Pipeline construction line and grade setter
By combining the pipe installation device and the remote processing unit, the problem of controlling the route and slope in underground pipeline construction was solved, achieving high-precision pipeline installation, reducing construction costs and delays, and improving the efficiency of construction quality control.
Patent Information
- Application Number
- CN202180081574.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-12-21
- Filing Date
- 2021-12-17
- Publication Date
- 2026-05-12
- Estimated Expiration
- 2041-12-17
AI Technical Summary
In existing technologies, it is difficult to achieve high-precision control of the route and slope during underground pipeline construction, which leads to increased construction costs, schedule delays, and pipeline installation deviations, affecting the pipeline's flow characteristics and maintenance frequency.
By employing a pipe installation device and a remote processing and recording unit, the slope and position of the pipeline are monitored in real time through electronic components, ensuring that the pipeline installation conforms to the design plan, reducing the need for on-site surveyors, and transmitting data in real time to generate as-built plans.
It achieves high precision and speed in pipeline installation, reduces construction and inspection costs, minimizes the risk of construction delays and deviations from contracts, and improves the efficiency of construction quality control.
Smart Images

Figure CN116964278B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the setting of lines and slopes for underground pipes. More specifically, this invention relates to an improved system and apparatus for setting lines and slopes for underground pipes that match a design plan. Background Technology
[0002] Construction projects typically involve four parties: the owner, the contractor, the engineer, and an independent third-party inspector. The construction of underground pipelines must conform to the design plans and specifications prepared by the engineer.
[0003] Typically, once the ground is cleared, the contractor will send his surveyor to lay out the ground on-site according to the design plan. The contractor's surveyor places offset pipe stakes on the ground according to the instructions shown on the design plan ("offset stakes"), and then the contractor can align the excavation site with the designated pipe.
[0004] Typical measurements for gravity pipe installations require high precision. For example, streamline station layout is within ±0.2 feet every 25 feet along the tangent and every 10 feet along the curve, alignment is within ±0.1 feet, and height is within ±0.01 feet.
[0005] Open trench construction is a common practice for pipe installation, especially in open, undeveloped areas. Construction in developed and / or developing areas requires minimal impact. The trench dug to place the pipe is typically the width of the pipe's outer diameter plus one foot on each side. Therefore, deep and narrow trenches are most desirable. This type of construction makes achieving accurate pipe installation more difficult and time-consuming, as contractors must use trench boxes and / or other support equipment to ensure safe construction in deep and narrow trenches (Figure 1, 101).
[0006] Pipes made of concrete and metal (except for special corrosion-resistant stainless steel alloys) used for conveying wastewater are susceptible to corrosion from hydrogen sulfide gas produced by septic tank biological waste carried in the wastewater. Therefore, PVC and HDPE are preferred materials for pipes because they can withstand the corrosion of hydrogen sulfide gas. Similarly, PVC-lined concrete pipes, epoxy-coated lined steel pipes, and clay pipes are also used for conveying wastewater. PVC and HDPE are flexible pipes and can deform if improperly installed. Nevertheless, low-cost PVC pipes are the most widely used in sewer piping installations.
[0007] To construct and install the pipeline, the contractor's surveyors first lay out the ground at the pipeline offset, as shown on the design plan, so that the contractor can use a backhoe to dig along the designated pipeline alignment and simultaneously move the trench box (102). Due to weight limitations and the specific depth of the trench, trench boxes are available in several sizes. For a 30-foot deep trench, three trench boxes must be stacked vertically (103).
[0008] Excavation, lowering, and stacking of trench boxes are concurrent operations. After the trench is excavated to the depth set by the offset stakes, the pipe is installed at the designed height, and a layer of padding material is placed and compacted to the height of the pipe spring line (approximately half the pipe diameter).
[0009] During this process, the contractor's surveyors and third-party surveyors should measure the bottom of each laid pipe immediately after laying a layer of bedding material, and compact the compacted soil layer to the height of the pipe spring line before filling the trench and covering the pipe.
[0010] If the wiring and slope are not checked immediately after each new 20-foot pipe is installed, misplaced pipes can result in an up-and-down and jagged finished wiring due to the flexible nature of pipes such as PVC. Even the most experienced installers may install pipes that deviate from the design plan due to (1) the deflection of PVC pipes at the joint (Fig. 2, 201) and (2) the flexible longitudinal deflection of PVC pipes (Fig. 2, 202). For example, pipe joints are flexible and can bend up to 5°. When two pipes are joined, this flexibility can cause a gradient deviation of up to 8% in the 360° direction. In the installation of a 20-foot new pipe, a 1% slope deviation can result in a height deviation of up to 2.4 inches.
[0011] Performing verification measurements on each pipe installed has a significant impact on construction costs and schedule.
[0012] The increased construction costs are primarily due to the need for on-site surveyors to measure the inner bottom of each pipe, and the delays caused by the contractor's pipe installers having to pause work to allow the surveyors to take measurements. This not only slows down the installation process but also requires the contractor's surveyors to be on-site at all times. Most contractors cannot afford to pay for backup surveyors within their project budget. Therefore, contractors take the risk and rely on pipe installers to put in more effort while laying pipes based on offset stakes, with or without laser pointers. This is often done without taking measurements after each pipe is laid to confirm that the alignment, slope, and other characteristics of the pipes conform to the design plan.
[0013] The extended project timeline necessitates the practice of third-party inspectors, who verify the as-built documentation for each section of pipe installed, either after the surveyors have taken measurements or at least after the pipe installers have laid the pipes. Using third-party inspectors can reduce construction time and significantly decrease the contractor's daily output.
[0014] Therefore, as-built inspections are typically not performed on every installed pipe, but only at access panels at a fixed height. This has little or no impact on intermediate pipe construction. Slightly downward or upward-constructed sewer lines can impair the designed flow characteristics of the piping.
[0015] When contractors suspect such damage, many rarely remove the installed pipes to reinstall them at the correct slope and angle. Instead, many contractors frequently adjust the angle or slope of the remaining pipe to be installed so that it connects to the next access port at the correct height and position. This results in incorrect pipe slope, and bulges or depressions in the pipes can accumulate debris and deposits. At best, this requires frequent and costly cleaning and maintenance; at worst, it can lead to a surge in backup services and access ports for the end user.
[0016] Most pipe manufacturers recommend that contractors use a pipe joining tool (Figure 1, 104) to join the pipes at the factory reference marks.
[0017] For lifting and joining large-diameter pipes, contractors can use a power pipe pusher (Fig. 1, 105). However, to save money and time, contractors can simply use a backhoe (106) to lift the pipe and place it in the trench, and push the pipe into another pipe to join it. This alternative approach may result in misaligned pipe installation.
[0018] Today, using laser beams (Figure 3, 301) to set pipe slopes is widespread. A laser beam diverges with increasing distance from the target. The beam divergence angle is defined as the angular measure of how the beam diameter increases with distance from the laser aperture. The beam divergence angle is measured in milliradians (mrad) or degrees (°). In short, it represents how the beam grows from the source to the target. The practice of using laser beams for precise slope setting depends heavily on the skill and diligence of the pipe installer. Nevertheless, the accuracy of pipe laying decreases as the new pipe moves further away from the source beam.
[0019] Quality control over the alignment and slope of each installed pipe is crucial for flexible PVC gravity sewer systems. Misalignment in the construction of sewer lines between access ports, both upwards and downwards, can impair flow. At best, this requires frequent and costly cleaning and maintenance; at worst, it can lead to a surge in backup services and access ports for the end user. Summary of the Invention
[0020] This invention is embodied in a construction quality control tool that enables owners and contractors to meet design plans and specifications. This tool allows for easy measurement of pipe slope without the need for on-site surveyors and enables rapid, real-time transmission of printed data for third-party inspectors to prepare as-built drawings, thus saving time and costs for both parties. Most importantly, this tool ensures safe and accurate pipe installation to prevent future construction problems.
[0021] A preferred embodiment of the present invention includes two devices: (1) a pipe setting device and (2) a remote processing and recording unit. The pipe setting device is installed inside the new pipe to be installed. The pipe setting device helps pipe installers reliably and accurately install pipes that match the route and slope (fixed x, y, z) according to the design plan. The remote processing and recording unit enables construction supervisors and third-party inspectors to monitor the pipe installation in real time.
[0022] Figures 17 and 18 illustrate two exemplary embodiments of the pipe installation device 18. As shown, a preferred pipe installation device 18 includes a central housing 66 and a hollow tube 98. The hollow tube 98 houses electronic components for monitoring the slope, height, and orientation of the pipe being installed. Typically, these electronic components include a 2-axis inclinometer, a digital magnetic compass, a single-board computer, an SD memory card, a Wi-Fi transmitter, and a battery. Furthermore, a mobile device can be wirelessly connected to one or more of these electronic components for real-time remote monitoring of the pipe installation.
[0023] The preferred central housing 66 has a curved surface 92 that abuts against the inner surface 94 of the tube. When the curved surface 92 is pressed against the inner surface of the tube, it aligns the hollow tube 98 longitudinally with the tube. To keep the curved surface 92 in close contact with the inner surface 94 of the tube, it is preferable to attach a torsion spring 68 to the central housing 66. As shown in FIG17, the purpose of the torsion spring 68 is to offset the central housing 66 against the inner surface 94 (i.e., the tube arch).
[0024] For smaller tubes, a single torsion spring 68 is sufficient. A single torsion spring 68 can be connected between the central housing and the base leg 70 and pre-compressed before insertion into the tube. Thus, when the torsion spring is released inside the tube, it biases the central housing 66 and the base leg 70 against the inner surface 94 of the tube. The base leg 70 preferably has a curved surface 92 that matches the inner surface 94, similar to that of the central housing 66.
[0025] As discussed in more detail below, more than one torsion spring 68 can be used to hold the central housing 66 against the inner surface 94. For example, instead of the base leg 70, a left arm (72) and a right arm (74) can be used. If the left arm (72) and the right arm (74) are used, they each preferably have a curved surface 92 that matches the inner surface 94, just like the central housing 66. Adjustable brackets can also be used to adjust the distance between the central housing 66 and the base leg 70.
[0026] A pair of mounting brackets 96 connected to the central housing 66 are used to hold the end of the hollow tube 98. Each bracket includes a rotatable bearing 54. A pair of shafts 38 connect the hollow tube 98 to the rotatable bearings 54, which rotatably suspend the hollow tube 98 between the pair of mounting brackets 96. By connecting the hollow tube 98 only to the rotatable bearings 54, the hollow tube 98 can rotate along its longitudinal axis. A keel counterweight 34 is connected to the bottom of the hollow tube, enabling the hollow tube 98 to vertically center itself. Preferably, a second chamber 102 is mounted to the hollow tube 98 and the keel counterweight 34 is positioned within the second chamber 102.
[0027] This invention enables pipe installation according to design plans and prevents accidental downward and / or tilted alignment. The invention transmits real-time data showing that the pipes are laid on the ground according to the design plans to pipe installers, site supervisors, and inspectors, and records this data for as-built plan printing. Excavation and installation can be adjusted based on readings from the pipe setting device.
[0028] One object of this invention is to enhance the construction quality required by conventional practices.
[0029] Another objective of this invention is to minimize construction delays.
[0030] Another objective of this invention is to reduce construction and inspection costs.
[0031] Another objective of this invention is to improve the accuracy and certainty of pipe installation.
[0032] Another objective of this invention is to mitigate the risk of disputes arising from deviations from the construction contract.
[0033] Another objective of this invention is to transmit printed as-built drawings in real time.
[0034] Another object of the present invention is a cost-effective quality control tool for pipeline installation, which can also transmit as-built plan data in real time. Attached Figure Description
[0035] Figure 1 – Existing Technology – Pipe Installation.
[0036] Figure 2 shows the deflection of the PVC pipe.
[0037] Figure 3 – Existing technology – Making every effort to install a single laser guide tube.
[0038] Figure 4A shows an embodiment of a pipe installation system layout for fixed-point installation.
[0039] Figure 4B shows an embodiment of the pipe installation system layout for installing the first new pipe section.
[0040] Figure 5 illustrates a preferred application of the present invention.
[0041] Figure 6 shows an embodiment of a double-lumen tube mounted on a central housing.
[0042] Figure 7 shows an end view of a double-lumen tube installed inside a pipe.
[0043] Figure 8 shows the cross section AA of Figure 6.
[0044] Figure 9 shows a top view of the electronic compartment.
[0045] Figure 10 shows a cross-sectional view of the electronic compartment.
[0046] Figure 11A shows a cross-sectional view of a preferred embodiment of a two-piece mounting housing for smaller tubes.
[0047] Figure 11B shows an end view of Figure 11A.
[0048] Figure 12A shows an end view of a preferred three-piece extendable mounting housing for installation inside a medium-sized pipe.
[0049] Figure 12B shows a top view of a preferred three-piece extendable mounting housing for medium-sized tubes in an unconstrained state.
[0050] Figure 12C shows an end view of a preferred three-piece extendable mounting housing for medium-sized tubes in an unconstrained state.
[0051] Figure 13A shows the end view CC of Figure 13B.
[0052] Figure 13B shows a cross-sectional view of a preferred two-piece extendable mounting housing for mounting large pipes inside a tube.
[0053] Figure 13C shows a side view of a preferred two-piece extendable mounting housing for large tubes in an unconstrained state.
[0054] Figure 14 shows the 2-cavity tube mounting accessory.
[0055] Figure 15 shows the mounting housing accessories.
[0056] Figure 16 shows the mounting housing accessories.
[0057] Figure 17 shows a cross-sectional view of an embodiment of the pipe installation device.
[0058] Figure 18 shows an end view of an embodiment of the pipe installation device in an unconstrained state.
[0059] Figure 19A shows a side view of a preferred three-piece mounting housing with a bellows suction cup and a handle.
[0060] Figure 19B shows a top view of Figure 19A in an unconstrained state.
[0061] Figure 19C shows an embodiment of the bellows suction cup and handle.
[0062] Figure 19D shows an embodiment of the bellows lip. Detailed Implementation
[0063] The key features of the invention will be clearly understood by referring to the accompanying drawings illustrating the methods and systems of the invention. It should be understood that such drawings depict preferred embodiments of the invention and should therefore not be construed as limiting the scope of other embodiments that can be considered with respect to the invention.
[0064] The present invention is specifically embodied in a system that assists in pipe installation based on a design plan. This system provides an as-built plan without requiring a third-party surveyor to verify each installed pipe on-site.
[0065] As shown in Figure 4, the preferred system 10 includes a pipe setting device 18 and a wireless control device 22. A fixed point 14 (measured x, y, z coordinates) serves as a reference point for the new pipe to be installed. The fixed point 14 is positioned to reference the first fixed pipe segment 16. The pipe setting device 18 is positioned on the next new pipe 20 to be installed. The wireless control device 22 communicates with the pipe setting device 18. The preferred use of the wireless control device is for remotely monitoring, processing, and recording as-built data.
[0066] The tube mounting device 18 is a device that includes a mounting housing. The mounting housing has four preferred embodiments—(1) a two-piece mounting housing, (2) a three-piece mounting housing, (3) a two-piece extendable mounting housing, and (4) a three-piece mounting housing with a bellows suction cup and a handle. All four embodiments are characterized by a central housing 66, which includes a surface 92 whose curvature matches the curvature of the inner surface 94 of the tube being mounted. Those skilled in the art will recognize that the tube mounting device 18 can operate without the curved surface 92; however, it is preferred.
[0067] All four embodiments of the mounting housing feature a central housing 66 (Figures 6 and 7). A pair of mounting brackets 96 are connected to the central housing 66. Each mounting bracket 96 includes a rotatable bearing 54. A hollow tube 98 for housing electronic components is suspended between the pair of mounting brackets 96 by a pair of shafts 38. By connecting the hollow tube 98 to the rotatable bearings 54, the hollow tube 98 can rotate along its longitudinal axis. A keel counterweight 34 is connected to the hollow tube to enable it to be vertically centered. Preferably, the hollow tube 98 has a circular cross-section, but other cross-sections are also feasible.
[0068] Alternatively, the bend level bubble tube 52 can be inserted in front of the center housing 66 to verify that the center housing is installed to the arch of the pipe.
[0069] Preferably, the second (or lower) chamber 102 is mounted to the hollow tube 98 and the keel counterweight 34 is positioned within the second chamber. This dual-chamber embodiment is a preferred embodiment of the hollow tube 98, and this embodiment is referred to herein as the "dual-chamber tube" 30. The dual-chamber tube 30 (Figures 6, 7, and 8) can be manufactured in many ways known in the art. A preferred method is to use injection-molded transparent plastic parts comprising a large hollow tube 98 (for housing the electronic compartment 32) and a small second chamber 102 (for housing the keel counterweight 34).
[0070] The hollow tube 98 may be longer than the second chamber 102. At each end of the hollow tube 98 is a cap 36. The cap 36 preferably has a central bore for receiving a shaft 38. The shaft 38 may engage with the central bore via a threaded connection, but other connections known in the art are also suitable. The cap 36 itself preferably engages with the end of the hollow tube 98 via a threaded connection (or other suitable connection) to externally seal the hollow tube 98.
[0071] Shaft 38 protrudes from cap 36 and can be housed by bearing 54. As shown in Figure 17, hollow tube 98 is rotatably supported at both ends by a pair of bearings 54 and can rotate freely about its longitudinal axis. Adding keel counterweight 34 to hollow tube allows hollow tube 98 to self-center in the vertical direction. When the central housing 66 is mounted near tube arch 104 and aligned with cover / rubber seal 86 (inside the tube tip), the free rotation of the bearings 54 (360°) allows the longitudinal axis of hollow tube 98 (or double-lumen tube 30) to be parallel to the longitudinal axis of the mounting tube.
[0072] An instrument panel with a width preferably equal to the inner diameter of the upper chamber is inserted into the hollow tube 98 to form an electronic compartment 32 (Figures 9 and 10), which houses (1) a 2-axis inclinometer 40, (2) a digital magnetic compass 42, (3) a single-board computer 46, (4) an SD memory card, (5) a WIFI transmitter 37, (6) an LED light, and (7) a battery 50.
[0073] The purpose of a 40-degree biaxial inclinometer is to measure longitudinal inclination. The measurement range of the biaxial inclinometer should be less than 3 degrees (0 to 5.45% slope), and the accuracy should meet the design and construction requirements.
[0074] The purpose of the digital magnetic compass 42 is to read the angle of the next new pipe 20. In addition, any discrepancies in the readings of the continuously laid pipes can also indicate the horizontal deviation of the connecting pipes (if any).
[0075] The single-board computer 46 and SD memory card can provide the following functions: (1) enabling users to input requirements according to construction drawings, (2) guiding installers to lay and set up pipes according to the input construction drawings, (3) recording the installation sequence, longitudinal slope and horizontal deflection angle of each pipe installed and sending the data to a wireless handheld device, and (4) providing data download to draw plan and section views of the pipes, while printing summary tables and identifying any deviations in construction accuracy that do not meet the requirements.
[0076] The purpose of the WIFI transmitter 37 is to transmit the collected data (including pipe laying sequence, slope, and geometric angles) to the wireless control device 22, which can track and subsequently be used to draw the as-built plan of the pipe.
[0077] The LED lights are located below the dashboard and can pass through the lower chamber and emit six different colors of light signals in front of the keel counterweight 34.
[0078] A mounting housing is a device for holding a tube setting system in place with a specific tube size. The central housing 66 can be interchanged between different embodiments of the mounting housing to accommodate different tube sizes for the same instrument compartment.
[0079] The mounting housing is characterized by an internal offset of the tube mounting device 18 against the tube to be mounted. The mounting housing of the present invention has four preferred embodiments: (1) a two-piece embodiment for smaller tubes (Fig. 11), (2) a three-piece embodiment for medium-sized tubes (Fig. 12), (3) a two-piece extendable embodiment for large tubes (Fig. 13), and (4) a three-piece mounting housing with a bellows suction cup and a handle (Figs. 19A to 19D).
[0080] In general, all preferred embodiments of the mounting housing (for various pipe sizes) have a central housing 66 with a curved bottom that matches the internal curvature of the laid pipe and bearings 54 for mounting two 360° sections. Preferably, the mounting housing is made of plastic, but other suitable materials are also feasible. For example, it is preferred that each plastic base be molded along the curvature of the target pipe or manufactured by 3D printing.
[0081] Figure 11 illustrates a preferred embodiment of the two-piece mounting housing. The two-piece mounting housing is preferably used for smaller diameter tubes. The two-piece mounting housing includes a central housing 66 connected to a torsion spring 68 and a base leg 70. These three parts (housing, leg, and spring) can be bent inwards to fit within the tube. When released within the tube, the torsion spring 68 applies a force to the housing 66 and the base leg 70, causing them to be biased against the inner surface 94 of the tube. Furthermore, the curvature of the central housing 66 and the base leg 70 helps to orient the mounting housing along the longitudinal axis of the tube. For this purpose, preferably, the base leg 70 has a similar shape and material to the central housing 66, but without the electronic compartment 32.
[0082] Typically, the smaller diameter tube is any tube less than 12 inches. In operation, the torsion spring 68 biases the bottom leg 70 against the bottom inner surface of the tube and the center housing 66 against the top of the tube. As shown, it is preferred to use two 90º torsion springs 68, but one may be suitable.
[0083] Figure 12 illustrates a preferred embodiment of the three-piece mounting housing. The preferred application of the three-piece mounting housing is for medium-diameter tubes. Typically, the diameter of a medium-diameter tube will be between 12 inches and 30 inches. The three-piece mounting housing includes a central housing 66, a left arm 72, a right arm 74, and at least two torsion springs 68. The two torsion springs 68 bias the left arm 72 and right arm 74, as well as the central housing 66, against the left inner surface, right inner surface, and top inner surface of the tube 82, respectively. The left and right arms have a similar shape and material to the central housing 66, but without the electronic compartment 32.
[0084] Figure 13 illustrates a preferred embodiment of the two-piece extendable mounting housing. The two-piece extendable mounting housing is preferably used for larger diameter tubes. Typically, the diameter of the larger diameter tube will be greater than 30 inches. As shown in Figures 13A to 13C, the two-piece extendable mounting housing includes a central housing 66, adjustable brackets 76, base legs 70, and torsion springs 68. Preferably, three pairs of torsion springs 68 are used, as shown. Furthermore, preferably, two adjustable brackets 76 are used between the torsion springs 68. The torsion springs 68 bias the central housing 66 against the top inner surface of the tube 82, and the torsion springs respectively bias the base legs 70 against the bottom of the inner surface of the tube 82. The torsion springs 68 are preferably helical 180-degree torsion springs passing through a central bore. The base legs have a similar shape and material to the central housing 66, but without electronic compartments. The adjustable brackets 76 consist of two retractable adjustable brackets (Figure 16).
[0085] Figure 19 shows a preferred embodiment of a three-piece mounting housing with a bellows suction cup and a handle. It can be used for tube diameters greater than 10 inches. The three-piece mounting housing with a bellows suction cup and a handle is a reinforced version of the three-piece mounting housing, adding a bellows suction cup 106 and a handle 112 where curved surfaces 92 are etched on the left and right arms to accommodate the bellows suction cup. The bellows lip 108 mates with the inner surface of the tube. Vacuum suction and release can be activated by pressing and releasing the suction level switch 110.
[0086] The legs of the torsion spring 68 can be threaded or unthreaded. Threaded legs can be connected or terminated via hexagonal connectors. Unthreaded legs can have retaining screw connectors for connection or termination.
[0087] The combination of the torque applied by the torsion spring 68 and the curvature of each base matching the curvature of the tube's interior allows the tube mounting device 18 to be installed and removed from the tube in a safe and easy manner. The torsion spring 68 biases the tube mounting device 18 against the inside of the tube 82 to hold the device in place.
[0088] The wireless control device 22 can provide remote processing and recording. The wireless control device 22 can be a mobile phone, a dedicated radio frequency (RF) controller, and / or other wireless devices (SD cards) with a processor and recording unit.
[0089] Preferred operation
[0090] Instead of the existing practice of setting up independent offline laser guidance for pipeline construction (see Figure 3), the measurement anchor point 14 is attached to the pipe installation device 18 placed within the first fixed pipe section 16 (see Figure 4).
[0091] The fixed point 14 for measurement forms the basis for configuring the geometry of the first fixed pipe segment 16, and the pipe installation device 18 is placed in the first fixed pipe segment 16 to verify and confirm the line and slope of the first installed pipe. Similarly, this also applies to continuing pipe installation from the last previously installed pipe.
[0092] Before placing the pipe setting device 18 onto the next new pipe 20, the single-board computer 46 in the electronic compartment 32 must be accessed via the wireless control device 22 by entering the end station number (whether high or low), the design plan slope, the pipe length, and the horizontal deflection angle of the pipe joint and station (if applicable).
[0093] Data input
[0094] (1) In order to begin operation, the pipe setting device 18 must start from a measuring fixed point where it can be tied to the new pipe to be installed.
[0095] (2) Input the starting height of the fixed point 14 to be measured.
[0096] (3) Input the starting station as shown on the design plan for the fixed point and / or the last completed pipe section.
[0097] (4) Input whether the new pipeline station is a station to be reduced or added from the station at the fixed point and / or the last installed pipeline section.
[0098] (5) Input tube manufacturing length (from the matching mark installation)
[0099] (6) Input the design pipe slope.
[0100] (7) Input the horizontal deflection angle of the pipe fitting and station (if any).
[0101] Installation pipe setting device
[0102] For example, to install the three-piece mounting housing, the user will turn down the left arm 72 and right arm 74 of the setting device 18 and pinch / pull towards the center housing 66. The user then inserts the setting device 18 into the tube 82 beyond and close to the rubber seal 86 (Figures 15, 1501 and 1502), bends the level bubble tube 52 to align with the tube arch, and then the user releases the setting device mounting arm against the inner tube 82.
[0103] The 360° bearing 54 and the keel counterweight align the double-lumen tube 30 with the tube 82. When the horizontal reading is horizontal and there is no movement, the longitudinal reading of the biaxial inclinometer will be the slope of the inner bottom of the tube.
[0104] LED 84 can emit five different colors of light, which signal the pipe status to the pipe installer.
[0105] A flashing red indicator shows that the pipe slope is steeper than the target slope. Upward adjustment measurements in two-digit decimal inches are also sent to the wireless control unit 22.
[0106] A flashing yellow indicates that the pipe slope is gentler than the target slope. Downward adjustment measurements in two-digit decimal inches are also sent to the wireless control unit 22.
[0107] A flashing blue indicator shows the tube is tilted to the left. Adjustments to the right, measured in two decimal inches, are also sent to the wireless control unit 22.
[0108] A flashing purple indicator shows the tube is tilted to the right. The left adjustment distance, indicated by two decimal places in inches, is also sent to the wireless control unit 22.
[0109] During the tube setup process, the dual-lumen tube is not stationary; the longitudinal slope calculated by the onboard program remains constant despite the oscillation. If the longitudinal slope remains constant, the flashing green light indicates that the tube setup is correct.
[0110] Once the dual-chamber tube is stationary and data is confirmed to be received from the wireless control device, the LED will turn into a non-flickering green light.
[0111] Calculate the as-built plan
[0112] Data is stored on a single-board computer 46 within the pipe setting device 18 and transmitted to a wireless control device 22 or transferred off-site. Wherever it is located, the data can be downloaded for CADD drawing and used for comparison with design floor plans.
[0113] The wireless control device 22 can be a mobile phone and / or wireless unit programmed to receive target lines and slopes from each design plan, as well as site data. For as-built plan preparation, stored construction data can be downloaded for CADD (CAD / CAD) drawing. The data can then be shared with the construction supervisor and the owner's engineers.
[0114] benefit
[0115] This invention provides a construction quality control tool that enables owners and contractors to meet design plans and specifications.
[0116] Easy to install and remove
[0117] By easily measuring pipe slope, eliminating the need for on-site surveyors, and quickly transmitting printed data in real time for third-party inspectors to prepare as-built plans, it saves time and costs for both parties' budgets. If contractors follow design and construction specifications, approximately $50,000 in labor costs can be saved per mile of sewer piping installed.
[0118] While the present invention has been described in summary and in detail according to specific embodiments and applications, such description is not intended to limit its scope in any way to any such embodiments and applications, and it should be understood that many changes, substitutions and modifications can be made to the embodiments, applications and details of the methods and systems described herein and their operation without departing from the spirit of the invention.
Claims
1. A pipe installation device for underground pipeline construction, comprising: A central housing, the central housing including a curved surface for abutting the inner surface of the tube; A pair of mounting brackets are connected to the central housing, each mounting bracket including a rotatable bearing; A hollow tube for housing electronic components, the hollow tube being suspended between a pair of mounting brackets by means of a pair of shafts connected to the rotatable bearing, wherein the rotatable bearing allows the hollow tube to rotate along a longitudinal axis; and A counterweight is attached to the hollow tube to center the tube in the vertical orientation. The hollow tube includes electronic components selected from the group consisting of a 2-axis inclinometer, a digital magnetic compass, a single-board computer, an SD memory card, a WIFI transmitter, and a battery.
2. The tube mounting device according to claim 1, further comprising a mobile device for remote data communication with one or more of the electronic components.
3. The tube setting device according to claim 1 further includes a second chamber installed in the hollow tube, the second chamber including the counterweight.
4. The tube setting device according to claim 1 further includes a first torsion spring connected to the central housing to offset the curved surface against the inner surface.
5. The pipe setting device according to claim 4 further includes a base leg, the base leg being connected to one end of the first torsion spring.
6. The pipe setting device according to claim 4 further includes a second torsion spring, an adjustable bracket, and a base leg, wherein the first torsion spring is connected to the adjustable bracket, and the second torsion spring is connected between the adjustable bracket and the base leg.
7. The tube setting device according to claim 4 further includes a left arm, a second torsion spring, and a right arm, the left arm being connected to the first torsion spring, and the second torsion spring being connected between the central housing and the right arm.