A method for preparing H-type concrete pile

By using a combination design of molds and mold dismantling frames in the existing pipe pile factory, the problem of low in situ steaming efficiency in the preparation of H-type concrete piles is solved, and the efficient production of H-type concrete piles is achieved, reducing production costs.

CN115214015BActive Publication Date: 2024-11-26NINGBO YIZHONG CONCRETE PILE
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202211061004.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-01
Publication Date
2024-11-26
Estimated Expiration
2042-09-01

AI Technical Summary

Technical Problem

The existing H-type concrete pile mold preparation method needs to be fixed in the factory, resulting in low in situ steaming efficiency, long time, increased production costs, and cannot be used directly in the existing pipe pile factory, and additional factory buildings and foundations are required.

Method used

Using a combination of mold and mold dismantling frame, the existing pipe pile factory facilities are used to remove and lift the mold by pretensioning of the tensioning hydraulic cylinder and prestressed ribs, and the mold is dismantled and lifted directly in the existing steaming and cooking tank. , reduce the demand for factory renovation.

Benefits of technology

The steaming and breeding efficiency of H-type concrete piles is improved, the steaming time and cost is reduced, and the H-type concrete piles can be produced efficiently in the existing pipe pile factory, reducing investment costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115214015B_ABST
    Figure CN115214015B_ABST
Patent Text Reader

Abstract

The present invention relates to a preparation method of H-type concrete piles. The core point is the setting of a demolding frame. There is no need to cast a reaction wall on the floor of a factory building. The demolding frame can be prefabricated as a modular component and can be hoisted into the factory building, which is conducive to the reconstruction of the factory building. It is only necessary to open up a vacant space in the existing pipe pile factory building to place the demolding frame, and then the setting of prestressed tendons and stirrups, pre-tensioning of prestressed tendons, mold closing and demolding can be completed on the demolding frame. The connection between each step of the entire preparation process is very reasonable and efficient. The H-type concrete piles that have just been cast can be hoisted together with the mold to a steaming tank for curing, which can improve the steaming efficiency and reduce the steaming time. The preparation method can be used to produce H-type concrete piles directly on the basis of existing facilities and equipment such as existing pipe pile factories and steaming tanks, without having to carry out large-scale transformation of factories and foundations to achieve in-situ steaming, which greatly reduces costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pile foundation engineering of various building structure systems, and in particular relates to a manufacturing method for preparing H-type concrete piles. Background Art

[0002] According to the pile shape, the more common concrete prestressed piles include pipe piles, square piles, T-type piles, H-type piles, etc. Each type of pile has its own characteristics and can be selected for use according to different occasions and environments. Taking the H-type pile as an example, it includes two flanges and a web connecting the two flanges. The cross-section of the H-type concrete pile is an H-shape consisting of two flanges and a web connecting the two flanges. The two flanges and the web form a groove extending along the length of the pile body on both sides of the H-type concrete pile. Compared with concrete piles with round, square, T-shaped, or other cross-sectional shapes, H-type concrete piles are superior in terms of stability in resisting lateral earth pressure, water pressure, wave force, and overturning. Therefore, H-type concrete piles are suitable for foundation pit maintenance, slope stability, and riverbank protection projects.

[0003] For example, a Chinese invention patent "Mold for preparing H-type concrete piles" with application number CN201610197475.3 (publication number CN105643776A) discloses such a mold for preparing H-type concrete piles, including a left template, a right template and a lower template, the lower template is located between the left template and the right template; the left template and the right template are driven by a flipping drive mechanism to flip and can together with the lower template form a cavity matching the shape of the H-type concrete pile; it is characterized in that it also includes a left movable seat and a right movable seat located on the left and right sides of the lower template and can slide left and right, the left template is hinged on the left movable seat, and the right template is hinged on the right movable seat; the flipping drive mechanism includes a left flipping cylinder and a right flipping cylinder, wherein the left flipping cylinder is installed on the left movable seat and hinged with the left template, and the right flipping cylinder is installed on the right movable seat and hinged with the right template. This structure allows the left and right templates to not only be flipped by the flipping cylinder, but also to slide left and right synchronously with the flipping cylinder, which is convenient for demoulding when manufacturing H-type concrete piles with complex structures.

[0004] Since the mold for preparing H-type concrete piles is fixed in the factory and cannot be moved, the piles can only be steamed in situ when the mold is used to prepare the piles. Compared with the traditional steam curing in the steam curing pool, the steam curing efficiency of the in-situ steam curing is low, the steam curing takes a long time, and the production cost of the mold is greatly increased. The in-situ steam curing requires targeted transformation of the factory, and the existing pipe pile factory cannot be used directly, which means that it is necessary to build a new factory and foundation. The construction of the new factory and foundation requires huge costs, which greatly increases the capital investment of investors who originally have a pipe pile factory.

[0005] For this reason, the existing H-type supporting pile mold and manufacturing method can be further improved. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a preparation method of H-type concrete piles with a reasonably designed step process in view of the above-mentioned current technical status. The preparation method can directly utilize the existing facilities and equipment in the existing pipe pile factory to prepare the H-type concrete piles, without having to carry out large-scale transformation of the factory and foundation to achieve in-situ steaming, thereby greatly reducing costs.

[0007] The technical solution adopted by the present invention to solve the above technical problems is: a method for preparing an H-shaped concrete pile, characterized in that a mold and a demolding frame are required in production, the mold comprises two side molds, a bottom mold, a front fixed plate, a rear fixed plate, a tensioning plate, and a tensioning rod, and the two side molds are detachable from the bottom mold; the two ends of the demolding frame are respectively fixed with a front reaction wall panel and a rear reaction wall panel, and specifically comprises the following steps:

[0008] Step 1: Place the bottom template on the demolding frame, fix the front reaction wall panel and the front fixed plate, the front fixed plate is pressed against the front end surface of the bottom template, a tensioning plate is placed on the bottom template, one end of the tensioning rod is connected to the tensioning plate and passes through the rear fixed plate, the rear fixed plate is pressed against the rear end surface of the bottom template; a tensioning hydraulic cylinder is installed on the rear reaction wall panel, and the tensioning hydraulic cylinder is connected and fixed to the other end of the tensioning rod;

[0009] Step 2, longitudinally arranging prestressed tendons on the bottom formwork, wherein one end of the prestressed tendons is anchored on the front fixed plate, and the other end of the prestressed tendons is anchored on the tensioning plate;

[0010] Step 3, start the tensioning hydraulic cylinder to pre-tension the prestressed tendons, and then arrange a number of stirrups on the prestressed tendons at intervals and tie them to the prestressed tendons;

[0011] Step 4: Close and secure the two side templates and the bottom template placed on the demolding frame together.

[0012] Step 5: Use the first locking nut to lock the tension rod on the rear fixing plate, so that the front fixing plate abuts against the front end surfaces of the side template and the bottom template, and the rear fixing plate abuts against the rear end surfaces of the side template and the bottom template;

[0013] Step 6: Separate the tensioning hydraulic cylinder from the tensioning rod, and remove the connection between the front reaction wall panel and the front fixed plate;

[0014] Step 7: hoist the mold with prestressed tendons, stirrups, tensioning plates, tensioning rods, front fixed plates and rear fixed plates to the feeding area as a whole, use the tensioning hydraulic cylinder to perform secondary tensioning on the prestressed tendons, and after tensioning in place, rotate the first locking nut to lock the tensioning rod on the rear fixed plate, and then start feeding;

[0015] Step 8: After feeding and vibrating to make it dense, the mold is hoisted as a whole to the curing tank for steaming. After the steaming is completed, the mold and the H-shaped concrete pile are hoisted as a whole to the demolding frame;

[0016] Step 9. Loosen the first locking nut to release the tension, thereby removing the retraction force of the prestressed tendons on the front fixed plate and the rear fixed plate, cut off the prestressed tendons that leak out of the end of the H-shaped concrete pile, release the connection between the side formwork and the bottom formwork, and then pull the side formwork to the left and right sides to separate the side formwork from the bottom formwork, and finally lift the H-shaped concrete pile out of the mold and transport it away.

[0017] Preferably, the front reaction wall panel is fixed to the front fixing plate by a plurality of screws.

[0018] In order to facilitate the fixing of the side formwork and the bottom formwork, the outer bottom of the side formwork has an outwardly extending mounting wall, and the bolt structure can fix the mounting wall and the bottom formwork together. During installation, the top surface of the mounting wall and the bottom formwork fit together, which is conducive to the bolt structure fixing the mounting wall and the bottom formwork together, and the plane contact can make the connection between the side formwork and the bottom formwork more stable and reliable.

[0019] Further improvement, the bolt structure includes bolts and clamping nuts; the bolts are hinged to the bottom template, and the top surface of the bottom template and the side of the mounting wall are provided with a bayonet for the rod of the bolt to be inserted, the bolt is swung upward to be inserted into the bayonet, the clamping nut is threadedly connected to the bolt, and then all the clamping nuts are tightened with a jackhammer to achieve the fixation of the side template and the bottom template. This structure is convenient for fixing the side template and the bottom template together. When fixing, it is only necessary to swing the bolt upward so that the rod of the bolt is inserted into the bayonet on the bottom template and the mounting wall, and then the top surface of the bottom template and the mounting wall are fixed together by the clamping nut threadedly connected to the bolt. In addition, the bolts are always hinged to the bottom template to ensure that the bolts will not be lost, and there is no need to look for bolts everywhere to lock, and the locking operation is faster.

[0020] As a further improvement, the step 4 also includes locking the tops of the two side templates together by multiple locking screws. This structure enables the two side templates to be better positioned and stabilized relative to the bottom template, and a more reliable mold assembly is formed between the bottom templates, with better integrity. When the two ends of the mold are subjected to a large tensile force, the two side templates and the bottom template are not easily deformed.

[0021] As a preferred setting, a plurality of ear seats are fixed on the top of the side template and are arranged at intervals along the length direction of the side template. The ear seats on the two side templates are arranged correspondingly on the left and right. The ear seats are provided with notches with the opening facing upward. The two ends of the locking screw are stuck in the notches and are pressed against the outer ends of the ear seats by the second locking nut threadedly connected to the locking screw. The setting of the ear seats facilitates the connection and locking between the locking screw and the side template.

[0022] Preferably, the pre-tensioning force in step 3 is 15-25 KN, and the best is 20 KN.

[0023] As an improvement, the secondary tensioning in step 7 above tensions the prestressed tendons to 60-80% of the tensile strength of the prestressed tendons, preferably 70%.

[0024] As an option, the above-mentioned prestressed tendons are steel rods or steel strands. The steel rods and steel strands have different anchoring methods. The steel rods are anchored by using the pre-8-shaped holes in the pier head, while the steel strands are anchored by using clips. Multiple demoulding cylinders are installed on both sides of the demoulding frame, and each demoulding cylinder on the demoulding frame can be detachably connected to the side template on the corresponding side. The setting of the demoulding cylinder is convenient for driving the side template to move to achieve demoulding and mold closing, and the demoulding cylinder is detachably connected to the side template on the corresponding side, which is convenient for detaching the entire mold from the demoulding frame, which is conducive to lifting and steaming.

[0025] As an improvement, it also includes a driving plate, the cylinder rod of the demoulding cylinder is connected to the driving plate, a guide rod is provided at the bottom of the driving plate, a guide hole for the guide rod to guide is opened on the side wall of the demoulding frame, a connecting rod is fixed to the upper part of the driving plate, and the connecting rod is hinged to the connecting ear on the outer wall of the side formwork. The synchronous action of each cylinder, combined with the guiding effect of the guide rod and the guide hole, can better ensure the horizontal movement of the side formwork. During the lateral movement of the side formwork, after the concrete pile is moved out after being formed, there will be a tendency to evert. If the cylinder rod is directly hinged to the side formwork, the force of the evertation of the side formwork will directly act on the cylinder rod, which is easy to damage the demoulding cylinder. The cylinder rod in this structure is connected to the side formwork through the driving plate and the connecting rod. The cylinder rod is not directly connected to the side formwork. The force of the evertation of the side formwork acts on the connecting rod, thereby playing a role in protecting the demoulding cylinder.

[0026] Preferably, the inner wall of the side formwork is fixed with an insert, which is independently set. By selecting inserts of different lengths to make H-shaped concrete piles of different lengths, the inserts are used to form the grooves on both sides of the H-shaped concrete piles; the inner wall of the side formwork corresponding to the tensioning movement range of the tensioning plate is a plane. The specific structure is that the front end of the insert fits the front fixed plate, the rear end of the insert is spaced from the rear fixed plate, and the tensioning plate is located between the rear end of the insert and the rear fixed plate. Since the inner wall of the side formwork at this position is a plane, the tensioning plate can be a rectangular plate instead of an H-shaped plate, which is more conducive to the production of the tensioning plate.

[0027] Compared with the prior art, the advantages of the present invention are: the core point of the preparation method lies in the setting of the demolding frame, which is mainly used to place the mold body. In addition, front and rear reaction walls can be set on it. There is no need to cast reaction walls on the factory floor. The demolding frame, as a modular component, can be prepared outside first and then hoisted into the factory, which is conducive to factory reconstruction. It is only necessary to open up a vacant space in the existing pipe pile factory to place the demolding frame, and then the setting of prestressed tendons and stirrups, pre-tensioning of prestressed tendons, mold closing and demolding can be completed on the demolding frame. After the prestressed tendons and stirrups are set, the mold can be closed, and the mold with prestressed tendons, stirrups, tensioning plates, tensioning rods, front fixed plates and rear fixed plates can be hoisted as a whole to the feeding lane, and the prestressed tendons are tensioned and fed for the second time using a tensioning hydraulic cylinder. After the feeding and vibration are completed, the mold is hoisted to the curing pool for steaming. After the steaming is completed, the mold and the H-type concrete pile are hoisted as a whole to the demolding frame for demolding and lifting out the H-type concrete pile. Finally, the mold is cleaned, and the above steps can be repeated to prepare the next H-type concrete pile. The connection between each step of the entire preparation process is very reasonable and efficient. The H-type concrete piles that have just been cast can be lifted together with the mold to the steam-curing tank for curing, which can improve the steam-curing efficiency and reduce the steam-curing time. The preparation method can be used to produce H-type concrete piles directly on the basis of existing facilities and equipment such as existing pipe pile factories and steam-curing tanks, without having to carry out large-scale modifications to the factory buildings and foundations to achieve in-situ steam-curing, greatly reducing costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 Schematic diagram of the three-dimensional structure of the mold in the embodiment of the present invention Figure 1 ;

[0029] Figure 2 Schematic diagram of the three-dimensional structure of the mold in the embodiment of the present invention Figure 2 ;

[0030] Figure 3 This is a front view (initial state) of the mold after the mold frame is removed in the embodiment of the present invention;

[0031] Figure 4 It is a top view of the mold in the embodiment of the present invention after the mold frame is removed;

[0032] Figure 5 It is a cross-sectional view along the left-right direction of the mold after the mold frame is removed in the embodiment of the present invention. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below with reference to the accompanying drawings.

[0034] like Figures 1 to 5 FIG. 1 is a first embodiment of the present invention.

[0035] A method for preparing an H-shaped concrete pile, which requires the use of a mold and a demolding frame 9 during production. The mold includes two side templates 1, a bottom template 2, a front fixed plate 3, a rear fixed plate 4, a tensioning plate 5, and a tensioning rod 6. The two side templates 1 are detachable from the bottom template 2; an inlay 18 is fixed to the inner wall of the side template 1, and the inner wall of the side template 1 corresponding to the tensioning movement range of the tensioning plate 5 is a plane. The specific structure is that the front end of the inlay 18 is in contact with the front fixed plate 3, the rear end of the inlay 18 is spaced from the rear fixed plate 4, and the tensioning plate 5 is located between the rear end of the inlay 18 and the rear fixed plate 4. The inner wall of the side template 1 at this position is a plane, which makes the tensioning plate 5 a rectangular plate instead of an H-shaped plate, which is more conducive to the production of the tensioning plate 5. The front reaction wall panel 91 and the rear reaction wall panel 92 are fixed to the two ends of the demolding frame 9, respectively, and specifically includes the following steps:

[0036] Step 1, place the bottom template 2 on the demolding frame 9, fix the front reaction wall panel 91 to the front fixed plate 3, and the front reaction wall panel 91 is fixed to the front fixed plate 3 through four screws 93. The front fixed plate 3 is pressed against the front end face of the bottom template 2, and a tensioning plate 5 is placed on the bottom template 2. One end of the tensioning rod 6 is connected to the tensioning plate 5 and passes through the rear fixed plate 4, and the rear fixed plate 4 is pressed against the rear end face of the bottom template 2; a tensioning hydraulic cylinder is installed on the rear reaction wall panel 92, and the tensioning hydraulic cylinder is connected and fixed to the other end of the tensioning rod 6; a plurality of demolding oil cylinders 12 are installed on both sides of the demolding frame 9, and each demolding oil cylinder 12 on the demolding frame 9 is detachably connected to the side template 1 on the corresponding side. It also includes a driving plate 13, the cylinder rod of the demoulding cylinder 12 is connected to the driving plate 13, a guide rod 14 is provided at the bottom of the driving plate 13, a guide hole for guiding the guide rod 14 is opened on the side wall of the demoulding frame 9, a connecting rod 15 is fixed to the upper part of the driving plate 13, and the connecting rod 15 is hinged to the connecting ear 16 on the outer wall of the side template 1.

[0037] Step 2: Arrange prestressed tendons longitudinally on the bottom template 2. The prestressed tendons are steel bars or steel strands. One end of the prestressed tendons is anchored on the front fixing plate 3, and the other end of the prestressed tendons is anchored on the tensioning plate 5. The tensioning plate 5 and the front fixing plate 3 are both provided with through holes for the prestressed tendons to pass through. This method is suitable for anchoring steel bars used as prestressed tendons. The front fixing plate 3 and the tensioning plate 5 are provided with sleeves for anchoring prestressed tendons. This method is suitable for anchoring steel strands used as prestressed tendons.

[0038] Step 3: Start the tensioning hydraulic cylinder to pre-tension the prestressed tendons, then set a number of stirrups on the prestressed tendons at intervals and tie them together; the pre-tensioning force is 15 to 25 KN.

[0039] Step 4, close and fix the two side templates 1 and bottom template 2 placed on the demolding frame 9. The outer bottom of the side template 1 has an outwardly extending mounting wall 11, and the mounting wall and the bottom template 2 can be fixed together by a bolt structure 7. The bolt structure 7 includes a bolt 71 and a clamping nut 72; the bolt 71 is hinged to the bottom template 2, and the top surface of the bottom template 2 and the side of the mounting wall 11 are provided with a bayonet 73 for the rod of the bolt 71 to be inserted, the bolt 71 is swung upward and inserted into the bayonet 73, and the clamping nut 72 is threadedly connected to the bolt 71, and then all the clamping nuts 72 are tightened with a jackhammer to fix the side template 1 and the bottom template 2.

[0040] Step 4 also includes locking the tops of the two side templates 1 together through a plurality of locking screws 8. A plurality of ear seats 19 are fixed to the top of the side template 1 and are arranged at intervals along the length direction of the side template 1. The ear seats 19 on the two side templates 1 are arranged correspondingly on the left and right. The ear seats 19 are provided with notches 191 with the opening facing upward. The two ends of the locking screw 8 are stuck in the notches 191 and are pressed against the outer ends of the ear seats 19 by the second locking nuts 81 threadedly connected to the locking screw 8.

[0041] Step 5: Use the first locking nut 61 to lock the tension rod 6 on the rear fixing plate 4, so that the front fixing plate 3 abuts against the front end surfaces of the side template 1 and the bottom template 2, and the rear fixing plate 4 abuts against the rear end surfaces of the side template 1 and the bottom template 2;

[0042] Step 6, separate the tensioning hydraulic cylinder from the tensioning rod 6, and remove the connection between the front reaction wall plate 91 and the front fixed plate 3; specifically, remove the connecting nut between the output shaft 10 of the tensioning hydraulic cylinder and the tensioning rod 6 to separate the two.

[0043] Step 7: hoist the mold with prestressed tendons, stirrups, tensioning plates 5, tensioning rods 6, front fixing plates 3 and rear fixing plates 4 to the feeding area, and use tensioning hydraulic cylinders to perform secondary tensioning on the prestressed tendons to 70% of the tensile strength of the prestressed tendons. After tensioning in place, rotate the first locking nut 61 to lock the tensioning rod 6 on the rear fixing plate 4, and then start feeding;

[0044] Step 8, after feeding and vibrating to make it dense, the mold is hoisted as a whole to the curing tank for steaming. After the steaming is completed, the mold and the H-shaped concrete pile are hoisted as a whole to the demolding frame 9;

[0045] Step 9, loosen the first locking nut 61 to release the tension, thereby removing the retraction force of the prestressed tendons on the front fixed plate 3 and the rear fixed plate 4, cut off the prestressed tendons that leak out of the ends of the H-shaped concrete pile, release the connection between the side formwork 1 and the bottom formwork 2, and then pull the side formwork 1 to the left and right sides to separate the side formwork 1 from the bottom formwork 2, and finally lift the H-shaped concrete pile out of the mold and transport it away.

[0046] The core point of this preparation method lies in the setting of the dismantling formwork frame 9. The dismantling formwork frame 9 is mainly used to place the mold body. In addition, the front reaction wall panel 91 and the rear reaction wall panel 92 can be set thereon. There is no need to cast an additional reaction wall on the factory floor. The dismantling formwork frame 9, as a modular component, can be prepared outside first and then hoisted into the factory, which is conducive to the reconstruction of the factory. It is only necessary to open up a vacant space in the existing pipe pile factory to place the demolding frame 9, and the setting of the prestressed tendons and stirrups, the prestressing of the prestressed tendons, the mold closing and the demolding can be completed on the demolding frame 9. After the prestressed tendons and stirrups are set, the mold is closed, and the mold with the prestressed tendons, stirrups, tensioning plates 5, tensioning rods 6, front fixed plates 3 and rear fixed plates 4 can be hoisted as a whole to the feeding lane, and the prestressed tendons are tensioned and fed by a tensioning hydraulic cylinder. After the feeding and vibration are compacted, the mold is hoisted to the curing tank for steaming. After the steaming is completed, the mold and the H-type concrete pile are hoisted as a whole to the demolding frame for demolding and lifting out the H-type concrete pile. Finally, the mold is cleaned, and the above steps can be repeated to prepare the next H-type concrete pile. The connection between each step of the entire preparation process is very reasonable and efficient. The H-type concrete piles that have just been cast can be lifted together with the mold to the steam-curing tank for curing, which can improve the steam-curing efficiency and reduce the steam-curing time. The preparation method can be used to produce H-type concrete piles directly on the basis of existing facilities and equipment such as existing pipe pile factories and steam-curing tanks, without having to carry out large-scale modifications to the factory buildings and foundations to achieve in-situ steam-curing, greatly reducing costs.

[0047] It should be noted that in the description of this embodiment, the terms "front, back", "left, right", "inside, outside", "upper, lower" and the like indicating directions or positional relationships are all based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. The terms "install", "connect", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

Claims

1. A method for preparing an H-shaped concrete pile, characterized in that: During production, a mold and a demolding frame (9) are required. The mold comprises two side molds (1), a bottom mold (2), a front fixing plate (3), a rear fixing plate (4), a tensioning plate (5), and a tensioning rod (6). The two side molds (1) and the bottom mold (2) are detachable. The two ends of the demolding frame (9) are respectively fixed with a front reaction wall panel (91) and a rear reaction wall panel (92). Specifically, the following steps are included: Step 1, place the bottom template (2) on the demolding frame (9), fix the front reaction wall panel (91) and the front fixed plate (3), the front fixed plate (3) is pressed against the front end surface of the bottom template (2), and a tensioning plate (5) is placed on the bottom template (2), one end of the tensioning rod (6) is connected to the tensioning plate (5) and passes through the rear fixed plate (4), and the rear fixed plate (4) is pressed against the rear end surface of the bottom template (2); a tensioning hydraulic cylinder is installed on the rear reaction wall panel (92), and the tensioning hydraulic cylinder is connected and fixed to the other end of the tensioning rod (6); Step 2, longitudinally arranging prestressed tendons on the bottom template (2), wherein one end of the prestressed tendons is anchored on the front fixed plate (3), and the other end of the prestressed tendons is anchored on the tensioning plate (5); Step 3, start the tensioning hydraulic cylinder to pre-tension the prestressed tendons, and then arrange a number of stirrups on the prestressed tendons at intervals and tie them to the prestressed tendons; Step 4: close and fix the two side templates (1) and the bottom template (2) placed on the demolding frame (9); Step 5: Use the first locking nut (61) to lock the tension rod (6) on the rear fixing plate (4), so that the front fixing plate (3) abuts against the front end surfaces of the side template (1) and the bottom template (2), and the rear fixing plate (4) abuts against the rear end surfaces of the side template (1) and the bottom template (2); Step 6: Separate the tensioning hydraulic cylinder from the tensioning rod (6), and remove the connection between the front reaction wall plate (91) and the front fixed plate (3); Step 7, hoist the mold with prestressed tendons, stirrups, tensioning plates (5), tensioning rods (6), front fixed plates (3) and rear fixed plates (4) to the feeding area as a whole, use a tensioning hydraulic cylinder to perform secondary tensioning on the prestressed tendons, and after tensioning in place, rotate the first locking nut (61) to lock the tensioning rod (6) on the rear fixed plate (4), and then start feeding; Step 8, after feeding and vibrating to make it dense, the mold is hoisted as a whole to the curing tank for steam curing. After the steam curing is completed, the mold and the H-shaped concrete pile are hoisted as a whole to the demolding frame (9); Step 9, loosen the first locking nut (61) to release the tension, thereby removing the retraction force of the prestressed tendons on the front fixing plate (3) and the rear fixing plate (4), cutting off the prestressed tendons leaking out of the ends of the H-shaped concrete pile, releasing the connection between the side formwork (1) and the bottom formwork (2), and then pulling the side formwork (1) to the left and right sides to separate the side formwork (1) from the bottom formwork (2), and finally lifting the H-shaped concrete pile out of the mold and transporting it away; The prestressed tendons are steel bars or steel strands; a plurality of demoulding cylinders (12) are installed on both sides of the demoulding frame (9); each demoulding cylinder (12) on the demoulding frame (9) is detachably connected to the side template (1) on the corresponding side; and a driving plate (13) is also included, wherein the cylinder rod of the demoulding cylinder (12) is connected to the driving plate (13); a guide rod (14) is provided at the bottom of the driving plate (13); a guide hole for guiding the guide rod (14) is opened on the side wall of the demoulding frame (9); a connecting rod (15) is fixed on the upper part of the driving plate (13); and the connecting rod (15) is hinged to a connecting ear (16) on the outer wall of the side template (1).

2. The method for preparing an H-shaped concrete pile according to claim 1, characterized in that: The front reaction wall plate (91) is fixed to the front fixing plate (3) via a plurality of screw rods (93).

3. The method for preparing an H-shaped concrete pile according to claim 1, characterized in that: The outer bottom of the side template (1) has an outwardly extending mounting wall (11), and the mounting wall and the bottom template (2) can be fixed together by a bolt structure (7).

4. The method for preparing an H-shaped concrete pile according to claim 3, characterized in that: The bolt structure (7) comprises a bolt (71) and a clamping nut (72); the bolt (71) is hinged to the bottom template (2); the top surface of the bottom template (2) and the side of the mounting wall (11) are provided with a slot (73) for the rod of the bolt (71) to be inserted into; the bolt (71) is swung upward to be inserted into the slot (73); the clamping nut (72) is threadedly connected to the bolt (71); and then all the clamping nuts (72) are tightened with a jackhammer to achieve the fixation of the side template (1) and the bottom template (2).

5. The method for preparing an H-shaped concrete pile according to claim 1, characterized in that: The step 4 also includes locking the tops of the two side mold plates (1) together using a plurality of locking screws (8).

6. The method for preparing an H-shaped concrete pile according to claim 5, characterized in that: A plurality of ear seats (19) are fixed to the top of the side template (1) and are arranged at intervals along the length direction of the side template (1). The ear seats (19) on the two side templates (1) are arranged correspondingly on the left and right. The ear seats (19) are provided with notches (191) with the opening facing upward. The two ends of the locking screw (8) are clamped in the notches (191) and are pressed against the outer ends of the ear seats (19) by a second locking nut (81) threadedly connected to the locking screw (8).

7. The method for preparing an H-shaped concrete pile according to claim 1, characterized in that: The pre-tensioning force in step 3 is 15 to 25 KN.

8. The method for preparing an H-shaped concrete pile according to claim 1, characterized in that: The secondary tensioning in step 7 tensions the prestressed tendons to 60-80% of the tensile strength of the prestressed tendons.

Citation Information

Patent Citations

  • Mould for preparing H-shaped concrete pile

    CN105643776A

  • Method for producing precast concrete piles

    CN102398305A

  • Full-automatic assembly machine of tongue-and-groove combining bolt of tubular pile steel mold

    CN107344287A

  • Tubular pile mould closing mechanism

    CN108638321A

  • Manufacturing mold of supporting pile and method for manufacturing supporting pile

    CN112873527A