A bridge service life assessment method, system and readable storage medium
By establishing a bridge service life assessment model and real-time data collection, it solves the problem of traditional bridge safety monitoring being difficult to achieve real-time, continuous monitoring and accurate assessment of service life, achieves accurate assessment and real-time monitoring of bridge service life, and improves the accuracy of safety management. sex and timeliness.
Patent Information
- Application Number
- CN202310203809.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-03-01
AI Technical Summary
Traditional bridge safety monitoring is difficult to achieve real-time, continuous and uninterrupted monitoring, and cannot accurately assess the service life of the bridge, resulting in potential safety hazards.
By obtaining the bridge construction materials and environmental factors, a service life assessment model is established, and sensors are used to real-time monitor weather data and image sensors are used to collect data on key parts of the bridge, the attenuation and defect area are calculated, and the remaining service life of the bridge is evaluated in real time.
It achieves accurate assessment and real-time monitoring of bridge service life, effectively avoids safety accidents, and improves the accuracy and timeliness of bridge safety management.
Smart Images

Figure CN116244806B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent evaluation technology, and in particular to an evaluation method, system and readable storage medium based on the service life of a bridge. Background Art
[0002] With the continuous improvement of transportation facilities, more and more bridges have been built and put into use. During the use of bridges, the structure will change due to external factors. This requires long-term monitoring of the bridge usage status to ensure that the bridge buildings are in a safe state of use and to issue early warning signals in time when a crisis occurs.
[0003] In recent years, due to the increasing number of heavy-duty vehicles in my country and other factors, traffic pressure has been increasing. At the same time, the corrosiveness caused by bad weather has also increased, which has had a significant negative impact on bridges and infrastructure structures that have been used for a certain period of time. Therefore, bridge health detection, structural safety assessment, and loss monitoring are particularly important. Traditional bridge safety monitoring is mainly based on manual inspections, supplemented by corresponding testing equipment, but it is difficult to achieve real-time, continuous and uninterrupted monitoring of bridges. The monitoring method is not intelligent enough, and traditional bridge safety monitoring cannot accurately assess the service life of bridges. Summary of the invention
[0004] In order to solve at least one of the above technical problems, the present invention proposes an evaluation method, system and readable storage medium based on the service life of the bridge, which can realize accurate evaluation of the service life of the bridge, grasp the current condition of the bridge, realize real-time monitoring of the service life of the bridge, and effectively avoid the occurrence of safety accidents.
[0005] The first aspect of the present invention proposes an evaluation method based on the service life of a bridge, the method comprising:
[0006] Obtaining the building material of the bridge and obtaining normalized environmental factors of the area where the bridge is located;
[0007] Analyze the weathering relationship of the building material under the normalized environmental factors;
[0008] Establishing a service life assessment model for the bridge based on the weathering relationship, and assessing the overall service life of the bridge through the service life assessment model;
[0009] The sensor collects the current weather data in real time and determines whether the weather data exceeds a preset threshold;
[0010] If yes, then calculating the attenuation of the weather data on the overall service life of the bridge according to the degree of influence of the weather data on the bridge;
[0011] Obtaining the construction completion time of the bridge, and calculating the time period between the current time and the construction completion time as the consumed service life;
[0012] The consumed service life and the attenuation are respectively subtracted from the overall service life to obtain the remaining service life of the bridge at the current time.
[0013] In this solution, after obtaining the remaining service life of the bridge at the current time, the method further includes:
[0014] The original image data of each key part of the bridge is collected in real time by an image sensor;
[0015] Defogging and enhancing the original image data, and binarizing the enhanced image data to obtain a grayscale image;
[0016] Performing image recognition and analysis processing on the grayscale image to determine whether there are defects in each key part of the bridge, and if so, calculating the defect area;
[0017] It is assumed that the bridge has m key parts, and the importance of the m key parts to the bridge is w1, w2, ..., w m , the defect areas of m key parts are s1,s2,…,s m , where w1+w2+…+w m =1;
[0018] The defect areas of the m key parts are multiplied by the corresponding importance ratios, and the products are accumulated to obtain the overall defect area of the bridge S = s1×w1+s2×w2+…+s m × m ;
[0019] A relationship curve between the defect area and the attenuation service life of the bridge is preset, and the calculated overall defect area S is substituted into the relationship curve to obtain the corresponding attenuation service life;
[0020] The remaining service life of the bridge at the current time is subtracted from the attenuated service life to obtain a corrected remaining service life.
[0021] In this solution, the original image data of each key part of the bridge is collected in real time by an image sensor, specifically including:
[0022] A key part is preset as a bridge pier, and the river water level lines at different periods of the preset historical period are obtained;
[0023] Cluster the river water levels at different periods in the historical period to obtain clustered water levels;
[0024] Marking corresponding coordinate positions on the bridge piers according to the clustered water level lines;
[0025] The acquisition angle of the image sensor is adjusted, and the acquisition sight line of the image sensor is always aligned with the coordinate position marked on the bridge pier.
[0026] In this scheme, the river water level lines at different periods in the historical period are clustered to obtain clustered water level lines, including:
[0027] Preset probability tables of floating objects hitting bridge piers at different river water levels;
[0028] Substituting different river water levels in historical periods into the event probability table, we can obtain the probability of floating objects hitting bridge piers per unit time at different river water levels;
[0029] Obtain the duration corresponding to different river water levels, multiply the duration of each river water level by the corresponding probability, and obtain the number of times floating objects hit the bridge pier at different river water levels;
[0030] Multiply each river water level by a corresponding number of times, and accumulate the products to obtain a first accumulation result; accumulate the number of times that floating objects hit the bridge piers at each river water level to obtain a second accumulation result;
[0031] The first accumulated result is divided by the second accumulated result to obtain the cluster waterline.
[0032] In this solution, a service life assessment model of the bridge is established based on the weathering relationship, and the overall service life of the bridge is assessed through the service life assessment model, specifically including:
[0033] Find all reference bridges that have reached the end of their service life within a preset area, and obtain the historical data of each reference bridge through the big data platform. The historical data of each reference bridge at least includes the environmental data of the corresponding reference bridge throughout its life cycle, as well as the corresponding actual service life;
[0034] Perform characteristic calculation on the environmental data in the historical data of each reference bridge to obtain respective first characteristic values;
[0035] Performing characteristic calculation on normalized environmental factors of the bridge to obtain a second characteristic value;
[0036] comparing the difference rate between the first characteristic value corresponding to the historical data of each reference bridge and the second characteristic value of the bridge;
[0037] adding the reference bridges whose difference rate is less than a first preset threshold into a correction queue;
[0038] Performing deep learning on the environmental data in the historical data of each reference bridge in the correction queue, and predicting the predicted service life corresponding to each reference bridge by the service life assessment model;
[0039] For each reference bridge, the corresponding predicted service life is subtracted from the corresponding actual service life to obtain the corresponding difference value;
[0040] The differences between the predicted service life and the actual service life of all reference bridges are averaged to obtain the corrected value;
[0041] The assessed overall service life of the bridge is added to the correction value to obtain a corrected overall service life.
[0042] In this solution, after obtaining the remaining service life of the bridge at the current time, the method further includes:
[0043] The length of the bridge is preset to be L, and the bridge has experienced d historical periods as of the current time;
[0044] Based on d historical periods, the traffic volume passing through the bridge is collected and obtained as f1, f2, ..., f d ;
[0045] Assuming the average weight of a single vehicle is g, the speed limit of the bridge is v, and the total load of the bridge in each historical period is calculated as Where j = 1, 2, ..., d;
[0046] The relationship table of the attenuation coefficient of different total loads on the service life of the bridge is preset, and the total load G of the bridge in each historical period is j Substitute them into the relationship table of the attenuation coefficients to match the corresponding attenuation coefficients β j ;
[0047] Get the duration of each historical period as T j , and the duration of each historical period T j Multiply by the corresponding attenuation coefficient β j , and obtain the overload life attenuation U in each historical period j =T j ×β j ;
[0048] The overload life attenuation of each historical period is accumulated to obtain the overall overload life attenuation of the bridge as of the current time.
[0049] The remaining service life of the bridge at the current time is subtracted from the overall overload life attenuation U of the bridge at the current time to obtain the corrected remaining service life.
[0050] The second aspect of the present invention further provides an evaluation system based on the service life of a bridge, comprising a memory and a processor, wherein the memory comprises an evaluation method program based on the service life of a bridge, and when the evaluation method program based on the service life of a bridge is executed by the processor, the following steps are implemented:
[0051] Obtaining the building material of the bridge and obtaining normalized environmental factors of the area where the bridge is located;
[0052] Analyze the weathering relationship of the building material under the normalized environmental factors;
[0053] Establishing a service life assessment model for the bridge based on the weathering relationship, and assessing the overall service life of the bridge through the service life assessment model;
[0054] The sensor collects the current weather data in real time and determines whether the weather data exceeds a preset threshold;
[0055] If yes, then calculating the attenuation of the weather data on the overall service life of the bridge according to the degree of influence of the weather data on the bridge;
[0056] Obtaining the construction completion time of the bridge, and calculating the time period between the current time and the construction completion time as the consumed service life;
[0057] The consumed service life and the attenuation are respectively subtracted from the overall service life to obtain the remaining service life of the bridge at the current time.
[0058] In this solution, after obtaining the remaining service life of the bridge at the current time, the evaluation method program based on the service life of the bridge further implements the following steps when executed by the processor:
[0059] The original image data of each key part of the bridge is collected in real time by an image sensor;
[0060] Defogging and enhancing the original image data, and binarizing the enhanced image data to obtain a grayscale image;
[0061] Performing image recognition and analysis processing on the grayscale image to determine whether there are defects in each key part of the bridge, and if so, calculating the defect area;
[0062] It is assumed that the bridge has m key parts, and the importance of the m key parts to the bridge is w1, w2, ..., w m , the defect areas of m key parts are s1,s2,…,s m, where w1+w2+…+w m =1;
[0063] The defect areas of the m key parts are multiplied by the corresponding importance ratios, and the products are accumulated to obtain the overall defect area of the bridge S = s1×w1+s2×w2+…+s m × m ;
[0064] A relationship curve between the defect area and the attenuation service life of the bridge is preset, and the calculated overall defect area S is substituted into the relationship curve to obtain the corresponding attenuation service life;
[0065] The remaining service life of the bridge at the current time is subtracted from the attenuated service life to obtain a corrected remaining service life.
[0066] In this solution, the original image data of each key part of the bridge is collected in real time by an image sensor, specifically including:
[0067] A key part is preset as a bridge pier, and the river water level lines at different periods of the preset historical period are obtained;
[0068] Cluster the river water levels at different periods in the historical period to obtain clustered water levels;
[0069] Marking corresponding coordinate positions on the bridge piers according to the clustered water level lines;
[0070] The acquisition angle of the image sensor is adjusted, and the acquisition sight line of the image sensor is always aligned with the coordinate position marked on the bridge pier.
[0071] The third aspect of the present invention also proposes a computer-readable storage medium, which includes an evaluation method program based on the service life of a bridge. When the evaluation method program based on the service life of a bridge is executed by a processor, the steps of the evaluation method based on the service life of a bridge as described above are implemented.
[0072] The present invention proposes an evaluation method, system and readable storage medium based on the service life of a bridge, which can realize an accurate evaluation of the service life of the bridge, grasp the current condition of the bridge, realize real-time monitoring of the service life of the bridge, and effectively avoid the occurrence of safety accidents.
[0073] Additional aspects and advantages of the present invention will be given in part in the following description and, in part, will be obvious from the following description or learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] Figure 1 A flow chart showing an evaluation method based on the service life of a bridge according to the present invention;
[0075] Figure 2 A block diagram of an evaluation system based on bridge service life of the present invention is shown. DETAILED DESCRIPTION
[0076] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0077] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.
[0078] Figure 1 A flow chart of an evaluation method based on bridge service life of the present invention is shown.
[0079] like Figure 1 As shown, the first aspect of the present invention proposes an evaluation method based on the service life of a bridge, the method comprising:
[0080] S102, obtaining the building material of the bridge and obtaining normalized environmental factors of the area where the bridge is located;
[0081] S104, analyzing the weathering relationship of the building material under the normalized environmental factors;
[0082] S106, establishing a service life assessment model for the bridge based on the weathering relationship, and assessing the overall service life of the bridge through the service life assessment model;
[0083] S108, collecting weather data of the current time in real time through sensors, and determining whether the weather data exceeds a preset threshold;
[0084] S110, if yes, then calculating the attenuation of the weather data on the overall service life of the bridge according to the degree of influence of the weather data on the bridge;
[0085] S112, obtaining the construction completion time of the bridge, and calculating the time period between the current time and the construction completion time as the consumed service life;
[0086] S114, subtracting the consumed service life and the attenuation from the overall service life to obtain the remaining service life of the bridge at the current time.
[0087] It can be understood that the present invention constructs a service life assessment model of the bridge by analyzing the weathering relationship of building materials in a normalized environment, and then evaluates the overall service life of the bridge. At the same time, since normalization is an ideal situation, its weathering relationship is more about considering the corrosion effect of carbon dioxide or water vapor on building materials (such as cement or steel). However, since bridges are usually located in open fields, they often face extreme weather conditions, such as strong winds, high temperatures, etc. These extreme weather conditions will reduce the service life of the bridge. For example, high temperatures will cause the bridge to expand, thereby affecting the stress inside the bridge, thereby causing damage to the structure inside the bridge, thereby reducing the service life. The present invention further combines sensors to monitor the weather data at the location of the bridge in real time, and analyzes the attenuation of the service life of the bridge due to extreme weather conditions, and finally calculates and obtains the remaining service life of the bridge at the current time, so that the regulatory authorities can promptly understand the use of the bridge and avoid the potential safety hazards caused by continuing to use it when its service life is exhausted.
[0088] According to a specific embodiment of the present invention, according to the influence degree of the weather data on the bridge, calculating the attenuation of the weather data on the overall service life of the bridge specifically includes:
[0089] Preset the aggravated attenuation factor α of the bridge life by different weather data. When the weather data is lower than the preset threshold, the aggravated attenuation factor α=1. When the weather data is greater than the preset threshold, the larger the weather data, the larger the corresponding aggravated attenuation factor α. In this way, a corresponding relationship table between various weather data and aggravated attenuation factor α is established.
[0090] According to the correspondence table, find out the accelerated attenuation factor α of the weather data, and obtain the duration t of the weather data up to the current time;
[0091] According to the accelerated attenuation factor α and duration t of the weather data, the attenuation amount q=(α-1)×t of the weather data on the overall service life of the bridge is calculated.
[0092] It should be noted that if the weather data is not greater than the preset threshold, the attenuation q=0 can be obtained, that is, the consumption of the service life of the bridge is completely limited by the influence of normalized environmental factors on bridge weathering.
[0093] It can be understood that there may be multiple types of weather data that exceed the preset threshold before the current time (for example, the first time period is high temperature weather, and the second time period is strong wind weather). In this case, the attenuation of each type of weather data is calculated separately, and the attenuation of each type of weather data is accumulated to obtain the attenuation of the overall weather data.
[0094] According to a specific embodiment of the present invention, according to the influence degree of the weather data on the bridge, calculating the attenuation of the weather data on the overall service life of the bridge specifically includes:
[0095] The preset weather data includes n types of fused meteorological data, and establishes various types of meteorological data and the aggravation attenuation factor α i The corresponding relationship table, where α i represents the aggravation attenuation factor of the i-th meteorological data, and i=1,2,…,n;
[0096] According to the corresponding relationship table of various types, the accelerated attenuation factor α of various types of meteorological data is obtained respectively. i , and obtain the duration t of various types of meteorological data up to the current time i ;
[0097] According to the accelerated attenuation factor α of various types of meteorological data i and duration t i , calculate the attenuation of the weather data on the overall service life of the bridge p = (α1-1)×t1+(α2-1)×t2+…+(α n -1)×t n .
[0098] It can be understood that if the weather data includes multiple types of meteorological data, such as strong wind and high temperature fusion in the same period, or fusion in different time periods, it is necessary to calculate the attenuation of various types of meteorological data and add them up to obtain the overall attenuation.
[0099] According to an embodiment of the present invention, after obtaining the remaining service life of the bridge at the current time, the method further includes:
[0100] The original image data of each key part of the bridge is collected in real time by an image sensor;
[0101] Defogging and enhancing the original image data, and binarizing the enhanced image data to obtain a grayscale image;
[0102] Performing image recognition and analysis processing on the grayscale image to determine whether there are defects in each key part of the bridge, and if so, calculating the defect area;
[0103] It is assumed that the bridge has m key parts, and the importance of the m key parts to the bridge is w1, w2, ..., w m , the defect areas of m key parts are s1,s2,…,s m , where w1+w2+…+w m =1;
[0104] The defect areas of the m key parts are multiplied by the corresponding importance ratios, and the products are accumulated to obtain the overall defect area of the bridge S = s1×w1+s2×w2+…+s m × m ;
[0105] A relationship curve between the defect area and the attenuation service life of the bridge is preset, and the calculated overall defect area S is substituted into the relationship curve to obtain the corresponding attenuation service life;
[0106] The remaining service life of the bridge at the current time is subtracted from the attenuated service life to obtain a corrected remaining service life.
[0107] It can be understood that if a bridge has defects, the service life of the bridge will be reduced. The larger the defect area, the greater the reduced service life. The present invention continues to introduce the analysis of the reduction in service life due to the defect area, and further corrects the remaining service life, so as to evaluate a more accurate remaining service life. At the same time, since a bridge has multiple key parts, such as piers, beams, bridge decks, etc., each key part has different importance to the bridge. The present invention further combines the importance of each key part and the defect area to obtain the overall defect area, and then accurately calculates the reduced service life based on the overall defect area.
[0108] According to a specific embodiment of the present invention, each key part is provided with a limit defect area threshold. Once the defect area of a key part exceeds the corresponding limit defect area threshold, it is directly regarded that the remaining service life of the bridge has been exhausted, and an alarm is issued. It can be understood that when the defect area is large and has seriously affected the safety of the main structure of the bridge, it is directly regarded as scrapped.
[0109] According to an embodiment of the present invention, the original image data of each key part of the bridge is collected in real time by an image sensor, specifically including:
[0110] A key part is preset as a bridge pier, and the river water level lines at different periods of the preset historical period are obtained;
[0111] Cluster the river water levels at different periods in the historical period to obtain clustered water levels;
[0112] Marking corresponding coordinate positions on the bridge piers according to the clustered water level lines;
[0113] The acquisition angle of the image sensor is adjusted, and the acquisition sight line of the image sensor is always aligned with the coordinate position marked on the bridge pier.
[0114] According to a specific embodiment of the present invention, clustering river water levels at different periods in the historical period to obtain clustered water levels specifically includes:
[0115] The preset historical period has R time periods, and each of the R time periods has a corresponding water level line h1, h2, …, h R , and the corresponding durations t1, t2, …, t R ;
[0116] Set the water level lines h1, h2, ..., h R Respectively with the corresponding duration t1, t2, ..., t R Multiply them, accumulate the products, and divide the accumulated result by the sum of the duration of R time periods to get the cluster water level line
[0117] It should be noted that there are a large number of floating objects in the river. By analyzing the impact of floating objects on the bridge piers, it is usually found that after multiple impacts, defects may occur in the bridge piers. In order to focus the image sensor's attention more on the position that is susceptible to impact, this embodiment adjusts the angle of the image sensor and makes the image sensor's acquisition line of sight always aligned with the coordinate position of the clustered water level line at the bridge pier. It can be understood that this embodiment comprehensively considers the duration of each water level line for clustering, and makes the obtained clustered water level line close to the water level line in more time periods. The clustered water level line is actually a common water level line of the river. It is easy for floating objects (such as tree stumps) to hit the bridge piers at this water level line, and the bridge section at the clustered water level line is most likely to have defects. Therefore, this embodiment aligns the image collector's acquisition line of sight with the coordinate position of the clustered water level line at the bridge pier.
[0118] According to a specific embodiment of the present invention, real-time collection of original image data of various key parts of the bridge by an image sensor specifically includes:
[0119] Real-time collection of the river water level at the current time;
[0120] Obtain the corresponding coordinate position on the bridge pier based on the river water level at the current time;
[0121] It is determined whether the image sensor's acquisition sight line is aligned with the coordinate position at the current time. If not, the image sensor's acquisition sight line is adjusted to be aligned with the coordinate position.
[0122] It is understandable that when the water level changes in the later stage, the angle of the image sensor will change accordingly. Without considering frequent adjustments, this embodiment always focuses the attention of the image sensor on the coordinate position of the water level corresponding to the bridge pier, so that the impact of floating objects on the bridge pier can be monitored at all times, the monitoring intensity of the bridge pier is enhanced, and the accuracy of defect detection is further improved.
[0123] According to an embodiment of the present invention, clustering river water levels at different periods in historical periods to obtain clustered water levels specifically includes:
[0124] Preset probability tables of floating objects hitting bridge piers at different river water levels;
[0125] Substituting different river water levels in historical periods into the event probability table, we can obtain the probability of floating objects hitting bridge piers per unit time at different river water levels;
[0126] Obtain the duration corresponding to different river water levels, multiply the duration of each river water level by the corresponding probability, and obtain the number of times floating objects hit the bridge pier at different river water levels;
[0127] Multiply each river water level by a corresponding number of times, and accumulate the products to obtain a first accumulation result; accumulate the number of times that floating objects hit the bridge piers at each river water level to obtain a second accumulation result;
[0128] The first accumulated result is divided by the second accumulated result to obtain the cluster waterline.
[0129] It should be noted that as the river water level continues to rise, the probability of floating objects gradually increases. In fact, as the river water level rises, heavy rainfall or floods may occur upstream. Heavy rainfall or floods will wash objects along the river downstream, such as tree stumps. Large tree stumps float and move rapidly with the river, and then hit the bridge piers, which is likely to cause the risk of bridge pier defects. This embodiment combines the duration of each water level line and the probability of floating object collision to further achieve accurate clustering of water levels, and focus the image sensor on the clustered water level lines, while performing effective image acquisition, further reducing the frequency of image sensor adjustment.
[0130] According to an embodiment of the present invention, a service life assessment model of the bridge is established based on the weathering relationship, and the overall service life of the bridge is assessed by the service life assessment model, specifically including:
[0131] Find all reference bridges that have reached the end of their service life within a preset area, and obtain the historical data of each reference bridge through the big data platform. The historical data of each reference bridge at least includes the environmental data of the corresponding reference bridge throughout its life cycle, as well as the corresponding actual service life;
[0132] Perform characteristic calculation on the environmental data in the historical data of each reference bridge to obtain respective first characteristic values;
[0133] Performing characteristic calculation on normalized environmental factors of the bridge to obtain a second characteristic value;
[0134] comparing the difference rate between the first characteristic value corresponding to the historical data of each reference bridge and the second characteristic value of the bridge;
[0135] adding the reference bridges whose difference rate is less than a first preset threshold into a correction queue;
[0136] Performing deep learning on the environmental data in the historical data of each reference bridge in the correction queue, and predicting the predicted service life corresponding to each reference bridge by the service life assessment model;
[0137] For each reference bridge, the corresponding predicted service life is subtracted from the corresponding actual service life to obtain the corresponding difference value;
[0138] The differences between the predicted service life and the actual service life of all reference bridges are averaged to obtain the corrected value;
[0139] The assessed overall service life of the bridge is added to the correction value to obtain a corrected overall service life.
[0140] It should be noted that the service life assessment model obtains the overall service life based on the normalized environmental factors of the area where the bridge is located. However, due to the diversity of environmental factors and the limitations of machine learning, the overall service life assessed by the service life assessment model may be biased. In order to further correct the assessed overall service life, an embodiment of the present invention analyzes multiple reference bridges with similar environmental characteristics within a preset area, and corrects the assessment result of the overall service life of the target bridge by using the difference between the predicted service life and the actual service life of the reference bridge, thereby improving the accuracy of the bridge service life assessment.
[0141] It can be understood that the environmental factors or environmental data can be the altitude of the bridge, the landform characteristics, and the surrounding vegetation and greening conditions. These factors around the bridge will affect the carbon dioxide concentration and humidity in the air, and the carbon dioxide concentration and humidity restrict the weathering speed of the bridge. Therefore, in order to further improve the accuracy of the correction, the present invention gives priority to reference bridges with similar environmental characteristic values.
[0142] According to an embodiment of the present invention, after obtaining the remaining service life of the bridge at the current time, the method further includes:
[0143] The length of the bridge is preset to be L, and the bridge has experienced d historical periods as of the current time;
[0144] Based on d historical periods, the traffic volume passing through the bridge is collected and obtained as f1, f2, ..., f d ;
[0145] Assuming the average weight of a single vehicle is g, the speed limit of the bridge is v, and the total load of the bridge in each historical period is calculated as Where j = 1, 2, ..., d;
[0146] The relationship table of the attenuation coefficient of different total loads on the service life of the bridge is preset, and the total load G of the bridge in each historical period is j Substitute them into the relationship table of the attenuation coefficients to match the corresponding attenuation coefficients β j ;
[0147] Get the duration of each historical period as T j , and the duration of each historical period T j Multiply by the corresponding attenuation coefficient β j , and obtain the overload life attenuation U in each historical period j =T j ×β j ;
[0148] The overload life attenuation of each historical period is accumulated to obtain the overall overload life attenuation of the bridge as of the current time.
[0149] The remaining service life of the bridge at the current time is subtracted from the overall overload life attenuation U of the bridge at the current time to obtain the corrected remaining service life.
[0150] It is understandable that if a bridge is overloaded for a long time, the service life of the bridge will be reduced. Based on the remaining service life, this embodiment further analyzes the impact of the total overload load on the bridge, so as to evaluate a more accurate remaining service life.
[0151] It can be understood that the traffic volume represents the number of vehicles passing through the bridge per unit time. When calculating the average weight of a single vehicle, sample vehicles passing through the bridge can be collected in a preset time period, and the weights of the sample vehicles can be averaged to obtain the average weight.
[0152] According to a specific embodiment of the present invention, the standard load capacity of the bridge is preset to ΔG. When the total load in a historical period is less than or equal to the standard load capacity ΔG, the attenuation coefficient of the historical period is 0. When the total load exceeds the standard load capacity ΔG, the attenuation coefficient is greater than 0. The more the load exceeds the standard load capacity ΔG, the greater the corresponding attenuation coefficient.
[0153] Figure 2 A block diagram of an evaluation system based on bridge service life of the present invention is shown.
[0154] like Figure 2As shown, the second aspect of the present invention further proposes an evaluation system 2 based on the service life of a bridge, comprising a memory 21 and a processor 22, wherein the memory comprises an evaluation method program based on the service life of a bridge, and when the evaluation method program based on the service life of a bridge is executed by the processor, the following steps are implemented:
[0155] Obtaining the building material of the bridge and obtaining normalized environmental factors of the area where the bridge is located;
[0156] Analyze the weathering relationship of the building material under the normalized environmental factors;
[0157] Establishing a service life assessment model for the bridge based on the weathering relationship, and assessing the overall service life of the bridge through the service life assessment model;
[0158] The sensor collects the current weather data in real time and determines whether the weather data exceeds a preset threshold;
[0159] If yes, then calculating the attenuation of the weather data on the overall service life of the bridge according to the degree of influence of the weather data on the bridge;
[0160] Obtaining the construction completion time of the bridge, and calculating the time period between the current time and the construction completion time as the consumed service life;
[0161] The consumed service life and the attenuation are respectively subtracted from the overall service life to obtain the remaining service life of the bridge at the current time.
[0162] According to an embodiment of the present invention, after obtaining the remaining service life of the bridge at the current time, the evaluation method program based on the service life of the bridge further implements the following steps when executed by the processor:
[0163] The original image data of each key part of the bridge is collected in real time by an image sensor;
[0164] Defogging and enhancing the original image data, and binarizing the enhanced image data to obtain a grayscale image;
[0165] Performing image recognition and analysis processing on the grayscale image to determine whether there are defects in each key part of the bridge, and if so, calculating the defect area;
[0166] It is assumed that the bridge has m key parts, and the importance of the m key parts to the bridge is w1, w2, ..., w m , the defect areas of m key parts are s1,s2,…,s m , where w1+w2+…+wm =1;
[0167] The defect areas of the m key parts are multiplied by the corresponding importance ratios, and the products are accumulated to obtain the overall defect area of the bridge S = s1×w1+s2×w2+…+s n × n ;
[0168] A relationship curve between the defect area and the attenuation service life of the bridge is preset, and the calculated overall defect area S is substituted into the relationship curve to obtain the corresponding attenuation service life;
[0169] The remaining service life of the bridge at the current time is subtracted from the attenuated service life to obtain a corrected remaining service life.
[0170] According to an embodiment of the present invention, the original image data of each key part of the bridge is collected in real time by an image sensor, specifically including:
[0171] A key part is preset as a bridge pier, and the river water level lines at different periods of the preset historical period are obtained;
[0172] Cluster the river water levels at different periods in the historical period to obtain clustered water levels;
[0173] Marking corresponding coordinate positions on the bridge piers according to the clustered water level lines;
[0174] The acquisition angle of the image sensor is adjusted, and the acquisition sight line of the image sensor is always aligned with the coordinate position marked on the bridge pier.
[0175] According to an embodiment of the present invention, clustering river water levels at different periods in historical periods to obtain clustered water levels specifically includes:
[0176] Preset probability tables of floating objects hitting bridge piers at different river water levels;
[0177] Substituting different river water levels in historical periods into the event probability table, we can obtain the probability of floating objects hitting bridge piers per unit time at different river water levels;
[0178] Obtain the duration corresponding to different river water levels, multiply the duration of each river water level by the corresponding probability, and obtain the number of times floating objects hit the bridge pier at different river water levels;
[0179] Multiply each river water level by a corresponding number of times, and accumulate the products to obtain a first accumulation result; accumulate the number of times that floating objects hit the bridge piers at each river water level to obtain a second accumulation result;
[0180] The first accumulated result is divided by the second accumulated result to obtain the cluster waterline.
[0181] According to an embodiment of the present invention, a service life assessment model of the bridge is established based on the weathering relationship, and the overall service life of the bridge is assessed by the service life assessment model, specifically including:
[0182] Find all reference bridges that have reached the end of their service life within a preset area, and obtain the historical data of each reference bridge through the big data platform. The historical data of each reference bridge at least includes the environmental data of the corresponding reference bridge throughout its life cycle, as well as the corresponding actual service life;
[0183] Perform characteristic calculation on the environmental data in the historical data of each reference bridge to obtain respective first characteristic values;
[0184] Performing characteristic calculation on normalized environmental factors of the bridge to obtain a second characteristic value;
[0185] comparing the difference rate between the first characteristic value corresponding to the historical data of each reference bridge and the second characteristic value of the bridge;
[0186] adding the reference bridges whose difference rate is less than a first preset threshold into a correction queue;
[0187] Performing deep learning on the environmental data in the historical data of each reference bridge in the correction queue, and predicting the predicted service life corresponding to each reference bridge by the service life assessment model;
[0188] For each reference bridge, the corresponding predicted service life is subtracted from the corresponding actual service life to obtain the corresponding difference value;
[0189] The differences between the predicted service life and the actual service life of all reference bridges are averaged to obtain the corrected value;
[0190] The assessed overall service life of the bridge is added to the correction value to obtain a corrected overall service life.
[0191] According to an embodiment of the present invention, after obtaining the remaining service life of the bridge at the current time, the evaluation method program based on the service life of the bridge further implements the following steps when executed by the processor:
[0192] The length of the bridge is preset to be L, and the bridge has experienced d historical periods as of the current time;
[0193] Based on d historical periods, the traffic volume passing through the bridge is collected and obtained as f1, f2, ..., f d ;
[0194] Assuming the average weight of a single vehicle is g, the speed limit of the bridge is v, and the total load of the bridge in each historical period is calculated as Where j = 1, 2, ..., d;
[0195] The relationship table of the attenuation coefficient of different total loads on the service life of the bridge is preset, and the total load G of the bridge in each historical period is j Substitute them into the relationship table of the attenuation coefficients to match the corresponding attenuation coefficients β j ;
[0196] Get the duration of each historical period as T j , and the duration of each historical period T j Multiply by the corresponding attenuation coefficient β j , and obtain the overload life attenuation U in each historical period j =T j ×β j ;
[0197] The overload life attenuation of each historical period is accumulated to obtain the overall overload life attenuation of the bridge as of the current time.
[0198] The remaining service life of the bridge at the current time is subtracted from the overall overload life attenuation U of the bridge at the current time to obtain the corrected remaining service life.
[0199] The third aspect of the present invention also proposes a computer-readable storage medium, which includes an evaluation method program based on the service life of a bridge. When the evaluation method program based on the service life of a bridge is executed by a processor, the steps of the evaluation method based on the service life of a bridge as described above are implemented.
[0200] The present invention proposes an evaluation method, system and readable storage medium based on the service life of a bridge, which can realize an accurate evaluation of the service life of the bridge, grasp the current condition of the bridge, realize real-time monitoring of the service life of the bridge, and effectively avoid the occurrence of safety accidents.
[0201] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.
[0202] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units; they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0203] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0204] Those skilled in the art can understand that: all or part of the steps of implementing the above method embodiments can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps of the above method embodiments; and the aforementioned storage medium includes: mobile storage devices, read-only memories (ROM, Read-Only Memory), random access memories (RAM, Random Access Memory), disks or optical disks, and other media that can store program codes.
[0205] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.
[0206] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A bridge service life assessment method, characterized in that: The method comprises: Obtaining the building material of the bridge and obtaining normalized environmental factors of the area where the bridge is located; Analyze the weathering relationship of the building material under the normalized environmental factors; Establishing a service life assessment model for the bridge based on the weathering relationship, and assessing the overall service life of the bridge through the service life assessment model; The sensor collects the current weather data in real time and determines whether the weather data exceeds a preset threshold; If yes, then calculating the attenuation of the weather data on the overall service life of the bridge according to the degree of influence of the weather data on the bridge; Obtaining the construction completion time of the bridge, and calculating the time period between the current time and the construction completion time as the consumed service life; Subtract the consumed service life and the attenuation from the overall service life to obtain the remaining service life of the bridge at the current time; After obtaining the remaining service life of the bridge at the current time, the method further includes: The original image data of each key part of the bridge is collected in real time by an image sensor; Defogging and enhancing the original image data, and binarizing the enhanced image data to obtain a grayscale image; Performing image recognition and analysis processing on the grayscale image to determine whether there are defects in each key part of the bridge, and if so, calculating the defect area; It is assumed that the bridge has m key parts, and the importance of the m key parts to the bridge is respectively , the defect areas of m key parts are ,in ; The defect areas of the m key parts are multiplied by the corresponding importance ratios, and the products are accumulated to obtain the overall defect area of the bridge. ; The relationship curve between the bridge defect area and the attenuation service life is preset, and the overall defect area is calculated , substitute into the relationship curve to obtain the corresponding attenuation service life; The remaining service life of the bridge at the current time is subtracted from the attenuated service life to obtain a corrected remaining service life.
2. The evaluation method based on the service life of a bridge according to claim 1 is characterized in that: The original image data of each key part of the bridge is collected in real time by an image sensor, specifically including: A key part is preset as a bridge pier, and the river water level lines at different periods of the preset historical period are obtained; Cluster the river water levels at different periods in the historical period to obtain clustered water levels; Marking corresponding coordinate positions on the bridge piers according to the clustered water level lines; The acquisition angle of the image sensor is adjusted, and the acquisition sight line of the image sensor is always aligned with the coordinate position marked on the bridge pier.
3. The evaluation method based on the service life of a bridge according to claim 2 is characterized in that: Cluster the river water levels at different periods in the historical period to obtain clustered water levels, including: Preset probability tables of floating objects hitting bridge piers at different river water levels; Substituting different river water levels in historical periods into the event probability table, we can obtain the probability of floating objects hitting bridge piers per unit time at different river water levels; Obtain the duration corresponding to different river water levels, multiply the duration of each river water level by the corresponding probability, and obtain the number of times floating objects hit the bridge pier at different river water levels; Multiply each river water level by a corresponding number of times, and accumulate the products to obtain a first accumulation result; accumulate the number of times that floating objects hit the bridge piers at each river water level to obtain a second accumulation result; The first accumulated result is divided by the second accumulated result to obtain the cluster waterline.
4. The evaluation method based on the service life of a bridge according to claim 1 is characterized in that: A service life assessment model of the bridge is established based on the weathering relationship, and the overall service life of the bridge is assessed by the service life assessment model, specifically including: Find all reference bridges that have reached the end of their service life within a preset area, and obtain the historical data of each reference bridge through the big data platform. The historical data of each reference bridge at least includes the environmental data of the corresponding reference bridge throughout its life cycle, as well as the corresponding actual service life; Perform characteristic calculation on the environmental data in the historical data of each reference bridge to obtain respective first characteristic values; Performing characteristic calculation on normalized environmental factors of the bridge to obtain a second characteristic value; comparing the difference rate between the first characteristic value corresponding to the historical data of each reference bridge and the second characteristic value of the bridge; adding the reference bridges whose difference rate is less than a first preset threshold into a correction queue; Performing deep learning on the environmental data in the historical data of each reference bridge in the correction queue, and predicting the predicted service life corresponding to each reference bridge by the service life assessment model; For each reference bridge, the corresponding predicted service life is subtracted from the corresponding actual service life to obtain the corresponding difference value; The differences between the predicted service life and the actual service life of all reference bridges are averaged to obtain the corrected value; The assessed overall service life of the bridge is added to the correction value to obtain a corrected overall service life.
5. The evaluation method based on bridge service life according to claim 1 is characterized in that: After obtaining the remaining service life of the bridge at the current time, the method further includes: The bridge length is assumed to be As of now, the bridge has experienced historical period; based on The traffic volume passing through the bridge is collected in historical periods. ; The average weight of a single vehicle is assumed to be , the speed limit of the bridge is , the total load of the bridge in each historical period is calculated as ,in ; The relationship table of the attenuation coefficient of different total loads on the service life of the bridge is preset, and the total load of the bridge in each historical period is Substitute them into the relationship table of the attenuation coefficients to match the corresponding attenuation coefficients ; Get the duration of each historical period as , and the duration of each historical period Multiply by the corresponding attenuation coefficient , and obtain the overload life attenuation of each historical period ; The overload life attenuation of each historical period is accumulated to obtain the overall overload life attenuation of the bridge as of the current time. ; Subtract the overall overload life attenuation of the bridge at the current time from the remaining service life of the bridge at the current time. , and obtain the corrected remaining service life.
6. An evaluation system based on bridge service life, characterized in that: The invention comprises a memory and a processor, wherein the memory comprises an evaluation method program based on the service life of a bridge, and when the evaluation method program based on the service life of a bridge is executed by the processor, the following steps are implemented: Obtaining the building material of the bridge and obtaining normalized environmental factors of the area where the bridge is located; Analyze the weathering relationship of the building material under the normalized environmental factors; Establishing a service life assessment model for the bridge based on the weathering relationship, and assessing the overall service life of the bridge through the service life assessment model; The sensor collects the current weather data in real time and determines whether the weather data exceeds a preset threshold; If yes, then calculating the attenuation of the weather data on the overall service life of the bridge according to the degree of influence of the weather data on the bridge; Obtaining the construction completion time of the bridge, and calculating the time period between the current time and the construction completion time as the consumed service life; Subtract the consumed service life and the attenuation from the overall service life to obtain the remaining service life of the bridge at the current time; After obtaining the remaining service life of the bridge at the current time, the evaluation method program based on the service life of the bridge further implements the following steps when executed by the processor: The original image data of each key part of the bridge is collected in real time by an image sensor; Defogging and enhancing the original image data, and binarizing the enhanced image data to obtain a grayscale image; Performing image recognition and analysis processing on the grayscale image to determine whether there are defects in each key part of the bridge, and if so, calculating the defect area; It is assumed that the bridge has m key parts, and the importance of the m key parts to the bridge is respectively , the defect areas of m key parts are ,in ; The defect areas of the m key parts are multiplied by the corresponding importance ratios, and the products are accumulated to obtain the overall defect area of the bridge. ; The relationship curve between the bridge defect area and the attenuation service life is preset, and the overall defect area is calculated , substitute into the relationship curve to obtain the corresponding attenuation service life; The remaining service life of the bridge at the current time is subtracted from the attenuated service life to obtain a corrected remaining service life.
7. The bridge service life evaluation system according to claim 6, characterized in that: The original image data of each key part of the bridge is collected in real time by an image sensor, specifically including: A key part is preset as a bridge pier, and the river water level lines at different periods of the preset historical period are obtained; Cluster the river water levels at different periods in the historical period to obtain clustered water levels; Marking corresponding coordinate positions on the bridge piers according to the clustered water level lines; The acquisition angle of the image sensor is adjusted, and the acquisition sight line of the image sensor is always aligned with the coordinate position marked on the bridge pier.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes an evaluation method program based on the service life of a bridge. When the evaluation method program based on the service life of a bridge is executed by a processor, the steps of an evaluation method based on the service life of a bridge as described in any one of claims 1 to 5 are implemented.