The UE 502 may include two panels. The panel may be a set of antennas. The UE 502 may communicate with the base station 504 using a first beam corresponding to the first panel, and may communicate with the base station 504 using a second beam corresponding to the second panel.

[0078] UE 502 may send multiple PUSCHs to base station 504 (that is, UE 502 may send information to base station 504 on corresponding resource sets configured for multiple PUSCHs simultaneously and / or in the same period). A first PUSCH may be sent to base station 504 on a first beam using a first panel. A second PUSCH may be sent to base station 504 on a second beam using a second panel. The first beam and the second beam may be indicated by respective transmission configuration indicators (TCIs), and the TCI may be associated with a reference signal such as a CSI-RS or an SRS. UE 502 may send information to base station 504 on a first beam using a first panel. Figure 6 As shown, a first PUSCH and a second PUSCH are transmitted. Figure 6 600 is a diagram illustrating multi-panel transmission using spatial division multiplexing. The first PUSCH and the second PUSCH can be scheduled for the same resources in the time domain and the frequency domain. The UE 502 can transmit the first PUSCH and the second PUSCH simultaneously, and the base station 504 can distinguish the first PUSCH from the second PUSCH based on the beam on which the signal is received.

[0079] Figure 7 7 is a communication flow diagram 700 illustrating power rebalancing and MPE reporting in response to an MPE event. UE 702 may communicate with base station 704 using a first beam and a second beam. For example, as described with respect to Figure 5 As described above, the UE 702 may include a first panel corresponding to the first beam and a second panel corresponding to the second beam.

[0080] The base station 704 may schedule the UE 702 for simultaneous transmission of a first PUSCH and a second PUSCH. The first PUSCH may be scheduled to be transmitted on a first beam, and the second PUSCH may be scheduled to be transmitted on a second beam. The base station 704 may send a scheduling grant 712 (e.g., in a DCI) to the UE 702 identifying resources scheduled for the first PUSCH and the second PUSCH. The scheduled transmit power for the first PUSCH and the scheduled transmit power for the second PUSCH may be referred to as an initial transmit power for the PUSCH.

[0081] As shown at 722, UE 702 may determine that an MPE event has occurred for the first PUSCH. For example, UE 702 may determine that a body is proximate to UE 702 and in the path of a first beam. UE 702 may use a sensor such as an ultrasonic sensor or a millimeter wave signal to determine that a body is proximate to UE 702 and in the path of a beam. UE 702 may then determine that transmitting the first PUSCH at a predetermined initial transmit power in the scheduled frequency band will exceed the MPE.

[0082] Once it is determined that an MPE event has occurred, as shown in 724, the UE 702 may reduce the transmit power for the first PUSCH. For example, the UE 702 may reduce the power applied to the amplifier for the panel corresponding to the first beam. In some aspects, the UE 702 may reduce the transmit power by an amount less than the total transmit power for the first PUSCH. The amount by which the transmit power is reduced may be referred to as a power variation. The UE 702 may reduce the transmit power for the first PUSCH to a level that does not exceed the MPE. In some aspects, the UE 702 may reduce the transmit power for the first PUSCH to zero (e.g., the first PUSCH may not be transmitted).

[0083] The first PUSCH may include a set of symbols scheduled to transmit UCI (e.g., QAM or QPSK symbols). In some aspects, the UE 702 may not reduce the transmit power of the set of symbols used for the first PUSCH scheduled to transmit UCI (e.g., the symbols of the first PUSCH carrying UCI may be transmitted at the initial transmit power), but may reduce the transmit power of other symbols used for the first PUSCH, such as symbols scheduled to carry uplink data information.

[0084] In some aspects, UCI scheduled to be sent on a first PUSCH may be remapped to be sent on a second PUSCH. For example, UE 702 may be scheduled with a first PUSCH having two layers (e.g., layer index 0 and layer 1) and a second PUSCH having two layers (e.g., layer index 2 and layer 3) using UCI. When there is no MPE event, UCI may be mapped to a common symbol set for all layers (e.g., layer indexes 0, 1, 2, 3). However, when there is an MPE event, UCI may be mapped to a new symbol set for a second PUSCH having only layer indexes 2 and 3, instead of layer indexes 1 and 2. In this way, when the transmit power of the first PUSCH is reduced or lowered, the portion of UCI scheduled to be sent on the first PUSCH is remapped to the second PUSCH, which may be less or not affected by MPE.

[0085] As shown in 726, the UE 702 may rebalance the transmit power reduced from the first PUSCH at 724 to the second PUSCH. For example, the UE 702 may increase the power applied to the amplifier for the panel corresponding to the second beam. Increasing the transmit power of the second PUSCH may improve the reception of the second PUSCH by the base station 704. In the case where the transmit power of the first PUSCH is reduced by a power variation amount, the transmit power of the second PUSCH may be increased by the power variation amount. The transmit power of the second PUSCH may be the smaller of the maximum transmit power of the panel used to transmit the second PUSCH and the initial transmit power of the second PUSCH plus the power variation amount. In the case where the transmit power of the first PUSCH is reduced to zero, the UE 702 may increase the transmit power of the second PUSCH by the full initial transmit power of the first PUSCH. The transmit power of the second PUSCH may be the smaller of the maximum transmit power of the panel used to transmit the second PUSCH and the initial transmit power of the second PUSCH plus the initial transmit power of the first PUSCH.

[0086] The UE 702 may send a second PUSCH 732 to the base station 704 at a new transmit power. The UE 702 may include an MPE report in the second PUSCH 732. The MPE report may be a medium access control control element (MAC-CE). The MPE report may include an indicator identifying the amount of reduction in the transmit power of the first PUSCH. For example, the indicator may be a power management maximum power reduction (P-MPR) for the first PUSCH, may be an amount of power change for the first or second PUSCH, may be a power headroom report for the second PUSCH, or may be a combination thereof. In some aspects, the UE 702 may report a P-MPR or UL RSRP in the MPE report for each beam that the UE 702 is using to communicate with the base station 704. The MPE report may also include an indicator identifying the first beam that has experienced an MPE event. The indicator identifying the first beam may be an uplink beam identifier, such as a scheduling request indicator, a PUCCH spatial correlation identifier, or an SRS spatial correlation reference signal; may be a spatial reference signal identifier, such as a CSI-RS resource identifier or a synchronization signal block identifier; or may be an uplink resource identifier, such as a PUCCH / SRS resource identifier or an SRS resource set identifier. The MPE report may include an indicator identifying a PUSCH that is dropped or has its transmit power reduced, for example, may include an indicator identifying the first PUSCH. The MPE report may further indicate whether the transmit power is rebalanced to a second PUSCH, and if so, the amount of power rebalanced to the PUSCH (e.g., a power boost value for a demodulation reference signal for the second PUSCH may be identified). In some aspects, the MPE report may include a new beam pairing request requesting that the UE 702 be paired with a new beam to replace the first beam that is experiencing the MPE event.

[0087] The base station 704 may receive the second PUSCH 732 and the MPE report. As shown at 742, the base station 704 may change the scheduling of the first PUSCH based on the MPE report. In some aspects, the base station 704 may not schedule the first PUSCH on the first beam in a subsequent time slot. In some aspects, such as when the MPE report includes a new beam pairing request, the base station 704 may determine a new beam to pair with the UE 702, and may schedule the first PUSCH on the new beam in a subsequent time slot.

[0088] Figure 8 800 is a flow chart of a method of wireless communication. The method may be performed by a UE (e.g., UE 104, 350, 502, 702; or a component of UE 350, such as TX processor 368, RX processor 356, and / or controller / processor 359) and / or other devices (e.g., device 1002).

[0089] At 802, the UE may receive at least one scheduling grant from a base station that schedules transmission on a first data channel (e.g., PUSCH) and further schedules transmission on a second data channel (e.g., PUSCH). Figure 7 In the context of, for example, UE 702 may receive a scheduling grant 712 from base station 704.

[0090] At 804, when a radio frequency (RF) exposure event (e.g., a maximum allowed exposure event) occurs, the UE may reduce the transmit power of transmissions using a first beam on a first data channel. Figure 7 In the context of, for example, the UE 702 may reduce the transmit power for the first PUSCH at 724. In some aspects, the UE may determine whether an RF exposure event (e.g., an MPE event) has occurred by measuring RF exposure associated with communication using a first beam, comparing the RF exposure measurement to a threshold, and determining whether the RF exposure measurement satisfies the threshold. For example, if the RF exposure measurement satisfies the threshold, the UE may determine that the RF exposure event has occurred. In some aspects, when the RF exposure event has occurred, the UE may reduce the transmit power of the transmission using the first beam on the first data channel (e.g., the first PUSCH) by identifying at least a portion of at least one antenna element associated with the transmission on the first data channel (e.g., the first PUSCH) and avoiding using the portion of the at least one antenna element for another transmission based on the identification. The transmit power of the first data channel (e.g., the first PUSCH) may be reduced by a power change amount, and the transmit power of the second data channel (e.g., the second PUSCH) may be increased by the power change amount. The power change amount may be the total transmit power of the first data channel (e.g., the first PUSCH). Uplink control information scheduled on a first data channel (e.g., a first PUSCH) may be remapped to a second data channel (e.g., a second PUSCH). The uplink control information may be scheduled for uplink control information symbols of the first data channel (e.g., a first PUSCH), and when an RF exposure event (e.g., an MPE event) occurs, the transmit power of the uplink control information symbols for the first data channel (e.g., the first PUSCH) may not be reduced.

[0091] At 806, after the RF exposure event (eg, MPE event) occurs, the UE may increase the transmit power of the transmission using the second beam on the second data channel (eg, PUSCH). Figure 7In the context of , the UE 702 may rebalance the transmit power reduced from the first PUSCH at 724 to the second PUSCH at 726. In some aspects, after the RF exposure event occurs, the UE may increase the transmit power of transmissions on a second data channel (e.g., a second PUSCH) using a second beam by identifying at least a portion of at least one antenna element associated with transmissions on the second data channel and increasing power applied to an amplifier of at least the portion of at least one antenna element associated with transmissions on the second data channel.

[0092] At 808, the UE may send an RF exposure report (e.g., an MPE report) associated with at least one of the first data channel or the first beam to the base station. In some aspects, the RF exposure report may be sent to the base station on a second data channel using a second beam. The RF exposure report (e.g., an MPE report) may be based on a reduction in transmit power for the first data channel (e.g., a first PUSCH). The RF exposure report (e.g., an MPE report) may be a MAC-CE. The RF exposure report (e.g., an MPE report) may include an identifier of the amount of power reduction for the first data channel (e.g., a first PUSCH) and an identifier of the first beam. The RF exposure report (e.g., an MPE report) may include an identifier of the first data channel (e.g., a first PUSCH). The RF exposure report (e.g., an MPE report) may include an identifier of the amount of power increase for the second data channel (e.g., a second PUSCH). The RF exposure report (e.g., an MPE report) may include a request for a second beam to be paired with a new beam. In some aspects, the RF exposure report is sent to the base station on a second data channel (e.g., a second PUSCH) using a second beam.

[0093] Fig. 9 900 is a flow chart of a method of wireless communication. The method may be performed by a base station (e.g., base station 102 / 180, 310, 504, 704; or a component of base station 310, such as TX processor 316, RX processor 370, and / or controller / processor 375) and / or other devices (e.g., device 1102).

[0094] At 902, a base station may send at least one scheduling grant to a UE that schedules transmission on a first data channel (eg, PUSCH) and further schedules transmission on a second data channel (eg, PUSCH). Figure 7 In the context of, for example, the base station 704 can send a scheduling grant 712 to the UE 702.

[0095] At 904, the base station may receive, from the UE, a radio frequency (RF) exposure report (e.g., a maximum allowed exposure report) associated with transmissions on a first data channel (e.g., a first PUSCH). The RF exposure report (e.g., an MPE report) may be received on a second data channel (e.g., a second PUSCH). Figure 7 In the context of, for example, the base station 704 may receive an MPE report 732 from the UE 702. The RF exposure report (e.g., MPE report) may be a MAC-CE. The RF exposure report (e.g., MPE report) may include an identifier of the power reduction amount of the first PUSCH and an identifier of the first beam. The RF exposure report (e.g., MPE report) may include an identifier of the first data channel (e.g., the first PUSCH). The RF exposure report (e.g., MPE report) may include an identifier of the power increase amount of the second data channel (e.g., the second PUSCH). The base station may schedule the second data channel (e.g., the second PUSCH) in the next time slot based on the power increase amount of the second data channel (e.g., the second PUSCH). The RF exposure report (e.g., MPE report) may include a request for a second beam to be paired with a new beam. The base station may send a scheduling grant to the UE to schedule the first data channel (e.g., the first PUSCH) for the third beam.

[0096] The UE may be scheduled to send uplink control information on a first data channel (e.g., a first PUSCH). In some aspects, the base station may receive the uplink control information on a first data channel (e.g., a first PUSCH). In some aspects, the base station may receive the uplink control information on a second data channel (e.g., a second PUSCH).

[0097] At 906, when the RF exposure report (e.g., MPE report) is received, the base station can avoid scheduling another transmission on the first data channel (e.g., first PUSCH) in at least a portion of the at least one time slot. In some aspects, when the RF exposure report is received, the base station can avoid scheduling another transmission on the first data channel (e.g., first PUSCH) in at least the portion of the at least one time slot by identifying RF exposure information (e.g., MPE information) from the UE and selecting a beam that is not associated with the RF exposure event (e.g., MPE event).

[0098] Fig.101000 is a diagram illustrating an example of a hardware implementation for an apparatus 1002. The apparatus 1002 is a UE and includes a cellular baseband processor 1004 (also referred to as a modem) coupled to a cellular RF transceiver 1022 and one or more subscriber identity modules (SIM) cards 1020, an application processor 1006 coupled to a secure digital (SD) card 1008 and a screen 1010, a Bluetooth module 1012, a wireless local area network (WLAN) module 1014, a global positioning system (GPS) module 1016, and a power supply 1018. The cellular baseband processor 1004 communicates with the UE 104 and / or the base station 102 / 180 via the cellular RF transceiver 1022. The cellular baseband processor 1004 may include a computer-readable medium / memory. The computer-readable medium / memory may be non-transitory. The cellular baseband processor 1004 is responsible for general processing, including the execution of software stored on the computer-readable medium / memory. When executed by the cellular baseband processor 1004, the software causes the cellular baseband processor 1004 to perform the functions described above. The computer-readable medium / memory may also be used to store data that is operated on when the cellular baseband processor 1004 executes the software. The cellular baseband processor 1004 also includes a receiving component 1030, a communication manager 1032, and a sending component 1034. The communication manager 1032 includes one or more of the components shown. The components within the communication manager 1032 may be stored in a computer-readable medium / memory and / or configured as hardware within the cellular baseband processor 1004. The cellular baseband processor 1004 may be a component of the UE 350 and may include a memory 360 and / or at least one of a TX processor 368, an RX processor 356, and a controller / processor 359. In one configuration, the device 1002 may be a modem chip and include only the baseband processor 1004, and in another configuration, the device 1002 may be the entire UE (e.g., Figure 3 UE 350), and includes additional modules of the device 1002 discussed above.

[0099] The communications manager 1032 includes a scheduling grant component 1040 configured to receive at least one scheduling grant scheduling transmission on a first data channel and further scheduling transmission on a second data channel from a base station (e.g., base station 102 / 180, 310, 504, 704; or a component of base station 310, such as TX processor 316, RX processor 370, and / or controller / processor 375) and / or other device (e.g., device 1102), e.g., regarding Figure 8The communication manager 1032 also includes a power reduction component 1042 that receives input based on at least one scheduling grant from the scheduling grant component 1040 and is configured to reduce the transmission power of the transmission using the first beam on the first data channel when a radio frequency (RF) exposure event occurs, for example, with respect to Figure 8 The communication manager 1032 also includes a power increase component 1044 that receives input from the power reduction component 1042 based on a reduction in the transmit power of the transmission using the first beam on the first data channel, and is configured to increase the transmit power of the transmission using the second beam on the second data channel after the RF exposure event occurs, for example, with respect to Figure 8 The communication manager 1032 also includes an RF exposure reporting component 1046 that receives input from the power increase component 1044 of an increased transmit power based on transmissions on the second data channel using the second beam, and is configured to send an RF exposure report associated with at least one of the first data channel or the first beam to the base station, for example, regarding Figure 8 as described in block 808 of .

[0100] The apparatus 1002 may include executing (multiple) Figure 8 The additional components of some or all of the blocks, operations, signaling, etc. of the algorithm(s) in the (multiple) above flowchart(s). Thus, (multiple) Figure 8 Some or all of the blocks, operations, signaling, etc. in the (multiple) above flowcharts may be performed by components, and the apparatus 1002 may include one or more of these components. The components may be one or more hardware components specifically configured to execute the stated processes / algorithms, implemented by a processor configured to execute the stated processes / algorithms, stored in a computer-readable medium to be implemented by a processor, or some combination thereof.

[0101] In one configuration, the device 1002 and in particular the cellular baseband processor 1004 include components for receiving at least one scheduling grant from a base station to schedule transmission on a first data channel and further schedule transmission on a second data channel; components for reducing the transmit power of transmissions using a first beam on the first data channel when a radio frequency (RF) exposure event occurs; components for increasing the transmit power of transmissions using a second beam on the second data channel after the RF exposure event occurs; and components for sending an RF exposure report associated with the first data channel or at least one of the first beam to the base station using the second beam on the second data channel.

[0102] In one aspect, the transmit power of the first data channel is reduced by the power variation. In one aspect, the transmit power of the second data channel is increased by the power variation.

[0103] In one aspect, the amount of power change is the total transmit power for the first data channel.

[0104] In one aspect, uplink control information scheduled on a first data channel is remapped to a second data channel.

[0105] In one aspect, the uplink control information is scheduled for uplink control information symbols for the first data channel. In one aspect, when the RF exposure event occurs, the transmit power of the uplink control information symbols for the first data channel is not reduced.

[0106] In one aspect, the RF exposure report is based on a reduction in transmit power for the first data channel.

[0107] In one aspect, the RF exposure report is a Medium Access Control Control Element (MAC-CE).

[0108] In one aspect, the RF exposure report includes an identifier of the power reduction amount for the first data channel and an identifier of the first beam.

[0109] In one aspect, the RF exposure report includes an identifier of the amount of power increase for the second data channel.

[0110] In one aspect, the RF exposure report includes a request for a second beam to be paired with the new beam.

[0111] In one aspect, the RF exposure report is sent to the base station on a second data channel using a second beam.

[0112] The aforementioned means may be one or more of the aforementioned components of the apparatus 1002 configured to perform the functions recited by the aforementioned means. As described above, the apparatus 1002 may include the TX processor 368, the RX processor 356, and the controller / processor 359. Thus, in one configuration, the aforementioned means may be the TX processor 368, the RX processor 356, and the controller / processor 359 configured to perform the functions recited by the aforementioned means.

[0113] Fig.111100 is a diagram illustrating an example of a hardware implementation for an apparatus 1102. The apparatus 1102 is a base station and includes a baseband unit 1104. The baseband unit 1104 can communicate with the UE 104 via a cellular RF transceiver. The baseband unit 1104 may include a computer-readable medium / memory. The baseband unit 1104 is responsible for general processing, including the execution of software stored on the computer-readable medium / memory. When executed by the baseband unit 1104, the software causes the baseband unit 1104 to perform the functions described above. The computer-readable medium / memory can also be used to store data operated by the baseband unit 1104 when executing the software. The baseband unit 1104 also includes a receiving component 1130, a communication manager 1132, and a sending component 1134. The communication manager 1132 includes one or more of the components shown. The components within the communication manager 1132 can be stored in a computer-readable medium / memory and / or configured as hardware within the baseband unit 1104. The baseband unit 1104 may be a component of the base station 310 and may include a memory 376 and / or at least one of the TX processor 316 , the RX processor 370 , and the controller / processor 375 .

[0114] The communications manager 1132 includes a scheduling grant component 1140 configured to send at least one scheduling grant to a user equipment (UE) (e.g., UE 104, 350, 502, 702; or a component of a UE 350, such as a TX processor 368, an RX processor 356, and / or a controller / processor 359) and / or other apparatus (e.g., apparatus 1002) that schedules transmission on a first data channel and further schedules transmission on a second data channel, e.g., Fig. 9 The communication manager 1132 also includes an RF exposure reporting component 1142 configured to receive a radio frequency (RF) exposure report associated with a transmission on a first data channel from a UE, the RF report being received on a second data channel, e.g., regarding Fig. 9 The communication manager 1132 also includes a scheduling component 1144 that receives input based on the RF exposure report from the receiving component 1142 and is configured to avoid scheduling another transmission on the first data channel in at least a portion of the at least one time slot when the RF exposure report is received, for example, with respect to Fig. 9 As described in block 906 of .

[0115] The device 1102 may include executing (multiple) Fig. 9 The additional components of some or all of the blocks, operations, signaling, etc. of the algorithm(s) in the (multiple) above flowchart(s). Thus, (multiple) Fig. 9Some or all of the blocks, operations, signaling, etc. in the (multiple) above flowcharts may be performed by components, and the device 1102 may include one or more of these components. The components may be one or more hardware components specifically configured to execute the stated process / algorithm, implemented by a processor configured to execute the stated process / algorithm, stored in a computer-readable medium to be implemented by a processor, or some combination thereof.

[0116] In one configuration, the apparatus 1102, and in particular the baseband unit 1104, includes means for sending to a user equipment (UE) at least one scheduling grant scheduling a transmission on a first data channel and further scheduling a transmission on a second data channel; means for receiving from the UE a radio frequency (RF) exposure report associated with the transmission on the first data channel, the RF exposure report being received on the second data channel; and means for avoiding scheduling another transmission on the first data channel in at least a portion of at least one time slot when the RF exposure report is received.

[0117] In one aspect, the RF exposure report is a Medium Access Control Control Element (MAC-CE).

[0118] In one aspect, the RF exposure report includes an identifier of the power reduction amount for the first data channel and an identifier of the first beam.

[0119] In one aspect, the RF exposure report includes an identifier of the first data channel.

[0120] In one aspect, the RF exposure report includes an identifier of the power increase amount of the second data channel, and the apparatus 1102 and particularly the baseband unit 1104 further includes means for scheduling the second data channel in the next time slot based on the power increase amount of the second data channel.

[0121] In one aspect, the RF report includes a request for a second beam to be paired with the new beam, and the method further includes sending a scheduling grant to the UE to schedule the first PUSCH for the third beam.

[0122] In one aspect, the UE is scheduled to transmit an uplink control channel on a first data channel, and the apparatus 1102, and in particular the baseband unit 1104, further comprises means for receiving uplink control information on the first data channel.

[0123] In one aspect, the UE is scheduled to transmit an uplink control channel on a first data channel, and the apparatus 1102, and in particular the baseband unit 1104, further comprises means for receiving uplink control information on a second data channel.

[0124] The aforementioned means may be one or more of the aforementioned components of the apparatus 1102 configured to perform the functions recited by the aforementioned means. As described above, the apparatus 1102 may include the TX processor 316, the RX processor 370, and the controller / processor 375. Thus, in one configuration, the aforementioned means may be the TX processor 316, the RX processor 370, and the controller / processor 375 configured to perform the functions recited by the aforementioned means.

[0125] It should be understood that the specific order or hierarchy of each frame in the disclosed process / flow chart is an illustration of an example scheme. Based on design preferences, it should be understood that the specific order or hierarchy of each frame in the process / flow chart can be rearranged. In addition, some frames can be combined or omitted. The attached method claims present the elements of each frame in a sample order and are not meant to be limited to the specific order or hierarchy presented.

[0126] The previous description is provided to enable any person skilled in the art to practice the various aspects described herein. For those skilled in the art, various modifications to these aspects will be apparent, and the general principles defined herein can be applied to other aspects. Therefore, the present claim is not intended to be limited to the various aspects shown herein, but to conform to the full scope consistent with the language claim, wherein, unless otherwise specified, the singular reference element is not intended to represent "one and only one", but to represent "one or more". The word "exemplary" is used herein to represent "used as an example, instance, or explanation". Any aspect described as "exemplary" herein does not have to be interpreted as being superior to or advantageous to other aspects. Unless otherwise clearly stated, the term "some" refers to one or more. Such as "at least one of A, B, or C", "one or more of A, B, or C", "at least one of A, B, and C", "one or more of A, B, and C", and "A, B, C, or any combination thereof" include any combination of A, B, and / or C, and may include multiple A, multiple B, or multiple C. Specifically, phrases such as "at least one of A, B, or C," "one or more of A, B, or C," "at least one of A, B, and C," "one or more of A, B, and C," and "A, B, C, or any combination thereof" may be only A, only B, only C, A and B, A and C, B and C, or A and B and C, wherein any such combination may include one or more members of A, B, or C. All structural and functional equivalents of the elements throughout the various aspects described in this disclosure that are known or will be known to those of ordinary skill in the art are expressly incorporated herein by reference and are intended to be included by the claims. In addition, nothing disclosed herein is intended to be dedicated to the public, regardless of whether such disclosure is explicitly recited in the claims. The words "module," "mechanism," "element," "device," and the like may not replace the word "component." Therefore, unless a claim element is explicitly recited using the phrase "component for...", no claim element should be interpreted as a component plus function.

Claims

1. A method for wireless communication at a user equipment UE, comprising: receiving from a base station at least one scheduling grant that schedules transmission on a first data channel and further schedules transmission on a second data channel; When a radio frequency (RF) exposure event occurs, reducing the transmission power of the first data channel using the first beam; increasing the transmit power of the transmission using the second beam on the second data channel after the RF exposure event occurs; as well as transmitting an RF exposure report associated with at least one of the first data channel or the first beam to the base station using the second beam on the second data channel, wherein uplink control information is scheduled for uplink control information symbols of the first data channel, and wherein a transmit power of the uplink control information symbols for the first data channel is not reduced when the RF exposure event occurs.

2. The method according to claim 1, wherein the transmission power of the first data channel is reduced by a power variation amount, and wherein the transmission power of the second data channel is increased by the power variation amount.

3. The method of claim 2, wherein the power change amount is a total transmit power for the first data channel.

4. The method of claim 1, uplink control information scheduled on the first data channel is remapped to the second data channel. The method of claim 1 , wherein the RF exposure report is based on the reduction in transmit power for the first data channel. The method of claim 1 , wherein the RF exposure report is a Medium Access Control Element (MAC-CE). 7 . The method of claim 1 , wherein the RF exposure report includes an identifier of an amount of power reduction for the first data channel and an identifier of the first beam. The method of claim 1 , wherein the RF exposure report includes an identifier of the first data channel.

9. The method of claim 1, wherein the RF exposure report includes an identifier of an amount of power increase for the second data channel.

10. The method of claim 1, wherein the RF exposure report includes a request for a second beam to be paired with a new beam.

11. The method of claim 1, wherein the RF exposure report is sent to the base station using the second beam on the second data channel.

12. An apparatus for wireless communication at a user equipment UE, comprising: Memory; as well as at least one processor, coupled to the memory and configured to: receiving from a base station at least one scheduling grant that schedules transmission on a first data channel and further schedules transmission on a second data channel; When a radio frequency (RF) exposure event occurs, reducing the transmission power of the first data channel using the first beam; increasing the transmit power of the transmission using the second beam on the second data channel after the RF exposure event occurs; as well as sending an RF exposure report associated with at least one of the first data channel or the first beam to the base station, wherein uplink control information is scheduled for uplink control information symbols of the first data channel, and wherein in response to determining that the RF exposure event has occurred, a transmit power of the uplink control information symbols for the first data channel is not reduced.

13. The apparatus according to claim 12, wherein the transmission power of the first data channel is reduced by a power variation amount, and wherein the transmission power of the second data channel is increased by the power variation amount.

14. The apparatus of claim 13, wherein the power change amount is a total transmit power for the first data channel.

15. The apparatus of claim 12, uplink control information scheduled on the first data channel is remapped to the second data channel.

16. The apparatus of claim 12, wherein the RF exposure report is based on the reduction in transmit power for the first data channel.

17. The apparatus of claim 12, wherein the RF exposure report is a Medium Access Control Element (MAC-CE).

18. The apparatus of claim 12, wherein the RF exposure report comprises an identifier of a power reduction amount for the first data channel and an identifier for the first beam.

19. The apparatus of claim 12, wherein the RF exposure report comprises an identifier of the first data channel.

20. The apparatus of claim 12, wherein the RF exposure report includes an identifier of an amount of power increase for the second data channel.

21. The apparatus of claim 12, wherein the RF exposure report comprises a request for a second beam to be paired with a new beam.

22. A method for wireless communication at a base station, comprising: sending at least one scheduling grant to a user equipment UE scheduling transmission on a first data channel and further scheduling transmission on a second data channel; receiving, from the UE, a radio frequency (RF) exposure report associated with the transmission on the first data channel, the RF exposure report being received on the second data channel; as well as avoiding scheduling another transmission on the first data channel in at least a portion of at least one time slot when the RF exposure report is received, wherein, when an RF exposure event occurs, the transmit power of the transmission using the first beam on the first data channel is reduced, and wherein uplink control information is scheduled for uplink control information symbols for the first data channel, and wherein, when the RF exposure event occurs, the transmit power of the uplink control information symbols for the first data channel is not reduced.

23. The method of claim 22, wherein the RF exposure report is a Medium Access Control Element (MAC-CE).

24. The method of claim 22, wherein the RF exposure report includes an identifier of the power reduction amount of the first data channel and an identifier of the first beam.

25. The method of claim 22, wherein the RF exposure report includes an identifier of a power increase amount for the second data channel, and the method further comprises scheduling the second data channel in a next time slot based on the power increase amount for the second data channel.

26. An apparatus for wireless communication at a base station, comprising: Memory; as well as at least one processor, coupled to the memory and configured to: sending at least one scheduling grant to a user equipment UE scheduling transmission on a first data channel and further scheduling transmission on a second data channel; receiving, from the UE, a radio frequency (RF) exposure report associated with the transmission on the first data channel, the RF exposure report being received on the second data channel; as well as avoiding scheduling another transmission on the first data channel in at least a portion of at least one time slot when the RF exposure report is received, wherein, when an RF exposure event occurs, the transmit power of the transmission using the first beam on the first data channel is reduced, and wherein uplink control information is scheduled for uplink control information symbols for the first data channel, and wherein, when the RF exposure event occurs, the transmit power of the uplink control information symbols for the first data channel is not reduced.

27. The apparatus of claim 26, wherein the RF exposure report is a Medium Access Control Element (MAC-CE).

28. The apparatus of claim 26, wherein the RF exposure report comprises an identifier of a power increase amount for the second data channel, and the processor is further configured to schedule the second data channel in a next time slot based on the power increase amount for the second data channel.

29. A computer-readable medium having a program code recorded thereon, wherein the program code can be executed by one or more processors of a user equipment (UE) to enable the processors to perform the method according to any one of claims 1 to 11.

30. A computer-readable medium having program code recorded thereon, wherein the program code is executable by one or more processors of a base station to cause the processors to perform the method according to any one of claims 22-25.