Flexible indication of the start position of a data channel
By managing control information in a wireless communication network to indicate the starting position of the data channel, the problem of overlapping resources of the DL control channel and data channel is solved, resource allocation efficiency is improved and interference is controlled, and efficient radio transmission is achieved.
Patent Information
- Application Number
- CN202211100281.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2016-07-21
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2036-07-21
AI Technical Summary
In wireless communication networks, there may be overlap between the radio resources of the DL control channel and the DL data channel, resulting in low resource allocation efficiency. Especially in LTE technology, it is difficult to effectively avoid overlap when PDSCH resource allocation is performed at PRB granularity.
By managing control information at nodes of the wireless communication network, indicating the start position of the data channel, overlaid with the DL control channel, the transmission parameters are adjusted according to potential interference to ensure effective resource allocation.
Effectively coordinate resource allocation of PDCCH and PDSCH, avoid resource conflicts, improve the efficiency of radio transmission, and tolerate certain overlaps when necessary to maintain interference at an acceptable level.
Smart Images

Figure CN115664606B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method of controlling radio transmissions in a wireless communication network and to corresponding devices and systems. Background Art
[0002] In wireless communication networks, it is known to define a data channel for conveying user plane data and a control channel for conveying control information, in particular control information transmitted on the control data channel, such as resource allocation information. For example, in LTE (Long Term Evolution) technology as defined by 3GPP (Third Generation Partnership Project), a DL (Downlink) control channel called PDCCH (Physical DL Control Channel) is used to convey DL control information to the UE (User Equipment). The DL control information may, for example, include a DL assignment indicating the radio resources of a DL data channel called PDSCH (Physical DL Shared Channel) assigned to the UE for DL transmission of data. The DL control information may, for example, include a UL (Uplink) grant indicating the radio resources of a UL data channel called PUSCH (Physical UL Shared Channel) assigned to the UE for UL transmission of data. The PDCCH provides dedicated radio resources for each UE and is transmitted in the first (one, two, three or four) OFDM (Orthogonal Frequency Division Multiplexing) symbols of a subframe, also referred to as the "control region". The PDSCH starts after the control region.
[0003] In the 3GPP contribution "Remaining details for the PDSCH starting symbol in TM10" by Huawei and HiSilicon (document R1-124696, 3GPP TSG RAN WG1 Meeting #71, New Orleans, USA, November 12-16, 2012), it is suggested that PDSCH can start at symbol 0, the first OFDM symbol of the subframe, and the use of this early starting position can be indicated to the UE through RRC (Radio Resource Control) signaling.
[0004] If only a single PDCCH (for one UE) is transmitted in the first (one or more) OFDM symbols, and this PDCCH schedules a PDSCH transmission for this UE, the PDSCH transmission for this UE can therefore start in the first OFDM symbol of the subframe. Since the UE decodes the PDCCH and therefore knows its time-frequency position, and according to the scheduling information contained in the PDCCH, the UE knows the area of the time-frequency grid containing the PDSCH transmission, such resource allocation is no problem. If this area overlaps (partially) with the PDCCH, the UE is aware of this and can infer that the radio resources actually used for the PDSCH transmission correspond to the area indicated by the scheduling information, minus the overlapping PDCCH resources. Further, if another PDCCH (for another UE) is transmitted on radio resources that do not overlap with the area of the time-frequency grid containing the PDSCH transmission, no problem should be expected. However, in some cases, avoiding such overlap can be difficult or inefficient, especially when taking into account that the allocation of PDSCH radio resources is performed at a granularity of one PRB (physical resource block) in LTE technology.
[0005] Therefore, there is a need for a technique that allows efficient control of radio transmission for a potential overlapping situation of radio resources used for transmission of a DL control channel and radio resources used for transmission of a DL data channel. Summary of the invention
[0006] According to an embodiment of the present invention, a method for controlling radio transmission in a wireless communication network is provided. According to the method, a node of the wireless communication network manages the sending of control information to a radio device. For a first frequency band, the control information indicates a first starting position for transmission of a data channel. For a second frequency band, the control information indicates a second starting position for transmission of the data channel. Based on the first starting position and the second starting position, the node controls the transmission of data on the data channel.
[0007] According to a further embodiment of the present invention, a method for controlling radio transmission in a wireless communication network is provided. According to the method, a node of the wireless communication network determines potential interference for a data channel for a radio device and a DL control channel for another radio device. Depending on the potential interference, the node determines a starting position of the data channel. Further, the node manages the sending of control information to the radio device. The control information indicates the starting position of the data channel. Based on the starting position, the node controls the transmission of data on the data channel.
[0008] According to another embodiment of the present invention, a method for controlling radio transmission in a wireless communication network is provided. According to the method, a radio device receives control information from the wireless communication network. For a first frequency band, the control information indicates a first starting position for transmission of a data channel. For a second frequency band, the control information indicates a second starting position for transmission of the data channel. Based on the first starting position and the second starting position, the radio device receives data on the data channel.
[0009] According to another embodiment of the present invention, a node for a wireless communication network is provided. The node is configured to manage the transmission of control information to a radio device. For a first frequency band, the control information indicates a first starting position for transmission of a data channel. For a second frequency band, the control information indicates a second starting position for transmission of a data channel. Further, the node is configured to control the transmission of data based on the first starting position and the second starting position.
[0010] According to another embodiment of the present invention, a node for a wireless communication network is provided. The node is configured to determine potential interference for a data channel for a radio device and a DL control channel for another radio device. Further, the node is configured to determine a starting position of the data channel depending on the potential interference. Further, the node is configured to manage the sending of control information to the radio device. The control information indicates the starting position of the data channel. Further, the node is configured to control the transmission of data on the data channel based on the starting position.
[0011] According to another embodiment of the present invention, a radio device is provided. The radio device is configured to receive control information from a wireless communication network. For a first frequency band, the control information indicates a first starting position for transmission of a data channel. For a second frequency band, the control information indicates a second starting position for transmission of the data channel. Further, the radio device is configured to control reception of data on the data channel based on the first starting position and the second starting position.
[0012] According to another embodiment of the present invention, a system for a wireless communication network is provided. The system includes a node and a radio device of the wireless communication network. The node is configured to manage the transmission of control information to the radio device. For a first frequency band, the control information indicates a first starting position for transmission of a data channel. For a second frequency band, the control information indicates a second starting position for transmission of the data channel. The radio device is configured to receive the control information and control the reception of data on the data channel based on the first starting position and the second starting position.
[0013] According to another embodiment of the present invention, a system for a wireless communication network is provided. The system includes a node and a radio device of the wireless communication network. The node is configured to determine potential interference for a data channel for the radio device and a DL control channel for another radio device. Further, the node is configured to determine a starting position of the data channel depending on the potential interference. Further, the node is configured to manage the sending of control information to the radio device. The control information indicates the starting position of the data channel. The radio device is configured to control the reception of data on the data channel based on the starting position.
[0014] According to another embodiment of the present invention, a computer program or computer program product is provided in the form of, for example, a non-transitory storage medium, the non-transitory storage medium comprising program code to be executed by at least one processor of a node of a wireless communication network. The execution of the program code causes the node to manage the sending of control information to a radio device. For a first frequency band, the control information indicates a first starting position for transmission of a data channel. For a second frequency band, the control information indicates a second starting position for transmission of a data channel. Further, the execution of the program code causes the node to control the transmission of data based on the first starting position and the second starting position.
[0015] According to another embodiment of the present invention, a computer program or computer program product is provided in the form of, for example, a non-transitory storage medium, the non-transitory storage medium comprising program code to be executed by at least one processor of a node of a wireless communication network. The execution of the program code causes the node to determine potential interference of a data channel for a radio device and a DL control channel for another radio device. Further, the execution of the program code causes the node to determine a starting position of the data channel depending on the potential interference. Further, the execution of the program code causes the node to manage the sending of control information to the radio device. The control information indicates the starting position of the data channel. Further, the execution of the program code causes the node to control the transmission of data on the data channel based on the starting position.
[0016] According to another embodiment of the present invention, a computer program or computer program product is provided in the form of, for example, a non-transitory storage medium, the non-transitory storage medium comprising program code to be executed by at least one processor of a radio device. The execution of the program code causes the radio device to receive control information from a wireless communication network. For a first frequency band, the control information indicates a first starting position for transmission of a data channel. For a second frequency band, the control information indicates a second starting position for transmission of a data channel. Further, the execution of the program code causes the radio device to control the reception of data on the data channel based on the first starting position and the second starting position.
[0017] Details of such and further embodiments will be apparent from the following detailed description of the embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A situation in which a radio transmission is controlled according to an embodiment of the invention is schematically illustrated.
[0019] Figure 2 An exemplary resource allocation in which a DL control channel and a data channel are configured according to an embodiment of the present invention is illustrated.
[0020] Figure 3 A further exemplary resource allocation in which a DL control channel and a data channel are configured according to an embodiment of the present invention is illustrated.
[0021] Figure 4 A further exemplary resource allocation in which a DL control channel and a data channel are configured according to an embodiment of the present invention is illustrated.
[0022] Figure 5 A further exemplary resource allocation in which a DL control channel and a data channel are configured according to an embodiment of the present invention is illustrated.
[0023] Figure 6 A further exemplary resource allocation in which a DL control channel and a data channel are configured according to an embodiment of the present invention is illustrated.
[0024] Figure 7 A further exemplary resource allocation in which a DL control channel and a data channel are configured according to an embodiment of the present invention is illustrated.
[0025] Figure 8 A further exemplary resource allocation in which a DL control channel and a data channel are configured according to an embodiment of the present invention is illustrated.
[0026] Fig. 9 A further exemplary resource allocation in which a DL control channel and a data channel are configured according to an embodiment of the present invention is illustrated.
[0027] Fig.10 Shown is a flow chart for schematically illustrating a method performed by a network node according to an embodiment of the present invention.
[0028] Fig.11 Shown is a block diagram illustrating the functionality of a network node according to an embodiment of the present invention.
[0029] Fig.12 Shown is a flow chart for schematically illustrating a further method performed by a network node according to an embodiment of the present invention.
[0030] Fig.13 Shown is a block diagram illustrating the functionality of a network node according to an embodiment of the present invention.
[0031] Fig.14 A flow chart for schematically illustrating a method performed by a radio device according to an embodiment of the present invention is shown.
[0032] Fig.15 Shown is a block diagram illustrating the functionality of a radio device according to an embodiment of the present invention.
[0033] Fig.16 The structure of a network node according to an embodiment of the present invention is schematically illustrated.
[0034] Fig.17 The structure of a radio device according to an embodiment of the present invention is schematically shown. DETAILED DESCRIPTION
[0035] In the following, the concept of an exemplary embodiment of the present invention will be explained in detail with reference to the accompanying drawings. The illustrated embodiment relates to the control of radio transmission in a wireless communication network. The wireless communication network may be based on various radio access technologies, for example, 4G (fourth generation) radio access technologies such as LTE technology, or 5G (fifth generation) radio access technologies such as the evolution of LTE technology as one pillar and new radio access technologies (sometimes also referred to as "new air interface (NR)" radio access technologies) as another pillar. In the illustrated concept, it is assumed that the control of radio transmission from the network side is completed by transmitting DL control information to the radio device on a DL control channel. In the example illustrated below, without loss of generality, this DL control channel will be referred to as PDCCH (physical DL control channel). Data transmission is performed on a data channel. In the example illustrated below, without loss of generality, this data channel will be referred to as PDCH (physical data channel). In the example illustrated below, without loss of generality, the radio device will also be referred to as user equipment (UE). It is to be understood that such a radio device may be any handheld device capable of wireless communication, such as a cellular phone, a tablet computer, a modem, a Universal Serial Bus (USB) dongle, a laptop computer, or the like.
[0036] Radio transmission is assumed to be performed on radio resources organized in a time-frequency grid. The time-frequency grid defines resource elements, each of which is identified by a corresponding time position and a frequency position. The frequency position may correspond to different carrier frequencies arranged according to a predefined frequency grid, and the time position may correspond to a time slot arranged according to a predefined time grid. The radio transmission may, for example, be based on OFDM, the carrier frequency may correspond to an OFDM subcarrier, and the time slot may correspond to an OFDM symbol. However, other types of multiplexing schemes can also be utilized, for example, schemes based on FBMC (filter bank multicarrier) or precoded multicarrier schemes, such as DFTS-OFDM (discrete Fourier transform single carrier OFDM), SC-FDMA (single carrier frequency division multiple access) or precoded FBMC.
[0037] In the terminology used below, it will be assumed that for each UE, there is a corresponding PDCCH and a corresponding PDCH, and that the PDCCH is used to control data transmission by the UE on the PDCH, for example, by sending scheduling information indicating the allocation of radio resources for the PDCH. It is assumed that the PDCCH is transmitted in the initial (one or more) modulation symbols of a subframe or another type of time interval that defines the time domain granularity for transmitting control information and / or data to the UE. When utilizing LTE radio access technology, the PDCH may correspond to a PDSCH or a portion thereof (e.g., the radio resources of the PDSCH allocated to a given UE). Note that for completeness, the PDCCH may also carry control information that is used to schedule the transmission of data for the UE in the uplink (UL) direction, i.e., from the UE to the network. Such UL transmissions of data may be transmitted via a physical uplink data channel (PUDCH).
[0038] The starting position of the PDCH, i.e. the starting time position within a subframe or TTI, can be indicated to the UE in a flexible manner. In a given subframe, the PDCH may start immediately after the PDCCH. However, the PDCH may also start earlier, for example, in the first modulation symbol of the subframe, or later after a certain gap relative to the end of the PDCCH. The starting position may be controlled individually for each UE. If the PDCH is transmitted in multiple frequency bands (also referred to as subbands below), the starting position may also be controlled individually for each frequency band. The starting position may be set depending on the observed or expected interference of the PDCH with the PDCCH of one or more other UEs.
[0039] The starting position of the PDCH can be indicated by including the corresponding control information in the PDCCH. This control information can, for example, indicate to the UE whether the UE's PDCH starts at the beginning of the subframe, or whether it starts after the UE's PDCCH. The control information can indicate the starting position according to a bit field or a single bit. For example, such a bit or bit field can be explicitly transmitted as data encoded in the PDCCH or otherwise in the PDCCH. In some cases, the control information can also be indicated in an implicit manner, for example, based on the frequency domain position of the PDCCH, or derived from other control information conveyed by the PDCCH, such as derived from the radio resources allocated by the scheduling information conveyed on the PDCH. Further, the starting position can also be indicated by a bit mask for scrambling the CRC (cyclic redundancy check) of the PDCCH. A single bit of the control information can indicate whether the PDCH starts at the beginning of the subframe or after the received PDCCH. For example, a bit value of 0 can indicate that the PDCH starts at the beginning of the subframe, i.e. in the first modulation symbol, and a bit value of 1 can indicate that the PDCH starts after the received PDCCH, which means that there will be no overlap of the PDCH and the PDCCH. If the starting position is controlled separately for each frequency band, the control information includes a corresponding bit value for each frequency band or any one of the above-mentioned indications.
[0040] Figure 1 An exemplary situation in which the concepts outlined above can be applied is shown. Specifically, Figure 1 UEs 10, 11 and access nodes 100 are illustrated. Access nodes 100 may correspond to base stations, such as eNBs (“evolved Node Bs”) of LTE radio technology or similar radio access points of 5G radio technology. UEs 10, 11 are assumed to be located in a coverage area served by access nodes 100. Such coverage areas may also be referred to as “cells”. Note that a wireless communication network may actually provide multiple access nodes, each serving a corresponding coverage area, and UEs 10, 11 or other UEs may move between these different coverage areas and thus be connected to the wireless communication network via different access nodes.
[0041] To control data transmission from or to the UE 10, 11, a first PDCCH (PDCCH1) from the access node 100 to the UE 10 is configured, and a second PDCCH (PDCCH2) from the access node 100 to the UE 11 is configured. Further, the first PDCH (PDCH1) is configured for DL data transmission from the access node 100 to the UE 10, and the second PDCH (PDCH2) is configured for DL data transmission from the access node 100 to the UE 11. The PDCCH is used to convey DL control information from the access node 100 to the respective UE 10, 11. This DL control information may have the purpose of controlling DL data transmission on the PDCH. The DL control information may, for example, include a DL scheduling assignment (DL SA) to the UE 10, 11. The DL scheduling assignment may indicate the radio resources of the PDCH used for DL data transmission to the UE 10, 11.
[0042] A first PDCCH (PDCCH1) is transmitted on a radio resource dedicated to the first UE 10, and a second PDCCH (PDCCH2) is transmitted on a radio resource dedicated to the second UE 11 (e.g., on a different subcarrier). The first UE 10 will therefore monitor the first PDCCH (PDCCH1) instead of the radio resource of the second PDCCH (PDCCH2), and the second UE will monitor the second PDCCH (PDCCH2) instead of the radio resource of the first PDCCH (PDCCH1). By sending a PDCH start indication to the first UE 10, the access node 100 can flexibly control at which modulation symbol of the subframe the first PDCH (PDCH1) starts. In this way, it is possible to avoid that the radio resource where the first UE 10 expects the transmission of the first PDCH (PDCH1) overlaps with the radio resource where the access node 100 actually transmits the second PDCCH (PDCCH2). On the other hand, it is possible to allow the first UE 10 to expect the radio resources for transmission of the first PDCH (PDCH1) to overlap with the radio resources for which the access node 100 actually transmits the first PDCCH (PDCCH1), because the first UE 10 is aware of the latter radio resources and it can, for example, ignore these radio resources when decoding DL transmissions on the first PDCH (PDCH1). Accordingly, even if the DL SA received on the first PDCCH (PDCCH1) indicates radio resources of the first PDCH (PDCH1) that overlap with radio resources used for transmission of the first PDCCH (PDCCH1), the UE 10 will be able to determine that the radio resources that will actually be used for radio transmissions on the first PDCH (PDCH1) will be the radio resources indicated by the DL SA in addition to the radio resources configured for transmission of the first PDCCH (PDCCH1). Note that although Figure 1The sending of a PDCH start indication is only shown for the first UE 10 , but a corresponding PDCH start indication can of course also be transmitted to the second UE 11 .
[0043] Figure 2 An example of how the first PDCCH (PDCCH1), the second PDCCH (PDCCH2), and the first PDCH (PDCH1) may be mapped to resource elements of a time-frequency grid is illustrated. Figure 2 In the example of FIG. 1 , OFDM modulation using multiple subcarriers from a first frequency band (referred to as "subband 1") and a second frequency band (referred to as "subband 2") is assumed. The time-frequency grid defines multiple resource elements, each of which corresponds to a subcarrier in the frequency (f) domain and a certain OFDM symbol in the time (t) domain. Scheduling and / or other control of transmissions is assumed to be done on a per-subframe basis. In the illustrated example, a subframe is formed by seven consecutive OFDM symbols (symbol #0 to symbol #6).
[0044] exist Figure 2 In the example of , the first PDCCH (PDCCH1) and the second PDCCH (PDCCH2) are transmitted in the first OFDM symbol (symbol #0) of the subframe and in the first frequency band (subband 1). In the first frequency band, the first PDCH (PDCH1) starts after the first PDCCH (PDCCH1) and the second PDCCH (PDCCH2). Accordingly, there is no overlap of the radio resources assigned to the first PDCH (PDCH1) and the radio resources assigned to the second PDCCH (PDCCH2). In the second frequency band in which neither the first PDCCH (PDCCH1) nor the second PDCCH (PDCCH2) is transmitted, the first PDCH (PDCH1) has started in the first OFDM symbol (symbol #0). Accordingly, in the second frequency band, the first OFDM symbol can also be used for the transmission of the first PDCH (PDCH1).
[0045] To obtain Figure 2, the access node 100 may send control information to the first UE 10, the control information including a first bit value for the first frequency band indicating that the first PDCH (PDCH1) in the first frequency band starts after the first PDCCH (PDCCH1) and a second bit value for the second frequency band indicating that the first PDCH (PDCH1) in the second frequency band starts in the first OFDM symbol of the subframe (e.g., bit value 0 as defined above). The access node 100 may transmit this control information on the first PDCCH (PDCCH1). For example, a two-bit bit field can be used to indicate the starting position of the PDCH for the first frequency band and the second frequency band separately. A bit field of "00" can indicate that the PDCH starts at the beginning of a subframe in both frequency bands, a bit field of "01" can indicate that in the first frequency band, the PDCH starts at the beginning of a subframe, and in the second frequency band, the PDCH starts after the first OFDM symbol, a bit field of "10" can indicate that in the first frequency band, the PDCH starts after the first OFDM symbol, and in the second frequency band, the PDCH starts at the beginning of the subframe after the first OFDM symbol, and a bit field of "11" can indicate that the PDCH starts after the first OFDM symbol in both frequency bands. The corresponding rule for interpreting the bit field can be preconfigured in the UE or can be signaled to the UE from the network.
[0046] The above-mentioned way of indicating the starting position of PDCH separately for each frequency band can be extended to more than two frequency bands, for example, by using one bit value per frequency band. To avoid signaling overhead in the case of having many frequency bands, frequency bands with the same starting position (frequency bands where PDCH starts at the beginning of a subframe or frequency bands where PDCH starts after the first OFDM symbol) can be restricted to be continuous. By restricting the continuous allocation of PDCH resources to start at the first frequency band (for example, at the lowest available frequency) or end at the last frequency band (for example, at the highest available frequency), further reduction of overhead can be achieved. By indicating the size of the continuous resource allocation of the starting resource block and according to the number of resource blocks, the allocation of continuous radio resources can be achieved in an efficient manner.
[0047] Figure 3 FIG. 4 illustrates another example of how the first PDCCH (PDCCH1), the second PDCCH (PDCCH2), and the first PDCH (PDCH1) may be mapped to resource elements of the time-frequency grid. Figure 3In the example of , a first PDCCH (PDCCH1) and a second PDCCH (PDCCH2) (in the same frequency band or in different frequency bands) are transmitted in the first OFDM symbol (symbol #0) of a subframe. As illustrated, the first PDCH (PDCH1) starts in the first OFDM symbol of the subframe, and the radio resources assigned to the first PDCH (PDCH1) overlap with the radio resources used to transmit the first PDCCH (PDCCH1), but do not overlap with the radio resources used to transmit the second PDCCH (PDCCH2). As mentioned above, this overlapping situation can be handled by the first UE 10 because the first UE 10 knows the radio resources used to transmit the first PDCCH (PDCCH1) and therefore concludes that these radio resources will not be used by the access node 100 to send DL data transmission on the first PDCH (PDCH1). Accordingly, the effective resource region of the first PDCH (PDCH1) may have a non-rectangular shape and consist of radio resources (which may generally correspond to a rectangular resource region formed by one or more physical resource blocks) assigned to the first UE 10 by the DL SA transmitted on the first PDCCH (PDCCH1), in addition to overlapping radio resources used for transmission of the first PDCCH (PDCCH1).
[0048] To obtain Figure 3 , the access node 100 may send control information to the first UE 10, the control information including a bit value indicating that the first PDCH (PDCH1) starts in the first OFDM symbol of the subframe (e.g., a bit value of 0 as defined above). The access node 100 may transmit this control information on the first PDCCH (PDCCH1). Note that in the case where the first PDCH (PDCH1) is transmitted using multiple frequency bands, corresponding control information can be transmitted for each frequency band.
[0049] Figure 4 FIG. 4 illustrates another example of how the first PDCCH (PDCCH1), the second PDCCH (PDCCH2), and the first PDCH (PDCH1) may be mapped to resource elements of the time-frequency grid. Figure 4 In the example of , a first PDCCH (PDCCH1) and a second PDCCH (PDCCH2) are transmitted (in the same frequency band or in different frequency bands) in the first OFDM symbol (symbol #0) of a subframe. As illustrated, the first PDCH (PDCH1) starts after the first PDCCH (PDCCH1) and the second PDCCH (PDCCH2) to avoid overlapping of radio resources assigned to the first PDCH (PDCH1) with radio resources used to transmit the second PDCCH (PDCCH2).
[0050] To obtain Figure 4 , the access node 100 may send control information to the first UE 10, the control information including a bit value (e.g., a bit value 1 as defined above) indicating that the first PDCH (PDCH1) starts after the first PDCCH (PDCCH1). The access node 100 may transmit this control information on the first PDCCH (PDCCH1). Note that in the case where the first PDCH (PDCH1) is transmitted using multiple frequency bands, corresponding control information can be transmitted for each frequency band.
[0051] Figure 5 A more complex example is illustrated, which shows how a first PDCCH (PDCCH1), a second PDCCH (PDCCH2), a first PDCH (PDCH1) and a second PDCH (PDCH2) may be mapped to resource elements of a time-frequency grid. Figure 5 In the example of , a first PDCCH (PDCCH1) and a second PDCCH (PDCCH2) (in the same frequency band or in different frequency bands) are transmitted in the first OFDM symbol (symbol #0) of a subframe. As illustrated, the first PDCH (PDCH1) starts in the first OFDM symbol of the subframe, and the radio resources assigned to the first PDCH (PDCH1) overlap with the radio resources used to transmit the first PDCCH (PDCCH1), but do not overlap with the radio resources used to transmit the second PDCCH (PDCCH2). As mentioned above, this overlapping situation can be handled by the first UE 10 because the first UE 10 knows the radio resources used to transmit the first PDCCH (PDCCH1) and therefore concludes that these radio resources will not be used by the access node 100 to send DL data transmission on the first PDCH (PDCH1). Accordingly, the effective resource region of the first PDCH (PDCH1) may have a non-rectangular shape and be composed of the radio resources assigned to the first UE 10 by the DL SA transmitted on the first PDCCH (PDCCH1) (which may generally correspond to a rectangular resource region formed by one or more physical resource blocks) minus the overlapping radio resources used for the transmission of the first PDCCH (PDCCH1). The second PDCH (PDCH2) starts after the first PDCCH (PDCCH1) and the second PDCCH (PDCCH2) to avoid the radio resources assigned to the second PDCH (PDCH2) from overlapping with the radio resources used for transmitting the first PDCCH (PDCCH1).
[0052] To obtain Figure 5, the access node 100 may, for example, send control information to the first UE 10 on a first PDCCH (PDCCH1), the control information including a bit value indicating that the first PDCH (PDCH1) starts in the first OFDM symbol of the subframe (e.g., bit value 0 as defined above), and send control information to the second UE 11 on a second PDCCH (PDCCH2), the control information indicating that the second PDCH (PDCH2) starts after the second PDCCH (PDCCH2), for example, bit value 1 as defined above. Note that in the case where the first PDCH (PDCH1) is transmitted using multiple frequency bands, corresponding control information can be transmitted for each frequency band.
[0053] As can be seen, in Figure 5 In the example of , by sending different configuration information to the UE, the starting position of the PDCH can be defined separately for each UE 10, 11.
[0054] In the above example, the PDCCH is spread over one OFDM symbol and is transmitted in the first OFDM symbol of the subframe. Note, however, that the described concept can be applied in a corresponding manner to a situation in which the PDCCH is spread over more OFDM symbols (e.g., over two or three OFDM symbols) or is transmitted at a later position within the subframe (e.g., starting at the second or third OFDM symbol of the subframe). In this case, the control information for indicating the starting position of the PDCH for a given UE can, for example, define whether the PDCH starts at a position that avoids overlapping with the radio resources of the PDCCH of this UE, e.g., after the PDCCH of this UE. For example, a bit value of 0 can indicate that the PDCH starts at a position that causes the PDCH to overlap with the radio resources of the PDCCH of this UE, e.g., at the same symbol as the UE's PDCCH or even an earlier symbol than it, and a bit value of 1 can indicate that the PDCH starts at a position that avoids overlapping with the radio resources of the UE's PDCCH, e.g., after the UE's PDCCH.
[0055] In some cases, the PDCCHs of different UEs can have different extensions. This may have the effect that the PDCCHs of different UEs end up at different locations. Figure 6 A corresponding example is illustrated in FIG, where the first PDCCH (PDCCH1) is extended over only the first OFDM symbol of a subframe, and the second PDCCH (PDCCH2) is extended over the first two OFDM symbols of the subframe. In this case, the control information indicating the starting position can indicate whether the PDCH is in the first OFDM symbol of the subframe, in the longest PDCCH (in Figure 6In the example of , the PDCH starts after the second PDCCH (PDCCH2). For example, a bit value of 0 can indicate that the PDCH starts at the beginning of the subframe, and a bit value of 1 can indicate that the PDCH starts after the longest possible PDCCH. Information about the longest possible extended longest PDCCH can be preconfigured in the UE or configured in the UE by signaling from the network.
[0056] exist Figure 6 In the example of , the first PDCH (PDCH1) starts after the second PDCCH (PDCCH2) which is assumed to have the longest possible extension. In this way, the overlap of the radio resources assigned to the first PDCH (PDCH1) and the radio resources used to transmit the second PDCCH (PDCCH2) is avoided.
[0057] To obtain Figure 6 , the access node 100 may send control information to the first UE 10, the control information including a bit value indicating that the first PDCH (PDCH1) starts after the longest possible PDCCH (e.g., bit value 1 as defined above). The access node 100 may transmit this control information on the first PDCCH (PDCCH1). Note that in the case where the first PDCH (PDCH1) is transmitted using multiple frequency bands, corresponding control information can be transmitted for each frequency band.
[0058] Figure 7 The diagram is similar to Figure 6Another example of the example of . Furthermore, in this example, the longest possible extension of the PDCCH is assumed to be two OFDM symbols. However, in this case, both the first PDCCH (PDCCH1) and the second PDCCH (PDCCH2) extend only on the first OFDM symbol of the subframe and are therefore shorter than the longest possible extension. However, the first PDCH (PDCH1) starts after the longest possible extension in the third OFDM symbol (symbol #2). As can be seen, this resource allocation leaves the radio resources of the subframe unused. To avoid such situations, the starting position of the PDCH can be indicated with finer granularity, for example, (for each frequency band) by using a bit field of two or more bits. When, for example, assuming a situation in which the longest possible extension of the PDCCH is three OFDM symbols (which means that the extension of the PDCH can be one OFDM symbol, two OFDM symbols, three OFDM symbols), a bit field of "00" can indicate that the PDCH starts at the beginning of the subframe, a bit field of "01" can indicate that the PDCH starts after the first OFDM symbol, a bit field of "10" can indicate that the PDCH starts after the second OFDM symbol, and a bit field of "11" can indicate that the PDCH starts after the third OFDM symbol. The corresponding rules for interpreting the bit fields can be preconfigured in the UE or can be signaled to the UE from the network.
[0059] Note that the above mentioned approach to addressing different PDCCH extensions from UE to UE may also be applied to the case where different ending positions of the PDCCH arise because the PDCCH does not necessarily start at the first OFDM symbol of a subframe.
[0060] Figure 8 The diagram illustrates another example of how a first PDCH (PDCH1), a second PDCH (PDCH2), and a first PDCCH (PDCCH1), a second PDCCH (PDCCH2), and a third PDCCH (PDCCH3) of yet another UE may be mapped to resource elements of a time-frequency grid in a scenario involving subframe aggregation. In the case of subframe aggregation, the PDCCH transmitted in the first subframe is used to control radio transmissions on the PDCH not only in this subframe, but also in one or more subsequent subframes. Figure 8 In the example of , the first PDCH (PDCH1) is transmitted in the first subframe (subframe #X) and the subsequent subframe (subframe #X+1) and is controlled by the first PDCCH (PDCCH1) transmitted only in the first subframe. Figure 2In the case of the first PDCH (PDCH1) being transmitted in the first frequency band (sub-band 1) and the second frequency band (sub-band 2). The second PDCCH (PDCCH2) is transmitted in the first subframe and the first frequency band, and controls the radio transmission on the second PDCH (PDCH2), and the second PDCH (PDCH2) is transmitted only in the first subframe and the first frequency band. The third PDCCH is transmitted in the subsequent subframe and the first frequency band, and is illustrated without the corresponding PDCH. For example, the third PDCCH can be used to send UL grants.
[0061] exist Figure 8 In the example of , a first PDCCH (PDCCH1) and a second PDCCH (PDCCH2) are transmitted in a first OFDM symbol (symbol #0) of a first subframe. A third PDCCH is transmitted in a first OFDM symbol (symbol #0) of a subsequent subframe. In a first frequency band, the first PDCH (PDCH1) starts after the second PDCCH (PDCCH2). Accordingly, there is no overlap of radio resources assigned to the first PDCH (PDCH1) and radio resources assigned to the second PDCCH (PDCCH2). As further illustrated, in the first frequency band, the first PDCH (PDCH1) is scheduled on frequency resources other than the third PDCCH. Accordingly, there is no overlap of radio resources assigned to the first PDCH (PDCH1) and radio resources assigned to the third PDCCH. In the second frequency band, the first PDCH (PDCH1) has started at the first OFDM symbol (symbol #0), and the radio resources assigned to the first PDCH (PDCH1) overlap with the radio resources used to transmit the first PDCCH (PDCCH1). This overlapping situation can be handled by the first UE 10 because the first UE 10 knows the radio resources used to transmit the first PDCCH (PDCCH1) and therefore concludes that these radio resources will not be used by the access node 100 to send DL data transmission on the first PDCH (PDCH1).
[0062] To obtain Figure 8 , the access node 100 may send control information to the first UE 10, which includes a first bit value for the first frequency band indicating that the first PDCH (PDCH1) in the first frequency band starts after the first PDCCH (PDCCH1) (e.g., bit value 1 as defined above) and a second bit value for the second frequency band indicating that the first PDCH (PDCH1) in the second frequency band starts in the first OFDM symbol of the subframe (e.g., bit value 0 as defined above). The access node 100 may use, for example, as a combination of the first PDCCH (PDCCH1) and the second PDCH (PDCH1) in the second frequency band. Figure 2The interpreted bit field conveys this control information.
[0063] The access node 100 may apply various considerations when selecting the starting position of the PDCH indicated to the UE 10, 11. In this way, the configuration of the PDCCH and the scheduling of the PDCH may be coordinated in an efficient manner. In many cases, the access node 100 may aim to avoid overlapping of the radio resources of the PDCH assigned to one UE with the radio resources used for the transmission of the PDCCH of another UE. However, in some cases, the access node 100 may also select a starting position of the PDCH that causes the radio resources of the PDCH assigned to one UE to overlap with the radio resources used for the transmission of the PDCCH of another UE. Fig. 9 An example of corresponding mapping of the first PDCCH (PDCCH1), the second PDCCH (PDCCH2) and the first PDCH (PDCH1) is illustrated in FIG. Fig. 9 In the example of , a first PDCCH (PDCCH1) and a second PDCCH (PDCCH2) (in the same frequency band or in different frequency bands) are transmitted in the first OFDM symbol (symbol #0) of a subframe. As illustrated, the first PDCH (PDCH1) starts in the first OFDM symbol of the subframe, and the radio resources assigned to the first PDCH (PDCH1) overlap with the radio resources used to transmit the first PDCCH (PDCCH1) and also with the radio resources used to transmit the second PDCCH (PDCCH2). The access node 100 may determine that this overlapping situation is acceptable and indicate the starting position of the first PDCH (PDCH1) accordingly, for example by sending control information to the first UE 10, the control information including a bit value indicating that the first PDCH (PDCH1) starts in the first OFDM symbol of the subframe (e.g., bit value 0 as defined above). The access node 100 may also control the transmission parameters of the first PDCH (PDCH1) and / or the second PDCCH (PDCCH2) in such a way that interference is kept below a threshold, for example by selecting a beamforming configuration, selecting a (robust) modulation and coding scheme and / or adjusting transmitter power.
[0064] The criteria applied by the access node 100 for evaluating whether the overlap of the first PDCH (PDCH1) and the second PDCCH (PDCCH2) is acceptable may, for example, take into account the spatial separation of the UEs 10, 11 and / or the beamforming configuration applied by the UEs 10, 11. For example, if the UE 10 is able to decode the first PDCH (PDCH1) due to beamforming interference and / or spatial separation of the second PDCCH (PDCCH2) from the first PDCH (PDCH1) being estimated to be below a threshold, the access node 100 may determine that the overlap is acceptable and indicate the starting position of the first PDCH (PDCH1) accordingly.
[0065] In the above example, it is assumed that the PDCH is used for DL data transmission from the access node 100 to the UE 10. However, it is noted that the illustrated concepts can be applied in a corresponding manner to situations where the PDCH is used for wireless self-backhaul connections (e.g., from one access node to another access node) or for device-to-device connections (e.g., from one UE to another UE).
[0066] Fig.10 A flow chart is shown for illustrating a method of controlling radio transmissions in a wireless communication network. Fig.10 The method may be used to implement the described concepts in a node of a wireless communication network, for example in an access node such as the access node 100 mentioned above. If a processor-based implementation of the node is used, the steps of the method may be performed by one or more processors of the node. In such a case, the node may further include a memory in which program code for implementing the functionality described below is stored.
[0067] In optional step 1010, the node may determine a first starting position of a data channel of a radio device in a first frequency band and a second starting position of a data channel in a second frequency band. The radio device may be, for example, a UE, such as UE 10. The data channel may be, for example, a DL data channel, such as Figures 2 to 9 However, other kinds of data channels can also be used, for example, as a data channel of a wireless backhaul connection between two access nodes of a wireless communication network or a data channel of a device-to-device connection. At least one of the first start position and the second start position may correspond to the first modulation symbol of the subframe, such as in Figure 2 , 3 , 5, 8 and 9 as illustrated in the examples.
[0068] Determining the first start position and the second start position may involve selecting the first start position and the second start position depending on the time-frequency position of the DL control channel used for transmission of DL control information to at least one further radio device. This selection may be performed by the node. The further radio device may be, for example, a UE, such as UE 11. The first start position and the second start position may be selected to avoid overlap of the data channel with the DL control channel, for example, as in Figures 2 to 8 Alternatively, the first start position and the second start position may be selected to allow overlap of the data channel with the DL control channel, for example, as in Fig. 9 As shown in the example of . The decision whether to allow overlap may be based on potential interference between the data channel and the DL control channel. In some cases, the node may also control the transmission of data on the data channel depending on the potential interference between the data channel and the DL control channel. For example, this may involve adjusting transmission parameters such as beamforming, modulation and coding schemes, or transmit power in a manner such that potential interference is kept below a threshold and overlap of the data channel and the DL control channel can be allowed.
[0069] In step 1020, the node manages the sending of control information to the radio device. The control information indicates a first starting position for the transmission of the data channel and a second starting position for the transmission of the data channel. For example, the first starting position and the second starting position may have been determined by the access node in step 1010. However, the first starting position or the second starting position may also be determined in another way, for example, indicated by another node of the wireless communication network. The operation of managing the sending of the control information may involve actually sending the control information. However, in some cases, the operation of managing the sending of the control information may also involve determining not to send the control information. For example, the control information can only be sent when the first starting position or the second starting position deviates from the default starting position.
[0070] The control information may indicate a first starting position and a second starting position relative to the end of a DL control channel. This may be a DL control channel from the wireless communication network to the radio device. Further, this can be an estimated end position of any other DL control channel, for example estimated based on the longest possible extension of the DL control channel and / or the latest possible start of the DL control channel. For example, the control information may indicate that the starting position is immediately after the end of the DL control channel or after a certain number of modulation symbols before or after the end of the DL control channel. Further, the control information may indicate the first starting position and the second starting position according to a selection from a set of multiple starting positions. For example, the set of multiple starting positions may include two or more predefined starting positions, which may be identified by a bit value or a bit field included in the control information, for example, as combined with Figure 7 As explained in the example of Figure 7 As explained in the example of , the predefined starting positions can be adjacent, but non-adjacent starting positions can also be utilized. In some cases, the control information consists of one indicator bit per frequency band. However, the control information can also consist of two or more indicator bits per frequency band. The control information can be transmitted to the radio device on the DL control channel. The control information can be specific to the radio device. Accordingly, the first starting position and the second starting position can be indicated separately for each radio device.
[0071] At step 1030, the node controls transmission of data on the data channel. This action is performed based on the first starting position and the second starting position. For example, this may involve, in the first frequency band, the node mapping data to the data channel starting from the first starting position, and in the second frequency band, the node mapping data to the data channel starting from the second starting position.
[0072] Fig.11 A block diagram is shown for illustrating the functionality of a node 1100 for a wireless communication network. The node 1100 is assumed to be based on Fig.10 As illustrated, the node 1100 may optionally be provided with a module 1110 configured to determine a first start position and a second start position, such as explained in conjunction with step 1010. Further, the node 1100 may be provided with a module 1120 configured to manage the sending of control information, such as explained in conjunction with step 1020. Further, the node 1100 may be provided with a module 1130 configured to control the transmission of data, such as explained in conjunction with step 1030.
[0073] Note that the node 1100 may include additional modules for implementing other functionalities such as known functionalities of access nodes (such as eNBs of LTE technology). Further, note that the modules of the node 1100 do not necessarily represent the hardware structure of the node 1100, but may also correspond to functional elements implemented by hardware, software or a combination thereof, for example.
[0074] Fig.12 A flow chart is shown for illustrating a further method of controlling radio transmissions in a wireless communication network. Fig.12 The method may be used to implement the described concepts in a node of a wireless communication network, for example in an access node such as the access node 100 mentioned above. If a processor-based implementation of the node is used, the steps of the method may be performed by one or more processors of the node. In such a case, the node may further include a memory in which program code for implementing the functionality described below is stored.
[0075] At step 1210, the node determines potential interference of a data channel for a radio device and a DL control channel for another radio device. The radio device may be, for example, a UE, such as UE 10 and UE 11. The radio device may be, for example, a UE, such as UE 10. The data channel may be, for example, a DL data channel, such as Figures 2 to 9 However, other kinds of data channels can also be used, for example, as a data channel of a wireless backhaul connection between two access nodes of a wireless communication network or a data channel of a device-to-device connection.
[0076] At step 1220, the node determines the starting position of the data channel. This action is performed depending on the potential interference determined at step 1210. In some cases, the node may also determine multiple positions of the data channel, for example, a starting position frequency band.
[0077] The starting position may correspond to the first modulation symbol of a subframe, such as at Figure 2 , 3 , 5, 8 and 9. The starting position may be selected depending on the time-frequency position of the DL control channel used for transmission of DL control information to at least one further radio device. The further radio device may be, for example, a UE, such as UE 11. The starting position may be selected to avoid overlap of the data channel with the DL control channel, for example, as in Figures 2 to 8 Alternatively, the starting position may be selected to allow overlap of the data channel with the DL control channel, for example, as in Fig. 9 As shown in the example of . The decision whether to allow overlap may be based on potential interference between the data channel and the DL control channel. In some cases, the node may also control the transmission of data on the data channel depending on the potential interference between the data channel and the DL control channel. For example, this may involve adjusting transmission parameters such as beamforming, modulation and coding schemes, or transmit power in a manner such that potential interference is kept below a threshold and overlap of the data channel and the DL control channel can be allowed.
[0078] At step 1230, the node manages the sending of control information to the radio device. The control information indicates the starting position of the data channel. The operation of managing the sending of the control information may involve actually sending the control information. However, in some cases, the operation of managing the sending of the control information may also involve deciding not to send the control information. For example, the control information can only be sent when the starting position deviates from the default starting position.
[0079] The control information may indicate a start position relative to the end of a DL control channel. This may be a DL control channel from the wireless communication network to the radio device. Further, this can be an estimated end position of any other DL control channel, for example estimated based on the longest possible extension of the DL control channel and / or the latest possible start of the DL control channel. For example, the control information may indicate the start position immediately after the end of the DL control channel or after a certain number of modulation symbols before or after the end of the DL control channel. Further, the control information may indicate the start position according to a selection from a set of multiple start positions. For example, the set of multiple start positions may include two or more predefined start positions, which may be identified by a bit value or a bit field included in the control information, for example, as combined with Figure 7 As explained in the example of Figure 7 As explained in the example of , the predefined starting positions can be adjacent, but non-adjacent starting positions can also be utilized. In some cases, the control information consists of one indicator bit per frequency band. However, the control information can also consist of two or more indicator bits per frequency band. The control information can be transmitted to the radio device on a DL control channel.
[0080] The control information may be specific to the radio. Accordingly, a start position may be indicated individually for each radio. Further, the indicated start position may be specific to one of a plurality of frequency bands utilized by the radio. Accordingly, an individual start position may be indicated for each frequency band used for transmission of a data channel.
[0081] At step 1240, the node controls the transmission of data on the data channel. This is done based on the starting position determined at step 1220. For example, this may involve the node mapping data to the data channel starting from the starting position.
[0082] Fig.13 A block diagram is shown for illustrating the functionality of a node 1300 for a wireless communication network. The node 1100 is assumed to be based on Fig.12 As illustrated, the node 1300 may be provided with a module 1310 configured to determine interference, such as explained in conjunction with step 1210. Further, the node 1300 may be provided with a module 1320 configured to determine one or more starting positions, such as explained in conjunction with step 1220. Further, the node 1300 may be provided with a module 1330 configured to manage the transmission of control information, such as explained in conjunction with step 1230. Further, the node 1300 may be provided with a module 1340 configured to control the transmission of data, such as explained in conjunction with step 1240.
[0083] Note that the node 1300 may include additional modules for implementing other functionalities such as known functionalities of access nodes (such as eNBs of LTE technology). Further, note that the modules of the node 1300 do not necessarily represent the hardware structure of the node 1300, but may also correspond to functional elements implemented by hardware, software or a combination thereof, for example.
[0084] Fig.14 A flow chart is shown for illustrating a further method of controlling radio transmissions in a wireless communication network. Fig.14 The method may be used to implement the described concepts in a radio device, for example in a UE such as UE 10. If a processor-based implementation of the radio device is used, the steps of the method may be performed by one or more processors of the radio device. In such a case, the radio device may further include a memory in which program code for implementing the functionality described below is stored.
[0085] In optional step 1410, the radio receives control information. The control information may be received from a node of the wireless communication network, for example, from an access node such as access node 100. The control information indicates a first starting position of a data channel of the radio in the first frequency band and a second starting position of a data channel in the second frequency band. The data channel may be, for example, a DL data channel, such as Figures 2 to 9 However, other kinds of data channels can also be used, for example, as a data channel of a wireless backhaul connection between two access nodes of a wireless communication network or a data channel of a device-to-device connection. At least one of the first start position and the second start position may correspond to the first modulation symbol of the subframe, such as in Figure 2 , 3 , 5, 8 and 9 as illustrated in the examples.
[0086] The first start position and the second start position may be selected depending on the time-frequency position of a DL control channel used for transmission of DL control information to at least one further radio device. The further radio device may be, for example, a UE, such as UE11. The first start position and the second start position may be selected to avoid overlap of a data channel with a DL control channel, for example, as in Figures 2 to 8 Alternatively, the first start position and the second start position may be selected to allow overlap of the data channel with the DL control channel, for example, as in Fig. 9 as shown in the example.
[0087] The control information may indicate a first starting position and a second starting position relative to the end of a DL control channel. This may be a DL control channel from the wireless communication network to the radio device. Further, this can be an estimated end position of any other DL control channel, for example estimated based on the longest possible extension of the DL control channel and / or the latest possible start of the DL control channel. For example, the control information may indicate that the starting position is immediately after the end of the DL control channel or after a certain number of modulation symbols before or after the end of the DL control channel. Further, the control information may indicate the first starting position and the second starting position according to a selection from a set of multiple starting positions. For example, the set of multiple starting positions may include two or more predefined starting positions, which may be identified by a bit value or a bit field included in the control information, for example, as combined with Figure 7 As explained in the example of Figure 7 As explained in the example of , the predefined starting positions can be adjacent, but non-adjacent starting positions can also be utilized. In some cases, the control information consists of one indicator bit per frequency band. However, the control information can also consist of two or more indicator bits per frequency band. The control information can be transmitted to the radio device on the DL control channel. The control information can be specific to the radio device. Accordingly, the first starting position and the second starting position can be indicated separately for each radio device.
[0088] In step 1430, the radio device controls the reception of data on the data channel. This action is performed based on the first starting position and the second starting position indicated by the control information. For example, this may involve the radio device monitoring the radio resources of the TTI starting from the first starting position in the first frequency band and / or decoding the signals received on the radio resources of the TTI, while the radio device monitoring the radio resources of the TTI starting from the second starting position in the second frequency band and / or decoding the signals received on the radio resources of the TTI.
[0089] Fig.15 Shown for illustration purposes Fig.14 As shown, the radio device 1500 may be provided with a module 1510 configured to receive control information, such as explained in conjunction with step 1410. Further, the radio device 1500 may be provided with a module 1520 configured to receive control data, such as explained in conjunction with step 1420.
[0090] Note that the radio device 1500 may include additional modules for implementing other functionalities such as known functionalities of UEs supporting LTE technology. Further, note that the modules of the radio device 1500 do not necessarily represent the hardware structure of the radio device 1500, but may also correspond to functional elements implemented by hardware, software, or a combination thereof, for example.
[0091] Furthermore, it is important to understand that Fig.10 , 12 The methods of 1 and 14 may be combined with each other. For example, the same node of the wireless communication network can be based on Fig.10 and Fig.12 Further, the method can be performed in the following manner: Fig.10 and / or Fig.12 The method operates on the nodes and according to Fig.14 The method of operating one or more radio devices is combined in a system.
[0092] Fig.16 A processor-based implementation of a node 1600 for a wireless communication network is illustrated. The node 1600 may be used to implement the above-described concepts. The node 1600 may correspond to Fig.10 or a node operating with the method of 12, such as the access node 100 mentioned above.
[0093] As illustrated, the node 1600 may include a radio interface 1610 for connecting to one or more radio devices, such as the UE 10, 11 mentioned above or in Fig.14 The radio interface may be used, for example, to send the DL control channel or data channel mentioned above. Further, the node 1600 may include a network interface 1620 for connecting to one or more other nodes of the wireless communication network. The network interface 1620 may be used, for example, to establish a backhaul connection of the node.
[0094] Further, the node 1600 may include one or more processors 1650 coupled to the interfaces 1610, 1620 and a memory 1660 coupled to the (one or more) processors 1650. By way of example, the interfaces 1610, 1620, the (one or more) processors 1650 and the memory 1660 can be coupled via one or more internal bus systems of the node 1600. The memory 1660 may include a read-only memory (ROM) such as a flash ROM, a random access memory (RAM) such as a dynamic RAM (DRAM) or a static RAM (SRAM), a mass storage device such as a hard disk or a solid state disk, or the like. As illustrated, the memory 1660 may include software 1670, firmware 1680 and / or control parameters 1690. The memory 1660 may include appropriately configured program code to be executed by the (one or more) processors 1650 in order to implement the above-mentioned functionality of the wireless communication network node, such as in conjunction with Fig.10 or 12. This program code may be stored as part of software 1670 and / or as part of firmware 1680. Further, this program code may operate using one or more of control parameters in control parameters 1690.
[0095] It is important to understand that Fig.16 The structure illustrated in is only schematic, and the node 1600 may actually include additional components that have not been illustrated for clarity, such as additional interfaces or processors. In addition, it is to be understood that the memory 1660 may include additional program codes for implementing known functionality of a wireless communication network node (e.g., known functionality of an eNB or 5G access node of LTE technology). According to some embodiments, a computer program for implementing the functionality of the node 1600 may also be provided, for example, in the form of a physical medium storing program codes and / or other data to be stored in the memory 1660, or by making the program code available for download or by streaming.
[0096] Fig.17 A processor-based implementation of a radio device 1700 that can be used to implement the above-described concepts is illustrated. The radio device 1700 may correspond to a processor-based implementation of a radio device 1700 that can be used to implement the above-described concepts. Fig.14 A radio device, such as the UE 10 mentioned above, operates in accordance with the method.
[0097] As shown, the radio device 1700 may include a device for transmitting data to the access node 100 such as mentioned above or such as Fig.10 The access node of the wireless communication network of the access node in the method of 12 is connected to the radio interface 1710 of the wireless communication network. The radio interface can be used, for example, to receive the DL control channel or data channel mentioned above.
[0098] Further, the radio device 1700 may include one or more processors 1750 coupled to the radio interface 1710 and a memory 1760 coupled to the (one or more) processors 1750. By way of example, the radio interface 1710, the (one or more) processors 1750 and the memory 1760 can be coupled via one or more internal bus systems of the radio device 1700. The memory 1760 may include a ROM such as a flash ROM, a RAM such as a DRAM or SRAM, a mass storage device such as a hard disk or a solid state disk, or the like. As illustrated, the memory 1760 may include software 1770, firmware 1780 and / or control parameters 1790. The memory 1760 may include appropriately configured program code to be executed by the (one or more) processors 1750 in order to implement the above-mentioned functionality of the radio device, such as in conjunction with Fig.14 This program code may be stored as part of software 1770 and / or as part of firmware 1780. Further, this program code may operate using one or more of control parameters 1790.
[0099] It is important to understand that Fig.17 The structures illustrated in the figure are only schematic, and the radio device 1700 may actually include additional components that have not been illustrated for clarity, such as additional interfaces or processors. In addition, it is to be understood that the memory 1760 may include additional program code for implementing known functionality of the radio device (e.g., known functionality of a UE supporting LTE radio technology or 5G radio technology). According to some embodiments, a computer program for implementing the functionality of the radio device 1700 may also be provided, for example, in the form of a physical medium storing program code and / or other data to be stored in the memory 1760, or by making the program code available for download or by streaming.
[0100] As can be seen, the concepts described above can be used to efficiently control radio transmissions in a wireless communication network. Specifically, radio resources assigned for transmission of a data channel of one radio device can be efficiently coordinated with radio resources used for transmission of a DL control channel to other radio devices. In this way, conflicting assignments or allocations of radio resources can be avoided. In some cases, overlapping assignments can be tolerated based on an assessment of potential interference.
[0101] It is to be understood that the examples and embodiments as explained above are merely illustrative and are susceptible to various modifications. For example, the illustrated concepts may be applied in conjunction with a variety of radio technologies, not limited to the above-mentioned examples of LTE radio technology or 5G radio technology. Further, the illustrated concepts may be applied in conjunction with a variety of data channels, including DL data channels, device-to-device data channels, or wireless backhaul data channels. In addition, it is to be understood that the above concepts may be implemented using correspondingly designed software to be executed by one or more processors of an existing device or by using dedicated device hardware. In addition, it should be noted that the illustrated nodes may each be implemented as a single device or as a system of multiple interacting devices.
Claims
1. A method in a node (100; 1100; 1300; 1600) of a wireless communication network for controlling radio transmission in a subframe of the wireless communication network, the method comprising: managing the sending of downlink control information on a physical downlink control channel (PDCCH) to a user equipment (10; 1500; 1700), the downlink control information controlling reception of a data channel within the subframe, the data channel being based on modulation using subcarriers from a first frequency band and a second frequency band, and the downlink control information indicating a first starting position for transmission of the data channel for the first frequency band and a second starting position for transmission of the data channel for the second frequency band, wherein at least one of the first starting position and the second starting position corresponds to a first modulation symbol of the subframe; and Based on the first starting position and the second starting position, transmission of data on the data channel is controlled, wherein the downlink control information indicates the first starting position and the second starting position as selected from a set of multiple predefined starting positions.
2. The method according to claim 1, in, The first start position and the second start position are selected depending on the time-frequency position of a downlink control channel used for transmission of downlink control information to at least one further user equipment (11).
3. The method according to claim 2, in, The first starting position and the second starting position are selected to avoid overlapping of the data channel with the downlink control channel.
4. The method according to claim 2, in, The first starting position and the second starting position are selected to allow overlapping of the data channel with the downlink control channel.
5. The method according to any one of claims 2 to 4, comprising: The node controls transmission of the data depending on potential interference between the data channel and the downlink control channel.
6. The method according to any one of claims 1 to 4, in, The downlink control information indicates the first start position and the second start position relative to an end of a downlink control channel.
7. The method according to any one of claims 1 to 4, in, The downlink control information consists of one indicator bit per frequency band.
8. The method according to any one of claims 1 to 4, in, The downlink control information consists of two indicator bits per frequency band.
9. The method according to any one of claims 1 to 4, in, The downlink control information is specific to the user equipment.
10. The method according to any one of claims 1 to 4, in, The modulation is orthogonal frequency division multiplexing OFDM modulation, filter bank multi-carrier FBMC modulation, discrete Fourier transform single carrier OFDM DFTS-OFDM modulation, single carrier frequency division multiple access SC-FDMA modulation or precoded FBMC modulation.
11. A method in a user equipment (10; 1500; 1700) of controlling radio transmission in a subframe of a wireless communication network, the method comprising: receiving downlink control information from the wireless communication network on a physical downlink control channel (PDCCH), the downlink control information controlling reception of a data channel within the subframe, the data channel being based on modulation using subcarriers from a first frequency band and a second frequency band, and the downlink control information indicating a first starting position for transmission of the data channel for the first frequency band and a second starting position for transmission of the data channel for the second frequency band, wherein at least one of the first starting position and the second starting position corresponds to a first modulation symbol of the subframe; and Based on the first starting position and the second starting position, the user equipment (10; 1500; 1700) controls reception of data on the data channel, wherein the downlink control information indicates the first starting position and the second starting position according to a selection from a set of multiple predefined starting positions.
12. The method according to claim 11, in, At least one of the first starting position and the second starting position corresponds to a first modulation symbol of a transmission time interval.
13. The method according to claim 11, in, The downlink control information indicates the first start position and the second start position relative to an end of a downlink control channel.
14. The method according to any one of claims 11 to 13, in, The downlink control information consists of one indicator bit per frequency band.
15. The method according to any one of claims 11 to 13, in, The downlink control information consists of two indicator bits per frequency band.
16. The method according to any one of claims 11 to 13, in, The downlink control information is specific to the user equipment.
17. The method according to any one of claims 11 to 13, in, The modulation is OFDM modulation, FBMC modulation, DFTS-OFDM modulation, SC-FDMA modulation or precoded FBMC modulation.
18. A node (100; 1100; 1300; 1600) for controlling radio transmission within a subframe of a wireless communication network, the node (100; 1100; 1300; 1600) comprising a first module, a second module and a third module, wherein: The first module is configured to determine, for a first frequency band, a first starting position for transmission of a data channel within the subframe and to determine, for a second frequency band, a second starting position for transmission of the data channel within the subframe, the data channel being based on modulation using subcarriers from the first frequency band and the second frequency band, The second module is configured to manage the transmission of downlink control information on a physical downlink control channel, PDCCH, to a user equipment (10; 1500; 1700), the downlink control information controlling reception of the data channel within the subframe and indicating the first starting position for the first frequency band and the second starting position for the second frequency band, wherein at least one of the first starting position and the second starting position corresponds to a first modulation symbol of the subframe; as well as The third module is configured to control transmission of data on the data channel based on the first starting position and the second starting position, wherein the downlink control information indicates the first starting position and the second starting position as selected from a set of multiple predefined starting positions.
19. The node (100; 1100; 1300; 1600) according to claim 18, in, The first start position and the second start position are selected depending on the time-frequency position of a downlink control channel used for transmission of downlink control information to at least one further user equipment (11).
20. The node (100; 1100; 1300; 1600) according to claim 19, in, The first starting position and the second starting position are selected to avoid overlapping of the data channel with the downlink control channel.
21. The node (100; 1100; 1300; 1600) according to claim 19, in, The first starting position and the second starting position are selected to allow overlapping of the data channel with the downlink control channel.
22. The node (100; 1100; 1300; 1600) according to any one of claims 18 to 21, in, The node (100; 1100; 1300; 1600) is configured to control transmission of the data depending on potential interference between the data channel and the downlink control channel.
23. The node (100; 1100; 1300; 1600) according to any one of claims 18 to 21, in, The downlink control information indicates the first start position and the second start position relative to an end of a downlink control channel.
24. The node (100; 1100; 1300; 1600) according to any one of claims 18 to 21, in, The downlink control information consists of one indicator bit per frequency sub-band.
25. The node (100; 1100; 1300; 1600) according to any one of claims 18 to 21, in, The downlink control information consists of two indicator bits per frequency sub-band.
26. The node (100; 1100; 1300; 1600) according to any one of claims 18 to 21, in, The downlink control information is specific to the user equipment (10; 1500; 1700).
27. The node (100; 1100; 1300; 1600) according to any one of claims 18 to 21, in, The modulation is OFDM modulation, FBMC modulation, DFTS-OFDM modulation, SC-FDMA modulation or precoded FBMC modulation.
28. The node (100; 1100; 1300; 1600) according to claim 18, in, The node (100; 1100; 1300; 1600) is configured to perform a method according to any one of claims 2 to 10.
29. A user equipment (10; 1500; 1700) for controlling radio transmissions within a subframe of a wireless communication network, the user equipment (10; 1500; 1700) comprising a first module and a second module, wherein: The first module is configured to receive downlink control information from the wireless communication network on a physical downlink control channel (PDCCH), the control information controlling reception of a data channel within the subframe, the data channel being based on modulation using subcarriers from a first frequency band and a second frequency band, and the control information indicating a first starting position for transmission of the data channel for the first frequency band and a second starting position for transmission of the data channel for the second frequency band, wherein at least one of the first starting position and the second starting position corresponds to a first modulation symbol of the subframe; and The second module is configured to control reception of data on the data channel based on the first starting position and the second starting position, wherein the downlink control information indicates the first starting position and the second starting position as selected from a set of multiple predefined starting positions.
30. The user equipment (10; 1500; 1700) according to claim 29, in, The downlink control information indicates the first start position and the second start position relative to an end of a downlink control channel.
31. The user equipment (10; 1500; 1700) according to any one of claims 29 to 30, in, The downlink control information consists of one indicator bit per frequency sub-band.
32. The user equipment (10; 1500; 1700) according to any one of claims 29 to 30, in, The downlink control information consists of two indicator bits per frequency sub-band.
33. The user equipment (10; 1500; 1700) according to any one of claims 29 to 30, in, The downlink control information is specific to the user equipment.
34. The user equipment (10; 1500; 1700) according to any one of claims 29 to 30, in, The modulation is OFDM modulation, FBMC modulation, DFTS-OFDM modulation, SC-FDMA modulation or precoded FBMC modulation.
35. The user equipment (10; 1500; 1700) according to claim 29, in, The user equipment (10; 1500; 1700) is configured to perform the method according to any one of claims 12 to 17.
36. A system for controlling radio transmissions within a subframe of a wireless communication network, the system comprising: A node (100; 1100; 1300; 1600) for the wireless communication network; and User equipment (10; 1500; 1700); The node (100; 1100; 1300; 1600) is configured to manage the transmission of downlink control information on a physical downlink control channel (PDCCH) to a user equipment (10; 1500; 1700), the downlink control information controlling reception of a data channel within the subframe, the data channel being based on modulation using subcarriers from a first frequency band and a second frequency band, and the downlink control information indicating a first starting position for transmission of the data channel for the first frequency band and a second starting position for transmission of the data channel for the second frequency band, wherein at least one of the first starting position and the second starting position corresponds to a first modulation symbol of the subframe; as well as The user equipment (10; 1500; 1700) is configured to receive the downlink control information and control the reception of data on the data channel based on the first starting position and the second starting position, wherein the downlink control information indicates the first starting position and the second starting position according to a selection from a set of multiple predefined starting positions.
37. A non-transitory storage medium storing a computer program, the computer program comprising program code to be executed by at least one processor (1650) of a node (100; 1100; 1300; 1600) of a wireless communication network, wherein execution of the program code causes the node (100; 1100; 1300; 1600) to perform a method according to any one of claims 1 to 10.
38. A non-transitory storage medium storing a computer program, the computer program comprising program code to be executed by at least one processor (1650) of a user device (10; 1500; 1700), wherein execution of the program code causes the user device (10; 1500; 1700) to perform a method according to any one of claims 11 to 17.
39. A computer program product comprising computer executable instructions which, when executed by a processing circuit, cause the processing circuit to perform the method according to any one of claims 1-17.
Citation Information
Patent Citations
Data communication method, wireless communication system, and base station
CN102014091A
Control channel transmission and reception method and system
CN103355007A
Method and device for setting a control channel and a data channel in a wireless communication system
CN103688480A
Method and apparatus for transmitting / receiving downlink signal considering antenna port relationship in wireless communication system
CN104641582A
Radio communication system
US20130107855A1
